100% found this document useful (1 vote)
3K views5 pages

Memo To DTCP - SLA For TDR Certificate Issue-13!03!25

The Government of Andhra Pradesh has issued a memo detailing the timelines for the issuance of Transferable Development Rights (TDR) certificates through an online portal. Specific timeframes have been set for various functions and approvals to ensure timely processing and avoid delays. The memo emphasizes that manual applications for TDRs will not be accepted and outlines the responsibilities of officials involved in the process.

Uploaded by

Raghu
Copyright
© Public Domain
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
3K views5 pages

Memo To DTCP - SLA For TDR Certificate Issue-13!03!25

The Government of Andhra Pradesh has issued a memo detailing the timelines for the issuance of Transferable Development Rights (TDR) certificates through an online portal. Specific timeframes have been set for various functions and approvals to ensure timely processing and avoid delays. The memo emphasizes that manual applications for TDRs will not be accepted and outlines the responsibilities of officials involved in the process.

Uploaded by

Raghu
Copyright
© Public Domain
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

MAU01-MUNA/201/2025-M I/3996132/2025

GOVERNMENT OF ANDHRA PRADESH


MUNICIPAL ADMINISTRATION & URBAN DEVELOPMENT (M)
DEPARTMENT

Memo.No.2727066/M2/2025 Dated.13-03-2025

Sub: MA&UD Dept. – DT&CP., Mangalagiri - Transferable Development


Rights (TDR) - Functionary wise Time lines fixed for issuing of TDR
certificate - Instructions - Issued - Reg.

Ref: 1. G.O.Ms.No.4 of MA&UD Dept., dt:09.01.2025.


2.From the DT&CP., A.P., Mangalagiri, Lr.RoC.No.MAU03 -17/
81/2018-PLG-DOTCP, dated.13.02.2025.

****
In the reference 1 st
cited, the Government have issued amendments to
the A.P.Building Rules – 2017, wherein it is stated that detailed guidelines
governing the rules for disposal of TDRs through online portal by ULBs/UDAs
the SLA period will be fixed separately for each member. Wherein it is further
stated that the deemed provision shall be enabled in the Online portal. In
case of the deemed approval, if it is found at later date that the TDR is issued
erroneously, the concerned will be held responsible and liable for disciplinary
action. Further, if any of the Committee members reject the proposal without
proper justification and recording the reasons it shall not be considered.

2. Subsequently, in the reference 2 nd cited, the DT&CP., Mangalagiri has


proposed the timelines so as to dispose of the files within the specified
timelines.

3. Government, after careful examination of the matter, hereby issue the


following timelines (SLA period) for disposal of the TDRs through online portal
by all ULBs/UDAs to avoid delay in the issuance of the TDR as well in the
interest of the public.

1. Pre-verification/Scrutiny of Application and approval of Commissioner to


place before Scrutiny Committee/Paper Notification: 15 days

Urban Local Bodies


Time
Total
Sl.No Grade of ULB Designation period in
period
days
TPBO / TPS 6
Nagar Panchayats / III Grade / II Grade 15
1 TPO 5
/ I Grade Municipalities days
Commissioner 4
TPBO / TPS 6
MAU01-MUNA/201/2025-M I/3996132/2025

Special / Selection Grade TPO 4 15


2
Municipalities ACP 3 days
Commissioner 2
TPBO 4
/TPS/TPO 15
ACP 3 days
3 Municipal Corporations Dy.C.P 2
C.P 2
CCP 2
Commissioner 2

Urban Development Authorities


Time period in Total
Sl.No Designation
days period
1 ADM / BI/ Surveyor cum draftsman 3
2 JPO / TPO/TPA 2
3 APO / ZAD 2
4 ZDD/ PO 2
5 ZJD / CPO /CUP 2 15 days
6 Additional Director/Director/CUP 2
7 VC/Commissioner/Metropolitan
2
Commissioner

2. The Town Planning Section Head shall notify the TDR proposal, before
placing it in the committee, by way of paper notification to be given
within the stipulated period of 7 days, any claims and objections which
may arise are to be placed before the committee: 15 days

a. Paper Notification - To the public in daily News Paper – 4 days


b. Claims and objections calling period – 7 days
c. Consolidation of Objections – 4 days

3. To place the proposal before the scrutiny Committee: 7 Days


(or)
In case the proposal is forwarded to Committee Members

Urban Local Bodies


Time period Total
Sl.No Designation
in days period
1 ULB Town Planning head 1
2 Additional Commissioner, Revenue In charge 2
7 days
3 RDDTP of Concerned region 2
MAU01-MUNA/201/2025-M I/3996132/2025

4 Commissioner 2
Urban Development Authorities
Time period Total
Sl.No Designation
in days period
1 Town planning head of the UDA concerned 2
2 RDDTP of the Concerned region 3
7 days
3 Commissioner,CRDA/Metropolitan
2
Commissioner, VMRDA/ V.C. of the UDA

4. Issue of endorsement to submit Registered Gift Deed: 6 days


5. Gift Deed Verification and issue of TDR certificate: 7 days

Urban Local Bodies


Time
Total
Sl.No Grade of ULB Designation period in
period
days
TPBO / TPS 3
Nagar Panchayats / III Grade / II
1 TPO 2 7 days
Grade/ I Grade Municipalities
Commissioner 2
TPBO / TPS 2
TPO 2 7 days
2 Special/Selection Grade Municipalities
ACP 2
Commissioner 1
TPBO / TPS 2
ACP 1 7 days
Dy.C.P 1
3 Municipal Corporations
C.P 1
CCP 1
Commissioner 1

Urban Development Authorities


Time period in Total
Sl.No Designation
days period
1 ADM /BI/Surveyor cum drafts man 1
2 JPO / TPO/TPA 1
3 APO / ZAD 1
4 ZDD/ PO 1
5 ZJD / CPO 1
7 days
6 Additional Director/Director / CUP 1
7 VC/Commissioner/Metropolitan
1
Commissioner
MAU01-MUNA/201/2025-M I/3996132/2025

Further, each activity/task SLA period is as follows:


SLA
S.No Description - Task
Period
Pre-verification/Scrutiny of Application and approval of
15
1 Commissioner to place before Scrutiny Committee/Paper
days
Notification:

Before placing it in the committee, by way of paper notification,


15
2 within the stipulated period of 7 days, any claims and objections
days
which may arise are to be placed before the committee:

A Paper Notification - To the public in daily News Paper 4 days

B Claims and objections calling period 7 days

C Consolidation of Objections 4 days

3 To place the proposal before the Scrutiny Committee: 7 days

4 Issue of endorsement to submit Registered Gift Deed 6 days

5 Gift Deed Verification and issue of TDR certificate 7 days


50
Total SLA Period
days

4. It is further instructed that the SLAs are the maximum time for disposals
and proposals should be processed well within the SLA period. The officers
shall prepare the action plan for disposals accordingly. Further it is instructed
not to entertain manual applications for issue of TDRs.

5. The Director of Town & Country Planning, Mangalagiri shall take further
necessary action, accordingly.
S SURESH KUMAR
PRINCIPAL SECRETARY
To
The Commissioner & Director of Municipal Administration,
Vaddeswaram
The Director of Town & Country Planning, Mangalagiri
The Commissioner, A.P. Capital Region Development Authority,
Vijayawada.
The Metropolitan Commissioner, VMRDA., Visakhapatnam.
MAU01-MUNA/201/2025-M I/3996132/2025

All the Commissioners of ULBs in the State


- through CDMA., A.P., Vaddeswaram.
All the Vice –Chairpersons UDAs in the State –
through DT&CP., A.P., Mangalagiri.
Copy to:
The PS / OSD to Hon’ble Minister for MA&UD Department
The PS to Prl.Secretary to Government, MA&UD Dept.,
SF/SCs.
// FORWARDED: BY ORDER //

SECTION OFFICER

You might also like