0% found this document useful (0 votes)
28 views1 page

Lahmeyer India Approval Status Document

The document outlines the approval status for Lahmeyer International India Pvt. Ltd. as either approved, approved as noted, commented, or received for information/reference. It emphasizes that these statuses do not relieve the contractor from their contractual obligations. The approval was signed by Ujjwal Roy on July 19, 2014.

Uploaded by

bk kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
28 views1 page

Lahmeyer India Approval Status Document

The document outlines the approval status for Lahmeyer International India Pvt. Ltd. as either approved, approved as noted, commented, or received for information/reference. It emphasizes that these statuses do not relieve the contractor from their contractual obligations. The approval was signed by Ujjwal Roy on July 19, 2014.

Uploaded by

bk kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

LAHMEYER INTERNATIONAL INDIA PVT. LTD.

CONSULTING ENGINEERS GURGAON INDIA

APPROVAL STATUS:

1. APPROVED
2. APPROVED AS NOTED
3. COMMENTED
4. RECEIVED FOR INFORMATION/REFERENCE
THIS APPROVAL STATUS SHALL NOT RELEIVE THE CONTRACTOR FROM HIS CONTRACTUAL
OBLIGATIONS.

DEPARTMENT: DATE: SIGNATURE:

DEI 19-07-2014 NAME: UJJWAL ROY

( )