2nd payment CERTIFICATE(0)
2nd payment CERTIFICATE(0)
Description
------------------------------------------- ---------------------------------------
P. Supervisor Contractore
Take of sheet 2
------------------------------------------- ---------------------------------------
P. Supervisor Contractore
Take of sheet 3
###
6.2.apply 3coat of anti rest
------------------------------------------- ---------------------------------------
P. Supervisor Contractore
Take of sheet 4
08;Eletrical Instalation
08;1, flash mounted distribution board
2pcs 16AMP ABC 1phase
------------------------------------------- ---------------------------------------
P. Supervisor Contractore
Take of sheet 5
Description Description
A. Sub Structure
1. Excavation & Earth Work
2. Concrete
8
0.5 4 2.1. lean concrete
1.2 excavation to adjest level depth 40cmof 3 2.2. 15cm thick mass concrete
3 9
1.3 excavation of trench foundation at the depth
100cm starting from NGL
3. Masonary wall
3.1 50cm thick masonary wall
8 BNGL
1.4 back fill under hard core and around stone
masonary with selectewd
0.5
0.6 2.4
------------------------------------------- ---------------------------------------
P. Supervisor Contractore
Take of sheet 6
0.4 1.6
around masonary wall
3
1.5 deep burrow excaveted material 2 6 3.3. 30cm thick tid slab
B. Supper structur
4.concrete work
4.1 RC c-25,360kg cement/m3
5. HCB wall work
###
a) for R.C columen 5.1 20x20x40cm HCB wall
2 20.8
2.8 116.48
###
b) in R.C top tie beam and lintel 4 6.05
2.8 67.76
1 7.9
### 2.8 22.12
5 2.17 dito opning
0.9 9.765
4 1.8 7.2
------------------------------------------- ---------------------------------------
P. Supervisor Contractore
Take of sheet 7
###
6. Roofing
### 2 23 G-30 galvanied corrugated
iron roofing fixed to 5x7cm
c/side windo sill
4.2 193.2
###
23 6.2. 0.4mm flashing
------------------------------------------- ---------------------------------------
P. Supervisor Contractore
Take of sheet 8
total
12. painting
###
------------------------------------------- ---------------------------------------
P. Supervisor Contractore
Take of sheet 9
###
###
###
###
###
###
###
13. ditch
### 13.1 pre-cast half concrete pipe open ditch
###
------------------------------------------- ---------------------------------------
P. Supervisor Contractore
Take of sheet 10
###
###
dito opning
###
------------------------------------------- ---------------------------------------
P. Supervisor Contractore
Take of sheet 11
###
###
------------------------------------------- ---------------------------------------
P. Supervisor Contractore
Take of sheet 12
###
05;1, 4mm thick clear glass 14
### 6.4 89.6 06;3, cement screed
179.2 total
###
### 221.5 06;4, cement skerting
### 126
20.4
6.4 130.56
### 256.56 m2
------------------------------------------- ---------------------------------------
P. Supervisor Contractore
Take of sheet 13
### 48.4
###
08;Eletrical Instalation
###
7. Painting 08;1, flash mounted distribution
board
75 flourecent
###
13 08;3, ditto item above but
including flush mounted switches
button fell though conductor of
2*0.8m in coundiut of 13mm
###
------------------------------------------- ---------------------------------------
P. Supervisor Contractore
Take of sheet 14
###
dry latrin
A. Sub Structure
1.excavation & earth Work 13.9 3. masonary work
0.4 3;01, 40cm thick masonary wall
average height of 20cm 3.8 21.128
pit excavation to adjust level 150cm 13.9 3;02, ditto but above NGL
0.4
0.4 2.224
------------------------------------------- ---------------------------------------
P. Supervisor Contractore
Take of sheet 15
0.375
cart awey surplus excaveted material 4 1.5
a) foundation beam & groud floor slab 3.2 4.2, CIS roofing
3.6 11.52
4.03, Eucalyptus truss
------------------------------------------- ---------------------------------------
P. Supervisor Contractore
S
4.Penality
6. Other 0.00
TOTAL 127935.98
P.Supervisor
Payment Certificate
P.O.Box
Certificate of Payment No1
For measurement Certificate No1 Amount (Birr)
Main cont. 11,474,752.52
Project:- Garmadu Rehabilitation pond Work Supplementary cont.1
Client:- Oromia Region Guji zone Gorodola woreda Water aSupplementary cont.2
Location:-Harekelo town Variation O.No. 1
Part of project:- Rehabilitation pond Variation O.No. 2
ContractorLiben Lark water work TOTAL SUM 11,474,752.52
According to supervior (s) of the works ___________________________ certificate of measurement dated __________the
3 2nd 4.Penality
5.Advance 1110618.02
6. Other 0.00
TOTAL 5656240.32
Cetified By Approved By
P.O.Box
Certificate of Payment No2
For measurement Certificate No2 Amount (Birr)
Main cont. 31,000.00
Project:- Health Post Supplementary cont.1 8,739.00
Client:- Oromia Region Guji Zone Seba boru Wareda Health Office Supplementary cont.2
Location:- Haragessa kebele Variation O.No. 1
Part of project:- Heath Post Variation O.No. 2
Contractor:-Balitu Con. Int. TOTAL SUM 39,739.00
According to supervior (s) of the works ___________________________ certificate of measurement dated __________the value of the work executed
3 4.Penality
5.Advance 9300.00
6. Other 0.00
TOTAL 21346.97
Cetified By Approved By
According to supervior (s) of the works ___________________________ certificate of measurement dated __________the value of the work executed
3 4.Penality
5.Advance 9300.00
6. Other 0.00
TOTAL 21258.44
Cetified By Approved By