Bje S4hana2020 BPD en Us
Bje S4hana2020 BPD en Us
Table of Contents
1 Purpose
2 Prerequisites
2.1 System Access
2.2 Roles
2.3 Master Data, Organizational Data, and Other Data
2.4 Business Conditions
2.5 Preliminary Steps
2.5.1 Initial Stock Posting for the Material in BoM
2.5.2 Create Master Data for Material FG227 (Optional)
3 Overview Table
4 Test Procedures
4.1 MTO Sales Processing (Material w/o Sales Order BoM)
4.1.1 Receive Customer Request for Quotation
4.1.2 Create, and Send Sales Quotation to Customer
4.1.3 Change Sales Quotation
4.1.4 Create Sales Order with Ref. to Quotation
4.2 MTO Sales Processing (Material with Sales Order BoM) (Optional)
4.2.1 Create Sales Order
4.3 Down Payment Processing
4.3.1 Create Down Payment Request
4.3.2 Post Down Payment
4.4 Production Planning
4.4.1 Material Requirements Planning for Sales Order
4.5 Process Technical Change BoM in Sales Order (Optional)
4.5.1 Change Order BoM for Sales Order
4.5.2 Recalculation of Costs in Sales Order
4.5.3 Rerun MRP for Sales Order
4.6 Production Processing
4.6.1 Create Production Order
4.6.2 Release Production Orders
4.6.3 Pick Components (Picking List)
4.6.4 Confirm Assembly Activities
4.6.5 Post Goods Receipt for Production Order
4.7 Delivery Processing
4.7.1 Create Delivery with Order Reference
4.7.2 Execute Picking
4.7.3 Post Goods Issue
4.8 Billing Process
4.8.1 Change Sales Orders (Remove Billing Block)
4.8.2 Billing
4.9 Review Manufacturing Object Pages
5 Appendix
5.1 Process Integration
5.2 Succeeding Processes
Make-to-Order Production - Finished Goods Sales and Final Assembly (BJE_US) PUBLIC
Purpose Error: Reference source not found 2
1 Purpose
The Make-to-Order process starts with a customer quotation and ends with the clearing of a customer account after a payment is received.
The process starts with the creation of a quote that includes a price and lead time estimate. Once the customer accepts the quote, a sales order is created
that references the quote. The billing plan containing multiple customer payments (including down payment) may be set up in the order.
The production process is triggered by a Material Requirement Planning (MRP) run for the finished product and BoM components. Once the finished product is
manufactured (and confirmations entered and components issued) and received into stock, the delivery and final billing occurs.
Optionally, you can set up an order BoM that contains the components required for the customer’s specific requirements. A cost estimate can be generated
based on an order-specific BoM.
Components can be preplanned using the Make-to-Order Production - Semifinished Goods Planning and Assembly (1BM) scope item.
This document provides a detailed procedure for testing this scope item after solution activation, reflecting the predefined scope of the solution. Each
process step, report, or item is covered in its own section, providing the system interactions (test steps) in a table view. Steps that are not in scope of the
process but are needed for testing are marked accordingly. Project-specific steps must be added.
Make-to-Order Production - Finished Goods Sales and Final Assembly (BJE_US) PUBLIC
Purpose Error: Reference source not found 3
2 Prerequisites
This section summarizes all the prerequisites for conducting the test in terms of systems, users, master data, organizational data, other test data and busi-
ness conditions.
Sys- Details
tem
Sys- Access using the SAP Fiori® Launchpad. Your system administrator provides you with the URL to access the various
tem apps assigned to your role.
2.2 Roles
Assign the following business roles to your individual test users. Alternatively, if available, you can create business roles using the following spaces with
pages and predefined apps for the SAP Fiori launchpad and assign the business roles to your individual test users.
Note These roles or spaces are examples provided by SAP. You can use them as templates to create your own roles or spaces.
For more information about business roles, refer to Assigning business roles to a user in the Administration Guide to Implementation of SAP S/4HANA with
SAP Best Practices .
Material FG227 FIN227,MTO,PD,SerialNo To test order BOM management process, you can
use FG227.
Make-to-Order Production - Finished Goods Sales and Final Assembly (BJE_US) PUBLIC
Purpose Error: Reference source not found 5
Master Value Details Comments
Material RM18 RAW18,PD
Make-to-Order Production - Finished Goods Sales and Final Assembly (BJE_US) PUBLIC
Purpose Error: Reference source not found 6
Mate- Lev Material Un Characteristic of Material Optional Enhancements
rial el Type it
FG228 0 FERT PC Finished Good for MT0 processing with batch and serial num- Batch processing for Finished Good
ber processing optionally
FG227 0 FERT PC Finished Good for MT0 processing with batch and serial num- Batch processing for Finished Good
ber processing optionally
SG21 1 SEMI PC SF Repetitive Manufacturing
RM12 2 RAW PC External procured Initial Stock Posting
SG22 1 SEMI PC SF, Phantom Assembly Initial Stock Posting
RM16 2 RAW PC External procured Initial Stock Posting
RM17 2 RAW PC External procured Initial Stock Posting
RM18 2 RAW PC External procured Initial Stock Posting
SG23 1 SEMI PC External procured with subcontract
RM13 2 RAW PC External procured
RM14 2 RAW PC External procured
RM120 1 RAW PC External procured Initial Stock Posting
RM122 1 RAW PC External procured with Batch Management (FIFO-Strategy) Initial Stock Posting
RM128 1 RAW PC External procured with Consignment Processing Initial Stock Posting
SG25 1 SEMI PC SF Ext. Procurement Initial Stock Posting
SG224 1 SEMI PC Internal production of subassembly (MTO strategy)
RM27 1 RAW PC External procured, Packaging Box Initial Stock Posting
For more information on creating these master data objects, see the following Master Data Scripts (MDS)
Table 1: Master Data Script Reference
Master Description
Data ID
BNT Create Product Master of Type "Finished
Good"
Make-to-Order Production - Finished Goods Sales and Final Assembly (BJE_US) PUBLIC
Purpose Error: Reference source not found 7
Master Description
Data ID
rial"
BNZ - Create New Open MM Posting You have completed the steps described in the master data script. Posting
Period Period is up-to-date.
Make-to-Order Production - Finished Goods Sales and Final Assembly (BJE_US) PUBLIC
Purpose Error: Reference source not found 8
1. For the semifinished material SG224, you can either post initial stock here, or run through Make-to-Order Production - Semifinished Goods Planning and As-
sembly (1BM) scope item first to produce enough stock before creating sales orders for finished goods.
2. For the semifinished material SG21, you can either post initial stock here, or run through Make-to-Stock Production - Repetitive Manufacturing (BJH) scope
item to produce enough stock via repetitive manufacturing process.
3. For the remaining semifinished and raw materials in the multilevel BoM of FG228 or FG227 you can post initial stock.
Purpose
This process step shows you how to post initial stock for BoM materials of FG228 and FG227.
Alternatively, you can run the procurement scope items.
Procedure
2 Access Open Post Goods Movement (MIGO) The Goods Receipt Other - XXX (your user
the App name) screen displays.
3 Enter Choose Goods Receipt and Others on top of the screen. A message displays: The Document is OK. You
Details In the Detail Data section, make the following entries and press Enter. also post initial stock for material RM20 in case
Select Next Item icon to add entries. you test with material FG227.
On the Where tab:
● Goods Movement Type: 561 (Init.entry of stBal.)
● Plant: 1710
● Storage Location: 171B
On the Quantity tab:
● Quantity: <Quantity>, for example, <100>
On the Material tab:
● Material: <BOM Material>, see the Bill of Material Structure for FG228
and FG227 in the Master Data, Organizational Data, and Other Data
Make-to-Order Production - Finished Goods Sales and Final Assembly (BJE_US) PUBLIC
Purpose Error: Reference source not found 9
Test Test Instruction Expected Result Pass /
Step Step Fail /
# Name Com-
ment
section for a detailed materials list.
Run through Make-to-Order Production - Semifinished Goods Planning and
Assembly (1BM) test script if you do not want to post initial stock for
SG224.
Select Item OK, and choose Check.
4 Post Confirm the message that the batch has been created and choose Post. A message displays: Material document
XXXXXXXX posted.
BNK Create Material BOM for Production Create a production BOM for material FG227 with reference to BOM of FG228.
and Sales
BNL Create Routing Create routing for material FG227 with reference to group ID 41010046 and
group counter 1.
BLD Create Production Version Create production version for material FG227.
BET Create Sales Pricing Condition Create pricing condition for material FG227. Refer to FG228.
Make-to-Order Production - Finished Goods Sales and Final Assembly (BJE_US) PUBLIC
Purpose Error: Reference source not found 10
Master Val Details
ue
Plant 1710 Plant 1 US
Make-to-Order Production - Finished Goods Sales and Final Assembly (BJE_US) PUBLIC
Purpose Error: Reference source not found 11
3 Overview Table
This scope item consists of several process steps provided in the table below.
If your system administrator has enabled spaces and pages on the SAP Fiori launchpad, the homepage will only contain the essential apps for performing the
typical tasks of a business role.
You can find all other apps not included on the homepage using the search bar.
If you want to personalize the homepage and include the hidden apps, navigate to your user profile and choose Settings > App Finder .
Create, and Send Sales Quotation to Internal Sales Representative Manage Sales Quotations (F1852)
Customer [page ] 15
Change Sales Quotation [page ] 17 Internal Sales Representative Manage Sales Quotations (F1852)
Create Sales Order with Ref. to Quota- Internal Sales Representative Manage Sales Orders (F1873)
tion [page ] 19
Create Sales Order [page ] 22 Internal Sales Representative Manage Sales Orders (F1873)
Create Down Payment Request [page ] Internal Sales Representative Manage Sales Orders (F1873)
25
Post Down Payment [page ] 25 Accounts Receivable Accountant Post Incoming Payments (F1345)
Production Planning
Material Requirements Planning for Sales Production Planner Monitor Material Coverage - Net / Individual Segments
Order [page ] 26 (F2101)
Change Order BoM for Sales Order BOM Engineer - Customer Order Manage Order Bill of Material - Create, Change and Dis-
[page ] 28 play BOMs (F1813)
Make-to-Order Production - Finished Goods Sales and Final Assembly (BJE_US) PUBLIC
Purpose Error: Reference source not found 12
Process Step Business Role Transaction/App Expected
Results
Recalculation of Costs in Sales Order Internal Sales Representative Change Sales Orders (VA02)
[page ] 29
Rerun MRP for Sales Order [page ] 32 Production Planner Monitor Material Coverage - Net / Individual Segments
(F2101)
Production Processing
Create Production Order [page ] 34 Production Planner Monitor Material Coverage - Net / Individual Segments
(F2101)
Release Production Orders [page ] 36 Production Supervisor - Discrete Manage Production Orders (F2336)
Manufacturing
Pick Components (Picking List) [page ] Production Operator - Discrete Man- Pick Components for Production Orders (CO27)
38 ufacturing
Confirm Assembly Activities [page ] 39 Production Operator - Discrete Man- Confirm Production Operation (F3069)
ufacturing
Post Goods Receipt for Production Order Warehouse Clerk Post Goods Receipt for Production Order (F3110)
[page ] 41
Delivery Processing
Create Delivery with Order Reference Shipping Specialist Create Outbound Deliveries - From Sales Orders
[page ] 42 (F0869A)
Post Goods Issue [page ] 43 Shipping Specialist My Outbound Delivery Monitor (VL06O)
Change Sales Orders (Remove Billing Internal Sales Representative Manage Sales Orders (F1873)
Block) [page ] 44
Review Manufacturing Object Pages Any role for production listed in the Search function
[page ] 45 Roles chapter
Make-to-Order Production - Finished Goods Sales and Final Assembly (BJE_US) PUBLIC
Purpose Error: Reference source not found 13
4 Test Procedures
This section describes test procedures for each process step that belongs to this scope item.
Prerequisite
Purpose
A customer sends us a specification document (Customer_Specification_EN_<Country>.DOCX) and asks us to create a quotation based on the specification.
The customer specification document is assigned in a later step to the quotation.
You can download the document via the following link: Customer specification
Result
You, as a manufacturer, must create a sales quotation based on the specification received from the customer.
Make-to-Order Production - Finished Goods Sales and Final Assembly (BJE_US) PUBLIC
Purpose Error: Reference source not found 14
4.1.2 Create, and Send Sales Quotation to Customer
Test Administration
Business
Role(s)
Responsibil- <State the Service Provider, Customer or Joint Service Provider and Customer> Duration Enter a duration.
ity
Purpose
As a manufacturer, you have received a customer request for a make-to-order sales quotation in form of a customer specification document. The specifica-
tion document from the customer consists of detailed requirements that the product should fulfill to meet the customer’s expectations. This process step
shows you how to create a sales quotation, and send it to the customer.
Procedure
3 Create Sales On the Manage Sales Quotations (F1852) screen, The Create Quotation: Overview screen displays.
Quotation choose Create Quotation.
Make the following entries and press Enter:
Make-to-Order Production - Finished Goods Sales and Final Assembly (BJE_US) PUBLIC
Purpose Error: Reference source not found 15
Test Test Step Instruction Expected Result Pass / Fail /
Step # Name Comment
● Quotation Type: QT
● Sales Organization: 1710
● Distribution Channel: 10
● Division: 00
4 Enter the Quota- Make the following entries: A message displays: Message Quotation XXXXXXXX
tion Details ● Sold - to Party: 17100001 has been saved.
● Ship - to Party: 17100001 The order is saved and the quotation is sent to the
printer.
● Cust. Reference: <PO Number>
Note Ignore any dialog box.
● Cust. Ref. Date: <Today's Date>
● Req. Deliv. Date: <Today plus 1 month>
● Valid to: <Today plus 6 weeks>
In the All Items table, create an entry with the fol-
lowing data:
● Material: FG228
● Order Quantity: Quantity, for example: <10>
Choose Save (Ctrl+S).
Printing Form
2 Access the App Open Manage Sales Quotations (F1852). The Manage Sales Quotations screen
displays.
3 Search for Sales Quota- Enter search terms in the filter bar and choose Go. Sales quotation displays in result list.
tion For example: enter sales quotation number in the Sales
Quotation field.
Make-to-Order Production - Finished Goods Sales and Final Assembly (BJE_US) PUBLIC
Purpose Error: Reference source not found 16
Test Test Step Name Instruction Expected Result Pass / Fail /
Step # Comment
4 Navigate to Sales Quo- Choose sales quotation number and choose Display Quo- The Display Quotation XXX: Overview
tation Screen tation. screen displays.
5 Display Print Preview On the Display Quotation XXX: Overview screen, choose Preview for PDF document displays.
Header Output Preview.
Result
Test Administration
Business
Role(s)
Responsibil- <State the Service Provider, Customer or Joint Service Provider and Customer> Duration Enter a duration.
ity
Purpose
After you have set the quotation to customer, the customer sends a specification document and requests a commercial change(discount). Therefore, you
change the quotation and sent to the customer. A file of the specification document is attached to sales quotation as well. This process step shows you how
to change sales quotation.
Make-to-Order Production - Finished Goods Sales and Final Assembly (BJE_US) PUBLIC
Purpose Error: Reference source not found 17
Procedure
2 Access the App Open Manage Sales Quotations (F1852). The Manage Sales Quotations screen displays.
3 Search for Sales Use filter bar to search for the created sales quotation. Searched sales quotation displays.
Quotation Enter <sales quotation number> in the Sales Quota-
tion field.
4 Navigate to Sales Choose sales quotation number and choose Change The Change MTO Quotation XXXXXXXX: Overview
Quotation Screen Quotation. screen displays.
5 Create Attachment Choose Services for Object on top right corner of the A message displays: The attachment was suc-
for Sales Quotation screen, choose Create Attachment. cessfully created.
In the File Upload dialog box, choose OK.
Choose local path and Customer specification file you
downloaded.
6 Check Attachment Choose Services for Object, choose Attachment list and Attachment brings up on the Service: Attachment
Continue. list screen.
7 Enter Discount On the Sales tab, in the All Items table, select the line The Change Quotation screen displays with a
Amount and Save item, scroll to the right, and double click on PPR0(CnTy). message: Quotation XXXXXXXX has been
On the Change Quotation XXXXXXXX: Item Data screen, saved.
choose Conditions tab.
In the Pricing Element table, choose + (Insert Rows)
icon to add a new entry with the following data and
press Enter:
● CnTy: DPG4
● Amount: <10>
Choose Save.
Make-to-Order Production - Finished Goods Sales and Final Assembly (BJE_US) PUBLIC
Purpose Error: Reference source not found 18
Result
You entered a customer discount and created an attachment for sales quotation.
Test Administration
Business
Role(s)
Responsibil- <State the Service Provider, Customer or Joint Service Provider and Customer> Duration Enter a duration.
ity
Purpose
After the customer accepted the follow-on quotation, a customer order is created based on the negotiated quotation including a billing plan for a down pay-
ment. Finally, the order confirmation is printed and can be sent to the customer. This process step shows you how to create sales order with Ref. to quota-
tion.
Procedure
Make-to-Order Production - Finished Goods Sales and Final Assembly (BJE_US) PUBLIC
Purpose Error: Reference source not found 19
Test Test Step Name Instruction Expected Result Pass / Fail
Step / Com-
# ment
2 Access the App Open Manage Sales Orders (F1873). The Manage Sales Orders screen dis-
plays.
3 Create Sales Or- On the Create Sales Documents screen, choose +, and choose Create The Create Standard Order: Over-
der Sales Order-VA01. view screen displays.
Make the following entries and choose Create with Reference:
● Order Type: OR
● Sales Organization: 1710
In the Create with Reference dialog box, make the following entries
and choose Copy.
● Quot.: <Sales Quotation Number Created Previously>
4 Enter Order De- Make the following entries and press Enter.
tails ● Cust. Reference: <Cust. Reference>
● Cust. Ref. Date: <Today's Date>
On the Sales tab:
● Req. Deliv. Date: <Today's Date + 1 Month>
5 Choose Billing On the Create Standard Order: Overview screen, in the All Items ta-
Plan ble, select the item. Choose More > Goto > Item > Billing Plan .
If the Selection Criteria - Milestones for billing plan dialog box dis-
plays, choose Cancel. If the billing plan item existed, you can skip the
step 6.
6 Enter Billing Plan On the Create Standard Order: Item Data screen, make the first entry A message displays: Standard Or-
Details and Save (down payment) with the following data: der XXXXX has been saved.
● Billing Date: <Today's Date>
● DtDS (Date Description): <Y009>
● Bill.value: <Down Payment Value to be Invoiced>, for example,
<10>
● DCat (Date Category): <03>
Press Enter.
Block: Delete <Y2>
Make the second entry with the following data:
Make-to-Order Production - Finished Goods Sales and Final Assembly (BJE_US) PUBLIC
Purpose Error: Reference source not found 20
Test Test Step Name Instruction Expected Result Pass / Fail
Step / Com-
# ment
● Billing Date: <Today's Date + 1 Month>
● DtDS (Date Description): <Y008>
● DCat (Date Category): <02>
Press Enter.
Choose Back icon, and choose Save.
If the sales order requires approval, refer to Sell from Stock (BD9)
scope item, and complete the Process Sales Order Approval (Op-
tional) step.
If down payment is not required, at least create a billing plan item
with DtDS (Date Description) Y008 and Date Category 02.
Printing Form
2 Access the App Open Manage Sales Orders (F1873). The Manage Sales Orders screen dis-
plays.
3 Search for Sales Or- Enter search term(s) in filter bar and choose Go. Sales order displays in result list.
der For example, enter sales order number in field Sales Order.
4 Navigate to Sales Or- Choose sales order number and choose Display Sales Or- The Display Sales Order xxx: Overview
der Screen der. screen displays.
5 Display Print Preview On the Display Standard Order xxx: Overview screen, Choose your local destination and
choose Header Output Preview. press Print.
Make-to-Order Production - Finished Goods Sales and Final Assembly (BJE_US) PUBLIC
Purpose Error: Reference source not found 21
4.2 MTO Sales Processing (Material with Sales Order BoM) (Optional)
Test Administration
Business
Role(s)
Responsibil- <State the Service Provider, Customer or Joint Service Provider and Customer> Duration Enter a duration.
ity
Purpose
Create a sales order according to customer requirement. Later customer may require a technical change for the product. In this case, a sales order is created
without reference to quotation. For this test, you can use sample material FG227.
Procedure
2 Access the App Open Manage Sales Orders (F1873). The Manage Sales Orders screen dis-
Make-to-Order Production - Finished Goods Sales and Final Assembly (BJE_US) PUBLIC
Purpose Error: Reference source not found 22
Test Test Step Name Instruction Expected Result Pass / Fail
Step / Com-
# ment
plays.
3 Create Sales Or- On the Create Sales Documents screen, Choose +, and choose Create The Create Standard Order: Over-
der Sales Order-VA01. view screen displays.
Make the following entries and choose Continue:
● Order Type: OR
● Sales Organization: 1710
4 Enter Order De- Make the following entries and press Enter: The Create MTO Standard Order:
tails ● Sold - to Party: 17100001 Overview screen displays.
5 Choose Billing On the Create Standard Order: Overview screen, in the All Items ta-
Plan ble, select the item. Choose More > Goto > Item > Billing Plan .
If the Selection Criteria - Milestones for billing plan dialog box dis-
plays, choose Cancel.
6 Enter Billing Plan On the Create Standard Order: Item Data screen, make the first entry A message displays: Standard Or-
Details and Save (down payment) with the following data: der XXXXX has been saved.
● Billing Date: <Today's Date>
● DtDS (Date Description): <Y009>
● Bill.value: <Down Payment Value to be Invoiced>, for example,
<10>
● DCat (Date Category): <03>
Press Enter.
Block: Delete <Y2>
Make-to-Order Production - Finished Goods Sales and Final Assembly (BJE_US) PUBLIC
Purpose Error: Reference source not found 23
Test Test Step Name Instruction Expected Result Pass / Fail
Step / Com-
# ment
Make the second entry with the following data:
● Billing Date: <Today's Date + 1 Month>
● DtDS (Date Description): <Y008>
● DCat (Date Category): <02>
Press Enter.
Choose Back icon, and choose Save.
If the sales order requires approval, refer to Sell from Stock (BD9)
scope item, and complete the Process Sales Order Approval (Op-
tional) step.
After sales order is saved, you can check costing of sales order in dis-
play mode.
Follow menu path More > Extras > Costing .
On the Costing Structure session, check if the component is the same
as in BoM of FG227.
Printing Form
2 Access the App Open Manage Sales Orders (F1873). The Manage Sales Orders screen dis-
plays.
3 Search for Sales Or- Enter search term(s) in filter bar and choose Go. Sales order displays in result list.
der For example, enter sales order number in the field Sales Or-
der.
4 Navigate to Sales Or- Choose sales order number and choose Display Sales Order. The Display Sales Order XXX: Over-
der Screen view screen displays.
5 Display Print Preview On the Display Standard Order XXX: Overview screen, Choose your local destination and
Make-to-Order Production - Finished Goods Sales and Final Assembly (BJE_US) PUBLIC
Purpose Error: Reference source not found 24
Test Test Step Name Instruction Expected Result Pass / Fail /
Step # Comment
choose Header Output Preview. press Print.
Purpose
This process step shows you how to create an invoice according to your billing plan. Finally, you print out the down payment request and sent it to your cus-
tomer.
Procedure
Go to Sales Order Processing with Customer Down Payment (BKJ) test script and run Create Down Payment Request step as a Billing Clerk with master data
for this test script.
Purpose
This process step shows you how to post the down payment received from your customer.
Make-to-Order Production - Finished Goods Sales and Final Assembly (BJE_US) PUBLIC
Purpose Error: Reference source not found 25
Procedure
Go to Sales Order Processing with Customer Down Payment (BKJ) test script and run Post Down Payment step as an Accounts Receivable Accountant with
master data for this test script.
Test Administration
Business
Role(s)
Responsibil- <State the Service Provider, Customer or Joint Service Provider and Customer> Duration Enter a duration.
ity
Purpose
This process step shows you how to start the MRP run for the sales order you created before.
Make-to-Order Production - Finished Goods Sales and Final Assembly (BJE_US) PUBLIC
Purpose Error: Reference source not found 26
Procedure
2 Access the App Open Monitor Material Coverage - Net / Individual Segments (F2101). The The Monitor Material Coverage -
Net / Individual Segments screen dis-
plays.
3 Check Default Choose user icon and choose MRP Settings icon. In the MRP Settings
Area of Responsi- dialog box, choose Area of Responsibility.
bility On the My Area of Responsibility screen, check if only the following
entry is assigned:
Plant 1 US 1710
MRP Controller 001 (001)
Choose AOR status button of this entry if not assigned, choose AOR
status button of the corresponding entry to remove any other entry
then choose Back.
4 Search for Mate- Enter the following data and choose Go: The Material screen and Material De-
rial ● Material: <FG228 or FG227>, <Depends on which material you tails screen display.
test with> Note that you select the right individ-
Select the line item with your sales quotation / sales order number, ual segment for the customer order.
such as CustSt XXXXXX-10.
Choose Manage Materials in the lower right corner of the screen.
5 Start MRP Run Choose Start MRP run. A MRP run is started immediately in
background.
6 Check Generated Choose the generated planned order, and choose Open > Planned Or-
Planned Order der .
Choose Component Overview, check if the components are the sames
as in BoM of FG227.
Make-to-Order Production - Finished Goods Sales and Final Assembly (BJE_US) PUBLIC
Purpose Error: Reference source not found 27
4.5 Process Technical Change BoM in Sales Order (Optional)
This step is valid only when you create sales order with material FG227 in previous step 4.2 MTO Sales Processing (Material with Sales Order BoM) (Optional).
Test Administration
Business
Role(s)
Responsibil- <State the Service Provider, Customer or Joint Service Provider and Customer> Duration Enter a duration.
ity
Purpose
The customer asks for a technical change for finished goods. In this step, you therefore create an order BoM for the sales order and maintain order BoM ac-
cording to customer requirement (adding material RM20 for this testing).
This process step shows you how to create an order BoM for sales order and maintain the order BoM according to customer requirement.
Procedure
Make-to-Order Production - Finished Goods Sales and Final Assembly (BJE_US) PUBLIC
Purpose Error: Reference source not found 28
Test Test Step Name Instruction Expected Result Pass / Fail /
Step # Comment
Customer Order.
2 Access the App Open Manage Order Bill Of Material (F4339). The Manage Order Bill of Material
screen displays.
3 Select Material BoM Choose Copy Material BOM. Enter following value in the di-
alog box and choose Go.
● Material: FG227
● Plant: 1710
● BOM Usage: 1
Choose the searched material BoM and choose OK.
4 Create Order BoM for Make the following entries and choose Copy.
Sales Order ● Sales Document: <Sales Order Number Created Pre-
viously>
● Sales Document Item: 10
● Material: FG227
● BOM Usage: 1
5 Maintain Order BoM Choose + Add button on the tool bar with the following
values:
● Item: 0100
● Component: RM20
● Component Quantity: 100 PC
Test Administration
Business
Role(s)
Responsibil- <State the Service Provider, Customer or Joint Service Provider and Customer> Duration Enter a duration.
ity
Purpose
After order BoM is changed, you recalculate the sales order and put additional price for extra component. A order confirmation is printed and can be sent to
customer.
Procedure
2 Access the App Open Change Sales Orders (VA02). The Change Sales Orders screen dis-
plays.
3 Navigate to Chang On the Change Sales Orders screen, enter the following value and
Sales Order Screen choose Continue.
Order: <Sales Order Number Created Previously>
4 Recost Sales Order Choose following menu path More > Extras > Costing . In the On the Costing Structure session, check
Marked Cost Estimate dialog box , choose Continue. if component RM20 is taken into calcula-
On the Sales Order Costing screen, press Enter. tion.
5 Save Costing Re- Choose Save. In the Update Parameters dialog box , choose Con-
sult tinue and Save.
Make-to-Order Production - Finished Goods Sales and Final Assembly (BJE_US) PUBLIC
Purpose Error: Reference source not found 30
Test Test Step Name Instruction Expected Result Pass / Fail
Step / Com-
# ment
In the The costing has not been marked dialog box, choose Yes.
6 Add Additional On the Change Sales Order XXX: Overview screen, choose line
Price item and choose Item Cconditions icon on the tool bar above All
Items section.
In the Pricing Elements table, add a new entry as below:
● CnTy: DRQ1
● Amount: <2>
● CrCy: USD
● Per: <1>
● UoM: <PC>
Press Enter.
Printing Form
2 Access the App Open Manage Sales Orders (F1873). The Manage Sales Orders
screen displays
3 Search for Sales Use filter bar to search for the created sales order. Searched sales order dis-
Order Enter <sales order number> in the Sales Order field. plays.
4 Print Sales Or- Choose sales order number and choose Display Sales Order. Sales order is printed.
der On the Display Standard Order XXX: Overview screen, choose More > Ex-
tras > Output > Header > Edit .
Select the line created with completed status and choose Display PDF
Make-to-Order Production - Finished Goods Sales and Final Assembly (BJE_US) PUBLIC
Purpose Error: Reference source not found 31
Test Test Step Instruction Expected Result Pass / Fail /
Step # Name Comment
Document.
Choose Print icon to print your sales order.
Test Administration
Business
Role(s)
Responsibil- <State the Service Provider, Customer or Joint Service Provider and Customer> Duration Enter a duration.
ity
Purpose
You have added a material for the finished good and evaluate the effects by rerun MRP for the sales order.
Procedure
3 Check Default On the Monitor Material Coverage - Net / Individual Segments screen, select
Area of Responsi- your user name and choose MRP Settings icon. On the MRP Settings screen,
bility choose Area of Responsibility.
Check if only the following entry displays:
Plant 1 US (1710)
MRP Controller 001 (001)
Choose + to select this entry if not displayed; choose the Delete icon to re-
move any other plant entries and then choose OK.
4 Select the Mate- Enter the following data and choose Go: The Material screen and Material
rial Material: FG227 Details screen display.
Select the line item with your sales quotation / sales order number, such as Note that you select the right in-
CustSt XXXXXX-10. dividual segment for the cus-
tomer order.
Choose Manage Materials in the lower right corner of the screen.
5 Start MRP Run Choose Start MRP run. A MRP run is started immediately
in background.
6 Check Generated Choose the newly generated planned order, and choose Open > Planned
Planned Order Order .
Choose Component Overview, check the new components RM20 is added.
Result
Planned order for the final assembly of material finished good FG227 is updated.
Make-to-Order Production - Finished Goods Sales and Final Assembly (BJE_US) PUBLIC
Purpose Error: Reference source not found 33
4.6 Production Processing
Test Administration
Business
Role(s)
Responsibil- <State the Service Provider, Customer or Joint Service Provider and Customer> Duration Enter a duration.
ity
Purpose
This process step shows you how to create production order without external processing operation.
Prerequisite
Planned orders for assembly finished good (FG228 or FG227) is generated in the same way as for parts production.
Precedure
Make-to-Order Production - Finished Goods Sales and Final Assembly (BJE_US) PUBLIC
Purpose Error: Reference source not found 34
Test Test Step Name Instruction Expected Result Pass / Fail
Step / Com-
# ment
1 Log On Log on to the SAP Fiori launchpad as a Production Planner. The SAP Fiori launchpad displays.
2 Access the App Open Monitor Material Coverage - Net / Individual Segments The Monitor Material Coverage - Net / In-
(F2101). dividual Segments screen displays.
3 Check Default Area of Choose user icon and choose MRP Settings icon. In the MRP
Responsibility Settings dialog box, choose Area of Responsibility.
Check if only the following entry is assigned:
Plant 1 US (1710)
MRP Controller 001 (001)
Choose AOR Status if the status for the above entry is not yet
assigned.
Choose AOR Status to unassign the rest of other entries.
4 Search for Material Enter the following data and choose Go: The Material screen and Material Details
● Material: <FG228 or FG227> screen display.
Select the line item with your sales quotation / sales order Note that you select the right individual
number, such as CustSt XXXXXX-10. segment for the customer order.
5 Convert Planned Or- Find the generated planned order. Select Convert from the A message displays: production order
der to Production Or- Action dropdown list. Choose Convert, and choose OK. XXXXXXXX has been created.
der
6 Rescheduling Check On the Stock/Requirements List tab, the Rescheduling column Corresponding actions perform.
(Optional) displays the rescheduling status of the following MRP Ele-
ments.
● PurReq
● Purchase Orders
● Planned Orders
● Production Orders
● Process Orders
If needed, you can choose the following icons in Rescheduling
column for corresponding functions:
Make-to-Order Production - Finished Goods Sales and Final Assembly (BJE_US) PUBLIC
Purpose Error: Reference source not found 35
Test Test Step Name Instruction Expected Result Pass / Fail
Step / Com-
# ment
● Reschedule in (bring operation forward if the receipt ele-
ment lies after the requirement date)
● Reschedule out (postpone operation, if the receipt element
lies before the requirement date)
● Plan Process according to schedule
● Cancel Process
● Excess Stock
● Excess in individual segment
Test Administration
Business
Role(s)
Responsibil- <State the Service Provider, Customer or Joint Service Provider and Customer> Duration Enter a duration.
ity
Prerequisite
The production order created by the MRP controller is assigned a release date in accordance with the scheduling margin key.
Make-to-Order Production - Finished Goods Sales and Final Assembly (BJE_US) PUBLIC
Purpose Error: Reference source not found 36
Purpose
Procedure
2 Access the App Open Manage Production Orders (F2336). The Manage Production Orders screen
displays.
3 Check Default Area of Re- In the Area of Responsibility dialog box, choose Produc-
sponsibility (Supervisor) tion Supervisor.
In the Area of Responsibility (Supervisor) dialog box,
check whether this entry displays:
Plant 1 US (1710)
MTO w/o VC Val. (YB4)
Choose + to add it if not displayed; choose the Delete
icon to remove the other entries. Choose OK.
4 Search for Production Order On the Manage Production Orders screen, choose Adapt The Material and Production Plants
Filters to display more filter options. fields are added to the filter bar.
Choose More Filters, and select Material and Production Searched production order displays.
Plant. Choose Go.
Enter the following filter criteria to search for your pro-
duction order and press Enter:
● Status: Created
● Material: FG228 or FG227
● Production Plant: 1710
Choose the filtered production order entry.
5 Release Production Order Choose the production order you created previously. Order is released.
On the XXXXXXX (production order number) page,
Make-to-Order Production - Finished Goods Sales and Final Assembly (BJE_US) PUBLIC
Purpose Error: Reference source not found 37
Test Test Step Name Instruction Expected Result Pass / Fail /
Step Comment
#
choose Release in the top right corner of the screen.
Test Administration
Business
Role(s)
Responsibil- <State the Service Provider, Customer or Joint Service Provider and Customer> Duration Enter a duration.
ity
Prerequisite
Ensure that sufficient material is present on stock. To check this, use Monitor Stock / Requirements List (MD04) App.
Purpose
The released production order is now ready for picking. Only those materials that are not in the service stock at the assembly aisle are to be picked. For pick-
ing, the operator selects the specific picking list that can be called up directly with the production order number. The operator has a series of further selec-
tion options to allow for optimal worklist selection. This process step shows you how to pick components (picking list).
Make-to-Order Production - Finished Goods Sales and Final Assembly (BJE_US) PUBLIC
Purpose Error: Reference source not found 38
Procedure
2 Access the App Open Pick Components for Production Orders (CO27). The Picking List: Initial Screen displays.
3 Enter Relevant Make the following entries and choose Execute. The Order Information System: Detail List
Search Criteria ● Profile: 000002 of Components screen displays.
4 Picking Select the relevant reservations and choose Picking. A list of all the selected reservations dis-
plays.
5 Batch Determina- Some materials are batch managed, for example: RM122, select The Batch Determination MM: Select
tion relation line item and choose Batch Determination. Batches screen displays.
Make the following entry and choose Copy.
Split Quantity: <split quantity>
Test Administration
Business
Role(s)
Make-to-Order Production - Finished Goods Sales and Final Assembly (BJE_US) PUBLIC
Purpose Error: Reference source not found 39
Responsibil- <State the Service Provider, Customer or Joint Service Provider and Customer> Duration Enter a duration.
ity
Purpose
The confirmation documents the processing status of orders, operations, sub operations, and individual capacities. It is an instrument for controlling orders.
This scope item uses time event confirmation. This process step shows you how to confirm assembly activities.
Note In practice, some operations produce scrap due to operational or component defects. To simulate this process, refer to Rework Processing - Work-in-
Process (BJQ) scope item and perform steps described in the related test scripts.
Procedure
2 Access the App Open Confirm Production Operation (F3069). The Enter Time Ticket for Production
Order screen displays.
3 Enter the Confir- Make the following entries and press Enter.
mation Details ● Order: The order no. you noted for the material Fin-
ished Good MTO (FG226)
● Operation: <0010>
● Confirm Type: <Final Confirmation>
● Yield: <Produced Quantity>
● Setup: <Setup Time>
● Machine:<Machine Time>
● Labor: <Labor Time>
5 Confirm Operation Repeat steps 1-4 for operation number <0020> to <0040>.
20
Make-to-Order Production - Finished Goods Sales and Final Assembly (BJE_US) PUBLIC
Purpose Error: Reference source not found 40
4.6.5 Post Goods Receipt for Production Order
Test Administration
Business
Role(s)
Responsibil- <State the Service Provider, Customer or Joint Service Provider and Customer> Duration Enter a duration.
ity
Purpose
This process step shows you how to post the goods receipt for the production order.
Procedure
2 Access the Open Post Goods Receipt for Production Order (F3110). The Post Goods Receipt for Produc-
App tion Order screen displays.
4 Check and In the Items section, select the item and choose Post. Goods receipt for production order
Post The Success dialog box displays with the following message: 1 mate- has been post.
Make-to-Order Production - Finished Goods Sales and Final Assembly (BJE_US) PUBLIC
Purpose Error: Reference source not found 41
Test Test Step Instruction Expected Result Pass / Fail /
Step Name Comment
#
rial document(s)posted: XXXXXXXXX.
Choose OK.
Purpose
Procedure
Go to Sales Order Processing with Customer Down Payment (BKJ) test script and run Create Delivery step as a Shipping Specialist using master data from this
test script.
Result
Make-to-Order Production - Finished Goods Sales and Final Assembly (BJE_US) PUBLIC
Purpose Error: Reference source not found 42
4.7.2 Execute Picking
Purpose
In this step, we take goods from a storage location and staging the right quantity in a picking area where the goods are prepared for shipping.
Procedure
Go to Sales Order Processing with Customer Down Payment (BKJ) test script and run Execute Picking step as a Shipping Specialist using master data from this
test script.
Result
Purpose
This process step shows you how to post goods issue for the delivery.
Procedure
Go to Sales Order Processing with Customer Down Payment (BKJ) test script and run Post Goods Issue step as a Shipping Specialist using master data from
this test script.
Make-to-Order Production - Finished Goods Sales and Final Assembly (BJE_US) PUBLIC
Purpose Error: Reference source not found 43
Result
Purpose
After the finished goods are shipped, it is ready to invoice the customer. The billing blocks in sales order are removed before billing takes place. This process
step shows you how to change sales orders(remove billing block).
Procedure
Go to Sales Order Processing with Customer Down Payment (BKJ) test script and run Change Sales Orders (Remove Billing Block) step as an Internal Sales
Representative using master data from this test script.
4.8.2 Billing
Purpose
Make-to-Order Production - Finished Goods Sales and Final Assembly (BJE_US) PUBLIC
Purpose Error: Reference source not found 44
Procedure
Go to Sales Order Processing with Customer Down Payment (BKJ) test script and run Billing step as a Billing Clerk using master data from this test script.
Test Administration
Business
Role(s)
Responsibil- <State the Service Provider, Customer or Joint Service Provider and Customer> Duration Enter a duration.
ity
Purpose
This process step shows you how to review the different objects pages available for different roles in the area of manufacturing.
Procedure
3 Display Object In the All field, select an object from the dropdown list The list of objects is limited to the object type se-
and choose the Search icon. lected. If no object is selected, a message is displayed
instead.
4 Tailor the Result Under the search line, choose an icon (for example, The results list is filtered according to your selections.
Display Show filters, Display as Table, Sort and so on) to filter
the results list.
5 Review Produc- Choose searched production order number and go If the product is configurable, you can choose Display
tion Order Fact into production order fact sheet. in the Items section to display configuration details for
Sheet Check details in production order fact sheet. the product.
6 Repeat Steps Repeat steps 1-5 for any other role in this test script The list of objects offered for search differs by the role
and any other object offered in the search function. you used to log on.
Make-to-Order Production - Finished Goods Sales and Final Assembly (BJE_US) PUBLIC
Purpose Error: Reference source not found 46
5 Appendix
Make-to-Order Production - Finished Goods Sales and Final Assembly (BJE_US) PUBLIC
Purpose Error: Reference source not found 47
Typographic Conventions
Type Description
Style
Example Words or characters quoted from the screen. These include field names, screen titles, push-
buttons labels, menu names, menu paths, and menu options.
Textual cross-references to other documents.
www.sap.com/contactsap
Example Emphasized words or expressions.
EXAMPLE Technical names of system objects. These include report names, program names, transaction
codes, table names, and key concepts of a programming language when they are surrounded
by body text, for example, SELECT and INCLUDE.
Example Output on the screen. This includes file and directory names and their paths, messages,
names of variables and parameters, source text, and names of installation, upgrade and data-
base tools.
Example Exact user entry. These are words or characters that you enter in the system exactly as they
appear in the documentation.
<Exam- Variable user entry. Angle brackets indicate that you replace these words and characters with
ple> appropriate entries to make entries in the system.
EXAMPLE Keys on the keyboard, for example, F 2 or E N T E R .
© 2020 SAP SE or an SAP affiliate company. All rights re-
served.
No part of this publication may be reproduced or transmitted
in any form or for any purpose without the express permis-
sion of SAP SE or an SAP affiliate company. The information
contained herein may be changed without prior notice.
Some software products marketed by SAP SE and its distribu-
tors contain proprietary software components of other soft-
ware vendors. National product specifications may vary.
These materials are provided by SAP SE or an SAP affiliate
company for informational purposes only, without representa-
tion or warranty of any kind, and SAP or its affiliated compa-
nies shall not be liable for errors or omissions with respect to
the materials. The only warranties for SAP or SAP affiliate
company products and services are those that are set forth in
the express warranty statements accompanying such prod-
ucts and services, if any. Nothing herein should be construed
as constituting an additional warranty.
SAP and other SAP products and services mentioned herein
as well as their respective logos are trademarks or registered
trademarks of SAP SE (or an SAP affiliate company) in Ger-
Make-to-Order Production - Finished Goods Sales and Final Assembly (BJE_US) PUBLIC
many and other countries. All other product and service
Purpose names mentionedError: Reference
are the source
trademarks not found
of their respective 48
companies.