MARATHON PETROLEUM COMPANY LLC
Project Number: 161611
Vendor Documents - Current Issue Status
Sub Eng
File Name Description Type Rev Submitted Returned Act Trans #
Project 161611
Contract: CTL-0401B Vendor: Lin & Associates, Inc. Avery Fliger
05. 01 33 24-B-CTL-0401B includes Dates from VDR required docs 0 12/13/2024 12/15/2024 F 21190
24-3247 Marathon Illinois DCS Rail Questions to go with Progress Report - 12/03/2024 12/03/2024 F 21012
3247 - Marathon Illinois DCS Project Progress Report 1 12/03/2024 12/03/2024 F 21012
3247 - Marathon Illinois DCS Feb Progress Report 0 02/04/2025 02/04/2025 F 21788
3247 - Marathon Illinois DCS Progress Report 5 03/13/2025 03/13/2025 F 22217
C300 Database IFR Merox C300 Database Issued For Review 0 01/21/2025 02/04/2025 A 21555
C300 Template Review C300 Template Review 0 01/10/2025 01/23/2025 A 21453
COMMUNICATION MATRIX L&A added info into Communication Matrix - 12/03/2024 12/03/2024 F 21012
Factory Acceptance Test Procedures FAT Testing Document 1 02/19/2025 03/02/2025 A 21967
Graphics Merox Graphics Issued For Review 1 02/19/2025 03/02/2025 B 21967
Graphics_Post_FAT Post FAT approved graphics 1 03/13/2025 03/13/2025 A 22217
Marathon Illinois DCS Configuration L&A Preliminary Schedule 1 12/03/2024 12/03/2024 F 21012
Software FAT Signoffs from Software FAT 0 03/13/2025 03/13/2025 A 22217
VDR Info Added L&A Comments 1 12/13/2024 12/15/2024 F 21190
Submittal Types Action Codes - See Spec 01330
IFR - Issued for Review A: Submittal Approved
IFC - Issued for Construction B: Submittal Approved As Noted (Resubmit)
IFI - Issued for Information Only Proceed with fabrication or procurement
CCR - Issue Conforming to Construction C: Submittal Returned For Revision (Resubmit)
Records Do not proceed
D: Submittal Not Approved (Submit Anew)
E: Preliminary Submittal
F: For Reference, No Approval Required
G: Distribution Copy (Previously Approved)
Report Run Time: 10:57 PM 03/17/2025