0% found this document useful (0 votes)
22 views1 page

Electricity Bill for Govt College

This document is a billing statement from the Office of the Assistant Executive Engineer for a government college's electricity usage for the period from January 12, 2025, to February 12, 2025. The bill shows a total amount due of Rs. 930.00, with no recorded electricity consumption during the billing period and a due date of February 26, 2025, before disconnection on March 13, 2025.

Uploaded by

pavitrajadhav555
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
22 views1 page

Electricity Bill for Govt College

This document is a billing statement from the Office of the Assistant Executive Engineer for a government college's electricity usage for the period from January 12, 2025, to February 12, 2025. The bill shows a total amount due of Rs. 930.00, with no recorded electricity consumption during the billing period and a due date of February 26, 2025, before disconnection on March 13, 2025.

Uploaded by

pavitrajadhav555
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Office of the Asst. Executive Engineer (Ele.

), C, O&M Section -SUNTIKOPPA

RR No Account ID Bill No Billing Period Bill Date Due Date Disconnection Date
SL45654 C243211427 1234204252120076 12-Jan-2025 to 12-Feb-2025 13-Feb-2025 12:05 26-Feb-2025 13-Mar-2025

Tariff LT1-Rural Registration Date N\A


Contract
Demand( 0 Average Units 0
KVA)
90 % of
0 Entitlement Units 0
CD(KVA)
Recorde
Name & Address: PRINCIPAL-GOVT COLLAGE,COMPUTER ROOM d
0
Demand
Power Cut Energy Entitlement
(KVA) 0
Demand Entitlement
Billing
Demand 1
(KVA)
Sanc 0.480 kW + 0.000
Wheeling Energy 0
Load HP
Meter Readings for New Meter ID:27055936 and Meter Status: NORMAL
Description Date KWH Meter Kvah Meter MD Meter Recorded PF
Present Reading 12-02-2025 3269 0 0.0100 0
Previous Reading 12-01-2025 3269 0
Difference 0 0
Meter Constant 1 1 1
Consumption 0
SubMeter Consumption 0
Wheeled Consumption(Captive) 0
Wheeled Consumption(Non Captive) 0
Total Wheeled Consumption 0
Slow Reading Consumption 0
Meter Change Units 0
Net Consumption 0 0 0.01

Your Detailed Bill


Amount (Rs.)
Description
Arrears 930.00
Net Payable Amount 930.00

Amount In words Nine Hundred and


Thirty Rupees only

Sd/- Asst Executive Engineer(Ele.)

You might also like