ENVIRONMENTAL AUDIT CHECKLIST
PROJECT: 2040 AHAFO NORTH
ISSUED TO CONTRACTOR MANAGER: DANIEL IDUN ANDY-ANDOH( 2MA PRIME, PROJECT MANAGER)
POSITIVE OBSERVATIONS:
1 Spill kits available and accessible.
2 Trenches free of fauna trapped
3 Automatic shutdown button for fuel dispenser in place.
4 Dust suppression activity being performed
5 Work areas kept tidy
6 Transfer hose shows no sign of leakage and defect
RECOMMENDATIONS AND CORRECTIVE ACTIONS:
Ref: Details By Who By When Status
3.2 Dispose brushes at approved topsoil dump. Daniel Idun-Andy - Andoh 21-Mar-25 Open
3.5 Repair cracks on water bowser. Daniel Idun-Andy - Andoh 21-Mar-25 Open
Maintain a purpose built waste facility with appropriate
5.1 Daniel Idun-Andy - Andoh 21-Mar-25 Open
barricade and signages.
5.3 Provide and make available adequate waste bins. Daniel Idun-Andy - Andoh 21-Mar-25 Open
5.5 Segregate recyclable plastic waste from general waste. Daniel Idun-Andy - Andoh 21-Mar-25 Open
5.6 Provide a labelled waste bin for hazardous waste. Daniel Idun-Andy - Andoh 21-Mar-25 Open
Provide disposal records for segregated hazardous waste
5.7 Daniel Idun-Andy - Andoh 21-Mar-25 Open
disposed.
5.8 Provide ablution facility for workforce. Daniel Idun-Andy - Andoh 21-Mar-25 Open
6.13 Provide chemical register. Daniel Idun-Andy - Andoh 21-Mar-25 Open
6.14 Provide checklist for spill equipment Daniel Idun-Andy - Andoh 21-Mar-25 Open
9.1 Maintain a notice board and display environmental issues on it. Daniel Idun-Andy - Andoh 21-Mar-25 Open
Conduct environmental awareness training(hydrocarbon
management, waste management, spill response, secondary
9.2 Daniel Idun-Andy - Andoh 21-Mar-25 Open
containment etc.) for personnel and provide evidence of
training
No hardcopies available. Provide and display hard copies of
9.3 SOPs, Environmental Policy and make Environmental Daniel Idun-Andy - Andoh 21-Mar-25 Open
management plan accessible in hardcopy form
ACTION STATUS UPDATE REQ: NEXT PROGRESS MEETING
DATE OF UPDATE: 19-Mar-25
BY WHOM: Daniel Idun Andy - Andoh
DATE COMPLETED: 21-Mar-25
APPROVED BY: Sean Cremin
DATE :
BRM-FRM-054_0 Environmental Audit_140325-
Printed 14/03/2025 - Uncontrolled if Printed Page 1 of 1 Lycopodium