Comments Resolution Sheet - CRS
RED_SEA_PROJECT
General Information
Doc or Dwg Title OCS Date
CCTV Pole Foundation
Program R12 Engineer in Charge Marvin Geraldo 26-Dec-2023
Details
Project Stage OCS Rev. R12-S07C01-RCO-XX-XX-SDW-
Project/Asset R12-S07C01 Construction C2 OCS Ref. No.
ST-40002
Reviewer's Identification of Comment's Reference No. of Doc. or Drwg. Assessment Sign-Off
S/N Observations|Comments Discipline Response
Name/Organization Source: (Title|Page|Clause) (Include Revision) Code (Open/Closed)
See comments/corrections on the attach copy of Shop
Drawing for CCTV Pole Foundation Details. - The
Approval of shop drawing is subjected to approval of
B | Accepted
Structural Design Calculation of CCTV Pole Foundation. - R12-S07C01-RCO-XX-XX-SDW- Comments are incorporated in the
1 S Ali | ATKINS N/A Structural with Open
It is Noted as Design and Build project, the responsibility ST-40002 (C2) revised drawing.
Comments
of the contractor to design & deliver functional and
operational systems that comply with codes
requirements and contract.
MAT reference are provided. Pole will
B | Accepted
In general notes: - For No. (4) provide reference for R12-S07C01-RCO-XX-XX-SDW- be Hot Dipped Galvanized. Material
2 O Alshebi | RSG N/A Structural with Open
approved MAT to be used as corrosion protection. ST-40002 (C2) specifications of Pole are same with
Comments
SUDC.
B | Accepted
Shown depth of embedment for anchors on the R12-S07C01-RCO-XX-XX-SDW-
3 O Alshebi | RSG N/A Structural with Provided on the revised drawing. Open
drawings. ST-40002 (C2)
Comments
Refer to SC comments. Approval of submittal by RSG is
subject to successfully closing above stated comments
B | Accepted
and shall not relieve the contractor of its obligations to R12-S07C01-RCO-XX-XX-SDW-
4 T Poppema | RSG N/A Structural with Noted. Refer to above response and rev Open
design, construct, perform and complete the work in ST-40002 (C2)
Comments
strict accordance with the contract documents and
project requirements.
TRS-DC-FRM-0008 Page 1 of 1
Rev. 00, 16 Nov 2022 # CLASSIFICATION: INTERNAL SENSITIVE
General Notes
1. ALL DIMENSIONS USED HEREIN ARE IN MILLIMETERS (MM)
UNLESS OTHERWISE SPECIFIED;
3MM THK.
PLATE COVER 2. REFER TO ELECTRICAL DRAWINGS FOR LOCATIONS OF CCTV
POLE;
3. REFER TO R12-S07C01-RCO-MAT-IC-0003 FOR MATERIAL
SUBMITTAL OF CCTV CAMERA;
4. REFER TO R12-S07C01-RCO-MAT-IC-0015 FOR MATERIAL
SUBMITTAL OF CCTV POLE;
5. REFER TO R12-S07C01-RCO-CAL-ST-0012 FOR APPROVED
200
12-12MMØ VERTICAL BARS STRUCTURAL DESIGN CALCULATION;
6. CONCRETE COMPRESSIVE STRENGTH OF FOUNDATION
CCTV CAMERA IS 35 MPA SRC;
7. ALL CONCRETE SURFACE IN CONTACT WITH SOIL WILL BE
APPLIED WITH 2 COATS OF BITUMINOUS PAINT;
8. ALL STEEL REINFORCEMENT BARS IS GRADE 60;
400 X 400 X 700MM
RC FOUNDATION PEDESTAL,
35 MPA (SRC)
3" (88.9MM) x6.8MM THK.
400
HOT DIP GALVANIZED POLE
2000
10MMØ @ 200MM O.C. TIES
4-STIFFENERS
PL 70x70x6
CCTV POLE
16MMØ X 400MM LONG
HDG ANCHOR BOLTS
400
COLUMN/FOOTING C2
C1
26.12.2023
10.04.2023
ISSUED FOR APPROVAL
ISSUED FOR APPROVAL
RCO
RCO
DETAIL (PLAN) Rev. Date Reason For Issue Chk
400 X 400 X 700MM RC
PEDESTAL FOUNDATION, SHOP DRAWING
35 MPA (SRC) Key Plan.
16MMØ X 400MM LONG CCTV POLE
400
300
200
HDG ANCHOR BOLTS
300 X 300 X 10MM THK.
20 x 20MM CHAMFER STEEL BASE PLATE (HDG)
ALL CORNERS
25MM HIGH STRENGTH
NON-SHRINKAGE GROUT
100 (THREAD)
FOR LEVELING
300 X 300 X 10MM THK.
STEEL BASE PLATE
200 400 X 400 X 700MM RC
4000
350 (EMBEDMENT)
PEDESTAL FOUNDATION,
300 35 MPA (SRC)
400
400
12-12MMØ VERTICAL
700
BARS
BASEPLATE DETAIL
(PLAN)
4" (114.3MM) x6.2MM THK. 10MMØ @ 200MM O.C. TIES
HOT DIP GALVANIZED POLE
2000
100
100MM THK.
LEAN CONCRETE
400
600
CABLE ACCESS DOOR
(300x80)
COLUMN/FOOTING
DETAIL
(ELEVATION)
**** Consultant
16MMØ X 400MM LONG
ANCHOR BOLTS (HDG) MATERIALS
300 X 300 X 10MM THK.
STEEL BASE PLATE (HDG)
DENSITY OF CONCRETE = 24 KN/M3
300
Main Contractor:
25 MM. HIGH STRENGTH
NON-SHRINKAGE GROUT
FOR LEVELING
fcu = 35 MPA A L R A E E L
ENGINEERING
CONSTRUCTION &
fy = 414 MPA DEVELOPMENT CO.
F.G.L. L T D , K S A
3
BLINDING CONCRETE = 20 KN/M Client
3
400 X 400 X 700MM
DENSITY OF STEEL = 78.5 KN/M
RC COLUMN/FOOTING,
35 MPA (SRC)
fy (columns & beams) = 355 MPA Project
fy (steel plates) = 275 MPA START-UP DISTRIBUTION
700
FACILITY CENTER (SUDC)
CONCRETE SURFACE IN
CONTACT WITH SOIL WILL
BE PAINTED WITH 2 COATS
COVER TO REINFORCEMENT Drawing Title
CCTV POLE
OF BITUMINOUS PAINT
FOUNDATION DETAILS
CLEAR COVER TO ALL REINFORCEMENT SHALL BE AS FOLLOWS -
UNLESS SHOWN OTHERWISE:- -
Model Reference:
XXXXX
100MM THK.
LEAN CONCRETE
FOUNDATIONS = 75mm EARTH FACES, 50mm OTHER FACES
Drawn By Checked By Approved By
ARCCO ARCCO ARCCO
ELEVATION 400 250 MICRON Project No Issue Date Scale at ISO A0
POLYETHYLENE SHEET ALL LAP &ANCHORAGE LENGTHS SHOULD NOT LESS THAN 60 D R12-S07C01 26.12.2023 N.T.S.
600 WELL COMPACTED SOIL, Drawing Number Revision
95% MIN. MDD R12-S07C01-RCO-XX-XX-SDW-ST-40002 C2