GROUP NAME – Super mario
1. we are tasked with managing the
development of a sport meet event
management system. In this
context
#so first these are the things we are
looking for –
1. printing certificates
2. registration
3. multi media task
4. find out who are the students are
enrolled for events
5. decorate and get ready for the
welcoming event of the main event
6. make the ground for that suitable
event with appropriate
7. we have to get the trophies for the
end of the event to give to the
winners.
`
And the second question is
2. Define the scope quality triangle
parameters (scope, time and cost)
for the sports meet management
system
First , Meet Event Management System
The Sports Meet Event Management
System is designed to streamline the
planning, execution, and management
of sports events. It includes key features
such as event scheduling, participant
registration, venue allocation, result
tracking, live updates, and reporting.
The project timeline is estimated at 8–
12 months, covering phases like
requirement gathering, system design,
development, testing, and deployment.
The cost depends on team size,
technology stack, and infrastructure,
with an estimated budget of $50,000 –
$100,000 for development, plus
additional expenses for hosting,
integrations, and maintenance.
3. After the development , the client
requests to generalize the system for
all types of event management,
rather than just sports events.
Discuss how this change affects the
scope, time and cost. How would you
adjust the scope -quality triangle to
accommodate this new request ?
#so this is it , first we are looking for
Impact of Expanding to a General Event
Management System
Expanding the Sports Meet Event
Management System to support all
types of events significantly increases
scope, time, and cost.
• Scope Increase: The system must
support corporate, academic, and
entertainment events, requiring new
features like custom registration,
ticketing, multi-event handling, and
advanced reporting.
• Time Impact: Development will
take longer due to requirement changes,
system redesign, and additional testing.
• Cost Increase: More resources are
needed for development, testing, UI/UX
redesign, and integrations.
So that’s it guys, thank you, for
listening to this
Contribution list
Rithil Nimsitha – 34392
HDSHS Hathurusinghe – 34768
SG Hewapathirana – 35663
KADR Thulnith – 35198
PVSH Peiris – 34713
WCMH Wickramasinghe – 34516
DVW Kannangara – 34872