General Post Pour & Repair
General Post Pour & Repair
Field Control Inspection Checks – control measures requiring inspection, check and signoff will be identified using ” ✓ “ indicator in either the “PRE-WORKS” or
“DURING” works columns within the “Action(s) Complete/Control in Place” column as appropriate. Inspections and checks are related to the stated control
measures per “job/task”.
“Job/Task” steps that do not show an inspection/check, i.e. no cross indicated in box “ “ do not require formal inspection check or signoff but should be
referenced / observed and considered during inspections activities.
Title:
Document No.: ASIACMSID-4-481
Version: 2.0 Date Published: 08/04/2019
Management System – Uncontrolled Documents when Printed Page 1 of 9
Leighton Asia
Name: Camille Tolentino Name: Jeffrey Fernandez Name: Manuel Asumen Name: Glenn Reponte Name: Name:
Title: Site Engineer Title: Site Engineer Title: Foreman Title: Foreman Title: Title:
Contact: 0920-3605128 Contact: 0949-1017790 Contact: 0927-9521124 Contact: 0938-0793528 Contact: Contact:
Signature: Signature: Signature: Signature: Signature: Signature:
Title:
Document No.: ASIACMSID-4-481
Version: 2.0 Date Published: 08/04/2019
Management System – Uncontrolled Documents when Printed Page 2 of 9
Leighton Asia
Title:
Document No.: ASIACMSID-4-481
Version: 2.0 Date Published: 08/04/2019
Management System – Uncontrolled Documents when Printed Page 3 of 9
Leighton Asia
Adverse weather condition Unfamiliar with • Ensure all access way are clear of
2
emergency response any obstruction. ✓
during sudden • Limit materials stored on low lying
flashflood areas where immediate removal is
critical.
• Close coordination with other site
teams for current weather condition,
stop activity when heavy rain pours
and immediate evacuation to higher
ground shall commence.
• Lifting and working at heights activity
cease, all boom/jib retracted, basket
and other similar shall be lowered on
ground.
• Barriered off all access way when
affected by sudden flood.
• Standby life buoy (with rope
attached), life vest / life jacket.
• Change management procedure
shall commence if any changes
required when work area become
affected.
Title:
Document No.: ASIACMSID-4-481
Version: 2.0 Date Published: 08/04/2019
Management System – Uncontrolled Documents when Printed Page 4 of 9
Leighton Asia
Set up of cherry picker • Collision with • Conduct regular pre-start briefing and
4
(If using cherry picker verify if equipment is in good working ✓
another equipment /
for rectification) worker hit by condition.
equipment. • Provide safety barricade and signage
• Fire / Explosion for working area.
• Provide adequate lighting (for night
works) and spotter to guide the
cherry picker for set-up and during
operation.
• Conduct regular inspection on cherry
picker engine and oil leaks.
Title:
Document No.: ASIACMSID-4-481
Version: 2.0 Date Published: 08/04/2019
Management System – Uncontrolled Documents when Printed Page 5 of 9
Leighton Asia
Title:
Document No.: ASIACMSID-4-481
Version: 2.0 Date Published: 08/04/2019
Management System – Uncontrolled Documents when Printed Page 6 of 9
Leighton Asia
Title:
Document No.: ASIACMSID-4-481
Version: 2.0 Date Published: 08/04/2019
Management System – Uncontrolled Documents when Printed Page 7 of 9
Leighton Asia
Title:
Document No.: ASIACMSID-4-481
Version: 2.0 Date Published: 08/04/2019
Management System – Uncontrolled Documents when Printed Page 8 of 9
Leighton Asia
Remarks/Comments
Note: Please issue the completed copies to Safety Department for filing
Title:
Document No.: ASIACMSID-4-481
Version: 2.0 Date Published: 08/04/2019
Management System – Uncontrolled Documents when Printed Page 9 of 9