0% found this document useful (0 votes)
82 views448 pages

Vol III - HD & Twad Book 12-3-2025

The document is a comprehensive standard data book for civil works, divided into multiple volumes covering various aspects of construction including materials, techniques, and calculations. It includes detailed indices for public works, highways, and water supply, along with specific data for tasks such as centering, masonry, and plumbing. Each volume provides essential guidelines and data necessary for civil engineering projects.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
82 views448 pages

Vol III - HD & Twad Book 12-3-2025

The document is a comprehensive standard data book for civil works, divided into multiple volumes covering various aspects of construction including materials, techniques, and calculations. It includes detailed indices for public works, highways, and water supply, along with specific data for tasks such as centering, masonry, and plumbing. Each volume provides essential guidelines and data necessary for civil engineering projects.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 448

STANDARD DATA BOOK

FOR CIVIL WORKS

VOLUME I
(PUBLIC WORKS DEPARTMENT)

INDEX

Sl. No. Description Page No.

PUBLIC WORKS DEPARTMENT

1 Sub Data - Mortar 1-28

2 Earthwork, Filling Basement & DPC 29-37

3 Plain Cement Concrete 38-44

4 Shuttering & Centering 45-65

5 Reinforced Cement Concrete 66-81

6 Stone Masonry 82-92

7 Brick Masonry 93-132

8 Flooring 133-161

9 Pointing 162-165

10 Plastering 166-176

11 Roofing and Ceiling 177-197

12 Painting 198-218

13 Other Items 219-239

14 Joineries 240-410
STANDARD DATA BOOK
FOR CIVIL WORKS

VOLUME II
(Public Works Department & Hindu Religious and Charitable Endowments)

INDEX

Sl. No. Description Page No.

PUBLIC WORKS DEPARTMENT

14 Joineries continued... 411-578

15 Water Supply & Sanitary Works 579-690

16 Miscellaneous 691-727

17 Heritage works 728-797

HINDU RELIGIOUS AND CHARITABLE


ENDOWMENTS
18 Temple Data 798-834

19 Temple Car Data 835-837


STANDARD DATA BOOK
FOR CIVIL WORKS

VOLUME III
(Highways Department & Tamil Nadu Water Supply and Drainage Board)

INDEX

Sl. No. Description Page No.

I HIGHWAYS DEPARTMENT

A NABARD & RURAL ROADS 1

1 Centering Rate Calculations – Bridge Works & Sub Works 2-5

2 Centering Rate Calculations – Road Works & Sub Works 6-8

3 Sub Data – Cement, Steel, Mortar & Grades of Concrete 9-14

4 Pile Load Test – Sub Data 14-16

5 Bridges Data 17-33

6 Miscellaneous Data 34-39

7 Observed Data 39-40

B HIGHWAYS - PROJECTS 41

1 Annexure and Sub-data 42-65

2 Data for Main Estimates 65-79

3 Data for Construction of RCC Box Culvert 80-85

4 Data for providing Foot path cum Drain 86-89

Data for providing Safety kerb and filling under the span to the
5 90-92
ROB

6 Data for Painting 93-95

7 Data for Drainage arrangements to the ROB 96-99


8 Data for Dismantling of existing structure 100-101

9 Data for River Training Works 102-104

C METRO 105

1 Preamble 106

2 Data for Earthwork 107-117

3 Data for Open Foundation 118-129

4 Data for Pile Foundation 130-140

5 Data for Sub Structure 141-151

6 Data for Super Structure and steel Reinforcement 152-158

7 Sub Data 159

8 General Items to be Covered in the Data 160-163

9 Sub Data for Earthwork 164-168

10 Sub Data for Foundation works 169-173

11 Sub Data for Piling works 174-180

12 Sub Data for Sub Structure 181-189

13 Sub Data for Super Structure 190-201

14 Sub Data for Steel Reinforcement 202-203

D CONSTRUCTION AND MAINTENANCE 204

(i) C&M - BRIDGE 205

1 Basic Data 206-211

2 Earth Work 212-214

3 Foundation 214-219

4 Sub Structure 220-222

5 Super Structure 222-227

6 Miscellaneous 227-230

7 Pile load - Test 230-231


8 Centering Rate-1 231-233

9 Centering Rate-2 234-235

(ii) C&M - OBSERVED DATA 236-242

(iii) C&M - ROAD 243

1 Working out Metal 244-254

2 Granular sub-base 255-257

3 Earth work 258-261

4 Gravel for berms 261

5 Earth work (Compaction Only) 262

6 EARTH WORK FOR FORMATION OF EMBANKMENT 263

7 EARTH WORK FOR MAKING UP OF LOW BERMS 264-265

8 Labour Charges for Patch Work 266

9 Bituminous Macadam (For Patch Works) 267-268

10 GRAVEL FOR BERMS 268

11 WET MIX MACADAM 269-270

12 Removal of the Black Topped (BT) surface 271

13 CRUSHER RUN MACADAM 272-274

14 Bituminous Macadam 275-290

15 Dense Bituminous Macadam 291-307

16 Prime Coat Over WBM/ WMM Surface / Tack Coat 308-310

17 Bituminous Concrete 311-346

TAMILNADU WATER SUPPLY AND DRAINAGE


II 347-436
BOARD
STANDARD DATA BOOK
FOR CIVIL WORKS

VOLUME IV to VIII
(Chennai Metropolitan Water Supply and Sewerage Board)

INDEX

Section Description Page No.

CHENNAI METROPOLITAN WATER SUPPLY


AND SEWERAGE BOARD

VOLUME IV

1 Data for pipe laying works Water Supply 1 - 167

2 Data for construction of Bore-wells 168 - 170

3 Data For Plumbing Works 171- 205

4 Data for Pipe Laying Works Sewerage 206 - 412

VOLUME V

4 Data for pipe laying works Sewerage continued... 413-795

VOLUME VI

4 Data for pipe laying works Sewerage continued... 796 - 1190

VOLUME VII

5 Data for Electrical Works 1191 -1259

6 Data for Civil Works 1260-1356

7 Data For Road Works 1357-1369

8 Data for conveyance charges of material 1370-1416

11 Data for Additional Items 1417-1482

12 Data for Night Works 1483-1595

VOLUME VIII

12 Data for Night Works continued... 1596-1992


HIGHWAYS DEPARTMENT
(HD)

1
NABARD & RURAL ROADS

1
CENTERING RATE CALCULATIONS(STEEL PROPS) - BRIDGE WORKS & SUB WORKS

Sl. No Qty Unit Description of work Rate Per Amount


Steel centering for sides and sofits including supports and strutting upto 3.00m
height for plain surface such as RCC slab, rectangular beams, T or L beams lintels
bedblocks, staircase waist and landing slab landing beams, canopy etc., with all
1(A) cross bracings using mild steel sheets of size 90cm x 60cm x 10 gauge stiffened
with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over
silver oak (country wood) joist of size 10cm x 6.50cm spaced at about 90 cms c/c
and supported by steel props spaced at 75cm c/c etc., complete.
Sub Data 1

Cost of MS sheets and angles for each set

Weight of MS sheet 90cmx60cmx10 gauge


kg/
3.175 x 7850 /1000 = 24.92
sqm
kg/
0.90 x 0.60 x 24.92 = 13.46
No.
Weight of MS angle of size 25 x 25 x
3mm
kg/
3.60m x 1.11 kg / m = 4.00
No.
Cost of MS sheets, 90cm x 60cm x 10
13.46 kg / kg
gauge
4.00 kg Cost of MS angle, 25mm x 25mm x 3mm / kg
Add contingencies for Cutting, bending
10 %
and welding charges

Sub Data 2

19 Nos Cost of MS angle and sheet Each


Total
(Assuming for 40 uses)
=
Cost for single use / 40 =
Silver Oak country wood joist, 10cm x
0.12 cu.m cu.m
6.5cm at about 90cm c/c etc. (For 5 uses)
For 1 use /5 =

Steel props, (40 * 11.10 * Rs. )/40 =


Total
For 1 use
=
Cost for single use

Main Data

1.00 Use Cost of M.S sheets and angles 1 Use

1.00 Use Cost of Silver oak joists and steel props 1 Use

2
Sl. No Qty Unit Description of work Rate Per Amount

3.80 Nos Carpenter I Class Each

5.40 Nos Mazdoor I Class Each

1.00 No Fitter II class Each


Add for welding grills nails etc.,(Single
2.50 %
usage cost)
Add for oiling for MS sheets and edges
5.00 % etc(single usage cost of sheets, angles &
props)
Total /10 sqm

Rate per sqm =

Centering for Foundation, Pile cap etc.,


1
(Below sill)
1.00 sqm Centering rate sqm

Deduct for strutting charges

0.30 Nos Carpenter I Class Each

0.30 Nos Mazdoor I Class Each

Total /10 sqm =

Rate per sqm =

Centering for vertical surfaces of Abutments


2 & Return Walls, Bed Block, Parapet,Outer
Crash barrier
1.00 sqm Centering rate sqm

1.00 sqm Add 10% extra for vertical surfaces sqm

Rate per sqm =

Centering for Columns piers, rectangular


3
piers
1.00 sqm Centering rate sqm

1.00 sqm Add 100% extra for vertical surfaces sqm

Rate per sqm =

3
Sl. No Qty Unit Description of work Rate Per Amount

4 Centering for Capping Beam

1.00 sqm Centering rate sqm

1.00 sqm Add 50% extra for vertical surfaces sqm

Rate per sqm =

Steel centering for sides and sofits including supports and strutting upto 3.00m height
for plain surface such as RCC slab, rectangular beams, T or L beams lintels bedblocks,
staircase waist and landing slab landing beams, canopy etc., with all cross bracings
1(B) using mild steel sheets of size 90cm x 60cm x 10 gauge stiffened with welded mild
steel angles of size 25mm x 25mm x 3mm for boarding laid over silver oak (country
wood) joist of size 10cm x 6.50cm spaced at about 90 cms c/c and supported by iron
gribs etc., complete. For Deck Slab & T Beam
Sub Data 1

Cost of MS sheets and angles for each set

Weight of MS sheet 90cmx60cmx10 gauge


kg/
3.175 x 7850 /1000 = 24.92
sqm
kg/
0.90 x 0.60 x 24.92 = 13.46
No.
Weight of MS angle of size 25 x 25 x
3mm
kg/
3.60m x 1.11 kg / m = 4.00
No.
Cost of MS sheets, 90cm x 60cm x 10
13.46 kg / kg
gauge
4.00 kg Cost of MS angle, 25mm x 25mm x 3mm / kg
Add Contingencies for Cutting, bending
10 %
and welding charges

Sub Data 2

19 Nos Cost of MS angle and sheet Each


Total
(Assuming for 40 uses)
=
Cost for single use / 40 =
Silver Oak country wood joist, 10cm x
0.12 cu.m cu.m
6.5cm at about 90cm c/c etc. (For 5 uses)
For 1 use /5 =

Size of gribs, 0.60m x 0.60m x 1.20m

4
Sl. No Qty Unit Description of work Rate Per Amount

Gribs, (36 x 100 x Rs. )/40


Cross bracings,
(2 x 19.20m x 11.10m x Rs. )/40
Total
For 1 use
=
Cost for
single use
For Superstructure :

Main Data
40
1.00 Use Cost of M.S sheets and angles
uses
1.00 Use Cost of Silver oak joists and steel props 5 uses

3.80 Nos Carpenter I Class Each

5.40 Nos Mazdoor I Class Each

1.00 No Fitter II class Each


Add for welding grills nails etc.,(Single
2.50 %
usage cost)
Add for oiling for MS sheets and edges
5.00 % etc(single usage cost of sheets, angles &
props)
Total /10 sqm =

Rate per sqm =

5
CENTERING RATE CALCULATIONS (Using Casurina Poles) - Road Works & Sub Works

Sl. No Qty Unit Description of work Rate Per Amount


Supplying and erecting centering for sides and soffits including necessary supports
and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with
all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with
welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak
1
joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by
casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre
etc. complete complying with the standard specificaiton. (Payment for centering shall
be given after the concrete is laid)
Sub Data 1
Cost of MS sheets and angles for
each set
Weight of MS sheet 90cmx60cmx10
gauge
3.175 x 7850 /1000 = 24.92 kg/sqm

0.90 x 0.60 x 24.92 = 13.46 kg/ No.


Weight of MS angle of size 25 x 25
x 3mm
3.60m x 1.11 kg / m = 4.00 kg/ No.
Cost of MS sheets, 90cm x 60cm x
13.46 kg / kg
10 gauge
Cost of MS angle, 25mm x 25mm x
4.00 kg / kg
3mm
Add Contingencies for Cutting,
10.00 %
bending and welding charges

Sub Data 2

19 Nos Cost of MS angle and sheet Each

(Assuming for 40 uses) Total =

Cost for single use / 40 =


Silver Oak country wood joist, 10cm
0.12 cu.m x 6.5cm at about 90cm c/c etc. (For cu.m
5 uses)
Cost of casurina props 10 to 13cm
98.5 RM RM
dia.
For 1 use /5 =
Cost for single
use
For Superstructure : Deck Slab

Main Data

1.00 Use Cost of M.S sheets and angles 40 uses

6
Sl. No Qty Unit Description of work Rate Per Amount
Cost of Silver oak joists and steel
1.00 Use 5 uses
props
3.80 Nos Carpenter I Class Each

5.40 Nos Mazdoor I Class Each

1.00 No Fitter II class Each


Add for welding grills nails etc.,(Sin-
2.50 %
gle usage cost)
Add for oiling for MS sheets and edg-
5.00 % es etc(single usage cost of sheets,
angles & props)
Total /10 sqm =

Rate per sqm =

1 Centering for Foundation(Below sill)


Cost of casurina props 10 to 13cm
98.5 RM RM
dia.
For 1 use =

0.30 Nos Upto 3.3m 0.00 Each

0.30 Nos 3.3 - 4.3m 0.00 Each

1.00 % Add for nails, coirs, etc., 0.00

Total / 10 sqm =

Rate per sqm =

1.00 sqm Centering rate =

Rate per sqm =

Rate for 1m height or part thereof but not


2
less than 30cm 1/3 of rate allowed
Cost of casurina props 10 to 13cm
98.5 RM RM
dia.
For 1 use =

0.30 Nos Carpenter I Class Each

0.30 Nos Mazdoor I Class Each

1.00 % Add for nails, coirs, etc.,

Total / 10 sqm =

7
Sl. No Qty Unit Description of work Rate Per Amount

Rate for 1 sq.m. per 3m height =

Rate for 1 sq.m. / 1m height =

For every additional 1m height of


3 strutting above 3m or part thereof but
not less than 30cm
Upto 3.3m / Sqm =

3.3 - 4.3m / Sqm =

4.3 - 5.3m / Sqm =

5.3 - 6.3m / Sqm =

6.3 - 7.3m / Sqm =

7.3 - 8.3m / Sqm =

8.3 - 9.3m / Sqm =

9.3 - 10.3m / Sqm =

10.3 - 11.3m / Sqm =

4 Above Ground Level


Add extra Required percentage Vertical Deck Slab Capping
Columns
for all items faces & T Beams Beam
10% 20% 50% 100%

Upto 3.3m

3.3 - 4.3m

4.3 - 5.3m

5.3 - 6.3m

6.3 - 7.3m

7.3 - 8.3m

8.3 - 9.3m

9.3 - 10.3m

10.3 - 11.3m

8
Sub Data - Cement, Steel, Mortar & Grades of Concrete
Sl.
Qty Unit Description of work Rate Per Amount
No
CEMENT
Price of non levy cement
1.00 MT including all taxes and 1 MT
transportation charges
Deduct loading & unloading 1 MT

Storage charges @ 5%

Total =

STEEL Fe - 500 / Fe - 240

1.00 MT Cost of steel 1 MT

Deduct loading & unloading 1 MT

Storage charges

Total =

CEMENT MORTAR M10(1:3:6) (using 40mm)

0.48 MT Cost of Cement 1 MT


Deduct 30kg for 40mm size
0.067 MT 1 MT
metal
1.00 cu.m Cost of M Sand 1 cu.m

Total =

CEMENT MORTAR M15(1:2:4) (using 40mm)

0.72 MT Cost of Cement 1 MT


Deduct 30kg for 40mm size
0.067 MT 1 MT
metal
1.00 cu.m Cost of M Sand 1 cu.m

Total =

9
Sl.
Qty Unit Description of work Rate Per Amount
No
CEMENT MORTAR M15(1:2:4) (using 20mm)

0.72 MT Cost of Cement 1 MT

1.00 cu.m Cost of M Sand 1 cu.m

Total =

CEMENT MORTAR M20(1:1.5:3) (using 40mm)

0.76 MT Cost of Cement 1 MT


Deduct 30kg for 40mm size
0.067 MT 1 MT
metal
1.00 cu.m Cost of M Sand 1 cu.m

Total =

CEMENT MORTAR M20(1:1.5:3) (Using 20mm)

0.76 MT Cost of Cement 1 MT

1.00 cu.m Cost of M Sand 1 cu.m

Total =

CEMENT MORTAR M25

0.845 MT Cost of Cement 1 MT

1.00 cu.m Cost of M Sand 1 cu.m

Total =

CEMENT MORTAR M30

0.889 MT Cost of Cement 1 MT

1.00 cu.m Cost of M Sand 1 cu.m

Total =

CEMENT MORTAR M35

0.934 MT Cost of Cement 1 MT

1.00 cu.m Cost of M Sand 1 cu.m

Total =

10
Sl.
Qty Unit Description of work Rate Per Amount
No
CEMENT MORTAR M40

0.934 MT Cost of Cement 1 MT

1.00 cu.m Cost of M Sand 1 cu.m

Total =

CEMENT CONCRETE - M10 (1:3:6) (Using 40mm HBG)

9.00 cu.m Cost of 40mm ISS HBG metal 1 cu.m

4.50 cu.m Cost of Cement mortar 1:3 1 cu.m

1.80 No. Mason II Class 1 No.

17.70 No. Mazdoor I class 1 No.

14.10 No. Mazdoor II class 1 No.

Total per 10 cu.m =

Rate per cu.m

VIBRATED CEMENT CONCRETE - M15 (1:2:4) (Using 40mm HBG)

9.00 cu.m Cost of 40mm ISS HBG metal 1 cu.m

4.50 cu.m Cost of Cement mortar 1:2 1 cu.m

1.80 No. Mason II Class 1 No.

17.70 No. Mazdoor I class 1 No.

14.10 No. Mazdoor II class 1 No.

10.00 cu.m Vibration charges 1 cu.m

Total per 10 cu.m =

Rate per cu.m

Rate per cu.m (without vibration charges)

VIBRATED CEMENT CONCRETE - M15 (1:2:4) (Using 20mm HBG)

9.00 cu.m Cost of 20mm ISS HBG metal 1 cu.m

4.50 cu.m Cost of Cement mortar 1:2 1 cu.m

1.80 No. Mason II Class 1 No.

11
Sl.
Qty Unit Description of work Rate Per Amount
No
17.70 No. Mazdoor I class 1 No.

14.10 No. Mazdoor II class 1 No.

10.00 cu.m Vibration charges 1 cu.m

Total per 10 cu.m =

Rate per cu.m

VIBRATED CEMENT CONCRETE - M20 (1:1.5:3) (Using 40mm HBG)

9.00 cu.m Cost of 40mm ISS HBG metal 1 cu.m

4.50 cu.m Cost of Cement mortar 1:1.50 1 cu.m

1.80 No. Mason II Class 1 No.

17.70 No. Mazdoor I class 1 No.

14.10 No. Mazdoor II class 1 No.

10.00 cu.m Vibration charges 1 cu.m

Total per 10 cu.m =

Rate per cu.m

VIBRATED CEMENT CONCRETE - M20 (1:1.5:3) (Using 20mm HBG)

9.00 cu.m Cost of 20mm ISS HBG metal 1 cu.m

4.50 cu.m Cost of Cement mortar 1:1.50 1 cu.m

1.80 No. Mason II Class 1 No.

17.70 No. Mazdoor I class 1 No.

14.10 No. Mazdoor II class 1 No.

10.00 cu.m Vibration charges 1 cu.m

Total per 10 cu.m =

Rate per cu.m

12
Sl.
Qty Unit Description of work Rate Per Amount
No
VIBRATED REINFORCED CEMENT CONCRETE (Design mix M25)

6.30 cu.m Cost of 20mm ISS HBG metal 1 cu.m

2.700 cu.m Cost of 12mm ISS HBG metal 1 cu.m

4.50 cu.m Cost of Cement mortar 1:1.50 1 cu.m

3.50 No. Mason II Class 1 No.

21.20 No. Mazdoor I class 1 No.

35.30 No. Mazdoor II class 1 No.

10.00 cu.m Vibration charges 1 cu.m

Total per 10 cu.m =

Rate per cu.m

VIBRATED REINFORCED CEMENT CONCRETE (Design mix M30)

6.30 cu.m Cost of 20mm ISS HBG metal 1 cu.m

2.700 cu.m Cost of 12mm ISS HBG metal 1 cu.m

4.50 cu.m Cost of Cement mortar M30 1 cu.m

3.50 No. Mason II Class 1 No.

21.20 No. Mazdoor I class 1 No.

35.30 No. Mazdoor II class 1 No.

10.00 cu.m Vibration charges 1 cu.m

Total per 10 cu.m =

Rate per cu.m

VIBRATED REINFORCED CEMENT CONCRETE (Design mix M35)

6.30 cu.m Cost of 20mm ISS HBG metal 1 cu.m

2.700 cu.m Cost of 12mm ISS HBG metal 1 cu.m

4.50 cu.m Cost of Cement mortar M35 1 cu.m

3.50 No. Mason II Class 1 No.

21.20 No. Mazdoor I class 1 No.

13
Sl.
Qty Unit Description of work Rate Per Amount
No
35.30 No. Mazdoor II class 1 No.

10.00 cu.m Vibration charges 1 cu.m

Total per 10 cu.m =

Rate per cu.m

(without vibration charges for


Rate per cu.m
piles)

VIBRATED REINFORCED CEMENT CONCRETE (Design mix M40)

6.30 cu.m Cost of 20mm ISS HBG metal 1 cu.m

2.700 cu.m Cost of 12mm ISS HBG metal 1 cu.m

4.50 cu.m Cost of Cement mortar M35 1 cu.m

3.50 No. Mason II Class 1 No.

21.20 No. Mazdoor I class 1 No.

35.30 No. Mazdoor II class 1 No.

10.00 cu.m Vibration charges 1 cu.m

Total per 10 cu.m =

Rate per cu.m

(without vibration charges for


Rate per cu.m
piles)

PILE SUB DATA

(A) Cost of Initial Pile Load Test - ABUTMENT


As per MORTH Vth Revision Minimum
clause 1113.1 2 Nos.

Load on Pile(Abutment) KN

Total number of Piles in Bridge Nos.

14
Sl.
Qty Unit Description of work Rate Per Amount
No
Total Length of Pile m

Total Reinforcement Qty for Piles MT


Total MS Liner Qty (at cut off Lvl
MT
to Scour Lvl)

MT Initial load test charges MT


Cost of RCC Cast - in - situ
RM RM
bored Pile
MT Cost of Steel for Pile MT

MT Cost of MS. Liner MT

Total

(B) Cost of Initial Pile Load Test - PIER

Load on Pile(PIER) KN

MT Initial load test charges MT


Cost of RCC Cast - in - situ
RM RM
bored Pile
MT Cost of Steel for Pile MT

MT Cost of MS. Liner MT

Total

(C) Cost of Routine Pile Load Test


Minimum
As per MORTH Vth Revision
No. of
clause 1113.2
Test Piles
upto 50 2

50-150 3
2% of
Beyond 150
Total Piles
(fractional No. rounded to next higher integer no.)

= Nos

15
Sl.
Qty Unit Description of work Rate Per Amount
No
Routine load test
MT MT
charges(Abutment)
MT Routine load test charges(Pier) MT

Abstract
Cost of Initial load test in
No. Each
Abutment
No. Cost of Initial load test in Pier Each
Cost of Routine load test in
No. Each
Abutment
No. Cost of Routine load test in Pier Each

Cost required for per Rm of


=
Pile

16
Sl.
Qty Unit Description of work Rate Per Amount
No
BRIDGES DATA

Earth work excavation in all classes of soils except hard rock not requiring blasting and
depositing on bank as per SS20B with all leads and lifts and all other incidental charges
1 such as bailing out water, shoring, strutting, walling and forming protective bunds
wherever necessary etc., complete as per relevent standard specification for DRESSING
THE BED UPTO SILL LEVEL.
1.00 cu.m W-0061 cu.m

Total =

Rate per cu.m

Earth work Excavation in all classes of soils except hard rock not requiring blasting and
depositing on bank with all leads and lifts as per SS20B including cost of all labour,
materials, tools, equipments and all incidental charges and sheeting, shoring, bracing
and their subsequent removal, removal of all logs, stumps and other deleterious matter
2
and obstructions, trimming of bottom of excavtion backfilling, and clearing the site and
disposal of all surplus materials etc. complete as per standard specification forFoundation
under Abutments & Return Walls and Piers / Pile cap under Abutments & Return
Walls and Piers.
1.00 cu.m W-0061 cu.m
Add 100% extra (Narrow
1.00 cu.m cu.m
Cutting)
Providing and Maintaining
1.00 cu.m cu.m
protective bund
1.00 cu.m Bailing out water cu.m

1.00 cu.m Shoring, strutting and walling cu.m

1.00 cu.m Refilling the sides cu.m

1.00 cu.m Hire charges for Tools and plants cu.m

1.00 cu.m Removal of protective bunds cu.m

Rate per cu.m

Earth work Excavation in soft rock not requiring blasting and depositing on bank
with all leads and lifts including cost of all labour, materials, tools, equipments and all
incidental charges and sheeting, shoring, bracing and their subsequent removal, removal
3 of all logs, stumps and other deleterious matter and obstructions, trimming of bottom
of excavtion backfilling, and clearing the site and disposal of all surplus materials etc.
complete as per standard specification for Foundation under Abutments & Return
Walls and Piers / Pile cap under Abutments & Return Walls and Piers.

17
Sl.
Qty Unit Description of work Rate Per Amount
No
1.00 cu.m W-0062 cu.m
Add 100% extra (Narrow
1.00 cu.m cu.m
Cutting)
Providing and Maintaining
1.00 cu.m cu.m
protective bund
1.00 cu.m Bailing out water cu.m

1.00 cu.m Shoring, strutting and walling cu.m

1.00 cu.m Refilling the sides cu.m

1.00 cu.m Hire charges for Tools and plants cu.m

1.00 cu.m Removal of protective bunds cu.m

Rate per cu.m

Earth work Excavation in hard rock requiring blasting and depositing on bank
with all leads as per SS20B including cost of all labour, equipments and maintaining
necessary cofferdams, and their subsequent removal, removal of all logs, stumps, grubs
4 and other deleterious matter and obstructions, trimming bottom of excavtion backfilling,
and clearing the site and disposal of all surplus materials etc complete as per relevent
standard specification for Foundation under Abutments & Return Walls and Piers /
Pile cap under Abutments & Return Walls and Piers.
1.00 cu.m W-0043(WRD) cu.m
Add 100% extra (Narrow
1.00 cu.m cu.m
Cutting)
Providing and Maintaining
1.00 cu.m cu.m
protective bund
1.00 cu.m Bailing out water cu.m

1.00 cu.m Shoring, strutting and walling cu.m

1.00 cu.m Refilling the sides cu.m

1.00 cu.m Hire charges for Tools and plants cu.m

1.00 cu.m Removal of protective bunds cu.m

Rate per cu.m

Benching rock up to an average depth of 10cm including labour etc., complete as per
5
relavant standard specification.
1.00 Sqm W-0048(WRD) Sqm

18
Sl.
Qty Unit Description of work Rate Per Amount
No

Rate per Sqm

Providng Fe-500 D grade of 25mm dia. Dowel bars, including cost and conveyance
of all materials to work site, drilling 40mm holes in rock and grouting the same with
6
cement mortar 1:2 after placing the 25mm dia. Dowel bars etc. complete in foundation
of Abutment & Return walls and Piers.
Drilling holes in hard granite
1.00 RM Rm
40mm dia (WRD - W-0049)
7.321 Kg Cost of steel MT

1.00 RM Grouting Charges Rm

Rate per metre

Providing and driving in position permanent MS liners for piles from bottom of pile cap
as per cl.709.1.4 of IRC 78 - 2014 (up to maximum scour level) including cost of liners
7 and fabricating, welded construction with consumables, labour and plants and driving MS
liner 6mm thick to be left permenantly with the pile shaft as per requirement and as per
specification and placing them in position with all lead and lift etc. complete.
Cost of 6mm MS sheet -
1.05 MT 1 MT
(M-0186)
0.80 Nos. Head Mazdoor Each

4.00 Nos. Fitter - I Class Each

4.00 Nos. Blacksmith - I Class Each

4.00 Nos. Welder - I Class Each

8.00 Nos. Mazdoor - I Class Each


Electrodes, Cutting Gas & Other
5 % Consumables@ 5% on Cost of 1 MT
MS Sheet
Mobile Hydraulic Crane 10 Tonne
8.00 Hours Day
Capacity

Rate for per MT

19
Sl.
Qty Unit Description of work Rate Per Amount
No
Providing Reinforced Cement Concrete cast-int-situ bored PILES of 1000mm diameter
in vibrated RCC M35 (Design mix) using 20mm ISS HBG metal including cost and
conveyance of all materials to site and cost of cement at site but excluding cost and
fabrication of steel and placing it in position before concreting setting up of piling equipment,
shifting the same from one pile location to another pile location, dismantling them and
reerceting as necessary including all labour for driving or boring and providing temporary
casing where required through all soils, leading the excavated earth to a distance of
8
200m including forming of working platform over the river bed of accommodating piling
equipment including working platform etc., forming approaches to the working platform,
mixing concrete, filling it in position, compacting, cutting of pile head to cut off level for
casting pile cap, including diversion of water course if necessary and all other incidental
charges etc., complete as per standard specifications, forming and maintaining protective
bunds and all other incidental charges etc., complete for PILES BELOW PIERS AND
ABUTMENTS.
Materials, Machineries for boring and construction,
Labours :
Taking output for 10m

7.850 cu.m Cost of RCC M35 /Cu.m

350.000 Kg Bentonite /Kg

Hire and running charges of


Hydraulic Piling rig with power
unit & complete accessories
6.00 Hrs. /Hour
including shifting from one bore
location to another.(HW-0023/
HW-0024)
Hire and running charges
0.500 Hrs. of Light crane for lowering /Hour
reinforcement cage
Front End Loader for removing
0.400 Hrs. /Hour
muck 1 cu.m capacity
Tipper 5.5 cu.m capacity for
12.56 t.km disposal of muck from Pile bore km
hole

0.16 Nos. Head Mazdoor Each

4.00 Nos. Mazdoor I Class Each

ADD
Labour for cutting of concrete at
Rm
cut off level
Spill of concrete at cut off level Rm
Conducting SPT test @ every
Rm
Pile location

20
Sl.
Qty Unit Description of work Rate Per Amount
No
Liner scrap above cut off level Rm
Load test on pile both vertical
and horizontal as per codal Rm
provision on pile
Total =

Rate per metre


BENTONITE should be used as per case (Usage as per guidelines of
MORT&H)

Providing Reinforced Cement Concrete cast-int-situ bored PILES of 1200mm diameter


in vibrated RCC M35 (Design mix) using 20mm ISS HBG metal including cost and
conveyance of all materials to site and cost of cement at site but excluding cost and
fabrication of steel and placing it in position before concreting setting up of piling equipment,
shifting the same from one pile location to another pile location, dismantling them and
reerceting as necessary including all labour for driving or boring and providing temporary
casing where required through all soils, leading the excavated earth to a distance of
9
200m including forming of working platform over the river bed of accommodating piling
equipment including working platform etc., forming approaches to the working platform,
mixing concrete, filling it in position, compacting, cutting of pile head to cut off level for
casting pile cap, including diversion of water course if necessary and all other incidental
charges etc., complete as per standard specifications, forming and maintaining protective
bunds and all other incidental charges etc., complete for PILES BELOW PIERS AND
ABUTMENTS.
Materials, Machineries for boring and construction,
Labours :
Taking output for 9m

10.180 cu.m Cost of RCC M35 /Cu.m

385.000 Kg Bentonite /Kg


Hire and running charges of
Hydraulic Piling rig with power
unit & complete accessories
6.00 Hrs. /Hour
including shifting from one bore
location to another.(HW-0023/
HW-0024)
Hire and running charges
0.500 Hrs. of Light crane for lowering /Hour
reinforcement cage
Front End Loader for removing
0.500 Hrs. /Hour
muck 1 cu.m capcity
Tipper 5.5 cu.m capacity for
16.290 t.km disposal of muck from Pile bore km
hole
0.18 Nos. Head Mazdoor Each

4.50 Nos. Mazdoor I Class Each

21
Sl.
Qty Unit Description of work Rate Per Amount
No
ADD
Labour for cutting of concrete at
Rm
cut off level
Spill of concrete at cut off level Rm
Conducting SPT test @ every
Rm
Pile location
Liner scrap above cut off level Rm
Load test on pile both vertical
and horizontal as per codal Rm
provision on pile
Total =

Rate per metre


BENTONITE should be used as per case (Usage as per guidelines of
MORT&H)

Filling with Stone Dust including cost and conveyance of material to work site including
labour charges for filling, laying, compacting by manual labour under optimum
10 moisture content to get the maximum density flooding with water as layers or built-up
to the bottom level inclusive all other incidental charges etc., complete below levelling
course.
Cost of Stone Dust / Sand / M
1.00 cu.m cu.m
Sand
Labour for Filling Charges /
1.00 cu.m cu.m
Spreading Charges

Rate per cu.m

Plain Cement concrete M10 Grade using 40mm ISS size hard broken granite metal
including cost and conveyance of all materials to site and cost of cement at site, including
soft water, labour charges for mixing transporting, laying, compacting, curing concrete,
11
Hire charges for Tools and plants and all incidental charges such as bailing out water,
maintaining protective bunds, cofferdams, shoring etc., complete for LEVELLING
COURSE BELOW FOUNDATION
1.00 cu.m Cost of CC M10 cu.m

1.00 cu.m Soft water for curing concrete cu.m

1.00 cu.m Hire charges for Tools and plants cu.m

Rate per cu.m

22
Sl.
Qty Unit Description of work Rate Per Amount
No
Plain Cement concrete M15 Grade using 40mm ISS size hard broken granite metal
including cost and conveyance of all materials to site and cost of cement at site, including
soft water, labour charges for mixing transporting, laying, compacting, curing concrete,
12
Hire charges for Tools and plants and all incidental charges such as bailing out water,
maintaining protective bunds, cofferdams, shoring etc., complete for LEVELLING
COURSE BELOW Foundation / Pile caps.
1.00 cu.m Cost of CC M15 cu.m

1.00 cu.m Soft water for curing concrete cu.m

1.00 cu.m Hire charges for Tools and plants cu.m

Rate per cu.m

Vibrated Plain Cement concrete of grade M15 using 40mm ISS size hard broken
granite metal including cost and conveyance of all materials to site and cost of cement
at site, including soft water, labour charges for mixing transporting, laying, compacting,
13
curing concrete, Hire charges for Tools and plants and all incidental charges such as
bailing out water, maintaining protective bunds, cofferdams, shoring etc., complete for
LEVELLING COURSE BELOW PILE CAPS / Foundation.
1.00 cu.m Cost of CC M15 cu.m

1.00 cu.m Soft water for curing concrete cu.m

1.00 cu.m Hire charges for Tools and plants cu.m

Rate per cu.m

Vibrated Plain Cement concrete of grade M20/M25/M30 using 20mm ISS size hard broken
granite metal including cost and conveyance of all materials to site and cost of cement
at site, including soft water, labour charges for mixing transporting, laying, compacting,
14
curing concrete, Hire charges for Tools and plants and all incidental charges such as
bailing out water, maintaining protective bunds, cofferdams, shoring etc., complete for
LEVELLING COURSE BELOW PILE CAPS / FOOTINGS.
1.00 cu.m Cost of CC M20/M25/M30 cu.m

1.00 cu.m Soft water for curing concrete cu.m

1.00 cu.m Hire charges for Tools and plants cu.m

Rate per cu.m

23
Sl.
Qty Unit Description of work Rate Per Amount
No
Vibrated Cement concrete of grade M20 (Nominal mix) using 40mm ISS HBG granite
metal including cost and conveyance of all materials to site including cement at site,
including cost of form work, soft water, labour charges for mixing, transporting, laying
15 and curing concrete, worikingat depths, Hire charges for Tools and plants and incidental
charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc,
complete as per relevent standard specification for Footing of Abutments, Return
Walls and Piers / Cutoff Wall / Raft (BELOW SILL).
1.00 cu.m Cost of Vibrated CC M20 cu.m

1.000 sqm Formwork and centering sqm

1.00 cu.m Working on Depths cu.m

1.00 cu.m Soft water for curing concrete cu.m

1.00 cu.m Hire charges for Tools and plants cu.m

Rate per cu.m

Vibrated Reinforced Cement Concrete of grade M30/M35 (Design mix) using


20mm and below HBG graded metal including cost and conveyance of all materials to site
excluding cost of steel including cost of formwork, soft water, labour charges for mixing,
16 transporting, laying and curing concrete, working at depths Hire charges for Tools and
plants and incidental charges such as bailing out water, maintaining of protective bunds,
cofferdams, shoring, strutting etc., complete as per relevent standard specification for
Foundation of Abutments and Return Walls, Piers.
1.00 cu.m Cost of Vibrated CC M30/M35 cu.m

1.000 sqm Formwork and centering sqm

1.00 cu.m Working on Depths cu.m

1.00 cu.m Soft water for curing concrete cu.m

1.00 cu.m Hire charges for Tools and plants cu.m

Rate per cu.m

Vibrated Cement Concrete of grade M15/M20 (Nominal mix) using 20mm ISS
size HBG metal including cost and conveyance of all materials to site and cost cement at
site including cost of formwork, soft water, labour charges for mixing, transporting, laying
17
and curing concrete, working at depths Hire charges for Tools and plants and incidental
charges etc., complete as per relevent standard specification for Foundation / Side
Walls & Bedding of Craddle Concrete of Collection Chamber / Pipe Culvert
1.00 cu.m Cost of Vibrated CC M15/M20 cu.m

1.000 sqm Formwork and centering sqm

24
Sl.
Qty Unit Description of work Rate Per Amount
No
1.00 cu.m Soft water for curing concrete cu.m

1.00 cu.m Hire charges for Tools and plants cu.m

Rate per cu.m

Cement concrete M15 (Nominal mix), using 40 mm ISS HBG graded metal, including
cost and conveyance of all materials to site and cost of cement at site, including soft water,
18 labour charges for mixing, transporting, laying and curing concrete, etc., complete, as
per relevant standard specification, for FILLING THE TRENCHES AROUND FOOTINGS
as per. 707.4.6 of IRC 78:2014.
1.00 cu.m Cost of CC M15 cu.m

1.00 cu.m Soft water for curing concrete cu.m

1.00 cu.m Hire charges for Tools and plants cu.m

Rate per cu.m

FILLING THE TRENCHES AROUND FOOTINGS for a depth greater than 1.5m in
soft rock or 0.6m in hard rock with boulders to be grouted with cement upto top
of rock / top of foundation as per. 707.4.6 of IRC 78:2014 and for the remaining
19 with Cement concrete M15 (Nominal mix), using 40 mm ISS HBG graded metal,
including cost and conveyance of all materials to site and cost of cement at site, including
soft water, labour charges for mixing, transporting, laying and curing concrete, etc.,
complete, as per relevant standard specification.
0.30 cu.m Cost of CC M15 cu.m

0.08 cu.m Cost of Cement mortar 1:2 cu.m

1.10 Nos. Mason II Class cu.m

2.20 cu.m Mazdoor I class cu.m

3.20 cu.m Mazdoor II class cu.m

Total for 10 cu.m =

A - Rate per cu.m


Filling Boulders with Cement
Grouting 1:2:4
11.00 cu.m cost of Rough stone cu.m

3.50 Nos. Wodders Each

25
Sl.
Qty Unit Description of work Rate Per Amount
No
10.60 Nos. Mazdoor I Class Each

7.10 Nos. Mazdoor II Class Each

Total for 10 cum =

B - Rate per cu.m

(A+B) Rate per cu.m

Vibrated Reinforced Cement Concrete of grade M35 (Design mix) using 20mm
and below HBG graded metal including cost and conveyance of all materials to site
excluding cost of steel including cost of formwork, soft water, labour charges for mixing,
20 transporting, laying and curing concrete, working at depths Hire charges for Tools and
plants and incidental charges such as bailing out water, maintaining of protective bunds,
cofferdams, shoring, strutting etc., complete as per relevent standard specification for
PILE CAPS Under Abutments & Piers
1.00 cu.m Cost of Vibrated CC M35 cu.m

1.000 sqm Formwork and centering sqm

1.00 cu.m Soft water for curing concrete cu.m

1.00 cu.m Hire charges for Tools and plants cu.m

Rate per cu.m

Vibrated Cement concrete of grade M15/M20 (Nominal mix) using 40mm ISS HBG
granite metal including cost and conveyance of all materials to site including cement at
site, including cost of form work, soft water, labour charges for mixing, transporting,
21 laying and curing concrete, worikingat depths, Hire charges for Tools and plants and
incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting
etc, complete as per relevent standard specification for Substructure of Abutments &
Return Walls / Wing Wall / BODY WALL (BELOW SILL / ABOVE SILL).
1.00 cu.m Cost of Vibrated CC M20 cu.m

1.000 sqm Formwork and centering sqm

1.00 cu.m Working on Depths / Heights cu.m

1.00 cu.m Soft water for curing concrete cu.m

1.00 cu.m Hire charges for Tools and plants cu.m

Rate per cu.m

26
Sl.
Qty Unit Description of work Rate Per Amount
No
Vibrated Reinforced Cement Concrete of grade M25/M30 (Design mix) using
20mm ISShard broken granite metal including cost and conveyance of all materials
to site and cost of cement excluding cost and fabrication of steel but including cost
22 of form work, labour charges for mixing, transporting, laying and curing concrete,
working at heights, hire charges for Hire charges for Tools and plants including all other
incidental charges etc, complete for Box culvert / FOOTPATH / DRAINS / Rainwater
Harvesting Cover Slab
1.00 cu.m Cost of Vibrated CC M25/M30 cu.m

1.000 sqm Formwork and centering sqm

1.00 cu.m Soft water for curing concrete cu.m

1.00 cu.m Hire charges for Tools and plants cu.m

Rate per cu.m


Vibrated Reinforced Cement concrete of grade M30/M35 (Design mix) using
20mm and below ISS HBG graded metal including cost and conveyance of all materials
to site including cement at site, including cost of soft water, labour charges for mixing,
23 transporting, laying and curing concrete, Hire charges for Tools and plants and incidental
charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc,
complete as per relevent standard specification for Substructure of Abutments &
Return Walls / Retaining Wall (BELOW SILL / ABOVE SILL).
1.00 cu.m Cost of Vibrated CC M30/M35 cu.m

1.000 sqm Formwork and centering sqm

1.00 cu.m Working on Depths / Heights cu.m

1.00 cu.m Soft water for curing concrete cu.m

1.00 cu.m Hire charges for Tools and plants cu.m

Rate per cu.m

Vibrated Reinforced Cement Concrete of grade M25/M30/M35 (Design mix)


using 20mm and below ISS HBG metal including cost and conveyance of all materials
to site and cost of cement excluding cost and fabrication of steel but including cost of
24
form work, labour charges for mixing, transporting, laying and curing concrete, working
at heights, hire charges for Hire charges for Tools and plants including all other incidental
charges etc. complete for Bed block cum Dirtwall Over Abutments.
Cost of Vibrated CC M25/M30/
1.00 cu.m cu.m
M35
1.000 sqm Formwork and centering sqm

1.00 cu.m Working on Heights cu.m

1.00 cu.m Soft water for curing concrete cu.m

27
Sl.
Qty Unit Description of work Rate Per Amount
No
1.00 cu.m Hire charges for Tools and plants cu.m

Rate per cu.m

Vibrated Reinforced Cement Concrete of grade M30/M35 (Design mix) using


20mm and below HBG graded metal including cost and conveyance of all materials
to site excluding cost of steel including cost of formwork, soft water, labour charges
25 for mixing, transporting, laying and curing concrete, working at depths Hire charges
for Tools and plants and incidental charges such as bailing out water, maintaining of
protective bunds, cofferdams, shoring, strutting etc., complete as per relevent standard
specification for PIERS.
1.00 cu.m Cost of Vibrated CC M30/M35 cu.m

1.000 sqm Formwork and centering sqm

1.00 cu.m Working on Heights cu.m

1.00 cu.m Soft water for curing concrete cu.m

1.00 cu.m Hire charges for Tools and plants cu.m

Rate per cu.m

Vibrated Reinforced cement concrete of grade M30/M35 (Design mix) using


20mm and below HBG metal including cost and conveyance of all materials to site and
cost of cement excluding cost and fabrication of steel but including cost of form work,
26
labour charges for mixing, transporting, laying and curing concrete, working at heights,
hire charges for Hire charges for Tools and plants including all other incidental charges
etc., complete for CAPPING BEAM OVER PIER.
1.00 cu.m Cost of Vibrated CC M30/M35 cu.m

1.000 sqm Formwork and centering sqm

1.00 cu.m Working on Heights cu.m

1.00 cu.m Soft water for curing concrete cu.m

1.00 cu.m Hire charges for Tools and plants cu.m

Rate per cu.m

28
Sl.
Qty Unit Description of work Rate Per Amount
No
Vibrated Reinforced cement concrete of grade M30/M35 (Design mix) using
20mm and below HBG metal including cost and conveyance of all materials to site
and cost of cement excluding cost and fabrication of steel but including labour charges
27
for mixing, transporting, laying and curing concrete, working at heights, hire charges for
Hire charges for Tools and plants including all other incidental charges etc., complete for
Pedsetals.
1.00 cu.m Cost of Vibrated CC M30/M35 cu.m

1.000 sqm Formwork and centering sqm

1.00 cu.m Working on Heights cu.m

1.00 cu.m Soft water for curing concrete cu.m

1.00 cu.m Hire charges for Tools and plants cu.m

Rate per cu.m

Supply and fixing of Elastomeric bearing of size shown in the drawing


28 including cost and conveyance to worksite, labour for fixing the bearing in correct position
and all other incidental charges etc., complete
Cost of bearing including labour
1.00 cu.cm cu.cm
charges for fixing

Rate per cu.cm

Vibrated Reinforced cement concrete of grade M30/M35 (Design mix) using


20mm and below HBG metal including cost and conveyance of all materials to site
and cost of cement excluding cost and fabrication of steel but including labour charges
29
for mixing, transporting, laying and curing concrete, working at heights, hire charges for
Hire charges for Tools and plants including all other incidental charges etc., complete for
Solid Deck Slab / T Beam and Cross girders / Deck Slab, Kerb & Footpath.
1.00 cu.m Cost of Vibrated CC M30/M35 cu.m

1.000 sqm Formwork and centering sqm

1.00 cu.m Working on Heights cu.m

1.00 cu.m Soft water for curing concrete cu.m

1.00 cu.m Hire charges for Tools and plants cu.m

Rate per cu.m

29
Sl.
Qty Unit Description of work Rate Per Amount
No
Vibrated Reinforced cement concrete of grade M30 (Design mix) using 20mm and
below ISS hard broken granite metal including cost and conveyance of all materials to
30 site cost of premoulded expansion joints and fixing the same in position including cost
and labour charges for formwork, labour charges for laying, compacting, curing including
all other incidental charges etc., complete for Hand Rails and Posts
cu.m Cost of Vibrated CC M30 cu.m

sqm Formwork and centering sqm

cu.m Soft water for curing concrete cu.m

cu.m Hire charges for T&P cu.m

Rate per metre

Vibrated Reinforced cement concrete of grade M40 (Design mix) using 20mm
and below HBG metal including cost and conveyance of all materials to site and cost
of cement excluding cost and fabrication of steel but including labour charges for
31
mixing, transporting, laying and curing concrete, working at heights, hire charges for
Hire charges for Tools and plants including all other incidental charges etc., complete for
Crash Barriers(INNER/OUTER).
1.00 cu.m Cost of Vibrated CC M40 cu.m

1.000 sqm Formwork and centering sqm

1.00 cu.m Soft water for curing concrete cu.m

1.00 cu.m Hire charges for T&P cu.m

Rate per cu.m

Providing and fixing G.I Drainage spouts of 100mm Dia as per GOI drawing No.
SD/205 with grating arrangements at top as shown in the drawing and 100mm dia
32
drainage spouts projecting atleast 300mm beyond bottom of deck slab including cost
and conveyance of all materials to site and fixing them in position etc., complete.
Cost of G.I pipe including labour As per
1.00 No. Each
charges for fixing SOR
Rate per No.

Supplying and installation of Strip Seal Expansion Joint system conforming to


specifications for Roads and Bridge works published by the MORT&H and Highways in the
40mm wide expansion gap provided in between decks over piers and in between decks
33 and dirt wall over abutment with fatigue tested structural steel section at the nosing and
anchorage seembly including cost and conveyance ofall materials cost of testing as per
the MOST specifications including labour equipment and incidental charges for fixing the
joints complete in all respects as per section 2600 of MORT&H specification.

30
Sl.
Qty Unit Description of work Rate Per Amount
No
Cost of Strip Seal Exp.Jt.
As per
1.00 Rm including labour charges for Rm
SOR
fixing
Rate per metre

Vibrated cement concrete M15 (Nominal mix) using 40mm ISS size hard broken
granite metal including cost and conveyance of all materials to site including cost and
34 labour charges for formwork, centering, labour charges for laying, compacting, curing
all incidental charges etc., complete for BASE COURSE BELOW APPROACH SLAB /
PARAPET / BROKEN PARAPET.
1.00 cu.m Cost of Vibrated CC M15 cu.m

1.00 sqm Formwork and centering sqm

1.00 cu.m Soft water for curing concrete cu.m

1.00 cu.m Hire charges for Tools and plants cu.m

Rate per cu.m

Vibrated reinforced cement concrete M30/M35 Grade (Design mix) using 20mm
& below ISS HBG graded size including cost and conveyance of all materials to work
site but excluding cost and conveyance and fabrication of steel but including cost and
35
labour charges for form work and centering, labour charges for laying, compacting, curing
including all other incidental charges etc.,complete for APPROACH SLABS / MEDIAN
/ SAFETY KERB.
1.00 cu.m Cost of Vibrated CC M30/M35 cu.m

1.00 sqm Formwork and centering sqm

1.00 cu.m Soft water for curing concrete cu.m

1.00 cu.m Hire charges for Tools and plants cu.m

Rate per cu.m

Vibrated cement concrete M30 Grade (Design mix) using 20mm, 12mm and
6mm ISS size hard broken granite metal including cost and conveyance of all materials
to site cost of premoulded expansion joints and fixing the same in position including cost
36
and labour charges for formwork, labour charges for laying, compacting, curing including
all other incidental charges etc.,complete for WEARING COAT 75mm UNIFORM
THICKNESS OVER DECK SLAB AND OVER APPROACH SLAB.
0.45 cu.m Cost of 20mm ISS metal cu.m

0.17 cu.m Cost of 12mm ISS metal cu.m

31
Sl.
Qty Unit Description of work Rate Per Amount
No
0.07 cu.m Cost of 6mm ISS metal cu.m

0.34 cu.m Cost of M Sand cu.m

0.408 MT Cost of Cement 1 MT

1.88 Nos. Mazdoor I Class Each

1.16 Nos. Mazdoor II Class Each

0.43 Nos. Carpenter I class Each

0.36 Nos. Mason I class Each

0.75 cu.m Vibration charges cu.m

0.75 cu.m Soft water for curing concrete cu.m

0.75 cu.m Hire charges for Tools and plants cu.m

Total for 10 sqm

Rate per Sqm

Providing and fixing Class I PVC seepage pipes of dia of required lengths
for abutments and return walls / Side Walls including costs and conveyance of all
37
materials to work site and labour charges for fixing etc., complete to drain from the
backfill as per section 2706 of MORTH specification (Rev- V)
Cost of PVC seepage pipe
1.00 Rm Rm
including
1.00 Rm Labour charges for fixing Rm

Rate per metre

Providing FILTER MEDIA behind abutments and return walls for 600mm thickness
using filter material conforming to clause 309.3.2.B of MORT&H(Rev -V) well packed
38 with smaller size towards the soil and bigger size towards the wall including cost and
conveyance of all materials to worksite and including labour charges and all other
incidental charges etc.,complete.
Cost of IRC metal incl.
1.00 cu.m conveyance (22.4mm, 11.2mm, cu.m
5.6mm & 2.75mm)
1.00 cu.m Labour for filling Charges cu.m

Rate per cu.m

32
Sl.
Qty Unit Description of work Rate Per Amount
No
Filling behind Abutments and return walls with clean gritty free draining gravel
including cost of gravel having pi value more than 35, conveyance of gravel to worksite.
39 Laying, handling charges and filling in layers tamping under optimum moisture content
to get the maximum density, including watering, with all leads and lifts for water and all
other incidental charges etc., complete
1.16 cu.m Cost of Gravel cu.m

1.00 cu.m Labour for filling Charges cu.m

Rate per cu.m


Supply and fabrication of STEEL grade Fe500 with suitable anticorrsive measure required
for all the reinforced cement concrete items of work involved in the shedule including cost
of steel, cost of fabrication, labour charges for cleaning the rods, straightening, cutting,
40
bending, tying grills, hoisting and placing the reinforcement in position as specified in the
drawing including cost of binding wire, provision of spacer bars, cover blocks and all other
incidental charges etc., complete.
1.05 MT Cost of steel MT

0.01 MT Cost of Binding wire MT


Anti corrosive Treatment for
1.00 MT MT
steel
35.00 Nos. Fitter I class for fabrication Each

Rate for per MT

Supply of Steel Grade Fe 240 including cost of steel at site including fabrication
chrages for cleaning the rods, straightening, cutting, bending, tying grills and placing
41 the reinforcement in position as specified in the drawings, including cost of binding wire,
provision of spacer bars, cover blocks and all other incidental charges etc., complete for
MILD STEEL.
1.05 MT Cost of Fe 240 steel MT

0.01 MT Cost of Binding wire MT


Anti corrosive Treatment for
1.00 MT MT
steel
35.00 Nos. Fitter I class for fabrication Each

Rate for per MT

33
Sl.
Qty Unit Description of work Rate Per Amount
No
MISCELLANEOUS

Supply and fixing of KRAFT paper for full width of seating of Deckslab and including
1 cost and conveyance to worksite, labour for fixing the same in correct position and all
other incidental charges etc., complete
Cost of Kraft paper including
1.00 Sqm Sqm
labour charges for fixing
Rate per Sqm

Supplying and fixing of PVC expansion joint in between Deck slabs over abutment
and pier as shown in the drawing including cost and conveyance of expansion joints
2
including shalimar pad and joint sealent etc., complete as per section 2600 of MORTH
specifications (Rev-V)
PVC expansion joint including
1.00 Rm Rm
labour charges for fixing
Rate per metre

Providing and Fixing of FRP GRATINGS of 600 X 300mm size with M.S. Flats of 25
X 10mm for outer frames, 25 X 6mm for Inner Braces and PVC pipe 150mm dia fixed with
3
Mild Steel Grating, including cost & conveyance of Pipes and Gratings and fixing them in
position (@ 5m Interval).
1.00 Each As per SOR Each

Rate per No.

Supplying and Fixing of Reinforced Cement Concrete Man Hole cover of 750 X
750mm size with frames as per IRC 50 - 1979 as directed by the departmental officers
4
including labour charges for fixing at every intervals of 5m along the drain including all
other incidental charges etc., complete.
1.00 Each As per SOR Each

Rate per No.

Providing & maintaining of the Cofferdam for protective foundation including cost and
conveyance of quarry fine(Stone dust) and empty bag including filling charges for gunny
5
bags, thread, needle, stitching charges & labour charges for positioning the site etc., to
complete as directed by the departmental officers.
Providing the Earth item given in
0.0283 cu.m cu.m
estimate

34
Sl.
Qty Unit Description of work Rate Per Amount
No
Empty cement bags @ 30% of
1.00 bag bag
L/C
L/C for filling the empty cement
1.00 bag bag
gunny bags
1.00 bag Thread & Needle @ 15% of L/C bag

Total for 0.0283 cu.m =

Rate per cu.m

Providing and Installing dewatering system for laying of foundation of Abutment and Piers
6 including cost and conveyance all Hire charges for Tools and plants including dewatering
pump and accessories including operating charges and maintanene charges etc., complete
Operation Hire Requirements
OPEN
for Abutment
Installing Well point connecting
1 Days all to leader pipes & standing the 8.00 Hrs 8.00
pump
Earthwork excavation for
foundation including leader
12 Days 6.00 Hrs 72.00
pipes & standing the pump and
Concreting Works (12*6)
1 Days Centering & formwork 8.00 Hrs 8.00

2 Days During Concreting 12.00 Hrs 24.00


Removal of centering & back
1 Days 8.00 Hrs 8.00
filling excavated portion
Total(A) Hrs 120.00

Operation Hire Requirements


for Pier
Installing Well point connecting
1 Days all to leader pipes & standing the 8.00 Hrs 8.00
pump
Earthwork excavation for
foundation including leader
8 Days 6.00 Hrs 48.00
pipes & standing the pump and
Concreting Works (8*6)
1 Days Centering & formwork 8.00 Hrs 8.00

1 Days During Concreting 12.00 Hrs 12.00


Removal of centering & back
1 Days 8.00 Hrs 8.00
filling excavated portion
Total(B) Hrs 84.00

35
Sl.
Qty Unit Description of work Rate Per Amount
No
Similar operation for Total
Abutments & Piers
Nos* Abutments - Required Nos. of
Hrs. Hrs
Total(A) Diesel Pump set for specified HP
Nos* Piers - Required Nos. of Diesel
Hrs. Hrs
Total(B) Pump set for specified HP
Total Hrs

Providing and Installing dewatering system for laying of foundation of Abutment and Piers
7 including cost and conveyance all Hire charges for Tools and plants including dewatering
pump and accessories including operating charges and maintanene charges etc., complete
Operation Hire Requirements
PILE
for Abutment
Earthwork excavation for
10 Days foundation including leader pipes 8.00 Hrs 80.00
& standing the pump
Lowering the water table below
1 Days 1.00 Hrs 1.00
foundation before LC work
1 Days Laying LC 5.00 Hrs 5.00
Lowering the water table below
2 Days foundation before Pile concrete 1.00 Hrs 2.00
upto cutoff level
2 Days During Breaking Concrete 8.00 Hrs 16.00
Lowering the water table below
1 Days foundation before fabrication of 1.00 Hrs 1.00
steel
2 Days During Fabrication of concrete 8.00 Hrs 16.00
Lowering the water table below
1 Days 1.00 Hrs 1.00
foundation before shuttering
3 Days During shuttering 8.00 Hrs 24.00
Lowering the water table below
2 Days 1.00 Hrs 2.00
foundation before concreting
2 Days During concreting 10.00 Hrs 20.00

2 Days During deshuttering & refilling 10.00 Hrs 20.00

Total(A) Hrs 188.00

Operation Hire Requirements


for Pier
Earthwork excavation for
5 Days foundation including leader pipes 8.00 Hrs 40.00
& standing the pump

36
Sl.
Qty Unit Description of work Rate Per Amount
No
Lowering the water table below
1 Days 1.00 Hrs 1.00
foundation before LC work
1 Days Laying LC 5.00 Hrs 5.00
Lowering the water table below
2 Days foundation before Pile concrete 1.00 Hrs 2.00
upto cutoff level
2 Days During Breaking Concrete 8.00 Hrs 16.00
Lowering the water table below
1 Days foundation before fabrication of 1.00 Hrs 1.00
steel
2 Days During Fabrication of concrete 8.00 Hrs 16.00
Lowering the water table below
1 Days 1.00 Hrs 1.00
foundation before shuttering
2 Days During shuttering 8.00 Hrs 16.00
Lowering the water table below
1 Days 1.00 Hrs 1.00
foundation before concreting
1 Days During concreting 10.00 Hrs 10.00

1 Days During deshuttering & refilling 10.00 Hrs 10.00

Total(B) Hrs 119.00

Similar operation for Total


Abutments & Piers
Nos* Abutments - Required Nos. of
Hrs. Hr
Total(A) Diesel Pump set for specified HP
Nos* Piers - Required Nos. of Diesel
Hrs. Hr
Total(B) Pump set for specified HP
Total Hrs

Supply of 900mm /1000mm /1200mm dia RCC NP3 class pipes confirming to IS
458 specification as directed by the departmental officers including cost and conveyance
8
of pipes to the worksite and all other incidental charges etc., complete as per standard
specification.
1.00 Rm As per SOR Rm

Rate per metre

37
Sl.
Qty Unit Description of work Rate Per Amount
No
Laying and fixing of 900mm /1000mm /1200mm dia RCC NP3 pipe in position
9 excluding cost of pipes but including conveyance to work spot and handling charges on
both sides including labour charges for hoisting and placing the pipes
1.00 Rm As per SOR Rm

Rate per metre


Supplying and fixing rough stone of 30cm thickness dry packing including cost and
10 conveyance of all materials to worksite including all other incidental charges etc., complete
for Revetments & Aprons.
11.00 cu.m cost of Rough stone cu.m

3.50 Nos. Wodder Each

10.60 Nos. Mazdoor I Class Each

7.10 Nos. Mazdoor II Class Each

Total for 10 cu.m

Rate per cu.m


Providing Sand bags as support to the diversion road including cost and conveyance of
quarry fine(Stone dust) and empty bag including filling charges for gunny bags,charges &
11
labour charges for positioning the site etc., to complete as directed by the departmental
officers.
Providing the Earth item given in
0.0283 cu.m cu.m
estimate
Empty cement bags @ 30% of
1.00 bag bag
L/C
L/c for filling the empty cement
1.00 bag bag
gunny bags
Total for 0.0283 cu.m

Rate per cu.m

Supplying and fixing of 83mm thick M35 grade Rubber moulded hydraulic pressed
type paver block with super embedded unskids texture design making the international
standard size with zig zag design for hipper interlock capacity rate inclusive of materials,
12
transporting to the work site from the factor and labour charges for laying, compacting
with paver vibrator and inclusive of taxes as per clause 410 of MORTH Vth Revision
and as directed by the departmental officers etc. complete.
Interlocking Paver block stone
10.00 sqm Nos.
83mm thk.
1.80 Nos. Mason I Class Each

3.60 Nos. Mason II Class Each

2.20 Nos. Mazdoor I Class Each

38
Sl.
Qty Unit Description of work Rate Per Amount
No
2.20 Nos. Mazdoor II Class Each

0.08 cu.m Crushed stone filling cu.m

0.50 Nos. Stone Cutter I Class Each


Plate compactor - Compaction &
0.029 Hrs /Hr
Rolling
Rate per 10 sqm

Rate per Sqm

OBSERVED
Providing and fixing Class I Cast Iron Pipe of 250mm dia of required lengths including
costs and conveyance of all materials to work site and labour charges for fixing etc.,
1
complete to the Rainwater Harvesting as per section 2706 of MORTH specification
(Rev- V)
1.00 Rm As per Local Rate Rm

Rate per metre

Filling with Pebbles of 4mm to 6mm size including cost and conveyance of material to
work site including labour charges for filling, laying, compacting by manual labour
2 under optimum moisture content to get the maximum density flooding with water as
layers or built-up to the bottom level inclusive all other incidental charges etc., complete
for RHT WELL.
1.00 cu.m Pebbles - Local Rate cu.m

1.00 cu.m Labour for Filling charges cu.m

Rate per cu.m

Providing & fixing handrails and posts with 65 x 65 x 6mm angle as vertical post and
3 32mm dia Gl pipe for horizontal handrails over crash barrier including cost and supply
of pipe and fixing charges etc complete as per MORT & H. No. 2700.
1.00 LS Cost of bolts LS

1.00 LS Welding Charges LS

1.00 LS Post drilling & fixing charges LS

1.00 LS Concrete drilling LS

1.00 LS Fixing of pipes LS

39
Sl.
Qty Unit Description of work Rate Per Amount
No
1.00 LS Conveyance charges LS

Total for cost of fabrication ‘A’

15.30 RM Cost of 65 x 65 x 6mm angle RM

48.00 RM Cost of 32mm dia. GI Pipes RM

17.00 Nos. Cost of 6mm plate Nos.

Total for cost of material ‘B’

Total for 16 RM

Rate per metre

Providing & fixing handrails and posts with 75mm angle as vertical post and 32mm
4 dia Gl pipe (16m length)for horizontal handrails over crash barrier including cost and
supply of pipe and fixing charges etc complete as per MORT & H. No. 2700.
Cost of 75mm dia. GI Pipes.
15.30 RM RM
(angle)
48.00 RM Cost of 32mm dia. GI Pipes RM

17.00 Nos. Cost of 6mm plate Nos.


Cost of bolts, screws, drilling
1.00 LS LS
holes
1.00 LS Welding Charges LS

1.00 LS Post drilling & fixing charges LS

1.00 LS Concrete drilling LS

1.00 LS Fixing of pipes LS

1.00 LS Conveyance charges LS

Total for 16 RM

Rate per metre

40
PROJECTS

41
RMR FOR SOR 2024 - 25
ANNEXURE - II
RATES OF MATERIALS

Basic rates Ap- Conve-


Sl. Unique Lead in Stacking/ Storage
Description of Material Unit proved for the year -yance Total
No. code Km charges
2024 - 2025 charge
1 M-0002 Steel (HYSD) MT

2 M-0001 Cement (OPC) MT

3 M-0086 HBGS Jelly 40mm size (ISS) Cu.m

4 M-0087 HBGS Jelly 25mm size (ISS) Cu.m

5 M-0088 HBGS Jelly 20mm size (ISS) Cu.m

6 M-0089 HBGS Jelly 12mm size (ISS) Cu.m

7 M-0090 HBGS Jelly 10mm size (ISS) Cu.m

42
8 M-0091 HBGS Jelly 6mm size (ISS) Cu.m

9 M-0064 Bond Stones Cu.m

10 M-0093 90 mm Size (IRC) Cu.m

11 M-0094 75 mm Size (IRC) Cu.m

12 M-0095 63 mm Size (IRC) Cu.m

13 M-0096 53 mm Size (IRC) Cu.m

14 M-0097 46.5 mm Size (IRC) Cu.m

15 M-0098 45 mm Size (IRC) Cu.m

16 M-0099 37.50 mm Size (IRC) Cu.m

17 M-0100 26.50 mm Size (IRC) Cu.m


18 M-0101 25 mm Size (IRC) Cu.m

19 M-0102 22.40 mm Size (IRC) Cu.m

20 M-0103 13.20 mm Size (IRC) Cu.m

21 M-0104 11.20 mm Size (IRC) Cu.m

22 M-0105 6.7/6/5.6 mm Size (IRC) Cu.m

23 M-0106 4.75 mm Size & Below (IRC) Cu.m

24 M-0119 Gravel Cu.m

25 M-0123 Stone Dust Cu.m


Crushed Stone Sand (Com-
26 M-0125 Cu.m
mercially called M-Sand)
27 M-0127 Sand for Mortar * Cu.m

43
28 M-0128 Sand for Filling * Cu.m

29 Earth (Conveyance cost only) Cu.m


ANNEXURE - I
RATES OF LABOUR

Extra % for
Pg. Basic rates
Rates of Labour,
No. Unique Approved TOTAL
Description of Material Unit Rates of Works
in code for the year RATE
and for Head
SOR 2024 - 2025
Load

30 L-0014 Blacksmith - I Class Day

31 L-0016 Carpenter-I Class Day

32 L-0018 Fitter-I Class Day

33 L-0019 Fitter-I Class (Pipe Laying / Bar Bending) Day

34 L-0029 Mason for Brick Work-I Class Day

44
35 L-0031 Mason for Stone Work-I Class Day

36 L-0037 Pile Driver Day

37 L-0036 Painter / Varnisher-I Class Day

38 L-0046 Welder / Bracer - I Day

39 L-0050 Wodder (Stone Packer) Day

40 L-0063 Carpenter-II Class Day

41 L-0068 Fitter-II Class (Pipe Laying / Bar Bending) Day

42 L-0071 Mason for Brick Work-II Class Day


Extra % for
Pg. Basic rates
Rates of Labour,
No. Unique Approved TOTAL
Description of Material Unit Rates of Works
in code for the year RATE
and for Head
SOR 2024 - 2025
Load
43 L-0072 Mason for Stone Work-II Class Day

44 L-0073 Mazdoor Category-I Day

45 L-0074 Mate (Head Mazdoor - as per SOR) Day

46 L-0077 Painter / Varnisher-II Class Day

47 L-0098 Mazdoor Category-II Day

48 L-0087 Welder / Bracer - II Day


ANNEXURE - III
RATES OF WORKS
ORDINARY SOIL (SS20B) Earth work excavating and

45
depositing on bank with initial lead of 10m & initial lift
49 W-0055 of 2m in Sand, silt or other loose soil, wet sand or silt Cu.m
not under water, light black cotton soil, sandy loam
and ordinary soil including excavated earth (SS20B)
Sand and Silt Under Water (SS20B) Earth work exca-
vating and depositing on bank with initial lead of 10m
50 W-0056 & initial lift of 2m in Slush and silt under water upto Cu.m
0.75m depth requiring the aid of basket and vessels
(SS20B)
HGS SS.20.B. Earth work excavating and depositing
on bank with initial lead of 10 m & initial lift of 2m
51 W-0061 in Hard stiff clay, stiff black cotton, hard red earth, Cu.m
shales, murram, gravel, stoney earth and earth mixed
with small size boulders SS.20.B.
SDR - (Not Requiring Blasting) Earth work excavating
and depositing on bank with initial lead of 10 m & ini-
52 W-0062 Cu.m
tial lift of 2m in Soft disintegrated rock, laterite, soft
rock or kankar, not requiring blasting.
Extra % for
Pg. Basic rates
Rates of Labour,
No. Unique Approved TOTAL
Description of Material Unit Rates of Works
in code for the year RATE
and for Head
SOR 2024 - 2025
Load
LOOSE BOULDERS Earth work excavating and deposit-
ing on bank with initial lead of 10 m & initial lift of 2m
53 W-0063 Cu.m
in loose boulders in excavation of various size 150mm
to 625 mm
MR-&-DMR (Not Requiring Blasting) Earth work exca-
vating and depositing on bank with initial lead of 10 m
54 W-0064 Cu.m
& initial lift of 2m in medium rock and dense medium
rock not requiring blasting
Refilling with excavated sand complying with standard
55 W-0074 Cu.m
specification for filling in foundation and basement.
Refilling with excavated soil (other than sand) comply-
56 W-0075 ing with standard specification for filling in foundation Cu.m
and basement.
Extra for every additional 10 metre lead or part there-

46
57 W-0065 Cu.m
of over the initial lead
Extra for every additional 1 metre lift or part thereof
58 W-0066 Cu.m
over the initial lift
59 W-0021 Removal of Cut Stone slabs / RCC Cover Slabs Cu.m

60 W-0034 Dismantling Plain Cement Concrete Cu.m

61 W-0035 Dismantling RCC Cu.m


Dismantling Brick / Stone Masonry in cement mortar
62 W-0015 Cu.m
walls under 3m high
Dismantling Brick / Stone Masonry in lime mortar
63 W-0016 walls, add for every additional 3m or part there of over Cu.m
the initial height of 3m

64 W-0100 Vibration Charges for PCC Cu.m

65 W-0101 Vibration Charges for RCC Cu.m


Extra % for
Pg. Basic rates
Rates of Labour,
No. Unique Approved TOTAL
Description of Material Unit Rates of Works
in code for the year RATE
and for Head
SOR 2024 - 2025
Load
66 W-0090 Concreting at Height upto 4.5 m (Above GL) Cu.m
Futher Addition for Concreting at Height above 4.5m
67 W-0091 Cu.m
(Above GL)
68 W-0094 Concreting at Depth from 1.5 m to 4.5 m (Below GL) Cu.m
Futher Addition for Concreting at Depth above 4.5 m
69 W-0095 Cu.m
to 9 m (Below GL)
Futher Addition for Concreting at Depth above every
70 W-0096 Cu.m
additional 2 m (Below GL)
71 W-0001 Clearing Heavy Jungle Sq.m

72 W-0002 Clearing light Jungle Sq.m

47
73 W-0003 Clearing Scrup Jungle Sq.m

74 W-0104 Cleaning of Cement plastered surface Sq.m


HW-
75 Initial pile Load test (excluding pile cost) (Design load) Tonne
W-0068
HW-
76 Routine Pile load Test (Design Load) Tonne
W-0069
77 W-0167 Iron works for trusess and record racks (labour only) Kg
ANNEXURE - II

RATES OF MATERIALS
75 M-0159 Silver Oak Scantlings Cu.m

76 M-0173 Casurina Poles 13cm-15cm dia Rm

77 M-0174 Casurina Poles 10cm-13cm dia Rm


Extra % for
Pg. Basic rates
Rates of Labour,
No. Unique Approved TOTAL
Description of Material Unit Rates of Works
in code for the year RATE
and for Head
SOR 2024 - 2025
Load
78 M-0175 Casurina Poles 8cm-10cm dia Rm

79 M-0176 Casurina Poles 5cm-8cm dia Rm

80 M-0186 Mild steel Plates or Sheets BG 10 Kg

81 M-0187 Mild steel Angles 25 x 25 x 3 mm Kg

82 M-0188 Binding Wire (Black 18 G) Kg

83 M-0189 Binding Wire (Galvanised -18 G) Kg


ANNEXURE - VI
RATES OF OTHER CONSTRUCTION MATERIALS
84 M-0197 Water Proofing Compound Kg

48
85 M-0198 Mild steel flats of all Sizes Kg

86 M-0199 Mild steel Square rods of all Sizes Kg

87 M-0281 Bentonite Powder for construction quality Kg

87 M-0416 Cement Paint (First quality) Lit

88 M-0419 Primer for Plastic Emulsion Paint Lit

89 M-0420 Plastic Emulsion Paint (First quality) Lit

90 M-0424 Synthetic Enamel Paint for Iron Work Lit

91 M-0636 Special Clamp, Teakwood Plugs and Screws Set

92 M-0640 Manhole Cover 60x60 cm (Heavy Duty) with frame Each

93 M-0685 Plasticizer / Super Plasticizer Kg


Extra % for
Pg. Basic rates
Rates of Labour,
No. Unique Approved TOTAL
Description of Material Unit Rates of Works
in code for the year RATE
and for Head
SOR 2024 - 2025
Load
94 M-0865 PVC Pipes 110mm dia (4 Kg/Sq.cm) Rm

95 M-0864 PVC Pipes 100mm dia (4 Kg/Sq.cm) Rm

96 M-0866 PVC Pipes 160mm dia (4 Kg/Sq.cm) Rm

97 M-0962 Bend 160mm dia No.

98 M-0958 Tee with Door (Double) 160mm dia No.


ANNEXURE - IX

RATES OF ITEMS IN RESPECT OF HIGHWAYS DEPARTMENT


99 W-0220 Strip seal expansion joint RM

49
100 W-0221 PVC Expansion joint RM

101 W-0222 GI Drainage Spouts Each

102 W-0223 Kraft Paper Sq.m

103 W-0224 Elastomeric Bearing Cu.cm

104 W-0225 NP 3 pipe of best quality of 1200mm dia No.


ANNEXURE - X
RATES OF HIRE CHARGES FOR Hire charges for Tools and plants
Per
HW -
105 Tipper Trucks tonne/
H0003
KM
HW -
106 Hydraulic piling Rig with bentonite pump Hr
H0023
HW - Hydraulic piling Rig with power unit and
107 Hr
H0024 double acting pile driving hammer complete
Extra % for
Pg. Basic rates
Rates of Labour,
No. Unique Approved TOTAL
Description of Material Unit Rates of Works
in code for the year RATE
and for Head
SOR 2024 - 2025
Load
HW -
108 Front end loader - 1 Cu.m bucket capacity Hr
H0041
Vibratory Soil Compactor (Earth/Soil, GSB,
109 H-0006 Hr
WMM)
110 H-0078 Tipper 10 Tonnes Day

111 H-0083 Hire Charges for Water Sprinkler per Day Hr


Air Compressor 250 cfm, with two leads for Pneumatic
112 H-0101 Day
Cutters / Hammers
113 H-0104 Hire and running charges of Crane 20 Tonne capacity Day
WR-
114 III phase welding machine Hr
H0001

50
ANNEXURE VIII

SUB DATA
FOR EARTH WORK
HW-
115 Bailing out of water Cu.m
W0126
HW-
116 Shoring and shuttering Cu.m
W0127
HW-
117 Tools & Plants Cu.m
W0128
HW-
118 Removal of Protective bunds and cleaning the sites. Cu.m
W0129
HW- Formation and maintaining of protective bunds and
120 Cu.m
W0130 coofer dams.
Extra % for
Pg. Basic rates
Rates of Labour,
No. Unique Approved TOTAL
Description of Material Unit Rates of Works
in code for the year RATE
and for Head
SOR 2024 - 2025
Load
FOR CONCRETE WORK
HW-
121 Curing of concrete Cu.m
W0131
HW-
122 Hire charges for Hire charges for Tools and plants. Cu.m
W0132
HW-
123 Drilling 40mm holes MT
W0133
HW-
124 Grouting Charge MT
W0134
HW-
125 Seepage pipe fixing charges RM
W0135
HW-
126 Revertment fixing charges 10Cu.m

51
W0136
HW-
127 conducting SPT test at every pile location RM
W0137
HW-
128 Anti corrosive treatment for steel MT
W0138
HW-
129 Wearing coat over Deck slab floating charges 10Sqm
W0139
OTHER ITEMS

130 - Fule Price (disel) Lit


Cost of Earth (as per GO D No. 214, Industries (MMC.2
131 - Cu.m
Department dated (3.11.15)
CEMENT AND STEEL CALCULATION

CEMENT
SI
Description Amount
No
Cost of Cement as per PWD Schedule of rate excluding GST
1
and all taxes.
2 Loading and unloading charges (As per SOR)

3 Basic Price after detection of loading and unloading.

4 Storage Charges at 5%

Total / MT

STEEL
SI
Description Amount
No
Cost of Steel as per PWD Schedule of rate excluding GST
1
and all taxes.
2 Loading and unloading charges (As per SOR)

3 Basic Price after detection of loading and unloading.

4 Storage Charges at 5%

Total / MT

VIBRATED CEMENT CONCRETE (M 15) Nominal Mix


using 40 mm Metal with vibration
Sl. Quan- Rate/
Unit Item Unit Amount
No tity Unit
5.40 Cu.m HBGS Jelly 40mm size Cu.m

2.700 Cu.m HBGS Jelly 20mm size Cu.m

0.90 Cu.m HBGS Jelly 10mm size Cu.m

4.50 Cu.m Sand Cu.m

2.75 M.T Cement M.T

1.80 Nos Mason for Class-II Day

17.70 Nos Mazdoor Category-I Day

14.10 Nos Mazdoor Category-II Day

10.00 Cu.m Vibration Charges for PCC Cu.m

52
Sl. Quan- Rate/
Unit Item Unit Amount
No tity Unit
Rate / 10 Cu.m

Rate / Cu.m

VIBRATED CEMENT CONCRETE (M 20) Nominal Mix using 20 mm Metal with


vibration
5.40 Cu.m HBGS Jelly 20mm size Cu.m

3.60 Cu.m HBGS Jelly 10mm size Cu.m

4.50 Cu.m Sand Cu.m

3.47 M.T Cement M.T

1.80 Nos Mason for Class-II Day

17.70 Nos Mazdoor Category-I Day

14.10 Nos Mazdoor Category-II Day

10.00 Cu.m Vibration Charges for PCC Cu.m

Rate / 10 Cu.m

Rate / Cu.m

VIBRATED REINFORCED CEMENT CONCRETE (M 25) Design Mix using


20 mm Metal
5.40 Cu.m HBGS Jelly 20mm size Cu.m

3.60 Cu.m HBGS Jelly 10mm size Cu.m

4.50 Cu.m Sand Cu.m

4.03 M.T Cement M.T


Admixtures 0.20% Cement
8.06 Kg Kg
Content
3.50 Nos Mason for Class-II Day

21.20 Nos Mazdoor Category-I Day

35.30 Nos Mazdoor Category-II Day

10.00 Cu.m Vibration Charges for RCC Cu.m

Rate / 10 Cu.m

53
Sl. Quan- Rate/
Unit Item Unit Amount
No tity Unit
Rate / Cu.m

VIBRATED REINFORCED CEMENT CONCRETE (M 30) Design Mix using


20 mm Metal
5.40 Cu.m HBGS Jelly 20mm size Cu.m

3.60 Cu.m HBGS Jelly 10mm size Cu.m

4.50 Cu.m Sand Cu.m

4.067 M.T Cement M.T


Admixtures 0.30% Cement
12.21 Kg Kg
Content
3.50 Nos Mason for Class-II Day

21.20 Nos Mazdoor Category-I Day

35.30 Nos Mazdoor Category-II Day

10.00 Cu.m Vibration Charges for RCC Cu.m

Rate / 10 Cu.m

Rate / Cu.m

VIBRATED REINFORCED CEMENT CONCRETE (M 35) Design Mix using 20 mm


Metal
5.40 Cu.m HBGS Jelly 20mm size Cu.m

3.60 Cu.m HBGS Jelly 10mm size Cu.m

4.50 Cu.m Sand Cu.m

4.22 M.T Cement M.T


Admixtures 0.40% Cement
16.88 Kg Kg
Content
3.50 Nos Mason for Class-II Day

21.20 Nos Mazdoor Category-I Day

35.30 Nos Mazdoor Category-II Day

10.00 Cu.m Vibration Charges for RCC Cu.m

Rate / 10 Cu.m

54
Sl. Quan- Rate/
Unit Item Unit Amount
No tity Unit
Rate / Cu.m

VIBRATED REINFORCED CEMENT CONCRETE (M 40) Design Mix using 20 mm


Metal
5.40 Cu.m HBGS Jelly 20mm size Cu.m

3.60 Cu.m HBGS Jelly 10mm size Cu.m

4.50 Cu.m Sand Cu.m

4.30 M.T Cement M.T


Admixtures 0.80% Cement
34.40 Kg Kg
Content
3.50 Nos Mason for Class-II Day

21.20 Nos Mazdoor Category-I Day

35.30 Nos Mazdoor Category-II Day

10.00 Cu.m Vibration Charges for RCC Cu.m

Rate / 10 Cu.m

Rate / Cu.m

55
SI Rate /
Quantity Unit Item Unit Amount
No Unit
Earth work excavation in all classes of soil except kankar requiring blasting
and depositing on bank as per SS20B with all leads and lifts and all other incidental
1 charges such as bailing out water shoring strutting, walling and forming protective bunds
whereever necessary etc., complete as per relevant standard specification for DRESSING
THE BED UPTO SILL LEVEL. UNDER ABUTMENTS AND PIERS LOCATION.
ORDINARY SOIL (SS20B) Earth
work excavating and depositing
on bank with initial lead of 10m
& initial lift of 2m in Sand, silt or
1 Cu.m other loose soil, wet sand or silt Cu.m
not under water, light black cotton
soil, sandy loam and ordinary
soil including excavated earth
(SS20B)
Rate / Cu.m
Earthwork excavation in all classes of ORDINARY SOIL except hardrock requiring
blasting and depositing on bank with all leads and lifts as per SS20B, including cost of
all labour, equipments and all incidential charges such as bailing out water, providing
and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent
2a. removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions,
trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus
materials etc., complete as per relevant standard specification for FOUNDATION OF
UNDER ABUTMENTS AND PIERS FOR OPEN & PILE CAP as per section 300 of
MORTH specification (V Revision) and Is 1200:1992 Part 1 (IV Revision)
ORDINARY SOIL (SS20B) Earth
work excavating and depositing
on bank with initial lead of 10m
& initial lift of 2m in Sand, silt or
1 Cu.m other loose soil, wet sand or silt Cu.m
not under water, light black cotton
soil, sandy loam and ordinary
soil including excavated earth
(SS20B)
1 Cu.m Add 100% extra (SS20B) Cu.m
Refilling with excavated soil for
1 Cu.m Cu.m
filling in foundation and basement.
Formation and maintaining of
1 Cu.m Cu.m
protective bunds and coffer dams.
1 Cu.m Bailing out of water Cu.m

1 Cu.m Shoring and strutting Cu.m

1 Cu.m Tools & Plants Cu.m


Removal of Protective bunds and
1 Cu.m Cu.m
cleaning the sites.
Sundries

Rate / Cu.m

56
SI Rate /
Quantity Unit Item Unit Amount
No Unit
Rate per 1 Cu.m upto 2m height
Rate per 1 Cu.m for 2m to 3m
height
Rate per 1 Cu.m for 3m to 4m
height
Rate per 1 Cu.m for 4m to 5m
height
Rate per 1 Cu.m for 5m to 6m
height
Rate per 1 Cu.m for 6m to 7m
height
Earthwork excavation in all classes of Sand and Silt Under Water except
hardrock requiring blasting and depositing on bank with all leads and lifts as per
SS20B, including cost of all labour, equipments and all incidential charges such as bailing
out water, providing and maintaining necessary cofferdams, sheeting, shoring bracing
2b. and their subsequent removal, removal of all logs, stumps, grubs and other deleterious
matter and obstructions, trimming bottom of excavation backfilling, and clearing the site
and disposal of all surplus materials etc., complete as per relevant standard specification
for FOUNDATION UNDER ABUTMENTS AND PIERS FOR OPEN & PILE CAP as per
section 300 of MORTH specification (V Revision) and IS 1200:1992 Part 1 (IV Revision)
Sand and Silt Under Water
(SS20B) Earth work excavating
and depositing on bank with initial
1 Cu.m lead of 10m & initial lift of 2m in Cu.m
Slush and silt under water upto
0.75m depth requiring the aid of
basket and vessels (SS20B)
1 Cu.m Add 100% extra (SS20B) Cu.m
Refilling with excavated soil for
1 Cu.m Cu.m
filling in foundation and basement.
Formation and maintaining of
1 Cu.m Cu.m
protective bunds and coffer dams.
1 Cu.m Bailing out of water Cu.m

1 Cu.m Shoring and strutting Cu.m

1 Cu.m Tools & Plants Cu.m


Removal of Protective bunds and
1 Cu.m Cu.m
cleaning the sites.
- - Sundries -

Rate / Cu.m

Rate per 1 Cu.m upto 2m height


Rate per 1 Cu.m for 2m to 3m
height
Rate per 1 Cu.m for 3m to 4m
height

57
SI Rate /
Quantity Unit Item Unit Amount
No Unit
Rate per 1 Cu.m for 4m to 5m
height
Rate per 1 Cu.m for 5m to 6m
height
Rate per 1 Cu.m for 6m to 7m
height
Earthwork excavation in all classes of HGS except hardrock requiring blasting
and depositing on bank with all leads and lifts as per SS20B, including cost of all labour,
equipments and all incidential charges such as bailing out water, providing and maintaining
necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal
2c. of all logs, stumps, grubs and other deleterious matter and obstructions, trimming
bottom of excavation backfilling, and clearing the site and disposal of all surplus materials
etc., complete as per relevant standard specification for FOUNDATION OF UNDER
ABUTMENTS AND PIERS FOR OPEN & PILE CAP as per section 300 of MORTH
specification (V Revision) and IS 1200:1992 Part 1 (IV Revision)
HGS SS.20.B. Earth work
excavating and depositing on
bank with initial lead of 10 m &
initial lift of 2m in Hard stiff clay,
1 Cu.m Cu.m
stiff black cotton, hard red earth,
shales, murram, gravel, stoney
earth and earth mixed with small
size boulders SS.20.B.
1 Cu.m Add 100% extra (SS20B) Cu.m
Refilling with excavated soil for
1 Cu.m Cu.m
filling in foundation and basement.
Formation and maintaining of
1 Cu.m Cu.m
protective bunds and coffer dams.
1 Cu.m Bailing out of water Cu.m

1 Cu.m Shoring and strutting Cu.m

1 Cu.m Tools & Plants Cu.m


Removal of Protective bunds and
1 Cu.m Cu.m
cleaning the sites.
Sundries

Rate / Cu.m

Rate per 1 Cu.m upto 2m height


Rate per 1 Cu.m for 2m to 3m
height
Rate per 1 Cu.m for 3m to 4m
height
Rate per 1 Cu.m for 4m to 5m
height
Rate per 1 Cu.m for 5m to 6m
height

58
SI Rate /
Quantity Unit Item Unit Amount
No Unit
Rate per 1 Cu.m for 6m to 7m
height
Earthwork excavation in Kankar / Soft disintegrated rock not requiring blasting
except hard rock requiring blasting and depositing on bank with all leads and lifts as per
SS20B, including cost of all labour, equipments and all incidental charges such as bailing
out water, providing and maintaining necessary cofferdams, sheeting, shoring bracing
and their subsequent removal, removal of all logs, stumps, grubs and other deleterious
2d.
matter and obstructions, trimming bottom of excavation backfilling, and clearing the site
and disposal of all surplus materials etc., complete as per relevant standard specification
for FOUNDATION OF UNDER ABUTMENTS AND PIERS FOR OPEN & PILE CAP as
per section 300 of MORTH specification (V Revision) and IS 1200:1992 Part 1 (IV
Revision)
SDR - (Not Requiring Blasting)
Earth work excavating and
depositing on bank with initial
1 Cu.m lead of 10 m & initial lift of 2m in Cu.m
Soft disintegrated rock, laterite,
soft rock or kankar, not requiring
blasting.
1 Cu.m Add 100% extra (SS20B) Cu.m
Refilling with excavated soil for
1 Cu.m Cu.m
filling in foundation and basement.
Formation and maintaining of
1 Cu.m Cu.m
protective bunds and coffer dams.
1 Cu.m Bailing out of water Cu.m

1 Cu.m Shoring and strutting Cu.m

1 Cu.m Tools & Plants Cu.m


Removal of Protective bunds and
1 Cu.m Cu.m
cleaning the sites.
- - Sundries -

Rate / Cu.m

Rate per 1 Cu.m upto 2m height


Rate per 1 Cu.m for 2m to 3m
height
Rate per 1 Cu.m for 3m to 4m
height
Rate per 1 Cu.m for 4m to 5m
height
Rate per 1 Cu.m for 5m to 6m
height
Rate per 1 Cu.m for 6m to 7m
height

59
SI Rate /
Quantity Unit Item Unit Amount
No Unit
Earthwork excavation in LOOSE BOULDERS not requiring blasting except hard
rock requiring blasting and depositing on bank with all leads and lifts as per SS20B,
including cost of all labour, equipments and all incidental charges such as bailing out
water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and
2e. their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter
and obstructions, trimming bottom of excavation backfilling, and clearing the site and
disposal of all surplus materials etc., complete as per relevant standard specification for
FOUNDATION OF UNDER ABUTMENTS AND PIERS FOR OPEN & PILE CAP as per
section 300 of MORTH specification (V Revision) and Is 1200:1992 Part 1 (IV Revision)
LOOSE BOULDERS Earth work
excavating and depositing on
bank with initial lead of 10 m &
1 Cu.m Cu.m
initial lift of 2m in loose boulders
in excavation of various size
150mm to 625 mm
1 Cu.m Add 100% extra (SS20B) Cu.m
Refilling with excavated soil for
1 Cu.m Cu.m
filling in foundation and basement.
Formation and maintaining of
1 Cu.m Cu.m
protective bunds and coffer dams.
1 Cu.m Bailing out of water Cu.m

1 Cu.m Shoring and strutting Cu.m

1 Cu.m Tools & Plants Cu.m


Removal of Protective bunds and
1 Cu.m Cu.m
cleaning the sites.
- - Sundries -

Rate / Cu.m

Rate per 1 Cu.m upto 2m height


Rate per 1 Cu.m for 2m to 3m
height
Rate per 1 Cu.m for 3m to 4m
height
Rate per 1 Cu.m for 4m to 5m
height
Rate per 1 Cu.m for 5m to 6m
height
Rate per 1 Cu.m for 6m to 7m
height

60
SI Rate /
Quantity Unit Item Unit Amount
No Unit
Earthwork excavation in MR-&-DMR (Not Requiring Blasting) except hard rock
requiring blasting and depositing on bank with all leads and lifts as per SS20B, including
cost of all labour, equipments and all incidental charges such as bailing out water,
providing and maintaining necessary cofferdams, sheeting, shoring bracing and their
2 f. subsequent removal, removal of all logs, stumps, grubs and other deleterious matter
and obstructions, trimming bottom of excavation backfilling, and clearing the site and
disposal of all surplus materials etc., complete as per relevant standard specification for
FOUNDATION OF UNDER ABUTMENTS AND PIERS FOR OPEN & PILE CAP as per
section 300 of MORTH specification (V Revision) and Is 1200:1992 Part 1 (IV Revision)
MR-&-DMR (Not Requiring
Blasting) Earth work excavating
and depositing on bank with initial
1 Cu.m Cu.m
lead of 10 m & initial lift of 2m in
medium rock and dense medium
rock not requiring blasting
1 Cu.m Add 100% extra (SS20B) Cu.m
Refilling with excavated soil for
1 Cu.m Cu.m
filling in foundation and basement.
Formation and maintaining of
1 Cu.m Cu.m
protective bunds and coffer dams.
1 Cu.m Bailing out of water Cu.m

1 Cu.m Shoring and strutting Cu.m

1 Cu.m Tools & Plants Cu.m


Removal of Protective bunds and
1 Cu.m Cu.m
cleaning the sites.
- - Sundries -

Rate / Cu.m

Rate per 1 Cu.m upto 2m height


Rate per 1 Cu.m for 2m to 3m
height
Rate per 1 Cu.m for 3m to 4m
height
Rate per 1 Cu.m for 4m to 5m
height
Rate per 1 Cu.m for 5m to 6m
height
Rate per 1 Cu.m for 6m to 7m
height

PILE FOUNDATION
Providing and driving in position permanet M.S liner including cost and conveyance to
the site and fabrication charges and Hire charges for Tools and plants and driving M.S
6mm thick liner to be left peramnently with the pile shaft as per the requirement and
3
as per the specifications and placing from the bottom with all leads and lifts using 6mm
M.S sheet etc., complete as per section 1100 and 1600 of MORT@H specifications (V
Revisions)

61
SI Rate /
Quantity Unit Item Unit Amount
No Unit
Providing and driving in position permanent M.S liner

1.05 MT Cost of Steel (6mm Plates) MT

1.24 Nos Mate Day

6.00 Nos Fitter Day

5.00 Nos Blacksmith Day

5.00 Nos Welder Day

10.00 Nos Mazdoor Day


Electrodes, cutting gas and other
consumables @ 5 per
cent on cost of Material
0.320 MT Add for liner in Pile cap portion MT
Deduct for the scrap value to the
0.320 MT MT
above cutoff level liners
- - Sundries -

Rate / MT
Providing --- mm Diameter Reinforced cement concrete cast-in-situ bored piles of M40
grade Design Mix using 20mm ISS size graded HBG metal with minimum cement content
of 400kg per cu.m maximum water cement ratio of 0.4 and slump of 150 - 200mm
by tremie concreting including cost and conveyance of all materials to site and cement
at site excluding cost and fabrication of steel including placing of reinforcement in
position, concreting, including all labour charges for driving or boring, mobilisation of
piling equipment and other accesssories required for driving the pile, cost of Bentonite
4 solution and the temporary liners, chiselling and including forming of working platform
over the river bed for accommodating piling equipments including working platform, cost
of test piles both initial and routine test for vertical loads and horizontal loads, forming
approaches to the working platform, mixing concrete, filling it in position, compacting,
cutting of pile head to cut off level for the casting the pile caps, including diversion of
water course if necessary and all other incidental charges etc., complete as per standard
specifications etc., complete for PILES BELOW ABUTMENTS & PIERS as per section 1100
and 1700 of of MORT@H specifications (V Revision)
Sub Data for Pile load test
Initial
Description Routine Test
Test
Diameter of pile =

Pile Cap Depth =

Area of Pile Cross section =

Total No. of pile =

Total length of pile =

Average length of pile =

62
SI Rate /
Quantity Unit Item Unit Amount
No Unit
Total Reinforcement Quantity for Piles =
Total MS linear quantity (excluding pile Chiselling
=
height)
Average Depth of Liner =

Reinforcement Quantity / Pile =

Reinforcement Quantity / RM of Pile =

Maximum load on pile is under pier point =

Initial load test as per clause 709 of IRC:78 2014 =

Routine load test as per clause 709 of IRC:78 2014 =

Total Number of test piles =

Sub Data - (A) COST OF INITIAL PILE LOAD TEST

Initial Pile Cost

Average length of pile =

Average length of pile + Pile Head =

Concrete Quantity per Pile ( Sq.m x _ m) =

Cost of Concrete =

Concrete Cost / Pile =

Reinforcement Cost / Pile ( _ MT x Rs. ) =

Weight of Liner (Л x 0.006 (Dia)x x 0.006 (Thick) x 7.85) =

Liner Cost / Pile ( _ MT x Rs. ) =

Rate of Liner to be Cut off + Total Cutting Charges Rate =

Cost of a Single Initial Pile =

Testing Charges

Total Testing Charges = / 9.81 x

No of Initial Load tests ( Required as per clause 1113.1)

Cost of Initial pile load test per RM

Cost of PILE = x =

Cost of Initial Pile Testing = x =

Total Cost of Initial Load test =

63
SI Rate /
Quantity Unit Item Unit Amount
No Unit
Total length of Pile =

Cost of Initial Load test per RM =

Sub Data - (B) COST OF ROUTINE LOAD TEST

Routine Pile Cost

Testing Charges

Total Testing Charges

No of Initial Load tests ( Required as per clause 1113.1)

Cost of Routine Load test per RM

Cost of Routine Pile Testing = x =

Total Cost of Routine Load test =

Total length of Pile =

Cost of Routine Load test per RM =

Sub Data - Weight of Cut off liners

Weight of Liner ( Л x (Dia) x x 0.006 (Thick) x 7.85 ) =

Extra Liner Quantity ( Sq.m x Nos) =

Cost of Liner =

Total Cost of Liner =

Deduct Scrab value of 50% =

Total Cost of Liner after scrab value

Total Length =

Cost of Liner to be Cut off / RM of Pile =

Dismantling of Reinforced Concrete Pile head complete as per Drawing and Technical
Specification (Rate per Out put 1.25 Cu.m)
Quantity Unit Item Unit Rate/Unit Amount

0.04 Nos Mate Day

0.50 Nos Mazdoor with Pneumatic breaker Day

0.25 Nos Blacksmith Day

64
SI Rate /
Quantity Unit Item Unit Amount
No Unit
0.25 Nos Mazdoor for loading and unloading Day
Air Compressor 250 cfm, with
1.875 Hrs two leads for Pneumatic Cutters / Day
Hammers
Tipper for transportation to
1.875 Cu.m dumping yard considering lead @ Cu.m
1 km = x 2.50 =
Tipper for Loading & unloading
0.292 Hrs. Day
time
Cutting the liner and Chiselling out Concrete (Rate per Out put for 1.25
Cu.m)

Average Length of Pile


/ 1.25 Cu.m x
Out put considered per pile
1.80m x
Cost of Chiselling / m length of
/
pile
Dismantling of Reinforced Concrete Pile head Charges
Rate/RM)
Cutting the liner and Chiselling out Concrete (Rate per Out put, i.e.,10 m)

Quantity Unit Item Unit Rate/Unit Amount

0.25 Nos Welder Class - I Day

0.25 Hr Hire Charges = /hr. x 8 hr = Day


Labour Charges for Cutting
Cu.m Cu.m
Concrete
Cutting the liner and Chiselling
out Concrete (Rate per Out put,
i.e.,10 m)
Average Length of Pile

Out put considered per pile head / 10 x 1.80m


Cost of Chiselling / m length of
/
pile
Rate / Rm (Rate of Liner to be Cut off + Total Cutting
Charges Rate/RM)

Main Data - PILE


Taking the output for 25m
Vibrated Reinforced Cement
Concrete M40 (Design mix)
Cu.m using 20 mm ISS HBG graded Cu.m
metal(including additional
concreting for Pile Head)

65
SI Rate /
Quantity Unit Item Unit Amount
No Unit
Kg Bentonite Kg
Hire and running charges of
7 Hrs. Hrs.
Bentonite pump
Shifting charges for above
mechineries to the every pile
location - Mazdoor (contingencies
10% extra)
Hire and running charges of light
crane for lowering reinforcement
2.5 Hrs. cage, trime pipe, holding trime Day
pipe for concreting, removal of
temporary casing etc
Front end loader for removing
Hrs. muck (1 Cu.m Hrs.
capacity)
Hrs. Tipper for Loading time Day
Tipper for disposal of muck from
Ton Ton
pile bore hole up to a lead of 1 km
0.14 Nos. Pile Driver Day

3.50 Nos. Mazdoor Day

Rate / 25 m

Rate / Rm
ADD for Reinforced Concrete Pile
Head Dismantling Charges
ADD Cost of INITIAL LOAD TEST
/ RM
ADD Cost of ROUTINE LOAD TEST
/ RM
- - Sundries - -

Rate / Rm
Plain Cement Concrete M15 (Nominal Mix) using 40mm ISS HBG metalincluding cost and
conveyance of all materials to site including cement at site including cost of formwork,
soft water, labour charges for mixing, transporting, laying and curing concrete, working
5 at depths, Hire charges for Tools and plants and incidental charges such as maintaining of
protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard
specification, etc, complete as per relevant standard specification for LEVELLING COURSE
BELOW PILE CAP / ABUTMENTS, WINGS, PIERS and RETAINING WALL.
Plain Cement Concrete M15
1 Cu.m (Nominal Mix) using 40mm ISS Cu.m
HBG metal
1 Cu.m Curing of concrete Cu.m
Hire charges for Hire charges for
1 Cu.m Cu.m
Tools and plants.

66
SI Rate /
Quantity Unit Item Unit Amount
No Unit
Working depth (Below Ground
1 Cu.m Cu.m
level)
- - Sundries -

Rate / Cu.m
Vibrated Reinforced Cement Concrete M35 (Design mix) using 20 mm ISS HBG graded
metal including cost and conveyance of all materials to site excluding cost of steel
but including cost of form work and centering soft water labour charges for mixing,
transporting, placing in position, vibrating and compacting finishing and curing concrete,
6
working at heights, hire charges for Hire charges for Tools and plants, including all other
incidental charges, etc., complete as per standard specifications for PILE CAPS UNDER
ABUTMENTS AND PIERS as per section 1100,1500 and 1700 of MORT@H specifications
(V Revisions)
Vibrated Reinforced Cement
1 Cu.m Concrete M35 (Design mix) using Cu.m
20 mm ISS HBG graded metal
Sq.m Formwork and Centering Rate Sq.m

1 Cu.m Curing of concrete Cu.m


Hire charges for Hire charges for
1 Cu.m Cu.m
Tools and plants.
Working depth (Below Ground
1 Cu.m Cu.m
level)
- - Sundries -

Rate / Cu.m
Vibrated Reinforced Cement Concrete M35 (Design mix) using 20 mm ISS HBG graded
metal including cost and conveyance of all materials to site and cement at site excluding
cost and fabrication of steel but form work and centering soft water labour charges
for mixing, transporting, placing in position, vibrating and compacting finishing and
7
curing concrete, working at heights, hire charges for Hire charges for Tools and plants,
including all other incidental charges, etc., complete as per standard specifications for
ABUTMENTS AND RETURNS ABOVE PILECAP as per section 1500,1700 and 2200 of
MORT@H specifications (V Revisions)
Vibrated Reinforced Cement
1 Cu.m Concrete M35 (Design mix) using Cu.m
20 mm ISS HBG graded metal
Sq.m Formwork and Centering Rate Sq.m

1 Cu.m Curing of concrete Cu.m


Hire charges for Hire charges for
1 Cu.m Cu.m
Tools and plants.
Working depth (Above Ground
1 Cu.m Cu.m
level)
- - Sundries -

Rate / Cu.m

67
SI Rate /
Quantity Unit Item Unit Amount
No Unit
Vibrated Reinforced Cement Concrete M35 (Design mix) using 20 mm ISS HBG graded
metal including cost and conveyance of all materials to site and cement at site excluding
cost and fabrication of steel but including form work and centering soft water labour
charges for mixing, transporting, placing in position, vibrating and compacting finishing
8
and curing concrete, working at heights, hire charges for Hire charges for Tools and
plants, including all other incidental charges, etc., complete as per standard specifications
for COLUMN PIER ABOVE PILECAP as per section 1500 ,1700 and 2200 of MORT@H
specifications (V Revisions)
Vibrated Reinforced Cement
1 Cu.m Concrete M35 (Design mix) using Cu.m
20 mm ISS HBG graded metal
Sq.m Formwork and Centering Rate Sq.m

1 Cu.m Curing of concrete Cu.m


Hire charges for Hire charges for
1 Cu.m Cu.m
Tools and plants.
Working at Heights (Above Ground
1 Cu.m Cu.m
Level)
- - Sundries -

Rate / Cu.m

OPEN FOUNDATION
Providing Fe-500 grade 25mm dowel bars including cost and conveyance of all
9 materials to site drilling 65mm holes in rock and grouting the same with cm 1:2 after
placing the 25mm dowel bars etc., complete
7.71 Kg cost of steel MT
Drilling 40mm holes as per S.I
7.71 Kg MT
No. 46
7.71 Kg Grouting charge MT

- - Sundries -

Rate / MT
Plain Cement Concrete M20 (Nominal Mix) using 20mm ISS HBG metal including cost
and conveyance of all materials to site including cost of cement at site including cost of
formwork, soft water, labour charges for mixing, transporting, laying and curing concrete,
10
working at depths, Hire charges for Tools and plants and maintaining of protective bunds,
cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for
FOOTING OF ABUTMENT AND RETURN.
Plain Cement Concrete M20
1 Cu.m (Nominal Mix) using 20mm ISS Cu.m
HBG metal
Sq.m Formwork and Centering Rate Sq.m

1 Cu.m Curing of concrete Cu.m


Hire charges for Hire charges for
1 Cu.m Cu.m
Tools and plants.

68
SI Rate /
Quantity Unit Item Unit Amount
No Unit
Working depth (Below Ground
1 Cu.m Cu.m
level)
- - Sundries -

Rate / Cu.m
Vibrated Reinforced Cement Concrete M 30 (Design mix) using 20 mm ISS HBG graded
metal including cost and conveyance of all materials to site including cost of cement at
site including cost of formwork, soft water, labour charges for mixing, transporting,
11
laying and curing concrete, working at depths, Hire charges for Tools and plants and
maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per
relevant standard specifications, for FOOTING OF COLUMN.
Vibrated Reinforced Cement
1 Cu.m Concrete M 30 (Design mix) using Cu.m
20 mm ISS HBG graded metal
Sq.m Formwork and Centering Rate Sq.m

1 Cu.m Curing of concrete Cu.m


Hire charges for Hire charges for
1 Cu.m Cu.m
Tools and plants.
Working depth (Below Ground
1 Cu.m Cu.m
level)
Sundries

Rate / Cu.m
Plain Cement Concrete M15 (Nominal Mix) using 40mm ISS HBG metal including cost
and conveyance of all materials to site including cost of cement at site including cost of
formwork, soft water, labour charges for mixing, transporting, laying and curing concrete,
12 working at depths , Hire charges for Tools and plants and maintaining of protective bunds,
cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for
FILLING THE TRENCHES AROUND THE FOOTINGS UPTO 0.6m IN HARD ROCK as per
cl.707.4.6 of IRC 78:2018
Plain Cement Concrete M15
1 Cu.m (Nominal Mix) using 40mm ISS Cu.m
HBG metal
1 Cu.m Curing of concrete Cu.m
Hire charges for Hire charges for
1 Cu.m Cu.m
Tools and plants.
Working depth (Below Ground
1 Cu.m Cu.m
level)
- - Sundries -

Rate / Cu.m
Vibrated Reinforced Cement Concrete M35 (Design mix) using 20 mm ISS HBG graded
metal including cost and conveyance of all materials to site including cost of cement at
site including cost of formwork, soft water, labour charges for mixing, transporting,
13
laying and curing concrete , working at depths , Hire charges for Tools and plants and
maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per
relevant standard specifications, for FOUNDATION OF RETAINING WALL

69
SI Rate /
Quantity Unit Item Unit Amount
No Unit
Vibrated Reinforced Cement
1 Cu.m Concrete M35 (Design mix) using Cu.m
20 mm ISS HBG graded metal
Sq.m Formwork and Centering Rate Sq.m

1 Cu.m Curing of concrete Cu.m


Hire charges for Hire charges for
1 Cu.m Cu.m
Tools and plants.
Working depth (Below Ground
1 Cu.m Cu.m
level)
- - Sundries -

Rate / Cu.m
Vibrated Reinforced Cement Concrete M35 (Design mix) using 20 mm ISS HBG graded
metal including cost and conveyance of all materials to site including cost of cement at
site including cost of formwork, soft water, labour charges for mixing, transporting,
14
laying and curing concrete , working at depths , Hire charges for Tools and plants and
maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per
relevant standard specifications, for RETAINING WALL (BELOW GROUND LEVEL)
Vibrated Reinforced Cement
1 Cu.m Concrete M35 (Design mix) using Cu.m
20 mm ISS HBG graded metal
Sq.m Formwork and Centering Rate Sq.m

1 Cu.m Curing of concrete Cu.m


Hire charges for Hire charges for
1 Cu.m Cu.m
Tools and plants.
Working depth (Below Ground
1 Cu.m Cu.m
level)
- - Sundries -

Rate / Cu.m
Vibrated Reinforced Cement Concrete M35 (Design mix) using 20 mm ISS HBG graded
metal including cost and conveyance of all materials to site including cost of cement at
site including cost of formwork, soft water, labour charges for mixing, transporting,
15
laying and curing concrete , working at depths , Hire charges for Tools and plants and
maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per
relevant standard specifications, for RETAINING WALL (ABOVE GROUND LEVEL)
Vibrated Reinforced Cement
1 Cu.m Concrete M35 (Design mix) using Cu.m
20 mm ISS HBG graded metal
Sq.m Formwork and Centering Rate Sq.m

1 Cu.m Curing of concrete Cu.m


Hire charges for Hire charges for
1 Cu.m Cu.m
Tools and plants.
Working depth (Above Ground
1 Cu.m Cu.m
level)

70
SI Rate /
Quantity Unit Item Unit Amount
No Unit
Sundries -

Rate / Cu.m
Vibrated Reinforced Cement Concrete M35 (Design mix) using 20 mm ISS HBG graded
metal including cost and conveyance of all materials to site including cost of cement at
site including cost of formwork, soft water, labour charges for mixing, transporting,
16
laying and curing concrete, working at depths, Hire charges for Tools and plants and
maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per
relevant standard specifications, for ABUTMENT AND RETURN (BELOW GROUND LEVEL)
Vibrated Reinforced Cement
1 Cu.m Concrete M35 (Design mix) using Cu.m
20 mm ISS HBG graded metal
Sq.m Formwork and Centering Rate Sq.m

1 Cu.m Curing of concrete Cu.m


Hire charges for Hire charges for
1 Cu.m Cu.m
Tools and plants.
Working depth (Below Ground
1 Cu.m Cu.m
level)
- - Sundries -

Rate / Cu.m
Plain Cement Concrete M20 (Nominal Mix) using 20mm ISS HBG metal including cost
and conveyance of all materials to site including cost of cement at site including cost of
formwork, soft water, labour charges for mixing, transporting, laying and curing concrete ,
17
working at depths , Hire charges for Tools and plants and maintaining of protective bunds,
cofferdams, shoring, strutting etc., complete as per relevant standard specifications, for
ABUTMENT AND RETURN (ABOVE GROUND LEVEL)
Plain Cement Concrete M20
1 Cu.m (Nominal Mix) using 20mm ISS Cu.m
HBG metal
Sq.m Formwork and Centering Rate Sq.m

1 Cu.m Curing of concrete Cu.m


Hire charges for Hire charges for
1 Cu.m Cu.m
Tools and plants.
Working depth (Above Ground
1 Cu.m Cu.m
level)
- - Sundries -

Rate / Cu.m
Vibrated Reinforced Cement Concrete M35 (Design mix) using 20 mm ISS HBG graded
metal including cost and conveyance of all materials to site including cost of cement at
site including cost of formwork, soft water, labour charges for mixing, transporting,
18
laying and curing concrete , working at depths , Hire charges for Tools and plants and
maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per
relevant standard specifications, for COLUMN (BELOW GROUND LEVEL)

71
SI Rate /
Quantity Unit Item Unit Amount
No Unit
Vibrated Reinforced Cement
1 Cu.m Concrete M35 (Design mix) using Cu.m
20 mm ISS HBG graded metal
Sq.m Formwork and Centering Rate Sq.m

1 Cu.m Curing of concrete Cu.m


Hire charges for Hire charges for
1 Cu.m Cu.m
Tools and plants.
Working depth (Below Ground
1 Cu.m Cu.m
level)
- - Sundries -

Rate / Cu.m
Vibrated Reinforced Cement Concrete M35 (Design mix) using 20 mm ISS HBG graded
metal including cost and conveyance of all materials to site including cost of cement at
site including cost of formwork, soft water, labour charges for mixing, transporting,
19
laying and curing concrete , working at depths , Hire charges for Tools and plants and
maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per
relevant standard specifications, for COLUMN (ABOVE GROUND LEVEL)
Quantity Unit Item Unit Rate/Unit Amount
Vibrated Reinforced Cement
1 Cu.m Concrete M35 (Design mix) using Cu.m
20 mm ISS HBG graded metal
Sq.m Formwork and Centering Rate Sq.m

1 Cu.m Curing of concrete Cu.m


Hire charges for Hire charges for
1 Cu.m Cu.m
Tools and plants.
Working depth (Above Ground
1 Cu.m Cu.m
level)
- - Sundries -

Rate / Cu.m
Vibrated Reinforced Cement Concrete M 30 (Design mix) using 20 mm ISS HBG graded
metal including cost and conveyance of all materials to site and cement at site excluding
cost and fabrication of steel but including form work and centering soft water labour
20 charges for mixing, transporting, placing in position, vibrating and compacting finishing
and curing concrete, working at heights, hire charges for Hire charges for Tools and
plants, including all other incidental charges, etc., complete as per standard specifications
for BED BLOCK Cu.m DIRT WALL OVER ABUTMENTS as per section 1500 ,1700
Vibrated Reinforced Cement
1 Cu.m Concrete M 30 (Design mix) using Cu.m
20 mm ISS HBG graded metal
Sq.m Formwork and Centering Rate Sq.m

1 Cu.m Curing of concrete Cu.m

72
SI Rate /
Quantity Unit Item Unit Amount
No Unit
Hire charges for Hire charges for
1 Cu.m Cu.m
Tools and plants.
Working depth (Above Ground
1 Cu.m Cu.m
level)
- - Sundries -

Rate / Cu.m
Vibrated Reinforced Cement Concrete M35 (Design mix) using 20 mm ISS HBG graded
metal including cost and conveyance of all materials to site and cement at site excluding
cost and fabrication of steel but including form work and centering soft water labour
charges for mixing, transporting, placing in position, vibrating and compacting finishing
21
and curing concrete, working at heights, hire charges for Hire charges for Tools and plants,
including all other incidental charges, etc., complete as per standard specifications for
CAPPING BEAM OVER PIER as per section 1500 ,1700 and 2200 of MORT@H specifications
(V Revisions)
Vibrated Reinforced Cement
1 Cu.m Concrete M35 (Design mix) using Cu.m
20 mm ISS HBG graded metal
Sq.m Formwork and Centering Rate Sq.m

1 Cu.m Curing of concrete Cu.m


Hire charges for Hire charges for
1 Cu.m Cu.m
Tools and plants.
1 Cu.m Working at Heights (Above GL) Cu.m

- - Sundries -

Rate / Cu.m
Vibrated Reinforced Cement Concrete M35 (Design mix) using 20 mm ISS HBG graded
metal including cost and conveyance of all materials to site and cement at site excluding
cost and fabrication of steel but including form work and centering soft water labour
22 charges for mixing, transporting, placing in position, vibrating and compacting finishing
and curing concrete, working at heights, hire charges for Hire charges for Tools and
plants, including all other incidental charges, etc., complete as per standard specifications
for PEDESTAL OVER PIERS AND ABUTMENTS as per section 1500 ,1700 and 2200
Vibrated Reinforced Cement
1 Cu.m Concrete M35 (Design mix) using Cu.m
20 mm ISS HBG graded metal
Sq.m Formwork and Centering Rate Sq.m

1 Cu.m Curing of concrete Cu.m


Hire charges for Hire charges for
1 Cu.m Cu.m
Tools and plants.
1 Cu.m Working at Heights Cu.m

- - Sundries -

Rate / Cu.m

73
SI Rate /
Quantity Unit Item Unit Amount
No Unit
Supply and fixing of Elastomeric bearing including cost and conveyance to work site,
labour for fixing the same in correct position and all other incidental charges etc., complete
23
as per standard specifications as per section 2000 MORT@H specifications (V Revisions)
and IRC :83-2015(part II)
Cu.
1 Cost of bearing Cu.Cm
Cm
Rate / Cu.Cm
Vibrated Reinforced Cement Concrete M35 (Design mix) using 20 mm ISS HBG graded
metal including cost and conveyance of all materials to site and cement at site but
excluding cost and fabrication of steel but including form work and centering soft water
labour charges for mixing, transporting, placing in position, vibrating and compacting
24
finishing and curing concrete, working at heights, hire charges for Hire charges for
Tools and plants, including all other incidental charges, etc., complete as per standard
specifications for T-BEAM AND CROSS BEAMS as per section 1500 ,1700 and 2300 of
MORT@H specifications (V Revisions)
Vibrated Reinforced Cement
1 Cu.m Concrete M35 (Design mix) using Cu.m
20 mm ISS HBG graded metal
Formwork, Centering & Stagging
1 Sq.m Sq.m
Rate
1 Cu.m Curing of concrete Cu.m
Hire charges for Hire charges for
1 Cu.m Cu.m
Tools and plants.
Working at Heights (Above Ground
1 Cu.m Cu.m
Level)
- - Sundries -

Rate / Cu.m
Vibrated Reinforced Cement Concrete M 30 (Design mix) using 20 mm ISS HBG graded
metal including cost and conveyance of all materials to site and cement at site but
excluding cost and fabrication of steel but including form work and centering soft water
labour charges for mixing, transporting, placing in position, vibrating and compacting
25
finishing and curing concrete, working at heights, hire charges for Hire charges for Tools
and plants, including all other incidental charges,including inspection chamber, inclusive
of 150mm ducts and other accessories of footpath etc., complete for DECK SLAB as per
section 1500 ,1700 and 2300 of MORT@H specifications (V Revisions)
Vibrated Reinforced Cement
1 Cu.m Concrete M 30 (Design mix) using Cu.m
20 mm ISS HBG graded metal
Formwork, Centering & Stagging
1 Sq.m Sq.m
Rate
1 Cu.m Curing of concrete Cu.m
Hire charges for Hire charges for
1 Cu.m Cu.m
Tools and plants.
Working at Heights (Above Ground
1 Cu.m Cu.m
Level )
- - Sundries -

74
SI Rate /
Quantity Unit Item Unit Amount
No Unit
Rate / Cu.m
Vibrated Reinforced Cement Concrete M 30 (Design mix) using 20 mm ISS HBG graded
metal including cost and conveyance of all materials to site including cement at site
including labour charges for mixing, transporting, laying, and curing concrete,working at
26
heights,hire charges for Hire charges for Tools and plants,including all other incidental
charges,etc, complete for HAND RAILS AND POSTS as per section 2703-3 of MORT@H
specifications (V Revisions) and as per MOST drawing no SD/202
Vibrated Reinforced Cement
0.08 Cu.m Concrete M 30 (Design mix) using Cu.m
20 mm ISS HBG graded metal
Sq.m Formwork and Centering Rate Sq.m

1 Cu.m Curing of concrete Cu.m


Hire charges for Hire charges for
1 Cu.m Cu.m
Tools and plants.
- - Sundries -

Rate / Rm
Vibrated Reinforced Cement Concrete M40 (Design mix) using 20 mm ISS HBG graded
metal including cost and conveyance of all materials to site including cement at site
including labour charges for mixing, transporting, laying, and curing concrete,working at
27
heights,hire charges for Hire charges for Tools and plants,including all other incidental
charges,etc, complete for Inner CRASH BARRIER as per section 811,1700 and 2703.3 of
MORT@H specifications (V Revisions)
Quantity Unit Item Unit Rate/Unit Amount
Vibrated Reinforced Cement
1 Cu.m Concrete M40 (Design mix) using Cu.m
20 mm ISS HBG graded metal
Sq.m Formwork and Centering Rate Sq.m

1 Cu.m Curing of concrete Cu.m


Hire charges for Hire charges for
1 Cu.m Cu.m
Tools and plants.
- - Sundries -

Rate / Cu.m
Providing and fixing of Galvinised Iron drainage spouts 100mm dia as per MOST
drawing SD/205 with grating arrangements at top as shown in the drawing using 12mm x
25mm flats for grating arrangements, and 100mm dia drainage spout projecting beyond
28
the bottom of deck slab as shown in the drawing including cost and conveyance of cast iron
pipes and flats and fixing them in position etc,complete.as per section 2705 of MORT@H
specifications (V Revisions)
Quantity Unit Item Unit Rate/Unit Amount
Galvinised Iron drainage spouts
1 No Each
100mm dia
Rate / No

75
SI Rate /
Quantity Unit Item Unit Amount
No Unit
Supply and fixing of High Quality of PVC pipes of 150mm dia. Including cost and
conveyance of pipes to the site and fixing in position to proper grade and level, including
29
labour charges for fixing and including all other incidental charges etc complete., for
proving utility services in footpaths as per the directions of the departmental officers.
Quantity Unit Item Unit Rate/Unit Amount
Cost of PVC pipes (4Kg/cm²)
1 Rm Rm
160mm
1 Rm Fixing Charges Rm

- - Sundries -

Rate / Rm
Plain Cement Concrete M15 (Nominal Mix) using 40mm ISS HBG metal including cost and
conveyance of all materials to site and cement at site including cost of formwork,lead for
soft water, labour charges for mixing , transporting, laying, and curing concrete working
30 in heights and hire charges for Hire charges for Tools and plants, and all other incidental
charges etc complete as per relevant specification for BASE COURSE BELOW APPROACH
SLAB AND FOOTPATH RAMP as per section 1500,1700 and 2704 of MORT@H specifications
(V Revision)
Plain Cement Concrete M15
1 Cu.m (Nominal Mix) using 40mm ISS Cu.m
HBG metal
Sq.m Formwork and Centering Rate Sq.m

1 Cu.m Curing of concrete Cu.m


Hire charges for Hire charges for
1 Cu.m Cu.m
Tools and plants.
- - Sundries -

Rate / Cu.m
Vibrated Reinforced Cement Concrete M 30 (Design mix) using 20 mm ISS HBG graded
metal including cost and conveyance of all materials to site including cement at site
including labour charges for mixing, laying, curing concrete, working at heights,hire
31
charges for Hire charges for Tools and plants, including all other incidental chages
etc., complete for APPROACH SLABS as per section 1500,1700 and 2704 of MORT@H
specifications (V Revisions)
Vibrated Reinforced Cement
1 Cu.m Concrete M 30 (Design mix) using Cu.m
20 mm ISS HBG graded metal
Sq.m Formwork and Centering Rate Sq.m

1 Cu.m Curing of concrete Cu.m


Hire charges for Hire charges for
1 Cu.m Cu.m
Tools and plants.
- - Sundries -

Rate / Cu.m

76
SI Rate /
Quantity Unit Item Unit Amount
No Unit
Plain Cement Concrete M20 (Nominal Mix) using 20mm ISS HBG metal including cost
and conveyance of all materials to site and cement at sitel including labour charges
for mixing,transporting, laying, and curing concrete,working at heights,hire charges for
32
Hire charges for Tools and plants, including all other incidental rges,etc.,complete as
per standard specification for CC PARAPET as per section 1500,and 1700 of MORT@H
specifications (V Revisions)
Plain Cement Concrete M20
1 Cu.m (Nominal Mix) using 20mm ISS Cu.m
HBG metal
Sq.m Formwork and Centering Rate Sq.m

1 Cu.m Curing of concrete Cu.m


Hire charges for Hire charges for
1 Cu.m Cu.m
Tools and plants.
- - Sundries -

Rate / Cu.m
Vibrated Cement Concrete M-30, Grade, Design Mix, using 25mm, 12mm and 6mm ISS
HBG graded metal including cost and conveyance of all materials to worksite and cement
at site including all labour charges for fixing concrete, laying, vibrating, hire charges
33 for Hire charges for Tools and plants, compacting, curing with all leads for soft water,
including all other incidental charges,formwork,cost of premoulded expansion joints and
fixing the same in position etc., complete for WEARING COAT OVER DECK SLAB AND
APPROACH SLAB
For per 10 Sq.m Area

Quantity Unit Item Unit Rate/Unit Amount

0.45 Cu.m Cost of 25 mm ISS Cu.m

0.17 Cu.m Cost of 12 mm ISS Cu.m

0.07 Cu.m Cost of 6 mm ISS Cu.m

0.34 Cu.m Cost of Sand Cu.m

0.41 MT Cost of Cement MT

1.88 Nos. Mazdoor I Class Day

1.16 Nos. Mazdoor II Class Day

0.43 Nos. Carpenter I class Day

0.36 Nos. Mason I class Day

0.75 Cu.m Vibration Charges Cu.m

10.00 Sqm Floating Charges 1 Sqm

10 Cu.m Curing of concrete Cu.m


Hire charges for Hire charges for
1 Cu.m Cu.m
Tools and plants.

77
SI Rate /
Quantity Unit Item Unit Amount
No Unit
- - Sundries -

Rate / 10 Sqm

Rate / Sqm
Supplying and installation of STRIP SEAL EXPANSION joint system of 40mm wide
expansion gap provided in between decks over piers and in between deck and dirt wall
over abutment with fatigue tested structural steel section at the nosing and anchorage
34
assembly, including cost and conveyance of all materials, cost of testing as per the MOST
specifications, including labour, equipment and incidental charges for fixing the joints
complete in all respects as per section 2600 of MORT@H specifications (V Revisions)
1 Rm Strip Seal Expansion joint Rm

Rate / Rm
Providing and fixing Seepage pipes of 100mm dia of requied lengths for abutments and
wings including cost and conveyance of all materials to work site and for labour charges
35
for fixing, etc.,to drain of the backfill as per section 2706 of MORT@H specifications (V
Revisions)
Quantity Unit Item Unit Rate/Unit Amount

1 Rm Cost of Seepage pipes Rm

1 Rm Fixing Charges Rm

- - Sundries -

Rate / Rm
Providing Filter media behind the abutments and wings for 600mm thickness using
filter materials well packed with smaller sized towards the soil and bigger size towards
36 the wall including cost and conveyance to work site including all labours and other
incidental charges including hire charges for Hire charges for Tools and plants employed
etc. complete.as per CI. 710.1.4 and appendix -6 of IRC : 78-2014
Quantity Unit Item Unit Rate/Unit Amount

1 Cu.m Cost of 22.4 mm IRC Cu.m

1 Cu.m Cost of 11.2 mm IRC Cu.m

1 Cu.m Cost of 6 mm IRC Cu.m

1 Cu.m Cost of 4.75 mm IRC Cu.m

Average Rate (with conveyance charges)


Labour for filling in layers and
1 Cu.m Cu.m
compacting
- - Sundries -

Rate / Cu.m
Filling behind Abutments and returns with clean gritty free drainig gravel including
cost and draining gravel having PHI value more than 35 conveyance of gravel to worksite,
37 laying, handling charges and filling in layers, tamping under optimum moisture content
to get the maximum density including watering, with all leads for water and all other
incidental charges etc,complete as per CI. 710.1.4 and appendix -6 of IRC : 78-2014

78
SI Rate /
Quantity Unit Item Unit Amount
No Unit
1.16 Cu.m Cost of Gravel Cu.m
Labour for filling in layers and
1 Cu.m Cu.m
compacting
- - Sundries -

Rate / Cu.m
Supply and fabrication of Fe-500 (HYSD) steel required in the schedule including
cost of steel at site cost of providing and cost of fabrication,labour charges for cleaning
the rods straightening, cutting, bending, tying grills, including overlapping to the required
38 length whenever necessary and placing the reinforcement in position as specified in the
drawings,including cost of binding wire(Galvanised-18 G), provision of spacer bars, cover
blocks and all other incidental charges etc,complete,as per section 1600 of MORT@H
specifications ( V revision)
For Bars upto 16mm dia.

Quantity Unit Item Unit Rate/Unit Amount

1.05 MT Steel (HYSD) MT

0.01 MT Binding Wire (Galvanised -18 G) MT

35 Nos Fitter-I Class Day

MT Anti corrosive treatment for steel MT

Rate / MT

For Bars Above 16mm dia.

Quantity Unit Item Unit Rate/Unit Amount

1.05 MT Steel (HYSD) MT

0.01 MT Binding Wire (Galvanised -18 G) MT

35 Nos Fitter-I Class Day

MT Anti corrosive treatment for steel MT

Rate / MT
Supply and fabrication of S-240 steel required in the schedule including cost of
steel at site cost of providing and cost of fabrication,labour charges for cleaning the
rods straightening, cutting, bending, tying grills, including overlapping to the required
39 length whenever necessary and placing the reinforcement in position as specified in the
drawings,including cost of binding wire(Galvanised-18 G), provision of spacer bars, cover
blocks and all other incidental charges etc,complete,as per section 1600 of MORT@H
specifications ( V revisions)
1.05 MT Steel (HYSD) MT

0.01 MT Binding Wire (Galvanised -18 G) MT

35 Nos Fitter-I Class Day

MT Anti corrosive treatment for steel MT

79
DATA - CONSTRUCTION OF RCC BOX CULVERT

SI Quan Rate /
Unit Description Unit Amount
No tity Unit
Earthwork excavation in all classes of ORDINARY SOIL except hardrock requiring
blasting and depositing on bank with all leads and lifts as per SS20B, including cost of
all labour, equipments and all incidential charges such as bailing out water, providing
and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent
1a. removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions,
trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus
materials etc., complete as per relevant standard specification for FOUNDATION OF
BOX CULVERT as per section 300 of MORTH specification (V Revision) and Is 1200:1992
Part 1 (IV Revision)
ORDINARY SOIL (SS20B) Earth work
excavating and depositing on bank
with initial lead of 10m & initial lift of
1 Cu.m 2m in Sand, silt or other loose soil, wet Cu.m
sand or silt not under water, light black
cotton soil, sandy loam and ordinary soil
including excavated earth (SS20B)
Refilling with excavated soil for filling in
1 Cu.m Cu.m
foundation and basement.
Formation and maintaining of protective
1 Cu.m Cu.m
bunds and coffer dams.
1 Cu.m Bailing out of water Cu.m

1 Cu.m Shoring and strutting Cu.m

1 Cu.m Tools & Plants Cu.m


Removal of Protective bunds and
1 Cu.m Cu.m
cleaning the sites.
- - Sundries -

Rate / Cu.m

Earthwork excavation in all classes of Sand and Silt Under Water except
hardrock requiring blasting and depositing on bank with all leads and lifts as per
SS20B, including cost of all labour, equipments and all incidential charges such as bailing
out water, providing and maintaining necessary cofferdams, sheeting, shoring bracing
1b. and their subsequent removal, removal of all logs, stumps, grubs and other deleterious
matter and obstructions, trimming bottom of excavation backfilling, and clearing the site
and disposal of all surplus materials etc., complete as per relevant standard specification
for FOUNDATION OF BOX CULVERT as per section 300 of MORTH specification (V
Revision) and Is 1200:1992 Part 1 (IV Revision)
Sand and Silt Under Water (SS20B)
Earth work excavating and depositing on
bank with initial lead of 10m & initial lift
1 Cu.m Cu.m
of 2m in Slush and silt under water upto
0.75m depth requiring the aid of basket
and vessels (SS20B)

80
SI Quan Rate /
Unit Description Unit Amount
No tity Unit
Refilling with excavated soil for filling in
1 Cu.m -
foundation and basement.
Formation and maintaining of protective
1 Cu.m -
bunds and coffer dams.
1 Cu.m Bailing out of water -

1 Cu.m Shoring and strutting -

1 Cu.m Tools & Plants -


Removal of Protective bunds and
1 Cu.m -
cleaning the sites.
- - Sundries -

Rate / Cu.m

Earthwork excavation in all classes of HGS except hardrock requiring blasting


and depositing on bank with all leads and lifts as per SS20B, including cost of all labour,
equipments and all incidential charges such as bailing out water, providing and maintaining
necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal
1c. of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom
of excavation backfilling, and clearing the site and disposal of all surplus materials etc.,
complete as per relevant standard specification for FOUNDATION OF BOX CULVERT
as per section 300 of MORTH specification (V Revision) and Is 1200:1992 Part 1 (IV
Revision)
HGS SS.20.B. Earth work excavating and
depositing on bank with initial lead of 10
m & initial lift of 2m in Hard stiff clay,
1 Cu.m Cu.m
stiff black cotton, hard red earth, shales,
murram, gravel, stoney earth and earth
mixed with small size boulders SS.20.B.
Refilling with excavated soil for filling in
1 Cu.m Cu.m
foundation and basement.
Formation and maintaining of protective
1 Cu.m Cu.m
bunds and coffer dams.
1 Cu.m Bailing out of water Cu.m

1 Cu.m Shoring and strutting Cu.m

1 Cu.m Tools & Plants Cu.m


Removal of Protective bunds and
1 Cu.m Cu.m
cleaning the sites.
- - Sundries -

Rate / Cu.m

81
SI Quan Rate /
Unit Description Unit Amount
No tity Unit
Earthwork excavation in Kankar / Soft disintegrated rock not requiring blasting
except hard rock requiring blasting and depositing on bank with all leads and lifts as per
SS20B, including cost of all labour, equipments and all incidental charges such as bailing
out water, providing and maintaining necessary cofferdams, sheeting, shoring bracing
1d. and their subsequent removal, removal of all logs, stumps, grubs and other deleterious
matter and obstructions, trimming bottom of excavation backfilling, and clearing the site
and disposal of all surplus materials etc., complete as per relevant standard specification
for FOUNDATION OF BOX CULVERT as per section 300 of MORTH specification (V
Revision) and Is 1200:1992 Part 1 (IV Revision)
SDR - (Not Requiring Blasting) Earth
work excavating and depositing on bank
1 Cu.m with initial lead of 10 m & initial lift of 2m Cu.m
in Soft disintegrated rock, laterite, soft
rock or kankar, not requiring blasting.
Refilling with excavated soil for filling in
1 Cu.m Cu.m
foundation and basement.
Formation and maintaining of protective
1 Cu.m Cu.m
bunds and coffer dams.
1 Cu.m Bailing out of water Cu.m

1 Cu.m Shoring and strutting Cu.m

1 Cu.m Tools & Plants Cu.m


Removal of Protective bunds and
1 Cu.m Cu.m
cleaning the sites.
- - Sundries -

Rate / Cu.m

Plain Cement Concrete M15 (Nominal Mix) using 40mm ISS HBG metal including Cost
and Conveyance of all materials to site and cost of Cement at site including soft water,
labour charges for mixing, transporting, laying compacting, curing concrete, Hire charges
2
for Tools and plants and incidental charges such as bailing out water, maintaining of
protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard
specification for LEVELLING COURSE BELOW FOUNDATION.
Plain Cement Concrete M15 (Nominal
1 Cu.m Cu.m
Mix) using 40mm ISS HBG metal
Sq.m Formwork and Centering Rate Sq.m

1 Cu.m Curing of concrete Cu.m


Hire charges for Hire charges for Tools
1 Cu.m Cu.m
and plants.
1 Cu.m Working depth (Below Ground level) Cu.m

- - Sundries -

82
SI Quan Rate /
Unit Description Unit Amount
No tity Unit
Rate / Cu.m

Vibrated Reinforced Cement Concrete M25 (Design mix) using 20 mm ISS HBG graded
metal including cost and conveyance of all materials to site and cement at site excluding
cost and fabrication of steel but form work and centering soft water labour charges for
3 mixing, transporting, placing in position, vibrating and compacting finishing and curing
concrete, working at heights, hire charges for Hire charges for Tools and plants, including
all other incidental charges, etc., complete as per standard specifications for BASE SLAB,
VERTICAL WALL AND DECK SLAB.
Vibrated Reinforced Cement Concrete
1 Cu.m M25 (Design mix) using 20 mm ISS Cu.m
HBG graded metal
Sq.m Formwork and Centering Rate Sq.m

1 Cu.m Curing of concrete Cu.m


Hire charges for Hire charges for Tools
1 Cu.m Cu.m
and plants.
- - Sundries -

Rate / Cu.m

Plain Cement Concrete M20 (Nominal Mix) using 20mm ISS HBG metal including cost
and conveyance of all materials to site and cement at site excluding cost and fabrication
of steel but form work and centering soft water labour charges for mixing, transporting,
4 placing in position, vibrating and compacting finishing and curing concrete, working at
heights, hire charges for Hire charges for Tools and plants, including all other incidental
charges, etc., complete as per standard specifications for WING WALL BELOW GROUND
LEVEL
Plain Cement Concrete M20 (Nominal
1 Cu.m Cu.m
Mix) using 20mm ISS HBG metal
Sq.m Formwork and Centering Rate Sq.m

1 Cu.m Curing of concrete Cu.m


Hire charges for Hire charges for Tools
1 Cu.m Cu.m
and plants.
1 Cu.m Working depth (Below Ground level) Cu.m

- - Sundries -

Rate / Cu.m

83
SI Quan Rate /
Unit Description Unit Amount
No tity Unit
Plain Cement Concrete M20 (Nominal Mix) using 20mm ISS HBG metal including cost
and conveyance of all materials to site and cement at site excluding cost and fabrication
of steel but form work and centering soft water labour charges for mixing, transporting,
5 placing in position, vibrating and compacting finishing and curing concrete, working at
heights, hire charges for Hire charges for Tools and plants, including all other incidental
charges, etc., complete as per standard specifications for WING WALL ABOVE GROUND
LEVEL
Plain Cement Concrete M20 (Nominal
1 Cu.m Cu.m
Mix) using 20mm ISS HBG metal
Sq.m Formwork and Centering Rate Sq.m

1 Cu.m Curing of concrete (i) RCC Cu.m


Hire charges for Hire charges for Tools
1 Cu.m Cu.m
and plants.
1 Cu.m Working depth (Above Ground level) Cu.m

- - Sundries -

Rate / Cu.m

Plain Cement Concrete M20 (Nominal Mix) using 20mm ISS HBG metal including cost and
conveyance of all materials to site including cement at site including labour charges for
6 mixing, transporting, laying, and curing concrete,working at heights,hire charges for Hire
charges for Tools and plants,including all other incidental charges,etc, complete for CC
PARAPET WALL OVER BOX CULVERT.
Plain Cement Concrete M20 (Nominal
1 Cu.m Cu.m
Mix) using 20mm ISS HBG metal
Sq.m Formwork and Centering Rate Sq.m

1 Cu.m Curing of concrete Cu.m


Hire charges for Hire charges for Tools
1 Cu.m Cu.m
and plants.
- - Sundries -

Rate / Cu.m

Supply and fabrication of Fe-500 (HYSD) steel required in the schedule including cost
of steel at site cost of providing and cost of fabrication,labour charges for cleaning the
rods straightening, cutting, bending, tying grills, including overlapping to the required
7 length whenever necessary and placing the reinforcement in position as specified in the
drawings,including cost of binding wire(Galvanised-18 G), provision of spacer bars, cover
blocks and all other incidental charges etc,complete,as per section 1600 of MORT@H
specifications ( V revision)
For Bars upto 16mm dia.

84
SI Quan Rate /
Unit Description Unit Amount
No tity Unit
1.05 MT Steel (HYSD) MT

0.01 MT Binding Wire (Galvanised -18 G) MT

35 Nos Fitter-I Class Day

1 MT Anti corrosive treatment for steel MT

- - Sundries -

Rate / MT

Providing and fixing Seepage pipes of 100mm dia of requied lengths for abutments and
wings including cost and conveyance of all materials to work site and for labour charges
8
for fixing, etc.,to drain of the backfill as per section 2706 of MORT@H specifications (V
Revisions)
1 Rm Cost of Seepage pipes Rm

1 Rm Fixing Charges Rm

- - Sundries -

Rate / Rm

85
DATA - Providing Footpath cu.m drain

SI. Quan- Rate/


Unit Description Unit Amount
No. tity Unit
Earthwork excavation in all classes of ORDINARY SOIL except hardrock requiring blasting
and depositing on bank with all leads and lifts as per SS20B, including cost of all labour,
equipments and all incidential charges such as bailing out water, providing and maintaining
necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal
1
of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom
of excavation backfilling, and clearing the site and disposal of all surplus materials etc.,
complete as per relevant standard specification for FOOTPATH Cu.m DRAIN as per
section 300 of MORTH specification (V Revision) and Is 1200:1992 Part 1 (IV Revision)
ORDINARY SOIL (SS20B) Earth work
excavating and depositing on bank with
initial lead of 10m & initial lift of 2m in
1 Cu.m Sand, silt or other loose soil, wet sand or Cu.m
silt not under water, light black cotton soil,
sandy loam and ordinary soil including
excavated earth (SS20B)
1 Cu.m Add 100% extra for Narrow foundation. Cu.m
Refilling with excavated soil for filling in
1 Cu.m Cu.m
foundation and basement.
Formation and maintaining of protective
1 Cu.m Cu.m
bunds and coffer dams.
1 Cu.m Bailing out of water Cu.m

1 Cu.m Shoring and strutting Cu.m

1 Cu.m Tools & Plants Cu.m


Removal of Protective bunds and
1 Cu.m Cu.m
cleaning the sites.
- - Sundries -

Rate / Cu.m

Plain Cement Concrete M15 (Nominal Mix) using 40mm ISS HBG metal including Cost
and Conveyance of all materials to site and cost of Cement at site including soft water,
labour charges for mixing, transporting, laying compacting, curing concrete, Hire charges
2
for Tools and plants and incidental charges such as bailing out water, maintaining of
protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard
specification for LEVELLING COURSE BELOW FOUNDATION.
Plain Cement Concrete M15 (Nominal
1 Cu.m Cu.m
Mix) using 40mm ISS HBG metal
2.00 Sq.m Formwork and Centering Rate Sq.m

1 Cu.m Curing of concrete Cu.m


Hire charges for Hire charges for Tools
1 Cu.m Cu.m
and plants.

86
SI. Quan- Rate/
Unit Description Unit Amount
No. tity Unit
- - Sundries -

Rate / Cu.m

Vibrated Reinforced Cement Concrete M25 (Design mix) using 20 mm ISS HBG graded
metal including cost and conveyance of all materials to site and cement at site excluding
cost and fabrication of steel but form work and centering soft water labour charges for
3 mixing, transporting, placing in position, vibrating and compacting finishing and curing
concrete, working at heights, hire charges for Hire charges for Tools and plants, including
all other incidental charges, etc., complete as per standard specifications for Drain bottom
Slab.
Vibrated Reinforced Cement Concrete
1 Cu.m M25 (Design mix) using 20 mm ISS HBG Cu.m
graded metal
Sq.m Formwork and Centering Rate Sq.m

1 Cu.m Curing of concrete (i) RCC Cu.m


Hire charges for Hire charges for Tools
1 Cu.m Cu.m
and plants.
- - Sundries -

Rate / Cu.m

Vibrated Reinforced Cement Concrete M25 (Design mix) using 20 mm ISS HBG graded
metal including cost and conveyance of all materials to site and cement at site excluding
cost and fabrication of steel but form work and centering soft water labour charges for
4 mixing, transporting, placing in position, vibrating and compacting finishing and curing
concrete, working at heights, hire charges for Hire charges for Tools and plants, including
all other incidental charges, etc., complete as per standard specifications for Drain Vertical
Wall.
Vibrated Reinforced Cement Concrete
1 Cu.m M25 (Design mix) using 20 mm ISS HBG Cu.m
graded metal
Sq.m Formwork and Centering Rate Sq.m

1 Cu.m Curing of concrete Cu.m


Hire charges for Hire charges for Tools
1 Cu.m Cu.m
and plants.
- - Sundries -

Rate / Cu.m

87
SI. Quan- Rate/
Unit Description Unit Amount
No. tity Unit

Vibrated Reinforced Cement Concrete M25 (Design mix) using 20 mm ISS HBG graded
metal including cost and conveyance of all materials to site and cement at site excluding
cost and fabrication of steel but form work and centering soft water labour charges for
5 mixing, transporting, placing in position, vibrating and compacting finishing and curing
concrete, working at heights, hire charges for Hire charges for Tools and plants, including
all other incidental charges, etc., complete as per standard specifications for Cover Slab
of Drain.
Vibrated Reinforced Cement Concrete
1 Cu.m M25 (Design mix) using 20 mm ISS HBG Cu.m
graded metal
Sq.m Formwork and Centering Rate Sq.m

1 Cu.m Curing of concrete (i) RCC Cu.m


Hire charges for Hire charges for Tools
1 Cu.m Cu.m
and plants.
- - Sundries -

Rate / Cu.m

Providing and fixing Drain pipes of 100mm Dia of requied lengths for abutments and
wings including cost and conveyance of all materials to work site and for labour charges
6
for fixing, etc.,to drain of the backfill as per section 2706 of MORT@H specifications (V
Revisions)
0.30 Rm Cost of Drain pipes 100mm Dia Rm

0.30 Rm Fixing Charges Rm

- - Sundries -

Rate / Rm

Supplying and fixing of fiber reinforced concrete Manholes cover 60 x 60cm with frame as
7 per IRC :50 - 1999 and as directed by the departmental officers at every 10m intervals
along the drain cover slab. For storm water drain portion.
1 Nos Manholes cover 60 x 60cm with frame Nos

Rate / Nos

88
SI. Quan- Rate/
Unit Description Unit Amount
No. tity Unit
Supply and fabrication of Fe-500 (HYSD) steel required in the schedule including
cost of steel at site cost of providing and cost of fabrication,labour charges for cleaning
the rods straightening, cutting, bending, tying grills, including overlapping to the required
8 length whenever necessary and placing the reinforcement in position as specified in the
drawings,including cost of binding wire(Galvanised-18 G), provision of spacer bars, cover
blocks and all other incidental charges etc,complete,as per section 1600 of MORT@H
specifications ( V revision)
1.05 MT Steel (HYSD) MT

0.01 MT Binding Wire (Galvanised -18 G) MT

35 Nos Fitter-I Class Day

1 MT Anti corrosive treatment for steel -

- - Sundries -

Rate / MT

89
DATA - Providing Safety Kerb and Filling under the span to the ROB

SI Quan- Rate/
Unit Description Unit Amount
No tity Unit

Vibrated Reinforced Cement Concrete M 30 (Design mix) using 20 mm ISS HBG graded
metal including Cost and Conveyance of all materials to site and cost of Cement at site
including soft water, labour charges for mixing, transporting, laying compacting, curing
1
concrete, Hire charges for Tools and plants and incidental charges such as bailing out wa-
ter, maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per
relevant standard specification for LEVELLING COURSE Cu.m SAFETY KERB.

Vibrated Reinforced Cement Concrete


1 Cu.m M 30 (Design mix) using 20 mm ISS Cu.m
HBG graded metal

2.00 Sq.m Formwork and Centering Rate Sq.m

1 Cu.m Curing of concrete Cu.m

Hire charges for Hire charges for Tools


1 Cu.m Cu.m
and plants.

- - Sundries -

Rate / Cu.m

Filling with carted earth in between trestle portion of ROB including cost and conveyance
to work site , laying and filling in layers, tamping under optimum moisture content to get
2
the maximum dry density including watering, handling charges and all other incidental
charges etc. complete as per relevant specifications

ORDINARY SOIL (SS20B) Earth work


excavating and depositing on bank with
initial lead of 10m & initial lift of 2m in
1 Cu.m Sand, silt or other loose soil, wet sand Cu.m
or silt not under water, light black cot-
ton soil, sandy loam and ordinary soil
including excavated earth (SS20B)

Cost of Earth (as per GO D No. 214,


1 Cu.m Industries (MMC.2 Department dated Cu.m
(3.11.15)

1 Cu.m Conveyance Charges for 10 Km Cu.m

90
SI Quan- Rate/
Unit Description Unit Amount
No tity Unit

1 Cu.m Tools & Plants Cu.m

- - Sundries -

Rate / Cu.m

Painting new iron work with two coats of best synthetic enamal paint of approved qual-
3 ity and colour and over one coat of primer using brushes including ordinary scrapping
charges and neat finishing etc complete

2.22 lit Synthetic enamel paint Lit.

1.10 nos Painter Ist Class No.

Cost for 10 m2

Cost for 1 m2

Sundries -

Cost for 1 m2

Supplying and fixing the M S Grill of approved design including prime coat and two
4
coats of synthetic enamel paint etc., complete.

For grill of size 1.90 m x 1.25 m = 2.38 m2

Sub Data for weight of grill

10mm square rods at 150mm c/c verti-


= 12.65 m
cally - Verticals - 11 x 1.15
Weight of 10mm square rods for
= 0.80 Kg/m
1.00m length

Total verticals rod weight = 10.12 Kg

91
SI Quan- Rate/
Unit Description Unit Amount
No tity Unit

Horizontals - 4x1.80 = 7.20 m

Weight of 25mmx6mm for 1.00m


= 1.18 Kg/m
length

Total Horizontals rod weight = 8.50 Kg

Weight for square tube of 50mmx50m-


= 3.73 Kg/m
mx2.6mm
Total squre tube post weight - 2 x
= 11.19 Kg
1.5m

Total weight = 29.81 Kg

Material cost

As per item no.2 of Annexure VI - Rates


29.81 Kg kg
of other materials
Painting two coats with synthetic enam-
2.38 m2 m2
el paint
Add: Charges for conveyance & all oth-
-
er incidentals

29.81 m2 Rate for Labour(S.No.127) m2

Cost for 2.38 m2

Cost for 1 m2

- - Sundries -

Cost for 1 m2

92
DATA - Painting

SI Quan- Rate/
Unit Description Unit Amount
No tity Unit
Painting two coat with ready mixed plastic emulsion paint and approved priming coat
over the cement surface complete including scrapping clean removal of dirt parts for
crash barrier, safety kerb, hand rails, bridge bottom sides, deck slab bottom, abutment,
1
return walls and retaining wall sides with approved quality and colour including cost
and conveyance of all materials to site, labour charges etc. complete as per standard
specifications

One Coat of White washing with White cement

10.00 Kg Cleaning of Plastered Surface Kg

1.80 Kg Cement Paint First quality Kg

0.25 Nos Painter I Class Day

0.25 Nos Mazdoor Category-I Day

0.40 Nos Mazdoor Category-II Day

- - Contingencies like Brushes etc 5% -

- - Sundries -

Rate for 10 Sq.m

Rate for 1 Sq.m

For Finishing two Coats

3.00 Kg Cement Paint First quality Kg

0.50 Nos Painter I Class Day

0.50 Nos Mazdoor Category-I Day

0.80 Nos Mazdoor Category-II Day

- - Contingencies like Brushes etc 10% -

- - Sundries -

Rate for 10 Sq.m

Rate for 1 Sq.m

93
SI Quan- Rate/
Unit Description Unit Amount
No tity Unit
One Coat of White washing with White cement =

For Finishing two Coats =

Total =

Providing One legged scaffolding using 150mm dia Casurina poles rate
for 6m run and 3m height
Vertical Post (Casurina Poles 13cm-
16.00 RM RM
15cm dia) (4 Nos *(3+0.5+0.5))
Horizontal Post (Casurina Poles 13cm-
14.00 RM RM
15cm dia) (2 Nos *(6+0.5+0.5))
10 10
0.10 1 Use Cost/Operation
Use Use
1 Nos Mazdoor Category-I Day

- - Contingencies like Coir Nails etc., -

- - Sundries -

Rate /(6*3 = 18 Sq.m) / 18 Sq.m

Rate for 1 Sq.m

For Every additional height of 1.75m taking 6m run extra cost


Vertical Post (Casurina Poles
11.00 RM 13cm-15cm dia) (4 Nos RM
*(1.75+0.5+0.5))
Horizontal Post (Casurina Poles 13cm-
14.00 RM 15cm dia) (2 Nos RM
*(6+0.5+0.5))
10 10
0.10 1 Use Cost/Operation
Use Use
1 Nos Mazdoor Category-I Day

- - Contingencies like Coir Nails etc., -

- - Sundries -

Rate /(6*1.75 = 10.5 Sq.m) / 10.5 Sq.m

Rate for 1 Sq.m

94
SI Quan- Rate/
Unit Description Unit Amount
No tity Unit
Total Scaffolding Charges =

Painting two coat with ready mixed plastic emulsion paint and approved
including priming coat over the cement surface complete including scrapping
clean removal of drit of parts and for zebra marking .
10.00 Sq.m Cleaning of Plastered Surface Sq.m

1.44 Lit Primer Plastic Emulsion Paint Lit

2.55 Lit Plastic Emulsion Paint Lit

1.20 Nos Painter I Class Nos

0.70 Nos Mazdoor Category-I Nos

- - Scaffolding Charges -

- - Contingencies like Brushes etc 10% -

- - Sundries -

00

Rate for 10 Sq.m

Rate for 1 Sq.m

95
DATA - Providing Drainage arrangements to the ROB

SI Quan- Rate/
Unit Description Unit Amount
No tity Unit
Providing and fixing 160 mm dia PVC pipes of approved class not less than 4 kg/
Sq.cm. connecting the drainage spouts of the deck slab along both the sides of the
1 deckslab connected to the Rainwater harvesting system below for two consecutive spans
with all bends tees clamps and all other accessories and fixtures complete including
Hire charges for Tools and plants ,transportation etc.,
Consider Rain water harvesting pit at every 3 spans once

75.00 Rm Cost of PVC pipe 160mm (4 kg/sq.cm) Rm

24.00 Nos PVC Tee 160mm dia (“O” Ring joint) Nos

12.00 Nos PVC bend 160mm dia (“O” Ring joint) Nos

Total for 75 Rm

Rate / Rm

Data for 3m length of pipe line

3.00 Rm Cost of PVC pipe 110mm Rm


Special Clamp, Teakwood Plugs and
2.00 Set Set
Screws
0.50 No. Fitter-I Class (Pipe Laying) Nos

1.25 No. Mazdoor Grade I Nos


Add for form work at varying levels
- - LS
and working at heights varying

Total for 75 Rm

Rate / Rm

Say

Earthwork excavation in all classes of ORDINARY SOIL except hardrock requiring


blasting and depositing on bank with all leads and lifts as per SS20B, including
cost of all labour, equipments and all incidential charges such as bailing out water,
providing and maintaining necessary cofferdams, sheeting, shoring bracing and their
2 subsequent removal, removal of all logs, stumps, grubs and other deleterious matter
and obstructions, trimming bottom of excavation backfilling, and clearing the site and
disposal of all surplus materials etc., complete as per relevant standard specification
for Providing Drainage arrangements to the ROB as per section 300 of MORTH
specification (V Revision) and Is 1200:1992 Part 1 (IV Revision)

96
SI Quan- Rate/
Unit Description Unit Amount
No tity Unit
ORDINARY SOIL (SS20B) Earth work
excavating and depositing on bank
with initial lead of 10m & initial lift of
1 Cu.m 2m in Sand, silt or other loose soil, wet Cu.m
sand or silt not under water, light black
cotton soil, sandy loam and ordinary
soil including excavated earth (SS20B)
Add 100% extra for Narrow founda-
1 Cu.m Cu.m
tion.
1 Cu.m Tools & Plants Cu.m

- - Sundries -

Rate / Cu.m

Rate per 1 Cu.m upto 2m height

Rate per 1 Cu.m for 2m to 3m height

Filling with Sand including cost and conveyance of all materials and stacking at site
to departmental guage for pre-measurements, labour charges for laying, handling and
3 filling in layers not more than 15 cm thick including watering with all leads for good soft
water and all other incidental charges, tamping, compacting under optimum moisture
content to get the maximum density for the pit and Rain water harvesting well
1 Cu.m Sand Cu.m

1 Cu.m Filling Charges Cu.m

- - Sundries -

Rate / Cu.m

Filling with 40mm size ISS HBG metal in the rain water harvesting system including
4 cost and conveyance of all material and labour charges for filling complete as directed
by the Engineer.
1 Cu.m Cost of 40 mm ISS metal Cu.m

1 Cu.m Filling Charges Cu.m

- - Sundries -

97
SI Quan- Rate/
Unit Description Unit Amount
No tity Unit
Rate / Cu.m

Filling with 20mm size ISS HBG metal in the rain water harvesting system including
5 cost and conveyance of all material and labour charges for filling complete as directed
by the Engineer .
1 Cu.m Cost of 20 mm ISS metal Cu.m

1 Cu.m Filling Charges Cu.m

- - Sundries -

Rate / Cu.m

Filling with 12mm size ISS HBG metal in the rain water harvesting system including
6 cost and conveyance of all material and labour charges for filling complete as direct-
ed by the Engineer .
1 Cu.m Cost of 12 mm ISS metal Cu.m

1 Cu.m Filling Charges Cu.m

- - Sundries -

Rate / Cu.m

Filling with 6 mm size ISS HBG metal in the rain water harvesting system including
7 cost and conveyance of all material and labour charges for filling complete as directed
by the Engineer .
1 Cu.m Cost of 6 mm ISS metal Cu.m

1 Cu.m Filling Charges Cu.m

- - Sundries -

Rate / Cu.m

Providing and laying of ISI Class NP 3 pipe of best quality of 1200mm dia. in the rain
water harvesting system with all required specials including cost and conveyance of
8
pipes and specials , labour charges for in position and all other incidental charges etc.,
complete for pipes as directed by the Engineer

98
SI Quan- Rate/
Unit Description Unit Amount
No tity Unit
1 Rm Cost of Seepage pipes Rm

1 Rm Fixing Charges (5% LS) Rm

- - Sundries -

Rate / RM

99
DATA - Dismantling of Existing Structure

SI Quan- Rate/
Unit Description Unit Amount
No tity Unit
Dismantling the existing and fell down RCC concrete structures in the cause way such as
deck slab, raft bed slab, pier protection side walls and disposing the demolished material
1 including all other incidental charges etc., with a lift upto 3 m and lead upto 1 km as per
specification and as per directions of Departmental officers for Dismantling the Reinforced
Cement Concrete Slab
1 Cu.m Dismantling RCC Cu.m

Rate / Cu.m

Dismantling the existing and fell down plain concrete structure in the cause way such as
PCC pavement slab, pier bottom slab, pier wall, bed block, pier protection top slab and
2 disposing the demolished material including all other incidental charges etc., with a lift
upto 3 m and lead upto 1 km as per specification and as per directions of Departmental
officers for Dismantling Cement Concrete Slab
1 Cu.m Dismantling Plain Cement Concrete Cu.m

Rate / Cu.m

Dismantling the existing and fell down stone Masanory structures such as Retaining wall,
revetment, pitching and disposing the demolished material including all other incidental
3
charges etc., with a lift upto 3 m and lead upto 1 km as per specification and as per
directions of Departmental officers for Dismantling Stone Masonry structures.
Dismantling Brick / Stone Masonry in
1 Cu.m Cu.m
cement mortar walls under 3m high

Rate / Cu.m

Dismantling the existing RCC Pipes and dispose the demolished material including all
4 other incidental charges etc., with a lift upto 3 m and lead upto 1 km as per specification
and as per directions of Departmental officers for Dismantling the RCC pipe.
1 Cu.m Dismantling RCC Cu.m

Rate / Cu.m

Picking the existing bituminous road surface to a depth of 75 mm and disposing of scarified
5 materials with a lift upto 3 m and lead upto 1 km as per specification and as per directions
of Departmental officers

100
SI Quan- Rate/
Unit Description Unit Amount
No tity Unit
1 Sq.m Picking of BT Road Sq.m

Rate / Sq.m

Removal of filling inbetween retaining walls by Earthwork excavation including all


classes of soil, gravel, WMM, GSB except soft disintegrated rock not requiring blasting
and hardrock requiring blasting and depositing on bank with all leads and lifts as per
SS20B, including cost of all labour, equipments and all incidential charges such as bailing
out water, providing and maintaining necessary cofferdams, sheeting, shoring bracing
6
and their subsequent removal, removal of all logs, stumps, grubs and other deleterious
matter and obstructions, trimming bottom of excavation backfilling, and clearing the
site and disposal of all surplus materials etc., with a lift upto 3 m and lead upto 1 km as
per specification and as per directions of Departmental officers complete as per relevant
standard specification.
Dismantling Brick / Stone Masonry in
1 Cu.m Cu.m
cement mortar walls under 3m high

Rate / Cu.m

101
DATA - RIVER TRAINING WORKS

SI Quan- Rate /
Unit Description Unit Amount
No tity Unit
Earthwork excavation in all classes of ORDINARY SOIL except hardrock requiring
blasting and depositing on bank with all leads and lifts as per SS20B, including cost of
all labour, equipments and all incidential charges such as bailing out water, providing
and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent
1a. removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions,
trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus
materials etc., complete as per relevant standard specification for FOUNDATION OF TOE
WALL REVERTMENT as per section 300 of MORTH specification (V Revision) and Is
1200:1992 Part 1 (IV Revision)
ORDINARY SOIL (SS20B) Earth work
excavating and depositing on bank
with initial lead of 10m & initial lift of
1 Cu.m 2m in Sand, silt or other loose soil, wet Cu.m
sand or silt not under water, light black
cotton soil, sandy loam and ordinary soil
including excavated earth (SS20B)

Refilling with excavated soil for filling in


1 Cu.m Cu.m
foundation and basement.

Formation and maintaining of protective


1 Cu.m Cu.m
bunds and coffer dams.

1 Cu.m Bailing out of water Cu.m

1 Cu.m Shoring and strutting Cu.m

1 Cu.m Tools & Plants Cu.m

Removal of Protective bunds and


1 Cu.m Cu.m
cleaning the sites.

- - Sundries -

Rate / Cu.m

Plain Cement Concrete M15 (Nominal Mix) using 40mm ISS HBG metal including Cost
and Conveyance of all materials to site and cost of Cement at site including soft water,
labour charges for mixing, transporting, laying compacting, curing concrete, Hire charges
2
for Tools and plants and incidental charges such as bailing out water, maintaining of
protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard
specification for LEVELLING COURSE Cu.m TOE WALL.

Plain Cement Concrete M15 (Nominal


1 Cu.m Cu.m
Mix) using 40mm ISS HBG metal

102
SI Quan- Rate /
Unit Description Unit Amount
No tity Unit

Sq.m Formwork and Centering Rate Sq.m

1 Cu.m Curing of concrete (i) PCC Cu.m

Hire charges for Hire charges for Tools


1 Cu.m Cu.m
and plants.

- - Sundries -

Rate / Cu.m

Gravel backing to revetment for 150mm thick, including cost and conveyance of gravel to
3 worksite,laying, and filling in layers, of 150mm thick, tamping, including watering with all
leads for water and all other incidental charges etc, complete.

11.6 Cu.m Gravel Cu.m

7.1 Nos Mazdoor Category-I Day

3.5 Nos Mazdoor Category-II Day

- - Sundries -

Rate / 10
Cu.m

Rate / Cu.m

Manufacturing and fixing cement concrete blocks of size 250 x 250x 300 mm in CC 1:2:4,
nominal mix (M15) using 20mm ISS size HBG metalincluding cost and conveyance of all
4
materials to worksite and cement site including conveyance and handling charges for the
same at both ends, including all other incidental charges, etcc, complete for REVETMENTS.

Plain Cement Concrete M20 (Nominal


10 Cu.m Cu.m
Mix) using 20mm ISS HBG metal

10 Cu.m Labour for fixing Cu.m

103
SI Quan- Rate /
Unit Description Unit Amount
No tity Unit

Sq.m Formwork and Centering Rate Sq.m

- - Curing of concrete (iI) PCC -

Hire charges for Hire charges for Tools


- - -
and plants.

- - Sundries -

Rate /
10 Cu.m

Rate / Cu.m

250 x 250
Size of Block x 300 mm
mm mm

No of blocks for One Cu.m = 1/0.019 = 53 Nos

= 0.0625
Area of block = 0.25 x 0.25
Sq.m
= 3.375
Area of One Cu.m = 53x0.0625
Sq.m

Rate per One Sq.m = /3.375 = Rs.

Rate / Sq.m

104
METRO

105
PREAMBLE

The Model Data for Bridge works is formulated considering the factors that
contributes to the completion of the works according to the latest specification and
current practice of construction.

The Data presently adopted are on volume basis and becomes obsolete as the
specifications are made out based on weight.

It becomes essential and warranted to make sufficient provisions in the data for
carrying out the work for the present scenario, i.e., on weight basis and also it becomes
harder to execute the work without revising the data.

The provisions of the Standard Data of MORT&H are used as guidelines for
formulation. Other provisions are adopted as per the guidelines of the specifications to
the corresponding work to execute the work as per the standards. Sub-Data are worked
for the provisions made based on the field observations to scientifically justify them.

The Model data is structured in parts as,

1. Excavation

2. Piling

3. Open foundation

4. Substructure

5. Superstructure

Sub Data are provided for the large and small Bridge works. The Sample data is
prepared for large bridges alone to avoid voluminous and repetitive content.

106
Sl. No Qty Unit Description Rate Per Amount

12.1 Excavation
Excavation for Structures
Earth work in excavation of foundation of structures as per drawing and technical
specification, including setting out, construction of shoring and bracing, removal of
stumps and other deleterious matter, dressing of sides and bottom and backfilling
with approved Head Mazdoorrial.
I. Ordinary soil

Unit = cu.m

Taking output = 10 cu.m

A. Manual Means

(i) Depth upto 3 m

a) Labour

0.14 day Head Mazdoor day

3.50 day Mazdoor day

10.00 cu.m b) Setting out cu.m

10.00 cu.m Bailing out water cu.m

10.00 cu.m Trimming the bed cu.m


Shoring the sides
cu.m cu.m
( If Necessary)
Coffer dams and Bunds
cu.m cu.m
( if Necessary)
10.00 cu.m Lifting Charges for 1m cu.m

Ls Tools ( for Crow bars and Pans) Ls

6.90 cu.m Back filling cu.m

10.00 cu.m Supervision Charges cu.m

10.00 cu.m Quality control charges cu.m

10.00 cu.m Labour Shed & Site Office cu.m

10.00 cu.m Watch & Ward cu.m

10.00 cu.m Traffic Management cu.m

Cost for 10 cu.m

Insurance @ 0.25%

Total

Rate per cu.m = (a+b)/10

107
Sl. No Qty Unit Description Rate Per Amount
12.1 (I)
(ii) Depth 3 m to 6 m
A
a) Labour

0.18 day Head Mazdoor/Supervisor day

4.50 day Mazdoor day

10.00 cu.m b) Setting out cu.m

10.00 cu.m Bailing out water cu.m

10.00 cu.m Trimming the bed cu.m


Shoring the sides
cu.m cu.m
( If Necessary)
Coffer dams and Bunds
cu.m cu.m
( if Necessary)
10.00 cu.m Lifting Charges for 4m cu.m

Tools ( for Crow bars and Pans)

6.90 cu.m Back filling cu.m

10.00 cu.m Supervision Charges cu.m

10.00 cu.m Quality control charges cu.m

10.00 cu.m Labour Shed & Site Office cu.m

10.00 cu.m Watch & Ward cu.m

10.00 cu.m Traffic Management cu.m

Cost for 10 cu.m = a+b

Insurance @ 0.25%

Total

Rate per cu.m = (a+b)/10


12.1 (I)
(iii) Depth above 6 m
A
a) Labour

0.24 day Head Mazdoor/Supervisor day

6.00 day Mazdoor day

10.00 cu.m b) Setting out cu.m

10.00 cu.m Bailing out water cu.m

108
Sl. No Qty Unit Description Rate Per Amount

10.00 cu.m Trimming the bed cu.m


Shoring the sides
cu.m cu.m
( If Necessary)
Coffer dams and Bunds
cu.m cu.m
( if Necessary)
10.00 cu.m Lifting Charges for 6m cu.m

Tools ( for Crow bars and Pans)

6.90 cu.m Back filling cu.m

10.00 cu.m Supervision Charges cu.m

10.00 cu.m Quality control charges cu.m

10.00 cu.m Labour Shed & Site Office cu.m

10.00 cu.m Watch & Ward cu.m

10.00 cu.m Traffic Management cu.m

Cost for 10 cu.m = a+b

Insurance @ 0.25%

Total

Rate per cu.m = (a+b)/10

12.1 (I) B. Mechanical Means

(i) Depth upto 3 m

Unit = cu.m

Taking output = 240 cu.m

a) Labour

0.32 day Head Mazdoor day

8.00 day Mazdoor day

b) Machinery
Hydraulic excavator 1.0 cu.m
6.00 hour hour
bucket capacity
240.00 cu.m c) Setting out cu.m

240.00 cu.m Bailing out water cu.m

109
Sl. No Qty Unit Description Rate Per Amount

240.00 cu.m Trimming the bed cu.m


Shoring the sides
cu.m cu.m
( If Necessary)
Coffer dams and Bunds
cu.m cu.m
( if Necessary)
240.00 cu.m Lifting Charges for 1m cu.m

Tools ( for Crow bars and Pans)

165.60 cu.m Back filling cu.m

240.00 cu.m Supervision Charges cu.m

240.00 cu.m Quality control charges cu.m

240.00 cu.m Labour Shed & Site Office cu.m

240.00 cu.m Watch & Ward cu.m

240.00 cu.m Traffic Management cu.m

Cost for 240 cu.m = a+b+c

Insurance @ 0.25%

Total

Rate per cu.m = (a+b+c)/240


12.1 (I)
(ii) Depth 3 m to 6 m
B
Unit = cu.m

Taking output = 210 cu.m

a) Labour

0.32 day Head Mazdoor day

8.00 day Mazdoor day

b) Machinery
Hydraulic excavator 1.0 cu.m
6.00 hour hour
bucket capacity
210.00 cu.m c) Setting out cu.m

210.00 cu.m Bailing out water cu.m

210.00 cu.m Trimming the bed cu.m


Shoring the sides
cu.m cu.m
( If Necessary)

110
Sl. No Qty Unit Description Rate Per Amount
Coffer dams and Bunds
cu.m cu.m
( if Necessary)
210.00 cu.m Lifting Charges for 4m cu.m

Tools ( for Crow bars and Pans)

144.90 cu.m Back filling cu.m

210.00 cu.m Supervision Charges cu.m

210.00 cu.m Quality control charges cu.m

210.00 cu.m Labour Shed & Site Office cu.m

210.00 cu.m Watch & Ward cu.m

210.00 cu.m Traffic Management cu.m

Cost for 210 cu.m = a+b+c

Insurance @ 0.25%

Total

Rate per cu.m = (a+b+c)/210


12.1 (I)
(iii) Depth above 6m
B
Unit = cu.m

Taking output = 180 cu.m

a) Labour

0.40 day Head Mazdoor day

10.00 day Mazdoor day

b) Machinery
Hydraulic excavator 1.0 cu.m
6.00 hour hour
bucket capacity
180.00 cu.m c) Setting out cu.m

180.00 cu.m Bailing out water cu.m

180.00 cu.m Trimming the bed cu.m


Shoring the sides
cu.m cu.m
( If Necessary)
Coffer dams and Bunds
cu.m cu.m
( if Necessary)
180.00 cu.m Lifting Charges for 6m cu.m

111
Sl. No Qty Unit Description Rate Per Amount

Tools ( for Crow bars and Pans)

168.00 cu.m Back filling cu.m

180.00 cu.m Supervision Charges cu.m

180.00 cu.m Quality control charges cu.m

180.00 cu.m Labour Shed & Site Office cu.m

180.00 cu.m Watch & Ward cu.m

180.00 cu.m Traffic Management cu.m

Cost for 180 cu.m = a+b+c

Insurance @ 0.25%

Total

Rate per cu.m = (a+b+c)/180

12.1 II. Ordinary Rock (not requiring blasting)

A. Manual Means

(i) Depth upto 3 m

Unit = cu.m

Taking output = 10 cu.m

a) Labour

0.20 day Head Mazdoor day

5.00 day Mazdoor day

10.00 cu.m b) Setting out cu.m

10.00 cu.m Bailing out water cu.m

10.00 cu.m Trimming the bed cu.m


Shoring the sides
cu.m cu.m
( If Necessary)
Coffer dams and Bunds
cu.m cu.m
( if Necessary)
10.00 cu.m Lifting Charges for 1m cu.m

Tools ( for Crow bars and Pans)

6.90 cu.m Back filling cu.m

112
Sl. No Qty Unit Description Rate Per Amount

10.00 cu.m Supervision Charges cu.m

10.00 cu.m Quality control charges cu.m

10.00 cu.m Labour Shed & Site Office cu.m

10.00 cu.m Watch & Ward cu.m

10.00 cu.m Traffic Management cu.m

Cost for 10 cu.m = a+b

Insurance @ 0.25%

Total

Rate per cu.m = (a+b)/10

12.1(II) B. Mechanical Means

Unit = cu.m

Taking output = 180 cu.m

a) Labour

0.24 day Head Mazdoor day

6.00 day Mazdoor day

b) Machinery
Hydraulic excavator 1.0 cu.m
6.00 hour hour
bucket capacity
180.00 cu.m c) Setting out cu.m

180.00 cu.m Bailing out water cu.m

180.00 cu.m Trimming the bed cu.m


Shoring the sides
cu.m cu.m
( If Necessary)
Coffer dams and Bunds
cu.m cu.m
( if Necessary)
180.00 cu.m Lifting Charges for 1m cu.m

Tools ( for Crow bars and Pans)

124.20 cu.m Back filling cu.m

180.00 cu.m Supervision Charges cu.m

113
Sl. No Qty Unit Description Rate Per Amount

180.00 cu.m Quality control charges cu.m

180.00 cu.m Labour Shed & Site Office cu.m

180.00 cu.m Watch & Ward cu.m

180.00 cu.m Traffic Management cu.m

Cost for 180 cu.m = a+b+c

Insurance @ 0.25%

Total

Rate per cu.m = (a+b+c)/180

12.1 (IV) Hard Rock ( blasting prohibited )

Unit = cu.m

Taking output = 10 cu.m

A. Mechanical Means

a) Labour

0.20 day Head Mazdoor day

5.00 day Mazdoor day

b) Machinery
Air Compressor 250 cfm with
6.00 hour hour
2 leads of pneumatic breaker
10.00 cu.m c) Setting out cu.m

10.00 cu.m Bailing out water cu.m

10.00 cu.m Trimming the bed cu.m


Shoring the sides
cu.m cu.m
( If Necessary)
Coffer dams and Bunds
cu.m cu.m
( if Necessary)
10.00 cu.m Lifting Charges for 1m cu.m

Tools ( for Crow bars and Pans)

114
Sl. No Qty Unit Description Rate Per Amount

6.90 cu.m Back filling cu.m

10.00 cu.m Supervision Charges cu.m

10.00 cu.m Quality control charges cu.m

10.00 cu.m Labour Shed & Site Office cu.m

10.00 cu.m Watch & Ward cu.m

10.00 cu.m Traffic Management cu.m

Cost for 10 cu.m = a+b+c+d

Insurance @ 0.25%

Total

Rate per cu.m = (a+b+c+d)/10

12.1 (V) Marshy Soil

Unit = cu.m

Taking output = 10 cu.m

Depth upto 3 m

A. Manual means

a) Labour

0.40 day Head Mazdoor/Supervisor day

10.00 day Mazdoor day

b) Machinery

2.67 hour Tractor-trolley for removal. hour

10.00 cu.m c) Setting out cu.m

10.00 cu.m Bailing out water cu.m

10.00 cu.m Trimming the bed cu.m


Shoring the sides
cu.m cu.m
( If Necessary)
Coffer dams and Bunds
cu.m cu.m
( if Necessary)

115
Sl. No Qty Unit Description Rate Per Amount

10.00 cu.m Lifting Charges for 1m cu.m

Tools ( for Crow bars and Pans)

6.90 cu.m Back filling cu.m

10.00 cu.m Supervision Charges cu.m

10.00 cu.m Quality control charges cu.m

10.00 cu.m Labour Shed & Site Office cu.m

10.00 cu.m Watch & Ward cu.m

10.00 cu.m Traffic Management cu.m

Cost for 10 cu.m = a+b+c

Insurance @ 0.25%

Total

Rate per cu.m = ( a+b+c)/ 10

12.1 (V) B. Mechanical Means

a) Labour

0.08 day Head Mazdoor day


Mazdoor for dressing sides,
2.00 day day
bottom and backfilling
b) Machinery
Hydraulic excavator 1.0 cu.m
0.17 hour bucket capacity @ 60 cu.m per hour
hour
Tipper 5.5 cu.m capacity, 4
0.45 hour hour
trips per hour.
10.00 cu.m c) Setting out cu.m

10.00 cu.m Bailing out water cu.m

10.00 cu.m Trimming the bed cu.m


Shoring the sides
cu.m cu.m
( If Necessary)

116
Sl. No Qty Unit Description Rate Per Amount
Coffer dams and Bunds
cu.m cu.m
( if Necessary)
10.00 cu.m Lifting Charges for 1m cu.m

Tools ( for Crow bars and Pans)

6.90 cu.m Back filling cu.m

10.00 cu.m Supervision Charges cu.m

10.00 cu.m Quality control charges cu.m

10.00 cu.m Labour Shed & Site Office cu.m

10.00 cu.m Watch & Ward cu.m

10.00 cu.m Traffic Management cu.m

Cost for 10 cu.m = a+b+c

Insurance @ 0.25%

Total

Rate per cu.m = (a+b+c)/10

117
Sl. No Qty Unit Description Rate Per Amount

OPEN FOUNDATION
12.4 PCC 1:3:6 in Foundation
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggre-
gate 40 mm nominal size mechanically mixed, placed in foundation and compacted
by vibration including curing for 14 days.
Unit = cu.m

Taking output = 15 cu.m

a) Labour

0.64 day Head Mazdoor day

1.00 day Mason day

15.00 day Mazdoor day

b) Head Mazdoorrial

13.50 cu.m 40 mm Aggregate cu.m

6.75 cu.m coarse Sand cu.m

3.45 tonne cement tonne

18.00 KL Cost of water KL

c) Machinery
Concrete mixer (cap.
6.00 hour hour
0.40/0.28 cu.m)
6.00 hour Generator 33 KVA hour

2.00 hour Water tanker 6 KL capacity hour

d)

15.00 cu.m Setting out cu.m

15.00 cu.m Vibration charges cu.m

15.00 cu.m Water charges for curing cu.m

15.00 cu.m Working at Depth cu.m

15.00 cu.m Supervision Charges cu.m

15.00 cu.m Quality control charges cu.m

15.00 cu.m Labour Shed & Site Office cu.m

15.00 cu.m Watch and Ward cu.m

118
Sl. No Qty Unit Description Rate Per Amount

15.00 cu.m Traffic Management cu.m

Cost for 15 cu.m = a+b+c+d

Insurance @ 0.25%

Total

Rate per cu.m = (a+b+c+d)/15


A) Plain/Reinforced Cement Concrete in Open Foundation complete as per
12.8
Drawing and Technical Specifications.
A) PCC Grade M15

Unit = cu.m

Taking output = 15 cu.m

a) Head Mazdoorrial

4.13 tonne Cement tonne

6.75 cu.m Coarse sand cu.m

8.10 cu.m 40 mm Aggregate cu.m

4.05 cu.m 20 mm Aggregate cu.m

1.35 cu.m 10 mm Aggregate cu.m

b) Labour

0.86 day Head Mazdoor day

1.50 day Mason day

20.00 day Mazdoor day

c) Machinery
Concrete mixer
6.00 hour hour
(cap. 0.40/0.28 cu.m)
6.00 hour Generator 63 KVA hour

1.45 KL d) water charges KL

Per Cu.m Basic Cost of Labour, Head Mazdoorrial & Machinery (a+b+c+d)

e)

15.00 cu.m Setting out cu.m

15.00 cu.m Vibration charges cu.m

119
Sl. No Qty Unit Description Rate Per Amount

15.00 cu.m Water charges for curing cu.m

15.00 cu.m Working at Depth cu.m

15.00 cu.m Supervision Charges cu.m

15.00 cu.m Quality control charges cu.m

15.00 cu.m Labour Shed & Site Office cu.m

15.00 cu.m Watch and Ward cu.m

15.00 cu.m Traffic Management cu.m

Cost for 15 cu.m = a+b+c+d+e

Insurance @ 0.25%

Total
Rate per cu.m =
(a+b+c+d+e)/15
12.8 B) PCC Grade M20

Unit : cu.m

Taking output = 15 cu.m

a) Head Mazdoorrial

5.16 tonne Cement tonne

6.75 cu.m Coarse sand cu.m

5.40 cu.m 40 mm Aggregate cu.m

5.40 cu.m 20 mm Aggregate cu.m

2.70 cu.m 10 mm Aggregate cu.m

b) Labour

0.86 day Head Mazdoor day

1.50 day Mason day

20.00 day Mazdoor day

c) Machinery
Concrete mixer
6.00 hour hour
(cap. 0.40/0.28 cu.m)
6.00 hour Generator 33 KVA hour

1.81 KL d) water charges KL

120
Sl. No Qty Unit Description Rate Per Amount

Per Cu.m Basic Cost of Labour, Head Mazdoorrial & Machinery (a+b+c)

e)

15.00 cu.m Setting out cu.m

15.00 cu.m Vibration charges cu.m

15.00 cu.m Water charges for curing cu.m

15.00 cu.m Working at Depth cu.m

15.00 cu.m Supervision Charges cu.m

15.00 cu.m Quality control charges cu.m

15.00 cu.m Labour Shed & Site Office cu.m

15.00 cu.m Watch and Ward cu.m

15.00 cu.m Traffic Management cu.m

Cost for 15 cu.m = a+b+c+d+e

Insurance @ 0.25%

Total
Rate per cu.m =
(a+b+c+d+e)/15
12.8 C) RCC Grade M20

Using Concrete Mixer

Unit = cu.m

Taking output = 15 cu.m

a) Head Mazdoorrial

5.21 tonne Cement tonne

6.75 cu.m Coarse sand cu.m

8.10 cu.m 20 mm Aggregate cu.m

5.40 cu.m 10 mm Aggregate cu.m

b) Labour

0.86 day Head Mazdoor day

1.50 day Mason day

20.00 day Mazdoor day

121
Sl. No Qty Unit Description Rate Per Amount

c) Machinery
Concrete mixer
6.00 hour hour
(cap. 0.40/0.28 cu.m)
6.00 hour Generator 33 KVA hour

1.82 KL d) water charges KL

Per Cu.m Basic Cost of Labour, Head Mazdoorrial & Machinery (a+b+c)

e)

15.00 cu.m Setting out cu.m


Shuttering Charges as per
15.00 cu.m cu.m
Sqm
15.00 cu.m Vibration charges cu.m

15.00 cu.m Water charges for curing cu.m

15.00 cu.m Working at Depth cu.m

15.00 cu.m Supervision Charges cu.m

15.00 cu.m Quality control charges cu.m

15.00 cu.m Labour Shed & Site Office cu.m

15.00 cu.m Watch and Ward cu.m

15.00 cu.m Traffic Management cu.m

Cost for 15 cu.m = a+b+c+d+e

Insurance @ 0.25%

Total
Rate per cu.m =
(a+b+c+d+e/15)
12.8 C With Batching Plant, Transit Mixer and Concrete Pump

Unit : cu.m

Taking Output = 120 cu.m

a) Head Mazdoorrial

41.66 tonne Cement tonne

54.00 cu.m Coarse Sand cu.m

64.80 cu.m 20 mm Aggregate cu.m

43.20 cu.m 10 mm Aggregate cu.m

122
Sl. No Qty Unit Description Rate Per Amount

b) Labour

0.84 day Head Mazdoor day

3.00 day Mason day

18.00 day Mazdoor day

c) Machinery
Batching Plant @ 20 cu.m/
6.00 hour hour
hour
6.00 hour Generator 100 KVA hour

6.00 hour Loader 1 cu.m capacity hour


Transit Mixer 4 cu.m capacity
15.00 hour hour
for lead upto 1 km.
tonne. Lead beyond 1 km, L-lead in tonne.
300L
km km km
6 hour Concrete Pump hour

16.66 KL d) water charges KL

166.64 kg Admixtures kg

Per Cu.m Basic Cost of Labour, Head Mazdoorrial & Machinery (a+b+c+d)

e)

1.00 cu.m Setting out cu.m


Shuttering Charges as per
1.00 cu.m cu.m
Sqm
1.00 cu.m Vibration/Compaction Charges cu.m

1.00 Cu.m Curing Concrete Cu.m

1.00 Cu.m Working at Depths Cu.m

1.00 cu.m Supervision Charges cu.m

1.00 cu.m Quality control charges cu.m

1.00 cu.m Labour Shed & Site Office cu.m

1.00 cu.m Watch and Ward cu.m

1.00 cu.m Traffic Management cu.m

Cost for 1 cu.m = a+b+c+d+e

Insurance @ 0.25%

Total

123
Sl. No Qty Unit Description Rate Per Amount

Rate per cu.m = a+b+c+d+e

RCC Grade M30

12.8 G Using Batching Plant, Transit Mixer and Concrete Pump

Unit = cu.m

Taking output = 120 cu.m

a) Head Mazdoorrial

48.00 tonne Cement tonne

54.00 cu.m Coarse sand cu.m

64.80 cu.m 20 mm Aggregate cu.m

43.20 cu.m 10 mm Aggregate cu.m

b) Labour

0.84 day Head Mazdoor day

3.00 day Mason day

18.00 day Mazdoor day

c) Machinery
Batching Plant @ 20 cu.m/
6.00 hour hour
hour
6.00 hour Generator 100 KVA hour

6.00 hour Loader 1 cu.m capacity hour


Transit Mixer 4 cu.m capacity
15.00 hour hour
for lead upto 1 km.
Transit Mixer 4 cu.m capacity
tonne. tonne.
300L lead beyond 1 Km, L - lead in
km km
Kilometer
6.00 hour Concrete Pump hour

19.20 KL d) water charges KL

192.00 kg Admixtures kg

Per Cu.m Basic Cost of Labour, Head Mazdoorrial & Machinery (a+b+c)

e)

1.00 cu.m Setting out cu.m

124
Sl. No Qty Unit Description Rate Per Amount
Shuttering Charges as per
1.00 cu.m cu.m
Sqm
1.00 cu.m Vibration/Compaction Charges cu.m

1.00 Cu.m Curing Concrete Cu.m

1.00 Cu.m Working at Depths Cu.m

1.00 cu.m Supervision Charges cu.m

1.00 cu.m Quality control charges cu.m

1.00 cu.m Labour Shed & Site Office cu.m

1.00 cu.m Watch and Ward cu.m

1.00 cu.m Traffic Management cu.m

cost of 1 cu.m = a+b+c+d+e

Insurance @ 0.25%

Total

Rate per cu.m (a+b+c+d+e)

12.8 RCC Grade M35

12.8 H Using Batching Plant, Transit Mixer and Concrete Pump

Unit ; cu.m

Taking Output = 120 cu.m

a) Head Mazdoorrial

49.20 tonne Cement tonne

54.00 cu.m Coarse sand cu.m

64.80 cu.m 20 mm Aggregate cu.m

43.20 cu.m 10 mm Aggregate cu.m

b) Labour

0.84 day Head Mazdoor day

3.00 day Mason day

18.00 day Mazdoor day

c) Machinery
Batching Plant @ 20 cu.m/
6.00 hour hour
hour

125
Sl. No Qty Unit Description Rate Per Amount

6.00 hour Generator 100 KVA hour

6.00 hour Loader1 cu.m capacity hour


Transit Mixer 4 cu.m capacity
15.00 hour hour
for lead upto 1 km.
Transit Mixer 4 cu.m capacity
tonne. tonne.
300L lead beyond 1 Km, L - lead in
km km
Kilometer
6.00 hour Concrete Pump hour

19.68 KL d) water charges KL

196.80 kg Admixtures kg

Per Cu.m Basic Cost of Labour, Head Mazdoorrial & Machinery (a+b+c)

e)

1.00 cu.m Setting out cu.m


Shuttering Charges as per
1.00 cu.m cu.m
Sqm
1.00 cu.m Vibration/Compaction Charges cu.m

1.00 Cu.m Curing Concrete Cu.m

1.00 Cu.m Working at Depths Cu.m

1.00 cu.m Supervision Charges cu.m

1.00 cu.m Quality control charges cu.m

1.00 cu.m Labour Shed & Site Office cu.m

1.00 cu.m Watch and Ward cu.m

1.00 cu.m Traffic Management cu.m

Cost of 1 cu.m = a+b+c+d+e

Insurance @ 0.25%

Total

Rate per cu.m = (a+b+c+d+e)

126
Sl. No Qty Unit Description Rate Per Amount

Forming Protective Bunds

12.9 Forming Protective Bunds


Forming Protective Bunds/constructing temporary island of size
12.5 x12.5m perimeter of 50m
A. Assuming depth of water 1.0 m and height of island to be 1.25 m.

Unit = 1 No

Taking output = 1 No.

a) Head Mazdoorrial

251.20 cu.m Earth (compacted) cu.m

750.00 each Sand bags each

b) Labour

0.40 day Head Mazdoor day


Mazdoor for filling sand bags,
15.00 day day
stitching and placing
c) Machinery
Crane with grab 1 cu.m
20.00 hour hour
capacity
Consumables

Total

Insurance @ 0.25%

Rate per No. (a+b+c)


Note: It is assumed that earth will be available within the working space of crane
with grab bucket.
B. Assuming depth of water 4.0 m and height of island 4.5 m.

Unit = 1No

Taking output = 1 No

a) Head Mazdoorrial

904.32 cu.m Earth (compacted) cu.m

6000.00 each Sand bags each


Wooden ballies 8” Dia and
95.00 each each
9 m long
Wooden ballies 2” Dia for
190.00 metre metre
bracing

127
Sl. No Qty Unit Description Rate Per Amount

b) Labour

5.60 day Head Mazdoor day


Mazdoor for piling 8” dia
18.00 day day
ballies
Mazdoor for bracing with 2”
12.00 day day
dia ballies
Mazdoor for filling sand bags,
110.00 day day
stitching and placing
c) Machinery
Crane with grab 1 cu.m
50.00 hour hour
capacity
Consumables for stiching and other bracing arrangements for piling ballies.

Total

Insurance @ 0.25%

Rate per No. (a+b+c)

C. Providing and constructing one span service road to reach island


location from one pier location to another pier location
a. Assuming span length 30 m, width of service road 10m and
depth of water 1m
Unit = 1 meter

Taking output = 30 metre

a) Head Mazdoorrial

450.00 cu.m Earth cu.m

300.00 each Sand bags each

b) Labour

0.24 day Head Mazdoor day


Mazdoor for filling sand bags,
6.00 day day
stitching and placing
c) Machinery
Front end Loader 1 cu.m
27.00 hour hour
capacity
28.00 hour Tipper 5.5 cu.m capacity hour

Cost for 30 m (a+b+c)

Insurance @ 0.25%

128
Sl. No Qty Unit Description Rate Per Amount

Total

Rate per m (a+b+c)/30

b. Assuming depth of water 4.0 m and height of island 4.5 m.

Unit = 1No

Taking output = 1 No

a) Head Mazdoorrial

3150.00 cu.m Earth (compacted) cu.m

7200.00 each Sand bags each


Wooden ballies 8” Dia and 9
168.00 each each
m long
Wooden ballies 2” Dia for
320.00 metre metre
bracing
b) Labour

1.68 day Head Mazdoor day


Mazdoor for piling 8” dia
42.00 day day
ballies
Mazdoor for bracing with 2”
19.00 day day
dia ballies
Mazdoor for filling sand bags,
176.00 day day
stitching and placing
c) Machinery
Crane with grab 1 cu.m
53.00 hour hour
capacity
Consumables and other
arrangements for piling
ballies.
Total

Insurance @ 0.25%
Cost for 30m of 4.5 ht and 10m
wide. (a+b+c)
Rate per m (a+b+c)/30

129
Sl. No Qty Unit Description Rate Per Amount

PILE DATA
RCC Grade M35

Using Concrete Mixer

Unit = cu.m

Taking output = 15 cu.m

a) Head Mazdoorrial

6.33 tonne Cement tonne

6.75 cu.m Coarse sand cu.m

8.10 cu.m 20 mm Aggregate cu.m

5.40 cu.m 10 mm Aggregate cu.m

b) Labour

0.86 day Head Mazdoor day

1.50 day Mason day

20.00 day Mazdoor day

c) Machinery
Concrete mixer
6.00 hour hour
(cap. 0.40/0.28 cu.m)
6.00 hour Generator 33 KVA hour
Light Crane 3 tonnes capacity
6.00 hour hour
for handling tremie pipe
3.17 KL d) water charges KL

21.60 kg Admixtures kg

Per Cu.m Basic Cost of Labour, Head Mazdoorrial & Machinery (a+b+c)

Using Batching Plant, Transit Mixer and Concrete Pump

Unit : cu.m

Taking Output = 120 cu.m

a) Head Mazdoorrial

49.20 tonne Cement tonne

54.00 cu.m Coarse sand cu.m

130
Sl. No Qty Unit Description Rate Per Amount

64.80 cu.m 20 mm Aggregate cu.m

43.20 cu.m 10 mm Aggregate cu.m

b) Labour

0.84 day Head Mazdoor day

3.00 day Mason day

18.00 day Mazdoor day

c) Machinery
Batching Plant @ 20 cu.m/
6.00 hour hour
hour
6.00 hour Generator 100 KVA hour

6.00 hour Loader1 cu.m capacity hour


Transit Mixer 4 cu.m capacity
15.00 hour hour
for lead upto 1 km.
Transit Mixer 4 cu.m capacity
tonne. tonne.
300L lead beyond 1 Km, L - lead in
km km
Kilometer
6.00 hour Concrete Pump hour

19.68 KL d) water charges KL

196.80 kg Admixtures kg

Per Cu.m Basic Cost of Labour, Head Mazdoorrial & Machinery (a+b+c)
Bored cast-in-situ M35 grade R.C.C. Pile excluding Reinforcement complete
12.23 as per Drawing and Technical Specifications and removal of excavated
earth with all lifts and lead upto 1000 m.
Pile diameter-750 mm

Unit = meter

Taking output = 15 m

a) Head Mazdoorrials

6.62 cu.m Grade M35 cu.m


Rate for concrete may be adopted same as for bottom plug vide item no.
12.11( C ) (IV)
Concrete to be cast with a tremie pipe 200mm dia.
b) Machinery ( for boring and
construction )

131
Sl. No Qty Unit Description Rate Per Amount
Hire and running charges of
hydraulic piling rig with power
6.00 hour unit and complete accessories hour
including shifting from one
bore location to another.
Hire and running charges
0.50 hour of light crane for lowering hour
reinforcement cage
Hire and running charges of
6.00 hour hour
Bentonite pump
0.30 hour Loader I cu.m bucket capacity. hour
Tipper 5.5 cu.m capacity for
0.30 hour disposal of muck from pile hour
bore hole
300.00 kg Bentonite kg

c) Labour

0.14 day Head Mazdoor/Supervisor day

3.50 day Mazdoor day

d)

13.24 KL Water for washing the bore KL

1.00 metre Cost for Chiselling metre


Cost for Protective bunds
( If necessary)
15.00 metre Cost for confirmatory bore metre

15.00 metre Cost for Initial Load test metre

15.00 metre Cost for Routine Load test metre

Cost for 15 m = a+b+c+d

Rate per metre (a+b+c+d)/15


Bored cast-in-situ M35 grade R.C.C. Pile excluding Reinforcement complete
12.24 as per Drawing and Technical Specifications and removal of excavated
earth with all lifts and lead upto 1000 m.
Pile diameter-1000 mm

Unit = meter

Taking output = 10 m

a) Head Mazdoorrials

7.85 cu.m Grade M35 cu.m

132
Sl. No Qty Unit Description Rate Per Amount
Rate for concrete may be adopted same as for bottom plug vide item no.
12.11( C ) (IV)
Concrete to be cast with a tremie pipe 200mm dia.
b) Machinery ( for boring and
construction )
Hire and running charges of
hydraulic piling rig with power
6.00 hour unit and complete accessories hour
including shifting from one
bore location to another.
Hire and running charges
0.50 hour of light crane for lowering hour
reinforcement cage
Hire and running charges of
6.00 hour hour
Bentonite pump
0.40 hour Loader I cu.m bucket capacity. hour
Tipper 5.5 cu.m capacity for
0.40 hour disposal of muck from pile hour
bore hole
350.00 kg Bentonite kg

c) Labour

0.16 day Head Mazdoor/Supervisor day

4.00 day Mazdoor day

d)

15.70 KL Water for washing the bore KL

1.00 metre Cost for Chiselling metre


Cost for Protective bunds
( If necessary)
10.00 metre Cost for confirmatory bore metre

10.00 metre Cost for Initial Load test metre

10.00 metre Cost for Routine Load test metre

Cost for 10 m = a+b+c+d

Rate per metre (a+b+c+d)/10

133
Sl. No Qty Unit Description Rate Per Amount
Bored cast-in-situ M35 grade R.C.C. Pile excluding Reinforcement com-
12.25 plete as per Drawing and Technical Specifications and removal of excavat-
ed earth with all lifts and lead upto 1000 m.
Pile diameter-1200 mm

Unit = meter

Taking output = 9 m

a) Head Mazdoorrials

10.17 cu.m Grade M35 cu.m


Rate for concrete may be adopted same as for bottom plug vide item no. 12.11(C)
(IV)
Concrete to be cast with a tremie pipe 200mm dia.
b) Machinery( for boring and
construction )
Hire and running charges of
hydraulic piling rig with power
6.00 hour unit and complete accessories hour
including shifting from one
bore location to another.
Hire and running charges
0.50 hour of light crane for lowering hour
reinforcement cage
Hire and running charges of
6.00 hour hour
Bentonite pump
0.50 hour Loader I cu.m bucket capacity. hour
Tipper 5.5 cu.m capacity for
0.50 hour disposal of muck from pile hour
bore hole
385.00 kg Bentonite kg

c) Labour

0.18 day Head Mazdoor/Supervisor day

4.50 day Mazdoor day

d)

20.34 KL Water for washing the bore KL

1.00 metre Cost for Chiselling metre


Cost for Protective bunds ( If
necessary)
9.00 metre Cost for confirmatory bore metre

134
Sl. No Qty Unit Description Rate Per Amount

9.00 metre Cost for Initial Load test metre

9.00 metre Cost for Routine Load test metre

Cost for 9 m = a+b+c+d

Rate per metre (a+b+c+d)/9


Cement Concrete for Reinforced Concrete in Pile Cap complete as per
12.38
Drawing and Technical Specification
12.38 RCC Grade M30

Unit = cu.m

12.38C Using Batching Plant, Transit Mixer and Concrete Pump

Taking output = 120 cu.m

a) Head Mazdoorrial

48.00 tonne Cement tonne

54.00 cu.m Coarse sand cu.m

64.80 cu.m 20 mm Aggregate cu.m

43.20 cu.m 10 mm Aggregate cu.m

b) Labour

1.28 day Head Mazdoor day

3.04 day Mason day

20.00 day Mazdoor for concreting day


Mazdoor for breaking pile
8.00 day head, bending bars, cleaning day
etc.
c) Machinery
Batching Plant @ 20 cu.m/
6.00 hour hour
hour
6.00 hour Generator 100 KVA hour

6.00 hour Loader (capacity 1 cu.m) hour


Transit Mixer ( capacity 4.0
cu.m )
15.00 hour Lead upto 1 Km hour

135
Sl. No Qty Unit Description Rate Per Amount
tonne. Lead beyond 1 Km, L - lead in tonne.
300L
km Kilometer km
6.00 hour Concrete Pump hour
Formwork @ 4 per cent on
cost of concrete i.e. cost of a)
Head Mazdoorrial, b) Labour
and c) Machinery
19.20 KL d) water charges KL

172.80 kg Admixtures kg

Per Cu.m Basic Cost of Labour, Head Mazdoorrial & Machinery (a+b+c)

e)

1.00 cu.m Setting out cu.m


Shuttering Charges as per
1.00 cu.m cu.m
Sqm
Vibration/Compaction
1.00 cu.m cu.m
Charges
1.00 Cu.m Curing Concrete Cu.m

1.00 Cu.m Working at Depths Cu.m

1.00 cu.m Supervision Charges cu.m

1.00 cu.m Quality control charges cu.m

1.00 cu.m Labour Shed & Site Office cu.m

1.00 cu.m Watch & Ward cu.m

1.00 cu.m Traffic Management cu.m

Cost for 1 cu.m = a+b+c+d+e

Insurance @ 0.25%

Total

Rate per metre (a+b+c+d+e)

12.38 RCC Grade M35

Unit = cu.m

12.38D Using Batching Plant, Transit Mixer and Concrete Pump

a) Head Mazdoorrial

49.20 tonne Cement tonne

136
Sl. No Qty Unit Description Rate Per Amount

54.00 cu.m Coarse sand cu.m

64.80 cu.m 20 mm Aggregate cu.m

43.20 cu.m 10 mm Aggregate cu.m

b) Labour

1.28 day Head Mazdoor day

3.04 day Mason day

20.00 day Mazdoor for concreting day


Mazdoor for breaking pile
8.00 day head, bending bars, cleaning day
etc.
c) Machinery
Batching Plant @ 20 cu.m/
6.00 hour hour
hour
6.00 hour Generator 125 KVA hour

6.00 hour Loader (capacity 1 cu.m) hour


Transit Mixer ( capacity 4.0
cu.m )
16.00 hour Lead upto 1 Km hour
tonne. Lead beyond 1 Km, L - lead in tonne.
300L
km Kilometer km
6.00 hour Concrete Pump hour

19.68 KL d) water charges KL

259.20 kg Admixtures kg
Per Cu.m Basic Cost of Labour,
Head Mazdoorrial & Machinery
(a+b+c)
e)

1.00 cu.m Setting out cu.m


Shuttering Charges as per
1.00 cu.m cu.m
Sqm
1.00 cu.m Vibration/Compaction Charges cu.m

1.00 Cu.m Curing Concrete Cu.m

1.00 Cu.m Working at Depths Cu.m

1.00 cu.m Supervision Charges cu.m

137
Sl. No Qty Unit Description Rate Per Amount

1.00 cu.m Quality control charges cu.m

1.00 cu.m Labour Shed & Site Office cu.m

1.00 cu.m Watch & Ward cu.m

1.00 cu.m Traffic Management cu.m

Cost for 1 cu.m = a+b+c+d+e

Insurance @ 0.25%

Total

Rate per metre (a+b+c+d+e)

12.39 Levelling Course for Pile cap


Providing and laying of PCC M15 levelling course 100mm thick below the
pile cap.
Unit = cu.m

Taking output = 15 cu.m

a) Head Mazdoorrial

4.13 tonne Cement tonne

6.75 cu.m Coarse sand cu.m

8.10 cu.m 40 mm aggregate cu.m

4.05 cu.m 20 mm Aggregate cu.m

1.35 cu.m 10 mm Aggregate cu.m

b) Labour

0.86 day Head Mazdoor day

1.50 day Mason day

20.00 day Mazdoor day

c) Machinery
Concrete mixer (cap.
6.00 hour hour
0.40/0.28 cu.m)
6.00 hour Generator 33 KVA hour

2.07 KL d) water charges KL

138
Sl. No Qty Unit Description Rate Per Amount
Per Cu.m Basic Cost of Labour,
Head Mazdoorrial & Machinery
(a+b+c)
e)

1.00 cu.m Setting out cu.m

1.00 cu.m Vibration/Compaction Charges cu.m

1.00 Cu.m Curing Concrete Cu.m

1.00 Cu.m Working at Depths Cu.m

1.00 cu.m Supervision Charges cu.m

1.00 cu.m Quality control charges cu.m

1.00 cu.m Labour Shed & Site Office cu.m

1.00 cu.m Watch & Ward cu.m

1.00 cu.m Traffic Management cu.m

Cost for 1 cu.m = a+b+c+d+e

Insurance @ 0.25%

Total

Rate per metre (a+b+c+d+e)


Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in
12.40
Foundation complete as per Drawing and Technical Specifications.
Unit = 1 MT

Taking output = 1 MT

a) Head Mazdoorrial
HYSD bars including5 per cent
1.05 tonne tonne
overlaps and wastage
6.00 Kg Binding wire Kg
b) Labour for cutting,
bending, shifting to site,
tying and placing in
position
0.40 day Head Mazdoor day

2.00 day Blacksmith day

6.00 day Mazdoor day

139
Sl. No Qty Unit Description Rate Per Amount

1.00 MT c) Setting out MT

1.00 MT Supervision Charges MT

1.00 MT Quality control charges MT

1.00 MT Labour Shed & Site Office MT

1.00 MT Traffic Management MT


Hirecharges for cutting and
1.00 MT MT
Bending Machinery
Intercarting charges from
1.00 MT MT
Yard to site
1.00 MT Hoisting charges MT

1.00 MT Lighting Charges MT

Total

Insurance @ 0.25%

Rate for per MT (a+b+c)


Supplying, fitting and placing un-coated Mild steel reinforcement complete
12.41
in foundation as per drawing and technical specification
Unit = 1 MT

Taking output = 1 MT

a) Head Mazdoorrial
MS bars including 5 per cent
1.05 tonne tonne
overlaps and wastage
6.00 Kg Binding wire Kg
b) Labour for straightening,
cutting, bending, shifting
to site, tying and placing
in position
0.43 day Head Mazdoor day

2.25 day Blacksmith day

6.50 day Mazdoor day

Total

Insurance @ 0.25%

Rate for per MT (a+b)

140
SUB-STRUCTURE

Sr No Qty Unit Description Per Rate Amount

13.5 B PCC Grade M20

(p) Height upto 5m

Subdata

B PCC Grade M20

Unit : cu.m

Taking output = 15 cu.m

a) Head Mazdoorrial

5.16 tonne Cement tonne

6.75 cu.m Coarse sand cu.m

5.40 cu.m 40 mm Aggregate cu.m

5.40 cu.m 20 mm Aggregate cu.m

2.70 cu.m 10 mm Aggregate cu.m

b) Labour

0.86 day Head Mazdoor day

1.50 day Mason day

20.00 day Mazdoor day

c) Machinery
Concrete mixer
6.00 hour hour
(cap. 0.40/0.28 cu.m)
6.00 hour Generator 33 KVA hour

d)

1.81 KL Water charges @ 0.35 KL

Per Cu.m Basic Cost of Labour, Head Mazdoorrial & Machinery

Per Cu.m Basic Cost

e)

1.00 cu.m Setting out cu.m


Shuttering charges and
1.00 cu.m cu.m
Staging charges
Vibration/Compaction
1.00 cu.m cu.m
Charges
1.00 Cu.m Curing Concrete Cu.m

141
Sr No Qty Unit Description Per Rate Amount

Sqm Covering with Gunny Cloth Sqm

1.00 Cu.m Working at Heights Cu.m

1.00 cu.m Supervision Charges cu.m

1.00 cu.m Quality control charges cu.m

1.00 cu.m Labour Shed & Site Office cu.m

1.00 cu.m Watch and Ward cu.m

1.00 cu.m Traffic Management cu.m

Rate per Cu.m

Insurance @ 0.25%

Total

13.5 G RCC Grade M30

(p) Height upto 5m

FOR COLUMN PIER


13.5
With Batching Plant, Transit Mixer and Concrete Pump
G (p)
Unit = cu.m

Taking output = 120 cu.m

a) Head Mazdoorrial

48.00 tonne Cement tonne

54.00 cu.m Coarse sand cu.m

64.80 cu.m 20 mm Aggregate cu.m

43.20 cu.m 10 mm Aggregate cu.m

b) Labour

0.84 day Head Mazdoor day

3.00 day Mason day

18.00 day Mazdoor day

c) Machinery
Batching Plant @ 20 cu.m/
6.00 hour hour
hour
6.00 hour Generator 100 KVA hour

6.00 hour Loader 1 cu.m capacity hour

142
Sr No Qty Unit Description Per Rate Amount
Transit Mixer 4 cu.m capacity
15.00 hour hour
for lead upto 1 km.
Transit Mixer 4 cu.m capacity
tonne. tonne.
300L lead beyond 1 Km, L - lead in
km km
Kilometer
6.00 hour Concrete Pump hour

19.20 KL d) water charges @ 0.5 KL

192.00 kg Admixtures @ 5% kg

Per Cu.m Basic Cost of Labour, Head Mazdoorrial & Machinery (a+b+c)

Per Cu.m Basic Cost

e)

1.00 cu.m Setting out cu.m


Shuttering charges and
1.00 cu.m cu.m
Staging charges
Vibration/Compaction
1.00 cu.m cu.m
Charges
1.00 Cu.m Curing Concrete Cu.m

Sqm Covering with Gunny Cloth Sqm

1.00 Cu.m Working at Heights Cu.m

1.00 cu.m Supervision Charges cu.m

1.00 cu.m Quality control charges cu.m

1.00 cu.m Labour Shed & Site Office cu.m

1.00 cu.m Watch and Ward cu.m

1.00 cu.m Traffic Management cu.m

Rate per Cu.m

Insurance @ 0.25%

Total

143
Sr No Qty Unit Description Per Rate Amount
13.5
(q) Height 5m to 10m
G
13.5
With Batching Plant, Transit Mixer and Concrete Pump
G (q)
PIER CAP

Per Cu.m Basic Cost

e)

1.00 cu.m Setting out cu.m


Shuttering Charges as per
1.00 cu.m cu.m
Sqm
Vibration/Compaction
1.00 cu.m cu.m
Charges
1.00 Cu.m Curing Concrete Cu.m

Sqm Covering with Gunny Cloth Sqm

1.00 Cu.m Working at Heights Cu.m

1.00 cu.m Supervision Charges cu.m

1.00 cu.m Quality control charges cu.m

1.00 cu.m Labour Shed & Site Office cu.m

1.00 cu.m Watch and Ward cu.m

1.00 cu.m Traffic Management cu.m

Rate per Cu.m

Insurance @ 0.25%

Total
13.5
(r) Height above 10m
G
13.5
With Batching Plant, Transit Mixer and Concrete Pump
G (r)
Per Cu.m Basic Cost

e)

1.00 cu.m Setting out cu.m


Shuttering Charges as per
1.00 cu.m cu.m
Sqm
Vibration/Compaction
1.00 cu.m cu.m
Charges
1.00 Cu.m Curing Concrete Cu.m

144
Sr No Qty Unit Description Per Rate Amount

Sqm Covering with Gunny Cloth Sqm

1.00 Cu.m Working at Heights Cu.m

1.00 cu.m Supervision Charges cu.m

1.00 cu.m Quality control charges cu.m

1.00 cu.m Labour Shed & Site Office cu.m

1.00 cu.m Watch and Ward cu.m

1.00 cu.m Traffic Management cu.m

Rate per Cu.m

Insurance @ 0.25%

Total

13.5 H RCC Grade M35

(p) Height upto 5m


13.5
With Batching Plant, Transit Mixer and Concrete Pump
H (p)
Unit ; cu.m

Taking Output = 120 cu.m

a) Head Mazdoorrial

49.20 tonne Cement tonne

54.00 cu.m Coarse sand cu.m

64.80 cu.m 20 mm Aggregate cu.m

43.20 cu.m 10 mm Aggregate cu.m

b) Labour

0.84 day Head Mazdoor day

3.00 day Mason day

18.00 day Mazdoor day

c) Machinery

6.00 hour Batching Plant @ 20 cu.m/hour hour

6.00 hour Generator 100 KVA hour

6.00 hour Loader1 cu.m capacity hour

145
Sr No Qty Unit Description Per Rate Amount
Transit Mixer 4 cu.m capacity
15.00 hour hour
for lead upto 1 km.
Transit Mixer 4 cu.m capacity
tonne. tonne.
300L lead beyond 1 Km, L - lead in
km km
Kilometer
6.00 hour Concrete Pump hour

19.68 KL d) water charges @ 0.5 KL

196.80 kg Admixtures @ 5% kg

Per Cu.m Basic Cost of Labour, Head Mazdoorrial & Machinery (a+b+c)

Per Cu.m Basic Cost

e)

1.00 cu.m Setting out cu.m


Shuttering Charges as per
1.00 cu.m cu.m
Sqm
Vibration/Compaction
1.00 cu.m cu.m
Charges
1.00 Cu.m Curing Concrete Cu.m

Sqm Covering with Gunny Cloth Sqm

1.00 Cu.m Working at Heights Cu.m

1.00 cu.m Supervision Charges cu.m

1.00 cu.m Quality control charges cu.m

1.00 cu.m Labour Shed & Site Office cu.m

1.00 cu.m Watch and Ward cu.m

1.00 cu.m Traffic Management cu.m

Rate per Cu.m

Insurance @ 0.25%

Total
13.5
(q) Height 5m to 10m
H
13.5
With Batching Plant, Transit Mixer and Concrete Pump
H (q)
For PIER CAP

Per Cu.m Basic Cost

146
Sr No Qty Unit Description Per Rate Amount

e)

1.00 cu.m Setting out cu.m


Shuttering Charges as per
1.00 cu.m cu.m
Sqm
Vibration/Compaction
1.00 cu.m cu.m
Charges
1.00 Cu.m Curing Concrete Cu.m

Sqm Covering with Gunny Cloth Sqm

1.00 Cu.m Working at Heights Cu.m

1.00 cu.m Supervision Charges cu.m

1.00 cu.m Quality control charges cu.m

1.00 cu.m Labour Shed & Site Office cu.m

1.00 cu.m Watch and Ward cu.m

1.00 cu.m Traffic Management cu.m

Rate per Cu.m

Insurance @ 0.25%

Total
13.5
(r) Height above 10m
H
13.5
With Batching Plant, Transit Mixer and Concrete Pump
H (r)
Per Cu.m Basic Cost

e)

1.00 cu.m Setting out cu.m


Shuttering Charges as per
1.00 cu.m cu.m
Sqm
Vibration/Compaction
1.00 cu.m cu.m
Charges
1.00 Cu.m Curing Concrete Cu.m

Sqm Covering with Gunny Cloth Sqm

1.00 Cu.m Working at Heights Cu.m

1.00 cu.m Supervision Charges cu.m

147
Sr No Qty Unit Description Per Rate Amount

1.00 cu.m Quality control charges cu.m

1.00 cu.m Labour Shed & Site Office cu.m

1.00 cu.m Watch and Ward cu.m

1.00 cu.m Traffic Management cu.m

Rate per Cu.m

Insurance @ 0.25%

Total
Providing weep holes in /Plain/ Reinforced concrete abutment, wing wall/
return wall with 100 mm dia PVC pipe, extending through the full width of
13.8
the structure with slope of 1V :20H towards drawing force. Complete as per
drawing and Technical Specifications

Unit = Nos.

Taking output = 30 Nos.

a) Material

PVC pipe 100 mm dia.


31.50 metre including wastage @ 5 per metre
cent )
Average length of weep hole
is taken as one metre for
the purpose of estimating.

b) Labour

0.03 day Mate day

0.50 day Mason day

0.25 day Mazdoor day

c)

Setting out

1.00 cu.m Supervision Charges cu.m

1.00 cu.m Quality control charges cu.m

1.00 cu.m Labour Shed & Site Office cu.m

1.00 cu.m Watch and Ward cu.m

1.00 cu.m Traffic Management cu.m

Cost for 30 m = a+b+c

148
Sr No Qty Unit Description Per Rate Amount

Rate per m (a+b+c)/30

Insurance @ 0.25%

Total

Back filling behind abutment, wing wall and return wall complete as per
13.9
drawing and Technical Specification

Unit = cu.m

Taking output = 10 cu.m

A Granular material

a) Labour

0.28 day Mate day

7.00 day Mazdoor day

b) Material

12.00 cu.m Granular material cu.m

c) Machinery

0.25 hour Vibratory roller hour

0.05 hour Water Tanker hour

d)

10.00 Cu.m Setting out Cu.m

2.00 KL Water Charges @ 20% KL

1.00 cu.m Supervision Charges cu.m

1.00 cu.m Quality control charges cu.m

1.00 cu.m Labour Shed & Site Office cu.m

1.00 cu.m Watch and Ward cu.m

1.00 cu.m Traffic Management cu.m

Cost for 10 cu.m of granular


backfill = a+b+c+d
Rate per cu.m =
(a+b+c+d)/10

Insurance @ 0.25%

149
Sr No Qty Unit Description Per Rate Amount

Total

13.9 B Sandy material

a) Labour

0.28 day Mate day

Mazdoor for filling,


7.00 day day
watering, ramming etc.

b) Material

12.00 cu.m Sand cu.m

c) Machinery

Plate compactor/power
2.50 hour hour
rammer

0.06 hour Water Tanker hour

d)

10.00 Cu.m Setting out Cu.m

2.00 KL Water Charges @ 20% KL

1.00 cu.m Supervision Charges cu.m

1.00 cu.m Quality control charges cu.m

1.00 cu.m Labour Shed & Site Office cu.m

1.00 cu.m Watch and Ward cu.m

1.00 cu.m Traffic Management cu.m

Cost for 10 cu.m of Sandy


backfill = a+b+c+d
Rate per cu.m =
(a+b+c+d)/10

Insurance @ 0.25%

Total

150
Sr No Qty Unit Description Per Rate Amount
Providing and laying of Filter media with granular materials/stone crushed
aggregates satisfying the requirements laid down in clause 2504.2.2. of
MoRTH specifications to a thickness of not less than 600 mm with smaller
13.10 size towards the soil and bigger size towards the wall and provided over
the entire surface behind abutment, wing wall and return wall to the full
height compacted to a firm condition complete as per drawing and Technical
Specification.

Unit = cu.m

Taking output = 10 cu.m.

a) Labour

0.32 day Mate day

Mazdoor for filling,


7.00 day day
watering, ramming etc.

1.00 day Mazdoor (Skilled) day

b) Material

Filter media of stone


aggregate conforming to
12.00 cu.m cu.m
clause 2504.2.2. of MoRTH
specifications.

c) Machinery

Water Tanker of 6 KL
0.06 hour hour
capacity

d)

10.00 Cu.m Setting out Cu.m

0.50 sqm Geo Synthetic wrapper sqm

cost for 10 cu.m of Fiter Media =


a+b+c+d
Rate per cu.m =
(a+b+c+d)/10

Insurance @ 0.25%

Total

151
SUPER-STRUCTURE
Sr No Quantity Unit Description Per Rate Cost

RCC Grade M35 for T- Beam Deck slab Super Structure for 6m Ht

Using Batching Plant, Transit Mixer and Concrete Pump

Unit = cu.m

Taking output = 120 cu.m

a) Material

49.20 tonne Cement tonne

54.00 cu.m Coarse sand cu.m

64.80 cu.m 20 mm Aggregate cu.m

43.20 cu.m 10 mm Aggregate cu.m

b) Labour

0.88 day Mate day

3.00 day Mason day

19.00 day Mazdoor day

c) Machinery
Batching Plant @ 20 cu.m/
6.00 hour hour
hour
6.00 hour Generator 100 KVA hour

6.00 hour Loader hour

Transit Mixer ( capacity 4.0


cu.m)

Transit Mixer 4 cu.m


15.00 hour hour
capacity lead upto1 Km

tonne. Lead beyond 1 Km, L - lead tonne.


300L
km in Kilometer km

6.00 hour Concrete Pump hour

19.68 KL d) Water charges KL

216.00 kg Admixtures kg

Basic Cost of Labour, Material & Machinery (a+b+c+d) for 120 cu.m

Cost per Cu.m

Basic cost per Cu.m

152
Sr No Quantity Unit Description Per Rate Cost

e)

1.00 cu.m Setting out cu.m


Shuttering Charges/Form
1.00 cu.m cu.m
work as per Sqm
Centering /Staging with
1.00 cu.m working Platform as per cu.m
Requirement
Vibration/Compaction
1.00 cu.m cu.m
Charges
Water charges for Curing
1.00 Cu.m Cu.m
Concrete
1.00 Cu.m Working at Heights Cu.m

1.00 cu.m Supervision Charges cu.m

1.00 cu.m Quality control charges cu.m

1.00 cu.m Labour Shed & Site Office cu.m

1.00 cu.m Watch and Ward cu.m

1.00 cu.m Traffic Management cu.m

Rate per Cu.m

Insurance @ 0.25%

Total

Supplying, fitting and placing HYSD bar reinforcement complete as per


14.2
drawing and technical specifications
Unit = 1 MT

Taking output = 1 MT

a) Material
HYSD bars including 5 per
1.05 tonne tonne
cent for laps and wastage
8.00 Kg Binding wire Kg
b) Labour for cutting,
bending, tying and
placing in position
0.44 day Mate (Fitter I Class) day

3.00 day Blacksmith day

8.00 day Mazdoor day


Basic Cost of Labour &
Material (a+b)

153
Sr No Quantity Unit Description Per Rate Cost

1.00 MT c) Setting out MT

1.00 MT Supervision Charges MT

1.00 MT Quality control charges MT

1.00 MT Labour Shed MT

1.00 MT Traffic Management MT

Hire charges for cutting


1.00 MT MT
and Bending Machinery
Intercarting charges from
1.00 MT MT
Yard to site

1.00 MT Hoisting charges MT

1.00 MT Lighting Charges MT


Charges for Fabrication
1.00 MT MT
Yard
Fabrication Yard Watch and
1.00 MT MT
Ward
Total

Insurance @ 0.25%

Rate for per MT = a+b+c

Providing and laying Cement concrete wearing coat M-30 grade including
14.4
reinforcement complete as per drawing and Technical Specifications
Unit = 1 cu.m

Taking output = 1 cu.m

a) Material
Cement concrete M30
1.00 cu.m cu.m
Grade excluding formwork
Add Steel Reinforcement
as Seperate item
b) Labour
Mazdoor for cleaning deck
0.15 day day
slab concrete surface.
c)

1.00 cu.m Setting out cu.m


Vibration/Compaction
1.00 cu.m cu.m
Charges
Water charges for Curing
1.00 Cu.m Cu.m
Concrete
1.00 Cu.m Working at Heights Cu.m

1.00 cu.m Supervision Charges cu.m

154
Sr No Quantity Unit Description Per Rate Cost

1.00 cu.m Quality control charges cu.m

1.00 cu.m Labour Shed & Site Office cu.m

1.00 cu.m Watch and Ward cu.m

1.00 cu.m Traffic Management cu.m

Rate per cu.m (a+b+c)

Insurance @ 0.25%

Rate per Cu.m Total

Construction of precast RCC railing of M30 Grade, aggregate size not exceeding
12 mm, true to line and grade, tolerance of vertical RCC post not to exceed
14.6 1 in 500, centre to centre spacing between vertical post not to exceed 2000
mm, leaving adequate space between vertical post for expansion, complete
as per approved drawings and technical specifications.

Unit = 1 RM

Taking output = 2 x 24 m span = 48 m

a) Material
Cement concreteM30 Grade Refer
relevant item of concrete in Item
4.09 cu.m 14.1(C) by using batching plant, cu.m
excluding formwork i.e. per cu.m
basic cost (a+b+c)
No. of vertical posts = (12 + 2)2 =
28 Nos., External area of vertical
post 0.25x0.275 = 0.069sqm,
Concrete in Vertical posts =
0.069 x 28 = 1.932 cu.m, Hand
rail in 3 tiers = 3 x 24 = 72 m,
External area = 0.170 x 0.175 =
0.03 sqm, Concrete in hand rails
= 0.03 x 72 = 2.16 cu.m, Total
Concrete = 1.932 + 2.16 = 4.092
cu.m. (Refer MoRTH SD / 202).

Add Steel Reinforcement as


Necessary

Refer MoRTH SD / 202.

b)

1.00 cu.m Setting out cu.m

Sqm Form work Charges Sqm

1.00 cu.m Handling Charges cu.m


Vibration/Compaction
1.00 cu.m cu.m
Charges

155
Sr No Quantity Unit Description Per Rate Cost
Water charges for Curing
1.00 Cu.m Cu.m
Concrete
1.00 Cu.m Working at Heights Cu.m

1.00 cu.m Supervision Charges cu.m

1.00 cu.m Quality control charges cu.m

1.00 cu.m Labour Shed & Site Office cu.m

1.00 cu.m Watch and Ward cu.m

1.00 cu.m Traffic Management cu.m

Rate for 48 m (a+b)

Rate per metre (a+b)/48

Insurance @ 0.25%

Rate per M
Note 1.Quantities of material have been adopted from standard plans of MoRTH vide
drawing no. SD/202.
2.48 m length is the total linear length adding both sides of 24 m span.
PCC M15 Grade leveling course below approach slab complete as per drawing
14.10
and Technical specification
Unit = 1 cu.m

Taking output = 1 cu.m

Material
Concrete, Rate excluding
1.00 cu.m cu.m
formworks
b)

1.00 cu.m Setting out cu.m

sqm Centering Charges sqm


Vibration/Compaction
1.00 cu.m cu.m
Charges
Water charges for Curing
1.00 Cu.m Cu.m
Concrete
1.00 Cu.m Working at Heights Cu.m

1.00 cu.m Supervision Charges cu.m

1.00 cu.m Quality control charges cu.m

1.00 cu.m Labour Shed & Site Office cu.m

1.00 cu.m Watch and Ward cu.m

1.00 cu.m Traffic Management cu.m

Rate per cu.m

Insurance @ 0.25%

156
Sr No Quantity Unit Description Per Rate Cost

Rate per Cu.m


Reinforced cement concrete approach slab including reinforcement and
14.11
formwork complete as per drawing and Technical specification
Unit = 1 cu.m

Taking output = 1 cu.m

a) Material

Cement concreteM30 Grade by


1.00 cu.m using batching plant, excluding cu.m
formwork
Add Steel Reinforcement as
Seperate item
b)

1.00 cu.m Setting out cu.m

sqm Centering Charges sqm


Vibration/Compaction
1.00 cu.m cu.m
Charges
Water charges for Curing
1.00 Cu.m Cu.m
Concrete
1.00 Cu.m Working at Heights Cu.m

1.00 cu.m Supervision Charges cu.m

1.00 cu.m Quality control charges cu.m

1.00 cu.m Labour Shed & Site Office cu.m

1.00 cu.m Watch and Ward cu.m

1.00 cu.m Traffic Management cu.m

Rate per cu.m (a+b)

Insurance @ 0.25%

Rate per Cu.m


Note: The grade of reinforced cement concrete may be adopted as M30 for severe
conditions and M25 for moderate conditions.
14.22 Strip Seal Expansion Joint
Providing and laying of a strip seal expansion joint catering to maximum
horizontal movement upto 70 mm, complete as per approved drawings and
standard specifications to be installed by the manufacturer/supplier or
their authorised representative ensuring compliance to the manufacturer’s
instructions for installation.
Unit = Running meter

157
Sr No Quantity Unit Description Per Rate Cost

Taking output = 12 m

a) Labour

0.05 day Mate day

1.00 day Mazdoor day

0.25 day Mazdoor (Skilled) day

b) Material

Supply of complete assembly


of strip seal expansion joint
comprising of edge beams,
12.00 metre anchorage, strip seal element metre
and complete accessories as
per approved specifications and
drawings.
Add 5 per cent of cost of material
for anchorage reinforcement,
welding and other incidentals.
c)

1.00 cu.m Setting out cu.m

Vibration/Compaction
1.00 cu.m cu.m
Charges
Water charges for Curing
1.00 Cu.m Cu.m
Concrete

1.00 Cu.m Working at Heights Cu.m

1.00 cu.m Supervision Charges cu.m

1.00 cu.m Quality control charges cu.m

1.00 cu.m Labour Shed & Site Office cu.m

1.00 cu.m Watch and Ward cu.m

1.00 cu.m Traffic Management cu.m

Cost for 12 m = (a+b+c)

Rate per m = (a+b+c)/12

Insurance @ 0.25%

Rate per RM

158
SUB-DATA

159
General Items to be Covered in the Data

1 Supervision Charges

2 Quality control charges

3 Labour Shed & Site Office

4 Traffic Management
These items shall be added to all Earth work,Filling.concreting,GSB,WMM and
Bituminous works in Bridges
5 Watch and Ward

1 Supervision Charges

Considering a Bridge work having a duration of -- years. It is required to Employ

the following list of Engineers for Supervising the Planning the day to day activities

at site

Project Manager ( above 15 yrs Exp) - 1 x =

Site Engineer ( 10 yrs Exp) - 1 x =

Junior Engineer ( 5 yrs Exp) - 3 x =

Quantity surveyor ( 5 yrs Exp) - 1 x =

Electrical Engineer ( 5 yrs Exp) - 1 x =

per month A =

For --- yrs A X Months : x 24 = B

This value shall be distributed to all items of work

A bridge of ------m length

No of spans : nos of

Solid Ramp portion : m on either side

Calculating the Quantities

Quantity of all items

1 Earth work all quantites


2 PCC M10
3 RCC Quantities

a Footing

b Substructure

c Superstructure

d Wearing coat

160
e Crash Barrier

f Drain / Kerb

g Retaining wall

4 Road work Quantities

a Earth work cutting and filling

b GSB

c WMM

d DBM

e BC

Total Quantity C =

Distributing in the items of work B / C

Hence Charges per M3 of work / =

2 Quality control charges

Quality control charges can be assumed as per the test charges given by HRS

The test charges for each item of work at the respective intervals are taken

3 Labour Shed & Site Office

Considering

Number of Labour :

Drivers,Operator& cleaner :

Watch and Ward :

Total A :

Assumming 4 labours can occupy a Shed of 3x3m

No of shed A / 4

/ 4 :

or

Add for Office 2

Add for Rest rooms 6

Total

161
Area

x 9 = m2

Cost of Construction per Sqm for Shed using Tin Sheet ,cc flooring and Electrification

x 2300 =

Distributing in the items of work

Hence Charges per m3 of work / =

4 Traffic Management
Barricading the work site is essential in modern day construction. The main purpose for bar-
ricading is to provide safety for the road users. Primarily it is to differentiate the Construction
area from the Traffic. Barricades with reflective signage help in guiding the traffic in a safe
manner.
Fully covered MS sheet Barricade for 3m ht and 3m long

L wt Rate

ISMC 100 Horizontal 3 x 9.2 x =

ISMC 100 Vertical 6 x 9.2 x =

MS sheet 1.5mm Th 9 x 11.78 x =

ISMC 200 Horizontal bottom leg 2 x 22.1 x =

Bracing ISA 60x60x6 12 x 5.4 x =

Cost of Materials

Deduct Depreciation after 2 yrs@ 40% = -0.00

Cost of Fabrication 290.5 x - x =

Cost of Painting 18 sqm x =

Reflective Tapes L.S = 50.00

Nails for Fixing L.S = 100.00


Lifting Crane L.S = 100.00
Lighting with LED strip lights 3 x - x = 1500

Cost of Barricade for 3m length =

Cost of Barricade per m length =

considering Project length of ----m =

Barricading both sides along the road of 2 x ---- m =

Cost of Barrication =

Distributing in the items of work

Hence Barricading Charges per m3 of work / =

162
5 Watch and Ward at Fabrication Yard

Employing 2 persons per shift 3 shifts per day

No of Persons required yrs

2 x 3 x days = nos.

Cost per month

nos x =

Hence Charges per M3 of work = / =

163
EARTHWORK
Setting out for Bridges

To Evaluate a Bridge length of 600m is considered

Solid fill portion Retaining wall length 2 x m

Spans of 20.0m each Spans

Setting out

Alignment Marking 5 days

Technical Assistant grade I : 5 @ =

Head Mazdoor : 5 @ =

Mazdoor II : 5 @ =

Instruments Total station Hire


: 5 @ =
charges and Consumables

Total : A

Excavation for Footing :

Excavation for Retaining walls :

Total : B

per
Cost for Setting out A/B : / =
Cu.m

or per 10 cu.m

Bailing out

a Low intensity recharging area where pumping for one time is enough

Excavation Volume = (1 nos of footing)

Considering Filled with A


=
water

Machinery required

5 Hp motor Discharge capacity 54.00 cu.m per hr

Time required A/ 54 = / 54.00 = hrs

Cost involved

Hire charges for


: @ / day =
5 hp motor

Diesel charges () : @ 1.5 Lts/hr =

164
Mazdoor II : @ / =

Total =

per
Cost of Bailing out : / =
Cu.m

or per 10 cu.m

Moderate intensity recharging area where pumping with higher capacity


b
is need to be operated continuously

Excavation Volume =

Considering Filled with water = A

Pumping operation done continuously or with stoppages

Considered as three times the volume =

Machinery required

10Hp motor Discharge capacity 108.00 cu.m per hr

Time required = / 108.00 = hrs

Cost involved

Hire charges for 10


: @ / day =
hp motor

Diesel charges ( /ltr) : @ 3 Lts/ hr =

Mazdoor II 2x : @ / day =

Total =

per
Cost of Bailing out : / =
Cu.m

or per 10 cu.m

For High intensity Recharging areas where Deep well or Well point
c Dewatering system required Dewatering shall be Considered as a seperate
Bill of Quantity item
Trimming the Bed and Removing of Deleterious Material

Cleaning the last 300mm by manual means ( 3.5nos Mazdoor for 10 cu.m)

Volume of Earth removed x x = cu.m

Mazdoor Required for removal nos x @ =

Cost per cu.m / = per cu.m

165
Back filling

Back filling considered with cut material. In urban areas where dumping of
materials is not possible. Disposal can be provided for suitable distance as
separate item. Refilling the Footing Excavation can be done with quarry fines
and shall be considered as separate item

Footing concrete

Base : x x = cu.m

Trapezoidal : x x = cu.m

Total = cu.m

Column Concrete 0.785 x 1.8 x 1.8 x = cu.m

Total concrete = cu.m

Refilling Quantity : - = cu.m

% of Refilling : / = %

Cost for Filling

Considering 180 cu.m per day for excavator / 180 = day

cost x =

Cost of Refilling : / = per cu.m

166
Shoring for Foundations

Shoring in foundations shall be considered only in Soft soils and suitable locations

a b c

Size of Footing assumed x x

Shoring assumed to be done with

1 Wooden Planks of size @ 0.4m c/c (c+0.5) x 0.3 x 0.04

2 Horizontal Bracers using Channels   (a) x 0.15 x 0.075

3 Tie using Turn buckkle or Pipes 5.0 x 0.1 dia

Cost of Materials

1 Cost of Wooden planks

Quantity of each
x 0.3 x 0.04 = cu.m
plank

No of planks 4 x (b/0.4) = nos

Total quantity of planks x = cu.m

cost of planks x =

Considering 10 operations / 10 A

167
2 Horizontal Bracers using Channels

cost of Channel 12 nos x @ 24 kg/m = kg

3 Tie using Turn buckle or Pipes

Cost of Turn buckle 12 nos x @ 14 kg/m = kg

Total Steel cost x =

Considering 25 operations / 25 B

4 Cost of labour

Head mazdoor 1 nos x =

Mazdoor I 6 nos x =

5 Cost for Installation

Cost for
4 Hrs x =
cranes

Bolts and other consumables =

Total cost involved for Shoring (A+B+C+D) =

per
Cost per Cu.m / =
cu.m

168
Sub Datas for Foundation works
1 Setting out

2 Water Charges for Mixing Concrete

3 Cost for Admixtures in Concrete

4 Cost for Shuttering /Form work

5 Vibration Charges ( Adopted as per SOR)

6 Water charges for Curing Concrete

7 Working at Depths (Adopted as per SOR)

1 Setting out
Considering Open Foundation of .....spans of .....mc/c Bridge with Retaining wall for a length
of .....m on either side

Assuming marking

For .....spans 2 hr x no = hrs

For retaining wall

.....sections 2 sides 2 Approaches 1 hr x no = hrs

hrs

No of Days = days

Technical Assistant grade I : @ =

Head Mazdoor : @ =

Mazdoor II : @ =
InstrumentsTotal station Hire charges
: @ =
and Consumables
Total :

Concrete in foundation

PCC M10

Abutment

Pier

Retaining wall

RCC M35 Footing

Abutment

Pier

Retaining wall

Total Concrete =

Cost for setting out : / = per

169
2 Water Charges for Mixing of Concrete

Water Charges for Mixing shall be calculated based on the Water Cement ratio. For
design mixes actual water content specified shall be adopted.

assumption made
Grade W/C ratio
Concrete
PCC M15 0.35
Mixer
Concrete
PCC M20 0.35
Mixer
Concrete
PCC M25 0.4
Mixer
Batching Plant and Transit
PCC M25 0.4
Mixer
Concrete
PCC M30 0.4
Mixer
Batching Plant and Transit
PCC M30 0.4
Mixer
Concrete
RCC M20 -25 0.4
Mixer
Batching Plant and Transit
RCC M20 -25 0.4
Mixer
Concrete Mixer &Batching Plant and Transit
RCC M30 -35 0.4
Mixer

3 Cost for Admixtures in Concrete

Admixtures are used as Retarders in RMC for transit purpose

Admixtures are also used to increase the Workability in concrete


Admixtures are used in higher grade concretes above M20 to limit the cement
content and increase the strength

For Design Mixes Actual Content of Admixtures shall be adopted

assumption made for model calculation

Grade Admixture

PCC M15 nil Concrete Mixer

PCC M20 nil Concrete Mixer

PCC M25 0.4 Concrete Mixer

PCC M25 0.4 Batching Plant and Transit Mixer

PCC M30 0.4 Concrete Mixer

PCC M30 0.4 Batching Plant and Transit Mixer

170
RCC M20 -25 0.4 Concrete Mixer

RCC M20 -25 0.4 Batching Plant and Transit Mixer

RCC M30 -35 0.4 Concrete Mixer & Batching Plant and Transit Mixer

4 Cost for Shuttering /Form work

Considering form work for foundation of the above Major bridge

Shuttering for one pier foundation is considered for calculation as a sample

Shuttering area of 1 footing

1x4

4 x x - x 1.00 = sqm

Shuttering area per cu.m of concrete is

/ = sqm/cu.m

Cost of Fabrication of a 1.2x0.9m wall form sheets

Materials

Using BG 10 sheets

Area of the sheet

1 x 1.20 x 0.90 x - = 1.1 sqm

wt of the sheet

1 x 1.08 @ 23.50 x - = 25.4 kg

Angles ISA 40x40x5

Length of Angles

2 x 1.20 x - x - = 2.4 m

2 x 0.90 x - x - = 1.8 m

4.2 m

wt of Angles 1 x 4.20 @ 3.00 x - = 12.6 kg

Flats 40x5

1 x 1.20 x - x - = 1.2 m

1 x 0.90 x - x - = 0.9 m

2.1 m

wt of Flats 1 x 2.10 @ 1.57 x - = 3.3 kg

Total Wt of Materials in the floor form sheet = 41.3 kg

171
Cost of Fabrication of a 1.2x0.9m floor form sheets

Material cost 1 x 41.28 @ x - =

Welding cost 1 x 41.28 @ x - =

Similarly Pipes 80mm required for bracing the sheets

2x4

8 x x - x - = m

Stirrup heads and Strutting materials @ 10% = m

Wt of Pipes 1 x @ 6.46 x - = kg

Cost of Pipes 1 x @ x - =

Quantity of material required for Form work in Footing

No of Sheets required when sheets placed 1.2m vertically

Perimeter of the footing

4 x x - x - = m

No of Sheets required

/ 0.90 = nos

or nos

Cost of ---- Sheets

x x =

Cost of Pipes =

Total cost of Materials =

Assuming usage of 40 cycles

Cost per usage / =

Cost of Labour

Carpenter Gr- I 0.5 x =

Carpenter Gr- II 0.5 x =

Mazdoor Gr - II 2 x =

Total cost of Materials and Labour + =

Cost per Cu.m / =

5 Vibration Charges ( Adopted as per SOR)

172
6 Water charges for Curing Concrete

Assuming Curing done in foundation for 7 days

Labour Charges

0.25x7

Mazdoor II : 1.75 no @ =

Assuming it requires100 lts per time for 5 times a day

Hence water required for curing a footing

Water qty : 5 times x 100 lts x 7 days = 3500.00 ltrs

Cost of water : 3500 @ per ltr =

Total cost required for Curing + =

Cost of curing per cu.m / =

173
Sub Datas for Piling works

1 Bund formation

2 Bund road formation

3 Water for boring and washing (2 times the bore shaft Vol.@Rs75/1000ltr)

4 Water for Concreting

5 Admixture for concreting

6 Cost for chiseling out excess concrete

7 Initial load test

8 Routine load test

Essential Inputs

PILE Dia : m

Pile Length : m

Depth of Liner : m

Total no of Piles : no

Total Length of Piles : m

No of Initial Load tests : no

No of Routine Load tests : no

Load on Pile : MT

Wt of steel reinforcement for single pile : MT

Sub Data for Chiselling out excess concrete

6a 0.75 m dia Pile

Taking Extra concrete as 0.75 m ht

Concrete Quantity 3.14x((0.75)^2)/4

1 x 0.442 x 0.75 = 0.33 cu.m

Cutting the liners

Welder 1 x 0.25 x =

Hire charges 1 x 0.25 x =

Labour charges for Chiselling 1 x 0.3315 x =

Total

174
Length of Pile is =

Out put considered for 15.0 m =

Cost for Chiselling for a out put of 15.0 m =

b 1.00 m dia Pile

Taking Extra concrete as 1.00 m ht

Concrete Quantity 3.14x((1.0)^2)/4

1 x 0.785 x 1.00 = 0.79 cu.m

Cutting the liners

Welder 1 x 0.25 x =

Hire charges 1 x 0.25 x =

Labour charges for Chiselling 1 x 0.785 x =

Total

Length of Pile is =

Out put considered for 10.0 m =

Cost for Chiselling for a out put of 10.0 m =

c 1.20 m dia Pile

Taking Extra concrete as 1.20 m ht

Concrete Quantity 3.14x((1.2)^2)/4

1 x 1.13 x 1.20 = 1.36 cu.m

Cutting the liners

Welder 1 x 0.25 x =

Hire
1 x 0.25 x =
charges

Labour charges for Chiselling 1 x 1.356 x =

Total

Length of Pile is =

Out put considered for 9.0 m =

Cost for Chiselling for a output of 9.0 m =

175
7 Initial Load Test for 1.0m dia pile
Considering

Load on Pile = MT

Test Load = MT

Dia of the Pile = 1.0 m

Length of Pile = m

Length of Liner = m

Wt of liner 3.14 x 1.003

0.006 x 3.149 x =

wt 1 x x 7850.00 = MT

Wt of Reinforcement = MT

Cost of Test Pile


Cost for Concreting 1 x x =

Cost for Reinforcement 1 x x =

Cost for Liner 1 x x =

Cost of Concrete Blocks


size 1 x 1 x 1 = 1.00 cu.m

wt of each block 1 x 2.4 = 2.40 MT


Test load /
Total Block required wt of oneblock / 2.4 = nos

Cost of Concrete x =

Cost per usage considering 25 usage / 25 =

Cost for Testing


Hire charges for ISMB 600 5 nos =

Hire charges for ISMB 450 16 nos =

Hire Charges for 6mm plate 144 sqm =

Hire Charges for Floor plate 2 nos =

Hire charges for Jack =

Hire charges for Crane days hrs

Loading 3 8 @ =

UnLoading 3 8 @ =

Cost of Concrete blocks =

Testing Charges = 20000

No of Initial Load tests = nos

176
Cost of Initial Load test per RM
Piles x =

load test x =

Total =

Total length of Piles =

Cost of initial load test per RM of Pile =

8 Routine Load Test


Considering

Load on Pile = MT

Test Load = MT

Dia of the Pile = 1.0 m

Length of Pile = m

Length of Liner = m

Cost of Concrete Blocks


size 1 x 1 x 1 = 1.00 cu.m

wt of each block 1 x 2.4 = 2.40 MT

Total Block required Test load / / 2.4 = nos


wt of oneblock

Cost of Concrete x =

Cost per usage considering 25 usage / 25 =

Cost for Testing


Hire charges for ISMB 600 4 nos =

Hire charges for ISMB 450 16 nos =

Hire Charges for 6mm plate 144 sqm =

Hire Charges for Floor plate 2 nos =

Hire charges for Jack =

Hire charges for Crane days hrs

Loading 2 8 @ =

UnLoading 2 8 @ =

Cost of Concrete blocks =

Testing Charges = 20000

No of Routine Load tests = nos

177
Cost of Routine Load test per RM
load test x =

Total length of Piles =

Cost of Routine load test per RM of Pile =

7b Initial Load Test for 1.2m dia pile


Considering

Load on Pile = MT

Test Load = MT

Dia of the Pile = 1.2 m

Length of Pile = m

Length of Liner = m

Wt of liner 3.14 x 1.003

0.006 x 3.149 x =

wt 1 x x 7850.00 = MT

Wt of Reinforcement = MT

Cost of Test Pile


Cost for Concreting 1 x x =

Cost for Reinforcement 1 x x =

Cost for Liner 1 x x =

Cost of Concrete Blocks


size 1 x 1 x 1 = 1.00 cu.m

wt of each block 1 x 2.4 = 2.40 MT

Total Block required Test load / / 2.4 = nos


wt of oneblock

Cost of Concrete x =

Cost per usage considering 25 usage / 25 =

Cost for Testing


Hire charges for ISMB 600 5 nos =

Hire charges for ISMB 450 16 nos =

Hire Charges for 6mm plate 144 sqm =

Hire Charges for Floor plate 2 nos =

178
Hire charges for Jack =

Hire charges for Crane days hrs

Loading 4 8 @ =

UnLoading 4 8 @ =

Cost of Concrete blocks =

Testing Charges = 20000

No of Initial Load tests = nos

Cost of Initial Load test per RM


Piles x =

load test x =

Total =

Total length of Piles =

Cost of initial load test per RM of Pile =

8 Routine Load Test


Considering

Load on Pile = MT

Test Load = MT

Dia of the Pile = 1.2 m

Length of Pile = m

Length of Liner = m

Cost of Concrete Blocks


size 1 x 1 x 1 = 1.00 cu.m

wt of each block 1 x 2.4 = 2.40 MT

Total Block required Test load / / 2.4 = nos


wt of oneblock

Cost of Concrete x =

Cost per usage considering 25 usage / 25 =

Cost for Testing


Hire charges for ISMB 600 5 nos =

Hire charges for ISMB 450 16 nos =

Hire Charges for 6mm plate 144 sqm =

179
Hire Charges for Floor plate 2 nos =

Hire charges for Jack =

Hire charges for Crane days hrs

Loading 2 8 @ =

UnLoading 2 8 @ =

Cost of Concrete blocks =

Testing Charges = 20000

No of Routine Load tests = nos

Cost of Routine Load test per RM


load test 2 x =

Total length of Piles =

Cost of Routine load test per RM of Pile =

180
Sub Data for Substructure

1 Water Charges for Mixing Concrete

2 Cost for Admixtures in Concrete

3 Setting out

4 Cost for Shuttering /Form work


5 Cost for Staging/Centering with working platform based on Dead &
operating wt and Ht of the Substructure

6 Vibration Charges ( Adopted as per SOR)

7 Water charges for Curing Concrete


Cost for Covering the Exposed area of Concrete with Gunny Cloth
8
(Same as Shuttering area)
9 Working at Heights (Adopted as per SOR)

1 Water Charges for Mixing of Concrete

Water Charges for Mixing shall be calculated based on the Water Cement ratio.
For design mixes actual water content specified shall be adopted.
assumption made

Grade W/C ratio

PCC M15 0.35 Concrete Mixer

PCC M20 0.35 Concrete Mixer

PCC M25 0.4 Concrete Mixer

PCC M25 0.4 Batching Plant and Transit Mixer

PCC M30 0.4 Concrete Mixer

PCC M30 0.4 Batching Plant and Transit Mixer

RCC M20 -25 0.4 Concrete Mixer

RCC M20 -25 0.4 Batching Plant and Transit Mixer


Concrete Mixer &Batching Plant and
RCC M30 -35 0.4
Transit Mixer

2 Cost for Admixtures in Concrete


Admixtures are used as Retarders in RMC for transit purpose

Admixtures are also used to increase the Workability in concrete


Admixtures are used in higher grade concretes above M20 to limit the cement
content and increase the strength

181
For Design Mixes Actual Content of Admixtures shall be adopted

assumption made for model calculation


Admixture
Grade
%
PCC M15 nil Concrete Mixer

PCC M20 nil Concrete Mixer

PCC M25 0.4 Concrete Mixer

PCC M25 0.4 Batching Plant and Transit Mixer

PCC M30 0.4 Concrete Mixer

PCC M30 0.4 Batching Plant and Transit Mixer

RCC M20 -25 0.4 Concrete Mixer

RCC M20 -25 0.4 Batching Plant and Transit Mixer


Concrete Mixer &Batching Plant and
RCC M30 -35 0.4
Transit Mixer

3 Setting out
For Substructure

Abutments & Piers Quantities

Total no of Sub structure nos

Assuming concreting done in 3 layers ( ---- Sub structure x0.5 days)

Total days of Marking x 3 = days

Technical Assitant Gr - I x =

Mason Class - I x =

Mazdoor Gr- II 2 nos x =

Instrument Rental = 10000

Total =

Cost per Cu.m = / =

182
4 Cost for Shuttering /Form work

9.3
0.75
0.75

4
1.8

Turn Buckle cribs

cribs Bracing
Plan

Calculating Shuttering area for

Column

3.14 x x = sqm

Calculating cost of shuttering for Column pier

Materials

Area of 3mm sheet = sqm

Wt of 3mm sheets sqm @ 23.55 kg/m2 = kg

Length of Angles and Flats

ISA 40x40x5

183
Along circumference @ 0.5m

8 x 3.14 x x - = m

Along vertical for making 2 halves

2 x x - x - = m

Wt of ISA 40x40x5 m @ 3.00 kg/m2 = kg

Flats 40x5 along vertical @ 0.3m

6 x x - x - = m

Wt of flats 40x5 sqm @ 1.57 kg/m2 = kg

Total Wt of Materials for Column Pier

+ + = kg

Cost of Materials kg @ /kg =

Cost of Fabrication kg @ /kg =

Total Cost =

Assuming usage of 25 cycles

Cost per usage / 25.00 = A

Crips

Wt of Each Crip

Angle size 75x75x6mm

Flat size75x6mm

Angle

Longitudinal 1) 1 x 4 x 1.8 = 7.2

Cross 2) 4 x 4 x 0.6 = 9.6

16.8 RM

Length of the Flats size 40x6mm

Cross 1) 3 x 4 x 0.85 = 10.2

10.2 RM

Total Wt of one CRIP

MS Angles
16.8 Rm @ 6.8 kg/Rm = 114.24 kg

MS Flats
10.2 RM @ 2.1 kg/Rm = 21.42 kg

135.66 kg

184
(change
Cost of Material 135.66 x /kg the cost as
per SOR)
=

Cost of Fabrication 135.66 x /kg S.O.R =

Cost of Single crip

Calculating No of Crips

sides 1x4

4 x = nos

corners 1x4

4 x = nos

Total crips required = nos

Cost of Crips x =

Add 10% for Bracings , Stirup heads , Clamps,Turn Buckles etc =

Assuming usage of 25 cycles

Cost per usage / 25.00 = B

Cost of Labour days nos

Carpenter Gr- I 2 x 1 x =

Mazdoor Gr - II 2 x 2 x =

= C

Cost of Machinery
Hire Charges for Crane 2 x 4 x = D

Total Cost (A+B+C+D)

+ + + =

Concrete quantity (D^2)/4

3.14 x x = cu.m

Cost of Shuttering and Staging for column pier

Cost per cu.m of concrete / =

Pier Cap
Calculating Shuttering area for

Capping beam

Shuttering area of Pier cap = sqm

Calculating cost of shuttering for Pier cap

Materials

Area of 3mm sheet = sqm

185
Wt of 3mm sheets sqm @ 23.55 kg/m2 = kg

Length of Angles and Flats

ISA 40x40x5

Along Horizontal

top & mid 2x2

4 x - x x - = m

Bottom

2 x - x x - = m

taper 2x2

4 x - x x - = m

Sides 2x2

4 x - x x - = m

Sides 2x2

4 x - x x - = m

Total length of angles = m

Wt of ISA 40x40x5 m @ 3.00 kg/m2 = kg

Flats 40x5 along vertical


2 x 18

36 x x - x - = m

Wt of flats 40x5 m @ 1.57 kg/m2 = kg

ISMC 100
2x3

6 x x - x - = m

Wt of ISMC 100 m @ 9.20 kg/m2 = kg

Total Wt of Materials for Pier cap

+ + + = kg

Cost of Materials kg @ /kg =

Cost of Fabrication kg @ /kg =

Total Cost =

Assuming usage of 25 cycles

Cost per usage / 25.00 = A

186
Crips

Wt of Each Crip

Angle size 75x75x6mm

Flat size75x6mm

Angle

Longitudinal 1) 1 x 4 x 1.8 = 7.2

Cross 2) 4 x 4 x 0.6 = 9.6

16.8 RM

Length of the Flats size 40x6mm

Cross 1) 3 x 4 x 0.85 = 10.2

10.2 RM

Total Wt of one CRIP

MS Angles
16.8 Rm @ 6.8 kg/Rm = 114.24 kg

MS Flats
10.2 RM @ 2.1 kg/Rm = 21.42 kg

135.66 kg

Cost of Material 135.66 x /kg =

Cost of Fabrication 135.66 x /kg S.O.R =

Cost of Single crip

Calculating No of Crips

sides 2x3

6 x = nos

Total crips required = nos

Cost of Crips x =

Add 10% for Bracings, Stirup heads, Clamps = B

Assuming usage of 25 cycles

Cost per usage / 25.00 =

Cost of Labour days nos

Carpenter Gr- I 2 x 1 x =

Mazdoor Gr - II 2 x 2 x =

= C

187
Cost of Machinery
Hire Charges for Crane 2 x 1 x = D

Total Cost (A+B+C+D)

+ + + =

Calculating the concrete quantity

Enter the quantity of pier cap = cu.m

Cost of Shuttering and Staging for Pier cap

Cost per cu.m of concrete / =

6 Vibration Charges ( Adopted as per SOR)

7 Water charges for Curing Concrete


Column pier
Assuming Curing done in foundation for 14 days

Labour Charges

0.25x14

Mazdoor II : 3.5 no @ =

Assuming it requires 50 lts per time for 5 times a day

Hence water required for curing a footing

Water qty : 5 times x 50 lts x 14 days = 3500.00 ltrs

Cost of water : 3500 @ per ltr =

Cost for pumping 0.5 Hp (including hire charges and working cost)

3.5 days @ =

Total cost required for Curing + + =

Cost of curing per cu.m / =

Capping beam
Assuming Curing done in foundation for 14 days

Labour Charges

0.25x14

Mazdoor II : 3.5 no @ =

Assuming it requires 100 lts per time for 5 times a day

Hence water required for curing a footing

188
Water qty : 5 times x 100 lts x 14 days = 7000.00 ltrs
per
Cost of water : 7000 @ =
ltr
Cost for pumping 0.5 Hp (including hire charges and working cost)

3.5 days @ =

Total cost required for Curing + + =

Cost of curing per cu.m / =

Cost for Covering the Exposed area of Concrete with Gunny Cloth
8
(Same as Shuttering area)

Cost of Gunny bags @ Rs: 10/sqm

9 Working at Heights (Adopted as per SOR)

189
Sub Data for Super structure

1 Water Charges for Mixing Concrete


2 Cost for Admixtures in Concrete
3 Setting out
4 Cost for Shuttering /Form work
5 Cost for Staging/Centering with working platform based on Dead &
operating wt and Ht of the Super structure
6 Vibration Charges (Adopted as per SOR)
7 Water charges for Curing Concrete
8 Working at Heights (Adopted as per SOR)

1 Water Charges for Mixing of Concrete

Water Charges for Mixing shall be calculated based on the Water Cement ratio. For
design mixes actual water content specified shall be adopted.
assumption made
Grade W/C ratio
RCC M20 -25 0.4 Concrete Mixer
RCC M20 -25 0.4 Batching Plant and Transit Mixer
RCC M30 -35 0.4 Concrete Mixer & Batching Plant and Transit Mixer
RCC M35 -40 0.4 Concrete Mixer & Batching Plant and Transit Mixer
RCC M40 &
0.4 Concrete Mixer & Batching Plant and Transit Mixer
above

2 Cost for Admixtures in Concrete

Admixtures are used as Retarders in RMC for transit purpose


Admixtures are also used to increase the Workability in concrete
Admixtures are used in higher grade concretes above M20 to limit the cement
content and increase the strength
For Design Mixes Actual Content of Admixtures shall be adopted
assumption made for model calculation
Admixture
Grade
%
RCC M20 -25 0.4 Concrete Mixer
RCC M20 -25 0.4 Batching Plant and Transit Mixer
RCC M30 -35 0.4 Concrete Mixer & Batching Plant and Transit Mixer
RCC M40 -50 0.4 Concrete Mixer & Batching Plant and Transit Mixer
RCC M50 -55 0.4 Concrete Mixer & Batching Plant and Transit Mixer

190
3 Setting Out

Quantity for T BEAM - Deck slab


Total = cu.m
For Marking

Technical Assistant Gr-I 4 x =


Mason Gr - I 1 x =
Mason Gr - II 1 x =
Mazddor Gr-I 2 x =
Carpenter Gr- I 1 x =
Carpenter Gr- II 1 x =

Instrument Rental 5000

Total =

Cost per Cu.m for Setting out in Superstructure = / =

4 Shuttering and Form work

Calculation of Shuttering cost for Girders


Shuttering area
Girder

191
Middle Portion Length m
1) 2 x =
2) 2 x =
3) 2 x =
4) 2 x =
5) 1 x =

End Portion Length m


1) 2 x =
2) 2 x =
3) 1 x =

Varying Portion Length m


Average + /2

Calculating Surface Area for 3mm sheet in Shuttering


End portion x =
Varying Portion x =
Middle Portion x =
Exp joint side 2 x =
Total = sqm

Calculating length of Angle 40x40x5mm in Shuttering


Angles are welded on the periphery of the Shuttering panels
Average length of the each side shutters is considered as 1.2m
Length of the Angles
Verticals 1) 2 x x =
Horizontal long 2) 2 x x =
Horizontal short 3) 1 x x =
RM
Length of Flats 40x5mm
Verticals 1) 1 x x =
Horizontal long 2) 1 x x =
Horizontal short 3) 1 x x =
RM

192
Similarly for Deck Slab
Calculating Surface Area for 3mm sheet in Deck slab Shuttering
Area of the Slab 1) 1 x x =
Deduction for Girders 4 x x =
= Area
Calculating length of Angle 40x40x5mm in Deck slab Shuttering
Angles are Welded on the periphery of the Shuttering panels
Average size of the each side shutters is considered as 0.6x1.2m
Length of the Angles
Longitudinal 1) x 2 x 3 x =
Cross 2) x 2 x 3 x =
RM
Length of the Flats size 40x5mm
Longitudinal 1) x 1 x 3 x =
Cross 2) x 1 x 3 x =
RM

Total Requirement of Steel for Fabrication


Steel plate of 3mm Thick
Girder x sqm @ 23.6 kg/sqm = kg
Deckslab x sqm @ 23.6 kg/sqm = kg
MS Angles of size 40x40x5mm
Girder x sqm @ 3 kg/sqm = kg
Deckslab x sqm @ 3 kg/sqm = kg
MS Flats of size 40x5mm
Girder x sqm @ 1.57 kg/sqm = kg
Deckslab x sqm @ 1.57 kg/sqm = kg
Total Steel for Fabrication = kg

Cost of Material x /kg =


Cost of Fabrication x /kg S.O.R =
Add for Periodic Maintainence @ 10% =
Add for Bolts, fasteners,
foam rubber sheets for joints, @ 10% =
Tie rods etc

Total cost of 1 shuttering


=
set for 1 span
Considering 25 repetitions / 25 =

193
Surface Area + = sqm
Shuttering Area per Cu.m
/ =
of Concrete
Material Cost of Shuttering
/ =
per sqm
Material Cost of Shuttering per
A / =
Cu.m of Concrete

Cost of Labour
Beam Bottom Girders
Carpenter Gr- I 2 x =
Carpenter Gr- II 2 x =
Mazdoor Gr - II 4 x =
Beam sides Girders
Carpenter Gr- I 4 x =
Carpenter Gr- II 4 x =
Mazdoor Gr - II 8 x =
Deck Slab
Carpenter Gr- I 2 x =
Carpenter Gr- II 4 x =
Mazdoor Gr - II 6 x =
Deshuttering
Carpenter Gr- II 8 x =
Mazdoor Gr - II 8 x =
Total cost of Labour =

Labour Cost of Shuttering


B / =
per Cu.m of Concrete

Cost of Machinery
Hire Charges for Crane 4 x 8 x =

Hire charges for Cost of


C / =
Shuttering per Cu.m of Concrete

TOTAL COST OF
SHUTTERING A + B + C =
PER Cu.m
or

194
5 Cost for Staging/Centering with working platform based on Dead &
operating wt and Ht of the Super structure

Considering a span of m c/c


Staging using Crips of size 1.8x0.6x0.6m
Ht of staging considered as m
Spacing of the Crips tower is considered as 2.5mc/c
ISMB 200 is Spread above Crips for Placing the stirrup Head at approximate
spacing of 0.5m

Calculation of Materials
Crips
No of Towers + =
end Centre
Calculation of No of Crips row col ht
Ends by the side of Pier cap x x = nos
Centre x x = nos

Total Crips = nos

Wt of Each Crip
Angle size 75x75x6mm
Flat size75x6mm
Angle
Longitudinal 1) 1 x 4 x 1.8 = 7.2
Cross 2) 4 x 4 x 0.6 = 9.6
16.8 RM
Length of the Flats size 40x6mm
Cross 1) x 4 x 0.85 = 10.2

Total Wt of one CRIP 10.2 RM

195
MS Angles
16.8 Rm @ 6.8 kg/Rm = 114.24 kg
MS Flats
10.2 RM @ 2.1 kg/Rm 21.42 kg
135.66 kg
Cost of Material 135.66 x /kg =
Cost of Fabrication 135.66 x /kg S.O.R =
Cost of Single crip
Total cost of the Crips x nos =
ISMB200 Longitudinal
No of ISMB section / 0.5 =

Length x = RM

Cost of Material x 29.8 kg/m @ /kg = B


ISMC75 @ Beam Bottom Cross
x 4 x 0.7 =
Cost of Material x 17 kg/m @ /kg = C
ISMC75 @ Deck floor form
Longitudinal
Bottom
no of spans Length
x 3 x =
Cost of Material x 17 kg/m @ /kg = C

Vertical Pipes for supporting Deck


slab

No of Pipes x x = nos

Total length of
x ht = RM
the pipes

Cost of the Pipe x 3.5 wt x /kg = D


Total cost of Staging
= (A+B+C+D) =
Materials

Assuming to be used for 25 repetitions / 25 = X


Cost of Labour
Carpenter Gr- I 4 x =
Mazdoor Gr - II 8 x =
= E
Cost of Machinery
Hire Charges for Crane 5 x 8 x = F

196
Cost of Staging (X+E+F) =
Add for Clamps and Bracings, Stirrup
10% =
Heads
Add for Periodic Maintainence 10% =
Total =

Total cost of Staging per Cu.m / =

b. Considering span of 40 m with Obligatory of 2 x 7.5m


Considering a span of m c/c Box Girder Superstructure
Staging using Crips of size 1.8x0.6x0.6m
Ht of staging considered as-------m
Spacing of the Crips tower is considered as 2.5mc/c
ISMB 400 is Spread above Crips for Placing the stirrup Head at approximate
spacing of 0.5m

Calculation of Materials
Crips
No of Towers 2 + =
end Centre
Calculation of No of Crips row col ht
Ends by the side of Pier cap 2 x 4 x = nos
Centre x x = nos
Total Crips = nos

Total cost of the


x nos = A
Crips

ISMB400 Longitudinal
No of ISMB section L nos = 4.00
Length x 6 = RM
Cost of Material x 49.4 kg/m @ /kg = B

197
ISMC100 Transverse
No of ISMC section / 0.5 =
Length 12 x = RM
Cost of Material x 9.2 kg/m @ /kg = B

Pipes for supporting Deck slab


No of Pipes x x = nos
Total length of
x ht = RM
the pipes
Cost of the Pipe x 3.5 wt x /kg = D

Total cost of Staging


= (A+B+C+D) =
Materials

Assuming to be used for 25 repetitions / 25 = X

Cost of Labour days nos


Carpenter Gr- I 6 x 2 x =
Mazdoor Gr - II 6 x 8 x =
= E
Cost of Machinery
Hire Charges for Crane 6 x 8 x = F

Cost of Staging (X+E+F) =


Add for Clamps and Bracings, Stirrup Heads 10% =
Add for Periodic Maintenance 10% =
Total =

Total cost of Staging per Cu.m / =

c Considering span of 6.0 m clear, 12 m wide Deck

198
Staging using Crips of size 1.8x0.6x0.6m

Ht of staging considered as----m

Spacing of the Crips tower is considered as 1.5mc/c

ISMB 200 is Spread above Crips for Placing the stirrup Head at approximate
spacing of 0.5m

Calculation of Materials

Crips

No of Towers

end Centre

Calculation of No of Crips row col ht

Centre x x = nos

Total Crips = nos

Total cost of the Crips x nos = A

ISLB200 Longitudinal

No of ISLB section L nos =

Length x = RM

Cost of Material x 19.8 kg/m @ /kg = B

Total cost of Staging


= (A+B) =
Materials

Assuming to be used for 25 repetitions / 25 = X

Cost of Labour days nos

Carpenter Gr- I 2 x 1 x =

199
Mazdoor Gr - II 2 x 2 x = E

Cost of Machinery F

Hire Charges for Crane 2 x 4 x =

Cost of Staging (X+E+F) =

Add for Clamps and Bracings, Stirrup Heads 10% =

Add for Periodic Maintenance 10% =

Total =

Total cost of Staging per Cu.m / cu.m =

7 Water charges for Curing Concrete

The Main Purpose of curing is to Prevent moisture escaping from the concrete during
the process of hydration of the cement .Curing is done on the exposed surface of the
concrete to prevent the moisture loss in the concrete . Various components of the
bridge structure have various exposed area. The provision for curing will differ based
on the exposed surface .

Assuming a Deck slab for -----m span and ------m wide with ------Cu.m concrete
Water required for stagnation for 2.5 cm height for 14 Days

Qty for 1 day x x 0.025 = cu.m

or ltrs

For 14 days 14 x = ltrs

Cost of Water x 0.075 Rs = A

Cost of Cement Mortar to form bunds to retain water

Longitudinal x = RM

Cross x = RM

Quantity of Mortar x 0.075 x 0.05 /2 =

say = Cu.m

Cost of Mortar x /cu.m Rs = B

Labour Charges

200
For Forming Bund

Mason Gr-II 0.5 x Rs =

Mazdoor Gr - II 2 x Rs =

for Curing 14 days

Mazdoor Gr - II 14 x Rs =

Total Labour Charges Rs. = C

Cost for Curing (A+B+C) Rs =

Add for Pumping Charges @ 5 %

Cost of Curing Per Cu.m of Concrete is / =

or
Rs

201
Sub Data for Steel Reinforcement

Assuming ---m span ----m carriageway Superstructure

Steel Reinforcement required

Deck Slab - MT

Girders - MT

Total MT

Setting Out

Girders & slabs

Technical Assistant Gr-I 2 x =

Barbender Gr-I 2 x =

Cost per MT = / =

Cutting and Bending Machinery

Hirecharges for Cutting Machine Including cost of


6 days x =
Electricity

Hirecharges for Bending Machine including Electrical


6 days x =
Charges
Cost per MT = / =

Intercarting From Yard to Site

Loading 4 mazdoor 3 days

at Yard Mazdoor Gr-II 3 x 4 nos x =

Long body Vehicle 36 hr x =

Cost per MT = / =

Hoisting Charges At site

5T crane 48 hr x =

Cost per MT = / =

Providing Lighting Arrangements

Providing 2 at yard and 4 at site

750watts 6 nos x =

Considering 6 months life / 24

Electricity Charges day 6 x 12 x =

Add hr

Cost per MT = / =

202
Fabrication Yard

Assuming a yard of minimum 1000sqm

Rental 1000 sqm x =

On average 4 Decks are laid per month

So steel Handled per month 4 nos x =

Cost per MT = / =

Watch and Ward at Fabrication Yard

Employing 4 persons per shift 3 shifts per day

No of Persons required

4 x 3 x 30 = 360

Cost per month

360 sqm x = 0

Cost per MT = / =

Labour Shed

Considering

Number of Labour :

Watch and Ward :

Total :

Assumming 4 labours can occupy a Shed of 3x3m

No of shed

/ 4 :

or

Rest rooms

Total

Area

x 9 = m2

Cost of Construction per Sqm for Shed using Tin Sheet ,cc flooring and Electrification

x =
Distributing in the items of work
Assuming total steel used in projects as ---- MT

Cost per MT = / =

203
CONSTRUCTION & MAINTENANCE
(C&M)

204
C&M - BRIDGE

205
Sl.
Qty Unit Description of work Rate Per Amount
No.
BASIC DATA

1 CEMENT
Price of non levy cement
including all taxes and
1.00 MT MT
transportation charges Deduct
loading & unloading
Deduct loading & unloading MT

Storage charges @ 5% MT

Total

2 STEEL

1.00 MT Cost of Steel MT

Deduct loading & unloading MT

Storage charges @ 5% MT

Total

3 CEMENT MORTAR M10 (using 40mm)

0.48 MT Cost of Cement 1 MT


Deduct 30kg for 40mm size
0.067 MT 1 MT
metal
1.00 Cu.m Cost of M Sand 1 Cu.m

Total

4 CEMENT MORTAR M15 (using 40mm)

0.72 MT Cost of Cement 1 MT


Deduct 30kg for 40mm size
0.067 MT 1 MT
metal
1.00 Cu.m Cost of M Sand 1 Cu.m

Total

5 CEMENT MORTAR M15 (using 20mm)

0.72 MT Cost of Cement 1 MT

1.00 Cu.m Cost of M Sand 1 Cu.m

206
Sl.
Qty Unit Description of work Rate Per Amount
No.
Total

6 CEMENT MORTAR M20 (using 40mm)

0.76 MT Cost of Cement 1 MT


Deduct 30kg for 40mm size
0.067 MT 1 MT
metal
1.00 Cu.m Cost of M Sand 1 Cu.m

Total

7 CEMENT MORTAR M20 (Using 20mm)

0.76 MT Cost of Cement 1 MT

1.00 Cu.m Cost of M Sand 1 Cu.m

Total

8 CEMENT MORTAR M25

0.845 MT Cost of Cement 1 MT

1.00 Cu.m Cost of M Sand 1 Cu.m

Total

9 CEMENT MORTAR M30

0.889 MT Cost of Cement 1 MT

1.00 Cu.m Cost of M Sand 1 Cu.m

Total

10 CEMENT MORTAR M35 and above

0.934 MT Cost of Cement 1 MT

1.00 Cu.m Cost of M Sand 1 Cu.m

Total

11 CEMENT CONCRETE M10 (Nominal Mix) using 40 mm Metal

9.00 Cu.m HBGS Jelly 40mm size (M-0086) Cu.m

207
Sl.
Qty Unit Description of work Rate Per Amount
No.
M Sand (M-0125)/Sand (M-
4.50 Cu.m Cu.m
0127)
1.86 M.T Cement M.T

1.80 Nos Mason for Class-II (L-0071) Day

17.70 Nos Mazdoor Category-I (L-0073) Day

14.10 Nos Mazdoor Category-II (L-0098) Day


Vibration Charges for PCC (W-
10.00 Cu.m Cu.m
0100)
Rate per 10 Cu.m

Rate per 1 Cu.m

12 VIBRATED CEMENT CONCRETE M15 (Nominal Mix) using 40 mm Metal

9.00 Cu.m HBGS Jelly 40mm size (M-0086) Cu.m


M Sand (M-0125)/Sand (M-
4.50 Cu.m Cu.m
0127)
2.94 M.T Cement M.T

1.80 Nos Mason for Class-II (L-0071) Day

17.70 Nos Mazdoor Category-I (L-0073) Day

14.10 Nos Mazdoor Category-II (L-0098) Day


Vibration Charges for PCC (W-
10.00 Cu.m Cu.m
0100)
Rate per 10 Cu.m

Rate per 1 Cu.m

13 VIBRATED CEMENT CONCRETE M20 (Nominal Mix) using 40 mm Metal

9.00 Cu.m HBGS Jelly 40mm size (M-0086) Cu.m


M Sand (M-0125)/Sand (M-
4.50 Cu.m Cu.m
0127)
3.12 M.T Cement M.T

1.80 Nos Mason for Class-II (L-0071) Day

17.70 Nos Mazdoor Category-I (L-0073) Day

14.10 Nos Mazdoor Category-II (L-0098) Day


Vibration Charges for PCC
10.00 Cu.m Cu.m
(W-0100)

208
Sl.
Qty Unit Description of work Rate Per Amount
No.
Rate per 10 Cu.m

Rate per 1 Cu.m

14 VIBRATED CEMENT CONCRETE M20 (Nominal Mix) using 20 mm Metal

9.00 Cu.m HBGS Jelly 20mm size (M-0088) Cu.m

3.42 M.T Cement M.T

1.80 Nos Mason for Class-II (L-0071) Day

17.70 Nos Mazdoor Category-I (L-0073) Day

14.10 Nos Mazdoor Category-II (L-0098) Day


Vibration Charges for PCC (W-
10.00 Cu.m Cu.m
0100)
Rate per 10 Cu.m

Rate per 1 Cu.m

15 VIBRATED REINFORCED CEMENT CONCRETE M25 (Design Mix)

6.30 Cu.m HBGS Jelly 20mm size (M-0088) Cu.m

2.700 Cu.m HBGS Jelly 12mm size (M-0089) Cu.m


M Sand (M-0125)/Sand (M-
4.50 Cu.m Cu.m
0127)
3.80 M.T Cement M.T
Admixtures 0.20% Cement
8.06 Kg Kg
Content
3.50 Nos Mason for Class-II (L-0071) Day

21.20 Nos Mazdoor Category-I (L-0073) Day

35.30 Nos Mazdoor Category-II (L-0098) Day


Vibration Charges for RCC
10.00 Cu.m Cu.m
(W-0101)
Rate per 10 Cu.m

Rate per 1 Cu.m

16 VIBRATED REINFORCED CEMENT CONCRETE M30 (Design Mix)

6.30 Cu.m HBGS Jelly 20mm size (M-0088) Cu.m

2.700 Cu.m HBGS Jelly 12mm size (M-0089) Cu.m

209
Sl.
Qty Unit Description of work Rate Per Amount
No.
M Sand (M-0125)/Sand (M-
4.50 Cu.m Cu.m
0127)
4.000 M.T Cement M.T
Admixtures 0.30% Cement
12.21 Kg Kg
Content
3.50 Nos Mason for Class-II (L-0071) Day

21.20 Nos Mazdoor Category-I (L-0073) Day

35.30 Nos Mazdoor Category-II (L-0098) Day


Vibration Charges for RCC
10.00 Cu.m Cu.m
(W-0101)
Rate per 10 Cu.m

Rate per 1 Cu.m

17 VIBRATED REINFORCED CEMENT CONCRETE M35 (Design Mix)

6.30 Cu.m HBGS Jelly 20mm size (M-0088) Cu.m

2.700 Cu.m HBGS Jelly 12mm size (M-0089) Cu.m


M Sand (M-0125)/Sand (M-
4.50 Cu.m Cu.m
0127)
4.20 M.T Cement M.T
Admixtures 0.40% Cement
16.88 Kg Kg
Content
3.50 Nos Mason for Class-II (L-0071) Day

21.20 Nos Mazdoor Category-I (L-0073) Day

35.30 Nos Mazdoor Category-II (L-0098) Day


Vibration Charges for RCC
10.00 Cu.m Cu.m
(W-0101)
Rate per 10 Cu.m

Rate per 1 Cu.m

18 VIBRATED REINFORCED CEMENT CONCRETE M40 (Design Mix)

6.70 Cu.m HBGS Jelly 20mm size (M-0088) Cu.m

2.30 Cu.m HBGS Jelly 12mm size (M-0089) Cu.m


M Sand (M-0125)/Sand (M-
4.50 Cu.m Cu.m
0127)

210
Sl.
Qty Unit Description of work Rate Per Amount
No.
4.20 M.T Cement M.T
Admixtures 0.80% Cement
34.40 Kg Kg
Content
3.50 Nos Mason for Class-II (L-0071) Day

21.20 Nos Mazdoor Category-I (L-0073) Day

35.30 Nos Mazdoor Category-II (L-0098) Day


Vibration Charges for RCC
10.00 Cu.m Cu.m
(W-0101)
Rate per 10 Cu.m

Rate per 1 Cu.m

19 VIBRATED REINFORCED CEMENT CONCRETE M45 (Design Mix)

6.70 Cu.m HBGS Jelly 20mm size (M-0088) Cu.m

2.30 Cu.m HBGS Jelly 12mm size (M-0089) Cu.m


M Sand (M-0125)/Sand (M-
4.50 Cu.m Cu.m
0127)
4.20 M.T Cement M.T

43.00 Kg Admixtures 1% Cement Content Kg

3.50 Nos Mason for Class-II (L-0071) Day

21.20 Nos Mazdoor Category-I (L-0073) Day

35.30 Nos Mazdoor Category-II (L-0098) Day


Vibration Charges for RCC
10.00 Cu.m Cu.m
(W-0101)
Rate per 10 Cu.m

Rate per 1 Cu.m

20 VIBRATED REINFORCED CEMENT CONCRETE M50 (Design Mix)

6.70 Cu.m HBGS Jelly 20mm size (M-0088) Cu.m

2.30 Cu.m HBGS Jelly 12mm size (M-0089) Cu.m


M Sand (M-0125)/Sand (M-
4.50 Cu.m Cu.m
0127)
4.20 M.T Cement M.T
Admixtures 0.80% Cement
34.40 Kg Kg
Content

211
Sl.
Qty Unit Description of work Rate Per Amount
No.
215.00 Kg Silica Fume @ 5% of Cement Kg

3.50 Nos Mason for Class-II (L-0071) Day

21.20 Nos Mazdoor Category-I (L-0073) Day

35.30 Nos Mazdoor Category-II (L-0098) Day


Vibration Charges for RCC
10.00 Cu.m Cu.m
(W-0101)
Rate per 10 Cu.m

Rate per 1 Cu.m

EARTH WORK EXCAVATION

Earth work excavation in all classes of soils except hard rock not requiring blasting
and depositing on bank as per SS20B with all leads and lifts and all other incidental
1 charges such as bailing out water, shoring, strutting, walling and forming protective
bunds wherever necessary etc., complete as per relevent standard specification for
DRESSING THE BED UPTO SILL LEVEL.
Earth work excavation
1.00 Cu.m 1 Cu.m
(W- 0061)
Total

Rate per 1 Cu.m


Earth work Excavation in all classes of soils except hard rock not requiring blasting and
depositing on bank with all leads and lifts as per SS20B including cost of all labour,
materials, tools, equipments and all incidental charges and sheeting, shoring, bracing
2 and their subsequent removal, removal of all logs, stumps and other deleterious matter
and obstructions, trimming of bottom of excavtion backfilling, and clearing the site
and disposal of all surplus materials etc. complete as per standard specification for
Foundation of Abutments and Piers / Pile Cap
Earth work excavation
1.00 Cu.m 1 Cu.m
(W- 0061)
Add 100% extra for narrow
1.00 Cu.m 1 Cu.m
foundation
Shoring, strutting and walling
1 Cu.m
(HW-W 0127)
Refilling the sides (W-0075) 1 Cu.m
Hire charges for Tools and
1 Cu.m
plants (HW-W 0128)
Providing and Maintaining
1 Cu.m
protective bund (HW-W 0130)
Bailing out water (HW-W 0126) 1 Cu.m

212
Sl.
Qty Unit Description of work Rate Per Amount
No.
Removal of protective bunds
1 Cu.m
(HW-W 0129)
Rate per 1 Cu.m
Earth work Excavation in soft rock not requiring blasting and depositing on bank with all
leads and lifts including cost of all labour, materials, tools, equipments and all incidental
charges and sheeting, shoring, bracing and their subsequent removal, removal of all
3
logs, stumps and other deleterious matter and obstructions, trimming of bottom of
excavtion backfilling, and clearing the site and disposal of all surplus materials etc.
complete as per standard specification for Foundation under Abutments and Piers.
Earth work Excavation in soft
1.00 Cu.m 1 Cu.m
rock not requiring blasting
Add 100% extra for narrow
1.00 Cu.m 1 Cu.m
foundation
Shoring, strutting and walling
1 Cu.m
(HW-W 0127)
Refilling the sides (W-0074) 1 Cu.m
Hire charges for Tools and
1 Cu.m
plants (HW-W 0128)
Providing and Maintaining
protective bund 1 Cu.m
(HW-W 0130)
Bailing out water (HW-W 0126) 1 Cu.m
Removal of protective bunds
1 Cu.m
(HW-W 0129)
Rate per 1 Cu.m

Earth work Excavation in hard rock requiring blasting and depositing on bank with all
leads as per SS20B including cost of all labour, equipments and maintaining necessary
cofferdams, sheeting, shoring, bracing and their subsequent removal, removal of all
4 logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom
of excavtion backfilling, and clearing the site and disposal of all surplus materials etc.
complete as per relevent standard specification for Foundation under Abutments
and Piers.
Earth work Excavation in hard
1.00 Cu.m 1 Cu.m
rock requiring blasting
Add 100% extra for narrow
1.00 Cu.m 1 Cu.m
foundation
Shoring, strutting and walling
1 Cu.m
(HW-W 0127)
Hire charges for Tools and
1 Cu.m
plants (HW-W 0128)
Providing and Maintaining
protective bund 1 Cu.m
(HW-W 0130)
Bailing out water (HW-W 0126) 1 Cu.m

213
Sl.
Qty Unit Description of work Rate Per Amount
No.
Removal of protective bunds
1 Cu.m
(HW-W 0129)
Rate per 1 Cu.m

5 Benching hard rock upto an average 10 cm depth

1.00 Sq.m As per SOR W-0048 Sq.m

Rate per 1 Sq.m = Rs.

6 Providing dowel bars for footing under Abutment & Piers

6.936 Kg Cost of Fe 500 steel Kg


Drilling 40mm dia (As per Sch.
0.90 Rm Rm
Item. No46) (W-0049)
0.90 Rm Grouting with CM 1:2 Rm

Rate per 1 Cu.m

Cement concrete M15 (Nominal mix) using 40 mm ISS size hard broken granite metal
including cost and conveyance of all materials to site including cost and labour charges
7 for formwork, centering, labour charges for laying, compacting, curing all incidental
charges etc., complete for Filling the trenches around footing upto the top of
rock
1.00 Cu.m Cost of CC M15 1 Cu.m
Soft water for curing concrete
LS
(HW -W 0131)
Hire charges for Hire charges
for Tools and plants (HW -W LS
0132)
Rate per 1 Cu.m

BRIDGE DATA
Foundation
Plain Cement concrete M10 Grade using 40mm ISS size hard broken granite metal
including cost and conveyance of all materials to site and cost of cement at site,
including soft water, labour charges for mixing transporting, laying, compacting, curing
1
concrete, Hire charges for Tools and plants and all incidental charges such as bailing out
water, maintaining protective bunds, cofferdams, shoring etc., complete for Levelling
course below foundation.

1.00 Cu.m Cost of CC M10 1 Cu.m

214
Sl.
Qty Unit Description of work Rate Per Amount
No.
Soft water for curing concrete
LS
(HW -W 0131)

Bailing out water (HW-W 0126) LS

Hire charges for Hire charges


for Tools and plants (HW -W LS
0132)

Rate per 1 Cu.m

Vibrated cement concrete of grade M15 (Nominal mix) using 40mm ISS hard broken
granite metal including cost and conveyance of all materials to site, including cost and
2 labour charges for form work and centering, labour charges for compacting, curing and
all incidental charges etc., complete as per standard specification for Levelling course
below Pile Cap / Foundation

1.00 Cu.m Cost of VCC M15 1 Cu.m

Soft water for curing concrete


(HW -W 0131)

Bailing out water (HW-W 0126)

Hire charges for Hire charges


for Tools and plants (HW -W
0132)

Rate per 1 Cu.m

Vibrated Cement Concrete of grade M20 (Nominal mix) using 40mm ISS size HBG metal
including cost and conveyance of all materials to site and cost cement at site including
cost of formwork, soft water, labour charges for mixing, transporting, laying and curing
3
concrete, working at depths Hire charges for Tools and plants and incidental charges
etc., complete as per relevent standard specification for Foundation of Abutments,
Return walls and Piers, Cutoff wall, Raft

1.00 Cu.m Cost of Vibrated CC M20 1 Cu.m

Sq.m/
Formwork and centering Sq.m
Cu.m
Soft water for curing concrete
LS
(HW -W 0131)
Hire charges for Hire charges
for Tools and plants (HW -W LS
0132)

Working on heights LS

Rate per 1 Cu.m

Vibrated Reinforced Cement Concrete of grade M30 (Design mix) using 20mm and
below ISS graded metal including cost and conveyance of all materials to site excluding
cost of steel including cost of formwork, soft water, labour charges for mixing,
4 transporting, laying and curing concrete, working at depths Hire charges for Tools and
plants and incidental charges such as bailing out water, maintaining of protective bunds,
cofferdams, shoring, strutting etc., complete as per relevent standard specification for
Foundation of Abutments, Return walls and Piers, Cutoff wall, Raft

215
Sl.
Qty Unit Description of work Rate Per Amount
No.

1.00 Cu.m Cost of Vibrated CC M30 1 Cu.m

Sq.m/
Formwork and centering Sq.m
Cu.m
Soft water for curing concrete
LS
(HW -W 0131)

Bailing out water (HW-W 0126) LS

Hire charges for Hire charges


for Tools and plants (HW -W LS
0132)

Rate per 1 Cu.m

Filling inside the raft with sand including cost and conveyance of sand to worksite,
laying, handling charges and filling in layers, tamping under optimum moisture content
5
to get the maximum density including watering with all leads for water and all other
incidental charges etc., complete for Filling inside the Raft.

1.00 Cu.m Cost of M Sand 1 Cu.m

Labour charges for filling (W-


1.00 Cu.m 1 Cu.m
0074)

Rate per 1 Cu.m

Providing and driving in position permenent MS liners for piles from bottom of pile
cap as per cl.709.1.4 of IRC 78 - 2014 (up to maximum scour level) including cost of
6 liners and fabricating, welded construction with consumables, labour and plants and
driving MS liner 6mm thick to be left permenantly with the pile shaft as per requirement
and as per specification and placing them in position with all lead and lift etc. complete.
Cost of 6mm MS sheet
1.05 MT 1 MT
(M-0186)

0.80 day Mate (Head Mazdoor) (L-0074) day

4.00 day Fitter (I - Class) (L-0018) day

4.00 day Blacksmith ( I - Class) (L-0040) day

4.00 day Welder (L-0046) day

8.00 day Mazdoor (Category - I) (L-0073) day

Consumables @ 5% of material

Hydraulic Crane 10T capacity


8.00 Hour Hour
for lifting shifting (HW-H0038)

Rate for per MT

216
Sl.
Qty Unit Description of work Rate Per Amount
No.
Providing Reinforced Cement Concrete cast-int-situ bored PILES of 1000mm
diameter in vibrated RCC M35 (Design mix) using 20mm ISS HBG metal including
cost and conveyance of all materials to site and cost of cement at site but excluding
cost and fabrication of steel and placing it in position before concreting setting up of
piling equipment, shifting the same from one pile location to another pile location,
dismantling them and reerceting as necessary including all labour for driving or boring
and providing temporary casing where required through all soils, leading the excavated
7
earth to a distance of 200m including forming of working platform over the river bed of
acomodating piling equipment including working platform etc., forming approaches to
the working platform, mixing concrete, filling it in position, compacting, cutting of pile
head to cut off level for casting pile cap, including diversion of water course if necessary
and all other incidental charges etc., complete as per standard specifications, forming
and maintaining protective bunds and all other incidental charges etc., complete for
PILES BELOW PIERS AND ABUTMENTS.

0.785 Cu.m Cost of CC M35 1 Cu.m

Machinery for boring and Output


construction : 10.0 Rm.

Hydraulic piling rig with power


unit and complete accessories
6.00 Hrs including shifting from one bore / Hour
to another bore location.
(HW-H0023)

Hire and running charges


for Light crane for lowering
0.50 Hrs / Hour
reinforcement gauge
(HW-H0018)

Hire and running charges for


0.40 Hrs Loader 1 Cu.m capacity / Hour
(H-0079)

Hire and running charges for


Tipper 5.5 Cu.m capacity for
28.00 t-km t-km
disposal of muck from pile bore
hole (H-0003)

Total for 10.0 Rm

For 1 Rm

217
Sl.
Qty Unit Description of work Rate Per Amount
No.

Labour :

0.16 Nos Head mazdoor (L-0074) / Hour

4.50 Nos Mazdoor I class (L-0073) / Hour

Total for 10.0 Rm =

For 1 Rm

LS provisions :

Cutting of concrete at cut off


LS
level

Spill of concrete LS

Conducting confirmatory bores LS

Liner scrap above cut off level LS

Load test on pile both vertical


L.S
and
horizontal as per codel provision
on pile

Sundries

Total

Rate per metre

Providing Reinforced Cement Concrete cast-int-situ bored PILES of 1200 mm


diameter in vibrated RCC M35 (Design mix) using 20mm ISS HBG metal including
cost and conveyance of all materials to site and cost of cement at site but excluding
cost and fabrication of steel and placing it in position before concreting setting up of
piling equipment, shifting the same from one pile location to another pile location,
dismantling them and reerceting as necessary including all labour for driving or boring
and providing temporary casing where required through all soils, leading the excavated
8
earth to a distance of 200m including forming of working platform over the river bed of
acomodating piling equipment including working platform etc., forming approaches to
the working platform, mixing concrete, filling it in position, compacting, cutting of pile
head to cut off level for casting pile cap, including diversion of water course if necessary
and all other incidental charges etc., complete as per standard specifications, forming
and maintaining protective bunds and all other incidental charges etc., complete for
PILES BELOW PIERS AND ABUTMENTS.
1.131 Cu.m Cost of CC M35 1 Cu.m

Machinery for boring and Output


construction : 9.0 Rm.

218
Sl.
Qty Unit Description of work Rate Per Amount
No.
Hydraulic piling rig with power
unit and complete accessories
6.00 Hrs including shifting from one bore / Hour
to another bore location.
(HW-H0023)
Hire and running charges
for Light crane for lowering
0.50 Hrs / Hour
reinforcement gauge
(HW-H0018)
Hire and running charges for
0.50 Hrs Loader 1 Cu.m capacity / Hour
(H-0079)
Hire and running charges for
Tipper 5.5 Cu.m capacity for
36.60 t-km t-km
disposal of muck from pile bore
hole (H-0003)
Total for 10.0 Rm

For 1 Rm

Labour :

0.18 Nos Head mazdoor (L-0074) / Hour

4.50 Nos Mazdoor I class (L-0073) / Hour

Total for 9.0 Rm

For 1 Rm

LS provisions :
Cutting of concrete at cut off
LS
level
Spill of concrete LS

Conducting confirmatory bores LS

Liner scrap above cut off level LS


Load test on pile both vertical
and horizontal as per codel L.S
provision on pile
Sundries

Total

Rate per metre

219
Sl.
Qty Unit Description of work Rate Per Amount
No.
Vibrated Reinforced Cement Concrete of grade M35 (Design mix) using 20mm and
below HBG graded metal including cost and conveyance of all materials to site excluding
cost of steel including cost of formwork, soft water, labour charges for mixing,
9 transporting, laying and curing concrete, working at depths Hire charges for Tools and
plants and incidental charges such as bailing out water, maintaining of protective bunds,
cofferdams, shoring, strutting etc., complete as per relevent standard specification for
PILE CAPS UNDER ABUTMENT & PIERS
1.00 Cu.m Cost of Vibrated CC M35 1 Cu.m
Sq.m/
Formwork and centering Sq.m
Cu.m
Soft water for curing concrete
LS
(HW -W 0131)

Bailing out water (HW-W 0126) LS

Hire charges for Hire charges


for Tools and plants (HW -W
0132)

Rate per 1 Cu.m

SUBSTRUCTURE
Vibrated Cement Concrete of grade M20 (Nominal mix) using 40mm ISS size HBG metal
including cost and conveyance of all materials to site and cost cement at site including
cost of formwork, soft water, labour charges for mixing, transporting, laying and curing
1
concrete, working at depths Hire charges for Tools and plants and incidental charges
etc., complete as per relevent standard specification for Substructure of Abutments,
Return walls and Piers,Body wall.

1.00 Cu.m Cost of Vibrated CC M20 1 Cu.m

sq.m/
Formwork and centering sq.m
Cu.m
Soft water for curing concrete
LS
(HW -W 0131)
Hire charges for Hire charges
for Tools and plants (HW -W LS
0132)

Working on heights LS

Rate per 1 Cu.m

Vibrated Reinforced Cement Concrete of grade M30/M35 (Design mix) using 20mm
and below HBG graded metal including cost and conveyance of all materials to site
excluding cost of steel including cost of formwork, soft water, labour charges for mixing,
2
transporting, laying and curing concrete, working at depths Hire charges for Tools and
plants and incidental charges etc., complete as per relevent standard specification for
Abutment / Pier/Retaining wall.

1.00 Cu.m Cost of Vibrated CC M30/M35 1 Cu.m

sq.m/
Formwork and centering sq.m
Cu.m

220
Sl.
Qty Unit Description of work Rate Per Amount
No.
Soft water for curing concrete
LS
(HW -W 0131)
Hire charges for Hire charges
for Tools and plants (HW -W LS
0132)

Working on heights

Rate per 1 Cu.m

Vibrated Reinforced cement concrete of grade M25/M30/M35 (Design mix) using 20mm
and below ISS hard broken granite metal including cost and conveyance of all materials
to site and cost of cement excluding cost and fabrication of steel but including cost
3 of form work, labour charges for mixing, transporting, laying and curing concrete,
working at heights, hire charges for Hire charges for Tools and plants including all
other incidental charges etc., complete for Bed block Cum Dirtwall / Box Culvert/Drain/
Reinforcement wall.
Cost of Vibrated CC M25/M30/
1.00 Cu.m 1 Cu.m
M35
sq.m/
Formwork and centering sq.m
Cu.m
Soft water for curing concrete
LS
(HW -W 0131)
Hire charges for Hire charges
for Tools and plants (HW -W LS
0132)
Rate per 1 Cu.m
Supply and fixing of KRAFT paper for full width of seating of deckslab and including
4 cost and conveyance to worksite, labour for fixing the same in correct position and all
other incidental charges etc., complete.
Cost of Kraft paper including
1.00 sq.m labour charges for fixing
(W-0223)
Rate per 1 sq.m
Vibrated Reinforced Cement Concrete of grade M30/M35 (Design mix) using 20mm
and below HBG graded metal including cost and conveyance of all materials to site
5 excluding cost of steel including cost of formwork, soft water, labour charges for mixing,
transporting, laying and curing concrete, working at depths Hire charges for Tools and
plants etc., complete as per relevent standard specification for Capping beam
1.00 Cu.m Cost of Vibrated CC M30/M35 1 Cu.m
sq.m/
Formwork and centering sq.m
Cu.m
Soft water for curing concrete
LS
(HW -W 0131)
Hire charges for Hire charges
for Tools and plants (HW -W LS
0132)
Working on heights

221
Sl.
Qty Unit Description of work Rate Per Amount
No.
Rate per 1 Cu.m
Vibrated Reinforced Cement Concrete of grade M30/M35 (Design mix) using 20mm
and below HBG graded metal including cost and conveyance of all materials to site
6 excluding cost of steel including cost of formwork, soft water, labour charges for mixing,
transporting, laying and curing concrete, working at depths Hire charges for Tools and
plants etc., complete as per relevent standard specification for Pedestal
1.00 Cu.m Cost of Vibrated CC M30/M35 1 Cu.m
sq.m/
Formwork and centering sq.m
Cu.m
Soft water for curing concrete
LS
(HW -W 0131)
Hire charges for Hire charges
for Tools and plants (HW -W LS
0132)

Working on heights

Rate per 1 Cu.m

Supply of 1000mm dia RCC NP3 class pipes confirming to IS 458 specification as
7 directed by the departmental officers including cost and conveyance of pipes to the
worksite and all other incidental charges etc., complete as per standard specification.

SOR rate = Rs. (W-0226) / Rm

Laying and fixing of 1000 mm dia RCC NP3 pipe in position excluding cost of pipes but
8 including conveyance to work spot and handling charges on both sides including labour
charges for hoisting and placing the pipes

SOR rate per Rm (W-0229) / Rm

Stone dust filling including cost and conveyance of Stone dust to worksite including
labour charges for filling in layers as specified by the departmental officers including
9 watering with all leads for water including labour charges for compacting, tamping,
ramming under optimum moisture content to obtain the maximum density and all other
incidental charges etc. complete as per standard specification.
Cost of Stone dust/Sand/M-
1.00 Cu.m 1 Cu.m
Sand (M-0123/M-0127/M-0125)

1.00 Cu.m Filling charges (W-0075) 1 Cu.m

Rate per 1 Cu.m

SUPERSTRUCTURE
Vibrated Reinforced Cement Concrete of grade M30/M35 (Design mix) using 20mm
and below HBG graded metal including cost and conveyance of all materials to site
1 excluding cost of steel including cost of formwork, soft water,labour charges for
mixing, transporting, laying and curing concrete, working at depths etc., complete as
per relevent standard specification for Solid Deck slab

1.00 Cu.m Cost of Vibrated CC M35 1 Cu.m

222
Sl.
Qty Unit Description of work Rate Per Amount
No.
sq.m/
Formwork and centering sq.m
Cu.m
Soft water for curing concrete
LS
(HW -W 0131)
Hire charges for Hire charges
for Tools and plants (HW -W LS
0132)

Working on heights

Rate per 1 Cu.m

Vibrated Reinforced Cement Concrete of grade M30/M35/M40 (Design mix) using


20mm and below HBG graded metal including cost and conveyance of all materials to
2 site excluding cost of steel including cost of formwork, soft water,labour charges for
mixing, transporting, laying and curing concrete, working at depths etc., complete as
per relevent standard specification for T Beam / Deck slab/ Diaphragm / void slab
Cost of Vibrated CC M30/M35/
1.00 Cu.m 1 Cu.m
M40
sq.m/
Formwork and centering sq.m
Cu.m
Soft water for curing concrete
LS
(HW -W 0131)
Hire charges for Hire charges
for Tools and plants (HW -W LS
0132)
Working on heights

Rate per 1 Cu.m


Vibrated Reinforced Cement Concrete of grade M40/M45/M50 (Design mix) using
20mm and below HBG graded metal including cost and conveyance of all materials to
3 site excluding cost of steel including cost of formwork, soft water, labour charges for
mixing, transporting, laying and curing concrete, working at depths Hire charges for
Tools and plants etc., complete as per relevent standard specification for Box Girder .
Cost of Vibrated CC M40/M45/
1.00 Cu.m 1 Cu.m
M50
sq.m/
Formwork and centering sq.m
Cu.m
Soft water for curing concrete
LS
(HW -W 0131)
Hire charges for Hire charges
for Tools and plants (HW -W LS
0132)
Working on heights

Rate per 1 Cu.m

223
Sl.
Qty Unit Description of work Rate Per Amount
No.
Vibrated Reinforced cement concrete of grade M40/M45M50 (Design mix) using 20mm
and below HBG metal including cost and conveyance of all materials to site and cost of
cement excluding cost and fabrication of steel but including cost of form work, labour
4
charges for mixing, transporting, laying and curing concrete, working at heights, hire
charges for Hire charges for Tools and plants including all other incidental charges etc.,
complete for PSC ‘Y’ & ‘I’ Girders.
Cost of Vibrated CC M450/M45/
1.00 Cu.m 1 Cu.m
M50
1.72 kg Admixture at 0.4% of cement kg
sq.m/
Formwork and centering sq.m
Cu.m
Steam curing :

37.00 Lts. LDO for steam curing Lt.

0.01 No. Mate / Head mazdoor (L-0074) Each

0.35 Nos. Mazdoor I class (L-073) Each


Handling charges in stacking
yards
palcing of girders over pier
caps
0.05 Hrs Generator 100 kVA (M-2332) 1 Hr
Crane 80 Tonnes capacity
0.15 Hrs 1 Hr
(H-0106)
0.05 Hrs Loader (H-0079) 1 Hr
Trailer 30 Tonnes capacity
5.25 Hrs T.km
(HW-H0035)
0.02 Nos. Mate / Head mazdoor (L-0074) Each

0.55 Nos. Mazdoor I class (L-0073) Each

Rate per 1 Cu.m

Prestressed Cement Concrete of grade M50 (Design mix) using 20mm ISS graded metal
including cost and conveyance of all materials to site, cost of cement but excluding cost
of steel/strands and including cost of formwork, labour charges for mixing, casting,
steam curing, stacking at stock yard and transporting the precast girders to the site,
5
erection in position and level as per drawing and including working at heights, soft
water, hire charges for Hire charges for Tools and plants including all other incidental
charges etc., complete as per relevent standard specification for PSC Segmental Box
Girders.
Taking out put : 120 Cu.m

a) Material :

58.80 MT Cost of cement 1 Cu.m

224
Sl.
Qty Unit Description of work Rate Per Amount
No.
54.00 Cu.m Cost of coarse sand (M-0127) 1 Cu.m

64.80 Cu.m Cost of 20mm metal (M-0088) 1 Cu.m

43.20 Cu.m Cost of 10mm metal (M-0090) 1 Cu.m

235.20 kg Admixture at 0.4% of cement kg

b) Labour :

0.94 No. Mate / Supervisor (L-0074) Each

3.50 No. Mason Gr II (L-0071) Each

20.00 Nos. Mazdoor Gr I (L-0073) Each

c) Machinery :
Batching plant @ 20 Cu.m/hour
6.00 Hrs 1 Hr
(HW-H0013)
6.00 Hrs Generator 100 KVA (M-2332) 1 Hr

6.00 Hrs Loader (HW-H0079) 1 Hr


Transit Mixer 4 Cu.m capcity
15.00 Hrs T.km
(HW-H0036)
6.00 Nos. Concrete pump (HW-H0020) Each

Sub total

Rate per 1 Cu.m


d) Transportation and
erection in position :
Crane 80 Tonne capacity
0.15 Hour Hour
(H-0106)
30.00 T. km Trailer 120 T capacity to transit T.km
from yard to site (2.50 x 12
km)
0.15 Hour Trailer 120 T capacity during Hour

placement

e) Steam curing :

225
Sl.
Qty Unit Description of work Rate Per Amount
No.
37.00 lit LDO for steam curing /lit

0.01 No. Mate (L-0074) Each

0.35 Nos Mazddor - I (L-0073) Each


e) For formwork and
staging:
i) For height up to 5m - 35 % of
cost of concrete
ii) For height 5m to 10m - 45 %
of cost of concrete
iii) For height 10m to 15m - 55
% of cost of concrete

Cost of PSC segmental Box


girder for 0 to 5m height

Cost of PSC segmental Box


girder for 5 to 10m height

Cost of PSC segmental Box


girder for 10 to 15m height

Vibrated Reinforced Cement Concrete of grade M25/M30/M35 (Design mix) using


20mm and below HBG graded metal including cost and conveyance of all materials
to site excluding cost of steel including cost of formwork, soft water, labour charges
6
for mixing, transporting, laying and curing concrete, working at heights Hire charges
for Tools and plants and incidental charges etc., complete as per relevent standard
specification for Box Culvert/Drain/Retaining wall.
Cost of Vibrated CC M25/M30/
1.00 Cu.m 1 Cu.m
M35
sq.m/
Formwork and centering sq.m
Cu.m
Soft water for curing concrete
LS
(HW -W 0131)
Hire charges for Hire charges
for Tools and plants (HW -W LS
0132)
Rate per 1 Cu.m
Supply and fabrication of STEEL Fe500/ Fe500D/ Fe550/ Fe550D grade with
suitable anticorrsive measure required for all the reinforced cement concrete items of
work involved in the shedule including cost of steel, cost of fabrication, labour charges
7
for cleaning the rods, straightening, cutting, bending, tying grills, hoisting and placing
the reinforcement in position as specified in the drawing including cost of binding wire,
provision of spacer bars, cover blocks and all other incidental charges etc., complete.
1.05 MT Cost of steel 1 MT

226
Sl.
Qty Unit Description of work Rate Per Amount
No.
0.01 MT Cost of Binding wire (M-0188) 1 MT
Fitter I class for fabrication
35.00 No. Each
(L-0019)
Anti corrosive treatment
1.00 MT 1 MT
(HW-W0318)
Rate for per MT
Supply and fabrication of STEEL Fe240 grade with suitable anticorrsive measure
required for all the reinforced cement concrete items of work involved in the shedule
including cost of steel, cost of fabrication, labour charges for cleaning the rods,
8
straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in
position as specified in the drawing including cost of binding wire, provision of spacer
bars, cover blocks and all other incidental charges etc., complete.

1.05 MT Cost of steel 1 MT

0.01 MT Cost of Binding wire (M-0188) 1 MT

Fitter I class for fabrication


35.00 No. Each
(L-0019)
Anti corrosive treatment
1.00 MT 1 MT
(HW-W0138)

Rate for per MT

MISCELLANEOUS
Vibrated Reinforced cement concrete of grade M30 (Design mix) using 20mm and below
hard broken granite metal including cost and conveyance of all materials to site cost of
premoulded expansion joints and fixing the same in position including cost and labour
1
charges for formwork, labour charges for laying, compacting, curing including all other
incidental charges etc.,complete for WEARING COAT 75mm UNIFORM THICKNESS
OVER DECK SLAB AND OVER APPROACH SLAB

0.75 Cu.m Cost of Vibrated CC M30 1 Cu.m

Hire charges for mixers


LS
(HW-W0132)
Soft water for curing concrete
LS
(HW -W 0131)

Rate per 1 sq.m

Vibrated Cement Concrete of grade M15 (Nominal mix) using 40mm ISS hard broken
granite metal including cost and conveyance of all materials to site, including cost and
2 labour charges for form work and centering, labour charges for compacting, curing and
all incidental charges etc., complete as per standard specification for Parapet / Base
course below Approach slab.

1.00 Cu.m Cost of Vibrated CC M15 1 Cu.m

sq.m/
Formwork and centering sq.m
Cu.m
Soft water for curing concrete
LS
(HW -W 0131)

227
Sl.
Qty Unit Description of work Rate Per Amount
No.
Hire charges for Hire charges
for Tools and plants (HW -W LS
0132)

Rate per 1 Cu.m

Vibrated Reinforced cement concrete of grade M30/M35 (Design mix) using 20mm and
below ISS hard broken granite metal including cost and conveyance of all materials to
site and cost of cement excluding cost and fabrication of steel but including cost of form
3
work, labour charges for mixing, transporting, laying and curing concrete, working at
heights, hire charges for Hire charges for Tools and plants including all other incidental
charges etc., complete for Approach Slabs / Safety Kerb / Median
1.00 Cu.m Cost of Vibrated CC M30/M35 1 Cu.m
sq.m/
Formwork and centering sq.m
Cu.m
Soft water for curing concrete
LS
(HW -W 0131)
Hire charges for Hire charges
for Tools and plants (HW -W LS
0132)
Rate per 1 Cu.m
Vibrated Reinforced cement concrete of grade M30 (Design mix) using 20mm and
below HBG metal including cost and conveyance of all materials to site and cost of
cement excluding cost and fabrication of steel but including cost of form work, labour
4
charges for mixing, transporting, laying and curing concrete, working at heights, hire
charges for Hire charges for Tools and plants including all other incidental charges etc.,
complete for Hand Rails and Posts
Cu.m Cost of Vibrated CC M30 1 Cu.m
sq.m/
Formwork and centering sq.m
Cu.m
Soft water for curing concrete
LS
(HW -W 0131)
Hire charges for Hire charges
for Tools and plants (HW -W LS
0132)
Rate per 1 Rm
Vibrated Reinforced cement concrete of grade M40 (Design mix) using 20mm and
below ISS hard broken granite metal including cost and conveyance of all materials to
site and cost of cement excluding cost and fabrication of steel but including cost of form
5
work, labour charges for mixing, transporting, laying and curing concrete, working at
heights, hire charges for Hire charges for Tools and plants including all other incidental
charges etc., complete for Crash Barrier .
1.00 Cu.m Cost of Vibrated CC M40 1 Cu.m
sq.m/
Formwork and centering sq.m
Cu.m
Soft water for curing concrete
LS
(HW -W 0131)

228
Sl.
Qty Unit Description of work Rate Per Amount
No.
Hire charges for Hire charges
for Tools and plants (HW -W LS
0132)
Rate per 1 Cu.m
Providing and fixing Class I PVC seepage pipes of 110mm dia of required lengths
for abutments and return walls including costs and conveyance of all materials to work
6
site and labour charges for fixing etc., complete to drain from the backfill as per section
2706 of MORTH specification (Rev- V)
Cost of PVC seepage pipe
1.00 Rm Rm
including (M-0865)
Seepage pipe fixing charges
1.00 Rm Rm
(HW-W0135)
Rate per 1 Rm
Providing FILTER MEDIA behind abutments and return walls for 600mm thickness
using filter material conforming to clause 309.3.2.B of MORTH well packed with smaller
7 size towards the soil and bigger size towards the wall including cost and conveyance of
all materials to worksite and including labour charges and all other incidental charges
etc.,complete.
Cost of IRC metal 53mm to
1.00 Cu.m 1 Cu.m
5.75mm
Labour charges for filling
1.00 Cu.m 1 Cu.m
(W-0075)
Rate per 1 Cu.m
Filling behind Abutments and return walls with clean gritty free draining gravel
including cost of gravel having pi value less than 6, conveyance of gravel to worksite.
8 Laying, handling charges and filling in layers tamping under optimum moiture content
to get the maximum density, including watering, with all leads and lifts for water and
all other incidental charges etc., complete.
1.16 Cu.m Cost of Gravel 1 Cu.m
Labour charges for filling
1.00 Cu.m 1 Cu.m
(W-0075)
Rate per 1 Cu.m
Granite rough stone dry packing for the specified thickness for apron using good size
granite rough stone, properly wedged with quarry spalls including cost and conveyance
9
ofall materials to site labour charges for packing the same in position and all other
incidetal charges etc., complete for Apron.
11.00 Cu.m Cost of Rough stone (M-0045) 1 Cu.m
3.50 Nos Wodder (L-0050) Each
10.60 Nos Mazdoor I Class (L-0073) Each
7.10 Nos Mazdoor II Class (L-0098) Each
Rate per 10 Cu.m
Rate per 1 Cu.m

229
Sl.
Qty Unit Description of work Rate Per Amount
No.
Stone dust filling including cost and conveyance of Stone dust to worksite including
labour charges for filling in layers as specified by the departmental officers including
10 watering with all leads for water including labour charges for compacting, tamping,
ramming under optimum moisture content to obtain the maximum density and all other
incidental charges etc. complete as per standard specification.
Cost of Stone dust
1.00 Cu.m 1 Cu.m
(HW-M-0123)
Labour charges for filling
1.00 Cu.m 1 Cu.m
(W-0075)
Rate per 1 Cu.m

PILE LOAD TEST CHARGES CALCULATION


Total number of piles in bridge Nos

Total length of pile m


As per MORTH Vth revision
clause 1113.1

Initial load test

Routine load test Nos.

Total number of Initial tests Nos.


Total number of Routine load
Nos.
tests
Load on Abutment MT

Load on Pier MT

Initial load test in Abutment

MT Initial load test charges MT


Cost of RCC cast in situ bored
Rm Rm
pile
MT Cost of steel for pile MT

MT Cost of MS liners MT

Initial load test in Pier

MT Initial load test charges MT


Cost of RCC cast in situ bored
Rm Rm
pile

230
Sl.
Qty Unit Description of work Rate Per Amount
No.
MT Cost of steel for pile MT

MT Cost of MS liners MT

MT Routine load test in Abutment MT

MT Routine load test in Pier MT

ABSTRACT
Cost of Initial load test in
No. Each
Abutment
No. Cost of Initial load test in Pier Each

No. Cost of Routine load test in abut Each

No. Cost of routine load test in pier Each

Cost of required per Rm of pile

Cost per Rm / Rm

CENTERING RATE CALCULATIONS


Steel centering for sides and sofits including supports and strutting upto 3.00m height
for plain surface such as RCC slab, rectangular beams, T or L beams lintels bedblocks,
staircase waist and landing slab landing beams, canopy etc., with all cross bracings
1 using mild steel sheets of size 90cm x 60cm x 10 gauge stiffened with welded mild steel
angles of size 25mm x 25mm x 6mm for boarding laid over silver oak (country wood)
joist of size 10cm x 6.50cm spaced at about 90 cms c/c and supported by steel props
spaced at 75cm c/c etc., complete.
Sub Data 1
Cost of MS sheets and angles
for each set
Weight of MS sheet
90cmx60cmx10 gauge
3.175 x 7850 /1000 = 24.92 kg/sq.m

0.90 x 0.60 x 24.92 = 13.46 kg/ No.

Weight of MS angle of size 25 x


25 x 3mm
3.60m x 1.11 kg / m = 4.00 kg/ No.

231
Sl.
Qty Unit Description of work Rate Per Amount
No.

Cost of MS sheets, 90cm x


13.46 kg / kg
60cm x 10 gauge (M-0186)
Cost of MS angle, 25mm x
4.00 kg / kg
25mm x 3mm (M-0187)
Cutting, bending and welding
charges (10% of material)

Sub Data 2
Cost of MS angle and sheet
19 Nos Each
(Assuming for 40 uses)
Total

Cost for single use / 40

Silver Oak country wood joist,


0.12 Cu.m 1cm x 6.5cm at about 90cm c/c Cu.m
etc. (For 5 uses) (M-0159)
For 1 use /5

Steel props,
40 * 11.10 * Rs. / 40
Total

For 1 use

Cost for single use

Main Data

1.00 Use Cost of M.S sheets and angles 1 Use


Cost of Silver oak joists and
1.00 Use 1 Use
steel props
3.80 Nos Carpenter I Class (L-0016) Each

5.40 Nos Mazdoor I Class (L-0073) Each

1.00 No Fitter II class (L-0067) Each

LS Add for welding grills nails etc., LS

232
Sl.
Qty Unit Description of work Rate Per Amount
No.
Add for oiling for MS sheets and
LS LS
edges etc
0.00

Rate per 10 sq.m

Rate per 1 sq.m

1 Centering for Foundation, Pile cap, Pedestal etc.,

1.00 sq.m Centering rate sq.m

Deduct for strutting charges

0.30 Nos Carpenter I Class (L-0016) Each

0.30 Nos Mazdoor I Class (L-0073) Each

Total per 10 sq.m

Rate per 1 sq.m

Centering for Abutment, Capping beam, Bed Block, Crash barrier, Parapet
2
etc.,
1.00 sq.m Centering rate sq.m
Add 10% extra for vertical
1.00 sq.m sq.m
surfaces
Total per 1 sq.m

3 Centering for Columns piers, rectangular piers etc,

1.00 sq.m Centering rate sq.m


Add 100% extra for vertical
1.00 sq.m sq.m
surfaces
Total per 1 sq.m

233
Sl.
Qty Unit Description of work Rate Per Amount
No.

CENTERING RATE CALCULATIONS


for Bridge Super Structure
Steel centering for sides and sofits including supports and strutting upto 3.00m height
for plain surface such as RCC slab, rectangular beams, T or L beams lintels bedblocks,
staircase waist and landing slab landing beams, canopy etc., with all cross bracings
1 using mild steel sheets of size 90cm x 60cm x 10 gauge stiffened with welded mild steel
angles of size 25mm x 25mm x 6mm for boarding laid over silver oak (country wood)
joist of size 10cm x 6.50cm spaced at about 90 cms c/c and supported by iron gribs
etc., complete.
Sub Data 1

Cost of MS sheets and angles for each set


Weight of MS sheet 90cmx60cmx10
gauge
3.175 x 7850 /1000 = 24.92 kg/Sq.m

0.90 x 0.60 x 24.92 = 13.46 kg/ No.

Weight of MS angle of size 25 x 25 x


3mm
3.60m x 1.11 kg / m = 4.00 kg/ No.

Cost of MS sheets,
13.46 kg / kg
90cm x 60cm x 10 gauge (M-0186)
Cost of MS angle,
4.00 kg / kg
25mm x 25mm x 3mm (M-0187)
Cutting, bending and welding
charges (10% of material)

Sub Data 2
Cost of MS angle and sheet
19 Nos Each
(Assuming for 40 uses)
Total

Cost for single use / 40

Silver Oak country wood joist,


0.12 Cu.m 1cm x 6.5cm at about 90cm c/c Cu.m
etc. (M-0159)
For 1 use
Size of gribs, 0.60m x 0.60m x
1.20m

234
Sl.
Qty Unit Description of work Rate Per Amount
No.
Gribs, 36 x 100 x 70 / 40 6300.00
Cross bracings, 2 x 19.20m x 11.10m x
745.92
70 / 40
Steel props, 40 * 11.10 * 70 /
40
Total

For 1 use

Cost for single use

For Superstructure :

Main Data

1.00 Use Cost of M.S sheets and angles 40 uses

1.00 Use Cost of Silver oak joists and steel props 5 uses

3.80 Nos Each

5.40 Nos Each

1.00 No Each

LS Add for welding grills nails etc., LS

LS Add for oiling for MS sheets and edges etc LS

Total per 10 sq.m

Rate per 1 Sq.m

(Height from Sill level to BOD)

Rate
Up to 4.5m height
x1

For 4.5 to 7.5m height - 50% Rate x


Extra 1.5

For above 7.50m height - 100% Rate x


Extra 2.0

Note: In this standard Data book (Highways Department) the code as per Standard Schedule of Rates has
been indicated against the corresponding items for reference only.

The conveyance charges should be included accordingly for those items.

235
C&M - OBSERVED DATA

236
OBSERVED DATA ADOPTED IN CIRCLE OFFICE (PART)

Sl.
Qty Unit Description of work Rate Per Amount
No.
Hire charges for providing and maintaining of Barricades of minimum 2.00 m length
and 1.5m height, in the working locations of drain using ISMC 75 transom and verticals
with min wt of 7.14 kg / m in addition with L angle support of 50 x 50 x 5 mm size and
covered with 3 mm thick M.S sheet of Size 2m x 1.20m including nailing to the floor, cost
of fabrication, transportation, lifting, and placing, with reflective stickers of required
1
size and placing the barricades without hindrance to the traffic, including shifting of
barricads and the e barricading shall remain in the same location for minimum period
of 21 days or till completion of work on the particular location. (All the barricading
material shall be disposed and taken away from the site by the contractor. No additional
payment shall be made for extended period of contract) etc complete.
ISMC 75 Transom ( 2 Nos x
28.56 Kgs Kg
2.00 x 7.14 )
ISMC 75 Verticals ( 2 Nos x
25.70 Kgs Kg
1.80 x 7.14 )
M.S Sheet ( 3 mm thick plate)
56.52 Kgs Kg
( 2.00 x 1.20 x 23.55)
Angle Size 50 x 50 x 5mm
(additional Support)
19.76 Kgs Kg
( 2 x 1.00 ) + 2.00 + 1.20 x
*3.8

D/F Depreciation cost @ 30%

Labour charges for Fabrication


130.54 Kgs Kg
(S. Item No 167 Pg34)
HD Sticker (HW -- W0115) P.No
4.00 Nos Nos
2.70

4.80 Sq.m Painting Sq.m

Total cost for 2Rm

Cost per Rm

Sundries

Rate per Rm for 1.5 years

Rate per Rm / Day

Rate per Rm

237
Sl.
Qty Unit Description of work Rate Per Amount
No.
Providing RCC Centre Median height of 0.250m at bottom 0.250m at middle 0.400 at
top and to a total height of 0.900m from the road level including cost and conveyance
of all materials to work site including providing form work for shuttering on both sides
and chamfered edges at top, including cost of steel reinforcement as per the Bar
bending schedule appended here with, fabrication and placing in position of steel grills
including cost of binding wire, laying of R.C.C M25 concrete using ISS HBG graded
metal including cost and conveyance of all materials to work site from the approved
2
sources including labour charges for mixing laying curing etc middle of the median as
directed by the departmental officers, Rendering Smoothness over the CC surface with
10 kg of cement for 10 Sq.m area and painting two coats over the CC surfaces with best
approved quality of synthetic enamel paint including primer etc., including all labour
charges, hire and fuel charges for the Hire charges for Tools and plants employed and
as per the standard specification and in accordance with the drawings appended here
with and as directed by the departmental officers etc., complete.

2.07 Sq.m/RM Form work Sq.m/RM

26.90 Kg Steel Kg

0.34 Cu.m Vibrating RCC M25 Cu.m

Painting 2 coats synthetic


2.07 Sq.m Sq.m
enamel paint

L.S Sundries for curing charges L.S

For 1 Rm

Providing and Laying 25mm thick Mastic Asphalt Wearing Course with paving grade
bitumen meeting the requirements given in table 500 -- 29 prepared by using mastic
cooker and slope after cleaning the surface including providing and anto skid surface
with bitumen percolated fine grained hard stone chipping of 13.2mm nominal size at
3
the rate of 0.005 Cu.m per 10Sq.m and at an approx spacing of 10 cm center to center
in both directions pressed into surface when the temprature of surfaces is not less than
the 100 centigrade protruding 1mm to 4mm over mastic surface all complete as per
standard specification.
BITUMEN MASTIC WEARING
COAT 25 MM THICK

Bitumen Mastic Wearing Coat =


25mm thick

Unit -- 1 1 Sq.m and taking


output as 17.40 Sq.m

HIRE CHARGES FOR MACHINERIES

Mastic Cooker

238
Sl.
Qty Unit Description of work Rate Per Amount
No.
Hire Charges / Day ( Local Rate )
Full Charges @ 100 Litres of
100
Diesel @

Hire Charges per 17.40 Sq.m

Hire Charges per 10 Sq.m

Mazdoor I Class for allowing


1.50 Nos Each
mastic covers (HW-L0106)

0.50 Nos Mazdoor II Class (HW-L0107) Each

Mazdoor I Class for spraying


3.50 Nos Each
(HW-L0104)
Mazdoor II Class for surface
0.25 Nos Each
(HW-L0107)

0.50 Nos Head Mazdoor Each

Total Labour Charges for 17.40


Sq.m

Labour Charges for 10.00 Sq.m

DATA

Cost of Bitumen of 60 / 70
80.00 Kg MT
Grade

0.11 Cu.m
Cu.m Cost of Lime Powder (M-0133)
(or)
220 Kg

0.08 Cu.m Cost of Quarry Dust (M-0123) Cu.m

(or)
160 kg
Cost of 13.20 mm IRC Metal
0.20 Cu.m Cu.m
(M-0103)
(or)
300 kg

10.00 Sq.m Hire Charges for Machineries 10 Sq.m

10.00 Sq.m Labour Charges 10 Sq.m

LS For 20mm stones for grips LS

239
Sl.
Qty Unit Description of work Rate Per Amount
No.

Rate For 10Sq.m of 25mm thick

Engaging JCB for road maintenance activities including pay and allowances of crews
4
and fuel charges etc., complete as directed by departmental Engineers.
Hire Charges for JCB
8.000 Hrs /8 Hrs
(H-0094)
40.00 lit Fuel Charges / Hr. 5.00 Lit /Lit
Driver (Heavy Duty)
1.00 No (SOR 2024 - 25, L0024, Pg. no. /Each
12
Total

Rate for 8 Hours

Rate per 1 Hour


Providing RCC Pre cast Box Culvert ( Fabrication and Manufacturing of Solid Precast
Cement Element ) of Size including cost of RMC M35, Steel, Erection and Installation
of Precast / Pre-stressed Concrete Elements in correct and final position. (Solid Concrete
Wall Elements) , hire charges for Crane 20 Ton Capacity,Transportation of Precast
5
Elements by Flat Bed Trailor (Up to 15 Kilometere) including cost and conveyance of all
materials to work site from the approved sources including labour charges for mixing
laying curing etc as per standard specification and in accordance with the drawings as
directed by the departmental officers etc., complete.
Cost of RMC M 35 (as per SOR
Cu.m No
-W-0377)
MT Cost of Steel Kg

Cu.m Crane 20 Ton Capacity (H-0104) Cu.m


Transportation of Precast
MT Elements by Flat Bed Trailor (Up Sq.m
to 15 Kilometere) (W-0281)
Rate For 1.50 Rm

Rate For 1 Rm
Construction of reinforced, dowel jointed, plain cement concrete pavement over a
prepared sub base with 43 grade cement @ 400 kg per Cu.m, coarse and fine aggregate
conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed
in a batching and mixing plant as per approved mix design, transported to site, laid
6 with a fixed form or slip form paver, spread, compacted and finished in a continuous
operation including provision of contraction, expansion, construction and longitudinal
joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip,
dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and
grades as per drawing
1.00 Cu.m Cement Mortar M40 Cu.m

Sq.m Shuttering cost Sq.m

0.009 MT 32mm Steel dowel bars MT

240
Sl.
Qty Unit Description of work Rate Per Amount
No.
Dummy cap for Dowel Bar
0.004 MT MT
dowel bars

0.0011 MT 16mm Deformed steel tie bars MT

0.05 Cu.m M sand (M-0125) Cu.m

Impermeable platic sheet-125


3.50 Sq.m Sq.m
micron

0.900 Cu.m Sealent filling Cu.m

0.016 Cu.m Pre-moulded joint filler Cu.m

Primer, Barker road, Masking


LS
tape

Laying cost - Labour LS

Machinery

Concrete joint Cutting Machine


LS
including labour

Screed Paver LS

Finishing surface with textured


3.330 Sq.m Sq.m
broom
Soft water for curing concrete
Cu.m
(HW-W0131)
Hire Charges for Hire charges
for Tools and plants (HW- Cu.m
W0132)

Rate for 1 Cu.m

Constuction of Cast in Situ Catch Pit of inner size 450x 450 x 450mm including
necessary earth work excavation including providing foundation in PCC 1:4:8 under
wall 150mm thick and cutting the existing storm water of size 300 x 150mm for fixing
2 Nos of 160mm dia PVC pipe of the storm water drain mouth with RCC Cast in situ
wall of size 120mm in RCC 1:1.5:3 with steel of 18.32 KG including fixing Ductile Iron
7
Gratings hinged with Frame clear opening 450 x 450mm Ductile Iron Gratings hinged
with Frame of Class C -- 250 (Heavy Duty 25MT) of appropriate size and load capacity
of approved brand confirming to BSEN 124:1994 Standards. Raw material should be of
grade SG/500/7 as per IS-1865. Product should be tested in NABL/NTH accredited test
lab for load capacity

0.38 Cu.m Earthwork Cu.m

0.048 Cu.m PCC M15 40mm metal Cu.m

0.147 Cu.m M25 Box Cu.m

16.55 KG Steel Kg

Grating Size 300 x 200 mm


1.00 No No
(HW-W022)

241
Sl.
Qty Unit Description of work Rate Per Amount
No.

2.59 Sq.m Centering Sq.m

PVC Pipe 160mm dia


(Drain wall 0.250 + Catch pit
0.74 RM RM
Wall 0.120) = 0.37 RM 2 Nos
x 0.37 = 0.74 RM (M-0866)
SUPPLYING AND FIXING Ductile
Iron grating hinged with frame
clear opening of size 450 x
450mm Ductile Iron grating
hinged with frame of class
C-250 (Heavy Duty 25MT)
of appropriate size and load
1.00 No capacity of approved brand No
confirming to BSEN 124:1994
Standards. Raw material should
be of grade SG/500/7 as per
IS-1865. Product should be
tested in NABL/NTH accredited
test lab for load capacity
(SWD 27 -- COC)

Sundries

Rate For 1No.

242
C&M - ROAD

243
Highways Schedule of Rates
IRC HBG Metal Rates

Si.No. Description Rate

1 90mm (HW-M0093) /Cum


2 75mm (HW-M0094) /Cum
3 63mm (HW-M0095) /Cum
4 53mm (HW-M0096) /Cum
5 46.50mm (HW-M0097) /Cum
6 45mm (HW-M0098) /Cum
7 37.50mm (HW-M0099) /Cum
8 26.50mm (HW-M0100) /Cum
9 25mm (HW-M0101) /Cum
10 22.40mm (HW-M0102) /Cum
11 13.20mm (HW-M0103) /Cum
12 11.20mm (HW-M0104) /Cum
13 6.70mm (HW-M0105) /Cum
14 6mm (HW-M0105) /Cum
15 5.60mm (HW-M0105) /Cum
16 4.75&Below (HW-M0106) /Cum
RATES OF WORK AS PER PWD SCHEDULE OF RATES

1 Clearing Heavy Jungle (W-0001) /Sqm

2 Clearing Light Jungle (W-0002) /Sqm

3 Clearing Scrub Jungle (W-0003) /Sqm

4 Cleaning Juliflora Jungle with Uprooting (W-0007) /Sqm

5 Cleaning Juliflora Jungle without Uprooting (W-0008) /Sqm

6 Earth Work Excavation SS 20B (W-0061) /Cum

7 Earth Work Excavation SS 20B for Foundation /Cum

8 Refilling with excavated Sand (W-0074) /Cum

9 Refilling with excavated soil(other than Sand)(W-0075) /Cum

10 Vibrator Charges for PCC rate per Cum (W-0100) /Cum

244
Si.No. Description Rate

11 Vibrator Charges for RCC rate per Cum (W-0101) /Cum

12 Mixing Mortar Cement by Manual (W-0164) /Cum

13 Mixing Mortar Cement by Machine (W-0165) /Cum

Labour Charges for Road work

1 Bitumen Heat Master Operator (HW-L0099) /Day

2 Bitumen Raker Man (HW-L0100) /Day

3 Mini Hot Mix Plant Operator (HW-L0101 /Day

4 Bitumen Sprayer Man (HW-L0102) /Day

5 Gunnuting Gun Operator (HW-L0103) /Day

6 Head Mazdoor (HW-L0104) /Day

7 Gunnuting Plant Operator (HW-L0105) /Day

8 Road Mazdoor Grade - I (HW-L0106) /Day

9 Road Mazdoor Grade -II (HW-L0107) /Day

245
Cement Rate

Cost of Cement as per PWD Schedule of Rates =

Deduct loading and unloading charges = (-)

Basic Cement Rate

Add Storage Charges at 5% of Basic Cost

Cost of Cement incl. Storage at 5% of Basic cost

Rate for per MT

Steel Rate

Cost of Steel as per PWD Schedule of Rates =

Deduct loading and unloading charges = (-)

Basic Steel Rate

Add Storage Charges at 5% of Basic Cost

Cost of Steel incl. Storage at 5% of Basic cost

Rate for per MT

246
Hire Charges for Machinery

Si.No. Description Rate


1 Power Roller (HW-H0077) /Day
2 Water Sprinkler (HW-H0083) /Day
3 Mini Hot Mix Plant (HW-H0082) /Day
4 Bitumen Boiler per Day (HW-H0092) /Day
5 Vibrator Roller/ Hr /Hour
6 Water / KL (HW-H0002) /KL
7 Central Hot Mixing Plant (HW-H0091) /Day
8 Vibratory Roller (HW-H0081) 8-10 Tonne /Day
9 Paver Finisher (HW-H0080) /Day
10 Tipper (10 Tonnes) (HW-H0078) /Day
11 Loader 5 cum capacity (HW-H0079) /Day
12 Water tanker (WMM) (HW-H0089) /Day
13 Motor grader (110 HP) (HW-H0087) /Day
14 Pug mill (Base Mix Plant) (HW-H0090) /Day
15 Electrical Generator 125KVA (HW-H0085) /Day
16 Tractor per hour /Hour
17 Tipper Trucks-per tonne /km (HW-H0003) /tonne/Km
18 Rotovator per hour /Hour
19 Wet Mix Plant 75MT capacity (HW-H0084) /Day
20 Bitumen emulsion sprayer/10 sqm (HW-H0004) /10Sqm
21 Paver Finisher (more than 5m) per hour (HW-H0001) /Hour
22 Pneumatic tyred roller per hr (HW-H0005) /Hour
23 Tractor Rotovator (incl fuel /day) (HW-H0088) /Day
24 Water 6KL Capacity (GSB) (HW-H0086) /Day
25 Tractor with dozer (HW-H0093) /Day
26 JCB (HW-H0094) /Day
27 Dewatering Pump with Engine (HW-H0095) /Day
28 Ajax Self Loading Concrete Mixer (HW-H0096) /Day
29 Milling Machine with 1 Meter Drum Width (HW-H0007) /Hr.
30 Vibrator Soil Compactor (Earth/Soil, GSB, WMM)(HW-H0006) /Hr.
31 Plate Compactor (HW-H0030) /Hr.
32 Kerb Casting and laying Machine (HW-H0028) /Hr.
33 Transit Truck Agitator for Transportation (6Cum) (HW-H0039) /Hr.

247
WORKING OUT METAL RATE FOR GRANULAR SUB BASE

Granular Sub Base Grade - V

Cost of 53mm to 9.50mm Broken Stone

Cost of 53mm (HW-M0096) Metal /Cum.

Cost of 46.50mm (HW-M0097) Metal /Cum.

Cost of 45mm (HW-M0098) Metal /Cum.

Cost of 37.50mm (HW-M0099) Metal /Cum.

Cost of 26.50mm (HW-M0100) Metal /Cum.

Cost of 25mm (HW-M0101) Metal /Cum.

Cost of 22.40mm (HW-M0102) Metal /Cum.

Cost of 13.20mm (HW-M0103) Metal /Cum.

Cost of 11.20mm (HW-M0104) Metal /Cum.

Average Rate /Cum.

Cost of 9.50mm to 2.36mm Broken Stone /Cum.

Cost of 6.70mm (HW-M0105) Metal /Cum.

Cost of 6mm (HW-M0105) Metal /Cum.

Cost of 5.60mm (HW-M0105) Metal /Cum.

Cost of 4.75&Below (HW-M0106) Metal /Cum.

Cost of 2.36mm (M-0106) Metal /Cum.

Average Rate /Cum.

Cost of 2.36mm & Below of Sand

Cost of 2.36mm (M-0106) Metal

Rate /Cum.

METAL RATE FOR GRANULAR SUB BASE (TABLE NO.400.1)

Granular Sub Base Grade - III

Cost of 46.50 - 26.50 mm Broken Stone

Cost of 46.50mm (HW-M0097) Metal /Cum.

Cost of 45mm (HW-M0098) Metal /Cum.

Cost of 37.50mm (HW-M0099) Metal /Cum.

Cost of 26.50mm (HW-M0100) Metal /Cum.

Average Rate /Cum.

Cost of 26.50 - 4.75mm Broken Stone /Cum.

248
Cost of 25mm (HW-M0101) Metal /Cum.

Cost of 22.40mm (HW-M0102) Metal /Cum.

Cost of 13.20mm (HW-M0103) Metal /Cum.

Cost of 11.20mm (HW-M0104) Metal /Cum.

Cost of 6.70mm (HW-M0105) Metal /Cum.

Cost of 6mm (HW-M0105) Metal /Cum.

Cost of 5.60mm (HW-M0105) Metal /Cum.

Average Rate /Cum.

Cost of 4.75mm & Below of Sand

Cost of 4.75&Below (HW-M0106) Metal /Cum.

Rate /Cum.

WORKING OUT METAL RATE FOR

WET MIX MACADAM

Cost of 45mm to 22.40mm Broken Stone

Cost of 45mm (HW-M0098) Metal /Cum.

Cost of 37.50mm (HW-M0099) Metal /Cum.

Cost of 26.50mm (HW-M0100) Metal /Cum.

Cost of 25mm (HW-M0101) Metal /Cum.

Cost of 22.40mm (HW-M0102) Metal /Cum.

Average Rate /Cum.

Cost of 22.40mm to 2.36mm Broken Stone

Cost of 22.40mm (HW-M0102) Metal /Cum.

Cost of 13.20mm (HW-M0103) Metal /Cum.

Cost of 11.20mm (HW-M0104) Metal /Cum.

Cost of 6.70mm (HW-M0105) Metal /Cum.

Cost of 6mm (HW-M0105) Metal /Cum.

Cost of 5.60mm (HW-M0105) Metal /Cum.

Cost of 4.75&Below (HW-M0106) Metal /Cum.

Average Rate /Cum.

WORKING OUT METAL RATE FOR

249
CRUSHER RUN MACADAM

Cost of 53mm to 45 mm Broken Stone

Cost of 53mm (HW-M0096) Metal /Cum.

Cost of 46.50mm (HW-M0097) Metal /Cum.

Cost of 45mm (HW-M0098) Metal /Cum.

Average Rate /Cum.

Cost of 45mm - 22.40mm Broken Stone /Cum.

Cost of 45mm (HW-M0098) Metal /Cum.

Cost of 37.50mm (HW-M0099) Metal /Cum.

Cost of 26.50mm (HW-M0100) Metal /Cum.

Cost of 25mm (HW-M0101) Metal /Cum.

Cost of 22.40mm (HW-M0102) Metal /Cum.

Average Rate /Cum.

Cost of 22.40 mm to 5.60mm Broken Stone

Cost of 13.20mm (HW-M0103) Metal /Cum.

Cost of 11.20mm (HW-M0104) Metal /Cum.

Cost of 6.70mm (HW-M0105) Metal /Cum.

Cost of 6mm (HW-M0105) Metal /Cum.

Cost of 5.60mm (HW-M0105) Metal /Cum.

Average Rate /Cum.

Cost of 2.36mm (M-0106) Metal

Rate /Cum.

250
WORKING OUT METAL RATE FOR BM 50mm thick
Qty Unit Description Rate Per Amount

For 26.50 mm to 13.20 mm IRC

0.180 Cum Cost of 25 & 22.40mm IRC (Average) /Cum

0.820 Cum Cost of 13.20mm IRC /Cum

Rate of metal for 26.50 mm to 13.20 mm IRC for BM 50 MM Rs.

For 13.20 mm to 2.36 mm IRC


Cost of 11.2, 6.70, 6,5.6 & 4.75mm
0.570 Cum /Cum
(Average)
0.430 Cum Cost of 2.36mm IRC /Cum

Rate of metal for 13.20 mm to 2.36 mm IRC for BM 50 MM Rs.

For 2.36 mm & below

1.000 Cum Cost of 2.36mm IRC /Cum

Rate of metal for 2.36 mm IRC for BM 50 MM Rs.

WORKING OUT METAL RATE FOR DBM 50mm thick

For 26.50 mm to 13.20 mm IRC

0.160 Cum Cost of 26.50mm IRC /Cum

0.370 Cum Cost of 25 & 22.40mm IRC (Average) /Cum

0.470 Cum Cost of 13.20mm IRC /Cum

Rate of metal for 26.50 mm to 13.20 mm IRC for DBM 50 MM Rs.

For 13.20 mm to 2.36 mm IRC


Cost of 11.2, 6.70, 6,5.6 & 4.75mm
0.550 Cum /Cum
(Average)
0.450 Cum Cost of 2.36mm IRC /Cum

Rate of metal for 13.20 mm to 2.36 mm IRC for DBM 50 MM Rs.

For 2.36 mm & below

1.000 Cum Cost of 2.36mm IRC /Cum

Rate of metal for 2.36 mm IRC for DBM 50 MM Rs.

WORKING OUT METAL RATE FOR BM 80mm thick

For 37.50 mm to 13.20 mm IRC

251
Qty Unit Description Rate Per Amount

0.100 Cum Cost of 37.50mm IRC /Cum

0.380 Cum Cost of 26.50mm IRC /Cum

0.520 Cum Cost of 25,22.40 &13.20mm IRC (Average) /Cum

Rate of metal for 37.50 mm to 13.20 mm IRC for BM 80mm Rs.

For 13.20 mm to 2.36 mm IRC


Cost of 11.2, 6.70, 6,5.6 & 4.75mm
0.830 Cum /Cum
(Average)
0.170 Cum Cost of 2.36mm IRC /Cum

Rate of metal for 13.20 mm to 2.36 mm IRC for BM 80mm Rs.

For 2.36 mm & below

1.000 Cum Cost of 2.36mm IRC /Cum

Rate of metal for 2.36 mm IRC for BM 80mm Rs.

WORKING OUT METAL RATE FOR DBM 75 mm thick

For 37.50 mm to 13.20 mm IRC

0.140 Cum Cost of 37.50mm IRC /Cum

0.490 Cum Cost of 26.50mm IRC /Cum

0.370 Cum Cost of 25,22.40 &13.20mm IRC (Average) /Cum


Rate of metal for 37.50 mm to 13.20 mm IRC for DBM 75 mm
Rs.
thick
For 13.20 mm to 2.36 mm IRC
Cost of 11.2, 6.70, 6,5.6 & 4.75mm
0.370 Cum /Cum
(Average)
0.630 Cum Cost of 2.36mm IRC /Cum
Rate of metal for 13.20 mm to 2.36 mm IRC for DBM 75 mm
Rs.
thick
For 2.36 mm & below

1.000 Cum Cost of 2.36mm IRC /Cum

Rate of metal for 2.36 mm IRC for DBM 75 mm thick Rs.

WORKING OUT METAL RATE FOR BC 30/40 mm thick

For 19.00 mm to 9.50 mm IRC

0.240 Cum Cost of 13.20mm IRC /Cum

252
Qty Unit Description Rate Per Amount

0.760 Cum Cost of 11.20mm IRC /Cum

Rate of metal for 19.00 mm to 9.50 mm IRC for BC 30/40 mm


Rs.
thick

For 9.50 mm to 2.36 mm IRC

0.660 Cum Cost of 6.70, 6,5.6 & 4.75mm (Average) /Cum

0.340 Cum Cost of 2.36mm IRC /Cum


Rate of metal for 9.50 mm to 2.36 mm IRC for BC 30/40 mm
Rs.
thick
For 2.36 mm & below

1.000 Cum Cost of 2.36mm IRC /Cum

Rate of metal for 2.36 mm IRC for BC 30/40 mm thick Rs.

WORKING OUT METAL RATE FOR BC 50 mm thick

For 26.50 mm to 13.20 mm IRC

0.160 Cum Cost of 25mm & 22.40 mm IRC (Average) /Cum

0.840 Cum Cost of 11.20mm IRC /Cum

Rate of metal for 26.50 mm to 13.20mm IRC for BC 50 mm thick Rs.

For 13.20 mm to 2.36 mm IRC


Cost of 11.20,6.70, 6,5.6 & 4.75mm
0.730 Cum /Cum
(Average)
0.270 Cum Cost of 2.36mm IRC /Cum

Rate of metal for 13.20 mm to 2.36 mm IRC for BC 50 mm thick Rs.

For 2.36 mm & below

1.000 Cum Cost of 2.36mm IRC /Cum

Rate of metal for 2.36 mm IRC for BC 50 mm thick Rs.

WORKING OUT METAL RATE FOR CLOSE GRADED PREMIX CARPET

For 13.20 mm to 11.20 mm IRC

1.000 Cum Cost of 11.20 mm IRC /Cum

Rate of metal for 13.20 mm to 11.20mm Rs.

For 11.20 mm to 5.60 mm IRC

253
Qty Unit Description Rate Per Amount

1.000 Cum Cost of 6.70mm IRC /Cum

1.000 Cum Cost of 6mm IRC /Cum

1.000 Cum Cost of 5.60mm IRC /Cum

Rate of metal for 11.20 mm to 5.60 mm IRC Rs.

For 5.6MM to 2.80 mm & below

1.000 Cum Cost of 4.75mm IRC /Cum

Rate of metal for 5.60 mm - 2.80 mm Rs.

254
Granular Sub-Base with Close Graded Material (Table:- 400-1)

Rate
Description Unit Quantity Cost (Rs)
(Rs)
A Plant Mix Method

Construction of granular sub-base by providing close graded Material, mixing in a


mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in
uniform layers with motor grader on prepared surface and compacting with vibratory soil
compactor to achieve the desired density, complete as per clause 401
Taking output = 225 cu.m (450 tonne)

a) Labour

Mate day 0.400

Mazdoor skilled day 2.000

Mazdoor day 8.000

Total

b) Machinery

Wet Mix Plant 75 tonne capacity/ hr hour 6.000

Electric generator 125 KVA hour 6.000

Water tanker 6 KL capacity 5 km lead with hour 4.500


one trip per hour
Front end loader 1 cu.m bucket capacity hour 6.000

Tipper 10 tonne; conveyance: 40 km tonne. 450 x L


km
Add 10 per cent of cost of carriage to
cover loading and unloading
Motor Grader 110 HP hour 6.000

Vibratory Soil Compactor (HW-H0006) hour 6.000

Total

c) Material as per table 400-1

For Grading-V Material (Filter/ Separation Layer at Bottom)


Cost of 53mm to 9.50mm Broken Stone cu.m 144.000

Cost of 9.50mm to 2.36mm Broken Stone cu.m 100.000

Cost of 2.36mm & Below of Sand cu.m 43.000

Cost of water KL 27.000

Total

For Grading-III Material (Drainage Layer at Top)


46.5 mm to 26.50 mm cu.m 101.000

255
Rate
Description Unit Quantity Cost (Rs)
(Rs)
26.5 mm to 4.75 mm cu.m 130.000

4.75 mm below cu.m 58.000

Cost of water KL 27.000

Total

(i) Rate per cu.m for grading-V Material

Cost for 225 cu.m = a+b+c

Rate per cu.m = (a+b+c)/225

(ii) Rate per cu.m for grading-III


Material
Cost for 225 cu.m = a+b+c

Rate per cu.m = (a+b+c)/225

256
Granular Sub Base

Hire charges for Machineries

BY PLANT MIX METHOD

Motor Grader including fuel / Hour =Rs. /Hour

Wet Mix Plant 75 tonne capacity/ hr =Rs. /Hour

Vibratory Soil Compactor (HW-H0006)

Hire charges excluding fuel charges per day =Rs.


Fuel charges
3.00 lit/Hr x 8.00 Hrs. x /lit =Rs.
per day
Total Hire charges per day including Fuel =Rs.

Hire charges of Vibrator soil compactor per Hour / 8 =Rs. /Hour

Tipper Trucks

Hire charges excluding fuel charges per Hour / 8 =Rs.


Fuel charges
3.25 lit/Hr x /lit =Rs.
per day
Total Hire charges per Hour including Fuel =Rs. /Hour

Water Tanker (HW-H0086)

Hire charges excluding fuel charges per day =Rs.


Fuel charges
/Day /lit =Rs.
per day
Total Hire charges per day including Fuel =Rs.

Hire Charges for Water Tanker per Hour / 8 =Rs. /Hour

Front end loader 5 cu.m capacity (HW-H0079)

Hire charges excluding fuel charges per day =Rs.


Fuel charges
10.00 lit/Hr x 8.00 Hrs. x /lit =Rs.
per day
Total Hire charges per day including Fuel =Rs.

Hire charges of Front end loader per Hour / 8 =Rs. /Hour

257
EARTH WORK FOR BOXING INCL: CONVEYANCE OF CUT EARTH
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on
bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools,
equipments and all incidental charges, removal of other deleterious matter and obstructions,
trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus
materials etc., complete as per standard specification. For Box cutting including conveyance
of cut earth away from the site with average lead
Lead for removal :

1.00 Cu.m. Cost of Boxing cut =Rs.

Km. Conveyance Charges as per PWD Schedule of Rates =Rs.

Rate for 1.00 cu.m. =Rs.

EW for boxing with conveyance = =Rs.

EARTH WORK FOR FORMATION OF EMBANKMENT / SUB GRADE

Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing
on bank with all leads and lifts as per SS20B including cost of all labour charges, materials,
tools, equipments and all incidental charges, including compacting with vibratory soil
compactor, watering, including all hire and fuel charges for all Hire charges for Tools
and plants, removal of other deleterious matter and obstructions, trimming of bottom of
excavation back filling, clearing up the site and disposal of all surplus materials etc., complete
as per standard specification. For embankment / sub grade

CBR : & Lead:

Hire charges for Machineries

Vibratory Soil Compactor (HW-H0006)


Hire charges excluding fuel charges per
=Rs.
day
Fuel charges per day 2.5lit/Hr x 8Hrs x
=Rs.
/Lit
Total Hire charges per day including Fuel =Rs.

Daily Out turn 425Cu.m / Day

Hire charges of Power Roller per Cu.m. = / 425 =Rs.

Water Sprinklers (HW-H0083)


Hire charges excluding fuel charges per
=Rs.
day
Fuel charges per day 3.25lit/Hr x 8Hrs x /Lit =Rs.

Total Hire charges per day including Fuel =Rs.

258
Daily Out turn 1000Cu.m / Day

Hire charges of Water Sprinklers per Cu.m. = / 1000 =Rs.


Total Hire charges for Machineries per
=Rs.
Cu.m =

Labour charges for Laying Earth for 100cu.m

2.00 Nos. Mazdoor Ist Class =Rs.

Total Labour charges for laying earth per 100cu.m =Rs.

Total Labour charges for laying earth per Cu.m = / 100 =Rs.

=Rs.

1.16 Cu.m. Earth Work of CBR =Rs.

1.00 Cu.m. Hire & Fuel charges =Rs.

1.00 Cu.m. Labour charges =Rs.

Rate for 1.00 cu.m. =Rs.

Rate of Earth work for Embankment / Sub Grade of CBR =Rs.

EARTH WORK FOR FORMATION OF EMBANKMENT / SUB GRADE

Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing
on bank with all leads and lifts as per SS20B including cost of all labour charges, materials,
tools, equipments and all incidental charges, including compacting with vibratory soil
compactor, watering, including all hire and fuel charges for all Hire charges for Tools
and plants, removal of other deleterious matter and obstructions, trimming of bottom of
excavation back filling, clearing up the site and disposal of all surplus materials etc., complete
as per standard specification. For embankment / sub grade

CBR : & Lead:

Hire charges for Machineries

Vibratory Soil Compactor (HW-H0006)

Hire charges excluding fuel charges per day =Rs.

Fuel charges per day 2.5lit/Hr x 8Hrs x /Lit =Rs.

Total Hire charges per day including Fuel =Rs.

Daily Out turn 425Cu.m / Day

Hire charges of Power Roller per Cu.m. = / 425 =Rs.

259
Water Sprinklers

Hire charges excluding fuel charges per day =Rs.

Fuel charges per day 3.25lit/Hr x 8Hrs x /Lit =Rs.

Total Hire charges per day including Fuel =Rs.

Daily Out turn 1000Cu.m / Day

Hire charges of Water Sprinklers per Cu.m. = / 1000 =Rs.


Total Hire charges for Machineries per Cu.m
=Rs.
=

Labour charges for Laying Earth for 100cu.m

2.00 Nos. Mazdoor Ist Class =Rs.

Total Labour charges for laying earth per 100cu.m =Rs.

Total Labour charges for laying earth per Cu.m = / 100 =Rs.

=Rs.

1.16 Cu.m. Earth Work of CBR =Rs.

1.00 Cu.m. Hire & Fuel charges =Rs.

1.00 Cu.m. Labour charges =Rs.

Rate for 1.00 cu.m. =Rs.

Rate of Earth work for Embankment / Sub Grade of CBR =Rs.

EARTH WORK FOR BERMS INCL. COMPACTION

Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing
on bank with all leads and lifts as per SS20B including cost of all labour charges, materials,
tools, equipments and all incidental charges, including compacting with power roller,
watering, including all hire and fuel charges for all Hire charges for Tools and plants,
removal of other deleterious matter and obstructions, trimming of bottom of excavation back
filling, clearing up the site and disposal of all surplus materials etc., complete as per standard
specification. For making up of low berms with conveyance

Lead for Earth:


Hire charges for Machineries
Power Roller 8-10 tonne (HW-
H0077)
Hire charges excluding fuel charges
=Rs.
per day
Fuel charges per day 2.5lit/Hr x
=Rs.
8Hrs x /Lit

260
Total Hire charges per day including
=Rs.
Fuel
Daily Out turn 425Cu.m / Day
Hire charges of Power Roller per Cu.m. = / 425 =Rs. /Cu.m

Water Sprinklers (HW-H0083)


Hire charges excluding fuel charges
=Rs.
per day
Fuel charges per day 3.25lit/Hr x 8Hrs x /Lit =Rs.
Total Hire charges per day including
=Rs.
Fuel
Daily Out turn 1000Cu.m / Day
Hire charges of Water Sprinklers per Cu.m. = / 1000 =Rs. /Cu.m
Total Hire charges for Machineries per Cu.m = =Rs. /Cu.m

Labour charges for Laying Earth for 100cu.m


2.00 Nos. Mazdoor Ist Class =Rs.
Total Labour charges for laying earth per 100cu.m =Rs.
Total Labour charges for laying earth per Cu.m = / 100 =Rs. /Cu.m
=Rs.
Cost of Earth including conveyance
1.16
Cost of Earth Work =Rs.
Cu.m.
1.00
Hire & Fuel charges =Rs.
Cu.m.
1.00
Labour charges =Rs.
Cu.m.
Rate for 1.00 cu.m. =Rs.
Rate for Carted Earth with
=Rs.
conveyance

GRAVEL FOR BERMS INCL. COMPACTION

Providing and laying of Gravel including cost and conveyance of the same to work site from
approved quarry including stacking the same to departemental gauge for premeasurement
including all labour charges for laying, spreading, including all hire and fuel charges for power
roller for compaction, etc., complete and as directed by the departmental engineers for making
up of low berms

Lead for
Gravel :
Hire charges for Machineries
Power Roller 8-10 tonne

261
Hire charges excluding fuel charges per day =Rs.
Fuel charges per day (Diesel) 2.50lit/Hr x 8Hr. x /Lit =Rs.
Total Hire charges per day including Fuel =Rs.
Daily Out turn of 8-10 tonne Power Roller 425Cu.m.
Hire charges of Power Roller per Cu.m. = / 425 =Rs.

Water Sprinklers
Hire charges excluding fuel charges per day =Rs.
Fuel charges per day (Diesel) 3.25lit/Hr x 8Hr. X /Lit =Rs.
Total Hire charges per day including Fuel =Rs.
Daily Out turn of Water Sprinklers is 1000Cu.m
Hire charges of Water Sprinklers per Cu.m = /1000 =Rs.

Total Hire charges for Machineries per10sqm = =Rs.

Labour charges for Laying U.S. Gravel for 100cu.m


2.00 Nos Mazdoor Ist Class =Rs.
Total Labour charges for laying gravel per 100cu.m =Rs.
Total Labour charges for laying gravel per Cu.m / 100 =Rs.
=Rs.

Cost of Gravel including conveyance


1.16 Cu.m. Cost of Gravel =Rs.
1.00 Cu.m. Hire & Fuel charges =Rs.
1.00 Cu.m. Labour charges =Rs.
Rate for 1.00 cu.m. =Rs.
Rate of Gravel
=Rs.
for Berms =

COMPACTION ONLY FOR UTILIZING AVAILABLE BOX CUT EARTH

Providing compaction for embankment / making up of low berms using the available
box cut earth including all hire and fuel charges for power roller for compaction, water
sprinkler, including all labour charges for laying, spreading, watering etc., complete and as
directed by the departmental engineers.

Hire charges for Machineries

Power Roller 8-10 tonne

262
Hire charges excluding fuel charges per day =Rs.

Fuel charges per day 2.5lit/Hr x 8Hrs x /Lit =Rs.

Total Hire charges per day including Fuel =Rs.

Daily Out turn 425Cu.m / Day

Hire charges of Power Roller per Cu.m. = / 425 =Rs.

Water Sprinklers

Hire charges excluding fuel charges per day =Rs.

Fuel charges per day 3.25lit/Hr x 8Hrs x /Lit =Rs.

Total Hire charges per day including Fuel =Rs.

Daily Out turn 1000Cu.m / Day

Hire charges of Water Sprinklers per Cu.m. = / 1000 =Rs.

Total Hire charges for Machineries per Cu.m = =Rs.

Labour charges for Laying Earth for 100cu.m

2.00 Nos. Mazdoor Ist Class =Rs.

Total Labour charges for laying earth per 100cu.m =Rs.

Total Labour charges for laying earth per Cu.m = / 100 =Rs.

Hire and Labour Charges for Compacting only per Cu.m =Rs.

EARTH WORK FOR FORMATION OF EMBANKMENT / SUB GRADE

Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing
on bank with all leads and lifts as per SS20B including cost of all labour charges, materials,
tools, equipments and all incidental charges, including compacting with vibratory soil
compactor, watering, including all hire and fuel charges for all Hire charges for Tools
and plants, removal of other deleterious matter and obstructions, trimming of bottom of
excavation back filling, clearing up the site and disposal of all surplus materials etc., complete
as per standard specification. For embankment / sub grade

CBR :

Hire charges for Machineries

Vibratory Soil Compactor (HW-H0006)

Hire charges excluding fuel charges per day =Rs.

263
Fuel charges per day 2.5lit/Hr x 8Hrs x /Lit =Rs.

Total Hire charges per day including Fuel =Rs.

Daily Out turn 425Cu.m / Day

Hire charges of Power Roller per Cu.m. = / 425 =Rs.

Water Sprinklers

Hire charges excluding fuel charges per day =Rs.

Fuel charges per day 3.25lit/Hr x 8Hrs x /Lit =Rs.

Total Hire charges per day including Fuel =Rs.

Daily Out turn 1000Cu.m / Day

Hire charges of Water Sprinklers per Cu.m. = / 1000 =Rs.

Total Hire charges for Machineries per Cu.m = =Rs.

Labour charges for Laying Earth for 100cu.m

2.00 Nos. Mazdoor Ist Class =Rs.

Total Labour charges for laying earth per 100cu.m =Rs.

Total Labour charges for laying earth per Cu.m = / 100 =Rs.

Total Hire and Labour Charges for laying and compacting per cu.m =Rs.

EARTH WORK FOR MAKING UP OF LOW BERMS

Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing
on bank with all leads and lifts as per SS20B including cost of all labour charges, materials,
tools, equipments and all incidental charges, including compacting with power roller,
watering, including all hire and fuel charges for all Hire charges for Tools and plants,
removal of other deleterious matter and obstructions, trimming of bottom of excavation back
filling, clearing up the site and disposal of all surplus materials etc., complete as per standard
specification. For Carted Earth with compaction for making up of low berms

Hire charges for Machineries

Power Roller 8-10 tonne

Hire charges excluding fuel charges per day =Rs.

264
Fuel charges per day 2.5lit/Hr x 8Hrs x /Lit =Rs.

Total Hire charges per day including Fuel =Rs.

Daily Out turn 425Cu.m / Day

Hire charges of Power Roller per Cu.m. = / 425 =Rs.

Water Sprinklers

Hire charges excluding fuel charges per day =Rs.

Fuel charges per day 3.25lit/Hr x 8Hrs x /Lit =Rs.

Total Hire charges per day including Fuel =Rs.

Daily Out turn 1000Cu.m / Day

Hire charges of Water Sprinklers per Cu.m. = / 1000 =Rs.

Total Hire charges for Machineries per Cu.m = =Rs.

Labour charges for Laying Earth for 100cu.m

2.00 Nos. Mazdoor Ist Class =Rs.

Total Labour charges for laying earth per 100cu.m =Rs.

Total Labour charges for laying earth per Cu.m = / 100 =Rs.

Total Hire and Labour Charges for laying and compacting per cu.m =Rs.

265
Labour Charges for Patch Work with Bituminous Premix Materials
for 0.625 cu.m of Bituminous Materials

1. In patches and cutting Mazdoor Ist Class 1.08 x 1/6 x /E =Rs.

2. Removing the Picked up stuff Mazdoor Ist 1.08x1/8 x /E =Rs.

3. Brushing and Cleaning the Surface - - L. S. - - =Rs.

4. Spreading the Bitumen for Tack Coat excluding cost of Bitumen -L.S. =Rs.

5. Premixing the chips with hot Bitumen in the drum mixer and laying 0.625
cu.m of metal with 44 kg per cu.m of chips excluding the cost of the bitumen =Rs.
- - L. S. - -

6. Levelling and tamping the premix in the patches and pot holes rolling =Rs.

7. Special tools such as wire brushes etc., - L. S. - - =Rs.

8. Regulation of Traffic - - L.S. - - =Rs.

9. Sundries such as barricading arrangements - L. S. - - =Rs.

Labour for laying 0.625 cu.m of Bituminlous materials =Rs.

Therefore for laying 1.00 cu.m of Bituminous materials /0.625 /cu.m.

Patch work using 45mm IRC metal (for Each KM separately)

2 12

1.00 Cu.m. Cost of 45mm IRC at Rs. /cu.m. =

44 Kg Cost of VG10 Bitumen at Rs. /MT =

1.00 Cu.m. Labour charges at Rs. /cu.m. =

Rate for 1.00 cu.m. Rs.

Patch work using 13.20mm IRC metal (for Each KM separately)

1.00 Cu.m. Cost of 13.20 mm IRC at Rs. /cu.m. =

44 Kg Cost of VG10 Bitumen at Rs. /MT =

1.00 Cu.m. Labour charges at Rs. /cu.m. =

Rate for 1.00 cu.m. Rs.

266
B. M. 50mm Thick Using Mini Hot Mix Plant & VG30 Bitumen
Providing and Laying 50mm thick Bituminous Macadam using course aggregate and VG30
bitumen which shall consist of construction in a single course base/binder course confirming
to the specfication on a previously prepared base, (using Mini Hot Mix Plant and Power
Roller) including cost of material, labour charges, rentals for machinery, fuel and all other
incidental charges etc., complete as per clause 504 MORTH Rev-5 (For Patch Works)
Hire charges for Machineries
Mini Hot Mix Plant
Hire charges excluding fuel charges per hour /8 =Rs.
Fuel charges per hour diesel (running plant) 15.00 Lit x /lit =Rs.
Fuel for heating aggregates per hour 45.00 Lit x /lit =Rs.
Total Hire charges including Fuel =Rs.
Daily Out turn for BM 50mm thick = 75 sqm.
Hire charges of Mini Hot Mix Plant per 10 sqm. x 10 =Rs.
75
Power Roller 8-10 tonne
Hire charges excluding fuel charges per day =Rs.
Fuel charges per day
2.50 lit/Hr x 8 Hrs. x /lit =Rs.
(Diesel)
Total Hire charges per day including Fuel =Rs.
Daily Out turn for BM 50mm thick = 300 sqm
Hire charges for BM 50mm thick per 10 sqm. x 10 =Rs.
300
Bitumen Boiler 750 lit capacity
Hire charges excluding fuel charges per day =Rs.
Fuel charges per day Kerosene 25.00 Lit x /lit =Rs.
Total Hire charges per day including Fuel =Rs.
Hire and fuel charges of boiler per hour = /8 =Rs.
Daily Out turn of Bitumen Boiler per hour = 125 Kg.
Bitumen Required for BM 50mm thick per 10 sqm = 37 kg
Bitumen to be utilised for BM 50mm 125x10/37 = 33.784 sqm
Hire charges for BM per 10
= x10 = =
sqm
8x33.784 270.27
Total Hire Charges for Machineries per 10 sqm =Rs.

Labour charges for BM 50mm thick per 1200sqm


Cost of Mazdoor Ist
83 Nos. @Rs. /E =Rs.
Class
Cost of Mazdoor IInd
55 Nos. @Rs. /E =Rs.
Class
Total Labour charges for BM 50mm thick per 1200sqm =Rs.

Labour charges for BM 50mm thick per 10 sqm. x 10 =Rs.


1200
Total Hire and Labour charges per 10sqm = + =Rs.

267
BITUMINOUS MACADAM 50MM THICK (For Patch Works) (for Each KM separately)
3 12
0.20 Cu.m. Cost of 26.5-13.20mm IRC at Rs. /cu.m. =
0.43 Cu.m. Cost of 13.20-2.36mm IRC at Rs. /cu.m. =
0.08 Cu.m. Cost of 2.36mm & below IRC at Rs. /cu.m. =
37.00 Kgs. Cost of VG30 Bitumen at Rs. /MT =
10.00 Sqm Hire charges at Rs. /10sqm =
10.00 Sqm Labour charges at Rs. /10sqm =
Rate for 10 sqm =Rs.
Rate per cu.m of 50 mm thick = = Rs.

PROVIDING GRAVEL FOR BERMS INCL. COMPACTION


Providing and laying of Gravel including cost and conveyance of the same to work site from
approved quarry including stacking the same to departemental gauge for premeasurement
including all labour charges for laying, spreading, including all hire and fuel charges for power
roller for compaction, etc., complete and as directed by the departmental engineers for making
up of low berms
Hire charges for Machineries

Power Roller 8-10 tonne


Hire charges excluding fuel charges per day =Rs.
Fuel charges per day (Diesel) 2.50lit/Hr x 8Hr. x /Lit =Rs.
Total Hire charges per day including Fuel =Rs.
Daily Out turn of 8-10 tonne Power Roller 425Cu.m.
Hire charges of Power Roller per Cu.m. = / 425 =Rs.

Water Sprinklers
Hire charges excluding fuel charges per day =Rs.
Fuel charges per day (Diesel) 3.25lit/Hr x 8Hr. x /Lit =Rs.
Total Hire charges per day including Fuel =Rs.
Daily Out turn of Water Sprinklers is 1000Cu.m
Hire charges of Water Sprinklers per Cu.m = /1000 =Rs.

Total Hire charges for Machineries per10sqm = =Rs.

Labour charges for Laying U.S. Gravel for 100cu.m


2.00 Nos Mazdoor Ist Class =Rs.
Total Labour charges for laying gravel per 100cu.m =Rs.
Total Labour charges for laying gravel per Cu.m / 100 =Rs.

Total Hire and Labour charges per Cu.m =Rs.

268
WET MIX MACADAM

Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam
250mm thick, including premixing the materials with water at OMC in mechnanical mix plant,
conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub
Base/ Base course on well prepared surface and compacting with vibratory soil compactor to
acheive the desired density including cost of material, labour charges, rentals for machinery,
fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5

HIRE CHARGES FOR MACHINERIES

Loader 5 Cu.m. Capacity (HW-H0079)

Hire charges excluding fuel charges per day = Rs.


Fuel charges per day 80 liters of diesel at Rs.
= Rs.
/Lit
Total Hire charges per day including Fuel = Rs.
/
Total Hire charges per Hour including Fuel = Rs.
Hr

Tipper (HW-H0078)

Hire charges excluding fuel charges per day = Rs.

Fuel charges per day 3.25lit. of diesel x 8 hrs at Rs. /Lit = Rs.

Total Hire charges per day including Fuel = Rs.


/
Total Hire charges per Hour including Fuel = Rs.
Hr

Water Tankers (HW-H0089)

Hire charges excluding fuel charges per day = Rs.

Fuel charges per day 25 liters of diesel at Rs. /Lit = Rs.

Total Hire charges per day including Fuel = Rs.


/
Total Hire charges per Hour including Fuel = Rs.
Hr

Vibratory Soil Compactor (HW-H0006)

Hire charges excluding fuel charges per day = Rs.

Fuel charges per day 3.00lit. of diesel x 8 hrs at Rs. /Lit = Rs.
Total Hire charges per day including Fuel = Rs.
/
Total Hire charges per Hour including Fuel = Rs.
Hr

269
Motor Grader including fuel per Hour (HW-H0087) = Rs. / Hr

Base Mix Plant (pug mill) including fuel per hour (HW-H0090) = Rs. / Hr

Total Hire Charges for machineries for 100 Cu.m of WMM

1. Loader for 6 Hours at R.s. /Hr = Rs.

2. Base Mix Plant (Pug Mill) for 6 Hours at R.s. /Hr = Rs.

3. Tipper for 24 Hours at R.s. /Hr = Rs.

4. Water Tanker for 24 Hours at R.s. /Hr = Rs.


5. Motor Grader including fuel per Hour for 4
at R.s. /Hr = Rs.
Hours
6. Vibratory Soil Compact for 6 Hours at R.s. /Hr = Rs.

Total Hire Charges for machineries for 100 Cu.m of WMM = Rs.

Total Hire Charges for machineries for 1.00 Cu.m of WMM = Rs. /Cu.m

Labour Charges for 100 cu.m of WMM


at R.s. /
0.50 Nos. Head Mazsoor = Rs.
Each
at R.s. /
8.63 Nos. Mazdoor Ist Class = Rs.
Each
at R.s. /
2.00 Nos. Mazdoor IInd Class = Rs.
Each
Total Labour Charges of 100 cu.m of WMM = Rs.

Total Labour Charges of 1.00 cu.m of WMM = Rs. /Cu.m

Total Hire and Labour charges = Rs. /Cu.m

WET MIX MACADAM 250 mm thick

0.396 Cu.m Cost of 45-22.40mm IRC /Cu.m = Rs.

0.528 Cu.m Cost of 22.40-2.36mm IRC /Cu.m = Rs.

0.396 Cu.m Cost of 2.36mm IRC /Cu.m = Rs.

0.08 KL Cost of water /KL = Rs.

1.00 Cu.m Hire & Labour charges /Cu.m = Rs.

270
Rate for 1.00
cu.m.

Picking 5cm to 10cm old metalled surface and sectioning 1Sqm.

Labour for 10Sqm.


1/4 X 1.08 Nos. of Mazdoor Class-I at Rs. /E = Rs.
/10Sqm

Picking 5cm to 10cm old metalled surface and sectioning 1Sqm = / Sqm

Removal of the Black Topped (BT) surface to 50 to 70mm depth using Milling machine,
including conveying the milled waste materials away from the worksite to an average
distance including hire and running charges for the machine, conveyance charges,
unload

Removal of the Black Topped (BT) surface to 50 to 70mm depth using Milling machine, including
conveying the milled waste materials away from the worksite to an average distance including
hire and running charges for the machine, conveyance charges, unloading at unobjectionable
place, cleaning the milled surface as to avoid slippery including all other incidental charges etc.
complete as per the direction of the departmental officers
HIRE CHARGES FOR MACHINERIES

Milling Machine

Hire charges excluding fuel charges per Hour (HW-H0007) = Rs.

Fuel charges per Hour 40 liters of diesel at Rs. /Lit = Rs.

Total Hire charges per Hour including Fuel = Rs.

Total Hire charges per Hour including Fuel (a) = Rs. /Hr

Labour Charges for Cleaning the surface, barricading/ traffic safety measures etc.

5.00 Nos. Mazdoor Ist Class / Each = Rs.

Total Labour Charges of 220Sqm (b) = Rs.

Rs. / Hr

(v) Labour for replacement of Cutting tools

Labour at Rs. /Each (c) /Hr

271
Holder Replacement - 50% of cutting tool charges (d) /Hr

Sub Total (a+b+c+d) /Hr

Add 25% for Corporation limit & Night works

Total Charges per Hour /Hr

Out turn of Milling machine per Hour 220 Sqm.

Hire and Labour charges for Milling machine / 220 /Sqm

Conveyance of debries away from the work site Average Km

Out turn of debries per hour of Milling Machine 220*0.07 15.40 Cu.m.

Conveyance Charges for debries

Rate for milling per Sqm

CRUSHER RUN MACADAM

Providing, laying, spreading and compacting graded stone aggregates for Crusher Run Macadam,
including premixing the materials with water at OMC in mechnanical mix plant, conveyance of
mixed material by tipper to site, laying in uniform layers with pavers in Sub Base/ Base course
on well prepared surface and compacting with vibratory soil compactor to acheive the desired
density, including cost of material, labour charges, rentals for machinery, fuel and all other
incidental charges etc., complete as per Clause 407 of MORTH Rev-5

HIRE CHARGES FOR MACHINERIES

Loader 5 Cu.m. Capacity (HW-H0079)

Hire charges excluding fuel charges per day = Rs.

Fuel charges per day 80 liters of diesel at Rs. /Lit = Rs.

Total Hire charges per day including Fuel = Rs.

Total Hire charges per Hour including Fuel = Rs. /Hr

Tipper (HW-H0078)

Hire charges excluding fuel charges per day = Rs.

Fuel charges per day 3.25lit. of diesel x 8 hrs at Rs. /Lit = Rs.

Total Hire charges per day including Fuel = Rs.

Total Hire charges per Hour including Fuel = Rs. /Hr

272
Water Tankers (HW-H0089)

Hire charges excluding fuel charges per day = Rs.

Fuel charges per day 25 liters of diesel at Rs. /Lit = Rs.

Total Hire charges per day including Fuel = Rs.

Total Hire charges per Hour including Fuel = Rs. /Hr

Vibratory Soil Compactor (HW-H0006)

Hire charges excluding fuel charges per day =Rs.

Fuel charges per day 3.00lit. of diesel x 8 hrs at Rs. /Lit = Rs.
Total Hire charges per day including Fuel = Rs.
Total Hire charges per Hour including Fuel = Rs. /Hr

Motor Grader including fuel per Hour (HW-H0087) = Rs. /Hr

Total Hire Charges for machineries for 100 Cu.m of CRM

1. Loader for 6 Hours = Rs.

2. Tipper for 24 Hours = Rs.

3. Water Tanker for 24 Hours = Rs.

4. Motor Grader including fuel per Hour for 4 Hours = Rs.

5. Vibratory soil compactor for 6 Hours = Rs.

Total Hire Charges for machineries for 100 Cu.m of CRM = Rs.

Total Hire Charges for machineries for 1.00 Cu.m of CRM = Rs. /Cu.m

Labour Charges for 100 cu.m of CRM

0.50 Nos. Head Mazsoor /Each = Rs.

8.63 Nos. Mazdoor Ist Class /Each = Rs.

2.00 Nos. Mazdoor IInd Class /Each = Rs.

Total Labour Charges of 100 cu.m of CRM = Rs.

Total Labour Charges of 1.00 cu.m of CRM = Rs. /Cu.m

Total Hire and Labour charges = Rs. /Cu.m

CRUSHER RUN MACADAM 300mm THICK

273
0.090 Cu.m. Cost of 53-45mm IRC /Cu.m = Rs.

0.460 Cu.m. Cost of 45-22.40mm IRC /Cu.m = Rs.

0.300 Cu.m. Cost of 22.40-5.6mm IRC /Cu.m = Rs.

0.460 Cu.m. Cost of 900mm Micron and below /Cu.m = Rs.

1.00 Cu.m. Hire & Labour charges /Cu.m = Rs.

Rate for 1.00 cu.m.

BM (Grade-II) 50mm Thick Using VG30

274
Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cu.m of 26.50-
13.20mm, 0.43cu.m of 13.20-2.36mm and 0.08cu.m of 2.36mm & below size IRC metal with
37 Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all
materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature
using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site,
spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades
and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc.,
including labour for attending to paver to site etc., including hire and fuel charges for 20-30t
CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and
plant required, including all other incidental charges etc., complete as per specification using
CMP as per clause 504 of MORTH Rev-5

HIRE CHARGES FOR MACHINERIES


1. CENTRAL HOT MIX PLANT

Hire charges excluding fuel charges per hour /8 = Rs.

Running the Plant/Hr 30 lit of diesel at Rs. /Lit = Rs.

Heating bitumen/Hr 25lit of furnace oil at Rs. /Lit = Rs.

Heating aggregates/Hr 170lit of furnace oil at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of CMP per Hour for BM = 135sqm. of 50 mm thick

Hire Charges for CMP per 10sqm. ( / 135) x 10 = Rs.

2.BITUMEN BOILER
Since Bitumem boiler is attached with CMP unit hire charges for separate bitumen boiler is not
necessary

3.VIBRATOR ROLLERS (HW-H0081)

Hire charges excluding fuel charges/Hr at Rs. /8 = Rs.

Fuel charges/Hr 2.50lit at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of Vibrator Roller per hour= 350sqm. of 50 mm thick

Hire Charges for Vibrator roller/10sqm ( /350) x10 = Rs. / 10Sqm

4. PAVER FINISHER (HW-H0080)

Hire charges excluding fuel charges/Hr at Rs. /8 = Rs.

Fuel charges/Hr 6lit at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of Paver Finisher per hour = 135 sqm. of 50 mm thick

Hire Charges for Paver Finisher /10sqm ( /135) x 10 = Rs. / 10 Sqm

275
5. TIPPER TRUCKS (HW-H0078)

Hire charges excluding fuel charges /Hr at Rs. /8 = Rs.

Fuel charges /Hr 3.25lit at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of Tipper Truck per hour = 135 sqm. of 50 mm thick

Number of tipper required per CMP unit = 6 trucks

Hire Charges for Tipper /10sqm ( /135) x 6 x 10 = Rs. / 10Sqm

Total hire charges for machineries /10sqm =

/10Sqm

LABOUR CHARGES PER 1200SQM

For loading materials into CMP

33.00 Nos Mazdoor Ist Class /Each = Rs.

25.00 Nos Mazdoor IInd Class /Each = Rs.

For attending Paver Finisher

10.00 Nos Mazdoor Ist Class /Each = Rs.

Total Labour Charges per 1200sqm = Rs.

Labour Charges per 10sqm / 1200) x 10 = Rs. /10Sqm

BM 50mm thick using VG30 Bitumen and Paver per cu.m


rate
0.200 Cu.m Cost of 26.5-13.20mm IRC /Cu.m = Rs.

0.430 Cu.m Cost of 13.20-2.36mm IRC /Cu.m = Rs.

0.080 Cu.m Cost of 2.36mm & below IRC /Cu.m = Rs.

37.00 Kg Cost of VG30 Bitumen /MT = Rs.

10.00 Sqm Hire charges /10Sqm = Rs.

10.00 Sqm Labour charges /10Sqm = Rs.

Rate for 10 sqm = Rs.

Rate for cu.m of 50 mm thick ( /10 x 0.05)


= Rs.

BM (Grade-I) 80mm Thick Using VG30 Bitumen

276
Providing, laying 80mm consolidated thick Bituminous Macadam using 0.64cu.m of 37.5 -
13.20mm, 0.44cu.m of 13.2 - 2.36mm and 0.13cu.m of 2.36mm and below size IRC metal
with 62 Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance
of all materials to CMP site, heating the bitumen, aggregate and mixing them in required
temperature in central hot mix plant 20-30t capacity, conveying the mix by tipper trucks to
paver site, spreading the mix to uniform thickness of 80mm with mechanical paver to the
specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the
required density etc., including labour for attending to paver to site etc., including hire and fuel
charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and
all other tools and plant required, including all other incidental charges etc., complete as per
specification using CMP as per clause 504 of MORTH Rev-5.

HIRE CHARGES FOR MACHINERIES

1. CENTRAL HOT MIX PLANT

Hire charges excluding fuel charges per hour /8 = Rs.

Running the Plant/Hr 30 lit of diesel at Rs. /Lit = Rs.

Heating bitumen/Hr 25lit of furnace oil at Rs. /Lit = Rs.

Heating aggregates/Hr 170lit of furnace oil at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of CMP per Hour for BM = 90sqm. of 75 mm thick

Hire Charges for CMP per 10sqm. ( / 90) x 10 = Rs. /10Sqm

2.BITUMEN BOILER
Since Bitumem boiler is attached with CMP unit hire charges for separate bitumen boiler is
not necessary

3.VIBRATOR ROLLERS

Hire charges excluding fuel charges/Hr at Rs. /8 = Rs.

Fuel charges/Hr 2.50lit at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of Vibrator Roller per hour= 250sqm. of 80 mm thick

Hire Charges for Vibrator roller per 10sqm ( / 250) x 10 = Rs. /10Sqm

4. PAVER FINISHER

Hire charges excluding fuel charges/Hr at Rs. /8 = Rs.

Fuel charges/Hr 6lit at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of Paver Finisher per hour = 90 sqm. of 80 mm thick

Hire Charges for paver finisher per 10sqm ( / 90) x 10 = Rs. /10Sqm

277
5. TIPPER TRUCKS

Hire charges excluding fuel charges /Hr at Rs. /8 = Rs.

Fuel charges /Hr 3.25lit at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of Tipper Truck per hour = 90 sqm. of 80 mm thick

Number of tipper required per CMP unit = 6 trucks

Hire Charges for Tipper per 10sqm ( /90) x 6 x 10 = Rs. /10Sqm

Total hire charges for machineries /10sqm =

/10Sqm

LABOUR CHARGES PER 1000SQM

For loading materials into CMP

33.00 Nos Mazdoor Ist Class /Each = Rs.

25.00 Nos Mazdoor IInd Class /Each = Rs.

For attending Paver Finisher

10.00 Nos Mazdoor Ist Class /Each = Rs.

Total Labour Charges per 1000sqm = Rs.

Labour Charges per 10sqm ( / 1000) x 10 = Rs.

BM 80mm thick using VG30 Bitumen per cu.m rate

0.640 Cu.m Cost of 37.50-13.20mm IRC /Cu.m = Rs.

0.440 Cu.m Cost of 13.20-2.36mm IRC /Cu.m = Rs.

0.130 Cu.m Cost of 2.36mm & below /Cu.m = Rs.

62.00 Kg Cost of VG30 Bitumen /MT = Rs.

10.00 Sqm Hire charges /10 Sqm = Rs.

10.00 Sqm Labour charges /10 Sqm = Rs.

Rate for 10 sqm = Rs.

Rate per cu.m of 80 mm thick ( / 10 x 0.08) = Rs. /Cu.m

BM (Grade-II) 50mm Thick Using VG40

278
Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cu.m of 26.50-
13.20mm, 0.43cu.m of 13.20-2.36mm and 0.08cu.m of 2.36mm & below size IRC metal with
37 Kgs of VG40 Grade bitumen for premixing per 10sqm including cost and conveyance
of all materials to CMP site, heating the bitumen, aggregate and mixing them in required
temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks
to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the
specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the
required density etc., including labour for attending to paver to site etc., including hire and fuel
charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and
all other tools and plant required, including all other incidental charges etc., complete as per
specification using CMP as per clause 504 of MORTH Rev-5

HIRE CHARGES FOR MACHINERIES


1. CENTRAL HOT MIX PLANT

Hire charges excluding fuel charges per hour /8 = Rs.

Running the Plant/Hr 30 lit of diesel at Rs. /Lit = Rs.

Heating bitumen/Hr 25lit of furnace oil at Rs. /Lit = Rs.

Heating aggregates/Hr 170lit of furnace oil at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of CMP per Hour for BM = 135sqm. of 50 mm thick

Hire Charges for CMP per 10sqm. ( / 135) x 10 = Rs. /10Sqm

2.BITUMEN BOILER
Since Bitumem boiler is attached with CMP unit hire charges for separate bitumen boiler is not
necessary

3.VIBRATOR ROLLERS

Hire charges excluding fuel charges/Hr at Rs. /8 = Rs.

Fuel charges/Hr 2.50lit at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of Vibrator Roller per hour= 350sqm. of 50 mm thick

Hire Charges for Vibrator roller/10sqm ( /350) x10 = Rs. /10Sqm

4. PAVER FINISHER

Hire charges excluding fuel charges/Hr at Rs. /8 = Rs.

Fuel charges/Hr 6lit at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of Paver Finisher per hour = 135 sqm. of 50 mm thick

Hire Charges for Paver Finisher /10sqm ( /135) x 10 = Rs. /10Sqm

279
5. TIPPER TRUCKS

Hire charges excluding fuel charges /Hr at Rs. /8 = Rs.

Fuel charges /Hr 3.25lit at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of Tipper Truck per hour = 135 sqm. of 50 mm thick

Number of tipper required per CMP unit = 6 trucks

Hire Charges for Tipper /10sqm ( /135) x 6 x 10 = Rs. /10Sqm

Total hire charges for machineries /10sqm =


= /
10Sqm
LABOUR CHARGES PER 1200SQM

For loading materials into CMP

33.00 Nos Mazdoor Ist Class /Each = Rs.

25.00 Nos Mazdoor IInd Class /Each = Rs.

For attending Paver Finisher

10.00 Nos Mazdoor Ist Class /Each = Rs.

Total Labour Charges per 1200sqm = Rs.

Labour Charges per 10sqm 51,187.00 / 1200) x 10 = Rs. /10Sqm

BM 50mm thick using VG40 Bitumen and Paver per cu.m


rate
0.200 Cu.m Cost of 26.5-13.20mm IRC /Cu.m = Rs.

0.430 Cu.m Cost of 13.20-2.36mm IRC /Cu.m = Rs.

0.080 Cu.m Cost of 2.36mm & below IRC /Cu.m = Rs.

37.00 Kg Cost of VG40 Bitumen /MT = Rs.

10.00 Sqm Hire charges /10Sqm = Rs.

10.00 Sqm Labour charges /10Sqm = Rs.

Rate for 10 sqm = Rs.

= Rs.

BM (Grade-I) 80mm Thick Using VG40 Bitumen

280
Providing, laying 80mm consolidated thick Bituminous Macadam using 0.64cu.m of 37.5 -
13.20mm, 0.44cu.m of 13.2 - 2.36mm and 0.13cu.m of 2.36mm and below size IRC metal
with 62 Kgs of VG40 Grade bitumen for premixing per 10sqm including cost and conveyance
of all materials to CMP site, heating the bitumen, aggregate and mixing them in required
temperature in central hot mix plant 20-30t capacity, conveying the mix by tipper trucks to
paver site, spreading the mix to uniform thickness of 80mm with mechanical paver to the
specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the
required density etc., including labour for attending to paver to site etc., including hire and fuel
charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and
all other tools and plant required, including all other incidental charges etc., complete as per
specification using CMP as per clause 504 of MORTH Rev-5.

HIRE CHARGES FOR MACHINERIES

1. CENTRAL HOT MIX PLANT

Hire charges excluding fuel charges per hour /8 = Rs.

Running the Plant/Hr 30 lit of diesel at Rs. /Lit = Rs.

Heating bitumen/Hr 25lit of furnace oil at Rs. /Lit = Rs.

Heating aggregates/Hr 170lit of furnace oil at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of CMP per Hour for BM = 90sqm. of 75 mm thick

Hire Charges for CMP per 10sqm. ( / 90) x 10 = Rs. /10Sqm

2.BITUMEN BOILER
Since Bitumem boiler is attached with CMP unit hire charges for separate bitumen boiler is
not necessary

3.VIBRATOR ROLLERS

Hire charges excluding fuel charges/Hr at Rs. /8 = Rs.

Fuel charges/Hr 2.50lit at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of Vibrator Roller per hour= 250sqm. of 80 mm thick


Hire Charges for Vibrator roller per 10sqm ( /
= Rs. /10Sqm
250) x 10

4. PAVER FINISHER

Hire charges excluding fuel charges/Hr at Rs. /8 = Rs.

Fuel charges/Hr 6lit at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of Paver Finisher per hour = 90 sqm. of 80 mm thick

Hire Charges for paver finisher per 10sqm ( / 90) x 10 = Rs. /10Sqm

281
5. TIPPER TRUCKS

Hire charges excluding fuel charges /Hr at Rs. /8 = Rs.

Fuel charges /Hr 3.25lit at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of Tipper Truck per hour = 90 sqm. of 80 mm thick

Number of tipper required per CMP unit = 6 trucks

Hire Charges for Tipper per 10sqm ( /90) x 6 x 10 = Rs. /10Sqm

Total hire charges for machineries /10sqm

Rest.

LABOUR CHARGES PER 1000SQM

For loading materials into CMP

33.00 Nos Mazdoor Ist Class /Each = Rs.

25.00 Nos Mazdoor IInd Class /Each = Rs.

For attending Paver Finisher

10.00 Nos Mazdoor Ist Class /Each = Rs.

Total Labour Charges per 1000sqm = Rs.

Labour Charges per 10sqm ( / 1000) x 10 = Rs.

BM 80mm thick using VG40 Bitumen per cu.m rate

0.640 Cu.m Cost of 37.50-13.20mm IRC /Cu.m = Rs.

0.440 Cu.m Cost of 13.20-2.36mm IRC /Cu.m = Rs.

0.130 Cu.m Cost of 2.36mm & below /Cu.m = Rs.

62.00 Kg Cost of VG40 Bitumen /MT = Rs.

10.00 Sqm Hire charges /10 Sqm = Rs.

10.00 Sqm Labour charges /10 Sqm = Rs.

Rate for 10 sqm = Rs.

Rate per cu.m of 80 mm thick ( / 10 x 0.08) = Rs. /Cu.m

BM (Grade-II) 50mm Thick Using VG30 and more than 5m width Paver

282
Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cu.m of 26.50-
13.20mm, 0.43cu.m of 13.20-2.36mm and 0.08cu.m of 2.36mm & below size IRC metal with
37 Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all
materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature
using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site,
spreading the mix to uniform thickness of 50mm with mechanical paver finisher hydrostatic
(more than 5m width) to the specified grades and cross sections and consolidated by 8-10
tonne Vibratory Roller to the required density etc., including labour for attending to paver to
site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver
Finisher, Vibratory roller and all other tools and plant required, including all other incidental
charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5

HIRE CHARGES FOR MACHINERIES


1. CENTRAL HOT MIX PLANT

Hire charges excluding fuel charges per hour /8 = Rs.

Running the Plant/Hr 30 lit of diesel at Rs. /Lit = Rs.

Heating bitumen/Hr 25lit of furnace oil at Rs. /Lit = Rs.

Heating aggregates/Hr 170lit of furnace oil at Rs. Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of CMP per Hour for BM = 135sqm. of 50 mm thick

Hire Charges for CMP per 10sqm. ( / 135) x 10 = Rs.


‘/10Sqm

2.BITUMEN BOILER
Since Bitumem boiler is attached with CMP unit hire charges for separate bitumen boiler is not
necessary

3.PNEUMATIC TYRED ROLLERS (HW-H0005)

Hire charges /Hr at Rs. = Rs.

Fuel charges/Hr 2.50lit at Rs. /Lit = Rs. 0.00

Hire Charges including fuel charges per hour = Rs.

Out turn of Pneumatic Roller /Hr = 350sqm. of 50 mm thick

Hire Charges for Pneumatic Roller/10sqm ( /350) x10 = Rs. /10Sqm

4.Paver Finisher Hydrostatic (more than 5m width) 170 HP (HW-H0001)

Hire charges /Hr at Rs. = Rs.

Fuel charges/Hr 6lit at Rs. /Lit == Rs. 0.00

Hire Charges including fuel charges per hour = Rs.

Out turn of Paver Finisher /Hr = 135 sqm. of 50 mm thick

Hire Charges for more than 5m width Paver /10sqm ( 135) x 10 = Rs. /10Sqm

283
5. TIPPER TRUCKS

Hire charges excluding fuel charges /Hr at Rs. /8 = Rs.

Fuel charges /Hr 3.25lit at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of Tipper Truck per hour = 135 sqm. of 50 mm thick

Number of tipper required per CMP unit = 6 trucks

Hire Charges for Tipper /10sqm ( /135) x 6 x 10 = Rs. /10Sqm

Total hire charges for machineries /10sqm =

/10Sqm
LABOUR CHARGES PER 1200SQM

For loading materials into CMP

33.00 Nos Mazdoor Ist Class /Each = Rs.

25.00 Nos Mazdoor IInd Class /Each = Rs.

For attending Paver Finisher

10.00 Nos Mazdoor Ist Class /Each = Rs.

Total Labour Charges per 1200sqm = Rs.

Labour Charges per 10sqm / 1200) x 10 = Rs. /10Sqm

BM 50mm thick using VG30 Bitumen andmore than 5m width Paver cu.m rate
0.200
Cost of 26.5-13.20mm IRC /Cu.m = Rs.
Cu.m
0.430
Cost of 13.20-2.36mm IRC /Cu.m = Rs.
Cu.m
0.080
Cost of 2.36mm & below IRC /Cu.m = Rs.
Cu.m
37.00 Kg Cost of VG30 Bitumen /MT = Rs.

10.00 Sqm Hire charges /10Sqm = Rs.

10.00 Sqm Labour charges /10Sqm = Rs.

Rate for 10 sqm = Rs.

= Rs.

BM (Grade-I) 80mm Thick Using VG30 Bitumen and more than 5m width Paver

284
Providing, laying 80mm consolidated thick Bituminous Macadam using 0.64cu.m of 37.5 -
13.20mm, 0.44cu.m of 13.2 - 2.36mm and 0.13cu.m of 2.36mm and below size IRC metal
with 62 Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance
of all materials to CMP site, heating the bitumen, aggregate and mixing them in required
temperature in central hot mix plant 20-30t capacity, conveying the mix by tipper trucks to
paver site, spreading the mix to uniform thickness of 80mm with mechanical more than
5m width Paver to the specified grades and cross sections and consolidated by 8-10 tonne
Vibratory Roller to the required density etc., including labour for attending to paver to site
etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver
Finisher, Vibratory roller and all other tools and plant required, including all other incidental
charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5.

HIRE CHARGES FOR MACHINERIES

1. CENTRAL HOT MIX PLANT

Hire charges excluding fuel charges per hour /8 = Rs.

Running the Plant/Hr 30 lit of diesel at Rs. /Lit = Rs.

Heating bitumen/Hr 25lit of furnace oil at Rs. /Lit = Rs.

Heating aggregates/Hr 170lit of furnace oil at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of CMP per Hour for BM = 90sqm. of 75 mm thick

Hire Charges for CMP per 10sqm. ( / 90) x 10 = Rs. /10Sqm

2.BITUMEN BOILER
Since Bitumem boiler is attached with CMP unit hire charges for separate bitumen boiler is
not necessary

3.PNEUMATIC TYRED ROLLERS

Hire charges /Hr at Rs. = Rs.

Fuel charges /Hr 2.50lit at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of Pneumatic Roller per hour = 250sqm. of 80mm thick

Hire Charges for Pneumatic roller /10sqm ( / 250) x 10 = Rs. /10Sqm

4. PAVER FINISHER more than 5m width Paver (HW-H0001)

Hire charges /Hr at Rs. = Rs.

Fuel charges /Hr 6lit at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of Paver Finisher per hour = 90 sqm. of 80 mm thick


Hire Charges for more than 5m width Paver per 10sqm (
= Rs. /10Sqm
/ 90) x 10

285
5. TIPPER TRUCKS

Hire charges excluding fuel charges /Hr at Rs. /8 = Rs.

Fuel charges /Hr 3.25lit at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of Tipper Truck per hour = 90 sqm. of 80 mm thick

Number of tipper required per CMP unit = 6 trucks

Hire Charges for Tipper per 10sqm ( /90) x 6 x 10 = Rs. /10Sqm

Total hire charges for machineries /10sqm =

/10Sqm

LABOUR CHARGES PER 1000SQM

For loading materials into CMP

33.00 Nos Mazdoor Ist Class /Each = Rs.

25.00 Nos Mazdoor IInd Class /Each = Rs.

For attending Paver Finisher

10.00 Nos Mazdoor Ist Class /Each = Rs.

Total Labour Charges per 1000sqm = Rs.

Labour Charges per 10sqm ( / 1000) x 10 = Rs. /10Sqm

BM 80mm thick using VG30 Bitumen and more than 5m width Paver per cu.m rate
0.640
Cost of 37.50-13.20mm IRC /Cu.m = Rs.
Cu.m
0.440
Cost of 13.20-2.36mm IRC /Cu.m = Rs.
Cu.m
0.130
Cost of 2.36mm & below /Cu.m = Rs.
Cu.m
62.00 Kg Cost of VG30 Bitumen /MT = Rs.

10.00 Sqm Hire charges /10 Sqm = Rs.

10.00 Sqm Labour charges /10 Sqm = Rs.

Rate for 10 sqm = Rs.

Rate per cu.m of 80 mm thick ( / 10 x 0.08) = Rs. /Cu.m

BM (Grade-II) 50mm Thick using VG40 and more than 5m width Paver

286
Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cu.m of 26.50-
13.20mm, 0.43cu.m of 13.20-2.36mm and 0.08cu.m of 2.36mm & below size IRC metal with
37 Kgs of VG40 Grade bitumen for premixing per 10sqm including cost and conveyance of all
materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature
using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site,
spreading the mix to uniform thickness of 50mm with mechanical paver finisher hydrostatic
(more than 5m width) to the specified grades and cross sections and consolidated by 8-10
tonne Vibratory Roller to the required density etc., including labour for attending to paver to
site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver
Finisher, Vibratory roller and all other tools and plant required, including all other incidental
charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5

HIRE CHARGES FOR MACHINERIES


1. CENTRAL HOT MIX PLANT

Hire charges excluding fuel charges per hour /8 = Rs.

Running the Plant/Hr 30 lit of diesel at Rs. /Lit = Rs.

Heating bitumen/Hr 25lit of furnace oil at Rs. /Lit = Rs.

Heating aggregates/Hr 170lit of furnace oil at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of CMP per Hour for BM = 135sqm. of 50 mm thick

Hire Charges for CMP per 10sqm. ( / 135) x 10 = Rs.


/10Sqm

2.BITUMEN BOILER
Since Bitumem boiler is attached with CMP unit hire charges for separate bitumen boiler is not
necessary

3.PNEUMATIC TYRED ROLLERS

Hire charges /Hr at Rs. = Rs.

Fuel charges/Hr 2.50lit at Rs. /Lit = Rs. 0.00

Hire Charges including fuel charges per hour = Rs.

Out turn of Pneumatic Roller /Hr = 350sqm. of 50 mm thick

Hire Charges for Vibrator roller/10sqm ( /350) x10 = Rs.


/10Sqm

4.Paver Finisher Hydrostatic (more than 5m width) 170 HP

Hire charges /Hr at Rs. = Rs.

Fuel charges/Hr 6lit at Rs. /Lit = Rs. 0.00

Hire Charges including fuel charges per hour = Rs.

Out turn of Paver Finisher /Hr. = 135 sqm. of 50 mm thick

287
Hire Charges for more than 5m width Paver /10sqm (
= Rs.
/135) x 10 /10Sqm

5. TIPPER TRUCKS

Hire charges excluding fuel charges /Hr at Rs. /8 = Rs.

Fuel charges /Hr 3.25lit at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of Tipper Truck per hour = 135 sqm. of 50 mm thick

Number of tipper required per CMP unit = 6 trucks

Hire Charges for Tipper /10sqm ( /135) x 6 x 10 = Rs.


/10Sqm

Total hire charges for machineries /10sqm =

/10Sqm
LABOUR CHARGES PER 1200SQM

For loading materials into CMP

33.00 Nos Mazdoor Ist Class /Each = Rs.

25.00 Nos Mazdoor IInd Class /Each = Rs.

For attending Paver Finisher

10.00 Nos Mazdoor Ist Class /Each = Rs.

Total Labour Charges per 1200sqm = Rs.

Labour Charges per 10sqm / 1200) x 10 = Rs.


/10Sqm

BM 50mm thick using VG40 Bitumen and more than 5m width Paver per cu.m rate

0.200 Cu.m Cost of 26.5-13.20mm IRC /Cu.m = Rs.

0.430 Cu.m Cost of 13.20-2.36mm IRC /Cu.m = Rs.

0.080 Cu.m Cost of 2.36mm & below IRC /Cu.m = Rs.

37.00 Kg Cost of VG40 Bitumen /MT = Rs.

10.00 Sqm Hire charges /10Sqm = Rs.

10.00 Sqm Labour charges /10Sqm = Rs.

Rate for 10 sqm = Rs.

= Rs.

BM (Grade-I) 80mm Thick Using VG40 Bitumen and more than 5m width Paver

288
Providing, laying 80mm consolidated thick Bituminous Macadam using 0.64cu.m of 37.5 -
13.20mm, 0.44cu.m of 13.2 - 2.36mm and 0.13cu.m of 2.36mm and below size IRC metal
with 62 Kgs of VG40 Grade bitumen for premixing per 10sqm including cost and conveyance
of all materials to CMP site, heating the bitumen, aggregate and mixing them in required
temperature in central hot mix plant 20-30t capacity, conveying the mix by tipper trucks to
paver site, spreading the mix to uniform thickness of 80mm with mechanical more than
5m width Paver to the specified grades and cross sections and consolidated by 8-10 tonne
Vibratory Roller to the required density etc., including labour for attending to paver to site
etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver
Finisher, Vibratory roller and all other tools and plant required, including all other incidental
charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5.

HIRE CHARGES FOR MACHINERIES

1. CENTRAL HOT MIX PLANT

Hire charges excluding fuel charges per hour /8 = Rs.

Running the Plant/Hr 30 lit of diesel at Rs. /Lit = Rs.

Heating bitumen/Hr 25lit of furnace oil at Rs. /Lit = Rs.

Heating aggregates/Hr 170lit of furnace oil at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of CMP per Hour for BM = 90sqm. of 75 mm thick

Hire Charges for CMP per 10sqm. ( / 90) x 10 = Rs. /10Sqm

2.BITUMEN BOILER
Since Bitumem boiler is attached with CMP unit hire charges for separate bitumen boiler is
not necessary

3.PNEUMATIC TYRED ROLLERS

Hire charges /Hr at Rs. = Rs.

Fuel charges/Hr 2.50lit at Rs. /Lit = Rs. 0.00

Hire Charges including fuel charges per hour = Rs.

Out turn of Pneumatic Roller per hour= 250sqm. of 80 mm thick

Hire Charges for Pneumatic roller /10sqm ( / 250) x 10 = Rs. /10Sqm

4. PAVER FINISHER (more than 5m width Paver)

Hire charges /Hr at Rs. = Rs.

Fuel charges/Hr 6lit at Rs. /Lit = Rs. 0.00

Hire Charges including fuel charges per hour = Rs.

Out turn of Paver Finisher /Hr. = 90 sqm. of 80 mm thick


Hire Charges for more than 5m width Paver /10sqm (
= Rs. /10Sqm
/ 90) x 10

289
5. TIPPER TRUCKS

Hire charges excluding fuel charges /Hr at Rs. /8 = Rs.

Fuel charges /Hr 3.25lit at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of Tipper Truck per hour = 90 sqm. of 80 mm thick

Number of tipper required per CMP unit = 6 trucks

Hire Charges for Tipper per 10sqm ( /90) x 6 x 10 = Rs. /10Sqm

Total hire charges for machineries /10sqm =

/10Sqm

LABOUR CHARGES PER 1000SQM

For loading materials into CMP

33.00 Nos Mazdoor Ist Class /Each = Rs.

25.00 Nos Mazdoor IInd Class /Each = Rs.

For attending Paver Finisher

10.00 Nos Mazdoor Ist Class /Each = Rs.

Total Labour Charges per 1000sqm = Rs.

Labour Charges per 10sqm ( / 1000) x 10 = Rs. /10Sqm

BM 80mm thick using VG40 Bitumen and more than 5m width Paver per cu.m rate
0.640
Cost of 37.50-13.20mm IRC /Cu.m = Rs.
Cu.m
0.440
Cost of 13.20-2.36mm IRC /Cu.m = Rs.
Cu.m
0.130
Cost of 2.36mm & below /Cu.m = Rs.
Cu.m
62.00 Kg Cost of VG40 Bitumen /MT = Rs.

10.00 Sqm Hire charges /10 Sqm = Rs.

10.00 Sqm Labour charges /10 Sqm = Rs.

Rate for 10 sqm = Rs.

Rate per cu.m of 80 mm thick ( / 10 x 0.08) = Rs. /Cu.m

290
DBM

291
DBM (Grade-II) 50mm Thick Using VG30

Providing, laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cu.m
of 26.50-13.20mm, 0.25cu.m of 13.20-2.36mm and 0.23cu.m of 2.36mm & below and with
53.20Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance
of all materials to CMP site, heating the bitumen, aggregate and mixing them in the required
temperature in Central Hot Mix Plant 20-30 ton capacity, conveying the mix by tipper trucks to
work site, spreading the mix to uniform thickness of 50mm using paver to the specified grades
and cross sections and compacted by Vibratory / Pneumatic Roller to the required density etc.,
including labour for attending to paver at site etc., including hire and fuel charges for 20-30ton
CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory rollers and all other tools and
plant required, including all other incidental charges etc., complete as per specification using
CMP as per clause 505 MORTH Rev-5

HIRE CHARGES FOR MACHINERIES

1. CENTRAL HOT MIX PLANT

Hire charges excluding fuel charges per hour /8 = Rs.

Running the Plant/Hr 30 lit of diesel at Rs. /Lit = Rs.

Heating bitumen/Hr 25lit of furnace oil at Rs. /Lit = Rs.

Heating aggregates/Hr 170lit of furnace oil at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of CMP per Hour of DBM = 135sqm. of 50 mm thick

Hire Charges for CMP per 10sqm. ( / 135) x 10 = Rs. /10Sqm

2.BITUMEN BOILER
Since Bitumem boiler is attached with CMP unit hire charges for separate bitumen boiler is not
necessary

3.VIBRATOR ROLLERS

Hire charges excluding fuel charges/Hr at Rs. /8 = Rs.

Fuel charges/Hr 2.50lit at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of Vibrator Roller per hour = 320sqm. of 50 mm thick

Hire Charges for Vibrator roller/10sqm ( /320) x10 = Rs. /10Sqm

4. PAVER FINISHER

Hire charges excluding fuel charges/Hr at Rs. /8 = Rs.

Fuel charges/Hr 6lit at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of Paver Finisher per hour = 135 sqm. of 50 mm thick

292
Hire Charges for paver finisher /10sqm ( /135) x 10 = Rs. /10Sqm

5. TIPPER TRUCKS

Hire charges excluding fuel charges /Hr at Rs. /8 = Rs.

Fuel charges /Hr 3.25lit at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of Tipper Truck per hour = 135 sqm. of 50 mm thick

Number of tipper required per CMP unit = 6 trucks

Hire Charges for Tipper /10sqm ( /135) x 6 x 10 = Rs. /10Sqm

Total hire charges for machineries /10sqm =

‘= /10Sqm

LABOUR CHARGES PER 1200SQM

For loading materials into CMP

33.00 Nos Mazdoor Ist Class /Each = Rs.

25.00 Nos Mazdoor IInd Class /Each = Rs.

For attending Paver Finisher

10.00 Nos Mazdoor Ist Class /Each = Rs.

Total Labour Charges per 1200sqm = Rs.


Labour Charges per 10sqm / 1200)
= Rs. /10Sqm
x 10

DBM 50mm thick using VG30 Bitumen and Paver per cu.m
rate
0.240 Cu.m Cost of 26.50 - 13.20mm IRC /Cu.m = Rs.

0.250 Cu.m Cost of 13.20-2.36mm IRC /Cu.m = Rs.

0.230 Cu.m Cost of 2.36mm & below IRC /Cu.m = Rs.

53.20 Kg Cost of VG30 Bitumen /MT = Rs.

10.00 Sqm Hire charges /10Sqm = Rs.

10.00 Sqm Labour charges /10Sqm = Rs.

Rate for 10 sqm = Rs.

Rate per cu.m of 50 mm thick ( / 10 x 0.05 ) = Rs. /Cu.m

293
DBM (Grade-I) 75mm Thick Using VG30 Bitumen

Providing, laying 75mm consolidated thick Dense Bituminous Macadam using 0.40cu.m of
37.50-13.20mm, 0.35cu.m of 13.20-2.36mm and 0.36cu.m of 2.36mm & below size IRC metal
with 71.30kgs of VG30 grade bitumen for premixing per 10sqm including cost and conveyance
of all materials to CMP site, heating the bitumen, aggregate and mixing them in the required
temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to
site, spreading the mix to uniform thickness of 75mm with mechanical paver to the specified
grades and cross sections and consolidated by Vibratory Roller to the required density etc.,
including labour for attending to paver to site etc., including hire and fuel charges for 20-30t
CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and
plant required, including all other incidental charges etc., complete as per specification using
CMP as per clause 505 of MORTH rev-5.

HIRE CHARGES FOR MACHINERIES

1. CENTRAL HOT MIX PLANT

Hire charges excluding fuel charges per hour /8 = Rs.

Running the Plant/Hr 30 lit of diesel at Rs. /Lit = Rs.

Heating bitumen/Hr 25lit of furnace oil at Rs. /Lit = Rs.

Heating aggregates/Hr 170lit of furnace oil at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of CMP per Hour for DBM = 90sqm. of 75 mm thick

Hire Charges for CMP per 10sqm. ( / 90) x 10 = Rs. /10Sqm

2.BITUMEN BOILER
Since Bitumem boiler is attached with CMP unit hire charges for separate bitumen boiler is not
necessary

3.VIBRATOR ROLLERS

Hire charges excluding fuel charges/Hr at Rs. /8 = Rs.

Fuel charges/Hr 2.50lit at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of Vibrator Roller per hour= 220sqm. of 75 mm thick


Hire Charges for Vibrator roller per 10sqm ( / 220)
= Rs. /10Sqm
x 10

4. PAVER FINISHER

Hire charges excluding fuel charges/Hr at Rs. /8 = Rs.

Fuel charges/Hr 6lit at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

294
Out turn of Paver Finisher per hour = 90 sqm. of 75 mm thick

Hire Charges for paver finisher per 10sqm ( / 90) x 10 = Rs. /10Sqm

5. TIPPER TRUCKS

Hire charges excluding fuel charges /Hr at Rs. /8 = Rs.

Fuel charges /Hr 3.25lit at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of Tipper Truck per hour = 90 sqm. of 75 mm thick

Number of tipper required per CMP unit = 6 trucks

Hire Charges for Tipper per 10sqm ( /90) x 6 x 10 = Rs. /10Sqm

Total hire charges for machineries /10sqm =

/10Sqm

LABOUR CHARGES PER 1000SQM

For loading materials into CMP

33.00 Nos Mazdoor Ist Class /Each = Rs.

25.00 Nos Mazdoor IInd Class /Each = Rs.

For attending Paver Finisher

10.00 Nos Mazdoor Ist Class /Each = Rs.

Total Labour Charges per 1000sqm = Rs.

Labour Charges per 10sqm ( / 1000) x 10 = Rs. /10Sqm

DBM 75mm thick using VG30 Bitumen and Paver per cu.m
rate
0.400 Cu.m Cost of 37.50-13.20mm IRC /Cu.m = Rs.

0.350 Cu.m Cost of 13.20-2.36mm IRC /Cu.m = Rs.

0.360 Cu.m Cost of 2.36mm & Below IRC /Cu.m = Rs.

71.30 Kg Cost of VG30 Bitumen /MT = Rs.

10.00 Sqm Hire charges /10Sqm = Rs.

10.00 Sqm Labour charges /10Sqm = Rs.

Rate for 10 sqm = Rs.

Rate per cu.m of 75 mm thick ( / 10 x 0.075 ) = Rs. /Cu.m

295
DBM (Grade-II) 50mm Thick Using VG40

Providing, laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cu.m
of 26.50-13.20mm, 0.25cu.m of 13.20-2.36mm and 0.23cu.m of 2.36mm & below and with
53.20Kgs of VG40 Grade bitumen for premixing per 10sqm including cost and conveyance
of all materials to CMP site, heating the bitumen, aggregate and mixing them in the required
temperature in Central Hot Mix Plant 20-30 ton capacity, conveying the mix by tipper trucks to
work site, spreading the mix to uniform thickness of 50mm using paver to the specified grades
and cross sections and compacted by Vibratory / Pneumatic Roller to the required density etc.,
including labour for attending to paver at site etc., including hire and fuel charges for 20-30ton
CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory rollers and all other tools and
plant required, including all other incidental charges etc., complete as per specification using
CMP as per clause 505 MORTH Rev-5

HIRE CHARGES FOR MACHINERIES

1. CENTRAL HOT MIX PLANT

Hire charges excluding fuel charges per hour /8 = Rs.

Running the Plant/Hr 30 lit of diesel at Rs. /Lit = Rs.

Heating bitumen/Hr 25lit of furnace oil at Rs. /Lit = Rs.

Heating aggregates/Hr 170lit of furnace oil at Rs. /Lit = Rs.


Hire Charges including fuel charges per
= Rs.
hour
Out turn of CMP per Hour of DBM = 135sqm. of 50 mm thick

Hire Charges for CMP per 10sqm. ( / 135) x 10 = Rs. /10Sqm

2.BITUMEN BOILER
Since Bitumem boiler is attached with CMP unit hire charges for separate bitumen boiler is not
necessary

3.VIBRATOR ROLLERS

Hire charges excluding fuel charges/Hr at Rs. /8 = Rs.

Fuel charges/Hr 2.50lit at Rs. /Lit = Rs.


Hire Charges including fuel charges per
= Rs.
hour
Out turn of Vibrator Roller per hour = 320sqm. of 50 mm thick

Hire Charges for Vibrator roller/10sqm ( /320) x10 = Rs. /10Sqm

4. PAVER FINISHER

Hire charges excluding fuel charges/Hr at Rs. /8 = Rs.

Fuel charges/Hr 6lit at Rs. /Lit = Rs.


Hire Charges including fuel charges per
= Rs.
hour

296
Out turn of Paver Finisher per hour = 135 sqm. of 50 mm thick

Hire Charges for paver finisher /10sqm ( /135) x 10 = Rs. /10Sqm

5. TIPPER TRUCKS

Hire charges excluding fuel charges /Hr at Rs. /8 = Rs.

Fuel charges /Hr 3.25lit at Rs. /Lit = Rs.


Hire Charges including fuel charges per
= Rs.
hour
Out turn of Tipper Truck per hour = 135 sqm. of 50 mm thick

Number of tipper required per CMP unit = 6 trucks

Hire Charges for Tipper /10sqm ( /135) x 6 x 10 = Rs. /10Sqm

Total hire charges for machineries /10sqm


=
‘= /10Sqm

LABOUR CHARGES PER 1200SQM

For loading materials into CMP

33.00 Nos Mazdoor Ist Class /Each = Rs.

25.00 Nos Mazdoor IInd Class /Each = Rs.

For attending Paver Finisher

10.00 Nos Mazdoor Ist Class /Each = Rs.

Total Labour Charges per 1200sqm = Rs.


Labour Charges per 10sqm / 1200)
= Rs. /10Sqm
x 10

DBM 50mm thick using VG40 Bitumen and Paver per cu.m
rate
Cost of 26.50 - 13.20mm
0.240 Cu.m /Cu.m = Rs.
IRC
0.250 Cu.m Cost of 13.20-2.36mm IRC /Cu.m = Rs.

0.230 Cu.m Cost of 2.36mm & below IRC /Cu.m = Rs.

53.20 Kg Cost of VG40 Bitumen /MT = Rs.

10.00 Sqm Hire charges /10Sqm = Rs.

10.00 Sqm Labour charges /10Sqm = Rs.

Rate for 10 sqm = Rs.

Rate per cu.m of 50 mm thick ( / 10 x 0.05 ) = Rs. /Cu.m

297
DBM (Grade-I) 75mm Thick Using VG40 Bitumen

Providing, laying 75mm consolidated thick Dense Bituminous Macadam using 0.40cu.m of
37.50-13.20mm, 0.35cu.m of 13.20-2.36mm and 0.36cu.m of 2.36mm & below size IRC metal
with 71.30kgs of VG40 grade bitumen for premixing per 10sqm including cost and conveyance
of all materials to CMP site, heating the bitumen, aggregate and mixing them in the required
temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to
site, spreading the mix to uniform thickness of 75mm with mechanical paver to the specified
grades and cross sections and consolidated by Vibratory Roller to the required density etc.,
including labour for attending to paver to site etc., including hire and fuel charges for 20-30t
CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and
plant required, including all other incidental charges etc., complete as per specification using
CMP as per clause 505 of MORTH rev-5.

HIRE CHARGES FOR MACHINERIES

1. CENTRAL HOT MIX PLANT

Hire charges excluding fuel charges per hour /8 = Rs.

Running the Plant/Hr 30 lit of diesel at Rs. /Lit = Rs.

Heating bitumen/Hr 25lit of furnace oil at Rs. /Lit = Rs.

Heating aggregates/Hr 170lit of furnace oil at Rs. /Lit = Rs.


Hire Charges including fuel charges per
= Rs.
hour
Out turn of CMP per Hour for DBM = 90sqm. of 75 mm thick

Hire Charges for CMP per 10sqm. ( / 90) x 10 = Rs. /10Sqm

2.BITUMEN BOILER
Since Bitumem boiler is attached with CMP unit hire charges for separate bitumen boiler is not
necessary

3.VIBRATOR ROLLERS

Hire charges excluding fuel charges/Hr at Rs. /8 = Rs.

Fuel charges/Hr 2.50lit at Rs. /Lit = Rs.


Hire Charges including fuel charges per
= Rs.
hour
Out turn of Vibrator Roller per hour= 220sqm. of 75 mm thick

Hire Charges for Vibrator roller per 10sqm ( / 220) x 10 = Rs. /10Sqm

4. PAVER FINISHER

Hire charges excluding fuel charges/Hr at Rs. /8 = Rs.

Fuel charges/Hr 6lit at Rs. /Lit = Rs.


Hire Charges including fuel charges per
= Rs.
hour

298
Out turn of Paver Finisher per hour = 90 sqm. of 75 mm thick

Hire Charges for paver finisher per 10sqm ( / 90) x 10 = Rs. /10Sqm

5. TIPPER TRUCKS

Hire charges excluding fuel charges /Hr at Rs. /8 = Rs.

Fuel charges /Hr 3.25lit at Rs. /Lit = Rs.


Hire Charges including fuel charges per
= Rs.
hour
Out turn of Tipper Truck per hour = 90 sqm. of 75 mm thick

Number of tipper required per CMP unit = 6 trucks

Hire Charges for Tipper per 10sqm ( /90) x 6 x 10 = Rs. /10Sqm

Total hire charges for machineries /10sqm


=
/10Sqm

LABOUR CHARGES PER 1000SQM

For loading materials into CMP

33.00 Nos Mazdoor Ist Class /Each = Rs.

25.00 Nos Mazdoor IInd Class /Each = Rs.

For attending Paver Finisher

10.00 Nos Mazdoor Ist Class /Each = Rs.

Total Labour Charges per 1000sqm = Rs.

Labour Charges per 10sqm ( / 1000) x 10 = Rs. /10Sqm

DBM 75mm thick using VG40 Bitumen and Paver per cu.m
rate
0.400 Cu.m Cost of 37.50-13.20mm IRC /Cu.m = Rs.

0.350 Cu.m Cost of 13.20-2.36mm IRC /Cu.m = Rs.

0.360 Cu.m Cost of 2.36mm & Below IRC /Cu.m = Rs.

71.30 Kg Cost of VG40 Bitumen /MT = Rs.

10.00 Sqm Hire charges /10Sqm = Rs.

10.00 Sqm Labour charges /10Sqm = Rs.

Rate for 10 sqm = Rs.

Rate per cu.m of 75 mm thick ( / 10 x 0.075) = Rs. /Cu.m

299
DBM (Grade-II) 50mm Thick Using VG30 and more than 5m width Paver

Providing, laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cu.m
of 26.50-13.20mm, 0.25cu.m of 13.20-2.36mm and 0.23cu.m of 2.36mm & below and with
53.20Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance
of all materials to CMP site, heating the bitumen, aggregate and mixing them in the required
temperature in Central Hot Mix Plant 20-30 ton capacity, conveying the mix by tipper trucks to
work site, spreading the mix to uniform thickness of 50mm using paver finisher hydrostatic
(more than 5m width) to the specified grades and cross sections and compacted by Vibratory
/ Pneumatic Roller to the required density etc., including labour for attending to paver at site
etc., including hire and fuel charges for 20-30ton CMP with bitumen boiler, tipper trucks, Paver
Finisher, Vibratory rollers and all other tools and plant required, including all other incidental
charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5

HIRE CHARGES FOR MACHINERIES

1. CENTRAL HOT MIX PLANT

Hire charges excluding fuel charges per hour /8 = Rs.

Running the Plant/Hr 30 lit of diesel at Rs. /Lit = Rs.

Heating bitumen/Hr 25lit of furnace oil at Rs. /Lit = Rs.

Heating aggregates/Hr 170lit of furnace oil at Rs. /Lit = Rs.


Hire Charges including fuel charges per
= Rs.
hour
Out turn of CMP per Hour of DBM = 135sqm. of 50 mm thick

Hire Charges for CMP per 10sqm. ( / 135) x 10 = Rs. /10Sqm

2.BITUMEN BOILER
Since Bitumem boiler is attached with CMP unit hire charges for separate bitumen boiler is not
necessary

3.PNEUMATIC TYRED ROLLERS

Hire charges /Hr at Rs. = Rs.

Fuel charges/Hr 2.50lit at Rs. /Lit = Rs. 0.00


Hire Charges including fuel charges per
= Rs.
hour
Out turn of Pneumatic Tyred Roller per hour = 320sqm. of 50 mm
thick
Hire Charges for Pneumatic roller/10sqm ( /320) x10 = Rs. /10Sqm

4. Paver Finisher Hydrostatic (more than 5m width) 170 HP

Hire charges /Hr at Rs. = Rs.

Fuel charges/Hr 6lit at Rs. /Lit = Rs. 0.00

300
Hire Charges including fuel charges per
= Rs.
hour
Out turn of Paver Finisher per hour = 135 sqm. of 50 mm thick
Hire Charges for more than 5m width paver /10sqm (
= Rs. /10Sqm
/135) x 10

5. TIPPER TRUCKS

Hire charges excluding fuel charges /Hr at Rs. /8 = Rs.

Fuel charges /Hr 3.25lit at Rs. /Lit = Rs.


Hire Charges including fuel charges per
= Rs.
hour
Out turn of Tipper Truck per hour = 135 sqm. of 50 mm thick

Number of tipper required per CMP unit = 6 trucks

Hire Charges for Tipper /10sqm ( /135) x 6 x 10 = Rs. /10Sqm

Total hire charges for machineries /10sqm


=
‘= /10Sqm

LABOUR CHARGES PER 1200SQM

For loading materials into CMP

33.00 Nos Mazdoor Ist Class /Each = Rs.

25.00 Nos Mazdoor IInd Class /Each = Rs.

For attending Paver Finisher

10.00 Nos Mazdoor Ist Class /Each = Rs.

Total Labour Charges per 1200sqm = Rs.

Labour Charges per 10sqm / 1200) x 10 = Rs. /10Sqm

DBM 50mm thick using VG30 Bitumen and more than 5m width Paver per cu.m
rate
Cost of 26.50 - 13.20mm
0.240 Cu.m /Cu.m = Rs.
IRC
0.250 Cu.m Cost of 13.20-2.36mm IRC /Cu.m = Rs.

0.230 Cu.m Cost of 2.36mm & below IRC /Cu.m = Rs.

53.20 Kg Cost of VG30 Bitumen /MT = Rs.

10.00 Sqm Hire charges /10Sqm = Rs.

10.00 Sqm Labour charges /10Sqm = Rs.

Rate for 10 sqm = Rs.

Rate per cu.m of 50 mm thick ( / 10 x 0.05 ) = Rs. /Cu.m

301
DBM (Grade-I) 75mm Thick Using VG30 Bitumen and more than 5m width Paver

Providing, laying 75mm consolidated thick Dense Bituminous Macadam using 0.40cu.m
of 37.50-13.20mm, 0.35cu.m of 13.20-2.36mm and 0.36cu.m of 2.36mm & below size IRC
metal with 71.30kgs of VG30 grade bitumen for premixing per 10sqm including cost and
conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in
the required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by
tipper trucks to site, spreading the mix to uniform thickness of 75mm with mechanical paver
finisher hydrostatic (more than 5m width) to the specified grades and cross sections and
consolidated by Vibratory Roller to the required density etc., including labour for attending to
paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper
trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other
incidental charges etc., complete as per specification using CMP as per clause 505 of MORTH
rev-5.

HIRE CHARGES FOR MACHINERIES

1. CENTRAL HOT MIX PLANT

Hire charges excluding fuel charges per hour /8 = Rs.

Running the Plant/Hr 30 lit of diesel at Rs. /Lit = Rs.

Heating bitumen/Hr 25lit of furnace oil at Rs. /Lit = Rs.

Heating aggregates/Hr 170lit of furnace oil at Rs. /Lit = Rs.


Hire Charges including fuel charges per
= Rs.
hour
Out turn of CMP per Hour for DBM = 90sqm. of 75 mm thick

Hire Charges for CMP per 10sqm. ( / 90) x 10 = Rs. /10Sqm

2.BITUMEN BOILER
Since Bitumem boiler is attached with CMP unit hire charges for separate bitumen boiler is not
necessary

3.PNEUMATIC TYRED ROLLERS

Hire charges /Hr at Rs. = Rs.

Fuel charges/Hr 2.50lit at Rs. /Lit = Rs. 0.00


Hire Charges including fuel charges per
= Rs.
hour
Out turn of Pneumatic tyred roller per hour= 220sqm. of 75mm
thick
Hire Charges for Pneumatic roller per 10sqm ( / 220) x
= Rs. /10Sqm
10

4. Paver Finisher Hydrostatic (more than 5m width) 170 HP

Hire charges /Hr at Rs. = Rs.

Fuel charges/Hr 6lit at Rs. /Lit = Rs. 0.00

302
Hire Charges including fuel charges per
= Rs.
hour
Out turn of Paver Finisher per hour = 90 sqm. of 75 mm thick
Hire Charges for more than 5m width paver /10sqm ( /
= Rs. /10Sqm
90) x 10

5. TIPPER TRUCKS

Hire charges excluding fuel charges /Hr at Rs. /8 = Rs.

Fuel charges /Hr 3.25lit at Rs. /Lit = Rs.


Hire Charges including fuel charges per
= Rs.
hour
Out turn of Tipper Truck per hour = 90 sqm. of 75 mm thick

Number of tipper required per CMP unit = 6 trucks

Hire Charges for Tipper per 10sqm ( /90) x 6 x 10 = Rs. /10Sqm

Total hire charges for machineries /10sqm


=
/10Sqm

LABOUR CHARGES PER 1000SQM

For loading materials into CMP

33.00 Nos Mazdoor Ist Class /Each = Rs.

25.00 Nos Mazdoor IInd Class /Each = Rs.

For attending Paver Finisher

10.00 Nos Mazdoor Ist Class /Each = Rs.

Total Labour Charges per 1000sqm = Rs.


Labour Charges per 10sqm / 1000)
= Rs. /10Sqm
x 10

DBM 75mm thick using VG30 Bitumen and more than 5m width Paver per cu.m
rate
0.400 Cu.m Cost of 37.50-13.20mm IRC /Cu.m = Rs.

0.350 Cu.m Cost of 13.20-2.36mm IRC /Cu.m = Rs.

0.360 Cu.m Cost of 2.36mm & Below IRC /Cu.m = Rs.

71.30 Kg Cost of VG30 Bitumen /MT = Rs.

10.00 Sqm Hire charges /10Sqm = Rs.

10.00 Sqm Labour charges /10Sqm = Rs.

Rate for 10 sqm = Rs.

Rate per cu.m of 75 mm thick ( / 10 x 0.075 ) = Rs. /Cu.m

303
DBM (Grade-II) 50mm Thick Using VG40 and more than 5m width Paver

Providing, laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cu.m
of 26.50-13.20mm, 0.25cu.m of 13.20-2.36mm and 0.23cu.m of 2.36mm & below and with
53.20Kgs of VG40 Grade bitumen for premixing per 10sqm including cost and conveyance
of all materials to CMP site, heating the bitumen, aggregate and mixing them in the required
temperature in Central Hot Mix Plant 20-30 ton capacity, conveying the mix by tipper trucks to
work site, spreading the mix to uniform thickness of 50mm using paver finisher hydrostatic
(more than 5m width) to the specified grades and cross sections and compacted by Vibratory
/ Pneumatic Roller to the required density etc., including labour for attending to paver at site
etc., including hire and fuel charges for 20-30ton CMP with bitumen boiler, tipper trucks, Paver
Finisher, Vibratory rollers and all other tools and plant required, including all other incidental
charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5

HIRE CHARGES FOR MACHINERIES

1. CENTRAL HOT MIX PLANT

Hire charges excluding fuel charges per hour /8 = Rs.

Running the Plant/Hr 30 lit of diesel at Rs. /Lit = Rs.

Heating bitumen/Hr 25lit of furnace oil at Rs. /Lit = Rs.

Heating aggregates/Hr 170lit of furnace oil at Rs. /Lit = Rs.


Hire Charges including fuel charges per
= Rs.
hour
Out turn of CMP per Hour of DBM = 135sqm. of 50 mm thick

Hire Charges for CMP per 10sqm. ( / 135) x 10 = Rs. /10Sqm

2.BITUMEN BOILER
Since Bitumem boiler is attached with CMP unit hire charges for separate bitumen boiler is not
necessary

3.PNEUMATIC TYRED ROLLERS

Hire charges /Hr at Rs. = Rs.

Fuel charges/Hr 2.50lit at Rs. /Lit = Rs. 0.00


Hire Charges including fuel charges per
= Rs.
hour
Out turn of Pneumatic Tyred Roller per hour = 320sqm. of 50 mm
thick
Hire Charges for Pneumatic roller/10sqm ( /320) x10 = Rs. /10Sqm

4. Paver Finisher Hydrostatic (more than 5m width) 170 HP

Hire charges /Hr at Rs. = Rs.

Fuel charges/Hr 6lit at Rs. /Lit = Rs. 0.00

304
Hire Charges including fuel charges per
= Rs.
hour
Out turn of Paver Finisher /Hr = 135 sqm. of 50 mm thick
Hire Charges for more than 5m width paver /10sqm (
= Rs. /10Sqm
/135) x 10

5. TIPPER TRUCKS

Hire charges excluding fuel charges /Hr at Rs. /8 = Rs.

Fuel charges /Hr 3.25lit at Rs. /Lit = Rs.


Hire Charges including fuel charges per
= Rs.
hour
Out turn of Tipper Truck per hour = 135 sqm. of 50 mm thick

Number of tipper required per CMP unit = 6 trucks

Hire Charges for Tipper /10sqm ( /135) x 6 x 10 = Rs. /10Sqm

Total hire charges for machineries /10sqm =

‘= /10Sqm

LABOUR CHARGES PER 1200SQM

For loading materials into CMP

33.00 Nos Mazdoor Ist Class /Each = Rs.

25.00 Nos Mazdoor IInd Class /Each = Rs.

For attending Paver Finisher

10.00 Nos Mazdoor Ist Class /Each = Rs.

Total Labour Charges per 1200sqm = Rs.

Labour Charges per 10sqm / 1200) x 10 = Rs. /10Sqm

DBM 50mm thick using VG40 Bitumen and more than 5m width Paver per cu.m rate
Cost of 26.50 - 13.20mm
0.240 Cu.m /Cu.m = Rs.
IRC
0.250 Cu.m Cost of 13.20-2.36mm IRC /Cu.m = Rs.

0.230 Cu.m Cost of 2.36mm & below IRC /Cu.m = Rs.

53.20 Kg Cost of VG40 Bitumen /MT = Rs.

10.00 Sqm Hire charges /10Sqm = Rs.

10.00 Sqm Labour charges /10Sqm = Rs.

Rate for 10 sqm = Rs.

Rate per cu.m of 50 mm thick ( / 10 x 0.05 ) = Rs. /Cu.m

305
DBM (Grade-I) 75mm Thick Using VG40 Bitumen and more than 5m width Paver

Providing, laying 75mm consolidated thick Dense Bituminous Macadam using 0.40cu.m
of 37.50-13.20mm, 0.35cu.m of 13.20-2.36mm and 0.36cu.m of 2.36mm & below size IRC
metal with 71.30kgs of VG40 grade bitumen for premixing per 10sqm including cost and
conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in
the required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by
tipper trucks to site, spreading the mix to uniform thickness of 75mm with mechanical paver
finisher hydrostatic (more than 5m width) to the specified grades and cross sections and
consolidated by Vibratory Roller to the required density etc., including labour for attending to
paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper
trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other
incidental charges etc., complete as per specification using CMP as per clause 505 of MORTH
rev-5.

HIRE CHARGES FOR MACHINERIES

1. CENTRAL HOT MIX PLANT

Hire charges excluding fuel charges per hour /8 = Rs.

Running the Plant/Hr 30 lit of diesel at Rs. /Lit = Rs.

Heating bitumen/Hr 25lit of furnace oil at Rs. /Lit = Rs.

Heating aggregates/Hr 170lit of furnace oil at Rs. /Lit = Rs.


Hire Charges including fuel charges per
= Rs.
hour
Out turn of CMP per Hour for DBM = 90sqm. of 75 mm thick

Hire Charges for CMP per 10sqm. ( / 90) x 10 = Rs. /10Sqm

2.BITUMEN BOILER
Since Bitumem boiler is attached with CMP unit hire charges for separate bitumen boiler is not
necessary

3.PNEUMATIC TYRED ROLLERS

Hire charges /Hr at Rs. = Rs.

Fuel charges/Hr 2.50lit at Rs. /Lit = Rs. 0.00


Hire Charges including fuel charges per
= Rs.
hour
Out turn of Pneumatic tyred roller per hour= 220sqm. of 75mm
thick
Hire Charges for Pneumatic roller per 10sqm ( / 220) x
= Rs. /10Sqm
10

4. Paver Finisher Hydrostatic (more than 5m width) 170 HP

Hire charges /Hr at Rs. = Rs.

Fuel charges/Hr 6lit at Rs. /Lit = Rs. 0.00

306
Hire Charges including fuel charges per
= Rs.
hour
Out turn of Paver Finisher per hour = 90 sqm. of 75 mm thick
Hire Charges for more than 5m width paver /10sqm ( /
= Rs. /10Sqm
90) x 10

5. TIPPER TRUCKS

Hire charges excluding fuel charges /Hr at Rs. /8 = Rs.

Fuel charges /Hr 3.25lit at Rs. /Lit = Rs.


Hire Charges including fuel charges per
= Rs.
hour
Out turn of Tipper Truck per hour = 90 sqm. of 75 mm thick

Number of tipper required per CMP unit = 6 trucks

Hire Charges for Tipper per 10sqm ( /90) x 6 x 10 = Rs. /10Sqm

Total hire charges for machineries /10sqm =

/10Sqm

LABOUR CHARGES PER 1000SQM

For loading materials into CMP

33.00 Nos Mazdoor Ist Class /Each = Rs.

25.00 Nos Mazdoor IInd Class /Each = Rs.

For attending Paver Finisher

10.00 Nos Mazdoor Ist Class /Each = Rs.

Total Labour Charges per 1000sqm = Rs.

Labour Charges per 10sqm / 1000) x 10 = Rs. /10Sqm

DBM 75mm thick using VG40 Bitumen and more than 5m width Paver per cu.m rate

0.400 Cu.m Cost of 37.50-13.20mm IRC /Cu.m = Rs.

0.350 Cu.m Cost of 13.20-2.36mm IRC /Cu.m = Rs.

0.360 Cu.m Cost of 2.36mm & Below IRC /Cu.m = Rs.

71.30 Kg Cost of VG40 Bitumen /MT = Rs.

10.00 Sqm Hire charges /10Sqm = Rs.

10.00 Sqm Labour charges /10Sqm = Rs.

Rate for 10 sqm = Rs.

Rate per cu.m of 75 mm thick ( / 10 x 0.075 ) = Rs. /Cu.m

307
Prime Coat Over WBM/ WMM Surface
Providing and laying Prime Coat over WBM/ WMM surface using 7 Kg of Emulsion Bitumen
(SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost
of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
complete as perClause 502 of MORTH Rev-5
Labour Charges per 500 sqm for preparation of surface
10.00 Nos Mazdoor Ist Grade @Rs /each =Rs
16.00 Nos Mazdoor IIst Grade @Rs /each =Rs
For Applying Primer
4.00 Nos Mazdoor IIst Grade @Rs /each =Rs
Total Labour Charges per 500 sqm =Rs

Total Labour Charges per 10 sqm = x10 Rs.


500
Rate for Prime Coat over WBM/ WMM surface
Cost of Bitumen Emulsion -
7.00 Kgs
SS1 @Rs /MT =Rs
Hire for Bitumen Emulsion
10.00 Sqm Pressure Distributor (HW- @Rs /10sqm =Rs
H0004)
10.00 Sqm Labour Charges @Rs /10sqm =Rs
Rate for 10 sqm =Rs

Rate per 1.00 sqm =Rs /sqm

Prime Coat Over CRM/ Gravel base


Providing and laying Prime Coat over CRM/ Gravel base using 9 Kg of Emulsion Bitumen (SS1)
per 10 sqm for preparatory to another bituminous construction over it including cost of mate-
rial, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete
as perClause 502 of MORTH Rev-5
Labour Charges per 500 sqm for preparation of surface
10.00 Nos Mazdoor Ist Grade @Rs /each =Rs
16.00 Nos Mazdoor IIst Grade @Rs /each =Rs
For Applying Primer
4.00 Nos Mazdoor IIst Grade @Rs /each =Rs
Total Labour Charges per 500 sqm =Rs

Total Labour Charges per 10 sqm = x10 Rs.


500
Rate for Prime Coat over Crusher Run Macadam surface
Cost of Bitumen Emulsion
9.00 Kgs
(SS1) @Rs /MT =Rs
Hire for Bitumen Emulsion
10.00 Sqm Pressure Distributor (HW- @Rs /10sqm =Rs
H0004)
10.00 Sqm Labour Charges @Rs /10sqm =Rs
Rate for 10 sqm =Rs

308
Rate per 1.00 sqm =Rs /sqm

Tack Coat over Dry Lean Cement Concrete Surface

Providing and laying Tack Coat over Dry Lean Cement Concrete surface using 3.00 Kg of Bi-
tumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it
including cost of material, labour charges, rentals for machinery, fuel and all other incidental
charges etc., complete as perClause 503 of MORTH Rev-5
Labour Charges per 500 sqm

Mazdoor IInd Grade(Applying


3.00 Nos
TC) @Rs /each =Rs
Total Labour Charges per 500 sqm =Rs

Total Labour Charges per 10 sqm = x10 Rs.


500
Rate for Tack Coat over Dry Lean Cement Concrete Surface

3.00 Kgs Cost of RS-I Bitumen emulsion @Rs /MT =Rs


10.00 Sqm Hire for bitumen boiler @Rs /10sqm =Rs
Hire for Bitumen Emulsion
10.00 Sqm Pressure Distributor (HW- @Rs /10sqm =Rs
H0004)
10.00 Sqm Labour Charges @Rs /10sqm =Rs
Rate for 10 sqm =Rs

Rate per 1.00 sqm =Rs /sqm

Tack Coat Over Existing BT Surface


Providing and laying Tack Coat over Existing BT surface using 2 Kg of Bitumen Emulsion (RS1)
per 10 sqm for preparatory to another bituminous construction over it including cost of material,
labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as
perClause 503 of MORTH Rev-5

Labour Charges per 500 sqm

5.00 Nos Mazdoor Ist Grade Preparing Surface @Rs /each =Rs

5.00 Nos Mazdoor IIst Grade(Applying TC) @Rs /each =Rs

Total Labour Charges per 500 sqm =Rs

Total Labour Charges per 10 sqm = x10 Rs.

500

309
Rate for Tack Coat over Existing BT surface

2.00 Kgs Cost of RS-I Bitumen emulsion @Rs /MT =Rs


Hire for Bitumen Emulsion Pressure Distributor
10.00 sqm @Rs /10sqm =Rs
(HW-H0004)

10.00 sqm Labour Charges @Rs /10sqm =Rs

Rate for 10 sqm =Rs

Rate per 1.00 sqm =Rs /sqm

Tack Coat Over Primed Surface

Providing and laying Tack Coat over WBM/ WMM surface (treated with primer) using 2.50 Kg of
Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over
it including cost of material, labour charges, rentals for machinery, fuel and all other incidental
charges etc., complete as perClause 503 of MORTH Rev-5

Labour Charges per 500 sqm

3.00 Nos Mazdoor IInd Grade(Applying TC) @Rs /each =Rs

Total Labour Charges per 500 sqm =Rs

Total Labour Charges per 10 sqm = x10 Rs.

500

Rate for Tack Coat over primed WBM / WMM Surface

2.50 Kgs Cost of RS-I Bitumen emulsion @Rs /MT =Rs


Hire for Bitumen Emulsion Pressure Distributor
10.00 Sqm @Rs /10sqm =Rs
(HW-H0004)

10.00 Sqm Labour Charges @Rs /10sqm =Rs

Rate for 10 sqm =Rs

Rate per 1.00 sqm =Rs /sqm

310
BC 30/40mm Thick (Grade-II) Using VG30 Bitumen
Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cu.m of 19.00-
9.50mm, 0.17 cu.m of 9.50-2.36mm and 0.26 cu.m of 2.36 and below with 50.30kgs of
VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP
site, heating the bitumen and aggregate to required temperature and mixing them in required
temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks
to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the
specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required
density etc., including labour for attending to paver to site etc., including hire charges and fuel
charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and
all other tools and plant required, including fuel and all other incidental charges etc., complete
as per specification using CMP as per clause 507 of MORTH Rev-5
HIRE CHARGES FOR MACHINERIES

1. CENTRAL HOT MIX PLANT

Hire charges excluding fuel charges per hour /8 = Rs.

Running the Plant/Hr 30 lit of diesel at Rs. /Lit = Rs.

Heating bitumen/Hr 25lit of furnace oil at Rs. /Lit = Rs.

Heating aggregates/Hr 170lit of furnace oil at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of CMP per Hour for BC = 170sqm. of 40 mm thick

Hire Charges for CMP per 10sqm ( / 170) x 10 = Rs. /10Sqm

2.BITUMEN BOILER
Since Bitumem boiler is attached with CMP unit hire charges for separate bitumen boiler is not
necessary

3.VIBRATOR ROLLERS

Hire charges excluding fuel charges/Hr at Rs. /8 = Rs.

Fuel charges/Hr 2.50lit at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of Vibrator Roller per hour= 400sqm. of 40 mm thick

Hire Charges for Vibrator roller /10sqm ( / 400) x10 = Rs. /10Sqm

4. PAVER FINISHER

Hire charges excluding fuel charges/Hr at Rs. /8 = Rs.

Fuel charges/Hr 6lit at Rs. /Lit = Rs.

311
Hire Charges including fuel charges per hour = Rs.

Out turn of Paver Finisher per hour = 170 sqm. of 40 mm thick

Hire Charges for paver finisher /10sqm ( /170) x 10 = Rs. /10Sqm

5. TIPPER TRUCKS

Hire charges excluding fuel charges /Hr at Rs. /8 = Rs.

Fuel charges /Hr 3.25lit at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of Tipper Truck per hour = 170 sqm. of 40 mm thick

Number of tipper required per CMP unit = 6 trucks

Hire Charges for Tipper /10sqm ( / 170) x 6 x 10 = Rs. /10Sqm

Total hire charges for machineries /10sqm =

/10Sqm

LABOUR CHARGES PER 1200 SQM

For loading materials into CMP

33.00 Nos Mazdoor Ist Class /Each = Rs.

25.00 Nos Mazdoor IInd Class /Each = Rs.

For attending Paver Finisher

10.00 Nos Mazdoor Ist Class /Each = Rs.

Total Labour Charges per 1200sqm = Rs.

Labour Charges per 10sqm ( / 1200) x 10 = Rs. /10Sqm

BC 30/40mm Thick (Grade-II) Using VG30 Bitumen

0.130 Cu.m Cost of 19.00-9.50mm IRC /Cu.m = Rs.

0.170 Cu.m Cost of 9.50 - 2.36mm IRC /Cu.m = Rs.

0.260 Cu.m Cost of 2.36 mm and below /Cu.m = Rs.

50.30 Kg Cost of VG30 grade Bitumen /MT = Rs.

10.00 Sqm Hire charges /10Sqm = Rs.

10.00 Sqm Labour charges /10Sqm = Rs.

312
Rate for 10 sqm = Rs.

Rate per Cu.m of 30/40mm thick ( / (10*0.04) ) = Rs. /Cu.m

BC 30/40mm Thick (Grade-II) Using VG40 Bitumen


Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cu.m of 19.00-
9.50mm, 0.17 cu.m of 9.50-2.36mm and 0.26 cu.m of 2.36 and below with 50.30kgs of
VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP
site, heating the bitumen and aggregate to required temperature and mixing them in required
temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks
to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the
specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the
required density etc., including labour for attending to paver to site etc., including hire charges
and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory
roller and all other tools and plant required, including fuel and all other incidental charges etc.,
complete as per specification using CMP as per clause 507 of MORTH Rev-5
HIRE CHARGES FOR MACHINERIES

1. CENTRAL HOT MIX PLANT

Hire charges excluding fuel charges per hour /8 = Rs.

Running the Plant/Hr 30 lit of diesel at Rs. /Lit = Rs.

Heating bitumen/Hr 25lit of furnace oil at Rs. /Lit = Rs.

Heating aggregates/Hr 170lit of furnace oil at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of CMP per Hour for BC = 170sqm. of 40 mm thick

Hire Charges for CMP per 10sqm ( / 170) x 10 = Rs. /10Sqm

2.BITUMEN BOILER
Since Bitumem boiler is attached with CMP unit hire charges for separate bitumen boiler is not
necessary

3.VIBRATOR ROLLERS

Hire charges excluding fuel charges/Hr at Rs. /8 = Rs.

Fuel charges/Hr 2.50lit at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of Vibrator Roller per hour= 400sqm. of 40 mm thick

313
Hire Charges for Vibrator roller /10sqm ( / 400) x10 = Rs. /10Sqm

4. PAVER FINISHER

Hire charges excluding fuel charges/Hr at Rs. /8 = Rs.

Fuel charges/Hr 6lit at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of Paver Finisher per hour = 170 sqm. of 40 mm thick

Hire Charges for paver finisher /10sqm ( /170) x 10 = Rs. /10Sqm

5. TIPPER TRUCKS

Hire charges excluding fuel charges /Hr at Rs. /8 = Rs.

Fuel charges /Hr 3.25lit at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of Tipper Truck per hour = 170 sqm. of 40 mm thick

Number of tipper required per CMP unit = 6 trucks

Hire Charges for Tipper /10sqm ( / 170) x 6 x 10 = Rs. /10Sqm

Total hire charges for machineries /10sqm =

/10Sqm

LABOUR CHARGES PER 1200 SQM

For loading materials into CMP

33.00 Nos Mazdoor Ist Class /Each = Rs.

25.00 Nos Mazdoor IInd Class /Each = Rs.

For attending Paver Finisher

10.00 Nos Mazdoor Ist Class /Each = Rs.

Total Labour Charges per 1200sqm = Rs.

Labour Charges per 10sqm ( / 1200) x 10 = Rs. /10Sqm

BC 30/40mm Thick (Grade-II) Using VG40 Bitumen

0.130 Cu.m Cost of 19.00-9.50mm IRC /Cu.m = Rs.

314
0.170 Cu.m Cost of 9.50 - 2.36mm IRC /Cu.m = Rs.

0.260 Cu.m Cost of 2.36 mm and below /Cu.m = Rs.

50.30 Kg Cost of VG40 grade Bitumen /MT = Rs.

10.00 Sqm Hire charges /10Sqm = Rs.

10.00 Sqm Labour charges /10Sqm = Rs.

Rate for 10 sqm = Rs.

Rate per Cu.m of 30/40mm thick ( / (10*0.04) ) = Rs. /Cu.m

BC 30/40mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste


Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cu.m of 19.00-
9.50mm, 0.17 cu.m of 9.50-2.36mm and 0.26 cu.m of 2.36 and below with 47.28kgs of
VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost
and conveyance of all materials to CMP site, heating the bitumen and aggregate to required
temperature and mixing them in required temperature in central hot mix plant 20-30 ton
capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness
of 40mm with mechanical paver to the specified grades and cross sections and consolidated
by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to
site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper
trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and
all other incidental charges etc., complete as per specification using CMP as per clause 507 of
MORTH Rev-5
HIRE CHARGES FOR MACHINERIES

1. CENTRAL HOT MIX PLANT

Hire charges excluding fuel charges per hour /8 = Rs.

Running the Plant/Hr 30 lit of diesel at Rs. /Lit = Rs.

Heating bitumen/Hr 25lit of furnace oil at Rs. /Lit = Rs.

Heating aggregates/Hr 170lit of furnace oil at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of CMP per Hour for BC = 170sqm. of 40 mm thick

Hire Charges for CMP per 10sqm ( / 170) x 10 = Rs. /10Sqm

2.BITUMEN BOILER
Since Bitumem boiler is attached with CMP unit hire charges for separate bitumen boiler is not
necessary

315
3.VIBRATOR ROLLERS

Hire charges excluding fuel charges/Hr at Rs. /8 = Rs.

Fuel charges/Hr 2.50lit at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of Vibrator Roller per hour= 400sqm. of 40 mm thick

Hire Charges for Vibrator roller /10sqm ( / 400) x10 = Rs. /10Sqm

4. PAVER FINISHER

Hire charges excluding fuel charges/Hr at Rs. /8 = Rs.

Fuel charges/Hr 6lit at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of Paver Finisher per hour = 170 sqm. of 40 mm thick

Hire Charges for paver finisher /10sqm ( /170) x 10 = Rs. /10Sqm

5. TIPPER TRUCKS

Hire charges excluding fuel charges /Hr at Rs. /8 = Rs.

Fuel charges /Hr 3.25lit at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of Tipper Truck per hour = 170 sqm. of 40 mm thick

Number of tipper required per CMP unit = 6 trucks

Hire Charges for Tipper /10sqm ( / 170) x 6 x 10 = Rs. /10Sqm

Total hire charges for machineries /10sqm =

/10Sqm

LABOUR CHARGES PER 1200 SQM

For loading materials into CMP

33.00 Nos Mazdoor Ist Class /Each = Rs.

25.00 Nos Mazdoor IInd Class /Each = Rs.

For attending Paver Finisher

10.00 Nos Mazdoor Ist Class /Each = Rs.

316
Total Labour Charges per 1200sqm = Rs.

Labour Charges per 10sqm ( / 1200) x 10 = Rs. /10Sqm

BC 30/40mm Thick (Grade-II) Using VG30 Bitumen and Plastic


Waste
0.130 Cu.m Cost of 19.00-9.50mm IRC /Cu.m = Rs.

0.170 Cu.m Cost of 9.50 - 2.36mm IRC /Cu.m = Rs.

0.260 Cu.m Cost of 2.36mm & below IRC /Cu.m = Rs.

47.28 Kg Cost of VG30 grade Bitumen /MT = Rs.

3.02 Kg Cost of Waste Plastic /Kg = Rs.

10.00 Sqm Hire charges /10Sqm = Rs.

10.00 Sqm Labour charges /10Sqm = Rs.

Rate for 10 sqm = Rs.

Rate per Cu.m of 30/40mm thick ( / (10*0.04) ) = Rs. /Cu.m

BC 30/40mm Thick (Grade-II) Using VG40 Bitumen and Plastic Waste


Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cu.m of 19.00-
9.50mm, 0.17 cu.m of 9.50-2.36mm and 0.26 cu.m of 2.36 and below with 47.28kgs of
VG40 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost
and conveyance of all materials to CMP site, heating the bitumen and aggregate to required
temperature and mixing them in required temperature in central hot mix plant 20-30 ton
capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness
of 40mm with mechanical paver to the specified grades and cross sections and consolidated by
8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver
to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper
trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and
all other incidental charges etc., complete as per specification using CMP as per clause 507 of
MORTH Rev-5
HIRE CHARGES FOR MACHINERIES

1. CENTRAL HOT MIX PLANT

Hire charges excluding fuel charges per hour /8 = Rs.

Running the Plant/Hr 30 lit of diesel at Rs. /Lit = Rs.

Heating bitumen/Hr 25lit of furnace oil at Rs. /Lit = Rs.

Heating aggregates/Hr 170lit of furnace oil at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of CMP per Hour for BC = 170sqm. of 40 mm thick

317
Hire Charges for CMP per 10sqm ( / 170) x 10 = Rs. /10Sqm

2.BITUMEN BOILER
Since Bitumem boiler is attached with CMP unit hire charges for separate bitumen boiler is not
necessary

3.VIBRATOR ROLLERS

Hire charges excluding fuel charges/Hr at Rs. /8 = Rs.

Fuel charges/Hr 2.50lit at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of Vibrator Roller per hour= 400sqm. of 40 mm thick

Hire Charges for Vibrator roller /10sqm ( / 400) x10 = Rs. /10Sqm

4. PAVER FINISHER

Hire charges excluding fuel charges/Hr at Rs. /8 = Rs.

Fuel charges/Hr 6lit at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of Paver Finisher per hour = 170 sqm. of 40 mm thick

Hire Charges for paver finisher /10sqm ( /170) x 10 = Rs. /10Sqm

5. TIPPER TRUCKS

Hire charges excluding fuel charges /Hr at Rs. /8 = Rs.

Fuel charges /Hr 3.25lit at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of Tipper Truck per hour = 170 sqm. of 40 mm thick

Number of tipper required per CMP unit = 6 trucks

Hire Charges for Tipper /10sqm ( / 170) x 6 x 10 = Rs. /10Sqm

Total hire charges for machineries /10sqm =

/10Sqm

LABOUR CHARGES PER 1200 SQM

318
For loading materials into CMP

33.00 Nos Mazdoor Ist Class /Each = Rs.

25.00 Nos Mazdoor IInd Class /Each = Rs.

For attending Paver Finisher

10.00 Nos Mazdoor Ist Class /Each = Rs.

Total Labour Charges per 1200sqm = Rs.

Labour Charges per 10sqm ( / 1200) x 10 = Rs. /10Sqm

BC 30/40mm Thick (Grade-II) Using VG40 Bitumen and Plastic


Waste
0.130 Cu.m Cost of 19.00-9.50mm IRC /Cu.m = Rs.

0.170 Cu.m Cost of 9.50 - 2.36mm IRC /Cu.m = Rs.

0.260 Cu.m Cost of 2.36 mm and below /Cu.m = Rs.

47.28 Kg Cost of VG40 grade Bitumen /MT = Rs.

3.02 Kg Cost of Waste Plastic /Kg = Rs.

10.00 Sqm Hire charges /10Sqm = Rs.

10.00 Sqm Labour charges /10Sqm = Rs.

Rate for 10 sqm = Rs.

Rate per Cu.mm of 30/40mm thick ( / (10*0.04) ) = Rs. /Cu.m

BC 30/40mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste (more than
5m width Paver)
Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cu.m of 19.00-
9.50mm, 0.17 cu.m of 9.50-2.36mm and 0.26 cu.m of 2.36 and below with 47.28kgs of
VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost
and conveyance of all materials to CMP site, heating the bitumen and aggregate to required
temperature and mixing them in required temperature in central hot mix plant 20-30 ton
capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness
of 40mm with mechanical paver to the specified grades and cross sections and consolidated
by 8-10 tonne Pneumatic Roller to the required density etc., including labour for attending to
paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler,
tipper trucks, paver finisher hydrostatic (more than 5m width), Pneumatic roller and all
other tools and plant required, including fuel and all other incidental charges etc., complete as
per specification using CMP as per clause 507 of MORTH Rev-5
HIRE CHARGES FOR MACHINERIES

1. CENTRAL HOT MIX PLANT

Hire charges excluding fuel charges per hour /8 = Rs.

319
Running the Plant/Hr 30 lit of diesel at Rs. /Lit = Rs.

Heating bitumen/Hr 25lit of furnace oil at Rs. /Lit = Rs.

Heating aggregates/Hr 170lit of furnace oil at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of CMP per Hour for BC = 170sqm. of 40 mm thick

Hire Charges for CMP per 10sqm ( / 170) x 10 = Rs.


/10Sqm

2.BITUMEN BOILER
Since Bitumem boiler is attached with CMP unit hire charges for separate bitumen boiler is not
necessary

3.PNEUMATIC TYRED ROLLER

Hire charges /Hr at Rs. = Rs.

Fuel charges/Hr 2.50lit at Rs. /Lit = Rs.

Out turn of Vibrator Roller per hour= 400sqm. of 40 mm thick

Hire Charges for Vibrator roller /10sqm ( / 400) x10 = Rs.


/10Sqm

4. Paver Finisher Hydrostatic (more than 5m width) 170 HP

Hire charges /Hr at Rs. = Rs.

Fuel charges/Hr 6lit at Rs. /Lit = Rs.

Out turn of Paver Finisher per hour = 170 sqm. of 40 mm thick

Hire Charges for paver finisher /10sqm ( /170) x 10 = Rs.


/10Sqm

5. TIPPER TRUCKS

Hire charges excluding fuel charges /Hr at Rs. /8 = Rs.

Fuel charges /Hr 3.25lit at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of Tipper Truck per hour = 170 sqm. of 40 mm thick

320
Number of tipper required per CMP unit = 6 trucks

Hire Charges for Tipper /10sqm ( / 170) x 6 x 10 = Rs.


/10Sqm

Total hire charges for machineries /10sqm =

/10Sqm

LABOUR CHARGES PER 1200 SQM

For loading materials into CMP

33.00 Nos Mazdoor Ist Class /Each = Rs.

25.00 Nos Mazdoor IInd Class /Each = Rs.

For attending Paver Finisher

10.00 Nos Mazdoor Ist Class /Each = Rs.

Total Labour Charges per 1200sqm = Rs.

Labour Charges per 10sqm ( / 1200) x 10 = Rs.


/10Sqm

BC 30/40mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste (9m Paver)

0.130 Cu.m Cost of 19.00-9.50mm IRC /Cu.m = Rs.

0.170 Cu.m Cost of 9.50 - 2.36mm IRC /Cu.m = Rs.

0.260 Cu.m Cost of 2.36 mm and below /Cu.m = Rs.

47.28 Kg Cost of VG30 grade Bitumen /MT = Rs.

3.02 Kg Cost of Waste Plastic /Kg = Rs.

10.00 Sqm Hire charges /10Sqm = Rs.

10.00 Sqm Labour charges /10Sqm = Rs.

Rate for 10 sqm = Rs.

Rate per Cu.m of 30/40mm thick ( / (10*0.04) ) = Rs. /Cu.m

321
BC 30/40mm Thick (Grade-II) Using VG40 Bitumen and Plastic Waste (more than
5m width)
Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cu.m of 19.00-
9.50mm, 0.17 cu.m of 9.50-2.36mm and 0.26 cu.m of 2.36 and below with 47.28kgs of
VG40 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost
and conveyance of all materials to CMP site, heating the bitumen and aggregate to required
temperature and mixing them in required temperature in central hot mix plant 20-30 ton
capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform
thickness of 40mm with mechanical paver to the specified grades and cross sections and
consolidated by 8-10 tonne Vibratory / Pneumatic Roller to the required density etc., including
labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t
CMP with bitumen boiler, tipper trucks, paver finisher hydrostatic (more than 5m width),
Pneumatic roller and all other tools and plant required, including fuel and all other incidental
charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
HIRE CHARGES FOR MACHINERIES

1. CENTRAL HOT MIX PLANT

Hire charges excluding fuel charges per hour /8 = Rs.

Running the Plant/Hr 30 lit of diesel at Rs. /Lit = Rs.

Heating bitumen/Hr 25lit of furnace oil at Rs. /Lit = Rs.

Heating aggregates/Hr 170lit of furnace oil at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of CMP per Hour for BC = 170sqm. of 40 mm thick

Hire Charges for CMP per 10sqm ( / 170) x 10 = Rs.


/10Sqm

2.BITUMEN BOILER
Since Bitumem boiler is attached with CMP unit hire charges for separate bitumen boiler is not
necessary

3.PNEUMATIC TYRED ROLLER

Hire charges /Hr at Rs. = Rs.

Fuel charges/Hr 2.50lit at Rs. /Lit = Rs.

Out turn of Vibrator Roller per hour= 400sqm. of 40 mm thick

Hire Charges for Vibrator roller /10sqm ( / 400) x10 = Rs.


/10Sqm

4. Paver Finisher Hydrostatic (more than 5m width) 170 HP

Hire charges /Hr at Rs. = Rs.

322
Fuel charges/Hr 6lit at Rs. /Lit = Rs.

Out turn of Paver Finisher per hour = 170 sqm. of 40 mm thick

Hire Charges for paver finisher /10sqm ( /170) x 10 = Rs.


/10Sqm

5. TIPPER TRUCKS

Hire charges excluding fuel charges /Hr at Rs. /8 = Rs.

Fuel charges /Hr 3.25lit at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of Tipper Truck per hour = 170 sqm. of 40 mm thick

Number of tipper required per CMP unit = 6 trucks

Hire Charges for Tipper /10sqm ( / 170) x 6 x 10 = Rs.


/10Sqm

Total hire charges for machineries /10sqm =

/10Sqm

LABOUR CHARGES PER 1200 SQM

For loading materials into CMP

33.00 Nos Mazdoor Ist Class /Each = Rs.

25.00 Nos Mazdoor IInd Class /Each = Rs.

For attending Paver Finisher

10.00 Nos Mazdoor Ist Class /Each = Rs.

Total Labour Charges per 1200sqm = Rs.

Labour Charges per 10sqm ( / 1200) x 10 = Rs.


/10Sqm

BC 30/40mm Thick (Grade-II) Using VG40 Bitumen and Plastic Waste (more than
5m width)
0.130 Cu.m Cost of 19.00-9.50mm IRC /Cu.m = Rs.

0.170 Cu.m Cost of 9.50 - 2.36mm IRC /Cu.m = Rs.

0.260 Cu.m Cost of 2.36 mm and below /Cu.m = Rs.

47.28 Kg Cost of VG40 grade Bitumen /MT = Rs.

323
3.02 Kg Cost of Waste Plastic /Kg = Rs.

10.00 Sqm Hire charges /10Sqm = Rs.

10.00 Sqm Labour charges /10Sqm = Rs.

Rate for 10 sqm = Rs.

Rate per Cu.mm of 30/40mm thick ( / (10*0.04) ) = Rs. /Cu.m

BC 30/40mm Thick (Grade-II) Using VG30 Bitumen(more than 5m width Paver)


Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cu.m of 19.00-
9.50mm, 0.17 cu.m of 9.50-2.36mm and 0.26 cu.m of 2.36 and below with 50.30kgs of
VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to
CMP site, heating the bitumen and aggregate to required temperature and mixing them in
required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper
trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver
to the specified grades and cross sections and consolidated by 8-10 tonne Pneumatic Roller
to the required density etc., including labour for attending to paver to site etc., including hire
charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, paver finisher
hydrostatic (more than 5m width), Pneumatic roller and all other tools and plant required,
including fuel and all other incidental charges etc., complete as per specification using CMP as
per clause 507 of MORTH Rev-5
HIRE CHARGES FOR MACHINERIES

1. CENTRAL HOT MIX PLANT

Hire charges excluding fuel charges per hour /8 = Rs.

Running the Plant/Hr 30 lit of diesel at Rs. /Lit = Rs.

Heating bitumen/Hr 25lit of furnace oil at Rs. /Lit = Rs.

Heating aggregates/Hr 170lit of furnace oil at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of CMP per Hour for BC = 170sqm. of 40 mm thick


Hire Charges for CMP per 10sqm ( / 170) x
= Rs.
10 /10Sqm

2.BITUMEN BOILER
Since Bitumem boiler is attached with CMP unit hire charges for separate bitumen boiler is not
necessary

3.PNEUMATIC TYRED ROLLER

Hire charges /Hr at Rs. = Rs.

Fuel charges/Hr 2.50lit at Rs. /Lit = Rs.

324
Out turn of Vibrator Roller per hour= 400sqm. of 40 mm thick

Hire Charges for Vibrator roller /10sqm ( / 400) x10 = Rs.


/10Sqm

4. Paver Finisher Hydrostatic (more than 5m width) 170 HP

Hire charges /Hr at Rs. = Rs.

Fuel charges/Hr 6lit at Rs. /Lit = Rs.

Out turn of Paver Finisher per hour = 170 sqm. of 40 mm thick

Hire Charges for paver finisher /10sqm ( /170) x 10 = Rs.


/10Sqm

5. TIPPER TRUCKS

Hire charges excluding fuel charges /Hr at Rs. /8 = Rs.

Fuel charges /Hr 3.25lit at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of Tipper Truck per hour = 170 sqm. of 40 mm thick

Number of tipper required per CMP unit = 6 trucks

Hire Charges for Tipper /10sqm ( / 170) x 6 x 10 = Rs.


/10Sqm

Total hire charges for machineries /10sqm =

= Rs. /10sqm

LABOUR CHARGES PER 1200 SQM

For loading materials into CMP

33.00 Nos Mazdoor Ist Class /Each = Rs.

25.00 Nos Mazdoor IInd Class /Each = Rs.

For attending Paver Finisher

10.00 Nos Mazdoor Ist Class /Each = Rs.

Total Labour Charges per 1200sqm = Rs.

Labour Charges per 10sqm ( / 1200) x 10 = Rs.


/10Sqm

325
BC 30/40mm Thick (Grade-II) Using VG30 Bitumen (9m Paver)
0.130
Cost of 19.00-9.50mm IRC /Cu.m = Rs.
Cu.m
0.170
Cost of 9.50 - 2.36mm IRC /Cu.m = Rs.
Cu.m
0.260
Cost of 2.36 mm and below /Cu.m = Rs.
Cu.m
50.30 Kg Cost of VG30 grade Bitumen /MT = Rs.

10.00 Sqm Hire charges /10Sqm = Rs.

10.00 Sqm Labour charges /10Sqm = Rs.

Rate for 10 sqm = Rs.

Rate per Cu.m of 30/40mm thick ( / (10*0.04) ) = Rs. /Cu.m

BC 30/40mm Thick (Grade-II) Using VG40 Bitumen (more than 5m width)


Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cu.m of 19.00-
9.50mm, 0.17 cu.m of 9.50-2.36mm and 0.26 cu.m of 2.36 and below with 50.30kgs of
VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP
site, heating the bitumen and aggregate to required temperature and mixing them in required
temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks
to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the
specified grades and cross sections and consolidated by 8-10 tonne Pneumatic Roller to the
required density etc., including labour for attending to paver to site etc., including hire charges
and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, paver finisher hydro-
static (more than 5m width), Vibratory / Pneumatic roller and all other tools and plant re-
quired, including fuel and all other incidental charges etc., complete as per specification using
CMP as per clause 507 of MORTH Rev-5
HIRE CHARGES FOR MACHINERIES

1. CENTRAL HOT MIX PLANT

Hire charges excluding fuel charges per hour /8 = Rs.

Running the Plant/Hr 30 lit of diesel at Rs. /Lit = Rs.

Heating bitumen/Hr 25lit of furnace oil at Rs. /Lit = Rs.

Heating aggregates/Hr 170lit of furnace oil at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of CMP per Hour for BC = 170sqm. of 40 mm thick


Hire Charges for CMP per 10sqm ( / 170) x
= Rs.
10 /10Sqm

326
2.BITUMEN BOILER
Since Bitumem boiler is attached with CMP unit hire charges for separate bitumen boiler is not
necessary

3.PNEUMATIC TYRED ROLLER

Hire charges /Hr at Rs. = Rs.

Fuel charges/Hr 2.50lit at Rs. /Lit = Rs.

Out turn of Vibrator Roller per hour= 400sqm. of 40 mm thick

Hire Charges for Vibrator roller /10sqm ( / 400) x10 = Rs.


/10Sqm

4. Paver Finisher Hydrostatic (more than 5m width) 170 HP

Hire charges /Hr at Rs. = Rs.

Fuel charges/Hr 6lit at Rs. /Lit = Rs.

Out turn of Paver Finisher per hour = 170 sqm. of 40 mm thick

Hire Charges for paver finisher /10sqm ( /170) x 10 = Rs.


/10Sqm

5. TIPPER TRUCKS

Hire charges excluding fuel charges /Hr at Rs. /8 = Rs.

Fuel charges /Hr 3.25lit at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of Tipper Truck per hour = 170 sqm. of 40 mm thick

Number of tipper required per CMP unit = 6 trucks

Hire Charges for Tipper /10sqm ( / 170) x 6 x 10 = Rs.


/10Sqm

Total hire charges for machineries /10sqm =

/10Sqm

LABOUR CHARGES PER 1200 SQM

For loading materials into CMP

327
33.00 Nos Mazdoor Ist Class /Each = Rs.

25.00 Nos Mazdoor IInd Class /Each = Rs.

For attending Paver Finisher

10.00 Nos Mazdoor Ist Class /Each = Rs.

Total Labour Charges per 1200sqm = Rs.

Labour Charges per 10sqm ( / 1200) x 10 = Rs.


/10Sqm

BC 30/40mm Thick (Grade-II) Using VG40 Bitumen (more than 5m


width)
0.130
Cost of 19.00-9.50mm IRC /Cu.m = Rs.
Cu.m
0.170
Cost of 9.50 - 2.36mm IRC /Cu.m = Rs.
Cu.m
0.260
Cost of 2.36 mm and below /Cu.m = Rs.
Cu.m
50.30 Kg Cost of VG40 grade Bitumen /MT = Rs.

10.00 Sqm Hire charges /10Sqm = Rs.

10.00 Sqm Labour charges /10Sqm = Rs.

Rate for 10 sqm = Rs.

Rate per Cu.m of 30/40mm thick ( / (10*0.04) ) = Rs. /Cu.m

328
BC 50mm Thick (Grade - I) Using VG30 Bitumen
Providing and laying Bituminous Concrete to 50mm thick using 0.22 cu.m of 26.5-13.20mm,
0.24 cu.m of 13.20-2.36mm and 0.26cu.m of 2.36 & below IRC HBG metal with 62.40 kgs of
VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP
site, heating the bitumen and aggregate to required temperature and mixing them in required
temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks
to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the
specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the
required density etc., including labour for attending to paver to site etc., including hire charges
and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory
roller and all other tools and plant required, including fuel and all other incidental charges etc.,
complete as per specification using CMP clause 507 of MORTH.
HIRE CHARGES FOR MACHINERIES

1. CENTRAL HOT MIX PLANT

Hire charges excluding fuel charges /Hr. /8 = Rs.

Running the Plant 30Lit of diesel at Rs. /Lit = Rs.

Heating the bitumen 25Lit of furnace oil at Rs. /Lit = Rs.

Heating the aggregates 170Lit of furnace oil at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of CMP per Hour for BC = 170sqm. of 40 mm thick

Hire Charges for CMP per 10sqm ( / 170) x 10 = Rs. /10Sqm

2.BITUMEN BOILER
Since Bitumem boiler is attached with CMP unit hire charges for separate bitumen boiler is not
necessary

3.VIBRATOR ROLLERS

Hire charges excluding fuel charges/Hr at Rs. /8 = Rs.

Fuel charges/Hr 2.50lit at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of Vibrator Roller per hour= 400sqm. of 40 mm thick

Hire Charges for Vibrator roller /10sqm ( / 400) x10 = Rs. /10Sqm

4. PAVER FINISHER

Hire charges excluding fuel charges/Hr at Rs. /8 = Rs.

Fuel charges/Hr 6lit at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

329
Out turn of Paver Finisher per hour = 170 sqm. of 40 mm thick

Hire Charges for paver finisher /10sqm ( /170) x 10 = Rs. /10Sqm

5. TIPPER TRUCKS

Hire charges excluding fuel charges /Hr at Rs. /8 = Rs.

Fuel charges /Hr 3.25lit at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of Tipper Truck per hour = 170 sqm. of 40 mm thick

Number of tipper required per CMP unit = 6 trucks

Hire Charges for Tipper /10sqm ( / 170) x 6 x 10 = Rs. /10Sqm

Total hire charges for machineries /10sqm =

/10Sqm

LABOUR CHARGES PER 1200 SQM

For loading materials into CMP

33.00 Nos Mazdoor Ist Class /Each = Rs.

25.00 Nos Mazdoor IInd Class /Each = Rs.

For attending Paver Finisher

10.00 Nos Mazdoor Ist Class /Each = Rs.

Total Labour Charges per 1200sqm = Rs.

Labour Charges per 10sqm ( / 1200) x 10 = Rs. /10Sqm

BC 50mm Thick (Grade - I) Using VG30 Bitumen

0.220 Cu.m Cost of 26.5 - 13.20mm IRC /Cu.m = Rs.

0.240 Cu.m Cost of 13.20 - 2.36mm IRC /Cu.m = Rs.

0.260 Cu.m Cost of 2.36 mm and below /Cu.m = Rs.

62.40 Kg Cost of VG30 grade Bitumen /MT = Rs.

10.00 Sqm Hire charges /10Sqm = Rs.

10.00 Sqm Labour charges /10Sqm = Rs.

Rate for 10 sqm = Rs.

Rate per Cu.m of 50mm thick ( / (10*0.05) ) = Rs. /Cu.m

330
BC 50mm Thick (Grade - I) Using VG40 Bitumen
Providing and laying Bituminous Concrete to 50mm thick using 0.22 cu.m of 26.5-13.20mm,
0.24 cu.m of 13.20-2.36mm and 0.26cu.m of 2.36 & below IRC HBG metal with 62.40 kgs of
VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP
site, heating the bitumen and aggregate to required temperature and mixing them in required
temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks
to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the
specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the
required density etc., including labour for attending to paver to site etc., including hire charges
and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory
roller and all other tools and plant required, including fuel and all other incidental charges etc.,
complete as per specification using CMP clause 507 of MORTH.
HIRE CHARGES FOR MACHINERIES

1. CENTRAL HOT MIX PLANT

Hire charges excluding fuel charges /Hr. /8 = Rs.

Running the Plant 30Lit of diesel at Rs. /Lit = Rs.

Heating the bitumen 25Lit of furnace oil at Rs. /Lit = Rs.

Heating the aggregates 170Lit of furnace oil at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of CMP per Hour for BC = 170sqm. of 40 mm thick

Hire Charges for CMP per 10sqm ( / 170) x 10 = Rs. /10Sqm

2.BITUMEN BOILER
Since Bitumem boiler is attached with CMP unit hire charges for separate bitumen boiler is not
necessary

3.VIBRATOR ROLLERS

Hire charges excluding fuel charges/Hr at Rs. /8 = Rs.

Fuel charges/Hr 2.50lit at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of Vibrator Roller per hour= 400sqm. of 40 mm thick

Hire Charges for Vibrator roller /10sqm ( / 400) x10 = Rs. /10Sqm

4. PAVER FINISHER

Hire charges excluding fuel charges/Hr at Rs. /8 = Rs.

Fuel charges/Hr 6lit at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

331
Out turn of Paver Finisher per hour = 170 sqm. of 40 mm thick

Hire Charges for paver finisher /10sqm ( /170) x 10 = Rs. /10Sqm

5. TIPPER TRUCKS

Hire charges excluding fuel charges /Hr at Rs. /8 = Rs.

Fuel charges /Hr 3.25lit at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of Tipper Truck per hour = 170 sqm. of 40 mm thick

Number of tipper required per CMP unit = 6 trucks

Hire Charges for Tipper /10sqm ( / 170) x 6 x 10 = Rs. /10Sqm

Total hire charges for machineries /10sqm =

= /10Sqm

LABOUR CHARGES PER 1200 SQM

For loading materials into CMP

33.00 Nos Mazdoor Ist Class /Each = Rs.

25.00 Nos Mazdoor IInd Class /Each = Rs.

For attending Paver Finisher

10.00 Nos Mazdoor Ist Class /Each = Rs.

Total Labour Charges per 1200sqm = Rs.

Labour Charges per 10sqm ( / 1200) x 10 = Rs. /10Sqm

BC 50mm Thick (Grade - I) Using VG40 Bitumen

0.220 Cu.m Cost of 26.5 - 13.20mm IRC /Cu.m = Rs.

0.240 Cu.m Cost of 13.20 - 2.36mm IRC /Cu.m = Rs.

0.260 Cu.m Cost of 2.36 mm and below /Cu.m = Rs.

62.40 Kg Cost of VG40 grade Bitumen /MT = Rs.

10.00 Sqm Hire charges /10Sqm = Rs.

10.00 Sqm Labour charges /10Sqm = Rs.

Rate for 10 sqm = Rs.

Rate per sqm of 50mm thick ( / (10*0.05) ) = Rs. /Cu.m

332
BC 50mm Thick (Grade - I) Using VG30 Bitumen (more than 5m width Paver)
Providing and laying Bituminous Concrete to 50mm thick using 0.22 cu.m of 26.5-13.20mm,
0.24 cu.m of 13.20-2.36mm and 0.26cu.m of 2.36 & below IRC HBG metal with 62.40 kgs
of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to
CMP site, heating the bitumen and aggregate to required temperature and mixing them in
required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper
trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver
to the specified grades and cross sections and consolidated by 8-10 tonne Pneumatic Roller
to the required density etc., including labour for attending to paver to site etc., including hire
charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, paver finisher
hydrostatic (more than 5m width), Pneumatic roller and all other tools and plant required,
including fuel and all other incidental charges etc., complete as per specification using CMP
clause 507 of MORTH.
HIRE CHARGES FOR MACHINERIES

1. CENTRAL HOT MIX PLANT

Hire charges excluding fuel charges /Hr. /8 = Rs.

Running the Plant 30Lit of diesel at Rs. /Lit = Rs.

Heating the bitumen 25Lit of furnace oil at Rs. /Lit = Rs.

Heating the aggregates 170Lit of furnace oil at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of CMP per Hour for BC = 170sqm. of 40 mm thick

Hire Charges for CMP per 10sqm ( / 170) x 10 = Rs. /10Sqm

2.BITUMEN BOILER
Since Bitumem boiler is attached with CMP unit hire charges for separate bitumen boiler is not
necessary

3.PNEUMATIC TYRED ROLLER

Hire charges /Hr at Rs. = Rs.

Fuel charges/Hr 2.50lit at Rs. /Lit = Rs.

Out turn of Vibrator Roller per hour= 400sqm. of 40 mm thick

Hire Charges for Vibrator roller /10sqm ( / 400) x10 = Rs. /10Sqm

4. Paver Finisher Hydrostatic (more than 5m width) 170


HP
Hire charges /Hr at Rs. = Rs.

333
Fuel charges/Hr 6lit at Rs. /Lit = Rs.

Out turn of Paver Finisher per hour = 170 sqm. of 40 mm thick

Hire Charges for paver finisher /10sqm ( /170) x 10 = Rs. /10Sqm

5. TIPPER TRUCKS

Hire charges excluding fuel charges /Hr at Rs. /8 = Rs.

Fuel charges /Hr 3.25lit at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of Tipper Truck per hour = 170 sqm. of 40 mm thick

Number of tipper required per CMP unit = 6 trucks

Hire Charges for Tipper /10sqm ( / 170) x 6 x 10 = Rs. /10Sqm

Total hire charges for machineries /10sqm =

/10Sqm

LABOUR CHARGES PER 1200 SQM

For loading materials into CMP

33.00 Nos Mazdoor Ist Class /Each = Rs.

25.00 Nos Mazdoor IInd Class /Each = Rs.

For attending Paver Finisher

10.00 Nos Mazdoor Ist Class /Each = Rs.

Total Labour Charges per 1200sqm = Rs.

Labour Charges per 10sqm ( / 1200) x 10 = Rs. /10Sqm

BC 50mm Thick (Grade - I) Using VG30 Bitumen (more than 5m width Paver)

0.220 Cu.m Cost of 26.5 - 13.20mm IRC /Cu.m = Rs.

0.240 Cu.m Cost of 13.20 - 2.36mm IRC /Cu.m = Rs.

0.260 Cu.m Cost of 2.36 mm and below /Cu.m = Rs.

62.40 Kg Cost of VG30 grade Bitumen /MT = Rs.

10.00 Sqm Hire charges /10Sqm = Rs.

334
10.00 Sqm Labour charges /10Sqm = Rs.

Rate for 10 sqm = Rs.

Rate per Cu.m of 50mm thick ( / (10*0.05) ) = Rs. /Cu.m

BC 50mm Thick (Grade - I) Using VG40 Bitumen (more than 5m width Paver)
Providing and laying Bituminous Concrete to 50mm thick using 0.22 cu.m of 26.5-13.20mm,
0.24 cu.m of 13.20-2.36mm and 0.26cu.m of 2.36 & below IRC HBG metal with 62.40 kgs
of VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to
CMP site, heating the bitumen and aggregate to required temperature and mixing them in
required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper
trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver
to the specified grades and cross sections and consolidated by 8-10 tonne Pneumatic Roller
to the required density etc., including labour for attending to paver to site etc., including hire
charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, paver finisher
hydrostatic (more than 5m width), Pneumatic roller and all other tools and plant required,
including fuel and all other incidental charges etc., complete as per specification using CMP
clause 507 of MORTH.
HIRE CHARGES FOR MACHINERIES

1. CENTRAL HOT MIX PLANT

Hire charges excluding fuel charges /Hr. /8 = Rs.

Running the Plant 30Lit of diesel at Rs. /Lit = Rs.

Heating the bitumen 25Lit of furnace oil at Rs. /Lit = Rs.

Heating the aggregates 170Lit of furnace oil at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of CMP per Hour for BC = 170sqm. of 40 mm thick

Hire Charges for CMP per 10sqm ( / 170) x 10 = Rs. /10Sqm

2.BITUMEN BOILER
Since Bitumem boiler is attached with CMP unit hire charges for separate bitumen boiler is not
necessary

3.PNEUMATIC TYRED ROLLER

Hire charges /Hr at Rs. = Rs.

Fuel charges/Hr 2.50lit at Rs. /Lit = Rs.

Out turn of Vibrator Roller per hour= 400sqm. of 40 mm thick

335
Hire Charges for Vibrator roller /10sqm ( / 400) x10 = Rs. /10Sqm

4. Paver Finisher Hydrostatic (more than 5m width) 170 HP

Hire charges /Hr at Rs. = Rs.

Fuel charges/Hr 6lit at Rs. /Lit = Rs.

Out turn of Paver Finisher per hour = 170 sqm. of 40 mm thick

Hire Charges for paver finisher /10sqm ( /170) x 10 = Rs. /10Sqm

5. TIPPER TRUCKS

Hire charges excluding fuel charges /Hr at Rs. /8 = Rs.

Fuel charges /Hr 3.25lit at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of Tipper Truck per hour = 170 sqm. of 40 mm thick

Number of tipper required per CMP unit = 6 trucks

Hire Charges for Tipper /10sqm ( / 170) x 6 x 10 = Rs. /10Sqm

Total hire charges for machineries /10sqm =

/10Sqm

LABOUR CHARGES PER 1200 SQM

For loading materials into CMP

33.00 Nos Mazdoor Ist Class /Each = Rs.

25.00 Nos Mazdoor IInd Class /Each = Rs.

For attending Paver Finisher

10.00 Nos Mazdoor Ist Class /Each = Rs.

Total Labour Charges per 1200sqm = Rs.

Labour Charges per 10sqm ( / 1200) x 10 = Rs. /10Sqm

BC 50mm Thick (Grade - I) Using VG40 Bitumen (more than 5m width Paver)

0.220 Cu.m Cost of 26.5 - 13.20mm IRC /Cu.m = Rs.

336
0.240 Cu.m Cost of 13.20 - 2.36mm IRC /Cu.m = Rs.

0.260 Cu.m Cost of 2.36 mm and below /Cu.m = Rs.

62.40 Kg Cost of VG40 grade Bitumen /MT = Rs.

10.00 Sqm Hire charges /10Sqm = Rs.

10.00 Sqm Labour charges /10Sqm = Rs.

Rate for 10 sqm = Rs.

Rate per Cu.m of 50mm thick ( / (10*0.05) ) = Rs. /Cu.m

337
BC 50mm Thick (Grade - I) Using VG30 & Plastic Waste
Providing and laying Bituminous Concrete to 50mm thick using 0.22 cu.m of 26.5-13.20mm,
0.24 cu.m of 13.20-2.36mm and 0.26cu.m of 2.36 & below IRC HBG metal with 58.66 kgs of
VG30 bitumen with 3.74kg of Plastic Waste for premixing per 10sqm including cost and
conveyance of all materials to CMP site, heating the bitumen and aggregate to required tem-
perature and mixing them in required temperature in central hot mix plant 20-30 ton capacity,
conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of
50mm with mechanical paver to the specified grades and cross sections and consolidated by
8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver
to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper
trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and
all other incidental charges etc., complete as per specification using CMP clause 507 of MORTH.
HIRE CHARGES FOR MACHINERIES

1. CENTRAL HOT MIX PLANT

Hire charges excluding fuel charges /Hr. /8 = Rs.

Running the Plant 30Lit of diesel at Rs. /Lit = Rs.

Heating the bitumen 25Lit of furnace oil at Rs. /Lit = Rs.

Heating the aggregates 170Lit of furnace oil at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of CMP per Hour for BC = 170sqm. of 40 mm thick

Hire Charges for CMP per 10sqm ( / 170) x 10 = Rs. /10Sqm

2.BITUMEN BOILER
Since Bitumem boiler is attached with CMP unit hire charges for separate bitumen boiler is not
necessary

3.VIBRATOR ROLLERS

Hire charges excluding fuel charges/Hr at Rs. /8 = Rs.

Fuel charges/Hr 2.50lit at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of Vibrator Roller per hour= 400sqm. of 40 mm thick

Hire Charges for Vibrator roller /10sqm ( / 400) x10 = Rs. /10Sqm

4. PAVER FINISHER

Hire charges excluding fuel charges/Hr at Rs. /8 = Rs.

Fuel charges/Hr 6lit at Rs. /Lit = Rs.

338
Hire Charges including fuel charges per hour = Rs.

Out turn of Paver Finisher per hour = 170 sqm. of 40 mm thick

Hire Charges for paver finisher /10sqm ( /170) x 10 = Rs. /10Sqm

5. TIPPER TRUCKS

Hire charges excluding fuel charges /Hr at Rs. /8 = Rs.

Fuel charges /Hr 3.25lit at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of Tipper Truck per hour = 170 sqm. of 40 mm thick

Number of tipper required per CMP unit = 6 trucks

Hire Charges for Tipper /10sqm ( / 170) x 6 x 10 = Rs. /10Sqm

Total hire charges for machineries /10sqm =

/10Sqm

LABOUR CHARGES PER 1200 SQM

For loading materials into CMP

33.00 Nos Mazdoor Ist Class /Each = Rs.

25.00 Nos Mazdoor IInd Class /Each = Rs.

For attending Paver Finisher

10.00 Nos Mazdoor Ist Class /Each = Rs.

Total Labour Charges per 1200sqm = Rs.

Labour Charges per 10sqm ( / 1200) x 10 = Rs. /10Sqm

BC 50mm Thick (Grade - I) Using VG30 & Plastic Waste

0.220 Cu.m Cost of 26.5 - 13.20mm IRC /Cu.m = Rs.

0.240 Cu.m Cost of 13.20 - 2.36mm IRC /Cu.m = Rs.

0.260 Cu.m Cost of 2.36 mm and below /Cu.m = Rs.

58.66 Kg Cost of VG30 grade Bitumen /MT = Rs.

3.74 Kg Cost of Waste Plastic /10Sqm = Rs.

10.00 Sqm Hire charges /10Sqm = Rs.

339
10.00 Sqm Labour charges = Rs.

Rate for 10 sqm = Rs. 5204.30

Rate per Cu.m of 50mm thick ( / (10*0.05) ) = Rs. /Cu.m

BC 50mm Thick (Grade - I) Using VG40 Bitumen & Plastic Waste


Providing and laying Bituminous Concrete to 50mm thick using 0.22 cu.m of 26.5-13.20mm,
0.24 cu.m of 13.20-2.36mm and 0.26cu.m of 2.36 & below IRC HBG metal with 58.66 kgs of
VG40 bitumen and 3.74Kg of Plastic Waste for premixing per 10sqm including cost and
conveyance of all materials to CMP site, heating the bitumen and aggregate to required tem-
perature and mixing them in required temperature in central hot mix plant 20-30 ton capacity,
conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of
50mm with mechanical paver to the specified grades and cross sections and consolidated by
8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver
to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper
trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and
all other incidental charges etc., complete as per specification using CMP clause 507 of MORTH.
HIRE CHARGES FOR MACHINERIES

1. CENTRAL HOT MIX PLANT

Hire charges excluding fuel charges /Hr. /8 = Rs.

Running the Plant 30Lit of diesel at Rs. /Lit = Rs.

Heating the bitumen 25Lit of furnace oil at Rs. /Lit = Rs.

Heating the aggregates 170Lit of furnace oil at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of CMP per Hour for BC = 170sqm. of 40 mm thick

Hire Charges for CMP per 10sqm ( / 170) x 10 = Rs. /10Sqm

2.BITUMEN BOILER
Since Bitumem boiler is attached with CMP unit hire charges for separate bitumen boiler is not
necessary

3.VIBRATOR ROLLERS

Hire charges excluding fuel charges/Hr at Rs. /8 = Rs.

Fuel charges/Hr 2.50lit at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of Vibrator Roller per hour= 400sqm. of 40 mm thick

Hire Charges for Vibrator roller /10sqm ( / 400) x10 = Rs. /10Sqm

340
4. PAVER FINISHER

Hire charges excluding fuel charges/Hr at Rs. /8 = Rs.

Fuel charges/Hr 6lit at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of Paver Finisher per hour = 170 sqm. of 40 mm thick

Hire Charges for paver finisher /10sqm ( /170) x 10 = Rs. /10Sqm

5. TIPPER TRUCKS

Hire charges excluding fuel charges /Hr at Rs. /8 = Rs.

Fuel charges /Hr 3.25lit at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of Tipper Truck per hour = 170 sqm. of 40 mm thick

Number of tipper required per CMP unit = 6 trucks

Hire Charges for Tipper /10sqm ( / 170) x 6 x 10 = Rs. /10Sqm

Total hire charges for machineries /10sqm =

= /10Sqm

LABOUR CHARGES PER 1200 SQM

For loading materials into CMP

33.00 Nos Mazdoor Ist Class /Each = Rs.

25.00 Nos Mazdoor IInd Class /Each = Rs.

For attending Paver Finisher

10.00 Nos Mazdoor Ist Class /Each = Rs.

Total Labour Charges per 1200sqm = Rs.

Labour Charges per 10sqm ( / 1200) x 10 = Rs. /10Sqm

BC 50mm Thick (Grade - I) Using VG40 Bitumen & Plastic


Waste
0.220 Cu.m Cost of 26.5 - 13.20mm IRC /Cu.m = Rs.

0.240 Cu.m Cost of 13.20 - 2.36mm IRC /Cu.m = Rs.

0.260 Cu.m Cost of 2.36 mm and below /Cu.m = Rs.

341
58.66 Kg Cost of VG40 grade Bitumen /MT = Rs.

3.74 Kg Cost of Waste Plastic /Kg = Rs.

10.00 Sqm Hire charges /10Sqm = Rs.

10.00 Sqm Labour charges /10Sqm = Rs.

Rate for 10 sqm = Rs.

Rate per sqm of 50mm thick ( / (10*0.05) ) = Rs. /Cu.m

BC 50mm Thick (Grade - I) Using VG30 Bitumen & Plastic Waste (More than 5m
Paver)
Providing and laying Bituminous Concrete to 50mm thick using 0.22 cu.m of 26.5-13.20mm,
0.24 cu.m of 13.20-2.36mm and 0.26cu.m of 2.36 & below IRC HBG metal with 58.66 kgs
of VG30 bitumen and 3.74Kg of Plastic Waste for premixing per 10sqm including cost
and conveyance of all materials to CMP site, heating the bitumen and aggregate to required
temperature and mixing them in required temperature in central hot mix plant 20-30 ton
capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness
of 50mm with mechanical paver to the specified grades and cross sections and consolidated
by 8-10 tonne Pneumatic Roller to the required density etc., including labour for attending to
paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler,
tipper trucks, paver finisher hydrostatic (more than 5m width), Pneumatic roller and all
other tools and plant required, including fuel and all other incidental charges etc., complete as
per specification using CMP clause 507 of MORTH.
HIRE CHARGES FOR MACHINERIES

1. CENTRAL HOT MIX PLANT

Hire charges excluding fuel charges /Hr. /8 = Rs.

Running the Plant 30Lit of diesel at Rs. /Lit = Rs.

Heating the bitumen 25Lit of furnace oil at Rs. /Lit = Rs.

Heating the aggregates 170Lit of furnace oil at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of CMP per Hour for BC = 170sqm. of 40 mm thick

Hire Charges for CMP per 10sqm ( / 170) x 10 = Rs. /10Sqm

2.BITUMEN BOILER
Since Bitumem boiler is attached with CMP unit hire charges for separate bitumen boiler is not
necessary

3.PNEUMATIC TYRED ROLLER

Hire charges /Hr at Rs. = Rs.

342
Fuel charges/Hr 2.50lit at Rs. /Lit = Rs.

Out turn of Vibrator Roller per hour= 400sqm. of 40 mm thick

Hire Charges for Vibrator roller /10sqm ( / 400) x10 = Rs. /10Sqm

4. Paver Finisher Hydrostatic (more than 5m width) 170 HP

Hire charges /Hr at Rs. = Rs.

Fuel charges/Hr 6lit at Rs. /Lit = Rs.

Out turn of Paver Finisher per hour = 170 sqm. of 40 mm thick

Hire Charges for paver finisher /10sqm ( /170) x 10 = Rs. /10Sqm

5. TIPPER TRUCKS

Hire charges excluding fuel charges /Hr at Rs. /8 = Rs.

Fuel charges /Hr 3.25lit at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of Tipper Truck per hour = 170 sqm. of 40 mm thick

Number of tipper required per CMP unit = 6 trucks

Hire Charges for Tipper /10sqm ( / 170) x 6 x 10 = Rs. /10Sqm

Total hire charges for machineries /10sqm =

/10Sqm

LABOUR CHARGES PER 1200 SQM

For loading materials into CMP

33.00 Nos Mazdoor Ist Class /Each = Rs.

25.00 Nos Mazdoor IInd Class /Each = Rs.

For attending Paver Finisher

10.00 Nos Mazdoor Ist Class /Each = Rs.

Total Labour Charges per 1200sqm = Rs.

Labour Charges per 10sqm ( / 1200) x 10 = Rs. /10Sqm

343
BC 50mm Thick (Grade - I) Using VG30 Bitumen & Plastic Waste (9m Paver)

0.220 Cu.m Cost of 26.5 - 13.20mm IRC /Cu.m = Rs.

0.240 Cu.m Cost of 13.20 - 2.36mm IRC /Cu.m = Rs.

0.260 Cu.m Cost of 2.36 mm and below /Cu.m = Rs.

58.66 Kg Cost of VG30 grade Bitumen /MT = Rs.

3.74 Kg Cost of Waste Plastic /Kg = Rs.

10.00 Sqm Hire charges /10Sqm = Rs.

10.00 Sqm Labour charges /10Sqm = Rs.

Rate for 10 sqm = Rs.

Rate per Cu.m of 50mm thick ( / (10*0.05) ) = Rs. /Cu.m


BC 50mm Thick (Grade - I) Using VG40 Bitumen & Plastic Waste (more than 5m
width Paver)
Providing and laying Bituminous Concrete to 50mm thick using 0.22 cu.m of 26.5-13.20mm,
0.24 cu.m of 13.20-2.36mm and 0.26cu.m of 2.36 & below IRC HBG metal with 58.66 kgs
of VG40 bitumen and 3.74Kg of Plastic Waste for premixing per 10sqm including cost
and conveyance of all materials to CMP site, heating the bitumen and aggregate to required
temperature and mixing them in required temperature in central hot mix plant 20-30 ton
capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness
of 50mm with mechanical paver to the specified grades and cross sections and consolidated
by 8-10 tonne Pneumatic Roller to the required density etc., including labour for attending to
paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler,
tipper trucks, paver finisher hydrostatic (more than 5m width), Pneumatic roller and all
other tools and plant required, including fuel and all other incidental charges etc., complete as
per specification using CMP clause 507 of MORTH.
HIRE CHARGES FOR MACHINERIES

1. CENTRAL HOT MIX PLANT

Hire charges excluding fuel charges /Hr. /8 = Rs.

Running the Plant 30Lit of diesel at Rs. /Lit = Rs.

Heating the bitumen 25Lit of furnace oil at Rs. /Lit = Rs.

Heating the aggregates 170Lit of furnace oil at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of CMP per Hour for BC = 170sqm. of 40 mm thick

Hire Charges for CMP per 10sqm ( / 170) x 10 = Rs. /10Sqm

344
2.BITUMEN BOILER
Since Bitumem boiler is attached with CMP unit hire charges for separate bitumen boiler is not
necessary

3.PNEUMATIC TYRED ROLLER

Hire charges /Hr at Rs. = Rs.

Fuel charges/Hr 2.50lit at Rs. /Lit = Rs.

Out turn of Vibrator Roller per hour= 400sqm. of 40 mm thick

Hire Charges for Vibrator roller /10sqm ( / 400) x10 = Rs. /10Sqm

4. Paver Finisher Hydrostatic (more than 5m width) 170 HP

Hire charges /Hr at Rs. = Rs.

Fuel charges/Hr 6lit at Rs. /Lit = Rs.

Out turn of Paver Finisher per hour = 170 sqm. of 40 mm thick

Hire Charges for paver finisher /10sqm ( /170) x 10 = Rs. /10Sqm

5. TIPPER TRUCKS

Hire charges excluding fuel charges /Hr at Rs. /8 = Rs.

Fuel charges /Hr 3.25lit at Rs. /Lit = Rs.

Hire Charges including fuel charges per hour = Rs.

Out turn of Tipper Truck per hour = 170 sqm. of 40 mm thick

Number of tipper required per CMP unit = 6 trucks

Hire Charges for Tipper /10sqm ( / 170) x 6 x 10 = Rs. /10Sqm

Total hire charges for machineries /10sqm =

/10Sqm

LABOUR CHARGES PER 1200 SQM

For loading materials into CMP

33.00 Nos Mazdoor Ist Class /Each = Rs.

345
25.00 Nos Mazdoor IInd Class /Each = Rs.

For attending Paver Finisher

10.00 Nos Mazdoor Ist Class /Each = Rs.

Total Labour Charges per 1200sqm = Rs.

Labour Charges per 10sqm ( / 1200) x 10 = Rs. /10Sqm

BC 50mm Thick (Grade - I) Using VG40 Bitumen & Plastic Waste (more than 5m
width Paver)
0.220 Cu.m Cost of 26.5 - 13.20mm IRC /Cu.m = Rs.

0.240 Cu.m Cost of 13.20 - 2.36mm IRC /Cu.m = Rs.

0.260 Cu.m Cost of 2.36 mm and below /Cu.m = Rs.

58.66 Kg Cost of VG40 grade Bitumen /MT = Rs.

3.74 Kg Cost of Waste Plastic /Kg = Rs.

10.00 Sqm Hire charges /10Sqm = Rs.

10.00 Sqm Labour charges /10Sqm = Rs.

Rate for 10 sqm = Rs.

Rate per Cu.m of 50mm thick ( / (10*0.05) ) = Rs. /Cu.m

Note: In this standard Data book (Highways Department) the code as per Standard Schedule of Rates has
been indicated against the corresponding items for reference only.

The conveyance charges should be included accordingly for those items.

346
TAMIL NADU WATER SUPPLY
AND DRAINAGE BOARD
(TWAD)

i
7(a) Lowering of C.I. pipes and specials in the trenches and laying to proper grade and alignment
and as directed by the TWAD Boards officers

(TWAD) PIPE LAYING WORKS 80 to 900 mm DIA

Size in Depth in Qty in Mazdoor Cat I Fitter II class Fitter I class Using JCB machine Total
Rate/m
mm metre metre Nos Rate Amount Nos Rate Amount Nos Rate Amount Hrs Rate Amount cost

1 2 3 4 7 8 9 10 11 12 13 14 15 16 17

80 2.00 247.50 1 1 #REF! #REF! 1 #REF! #REF! 1.60 #REF! #REF! #REF! #REF!

100 2.00 242.00 1 1 #REF! #REF! 1 #REF! #REF! 2.00 #REF! #REF! #REF! #REF!

125 2.00 220.00 2 1 #REF! #REF! 1 #REF! #REF! 2.00 #REF! #REF! #REF! #REF!

150 2.00 154.00 2 1 #REF! #REF! 1 #REF! #REF! 2.00 #REF! #REF! #REF! #REF!

200 2.00 127.50 2 1 #REF! #REF! 1 #REF! #REF! 2.00 #REF! #REF! #REF! #REF!

250 2.00 115.50 1 1 #REF! #REF! 1 #REF! #REF! 3.00 #REF! #REF! #REF! #REF!

300 2.00 121.00 1 1 #REF! #REF! 1 #REF! #REF! 3.75 #REF! #REF! #REF! #REF!

347
350 2.00 99.00 1 1 #REF! #REF! 1 #REF! #REF! 4.00 #REF! #REF! #REF! #REF!

400 2.00 93.50 2 1 #REF! #REF! 1 #REF! #REF! 4.00 #REF! #REF! #REF! #REF!

450 2.00 82.50 2 1 #REF! #REF! 1 #REF! #REF! 4.15 #REF! #REF! #REF! #REF!

500 2.00 82.50 3 1 #REF! #REF! 1 #REF! #REF! 4.15 #REF! #REF! #REF! #REF!

600 2.00 77.00 4 1 #REF! #REF! 1 #REF! #REF! 4.60 #REF! #REF! #REF! #REF!

700 2.00 60.50 4 1 #REF! #REF! 1 #REF! #REF! 4.70 #REF! #REF! #REF! #REF!

750 2.00 60.50 4 2 #REF! #REF! 1 #REF! #REF! 5.00 #REF! #REF! #REF! #REF!

800 2.00 55.00 4 2 #REF! #REF! 1 #REF! #REF! 5.40 #REF! #REF! #REF! #REF!

900 2.00 49.50 5 2 #REF! #REF! 1 #REF! #REF! 5.40 #REF! #REF! #REF! #REF!

Note For depth between 2m to 4m - 10% over basic rates and for 4m to 6m - 20% over basic rate allowed

For work of laying CI connecting pipe/ syphon basic pipe below water, double the above rates shall be allowed.

For laying pipes in sewerline except pumping main 10% more is allowed
7(a) Lowering of D.I. Pipes and specials in the trenches and laying to proper grade and alignment
and as directed by the TWAD Board officers
(TWAD) PIPE LAYING WORKS 80 to 900 mm DIA

Size in Depth in Qty in Mazdoor Cat I Fitter II class Fitter I class Using JCB machine Total
Rate/m
mm metre metre Nos Rate Amount Nos Rate Amount Nos Rate Amount Hrs Rate Amount cost

1 2 3 4 5 6 7 8 9 10 11 12 12 14 15 16 17

80 2.00 258.50 2 1 0.00 1.30

100 2.00 253.00 2 1 0.00 1.75

125 2.00 209.00 2 1 0.00 2.00

150 2.00 154.00 2 1 0.00 2.00

200 2.00 127.50 2 1 0.00 2.10

250 2.00 126.50 2 1 0.00 3.00

300 2.00 126.50 2 1 0.00 3.70

348
350 2.00 104.50 2 1 0.00 3.90

400 2.00 93.50 2 1 0.00 4.00

450 2.00 88.00 3 1 0.00 4.25

500 2.00 88.00 3 1 0.00 4.75

600 2.00 77.00 3 1 0.00 5.40

700 2.00 66.00 3 1 0.00 6.00

750 2.00 66.00 3 2 0.00 6.25

800 2.00 55.00 4 2 0.00 5.50

900 2.00 49.50 5 2 0.00 5.50

Note For depth between 2m to 4m - 10% over basic rates and for 4m to 6m - 20% over basic rate allowed

For work of laying CI connecting pipe/ syphon basic pipe below water, double the above rates shall be allowed.

For laying pipes in sewerline except pumping main 10% more is allowed
7(b) Laying and Jointing of G.I. pipes & Spls.

PIPE
Upto
(TWAD) LAYING
450 mm
WORKS

Mazdoor I Plumber II class Plumber I class


Depth in Qty in Total
Size in mm Rate/m
metre metre cost
Nos Rate Amount Nos Rate Amount Nos Rate Amount

1 2 3 4 5 6 7 8 9 10 11 12 16 17

15 to 40 2.0 74.00 1 1 0

50 to 65 2.0 74.00 1 1 0

80 to 100 2.0 55.00 1 1 0

349
125 to 150 2.0 55.00 1 1 0

11(b) I Laying and Jointing of P.V.C. DWSC pipes & Spls.

Up to 40 2.0 126.00 1 1 0

50 to 75 2.0 107.00 2 1 0

90 to 110 2.0 106.00 2 1 0

125 to 160 2.0 98.00 3 1 0

180 to 250 2.0 98.00 3 2 0

Above 250 2.0 97.00 4 2 1


7(d) Lowering of MS pipes and specials in the trenches and laying to proper grade
and alignment and as directed by the TWAD Boards officers

PIPE LAYING
RATES TWAD UPTO 1600 mm
WORKS

Mazdoor I class Fitter II class Fitter I class Using JCB machine


Size in Depth in Qty in Total
Rate/m
mm metre metre cost
Nos Rate Amount Nos Rate Amount Nos Rate Amount Hrs Rate Amount

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Upto 350 2.00 72.000 1 1 1 1.30

400 2.00 72.000 1 1 1 2.10

450 2.00 66.000 1 1 1 2.15

500 2.00 64.000 1 1 1 2.20

350
600 2.00 60.000 1 1 1 3.00

700 2.00 60.000 3 1 1 3.40

900 2.00 48.000 4 1 1 3.75

1000 2.00 42.000 4 2 1 3.90

1050 2.00 42.000 4 2 1 4.35

1100 2.00 42.000 4 2 1 4.70

1200 2.00 42.000 4 2 1 5.00

1400 2.00 30.000 4 2 2 5.00

1600 2.00 24.000 4 3 2 5.00

Note For depth between 2m to 4m - 10% and for 4m to 6m - 20% excess allowed over basic rate
8 (a) Jointing the C.I./D.I- S/S pipes and specials with molten lead and yarn
including caulking the joints (including cost of jointing materials).

Quantity Unit Description Rate Per Amount


80mm dia - C.I./D.I S/S
For depth up to 2m No.of joints per day 3
pipes and specials
1 no Fitter I class 0 day 0.00

0 no Fitter II class 0 day 0.00

1 no Mazdoor I category 0 day 0.00

1.81 kg Lead (Market rate) 0.00 kg 0.00

0.12 kg Yarn 0 kg 0.00

Cost of melting

Total for 3 joints 0.00

Rate per joint 0.00


100mm dia - C.I./D.I S/S
For depth up to 2m No.of joints per day 5
pipes and specials
1 no Fitter I class 0 day 0.00

0 no Fitter II class 0 day 0.00

4 no Mazdoor I category 0 day 0.00

2.19 kg Lead (Market rate) 0.00 kg 0.00

0.17 kg Yarn 0 kg 0.00

Cost of melting

Total for 5 joints 0.00

Rate per joint Rs. 0.00


125mm dia - C.I./D.I S/S
For depth up to 2m No.of joints per day 3
pipes and specials
1 no Fitter I class 0 day 0.00

1 no Fitter II class 0 day 0.00

1 no Mazdoor I category 0 day 0.00

2.94 kg Lead (Market rate) 0.00 kg 0.00

0.298 kg Yarn 0 kg 0.00

Cost of melting

Total for 3 joints 0.00

Rate per joint Rs. 0.00

351
Quantity Unit Description Rate Per Amount
150mm dia - C.I./D.I S/S
For depth up to 2m No.of joints per day 4
pipes and specials
1 no Fitter I class 0 day 0.00

2 no Fitter II class 0 day 0.00

2 no Mazdoor I category 0 day 0.00

3.44 kg Lead (Market rate) 0.00 kg 0.00

0.34 kg Yarn 0 kg 0.00

Cost of melting

Total for 4 joints 0.00

Rate per joint Rs. 0.00


200mm dia - C.I./D.I S/S
For depth up to 2m No.of joints per day 3
pipes and specials
1 no Fitter I class 0 day 0.00

2 no Fitter II class 0 day 0.00

2 no Mazdoor I category 0 day 0.00

4.6 kg Lead (Market rate) 0.00 kg 0.00

0.53 kg Yarn 0 kg 0.00

Cost of melting

Total for 3 joints 0.00

Rate per joint Rs. 0.00


250mm dia - C.I./D.I S/S
For depth up to 2m No.of joints per day 2
pipes and specials
1 no Fitter I class 0 day 0.00

1 no Fitter II class 0 day 0.00

2 no Mazdoor I category 0 day 0.00

6.74 kg Lead (Market rate) 0.00 kg 0.00

0.652 kg Yarn 0 kg 0.00

Cost of melting

Total for 2 joints 0.00

Rate per joint Rs. 0.00


300mm dia - C.I./D.I S/S
For depth up to 2m No.of joints per day 3
pipes and specials

352
Quantity Unit Description Rate Per Amount

2 no Fitter I class 0 day 0.00

2 no Fitter II class 0 day 0.00

4 no Mazdoor I category 0 day 0.00

7.33 kg Lead (Market rate) 0.00 kg 0.00

0.737 kg Yarn 0 kg 0.00

Cost of melting

Total for 3 joints 0.00

Rate per joint Rs. 0.00


350mm dia - C.I./D.I S/S
For depth up to 2m No.of joints per day 3
pipes and specials
2 no Fitter I class 0 day 0.00

3 no Fitter II class 0 day 0.00

5 no Mazdoor I category 0 day 0.00

9.104 kg Lead (Market rate) 0.00 kg 0.00

0.823 kg Yarn 0 kg 0.00

Cost of melting

Total for 3 joints 0.00

Rate per joint Rs. 0.00


400mm dia - C.I./D.I S/S
For depth up to 2m No.of joints per day 2
pipes and specials
1 no Fitter I class 0 day 0.00

2 no Fitter II class 0 day 0.00

4 no Mazdoor I category 0 day 0.00

11.21 kg Lead (Market rate) 0.00 kg 0.00

0.935 kg Yarn 0 kg 0.00

Cost of melting

Total for 2 joints 0.00

Rate per joint Rs. 0.00


450mm dia - C.I./D.I S/S
For depth up to 2m No.of joints per day 1
pipes and specials
1 no Fitter I class 0 day 0.00

no Fitter II class 0 day 0.00

353
Quantity Unit Description Rate Per Amount

1 no Mazdoor I category 0 day 0.00

17.01 kg Lead (Market rate) 0.00 kg 0.00

1.24 kg Yarn 0 kg 0.00

Cost of melting

Total for 1 joint 0.00

Rate per joint Rs. 0.00


500mm dia - C.I./D.I S/S
For depth up to 2m No.of joints per day 1
pipes and specials
1 no Fitter I class 0 day 0.00

no Fitter II class 0 day 0.00

1 no Mazdoor I category 0 day 0.00

18.95 kg Lead (Market rate) 0.00 kg 0.00

1.53 kg Yarn 0 kg 0.00

Cost of melting

Total for 1 joint 0.00

Rate per joint Rs. 0.00


600mm dia - C.I./D.I S/S
For depth up to 2m No.of joints per day 1
pipes and specials
1 no Fitter I class 0 day 0.00

no Fitter II class 0 day 0.00

2 no Mazdoor I category 0 day 0.00

22.76 kg Lead (Market rate) 0.00 kg 0.00

1.81 kg Yarn 0 kg 0.00


Cost of melting (cost of mate-
rials to melt lead - old tyres,
kerosene, kadai, karandi etc)
Total for 1 joint 0.00

Rate per joint Rs. 0.00


700mm dia - C.I./D.I S/S
For depth up to 2m No.of joints per day 1
pipes and specials
1 no Fitter I class 0 day 0.00

no Fitter II class 0 day 0.00

2 no Mazdoor I category 0 day 0.00

354
Quantity Unit Description Rate Per Amount

25.72 kg Lead (Market rate) 0.00 kg 0.00

1.98 kg Yarn 0 kg 0.00

Cost of melting

Total for 1 joint 0.00

Rate per joint Rs. 0.00


750mm dia - C.I./D.I S/S
For depth up to 2m No.of joints per day 1
pipes and specials
1 no Fitter I class 0 day 0.00

1 no Fitter II class 0 day 0.00

2 no Mazdoor I category 0 day 0.00

30.96 kg Lead (Market rate) 0.00 kg 0.00

2.27 kg Yarn 0 kg 0.00

Cost of melting

Total for 1 joint 0.00

Rate per joint Rs. 0.00

355
8{b} Jointing the C.I./D.I- S/S pipes and specials with Rubber Gaskets (Tyton
Joint) including cost of lubricants. including cost of jointing materials)

Quantity Unit Description Rate Per Amount


For depth up to 80mm dia - C.I./D.I S/S No.of joints 60
2m pipes and specials per day Joints
0 No Fitter I class 0.00 day 0.00

0 No Fitter II class 0.00 day 0.00

1 No Mazdoor I category 0.00 day 0.00

60 Nos Rubber gasket 0.00 No 0.00

Total for 60 joints 0.00

Rate per joint Rs. #VALUE!


For depth up to 100mm dia - C.I./D.I S/S No.of joints 60
2m pipes and specials per day Joints
0 No Fitter I class 0.00 day 0.00

1 No Fitter II class 0.00 day 0.00

1 No Mazdoor I category 0.00 day 0.00

60 Nos Rubber gasket 0.00 No 0.00

Total for 60 joints 0.00

Rate per joint Rs. #VALUE!


For depth up to 125mm dia - C.I./D.I S/S No.of joints 60
2m pipes and specials per day Joints
0 No Fitter I class 0.00 day 0.00

1 No Fitter II class 0.00 day 0.00

1 No Mazdoor I category 0.00 day 0.00

60 Nos Rubber gasket 0.00 No 0.00

Total for 60 joints 0.00

Rate per joint Rs. #VALUE!


For depth up to 150mm dia - C.I./D.I S/S No.of joints 60
2m pipes and specials per day Joints
0 No Fitter I class 0.00 day 0.00

1 No Fitter II class 0.00 day 0.00

1 No Mazdoor I category 0.00 day 0.00

60 Nos Rubber gasket 0.00 No 0.00

Total for 60 joints 0.00

Rate per joint Rs. #VALUE!

356
Quantity Unit Description Rate Per Amount
50
For depth up to 200mm dia - C.I./D.I S/S No.of joints
2m pipes and specials per day Joints
0 No Fitter I class 0.00 day 0.00

1 No Fitter II class 0.00 day 0.00

1 No Mazdoor I category 0.00 day 0.00

50 Nos Rubber gasket 0.00 No 0.00

Total for 50 joints 0.00

Rate per joint Rs. #VALUE!


For depth up to 250mm dia - C.I./D.I S/S No.of joints 40
2m pipes and specials per day Joints
1 No Fitter I class 0.00 day 0.00

1 No Fitter II class 0.00 day 0.00

1 No Mazdoor I category 0.00 day 0.00

40 Nos Rubber gasket 0.00 No 0.00

Total for 40 joints 0.00

Rate per joint Rs. #VALUE!


For depth up to 300mm dia - C.I./D.I S/S No.of joints 35
2m pipes and specials per day Joints
1 No Fitter I class 0.00 day 0.00

1 No Fitter II class 0.00 day 0.00

1 No Mazdoor I category 0.00 day 0.00

35 Nos Rubber gasket 0.00 No 0.00

Total for 35 joints 0.00

Rate per joint Rs. #VALUE!


For depth up to 350mm dia - C.I./D.I S/S No.of joints 35
2m pipes and specials per day Joints
1 No Fitter I class 0.00 day 0.00

1 No Fitter II class 0.00 day 0.00

1 No Mazdoor I category 0.00 day 0.00

35 Nos Rubber gasket 0.00 No 0.00

Total for 35 joints 0.00

Rate per joint Rs. #VALUE!

357
Quantity Unit Description Rate Per Amount
35
For depth up to 400mm dia - C.I./D.I S/S No.of joints
2m pipes and specials per day Joints
1 No Fitter I class 0.00 day 0.00

1 No Fitter II class 0.00 day 0.00

1 No Mazdoor I category 0.00 day 0.00

35 Nos. Rubber gasket 0.00 No 0.00

Total for 35 joints 0.00

Rate per joint Rs. #VALUE!


For depth up to 450mm dia - C.I./D.I S/S No.of joints 20
2m pipes and specials per day Joints
1 No Fitter I class 0.00 day 0.00

1 No Fitter II class 0.00 day 0.00

1 No Mazdoor I category 0.00 day 0.00

20 Nos Rubber gasket 0.00 No 0.00

0.5 hr JCB machine hire charges 0.00 hr 0.00

Total for 20 joints 0.00

Rate per joint Rs. #VALUE!


For depth up to 500mm dia - C.I./D.I S/S No.of joints 20
2m pipes and specials per day Joints
1 No Fitter I class 0.00 day 0.00

1 No Fitter II class 0.00 day 0.00

1 No Mazdoor I category 0.00 day 0.00

20 Nos Rubber gasket 0.00 No 0.00

0.5 hr JCB machine hire charges 0.00 hr 0.00

Total for 20 joints 0.00

Rate per joint Rs. #VALUE!


For depth up to 600mm dia - C.I./D.I S/S No.of joints 20
2m pipes and specials per day Joints
Quantity Unit Description Rate Per Amount

1 No Fitter I class 0.00 day 0.00

1 No Fitter II class 0.00 day 0.00

2 No Mazdoor I category 0.00 day 0.00

358
Quantity Unit Description Rate Per Amount

20 Nos Rubber gasket 0.00 No 0.00

1 hr JCB machine hire charges 0.00 hr 0.00

Total for 20 joints 0.00

Rate per joint Rs. #VALUE!


For depth up to 700mm dia - C.I./D.I S/S No.of joints 15
2m pipes and specials per day Joints
1 No Fitter I class 0.00 day 0.00

1 No Fitter II class 0.00 day 0.00

1 No Mazdoor I category 0.00 day 0.00

15 Nos Rubber gasket 0.00 No 0.00

1 hr JCB machine hire charges 0.00 hr 0.00

Total for 15 joints 0.00

Rate per joint Rs. #VALUE!


For depth up to 750mm dia - C.I./D.I S/S No.of joints 10
2m pipes and specials per day Joints
1 No Fitter I class 0.00 day 0.00

1 No Fitter II class 0.00 day 0.00

1 No Mazdoor I category 0.00 day 0.00

10 Nos Rubber gasket 0.00 No 0.00

1 hr JCB machine hire charges 0.00 hr 0.00

Total for 10 joints 0.00

Rate per joint Rs. #VALUE!


For depth up to 800mm dia - C.I./D.I S/S No.of joints 7
2m pipes and specials per day Joints
1 No Fitter I class 0.00 day 0.00

1 No Fitter II class 0.00 day 0.00

1 No Mazdoor I category 0.00 day 0.00

7 Nos Rubber gasket 0.00 No 0.00

1 hr JCB machine hire charges 0.00 hr 0.00

kg Total for 7 joints 0.00

Rate per joint Rs. #VALUE!

359
Quantity Unit Description Rate Per Amount
For depth up to 900mm dia - C.I./D.I S/S No.of joints 5
2m pipes and specials per day Joints
1 No Fitter I class 0.00 day 0.00

1 No Fitter II class 0.00 day 0.00

2 No Mazdoor I category 0.00 day 0.00

5 Nos Rubber gasket 0.00 No 0.00

1 hr JCB machine hire charges 0.00 hr 0.00

Total for 5 joints 0.00

Rate per joint Rs. #VALUE!

360
8 (C) Jointing the C.I./D.I- Double flanged pipes and specials with Rubber Insertion
with IS M.S Bolts and nuts of IS 1364-1 (2002), including cost of jointing materials
such as bolt & nuts Rubber insertion and labour charges etc., complete.

Quantity Unit Description Rate Per Amount


For depth up to 2m
80mm dia - C.I./D.I S/S pipes and No.of joints
(for works above 40 Joints
specials per day
water level)
0 no Fitter I class 0 day 0.00

1 no Fitter II class 0 day 0.00

1 no Mazdoor I category 0 day 0.00

40 kg MS Bolts and nuts 0 kg 0.00

7.44 kg Rubber Insertion sheet 1.55gm/cm3 kg 0.00

Total for 40 joints 0.00

Rate per joint Rs. 0.00


For depth up to 2m
100mm dia - C.I./D.I S/S pipes No.of joints
(for works above 40 Joints
and specials per day
water level)
0 no Fitter I class 0 day 0.00

1 no Fitter II class 0 day 0.00

1 no Mazdoor I category 0 day 0.00

80 kg MS Bolts and nuts 0 kg 0.00

9.002 kg Rubber Insertion sheet 0 kg 0.00

Total for 40 joints 0.00

Rate per joint Rs. 0.00


For depth up to 2m
125mm dia - C.I./D.I S/S pipes No.of joints
(for works above 35 Joints
and specials per day
water level)
0 no Fitter I class 0 day 0.00

1 no Fitter II class 0 day 0.00

1 no Mazdoor I category 0 day 0.00

70 kg MS Bolts and nuts 0 kg 0.00

10.172 kg Rubber Insertion sheet 0 kg 0.00

Total for 35 joints 0.00

Rate per joint Rs. 0.00

361
Quantity Unit Description Rate Per Amount
For depth up to 2m
150mm dia - C.I./D.I S/S pipes No.of joints
(for works above 25 Joints
and specials per day
water level)
0 no Fitter I class 0 day 0.00

1 no Fitter II class 0 day 0.00

1 no Mazdoor I category 0 day 0.00

80 kg MS Bolts and nuts 0 kg 0.00

9.442 kg Rubber Insertion sheet 0 kg 0.00

Total for 25 joints 0.00

Rate per joint Rs. 0.00


For depth up to 2m
200mm dia - C.I./D.I S/S pipes No.of joints
(for works above 22 Joints
and specials per day
water level)
1 no Fitter I class 0 day 0.00

1 no Fitter II class 0 day 0.00

1 no Mazdoor I category 0 day 0.00

70.4 kg MS Bolts and nuts 0 kg 0.00

11.826 kg Rubber Insertion sheet 0 kg 0.00

Total for 25 joints 0.00

Rate per joint Rs. 0.00


For depth up to 2m
250mm dia - C.I./D.I S/S pipes No.of joints
(for works above 20 Joints
and specials per day
water level)
1 no Fitter I class 0 day 0.00

1 no Fitter II class 0 day 0.00

1 no Mazdoor I category 0 day 0.00

96 kg MS Bolts and nuts 0 kg 0.00

14.510 kg Rubber Insertion sheet 0 kg 0.00

Total for 20 joints 0.00

Rate per joint Rs. 0.00


For depth up to 2m
300mm dia - C.I./D.I S/S pipes No.of joints
(for works above 15 Joints
and specials per day
water level)
1 no Fitter I class 0 day 0.00

362
Quantity Unit Description Rate Per Amount

1 no Fitter II class 0 day 0.00

2 no Mazdoor I category 0 day 0.00

72 kg MS Bolts and nuts 0 kg 0.00

13.812 kg Rubber Insertion sheet 0 kg 0.00

Total for 15 joints 0.00

Rate per joint Rs. 0.00


For depth up to 2m
350mm dia - C.I./D.I S/S pipes No.of joints
(for works above 13 Joints
and specials per day
water level)
1 no Fitter I class 0 day 0.00

1 no Fitter II class 0 day 0.00

2 no Mazdoor I category 0 day 0.00

83.2 kg MS Bolts and nuts 0 kg 0.00

15.416 kg Rubber Insertion sheet 0 kg 0.00

Total for 15 joints 0.00

Rate per joint Rs. 0.00


For depth up to 2m
400mm dia - C.I./D.I S/S pipes No.of joints
(for works above 10 Joints
and specials per day
water level)
1 no Fitter I class 0 day 0.00

2 no Fitter II class 0 day 0.00

2 no Mazdoor I category 0 day 0.00

96 kg MS Bolts and nuts 0 kg 0.00

14.844 kg Rubber Insertion sheet 0 kg 0.00

Total for 15 joints 0.00

Rate per joint Rs. 0.00


For depth up to 2m
450mm dia - C.I./D.I S/S pipes No.of joints
(for works above 15 Joints
and specials per day
water level)
1 no Fitter I class 0 day 0.00

2 no Fitter II class 0 day 0.00

3 no Mazdoor I category 0 day 0.00

180 kg MS Bolts and nuts 0 kg 0.00

363
Quantity Unit Description Rate Per Amount

26.381 kg Rubber Insertion sheet 0 kg 0.00

Total for 15 joints 0.00

Rate per joint Rs. 0.00


For depth up to 2m
500mm dia - C.I./D.I S/S pipes No.of joints
(for works above 5 Joints
and specials per day
water level)
1 no Fitter I class 0 day 0.00

1 no Fitter II class 0 day 0.00

3 no Mazdoor I category 0 day 0.00

60 kg MS Bolts and nuts 0 kg 0.00

10.437 kg Rubber Insertion sheet 0 kg 0.00

Total for 8 joints 0.00

Rate per joint Rs. 0.00


For depth up to 2m
600mm dia - C.I./D.I S/S pipes No.of joints
(for works above 3 Joints
and specials per day
water level)
1 no Fitter I class 0 day 0.00

2 no Fitter II class 0 day 0.00

2 no Mazdoor I category 0 day 0.00

45 kg MS Bolts and nuts 0 kg 0.00

8.487 kg Rubber Insertion sheet 0 kg 0.00

Total for 5 joints 0.00

Rate per joint Rs. 0.00


For depth up to 2m
700mm dia - C.I./D.I S/S pipes No.of joints
(for works above 6 Joints
and specials per day
water level)
1 no Fitter I class 0 day 0.00

2 no Fitter II class 0 day 0.00

4 no Mazdoor I category 0 day 0.00

108 kg MS Bolts and nuts 0 kg 0.00

22.349 kg Rubber Insertion sheet 0 kg 0.00

Total for 5 joints 0.00

Rate per joint Rs. 0.00

364
Quantity Unit Description Rate Per Amount
For depth up to 2m
750mm dia - C.I./D.I S/S pipes No.of joints
(for works above 5 Joints
and specials per day
water level)
1 no Fitter I class 0 day 0.00

2 no Fitter II class 0 day 0.00

3 no Mazdoor I category 0 day 0.00

90 kg MS Bolts and nuts 0 kg 0.00

21.427 kg Rubber Insertion sheet 0 kg 0.00

Total for 5 joints 0.00

Rate per joint Rs. 0.00


For depth up to 2m
800mm dia - C.I./D.I S/S pipes No.of joints
(for works above 7 Joints
and specials per day
water level)
2 no Fitter I class 0 day 0.00

2 no Fitter II class 0 day 0.00

4 no Mazdoor I category 0 day 0.00

126 kg MS Bolts and nuts 0 kg 0.00

33.534 kg Rubber Insertion sheet 0 kg 0.00

Total for 7 joints 0.00

Rate per joint Rs. 0.00


For depth up to 2m
900mm dia - C.I./D.I S/S pipes No.of joints
(for works above 5 Joints
and specials per day
water level)
1 no Fitter I class 0 day 0.00

2 no Fitter II class 0 day 0.00

4 no Mazdoor I category 0 day 0.00

105 kg MS Bolts and nuts 0 kg 0.00

28.905 kg Rubber Insertion sheet 0 kg 0.00

Total for 5 joints 0.00

Rate per joint Rs. 0.00

365
8{d} Jointing the C.I./D.I- S/S pipes and specials with neat Cement
or cement mortor and spun yarn including caulking the joints, curing
(including cost of jointing materials)

Quantity Unit Description Rate Per Amount


80mm dia - C.I./D.I S/S No.of joints
For depth up to 2m 10 Joints
pipes and specials per day
0 No Fitter I class 0 day 0.00

1 No Fitter II class 0 day 0.00

1 No Mazdoor I category 0 day 0.00

10 kg Cement 1.00kg 0.00 kg 0.00

2.5 kg Yarn 0.25kg 0 kg 0.00

Total for 10 joints 0.00

Rate per joint Rs. 0.00


100mm dia - C.I./D.I S/S No.of joints
For depth up to 2m 18 Joints
pipes and specials per day
0 No Fitter I class 0 day 0.00

1 No Fitter II class 0 day 0.00

3 Nos Mazdoor I category 0 day 0.00

18 kg Cement 1.00kg 0.00 kg 0.00

4.5 kg Yarn 0.25kg 0 kg 0.00

Total for 18 joints 0.00

Rate per joint Rs. 0.00


125mm dia - C.I./D.I S/S No.of joints
For depth up to 2m 17 Joints
pipes and specials per day
0 No Fitter I class 0 day 0.00

1 No Fitter II class 0 day 0.00

4 Nos Mazdoor I category 0 day 0.00

21.25 kg Cement 1.25kg 0.00 kg 0.00

5.1 kg Yarn 0.3kg 0 kg 0.00

Total for 17 joints 0.00

Rate per joint Rs. 0.00


150mm dia - C.I./D.I S/S No.of joints
For depth up to 2m 12 Joints
pipes and specials per day
0 No Fitter I class 0 day 0.00

1 No Fitter II class 0 day 0.00

366
Quantity Unit Description Rate Per Amount

3 Nos Mazdoor I category 0 day 0.00

18 kg Cement 1.5kg 0.00 kg 0.00

4.2 kg Yarn 0.35kg 0 kg 0.00

Total for 12 joints 0.00

Rate per joint Rs.


200mm dia - C.I./D.I S/S No.of joints
For depth up to 2m 10 Joints
pipes and specials per day
1 No Fitter I class 0 day 0.00

1 No Fitter II class 0 day 0.00

3 Nos Mazdoor I category 0 day 0.00

20 kg Cement 2kg 0.00 kg 0.00

7 kg Yarn 0.70kg 0 kg 0.00

Total for 10 joints 0.00

Rate per joint Rs. 0.00


250mm dia - C.I./D.I S/S No.of joints 10
For depth up to 2m
pipes and specials per day Joints
1 No Fitter I class 0 day 0.00

2 Nos Fitter II class 0 day 0.00

3 Nos Mazdoor I category 0 day 0.00

8 kg Cement 0.80kg 0.00 kg 0.00

3.5 kg Yarn 0.35 0 kg 0.00

Total for 10 joints 0.00

Rate per joint Rs. #VALUE!


300mm dia - C.I./D.I S/S No.of joints 9
For depth up to 2m
pipes and specials per day Joints
1 No Fitter I class 0 day 0.00

2 Nos Fitter II class 0 day 0.00

3 Nos Mazdoor I category 0 day 0.00

29.25 kg Cement 3.25kg 0.00 kg 0.00

9.9 kg Yarn 1.1kg 0 kg 0.00

Total for 9 joints 0.00

Rate per joint Rs. #VALUE!

367
Quantity Unit Description Rate Per Amount
350mm dia - C.I./D.I S/S No.of joints
For depth up to 2m 12
pipes and specials per day
1 No Fitter I class 0 day 0.00

3 Nos Fitter II class 0 day 0.00

6 Nos Mazdoor I category 0 day 0.00

54 kg Cement 4.50kg 0.00 kg 0.00

15 kg Yarn 1.25kg 0 kg 0.00

Total for 12 joints 0.00

Rate per joint Rs. 0.00


400mm dia - C.I./D.I S/S No.of joints
For depth up to 2m 9
pipes and specials per day
2 Nos Fitter I class 0 day 0.00

3 Nos Fitter II class 0 day 0.00

3 Nos Mazdoor I category 0 day 0.00

49.5 kg Cement 5.5kg 0.00 kg 0.00

13.5 kg Yarn 1.5kg 0 kg 0.00

Total for 9 joints 0.00

Rate per joint Rs. 0.00


450mm dia - C.I./D.I S/S No.of joints
For depth up to 2m 6 Joints
pipes and specials per day
1 No Fitter I class 0 day 0.00

2 Nos Fitter II class 0 day 0.00

4 Nos Mazdoor I category 0 day 0.00

36 kg Cement 6.0kg 0.00 kg 0.00

10.5 kg Yarn 1.75kg 0 kg 0.00

Total for 6 joint 0.00

Rate per joint Rs. 0.00


500mm dia - C.I./D.I S/S No.of joints
For depth up to 2m 6 Joints
pipes and specials per day
1 No Fitter I class 0 day 0.00

2 Nos Fitter II class 0 day 0.00

5 Nos Mazdoor I category 0 day 0.00

368
Quantity Unit Description Rate Per Amount

39 kg Cement 6.5kg 0.00 kg 0.00

12 kg Yarn 2kg 0 kg 0.00

Total for 6 joint 0.00

Rate per joint Rs. 0.00


600mm dia - C.I./D.I S/S No.of joints
For depth up to 2m 5 Joints
pipes and specials per day
2 Nos Fitter I class 0 day 0.00

2 Nos Fitter II class 0 day 0.00

4 Nos Mazdoor I category 0 day 0.00

35 kg Cement 7kg 0.00 kg 0.00

12.5 kg Yarn 2.5kg 0 kg 0.00

Total for 5 joint 0.00

Rate per joint Rs. #VALUE!


700mm dia - C.I./D.I S/S No.of joints
For depth up to 2m 3 Joints
pipes and specials per day
1 No Fitter I class 0 day 0.00

2 Nos Fitter II class 0 day 0.00

2 Nos Mazdoor I category 0 day 0.00

30 kg Cement 10kg 0.00 kg 0.00

12 kg Yarn 4kg 0 kg 0.00

Total for 3 joint 0.00

Rate per joint Rs. #VALUE!

369
Hire Charges for Dewatering using Diesel Engine Pumpset
Dewatering using 3HP to 70HP diesel engine pumpset including Hire charges, cost of
Diesel, Engine oil, pump operator, labour charges, conveyance of pumpset and fuel to
site and back, loading, unloading and any other incidental charges etc., complete.
Sl. Rate Amount/
Description Qty Unit per
No. Rs. Hr
For 3 HP
Hire charges for Diesel Pumpset
1 1.00 hr 0.00 24.00 Hr 0.00
alone
2 Diesel Consumption 0.60 Litre 0.00 1.00 Lit 0.00

3 Cost of Engine Oil 0.03 Litre 0.00 1.00 Lit 0.00

4 Pump Operator without ITI 1.00 hr 0.00 8.00 Hr 0.00


Labour for Pump Maintaining
5 1.00 hr 0.00 8.00 Hr 0.00
(Maz.Cat.II)
6 Freight charges for Diesel Shifting 0.60 Litre 0.00 210.00 Lit 0.00

Total Amount/Hr 0.00

For 5 HP
Hire charges for Diesel Pumpset
1 1.00 hr 0.00 24.00 Hr 0.00
alone
2 Diesel Consumption 1.00 Litre 0.00 1.00 Lit 0.00

3 Cost of Engine Oil 0.05 Litre 0.00 1.00 Lit 0.00

4 Pump Operator without ITI 1.00 hr 0.00 8.00 Hr 0.00


Labour for Pump Maintaining
5 1.00 hr 0.00 8.00 Hr 0.00
(Maz.Cat.II)
6 Freight charges for Diesel Shifting 1.00 Litre 0.00 210.00 Lit 0.00

Total Amount/Hr 0.00

For 7.5 HP
Hire charges for Diesel Pumpset
1 1.00 hr 0.00 24.00 Hr 0.00
alone
2 Diesel Consumption 1.50 Litre 0.00 1.00 Lit 0.00

3 Cost of Engine Oil 0.08 Litre 0.00 1.00 Lit 0.00

4 Pump Operator without ITI 1.00 hr 0.00 8.00 Hr 0.00


Labour for Pump Maintaining
5 1.00 hr 0.00 8.00 Hr 0.00
(Maz.Cat.II)
6 Freight charges for Diesel Shifting 1.50 Litre 0.00 210.00 Lit 0.00

Total Amount/Hr 0.00

For 10 HP

370
Sl. Rate Amount/
Description Qty Unit per
No. Rs. Hr
Hire charges for Diesel Pumpset
1 1.00 hr 0.00 24.00 Hr 0
alone
2 Diesel Consumption 2.00 Litre 0.00 1.00 Lit 0

3 Cost of Engine Oil 0.10 Litre 0.00 1.00 Lit 0

4 Pump Operator without ITI 1.00 hr 0.00 8.00 Hr 0


Labour for Pump Maintaining
5 1.00 hr 0.00 8.00 Hr 0
(Maz.Cat.II)
6 Freight charges for Diesel Shifting 2.00 Litre 0.00 210.00 Lit 0.000

Total Amount/Hr 0.00

For 12.5 HP
Hire charges for Diesel Pumpset
1 1.00 hr 0.00 24.00 Hr 0
alone
2 Diesel Consumption 2.50 Litre 0.00 1.00 Lit 0

3 Cost of Engine Oil 0.13 Litre 0.00 1.00 Lit 0

4 Pump Operator without ITI 1.00 hr 0.00 8.00 Hr 0


Labour for Pump Maintaining
5 1.00 hr 0.00 8.00 Hr 0
(Maz.Cat.II)
6 Freight charges for Diesel Shifting 2.50 Litre 0.00 210.00 Lit 0.000

Total Amount/Hr 0.00

For 15 HP
Hire charges for Diesel Pumpset
1 1.00 hr 0.00 24.00 hr 0.00
alone
2 Diesel Consumption 3.00 Litre 0.00 1.00 Litre 0.00

3 Cost of Engine Oil 0.15 Litre 0.00 1.00 Litre 0.00

4 Pump Operator without ITI 1.00 hr 0.00 8.00 hr 0.00


Labour for Pump Maintaining
5 1.00 hr 0.00 8.00 hr 0.00
(Maz.Cat.II)
6 Freight charges for Diesel Shifting 3.00 Litre 0.00 210.00 Litre 0.00

Total Amount/Hr 0.00

For 20 HP
Hire charges for Diesel Pumpset
1 1.00 hr 0.00 24.00 hr 0.00
alone
2 Diesel Consumption 4.00 Litre 0.00 1.00 Litre 0.00

371
Sl. Rate Amount/
Description Qty Unit per
No. Rs. Hr
3 Cost of Engine Oil 0.20 Litre 0.00 1.00 Litre 0.00

4 Pump Operator without ITI 1.00 hr 0.00 8.00 hr 0.00


Labour for Pump Maintaining
5 1.00 hr 0.00 8.00 hr 0.00
(Maz.Cat.II)
6 Freight charges for Diesel Shifting 4.00 Litre 0.00 210.00 Litre 0.00

Total Amount/Hr 0.00

For 40 HP
Hire charges for Diesel Pumpset
1 1.00 hr 0.00 24.00 hr 0.00
alone
2 Diesel Consumption 8.00 Litre 0.00 1.00 Litre 0.00

3 Cost of Engine Oil 0.40 Litre 0.00 1.00 Litre 0.00

4 Pump Operator without ITI 1.00 hr 0.00 8.00 hr 0.00


Labour for Pump Maintaining
5 1.00 hr 0.00 8.00 hr 0.00
(Maz.Cat.II)
6 Freight charges for Diesel Shifting 8.00 Litre 0.00 210.00 Litre 0.00

Total Amount/Hr 0.00

For 50 HP
Hire charges for Diesel Pumpset
1 1.00 hr 0.00 24.00 hr 0.00
alone
2 Diesel Consumption 10.00 Litre 0.00 1.00 Litre 0.00

3 Cost of Engine Oil 0.50 Litre 0.00 1.00 Litre 0.00

4 Pump Operator without ITI 1.00 hr 0.00 8.00 hr 0.00


Labour for Pump Maintaining
5 1.00 hr 0.00 8.00 hr 0.00
(Maz.Cat.II)
6 Freight charges for Diesel Shifting 10.00 Litre 0.00 210.00 Litre 0.00

Total Amount/Hr 0.00

For 60 HP
Hire charges for Diesel Pumpset
1 1.00 hr 0.00 24.00 hr 0.00
alone
2 Diesel Consumption 12.00 Litre 0.00 1.00 Litre 0.00

3 Cost of Engine Oil 0.60 Litre 0.00 1.00 Litre 0.00

4 Pump Operator without ITI 1.00 hr 0.00 8.00 hr 0.00

372
Sl. Rate Amount/
Description Qty Unit per
No. Rs. Hr
Labour for Pump Maintaining
5 1.00 hr 0.00 8.00 hr 0.00
(Maz.Cat.II)
6 Freight charges for Diesel Shifting 12.00 Litre 0.00 210.00 Litre 0.00

Total Amount/Hr 0.00

For 70 HP
Hire charges for Diesel Pumpset
1 1.00 hr 0.00 24.00 hr 0.00
alone
2 Diesel Consumption 14.00 Litre 0.00 1.00 Litre 0.00

3 Cost of Engine Oil 0.70 Litre 0.00 1.00 Litre 0.00

4 Pump Operator without ITI 1.00 hr 0.00 8.00 hr 0.00


Labour for Pump Maintaining
5 1.00 hr 0.00 8.00 hr 0.00
(Maz.Cat.II)
6 Freight charges for Diesel Shifting 14.00 Litre 0.00 210.00 Litre 0.00

Total Amount/Hr 0.00

373
Shoring with sheet piles From GL: depth of 0 to 3 m - for laying Pipe - for 30m

Sl. No. Description Rate Unit Amount


400mm width X 3 m height x 9mm thickness
Flat-Type Pile as per IS 2314-1986
No. of piles for 30 m length for 3 m height 75 Nos
For 2 sides in 3 m height 150 Nos
No of sheet piles for depth from 0 to 3 m 1 No
Total Number of piles required for the full height 150 Nos
Weight of One sheet pile as per IS 2314 Table 4 (
165.6 kg
55.2 X 3 m )
Total weight for 150 Nos of Sheet piles 24840 kg
MS Sheet cost/Kg (SoR) 0 Rs/kg
Total cost for 150 sheets 0 RS
Fabrication charges/ kg (SoR ) 0 Rs.
Total fabrication cost for 150 sheets 0 Rs.
Total cost for 150 completed pile sheets 0 Rs.
Assuming 40 uses, for one use 0 Rs.
A Hence cost of sheet piles 0 Rs.
For framing the Sheet piles using the above sheet
piles
No of sheet piles required per row 15 Nos
No of rows 2 Nos
No of sheet piles required . 30
B Cost of Sheet piles for framing 0 Rs.
Casurina Poles for struting at interval of 1.50m
in 2 Rows
Length of Casurina Pole of size 8 to 10 cm 1.3 m
No. poles required 40 Nos
Total length 52 m
Rate for Casurina Pole of size 8 to 10 cm (SOR) 0 Rs. / RM
C Total amount for Casurina pole 0 Rs.
Assuming 5 uses for 1 use 0.00 Rs.
Labour for Timbering
1 No Carpenter II class (SOR) 0 Rs.
12 Nos Mazdoor cat. II (SOR) 0 Rs.
10 Nos Pile driver (SOR) 0 Rs.
Total amount of Labour For fixing and removing
D 0.00 Rs.
sheet piles
Total amount for shoring and shuttering for 30M
0.00 Rs.
A+B+C+D
For 1 m Rs. 0.00 per RM

374
Shoring with sheet piles From GL: depth of 0 to 4 m - for laying Pipe - for 30m

Sl. No. Description Rate Unit Amount


400mm width X 3 m height x 9mm thickness
Flat-Type Pile as per IS 2314-1986
No. of piles for 30 m length for 3 m height 75 Nos
For 2 sides in 3 m height 150 Nos
No of sheet piles for depth from 0 to 4 m 1.34 No
Total Number of piles required for the full height 201 Nos
Weight of One sheet pile as per IS 2314 Table 4
165.6 kg
( 55.2 X 3 m )
Total weight for 201 Nos of Sheet piles kg
MS Sheet cost/Kg 0 Rs/kg
Total cost for 201 sheets 0 RS
Fabrication charges/ kg 0 Rs.
Total fabrication cost for 201 sheets 0 Rs.
Total cost for 201 completed pile sheets 0 Rs.
Assuming 40 uses, for one use 0 Rs.
A Hence cost of sheet piles 0 Rs.
For framing the Sheet piles using the above sheet piles
No of sheet piles required per row 15 Nos
No of rows 3 Nos
No of sheet piles required . 45
B Cost of Sheet piles for framing 0 Rs.
Casurina Poles for struting at interval of 1.50m in 3
Rows
Length of Casurina Pole of size 8 to 10 cm 1.3 m
No. poles required 60 Nos
Total length 78 m
Rate for Casurina Pole of size 8 to 10 cm 0 Rs./RM
C Total amount for Casurina pole 0 Rs.
Assuming 5 uses for 1 use 0.00 Rs.
Labour for Timbering
2Nos Carpenter II class 0 Rs.
15Nos Mazdoor cat. II 0 Rs.
12Nos Pile driver 0 Rs.
Total amount of Labour For fixing and removing sheet
D 0.00 Rs.
piles
Total amount for shoring and shuttering for 30M
0.00 Rs.
A+B+C+D
For 1 m Rs. 0.00 per RM

375
Shoring with sheet piles From GL: depth of 0 to 5 m - for laying Pipe - for 30m

Sl.
Description Rate Unit Amount
No.
400mm width X 3 m height x 9mm thickness Flat-Type
Pile as per IS 2314-1986
No. of piles for 30 m length for 3 m height 75 Nos
For 2 sides in 3 m height 150 Nos
No of sheet piles for depth from 0 to 5 m 1.67 No
Total Number of piles required for the full height Nos
Weight of One sheet pile as per IS 2314 Table 4
kg
( 55.2 X 3 m )
Total weight for 250.5 Nos of Sheet piles kg
MS Sheet cost/Kg (SoR ) Rs/kg
Total cost for 250.5 sheets 0 RS
Fabrication charges/ kg (SoR ) 0 Rs.
Total fabrication cost for 250.5 sheets 0 Rs.
Total cost for 250.5 completed pile sheets 0 Rs.
Assuming 40 uses, for one use 0 Rs.

A Hence cost of sheet piles 0 Rs.


For framing the Sheet piles using the above sheet piles -
No of sheet piles required per row 15 Nos
No of rows 4 Nos
No of sheet piles required . 60
B Cost of Sheet piles for framing 0 Rs.
Casurina Poles for struting at interval of 1.50m in 4 Rows
Length of Casurina Pole of size 8 to 10 cm 1.3 m
No. poles required 80 Nos
Total length 104 m
Rate for Casurina Pole of size 8 to 10 cm
Rs./RM
SoR P. No. 140 - 67.c 0
Total amount for Casurina pole 0 Rs.

C Assuming 5 uses for 1 use 0.00 Rs.


Labour for Timbering

2Nos Carpenter II class (SoR ) 0 Rs.

21Nos Mazdoor cat. II (SoR ) 0 Rs.

15Nos Pile driver (SoR ) 0 Rs.

D Total amount of Labour For fixing and removing sheet piles 0.00 Rs.
Total amount for shoring and shuttering for 30M
Rs.
A+B+C+D 0.00
For 1 m Rs. 0.00 per RM

376
Shoring with sheet piles From GL: depth of 0 to 6 m - for laying Pipe - for 30m

Sl. No. Description Rate Unit Amount


400mm width X 3 m height x 9mm thickness
Flat-Type Pile as per IS 2314-1986
No. of piles for 30 m length for 3 m height 75 Nos
For 2 sides in 3 m height 150 Nos
No of sheet piles for depth from 0 to 6 m 2 No
Total Number of piles required for the full height 300 Nos
Weight of One sheet pile as per IS 2314 Table 4
165.6 kg
( 55.2 X 3 m )
Total weight for 300 Nos of Sheet piles 49680 kg
MS Sheet cost/Kg 0 Rs/kg
Total cost for 300 sheets 0 RS
Fabrication charges/ kg 0 Rs.
Total fabrication cost for 300 sheets 0 Rs.
Total cost for 300 completed pile sheets 0 Rs.
Assuming 40 uses, for one use 0 Rs.
A Hence cost of sheet piles 0 Rs.
For framing the Sheet piles using the above sheet piles
No of sheet piles required per row 15 Nos
No of rows 5 Nos
No of sheet piles required . 75
B Cost of Sheet piles for framing 0 Rs.
Casurina Poles for struting at interval of 1.50m in 5 Rows
Length of Casurina Pole of size 8 to 10 cm 1.3 m
No. poles required 100 Nos
Total length 130 m
Rate for Casurina Pole of size 8 to 10 cm 0 Rs./RM
B Total amount for Casurina pole 0 Rs.
Assuming 5 uses for 1 use 0.00 Rs.
Labour for Timbering
3Nos Carpenter II class 0 Rs.
24Nos Mazdoor cat. II 0 Rs.
18 Nos Pile driver 0 Rs.
Total amount of Labour For fixing and removing sheet
D 0.00 Rs.
piles
Total amount for shoring and shuttering for 30M
0.00 Rs.
A+B+C+D
For 1 m Rs. 0.00 per RM

377
Shoring with sheet piles From GL: depth of 0 to 7 m - for laying Pipe - for 30m

Sl.
Description Rate Unit Amount
No.
400mm width X 3 m height x 9mm thickness Flat-Type
Pile as per IS 2314-1986
No. of piles for 30 m length for 3 m height 75 Nos
For 2 sides in 3 m height 150 Nos
No of sheet piles for depth from 0 to 7 m 2.34 No
Total Number of piles required for the full height 351 Nos
Weight of One sheet pile as per IS 2314 Table 4 ( 55.2 X
165.6 kg
3m)
Total weight for 351 Nos of Sheet piles kg
MS Sheet cost/Kg Rs/kg
Total cost for 351 sheets 0 RS
Fabrication charges/ kg 0 Rs.
Total fabrication cost for 351 sheets 0 Rs.
Total cost for 351 completed pile sheets 0 Rs.
Assuming 40 uses, for one use 0 Rs.
A Hence cost of sheet piles 0 Rs.
For framing the Sheet piles using the above sheet piles
No of sheet piles required per row 15 Nos
No of rows 6 Nos
No of sheet piles required . 90
B Cost of Sheet piles for framing 0 Rs.
Casurina Poles for struting at interval of 1.50m in 6 Rows
Length of Casurina Pole of size 8 to 10 cm 1.3 m
No. poles required 120 Nos
Total length 156 m
Rate for Casurina Pole of size 8 to 10 cm 0 Rs./RM
C Total amount for Casurina pole 0 Rs.
Assuming 5 uses for 1 use 0.00 Rs.
Labour for Timbering
3Nos Carpenter II class 0 Rs.
30Nos Mazdoor cat. II 0 Rs.
20Nos Pile driver 0 Rs.
D Total amount of Labour For fixing and removing sheet piles 0.00 Rs.
Total amount for shoring and shuttering for 30M
Rs.
A+B+C+D 0.00
For 1 m Rs. 0.00 per RM

378
Shoring with sheet piles From GL: depth of 0 to 8 m - for laying Pipe - for 30m
Sl.
Description Rate Unit Amount
No.
400mm width X 3 m height x 9mm thickness Flat-Type
Pile as per IS 2314-1986
No. of piles for 30 m length for 3 m height 75 Nos
For 2 sides in 3 m height 150 Nos
No of sheet piles for depth from 0 to 8 m 2.67 No
Total Number of piles required for the full height 400.5 Nos
Weight of One sheet pile as per IS 2314 Table 4
165.6 kg
( 55.2 X 3 m)
Total weight for 400.5 Nos of Sheet piles kg
MS Sheet cost/Kg Rs/kg
Total cost for 400.5 sheets 0 RS
Fabrication charges/ kg 0 Rs.
Total fabrication cost for 400.5 sheets 0 Rs.
Total cost for 400.5 completed pile sheets 0 Rs.
Assuming 40 uses, for one use 0 Rs.
A Hence cost of sheet piles 0 Rs.
For framing the Sheet piles using the above sheet piles
No of sheet piles required per row 15 Nos
No of rows 7 Nos
No of sheet piles required . 105
B Cost of Sheet piles for framing 0 Rs.
Casurina Poles for struting at interval of 1.50m in 7 Rows
Length of Casurina Pole of size 8 to 10 cm 1.3 m
No. poles required 140 Nos
Total length 182 m
Rate for Casurina Pole of size 8 to 10 cm 0 Rs./RM
C Total amount for Casurina pole 0 Rs.
Assuming 5 uses for 1 use 0.00 Rs.
Labour for Timbering
4Nos Carpenter II class 0 Rs.
38Nos Mazdoor cat. II 0 Rs.
25Nos Pile driver 0 Rs.
D Total amount of Labour For fixing and removing sheet piles 0.00 Rs.
Total amount for shoring and shuttering for 30M
0.00 Rs.
A+B+C+D
For 1 m Rs. 0.00 per RM

379
BARRICADING CHARGES FOR ONE SIDE OF TRENCH WITH GI SHEET 0.9 M HEIGHT
Barricading work (Where, there is less traffic areas and broader roads etc.) for laying of pipe
line using casurina poles at 1.50m center to center (8cm to 10cm dia and 1.80m height) vertical
with horizontal poles in three rows including painting the vertical poles in the road facing sides
with ready mix paint, tying the vertical and horizontal poles with coir rope including fixing
charges and fixing 75mm dia reflectors including earth work excavation for fixing vertical posts
and finally removing and stacking the materials safely for further use etc., complete and as
directed by TWAD Board officers.
Data worked out for 150 m length
S.NO DESCRIPTION Qty Rate Per Amount
Materials
Casurina poles 8 to 10 cm dia 1.8 m long fixed at 1.5m
1 (a) centers (SoR ) Vertical (150m/1.50m + 1) X 1.80m = 181.8 0.00 m 0.00
181.80m
Casurina poles 8 to 10 cm dia 150 m x 2 Nos long
(b) fixed at from GL 0.3 m and 0.9 m centers (SoR ) - 300 0.00 m 0.00
Horizontal
2 Red reflectors 75 mm dia each at 3 m spacing 50 0.00 Nos 0.00
Total 0.00
3 Adopting 5 uses, cost per use 0.00
Plain GI Sheet 0.8mm thick (22 Gauge) (SOR) (150 x
4 135 0.00 sqm 0.00
0.9 ) m
Supply and delivery of warning board/sign board of
size 0.75 m x 1.2 m on both sides with Plain GI sheet
0.8 mm thick fixed on 25 x 25 x 3 mm MS angles on
5 2 0.00 Each 0.00
four sides and at the centre of the GI Sheet, Painting
the warning words and symbol fixing on both ends of
the streets
Total 0.00
6 Adopting 8 uses, cost per use 0
7 Cost of coir (SoR) 15 0.00 Kg 0.00
Labour for Earth work excavation & refilling for fixing
of 100 nos of Vertical post to a depth of about 0.3
8 m, fixing the vertical post firmly, tying two rows of 0.00
horizantal post and fixing the GI sheet in position with
reflectors.
a Mazdoor cat I 2.00 0.00 each 0.00
b Mazdoor cat II 5.00 0.00 each 0.00
Removing the above post and sheets safely and
9 stacking the above materials for reuse after completion
of laying, Jointing, testing and refilling the trenches
a Mazdoor cat I 1.00 0.00 each 0.00
b Mazdoor cat II 3.00 0.00 each 0.00
10 Total Labour 0.00
11 Total cost for material (3+6+7 ) 0.00
12 Total cost for 150 m (10) + (11) 0.00
Cost per m 0.00

380
BARRICADING CHARGES FOR ONE SIDE OF TRENCH WITH CASURINA POLES
VERTICALLY AND HORIZONTALLY
Barricading work (Where the lines are in narrow width of municipality area, busy streets like Market,
Bus-stand and in the Highways etc.) for laying of pipe line using casurina poles at 1.50m center to
center (8cm to 10cm dia. and 1.80m height) vertical with horizontal poles in two rows, painting the
vertical poles in the road facing sides with ready mix paint, tying the vertical and horizontal poles with
coir rope including supplying, delivery and fixing of GI sheet (0.90m x 0.8mm thick) in the horizontal
poles and fixing 75mm dia. reflectors including earth work excavation for fixing vertical posts and
finally removing and stacking the materials safely for further use etc., complete and as directed by
TWAD Board officers.

Data worked out for 150 m length


S.
DESCRIPTION Qty Rate Per Amount
NO
I Materials
Casurina poles 8 to 10 cm dia 1.8 m long fixed at 1.5m
a 181.8 m
centers Vertical (150m / 1.50m +1) X 1.80m = 181.80m
Casurina poles 8 to 10 cm dia 150 m x 2 Nos long fixed at
b 300 m
1.5m centers - Horizontal
c Red reflectors 75 mm dia each at 1.5 m spacing 100 Nos
Supply and delivery of warning board/sign board of size
0.75 m x 1.2m on both sides with Plain GI sheet 0.8 mm
e thick fixed on 25 x 25 x 3 mm MS angles on four sides and 2 Each
at the centre of the GI Sheet, Painting the warning words
and symbol fixing on both ends of the streets
Painting the vertical casurina poles with multi colour ready
d mix paint for the road facing side side (3.14 x 0.08 x 1.8 x 22.62 sqm
(150/1.5) Nos.)/2 = 22.62 sqm
Total

Adopting 5 uses, cost per use

f Cost of coir 15 Kg

Total for Material

II Labour
Labour for Earth work excavation & refilling for fixing of
100 nos of Vertical post to a depth of about 0.3 m, fixing
2
the vertical post firmly, tying two rows of horizantal post in
position with reflectors.
a Mazdoor cat I 2 each

b Mazdoor cat II 3 each


Removing the above post, safely and stacking the above
3 materials for reuse after completion of laying, Jointing,
testing and refilling the trenches
a Mazdoor cat I 1 each

b Mazdoor cat II 2 each

Total for labour

Total cost for 150 m (Material + Labour)

Cost per m
Rs.

381
DATA FOR REPLACEMENT OF UNDER GROUND UTILITIES (HSC PIPES,
D SYSTEM & P MAIN PIPES )

Sl.
Description of item of Work Quantity Rate Unit Amount
No.
Excavating of driving pit and receiving pit of size 3.00m (length) x 3.50m (breadth),
upto 5m depth in all soil strata including shoring and strutting using 6mm tk MS
Plate of size 3.50m x 3.50m usable for 20 operations and providing 16mm thickness
MS plate of size 3.00m x 3.50m with 100mm x100mm x 12mm angles of 4m length
for holding the MS plates for Thrust arrangements to receive the impacts during
pushing operation of encasing pipe. Lowering the following size of MS encasing pipe
by using Contractor’s crane and machineries and jointing MS pipes by welding, across
the National Highways/State Highways/ Railways/Canal crossing etc and driving the
horizontal bore by pushing / jacking method (trenchless technology method) using
contractor’s machineries such as cranes, jacks, jacking materials, generator, welding
machineries, compressor, jack hammer and other equipments etc. without interfering
and causing any hindrance to the movement of traffic or any other vehicles, without
any disturbances to the railway/road/canal formation etc. including bailing / pumping
of water where ever necessary without affecting any installation like water supply
pipeline/telephone cable, electric cables etc. passing nearby area and scooping the
earth inside the pipes and pit and depositing the surplus earth in a convenient place
and leveling the site after completion of entire work as directed by TWAD Engineers.
The rate includes the cost of driving pit, thrust bed/wall and receiving pit to the depth
of om to 2m excluding the cost of MS pipes.
COST OF MS PLATES AND CHANNELS FOR THRUST ARRANGEMENT

Size of MS Plate
For sides for shoring - 2Nos
1 576.98
(3.50mx3.50mx6mm) - 47.1 kg/m2
For Rear sides for thurst - 1No
2 1318.8
(3.00mx3.50mx16mm) - 125.60 kg/m2
Total Weight of MS Plate 1895.78 0 Kg 0
Ms Equal angle of size 100mm x
3 100mmx12mm - (4m x4Nos) =16m x 283.2 0 Kg 0
17.70Kg/m
4 Bolts and nuts for fixing 32 0 No 0

5 Fabrication charges 2178.98 0 Kg 0

Upto 300mm dia MS Pipe

Cost for 20 operation 0

cost for one operation 0

Say 0

350mm to 900mm dia MS Pipe

Cost for15 operation 0

382
Sl.
Description of item of Work Quantity Rate Unit Amount
No.
cost for one operation 0

Say 0

1000mm to 2200mm dia MS Pipe

Cost for10 operation 0

cost for one operation 0

Say 0
For 200mm dia MS encasing pipe for various
a
thickness
For a length of 15m

Clearing and leveling both sides

Mazdoor catogery - I 2 0.00 No 0.00


Earth work excavation in all soil strata for
driving pit and receiving pit (2Nos x 3.0m
x3.5m x3.5m)
Mazdoor catogery - I 15 0.00 No 0.00

Mazdoor catogery - II 15 0.00 No 0.00


MS fabrication work for Thrust arrangenents
1 0 No 0.00
and shoring
Charges for Drilling horizontal bores by using
15 0 m 0.00
rig
Hire charges for welding machine with
genset and pushing the encasing pipe by jack 6 0 day 0.00
and push method (15m / 2.8m = 6 days)
Diesel charges for genset (9liters/hour) 386 0 litre 0.00

Labour charges for welding

Welder - I class 3 0.00 No 0.00

Welder - II class 3 0.00 No 0.00

Welding rod 5 0.00 pocket 0.00


Removing the excavated earth coveying and
depositing on bank for 6 days
Mazdoor catogery - I 6 0.00 No 0.00

Mazdoor catogery - II 12 0.00 No 0.00

labour charges for pushing MS pipe

Mazdoor catogery - I 12 0.00 No 0.00

383
Sl.
Description of item of Work Quantity Rate Unit Amount
No.
Watchman 6 0 No 0.00

Amount for 15m length 0.00

Rate per m length 0.00

Say 0.00

per 1m
For 250mm dia MS encasing pipe for various
b
thickness
For a length of 15m

Clearing and leveling both sides

Mazdoor catogery - I 2 0.00 No 0.00


Earth work excavation in all soil strata for
driving pit and receiving pit (2Nos x 3.0m
x3.5m x3.5m)
Mazdoor catogery - I 15 0.00 No 0.00

Mazdoor catogery - II 15 0.00 No 0.00


MS fabrication work for Thrust arrangenents
1 0 No 0.00
and shoring
Charges for Drilling horizontal bores by using
15 0 m 0.00
rig
Hire charges for welding machine with
genset and pushing the encasing pipe by jack 6 0 day 0.00
and push method (15m / 2.70m = 6 days)
Diesel charges for genset ( 9liters/hour) 400 0 litre 0.00

Labour charges for welding

Welder - I class 3 0.00 No 0.00

Welder - II class 3 0.00 No 0.00

Welding rod 6 0.00 pocket 0.00


Removing the excavated earth coveying and
depositing on bank for 6 days
Mazdoor catogery - I 6 0.00 No 0.00

Mazdoor catogery - II 12 0.00 No 0.00

labour charges for pushing MS pipe

Mazdoor catogery - I 12 0.00 No 0.00

Watchman 6 0 No 0.00

Amount for 15m length 0.00

384
Sl.
Description of item of Work Quantity Rate Unit Amount
No.
Rate per m length 0.00

Say 0.00

per 1m

For 300mm dia MS encasing pipe for various


c
thickness
For a length of 15m

Clearing and leveling both sides

Mazdoor catogery - I 2 0.00 No 0.00


Earth work excavation in all soil strata for
driving pit and receiving pit (2Nos x 3.0m
x3.5m x3.5m)
Mazdoor catogery - I 15 0.00 No 0.00

Mazdoor catogery - II 15 0.00 No 0.00


MS fabrication work for Thrust arrangenents
1 0 No 0.00
and shoring
Charges for Drilling horizontal bores by using
15 0 m 0.00
rig
Hire charges for welding machine with
genset and pushing the encasing pipe by jack 6 0 day 0.00
and push method (15m / 2.60m =6 days)
Diesel charges for genset ( 9liters/hour ) 416 0 litre 0.00

Labour charges for welding

Welder - I class 3 0.00 No 0.00

Welder - II class 3 0.00 No 0.00

Welding rod 7 0.00 pocket 0.00


Removing the excavated earth coveying and
depositing on bank for 6 days
Mazdoor catogery - I 6 0.00 No 0.00

Mazdoor catogery - II 12 0.00 No 0.00

labour charges for pushing MS pipe

Mazdoor catogery - I 12 0.00 No 0.00

Watchman 6 0 No 0.00

Amount for 15m length 0.00

Rate per m length 0.00

385
Sl.
Description of item of Work Quantity Rate Unit Amount
No.
Say 0.00

per 1m

For 350mm dia MS encasing pipe for various


d
thickness
For a length of 15m

Clearing and leveling both sides

Mazdoor catogery - I 2 0.00 No 0.00


Earth work excavation in all soil strata for
driving pit and receiving pit (2Nos x 3.0m
x3.5m x3.5m)
Mazdoor catogery - I 15 0.00 No 0.00

Mazdoor catogery - II 15 0.00 No 0.00


MS fabrication work for Thrust arrangenents
1 0 No 0.00
and shoring
Hire Charges for Power Driller ( with jack
48 0.00 hour 0.00
arrangement) for trenchless excavation
Labour charges for trenchless excavation

Hammer Mazdoor (with alternate) 12 0.00 No 0.00

Charges for providing oxygen and fan


6 0.00 day 0.00
arrangement
Hire charges for welding machine with
genset and pushing the encasing pipe by jack 6 0 day 0.00
and push method (15m / 2.50m =6 days)
Diesel charges for genset ( 9liters/hour) 540 0 litre 0.00

Labour charges for welding

Welder - I class 3 0.00 No 0.00

Welder - II class 3 0.00 No 0.00

Welding rod 8 0.00 pocket 0.00


Removing the excavated earth coveying and
depositing on bank for 6 days
Mazdoor catogery - I 4.73 0.00 No 0.00

Mazdoor catogery - II 12 0.00 No 0.00

labour charges for pushing MS pipe

Mazdoor catogery - I 12 0.00 No 0.00

386
Sl.
Description of item of Work Quantity Rate Unit Amount
No.
Watchman 6 0 No 0.00

Amount for 15m length 0.00

Rate per m length 0.00

Say 0.00

per 1m

For 400mm dia MS encasing pipe for various


e
thickness
For a length of 15m

Clearing and leveling both sides

Mazdoor catogery - I 2 0.00 No 0.00


Earth work excavation in all soil strata for
driving pit and receiving pit (2Nos x 3.0m
x3.5m x3.5m)
Mazdoor catogery - I 15 0.00 No 0.00

Mazdoor catogery - II 15 0.00 No 0.00


MS fabrication work for Thrust arrangenents
1 0 No 0.00
and shoring
Hire Charges for Power Driller ( with jack
50 0.00 day 0.00
arrangement) for trenchless excavation
Labour charges for trenchless excavation

Hammer Mazdoor (with alternate) 14 0.00 No 0.00


Charges for providing oxygen and fan
7 0.00 day 0.00
arrangement
Hire charges for welding machine with
genset and pushing the encasing pipe by jack 7 0 day 0.00
and push method (15m / 2.40m =7 days)
Diesel charges for genset ( 9liters/hour ) 450 0 litre 0.00

Labour charges for welding

Welder - I class 3.5 0.00 No 0.00

Welder - II class 3.5 0.00 No 0.00

Welding rod 9 0.00 pocket 0.00


Removing the excavated earth coveying and
depositing on bank for 7 days
Mazdoor catogery - I 6.5 0.00 No 0.00

Mazdoor catogery - II 14 0.00 No 0.00

387
Sl.
Description of item of Work Quantity Rate Unit Amount
No.
labour charges for pushing MS pipe

Mazdoor catogery - I 14 0.00 No 0.00

Watchman 6 0 No 0.00

Amount for 15m length 0.00

Rate per m length 0.00

Say 0.00

per 1m
For 450mm dia MS encasing pipe for various
f
thickness
For a length of 15m

Clearing and leveling both sides

Mazdoor catogery - I 2 0.00 No 0.00


Earth work excavation in all soil strata for
driving pit and receiving pit (2Nos x 3.0m
x3.5m x3.5m)
Mazdoor catogery - I 15 0.00 No 0.00

Mazdoor catogery - II 15 0.00 No 0.00


MS fabrication work for Thrust arrangenents
1 0 No 0.00
and shoring
Hire Charges for Power Driller ( with jack
53 0.00 day 0.00
arrangement) for trenchless excavation
Labour charges for trenchless excavation 210.00

Hammer Mazdoor (with alternate) 14 0.00 No 0.00


Charges for providing oxygen and fan
7 0.00 day 0.00
arrangement
Hire charges for welding machine with
genset and pushing the encasing pipe by jack 7 0 day 0.00
and push method (15m / 2.30m =7days)
Diesel charges for genset ( 9liters/hour ) 470 0 litre 0.00

Labour charges for welding

Welder - I class 3.5 0.00 No 0.00

Welder - II class 3.5 0.00 No 0.00

Welding rod 10 0.00 pocket 0.00


Removing the excavated earth coveying and
depositing on bank for 6 days
Mazdoor catogery - I 6.3 0.00 No 0.00

388
Sl.
Description of item of Work Quantity Rate Unit Amount
No.
Mazdoor catogery - II 14 0.00 No 0.00

labour charges for pushing MS pipe

Mazdoor catogery - I 14 0.00 No 0.00

Watchman 7 0 No 0.00

Amount for 15m length 0.00

Rate per m length 0.00

Say 0.00

per 1m

For 500mm dia MS encasing pipe for various


g
thickness
For a length of 15m

Clearing and leveling both sides

Mazdoor catogery - I 2 0.00 No 0.00


Earth work excavation in all soil strata for
driving pit and receiving pit (2Nos x 3.0m
x3.5m x3.5m)
Mazdoor catogery - I 15 0.00 No 0.00

Mazdoor catogery - II 15 0.00 No 0.00


MS fabrication work for Thrust arrangenents
1 0 No 0.00
and shoring
Hire Charges for Power Driller ( with jack
55 0.00 day 0.00
arrangement) for trenchless excavation
Labour charges for trenchless excavation

Hammer Mazdoor (with alternate) 14 0.00 No 0.00


Charges for providing oxygen and fan
7 0.00 day 0.00
arrangement
Hire charges for welding machine with
genset and pushing the encasing pipe by jack 7 0 day 0.00
and push method (15m / 2.20m =7days)
Diesel charges for genset ( 9liters/hour ) 491 0 litre 0.00

Labour charges for welding

Welder - I class 3.5 0.00 No 0.00

Welder - II class 3.5 0.00 No 0.00

Welding rod 11 0.00 pocket 0.00

389
Sl.
Description of item of Work Quantity Rate Unit Amount
No.
Removing the excavated earth coveying and
depositing on bank for 7days
Mazdoor catogery - I 6 0.00 No 0.00

Mazdoor catogery - II 14 0.00 No 0.00

labour charges for pushing MS pipe

Mazdoor catogery - I 14 0.00 No 0.00

Watchman 7 0 No 0.00

Amount for 15m length 0.00

Rate per m length 0.00

Say 0.00

per 1m

For 600mm dia MS encasing pipe for various


h
thickness
For a length of 15m

Clearing and leveling both sides

Mazdoor catogery - I 2 0.00 No 0.00


Earth work excavation in all soil strata for
driving pit and receiving pit (2Nos x 3.0m
x3.5m x3.5m)
Mazdoor catogery - I 15 0.00 No 0.00

Mazdoor catogery - II 15 0.00 No 0.00


MS fabrication work for Thrust arrangenents
1 0 No 0.00
and shoring
Hire Charges for Power Driller ( with jack
58 0.00 day 0.00
arrangement) for trenchless excavation
Labour charges for trenchless excavation

Hammer Mazdoor (with alternate) 14 0.00 No 0.00


Charges for providing oxygen and fan
7 0.00 day 0.00
arrangement
Hire charges for welding machine with
genset and pushing the encasing pipe by jack 7 0 day 0.00
and push method (15m / 2.10m =7days)
Diesel charges for genset ( 9liters/hour ) 515 0 litre 0.00

Labour charges for welding

Welder - I class 3.5 0.00 No 0.00

390
Sl.
Description of item of Work Quantity Rate Unit Amount
No.
Welder - II class 3.5 0.00 No 0.00

Welding rod 17 0.00 pocket 0.00


Removing the excavated earth coveying and
depositing on bank for7days
Mazdoor catogery - I 6.5 0.00 No 0.00

Mazdoor catogery - II 14 0.00 No 0.00

labour charges for pushing MS pipe

Mazdoor catogery - I 14 0.00 No 0.00

Watchman 7 0 No 0.00

Amount for 15m length 0.00

Rate per m length 0.00

Say 0.00

per 1m

For 700mm dia MS encasing pipe for various


i
thickness
For a length of 15m

Clearing and leveling both sides

Mazdoor catogery - I 2 0.00 No 0.00


Earth work excavation in all soil strata for
driving pit and receiving pit (2Nos x 3.0m
x3.5m x3.5m)
Mazdoor catogery - I 15 0.00 No 0.00

Mazdoor catogery - II 15 0.00 No 0.00


MS fabrication work for Thrust arrangenents
1 0 No 0.00
and shoring
Hire Charges for Power Driller ( with jack
60 0.00 day 0.00
arrangement) for trenchless excavation
Labour charges for trenchless excavation

Hammer Mazdoor (with alternate) 16 0.00 No 0.00


Charges for providing oxygen and fan
8 0.00 day 0.00
arrangement
Hire charges for welding machine with
genset and pushing the encasing pipe by jack 8 0 day 0.00
and push method (15m / 2.00m =8days)
Diesel charges for genset ( 9liters/hour ) 540 0 litre 0.00

391
Sl.
Description of item of Work Quantity Rate Unit Amount
No.
Labour charges for welding

Welder - I class 4 0.00 No 0.00

Welder - II class 4 0.00 No 0.00

Welding rod 19 0.00 pocket 0.00


Removing the excavated earth coveying and
depositing on bank for 8 days
Mazdoor catogery - I 7.5 0.00 No 0.00

Mazdoor catogery - II 16 0.00 No 0.00

labour charges for pushing MS pipe

Mazdoor catogery - I 16 0.00 No 0.00

Watchman 8 0 No 0.00

Amount for 15m length 0.00

Rate per m length 0.00

Say 0.00

per 1m

For 800mm dia MS encasing pipe for various


j
thickness
For a length of 15m

Clearing and leveling both sides

Mazdoor catogery - I 2 0.00 No 0.00


Earth work excavation in all soil strata for
driving pit and receiving pit (2Nos x 3.0m
x3.5m x3.5m)
Mazdoor catogery - I 15 0.00 No 0.00

Mazdoor catogery - II 15 0.00 No 0.00


MS fabrication work for Thrust arrangenents
1 0 No 0.00
and shoring
Hire Charges for Power Driller ( with jack
64 0.00 day 0.00
arrangement) for trenchless excavation
Labour charges for trenchless excavation

Hammer Mazdoor (with alternate) 16 0.00 No 0.00


Charges for providing oxygen and fan
8 0.00 day 0.00
arrangement

392
Sl.
Description of item of Work Quantity Rate Unit Amount
No.
Hire charges for welding machine with
genset and pushing the encasing pipe by jack 8 0 day 0.00
and push method (15m / 1.90m =8days)
Diesel charges for genset ( 9liters/hour ) 569 0 litre 0.00

Labour charges for welding

Welder - I class 4 0.00 No 0.00

Welder - II class 4 0.00 No 0.00

Welding rod 22 0.00 pocket 0.00


Removing the excavated earth coveying and
depositing on bank for 8 days
Mazdoor catogery - I 7.5 0.00 No 0.00

Mazdoor catogery - II 16 0.00 No 0.00

labour charges for pushing MS pipe

Mazdoor catogery - I 16 0.00 No 0.00

Watchman 8 0 No 0.00

Amount for 15m length 0.00

Rate per m length 0.00

Say 0.00

per 1m

For 900mm dia MS encasing pipe for various


k
thickness
For a length of 15m

Clearing and leveling both sides

Mazdoor catogery - I 2 0.00 No 0.00


Earth work excavation in all soil strata for
driving pit and receiving pit (2Nos x 3.0m
x3.5m x3.5m)
Mazdoor catogery - I 15 0.00 No 0.00

Mazdoor catogery - II 15 0.00 No 0.00


MS fabrication work for Thrust arrangenents
1 0 No 0.00
and shoring
Hire Charges for Power Driller ( with jack
67 0.00 day 0.00
arrangement) for trenchless excavation
Labour charges for trenchless excavation

393
Sl.
Description of item of Work Quantity Rate Unit Amount
No.
Hammer Mazdoor (with alternate) 16 0.00 No 0.00
Charges for providing oxygen and fan
8 0.00 day 0.00
arrangement
Hire charges for welding machine with
genset and pushing the encasing pipe by jack 8 0 day 0.00
and push method (15m / 1.80m =8days)
Diesel charges for genset ( 9liters/hour ) 600 0 litre 0.00

Labour charges for welding

Welder - I class 4 0.00 No 0.00

Welder - II class 4 0.00 No 0.00

Welding rod 25 0.00 pocket 0.00


Removing the excavated earth coveying and
depositing on bank for 8 days
Mazdoor catogery - I 7.5 0.00 No 0.00

Mazdoor catogery - II 16 0.00 No 0.00

labour charges for pushing MS pipe

Mazdoor catogery - I 16 0.00 No 0.00

Watchman 8 0 No 0.00

Amount for 15m length 0.00

Rate per m length 0.00

Say 0.00

per 1m

For 1000mm dia MS encasing pipe for various


l
thickness
For a length of 15m

Clearing and leveling both sides

Mazdoor catogery - I 2 0.00 No 0.00


Earth work excavation in all soil strata for
driving pit and receiving pit (2Nos x 3.0m
x3.5m x3.5m)
Mazdoor catogery - I 15 0.00 No 0.00

Mazdoor catogery - II 15 0.00 No 0.00


MS fabrication work for Thrust arrangenents
1 0 No 0.00
and shoring

394
Sl.
Description of item of Work Quantity Rate Unit Amount
No.
Hire Charges for Power Driller ( with jack
71 0.00 day 0.00
arrangement) for trenchless excavation
Labour charges for trenchless excavation

Hammer Mazdoor (with alternate) 18 0.00 No 0.00


Charges for providing oxygen and fan
9 0.00 day 0.00
arrangement
Hire charges for welding machine with
genset and pushing the encasing pipe by jack 9 0 day 0.00
and push method (15m / 1.70m =9days)
Diesel charges for genset (9liters/hour ) 636 0 litre 0.00

Labour charges for welding

Welder - I class 4.5 0.00 No 0.00

Welder - II class 4.5 0.00 No 0.00

Welding rod 28 0.00 pocket 0.00


Removing the excavated earth coveying and
depositing on bank for 9 days
Mazdoor catogery - I 9 0.00 No 0.00

Mazdoor catogery - II 18 0.00 No 0.00

labour charges for pushing MS pipe

Mazdoor catogery - I 18 0.00 No 0.00

Watchman 9 0 No 0.00

Amount for 15m length 0.00

Rate per m length 0.00

Say 0.00

per 1m

For 1050mm dia MS encasing pipe for various


j
thickness
For a length of 15m

Clearing and leveling both sides

Mazdoor catogery - I 2 0.00 No 0.00


Earth work excavation in all soil strata for
driving pit and receiving pit (2Nos x 3.0m
x3.5m x3.5m)
Mazdoor catogery - I 15 0.00 No 0.00

395
Sl.
Description of item of Work Quantity Rate Unit Amount
No.
Mazdoor catogery - II 15 0.00 No 0.00
MS fabrication work for Thrust arrangenents
1 0 No 0.00
and shoring
Hire Charges for Power Driller ( with jack
75 0.00 day 0.00
arrangement) for trenchless excavation
Labour charges for trenchless excavation

Hammer Mazdoor (with alternate) 18 0.00 No 0.00


Charges for providing oxygen and fan
9 0.00 day 0.00
arrangement
Hire charges for welding machine with
genset and pushing the encasing pipe by jack 9 0 day 0.00
and push method (15m / 1.60m =9days)
Diesel charges for genset ( 9liters/hour ) 675 0 litre 0.00

Labour charges for welding

Welder - I class 4.5 0.00 No 0.00

Welder - II class 4.5 0.00 No 0.00

Welding rod 29 0.00 pocket 0.00


Removing the excavated earth coveying and
depositing on bank for 9 days
Mazdoor catogery - I 8.7 0.00 No 0.00

Mazdoor catogery - II 18 0.00 No 0.00

labour charges for pushing MS pipe

Mazdoor catogery - I 18 0.00 No 0.00

Watchman 9 0 No 0.00

Amount for 15m length 0.00

Rate per m length 0.00

Say 0.00

per 1m

For 1100mm dia MS encasing pipe for various


k
thickness
For a length of 15m

Clearing and leveling both sides

Mazdoor catogery - I 2 0.00 No 0.00

396
Sl.
Description of item of Work Quantity Rate Unit Amount
No.
Earth work excavation in all soil strata for
driving pit and receiving pit (2Nos x 3.0m
x3.5m x3.5m)
Mazdoor catogery - I 15 0.00 No 0.00

Mazdoor catogery - II 15 0.00 No 0.00


MS fabrication work for Thrust arrangenents
1 0 No 0.00
and shoring
Hire Charges for Power Driller ( with jack
80 0.00 day 0.00
arrangement) for trenchless excavation
Labour charges for trenchless excavation

Hammer Mazdoor (with alternate) 20 0.00 No 0.00


Charges for providing oxygen and fan
10 0.00 day 0.00
arrangement
Hire charges for welding machine with
genset and pushing the encasing pipe by jack 10 0 day 0.00
and push method (15m / 1.50m =10days)
Diesel charges for genset ( 9liters/hour ) 720 0 litre 0.00

Labour charges for welding

Welder - I class 5 0.00 No 0.00

Welder - II class 5 0.00 No 0.00

Welding rod 30 0.00 pocket 0.00


Removing the excavated earth coveying and
depositing on bank for 10days
Mazdoor catogery - I 10.5 0.00 No 0.00

Mazdoor catogery - II 20 0.00 No 0.00

labour charges for pushing MS pipe

Mazdoor catogery - I 20 0.00 No 0.00

Watchman 10 0 No 0.00

Amount for 15m length 0.00

Rate per m length 0.00

Say 0.00

per 1m

For 1200mm dia MS encasing pipe for various


L
thickness
For a length of 15m

397
Sl.
Description of item of Work Quantity Rate Unit Amount
No.
Clearing and leveling both sides

Mazdoor catogery - I 2 0.00 No 0.00


Earth work excavation in all soil strata for
driving pit and receiving pit (2Nos x 3.0m
x3.5m x3.5m)
Mazdoor catogery - I 15 0.00 No 0.00

Mazdoor catogery - II 15 0.00 No 0.00


MS fabrication work for Thrust arrangenents
1 0 No 0.00
and shoring
Hire Charges for Power Driller ( with jack
86 0.00 day 0.00
arrangement) for trenchless excavation
Labour charges for trenchless excavation

Hammer Mazdoor (with alternate) 22 0.00 No 0.00


Charges for providing oxygen and fan
11 0.00 day 0.00
arrangement
Hire charges for welding machine with
genset and pushing the encasing pipe by jack 11 0 day 0.00
and push method (15m / 1.40m =11days)
Diesel charges for genset ( 9liters/hour ) 772 0 litre 0.00

Labour charges for welding

Welder - I class 5.5 0.00 No 0.00

Welder - II class 5.5 0.00 No 0.00

Welding rod 33 0.00 pocket 0.00


Removing the excavated earth coveying and
depositing on bank for 11 days
Mazdoor catogery - I 11.5 0.00 No 0.00

Mazdoor catogery - II 22 0.00 No 0.00

labour charges for pushing MS pipe

Mazdoor catogery - I 22 0.00 No 0.00

Watchman 11 0 No 0.00

Amount for 15m length 0.00

Rate per m length 0.00

Say 0.00

per 1m

398
Sl.
Description of item of Work Quantity Rate Unit Amount
No.
For 1400mm dia MS encasing pipe for various
m
thickness
For a length of 15m

Clearing and leveling both sides

Mazdoor catogery - I 2 0.00 No 0.00


Earth work excavation in all soil strata for
driving pit and receiving pit (2Nos x 3.0m
x3.5m x3.5m)
Mazdoor catogery - I 15 0.00 No 0.00

Mazdoor catogery - II 15 0.00 No 0.00


MS fabrication work for Thrust arrangenents
1 0 No 0.00
and shoring
Hire Charges for Power Driller ( with jack
93 0.00 day 0.00
arrangement) for trenchless excavation
Labour charges for trenchless excavation

Hammer Mazdoor (with alternate) 24 0.00 No 0.00


Charges for providing oxygen and fan
12 0.00 day 0.00
arrangement
Hire charges for welding machine with
genset and pushing the encasing pipe by jack 12 0 day 0.00
and push method (15m / 1.30m =12days)
Diesel charges for genset ( 9liters/hour ) 831 0 litre 0.00

Labour charges for welding

Welder - I class 6 0.00 No 0.00

Welder - II class 6 0.00 No 0.00

Welding rod 39 0.00 pocket 0.00


Removing the excavated earth coveying and
depositing on bank for 12 days
Mazdoor catogery - I 12.7 0.00 No 0.00

Mazdoor catogery - II 24 0.00 No 0.00

labour charges for pushing MS pipe

Mazdoor catogery - I 24 0.00 No 0.00

Watchman 12 0 No 0.00

Amount for 15m length 0.00

Rate per m length 0.00

Say 0.00

399
Sl.
Description of item of Work Quantity Rate Unit Amount
No.
per 1m

For 1600mm dia MS encasing pipe for various


n
thickness
For a length of 15m

Clearing and leveling both sides

Mazdoor catogery - I 2 0.00 No 0.00


Earth work excavation in all soil strata for
driving pit and receiving pit (2Nos x 3.0m
x3.5m x3.5m)
Mazdoor catogery - I 15 0.00 No 0.00

Mazdoor catogery - II 15 0.00 No 0.00


MS fabrication work for Thrust arrangenents
1 0 No 0.00
and shoring
Hire Charges for Power Driller ( with jack
100 0.00 day 0.00
arrangement) for trenchless excavation
Labour charges for trenchless excavation

Hammer Mazdoor (with alternate) 26 0.00 No 0.00


Charges for providing oxygen and fan
13 0.00 day 0.00
arrangement
Hire charges for welding machine with
genset and pushing the encasing pipe by jack 13 0 day 0.00
and push method (15m / 1.20m =13days)
Diesel charges for genset ( 9liters/hour ) 900 0 litre 0.00

Labour charges for welding

Welder - I class 6.5 0.00 No 0.00

Welder - II class 6.5 0.00 No 0.00

Welding rod 44 0.00 pocket 0.00


Removing the excavated earth coveying and
depositing on bank for 13 days
Mazdoor catogery - I 14 0.00 No 0.00

Mazdoor catogery - II 26 0.00 No 0.00

labour charges for pushing MS pipe

Mazdoor catogery - I 26 0.00 No 0.00

Watchman 13 0 No 0.00

Amount for 15m length 0.00

400
Sl.
Description of item of Work Quantity Rate Unit Amount
No.
Rate per m length 0.00

Say 0.00

per 1m

For 1800mm dia MS encasing pipe for various


o
thickness
For a length of 15m

Clearing and leveling both sides

Mazdoor catogery - I 2 0.00 No 0.00


Earth work excavation in all soil strata for
driving pit and receiving pit (2Nos x 3.0m
x3.5m x3.5m)
Mazdoor catogery - I 15 0.00 No 0.00

Mazdoor catogery - II 15 0.00 No 0.00


MS fabrication work for Thrust arrangenents
1 0 No 0.00
and shoring
Hire Charges for Power Driller ( with jack
110 0.00 day 0.00
arrangement) for trenchless excavation
Labour charges for trenchless excavation

Hammer Mazdoor (with alternate) 28 0.00 No 0.00


Charges for providing oxygen and fan
14 0.00 day 0.00
arrangement
Hire charges for welding machine with
genset and pushing the encasing pipe by jack 14 0 day 0.00
and push method (15m / 1.10m =14days)
Diesel charges for genset ( 9liters/hour ) 982 0 litre 0.00

Labour charges for welding

Welder - I class 7 0.00 No 0.00

Welder - II class 7 0.00 No 0.00

Welding rod 50 0.00 pocket 0.00


Removing the excavated earth coveying and
depositing on bank for 14 days
Mazdoor catogery - I 15.5 0.00 No 0.00

Mazdoor catogery - II 28 0.00 No 0.00

labour charges for pushing MS pipe

Mazdoor catogery - I 28 0.00 No 0.00

401
Sl.
Description of item of Work Quantity Rate Unit Amount
No.
Watchman 14 0 No 0.00

Amount for 15m length 0.00

Rate per m length 0.00

Say 0.00

per 1m

For 2000mm dia MS encasing pipe for various


p
thickness
For a length of 15m

Clearing and leveling both sides

Mazdoor catogery - I 2 0.00 No 0.00


Earth work excavation in all soil strata for
driving pit and receiving pit (2Nos x 3.0m
x3.5m x3.5m)
Mazdoor catogery - I 15 0.00 No 0.00

Mazdoor catogery - II 15 0.00 No 0.00


MS fabrication work for Thrust arrangenents
1 0 No 0.00
and shoring
Hire Charges for Power Driller ( with jack
120 0.00 day 0.00
arrangement) for trenchless excavation
Labour charges for trenchless excavation

Hammer Mazdoor (with alternate) 30 0.00 No 0.00


Charges for providing oxygen and fan
15 0.00 day 0.00
arrangement
Hire charges for welding machine with
genset and pushing the encasing pipe by jack 15 0 day 0.00
and push method (15m / 1.00m =15days)
Diesel charges for genset ( 9liters/hour ) 1080 0 litre 0.00

Labour charges for welding

Welder - I class 7.5 0.00 No 0.00

Welder - II class 7.5 0.00 No 0.00

Welding rod 55 0.00 pocket 0.00


Removing the excavated earth coveying and
depositing on bank for 15 days
Mazdoor catogery - I 16.5 0.00 No 0.00

Mazdoor catogery - II 30 0.00 No 0.00

402
Sl.
Description of item of Work Quantity Rate Unit Amount
No.
labour charges for pushing MS pipe

Mazdoor catogery - I 30 0.00 No 0.00

Watchman 15 0 No 0.00

Amount for 15m length 0.00

Rate per m length 0.00

Say 0.00

per 1m

For 2200mm dia MS encasing pipe for various


q
thickness
For a length of 15m

Clearing and leveling both sides

Mazdoor catogery - I 2 0.00 No 0.00


Earth work excavation in all soil strata for
driving pit and receiving pit (2Nos x 3.0m
x3.5m x3.5m)
Mazdoor catogery - I 15 0.00 No 0.00

Mazdoor catogery - II 15 0.00 No 0.00


MS fabrication work for Thrust arrangenents
1 0 No 0.00
and shoring
Hire Charges for Power Driller ( with jack
134 0.00 day 0.00
arrangement) for trenchless excavation
Labour charges for trenchless excavation

Hammer Mazdoor (with alternate) 34 0.00 No 0.00


Charges for providing oxygen and fan
17 0.00 day 0.00
arrangement
Hire charges for welding machine with
genset and pushing the encasing pipe by jack 17 0 day 0.00
and push method (15m / 0.9m =17days)
Diesel charges for genset ( 9liters/hour ) 1200 0 litre 0.00

Labour charges for welding

Welder - I class 8.5 0.00 No 0.00

Welder - II class 8.5 0.00 No 0.00

Welding rod 61 0.00 pocket 0.00


Removing the excavated earth coveying and
depositing on bank for 17 days

403
Sl.
Description of item of Work Quantity Rate Unit Amount
No.
Mazdoor catogery - I 19 0.00 No 0.00

Mazdoor catogery - II 34 0.00 No 0.00

labour charges for pushing MS pipe

Mazdoor catogery - I 34 0.00 No 0.00

Watchman 17 0 No 0.00

Amount for 15m length 0.00

Rate per m length 0.00

Say 0.00

per 1m

404
DATA FOR REPLACEMENT OF UNDER GROUND UTILITIES
(HSC PIPES, D SYSTEM & P MAIN PIPES )
Sl.
Description of item of Work Quantity Rate Unit Amount
No.
Replacement earthwork excavations for pipe laying works including cost of additional earthwork
excavation in all soil strata, including BT/CC road cutting, removal of slushy soil and replacing
the pipeline with sound pipe, including supply and delivery of GI pipes, coupler, Union, jointing
materials and required specials, cutting, threading, conveying , laying, jointing and cost of
refilling for the additional earthwork etc complete and as directed by the TWAD board officers
of Underground Utilities (GI Pipe) damaged during
a 15mm Dia GI Pipe

Total for 6 locations


Supply and delivery of 15mm Dia GI pipes
9 0 m 0.00
(1.50m x 6 Nos =9m)
Supply and delivery of 15mm Dia GI Coupling 6 0 No 0.00

Supply and delivery of 15mm Dia GI Union 6 0 No 0.00


Labour charges for Additional Earth work
Excavation in all kinds of soils for replacement of
damaged pipes
Mazdoor catogery - I 2 0.00 No 0.00

Mazdoor catogery - II 2 0.00 No 0.00


Labour charges for Lowering,laying and jointing
GI pipes
Plumber - II class 1 0.00 No 0.00

Rate for 9m length (6 Nos) 0.00

Rate for 1m length 0.00

b. 20mm Dia GI Pipe

Total for 6 locations


Supply and delivery of 20mm Dia GI pipes
9 0 m 0.00
(1.50m x 6 Nos = 9m )
Supply and delivery of 20mm Dia GI Coupling 6 0 No 0.00

Supply and delivery of 20mm Dia GI Union 6 0 No 0.00


Labour charges for Additional Earth work
Excavation in all kinds of soils for replacement of
damaged pipes
Mazdoor catogery - I 2 0.00 No 0.00

Mazdoor catogery - II 2 0.00 No 0.00


Labour charges for Lowering,laying and jointing
GI pipes
Plumber - II class 1 0.00 No 0.00

405
Sl.
Description of item of Work Quantity Rate Unit Amount
No.
Rate for 9m length (6 Nos) 0.00

Rate for 1m length 0.00

C. 25mm Dia GI Pipe

Total for 6 locations


Supply and delivery of 25mm Dia GI pipes
9 0 m 0.00
(1.50m x 6 Nos = 9m)
Supply and delivery of 25mm Dia GI Coupling 6 0 No 0.00

Supply and delivery of 25mm Dia GI Union 6 0 No 0.00


Labour charges for Additional Earth work
Excavation in all kinds of soils for replacement of
damaged pipes
Mazdoor catogery - I 2 0.00 No 0.00

Mazdoor catogery - II 2 0.00 No 0.00


Labour charges for Lowering,laying and jointing
GI pipes
Plumber - II class 1 0.00 No 0.00

Rate for 9m length (6 Nos) 0.00

Rate for 1m length 0.00

d. 32mm Dia GI Pipe

Total for 6 locations


Supply and delivery of 32mm Dia GI pipes
9 0 m 0.00
(1.50m x 6 Nos = 9m)
Supply and delivery of 32mm Dia GI Coupling 6 0 No 0.00

Supply and delivery of 32mm Dia GI Union 6 0 No 0.00


Labour charges for Additional Earth work
Excavation in all kinds of soils for replacement of
damaged pipes
Mazdoor catogery - I 2 0.00 No 0.00

Mazdoor catogery - II 2 0.00 No 0.00


Labour charges for Lowering,laying and jointing
GI pipes
Plumber - II class 1 0.00 No 0.00

Rate for 9m length (6 Nos) 0.00

Rate for 1m length 0.00

406
Sl.
Description of item of Work Quantity Rate Unit Amount
No.
e. 40mm Dia GI Pipe

Total for 6 locations


Supply and delivery of 40mm Dia GI pipes
9 0 m 0.00
(1.50m x 6 Nos = 9m)
Supply and delivery of 40mm Dia GI Coupling 6 0 No 0.00

Supply and delivery of 40mm Dia GI Union 6 0 No 0.00


Labour charges for Additional Earth work
Excavation in all kinds of soils for replacement of
damaged pipes
Mazdoor catogery - I 2 0.00 No 0.00

Mazdoor catogery - II 2 0.00 No 0.00


Labour charges for Lowering,laying and jointing
GI pipes
Plumber - II class 1 0.00 No 0.00

Rate for 9m length (6 Nos) 0.00

Rate for 1m length 0.00

f. 50mm Dia GI Pipe

Total for 6 locations


Supply and delivery of 50mm Dia GI pipes
9 0 m 0.00
(1.50m x 6 Nos = 9m)
Supply and delivery of 50mm Dia GI Coupling 6 0 No 0.00

Supply and delivery of 50mm Dia GI Union 6 0 No 0.00


Labour charges for Additional Earth work
Excavation in all kinds of soils for replacement of
damaged pipes
Mazdoor catogery - I 2 0.00 No 0.00

Mazdoor catogery - II 2 0.00 No 0.00


Labour charges for Lowering,laying and jointing
GI pipes
Plumber - II class 1 0.00 No 0.00

Rate for 9m length (6 Nos) 0.00

Rate for 1m length 0.00

g. 65mm Dia GI Pipe

Total for 4 locations


Supply and delivery of 65mm Dia GI pipes
6 0 m 0.00
(1.50m x 4 Nos = 6m)

407
Sl.
Description of item of Work Quantity Rate Unit Amount
No.
Supply and delivery of 65mm Dia GI Coupling 4 0 No 0.00

Supply and delivery of 65mm Dia GI Union 4 0 No 0.00


Labour charges for Additional Earth work
Excavation in all kinds of soils for replacement of
damaged pipes
Mazdoor catogery - I 2 0.00 No 0.00

Mazdoor catogery - II 2 0.00 No 0.00


Labour charges for Lowering,laying and jointing
GI pipes
Plumber - II class 1 0.00 No 0.00

Rate for 6m length (4 Nos) 0.00

Rate for 1m length 0.00

h. 80mm Dia GI Pipe

Total for 4 locations


Supply and delivery of 80mm Dia GI pipes
6 0 m 0.00
(1.50m x 4 Nos = 6m)
Supply and delivery of 80mm Dia GI Coupling 4 0 No 0.00

Supply and delivery of 80mm Dia GI Union 4 0 No 0.00


Labour charges for Additional Earth work
Excavation in all kinds of soils for replacement of
damaged pipes
Mazdoor catogery - I 2 0.00 No 0.00

Mazdoor catogery - II 2 0.00 No 0.00


Labour charges for Lowering,laying and jointing
GI pipes
Plumber - II class 1 0.00 No 0.00

Rate for 6m length (4 Nos) 0.00

Rate for 1m length 0.00

i. 100mm Dia GI Pipe

Total for 4 locations


Supply and delivery of 100mm Dia GI pipes
6 0 m 0.00
(1.50m x 4 Nos = 6m)
Supply and delivery of 100mm Dia GI Coupling 4 0 No 0.00

Supply and delivery of 100mm Dia GI Union 4 0 No 0.00

408
Sl.
Description of item of Work Quantity Rate Unit Amount
No.
Labour charges for Additional Earth work
Excavation in all kinds of soils for replacement of
damaged pipes
Mazdoor catogery - I 2 0.00 No 0.00

Mazdoor catogery - II 2 0.00 No 0.00


Labour charges for Lowering,laying and jointing
GI pipes
Plumber - II class 1 0.00 No 0.00

Rate for 6m length (4 Nos) 0.00

Rate for 1m length 0.00

j. 125mm Dia GI Pipe

Total for 4 locations


Supply and delivery of 125mm Dia GI pipes
6 0 m 0.00
(1.50m x 4 Nos = 6m)
Supply and delivery of 125mm Dia GI Coupling 4 0 No 0.00

Supply and delivery of 125mm Dia GI Union 4 0 No 0.00


Labour charges for Additional Earth work
Excavation in all kinds of soils for replacement of
damaged pipes
Mazdoor catogery - I 2 0.00 No 0.00

Mazdoor catogery - II 2 0.00 No 0.00


Labour charges for Lowering,laying and jointing
GI pipes
Plumber - II class 1 0.00 No 0.00

Rate for 6m length (4 Nos) 0.00

Rate for 1m length 0.00

409
DATA FOR REPLACEMENT OF UNDER GROUND UTILITIES
(HSC PIPES, D SYSTEM &P MAIN PIPES )
Sl.
Description of item of Work Quantity Rate Unit Amount
No.
Replacement of Underground Utilities (PVC Pipe) damaged during earthwork excavation for
pipe laying works including cost of additional earthwork excavation in all soil strata, including
BT/CC road cutting, removal of slushy soil and replacing the pipeline with sound pipe, including
supply and delivery of PVC pipes, couplers, jointing materials and required specials, cutting,
conveying , laying, jointing and cost of refilling for the additional earthwork etc complete and
as directed by the TWAD board officers.
a 15mm Dia PVC Pipe (10 KSC)

Total for 8 locations


Supply and delivery of 15mm Dia PVC pipes
12 0 m 0
(1.50m x 8 Nos = 12m)
Supply and delivery of 15mm Dia PVC Coupler 16 0 No 0.00
Labour charges for Additional Earth work
Excavation in all kinds of soils for replacement
of damaged pipes
Mazdoor catogery - I 2 0.00 No 0.00

Mazdoor catogery - II 2 0.00 No 0.00


Labour charges for Lowering,laying and jointing
PVC rigid pipes
Plumber - II class 1 0.00 No 0.00

Rate for 12m length (8Nos) 0

Rate for 1m length 0

b. 20mm Dia PVC Pipe (10 KSC)

Total for 8 locations


Supply and delivery of 20mm Dia PVC pipes
12 0 m 0
(1.50m x 8 Nos = 12m)
Supply and delivery of 20mm Dia PVC Coupler 16 0 No 0.00
Labour charges for Additional Earth work
Excavation in all kinds of soils for replacement
of damaged pipes
Mazdoor catogery - I 2 0.00 No 0.00

Mazdoor catogery - II 2 0.00 No 0.00


Labour charges for Lowering,laying and jointing
PVC rigid pipes
Plumber - II class 1 0.00 No 0.00

Rate for 12m length (8 Nos) 0

Rate for 1m length 0

410
Sl.
Description of item of Work Quantity Rate Unit Amount
No.
c. 25mm Dia PVC Pipe (10 KSC)

Total for 8locations


Supply and delivery of 25mm Dia PVC pipes
12 0 m 0
(1.50m x 8 Nos = 12m)
Supply and delivery of 25mm Dia PVC Coupler 16 0.00 No 0.00
Labour charges for Additional Earth work
Excavation in all kinds of soils for replacement
of damaged pipes
Mazdoor catogery - I 2 0.00 No 0.00

Mazdoor catogery - II 2 0.00 No 0.00


Labour charges for Lowering,laying and jointing
PVC rigid pipes
Plumber - II class 1 0.00 No 0.00

Rate for 12m length (8 Nos) 0

Rate for 1m length 0.00

d. 32mm Dia PVC Pipe (10 KSC)

Total for 8 locations


Supply and delivery of 32mm Dia PVC pipes
12 0 m 0
(1.50m x 8 Nos = 12m)
Supply and delivery of 32mm Dia PVC Coupler 16 0.00 No 0.00
Labour charges for Additional Earth work
Excavation in all kinds of soils for replacement
of damaged pipes
Mazdoor catogery - I 2 0.00 No 0.00

Mazdoor catogery - II 2 0.00 No 0.00


Labour charges for Lowering,laying and jointing
PVC rigid pipes
Plumber - II class 1 0.00 No 0.00

Rate for 12m length (8 Nos) 0

Rate for 1m length 0

e. 40mm Dia PVC Pipe (10 KSC)

Total for 8 locations


Supply and delivery of 40mm Dia PVC pipes
12 0 m 0
(1.50m x 8 Nos = 12m)
Supply and delivery of 40mm Dia PVC Coupler 16 0.00 No 0.00

411
Sl.
Description of item of Work Quantity Rate Unit Amount
No.
Labour charges for Additional Earth work
Excavation in all kinds of soils for replacement
of damaged pipes
Mazdoor catogery - I 2 0.00 No 0.00

Mazdoor catogery - II 2 0.00 No 0.00


Labour charges for Lowering,laying and jointing
PVC rigid pipes
Plumber - II class 1 0.00 No 0.00

Rate for 12m length (8 Nos) 0

Rate for 1m length 0

412
DATA FOR REPLACEMENT OF UNDER GROUND UTILITIES
(HSC PIPES, D SYSTEM &P MAIN PIPES )
Sl.
Description of item of Work Quantity Rate Unit Amount
No.
Replacement of Underground Utilities (PVC Pipe) damaged during earthwork excavation for
pipe laying works including cost of additional earthwork excavation in all soil strata, including
BT/CC road cutting, removal of slushy soil and replacing the pipeline with sound pipe, including
supply and delivery of PVC pipes, couplers, jointing materials and required specials, cutting,
conveying , laying, jointing and cost of refilling for the additional earthwork etc complete and
as directed by the TWAD board officers.
a. 50mm Dia PVC Pipe (10KSC)

Total for 8 locations


Supply and delivery of 50mm Dia PVC pipes
12 0.00 m 0.00
(1.50m x 8 Nos = 12m)
Supply and delivery of 50mm Dia PVC
16 0.00 No 0.00
Coupler
Labour charges for Additional Earth
work Excavation in all kinds of soils for
replacement of damaged pipes
Mazdoor catogery - I 2 0.00 No 0.00

Mazdoor catogery - II 2 0.00 No 0.00


Labour charges for Lowering,laying and
jointing PVC rigid pipes
Plumber - II class 1 0.00 No 0.00

Rate for 12m length (8 Nos) 0.00

Rate for 1m length 0.00

b. 63mm Dia PVC Pipe (10KSC)

Total for 8 locations


Supply and delivery of 63mm Dia PVC pipes
12 0.00 m 0.00
(1.50m x 8Nos = 12m)
Supply and delivery of 63mm Dia PVC
16 0.00 No 0.00
Coupler
Labour charges for Additional Earth
work Excavation in all kinds of soils for
replacement of damaged pipes
Mazdoor catogery - I 2 0.00 No 0.00

Mazdoor catogery - II 2 0.00 No 0.00


Labour charges for Lowering,laying and
jointing PVC rigid pipes
Plumber - II class 1 0.00 No 0.00

Rate for 12m length (8 Nos) 0.00

Rate for 1m length 0.00

413
Sl.
Description of item of Work Quantity Rate Unit Amount
No.
c. 75mm Dia PVC Pipe (10KSC)

Total for 8 locations


Supply and delivery of 75mm Dia PVC pipes
12 0.00 m 0.00
(1.50m x 8 Nos = 12m)
Supply and delivery of 75mm Dia PVC
16 0.00 No 0.00
Coupler
Labour charges for Additional Earth
work Excavation in all kinds of soils for
replacement of damaged pipes
Mazdoor catogery - I 2 0.00 No 0.00

Mazdoor catogery - II 2 0.00 No 0.00


Labour charges for Lowering,laying and
jointing PVC rigid pipes
Plumber - II class 1 0.00 No 0.00

Rate for 12m length (8 Nos) 0.00

Rate for 1m length 0.00

d. 90mm Dia PVC Pipe (10KSC)

Total for 8 locations


Supply and delivery of 90mm Dia PVC pipes
12 0.00 m 0.00
(1.50m x 8 Nos = 12m)
Supply and delivery of 90mm Dia PVC
16 0.00 No 0.00
Coupler
Labour charges for Additional Earth
work Excavation in all kinds of soils for
replacement of damaged pipes
Mazdoor catogery - I 2 0.00 No 0.00

Mazdoor catogery - II 2 0.00 No 0.00


Labour charges for Lowering,laying and
jointing PVC rigid pipes
Plumber - II class 1 0.00 No 0.00

Rate for 12m length (8 Nos) 0.00

Rate for 1m length 0.00

e. 110mm Dia PVC Pipe (10KSC)

Total for 6 locations


Supply and delivery of 110mm Dia PVC pipes
9 0.00 m 0.00
(1.50m x 6 Nos = 9m)
Supply and delivery of 110mm Dia PVC
12 0.00 No 0.00
Coupler

414
Sl.
Description of item of Work Quantity Rate Unit Amount
No.
Labour charges for Additional Earth
work Excavation in all kinds of soils for
replacement of damaged pipes
Mazdoor catogery - I 2 0.00 No 0.00

Mazdoor catogery - II 2 0.00 No 0.00


Labour charges for Lowering,laying and
jointing PVC rigid pipes
Plumber - II class 1 0.00 No 0.00

Rate for 9m length (6 Nos) 0.00

Rate for 1m length 0.00

f. 140mm Dia PVC Pipe (10KSC)

Total for 6 locations


Supply and delivery of 140mm Dia PVC pipes
9 0.00 m 0.00
(1.50m x 6Nos = 9m)
Supply and delivery of 140mm Dia PVC
12 0.00 No 0.00
Coupler
Labour charges for Additional Earth
work Excavation in all kinds of soils for
replacement of damaged pipes
Mazdoor catogery - I 2 0.00 No 0.00

Mazdoor catogery - II 2 0.00 No 0.00


Labour charges for Lowering,laying and
jointing PVC rigid pipes
Plumber - II class 1 0.00 No 0.00

Rate for 9m length (6 Nos) 0.00

Rate for 1m length 0.00

g. 160mm Dia PVC Pipe (10KSC)

Total for 6 locations


Supply and delivery of 160mm Dia PVC pipes
9 0.00 m 0.00
(1.50m x 6 Nos = 9m)
Supply and delivery of 160mm Dia PVC
12 0.00 No 0.00
Coupler
Labour charges for Additional Earth
work Excavation in all kinds of soils for
replacement of damaged pipes
Mazdoor catogery - I 2 0.00 No 0.00

Mazdoor catogery - II 2 0.00 No 0.00

415
Sl.
Description of item of Work Quantity Rate Unit Amount
No.
Labour charges for Lowering,laying and
jointing PVC rigid pipes
Plumber - II class 1 0.00 No 0.00

Rate for 9m length (6 Nos) 0.00

Rate for 1m length 0.00

h. 180mm Dia PVC Pipe (10KSC)

Total for 6 locations


Supply and delivery of 180mm Dia PVC pipes
9 0.00 m 0.00
(1.50m x 6 Nos = 9m)
Supply and delivery of 180mm Dia PVC
12 0.00 No 0.00
Coupler
Labour charges for Additional Earth
work Excavation in all kinds of soils for
replacement of damaged pipes
Mazdoor catogery - I 2 0.00 No 0.00

Mazdoor catogery - II 2 0.00 No 0.00

cutting charges for damaged PVC pipes 12 0.00 No 0.00

cutting charges for New PVC pipes 5 0.00 No 0.00


Labour charges for Lowering,laying and
jointing PVC rigid pipes
Fitter(Pipe laying) - II class 1 0.00 No 0.00

Plumber - II class 1 0.00 No 0.00

Rate for 9m length (6 Nos) 0.00

Rate for 1m length 0.00

i. 200mm Dia PVC Pipe (10KSC)

Total for 6 locations


Supply and delivery of 200mm Dia PVC pipes
9 0.00 m 0.00
(1.50m x 6 Nos = 9m)
Supply and delivery of 200mm Dia PVC
12 0.00 No 0.00
Coupler
Labour charges for Additional Earth
work Excavation in all kinds of soils for
replacement of damaged pipes
Mazdoor catogery - I 2 0.00 No 0.00

Mazdoor catogery - II 2 0.00 No 0.00

416
Sl.
Description of item of Work Quantity Rate Unit Amount
No.
cutting charges for damaged PVC pipes 12 0.00 No 0.00

cutting charges for New PVC pipes 5 0.00 No 0.00


Labour charges for Lowering,laying and
jointing PVC rigid pipes
Fitter(Pipe laying) - II class 1 0.00 No 0.00

Plumber - II class 1 0.00 No 0.00

Rate for 9m length (6Nos) 0.00

Rate for 1m length 0.00

417
DATA FOR REPLACEMENT OF UNDER GROUND UTILITIES
Sl.
Description of item of Work Quantity Rate Unit Amount
No.
Replacement of Underground Utilities (PVC Pipe) damaged during earthwork excavation for
pipe laying works including cost of additional earthwork excavation in all soil strata, including
BT/CC road cutting, removal of slushy soil and replacing the pipeline with sound pipe, including
supply and delivery of PVC pipes, couplers, jointing materials and required specials, cutting,
conveying , laying, jointing and cost of refilling for the additional earthwork etc complete and
as directed by the TWAD board officers.
a. 50mm Dia PVC Pipe (10KSC)

Total for 8 locations


Supply and delivery of 50mm Dia PVC pipes
12 0.00 m 0.00
(1.50m x 8 Nos = 12m)
Supply and delivery of 50mm Dia PVC Coupler 16 0.00 No 0.00
Labour charges for Additional Earth work
Excavation in all kinds of soils for replacement
of damaged pipes
Mazdoor catogery - I 2 0.00 No 0.00

Mazdoor catogery - II 2 0.00 No 0.00


Labour charges for Lowering,laying and jointing
PVC rigid pipes
Plumber - II class 1 0.00 No 0.00

Rate for 12m length (8 Nos) 0.00

Rate for 1m length 0.00

b. 63mm Dia PVC Pipe (10KSC)

Total for 8 locations


Supply and delivery of 63mm Dia PVC pipes
12 0.00 m 0.00
(1.50m x 8Nos = 12m)
Supply and delivery of 63mm Dia PVC Coupler 16 0.00 No 0.00
Labour charges for Additional Earth work
Excavation in all kinds of soils for replacement
of damaged pipes
Mazdoor catogery - I 2 0.00 No 0.00

Mazdoor catogery - II 2 0.00 No 0.00


Labour charges for Lowering,laying and jointing
PVC rigid pipes
Plumber - II class 1 0.00 No 0.00

Rate for 12m length (8 Nos) 0.00

Rate for 1m length 0.00

418
Sl.
Description of item of Work Quantity Rate Unit Amount
No.

c. 75mm Dia PVC Pipe (10KSC)

Total for 8 locations


Supply and delivery of 75mm Dia PVC pipes
12 0.00 m 0.00
(1.50m x 8 Nos = 12m)
Supply and delivery of 75mm Dia PVC Coupler 16 0.00 No 0.00
Labour charges for Additional Earth work
Excavation in all kinds of soils for replacement
of damaged pipes
Mazdoor catogery - I 2 0.00 No 0.00

Mazdoor catogery - II 2 0.00 No 0.00


Labour charges for Lowering,laying and jointing
PVC rigid pipes
Plumber - II class 1 0.00 No 0.00

Rate for 12m length (8 Nos) 0.00

Rate for 1m length 0.00

d. 90mm Dia PVC Pipe (10KSC)

Total for 8 locations


Supply and delivery of 90mm Dia PVC pipes
12 0.00 m 0.00
(1.50m x 8 Nos = 12m)
Supply and delivery of 90mm Dia PVC Coupler 16 0.00 No 0.00
Labour charges for Additional Earth work
Excavation in all kinds of soils for replacement
of damaged pipes
Mazdoor catogery - I 2 0.00 No 0.00

Mazdoor catogery - II 2 0.00 No 0.00


Labour charges for Lowering,laying and jointing
PVC rigid pipes
Plumber - II class 1 0.00 No 0.00

Rate for 12m length (8 Nos) 0.00

Rate for 1m length 0.00

e. 110mm Dia PVC Pipe (10KSC)

419
Sl.
Description of item of Work Quantity Rate Unit Amount
No.
Total for 6 locations
Supply and delivery of 110mm Dia PVC pipes
9 0.00 m 0.00
(1.50m x 6 Nos = 9m)
Supply and delivery of 110mm Dia PVC Coupler 12 0.00 No 0.00
Labour charges for Additional Earth work
Excavation in all kinds of soils for replacement
of damaged pipes
Mazdoor catogery - I 2 0.00 No 0.00

Mazdoor catogery - II 2 0.00 No 0.00


Labour charges for Lowering,laying and jointing
PVC rigid pipes
Plumber - II class 1 0.00 No 0.00

Rate for 9m length (6 Nos) 0.00

Rate for 1m length 0.00

f. 140mm Dia PVC Pipe (10KSC)

Total for 6 locations


Supply and delivery of 140mm Dia PVC pipes
9 0.00 m 0.00
(1.50m x 6Nos = 9m)
Supply and delivery of 140mm Dia PVC Coupler 12 0.00 No 0.00
Labour charges for Additional Earth work
Excavation in all kinds of soils for replacement
of damaged pipes
Mazdoor catogery - I 2 0.00 No 0.00

Mazdoor catogery - II 2 0.00 No 0.00


Labour charges for Lowering,laying and jointing
PVC rigid pipes
Plumber - II class 1 0.00 No 0.00

Rate for 9m length (6 Nos) 0.00

Rate for 1m length 0.00

g. 160mm Dia PVC Pipe (10KSC)

Total for 6 locations


Supply and delivery of 160mm Dia PVC pipes
9 0.00 m 0.00
(1.50m x 6 Nos = 9m)
Supply and delivery of 160mm Dia PVC Coupler 12 0.00 No 0.00

420
Sl.
Description of item of Work Quantity Rate Unit Amount
No.
Labour charges for Additional Earth work
Excavation in all kinds of soils for replacement
of damaged pipes
Mazdoor catogery - I 2 0.00 No 0.00

Mazdoor catogery - II 2 0.00 No 0.00


Labour charges for Lowering,laying and jointing
PVC rigid pipes
Plumber - II class 1 0.00 No 0.00

Rate for 9m length (6 Nos) 0.00

Rate for 1m length 0.00

h. 180mm Dia PVC Pipe (10KSC)

Total for 6 locations


Supply and delivery of 180mm Dia PVC pipes
9 0.00 m 0.00
(1.50m x 6 Nos = 9m)
Supply and delivery of 180mm Dia PVC Coupler 12 0.00 No 0.00
Labour charges for Additional Earth work
Excavation in all kinds of soils for replacement
of damaged pipes
Mazdoor catogery - I 2 0.00 No 0.00

Mazdoor catogery - II 2 0.00 No 0.00

cutting charges for damaged PVC pipes 12 0.00 No 0.00

cutting charges for New PVC pipes 5 0.00 No 0.00


Labour charges for Lowering,laying and jointing
PVC rigid pipes
Fitter(Pipe laying) - II class 1 0.00 No 0.00

Plumber - II class 1 0.00 No 0.00

Rate for 9m length (6 Nos) 0.00

Rate for 1m length 0.00

i. 200mm Dia PVC Pipe (10KSC)

Total for 6 locations


Supply and delivery of 200mm Dia PVC pipes
9 0.00 m 0.00
(1.50m x 6 Nos = 9m)
Supply and delivery of 200mm Dia PVC Coupler 12 0.00 No 0.00

421
Sl.
Description of item of Work Quantity Rate Unit Amount
No.
Labour charges for Additional Earth work
Excavation in all kinds of soils for replacement
of damaged pipes
Mazdoor catogery - I 2 0.00 No 0.00

Mazdoor catogery - II 2 0.00 No 0.00

cutting charges for damaged PVC pipes 12 0.00 No 0.00

cutting charges for New PVC pipes 5 0.00 No 0.00


Labour charges for Lowering,laying and jointing
PVC rigid pipes
Fitter(Pipe laying) - II class 1 0.00 No 0.00

Plumber - II class 1 0.00 No 0.00

Rate for 9m length (6Nos) 0.00

Rate for 1m length 0.00

422
DATA FOR REPLACEMENT OF UNDER GROUND UTILITIES
(HSC PIPES, D SYSTEM &P MAIN PIPES )
Sl.
Description of item of Work Quantity Rate Unit Amount
No.
Replacement of Underground Utilities (PVC Pipe) damaged during earthwork excavation for
pipe laying works including cost of additional earthwork excavation in all soil strata, including
BT/CC road cutting, removal of slushy soil and replacing the pipeline with sound pipe, including
supply and delivery of PVC pipes, couplers, jointing materials and required specials, cutting,
conveying , laying, jointing and cost of refilling for the additional earthwork etc complete and
as directed by the TWAD board officers.
a. 63mm Dia PVC Pipe (4KSC)

Total for 8 locations


Supply and delivery of 63mm Dia PVC pipes
12 0.00 m 0.00
(1.50m x 8 Nos = 12m)
Supply and delivery of 63mm Dia PVC Coupler 16 0.00 No 0.00
Labour charges for Additional Earth work
Excavation in all kinds of soils for replacement of
damaged pipes
Mazdoor catogery - I 2 0.00 No 0.00

Mazdoor catogery - II 2 0.00 No 0.00


Labour charges for Lowering,laying and jointing
PVC rigid pipes
Plumber - II class 1 0.00 No 0.00

Rate for 12m length (8Nos) 0.00

Rate for 1m length 0.00

b. 75mm Dia PVC Pipe (4KSC)

Total for 8 locations


Supply and delivery of 75mm Dia PVC pipes
12 0.00 m 0.00
(1.50m x 8 Nos = 12m)
Supply and delivery of 75mm Dia PVC Coupler 16 0.00 No 0.00
Labour charges for Additional Earth work
Excavation in all kinds of soils for replacement of
damaged pipes
Mazdoor catogery - I 2 0.00 No 0.00

Mazdoor catogery - II 2 0.00 No 0.00


Labour charges for Lowering,laying and jointing
PVC rigid pipes
Plumber - II class 1 0.00 No 0.00

Rate for 12m length (8 Nos) 0.00

Rate for 1m length 0.00

423
Sl.
Description of item of Work Quantity Rate Unit Amount
No.
c. 90mm Dia PVC Pipe (4KSC)

Total for 8 locations


Supply and delivery of 90mm Dia PVC pipes
12 0.00 m 0.00
(1.50m x 8 Nos = 12m)
Supply and delivery of 90mm Dia PVC Coupler 16 0.00 No 0.00
Labour charges for Additional Earth work
Excavation in all kinds of soils for replacement of
damaged pipes
Mazdoor catogery - I 2 0.00 No 0.00

Mazdoor catogery - II 2 0.00 No 0.00


Labour charges for Lowering,laying and jointing
PVC rigid pipes
Plumber - II class 1 0.00 No 0.00

Rate for 12m length (8 Nos) 0.00

Rate for 1m length 0.00

d. 110mm Dia PVC Pipe (4KSC)

Total for 6 locations


Supply and delivery of 110mm Dia PVC pipes
9 0.00 m 0.00
(1.50m x 6 Nos = 9m)
Supply and delivery of 110mm Dia PVC Coupler 12 0.00 No 0.00
Labour charges for Additional Earth work
Excavation in all kinds of soils for replacement of
damaged pipes
Mazdoor catogery - I 2 0.00 No 0.00

Mazdoor catogery - II 2 0.00 No 0.00


Labour charges for Lowering,laying and jointing
PVC rigid pipes
Plumber - II class 1 0.00 No 0.00

Rate for 9m length (6 Nos) 0.00

Rate for 1m length 0.00

e. 140mm Dia PVC Pipe (4KSC)

Total for6 locations


Supply and delivery of 140mm Dia PVC pipes
9 0.00 m 0.00
(1.50m x 6 Nos = 9m)
Supply and delivery of 140mm Dia PVC Coupler 12 0.00 No 0.00

424
Sl.
Description of item of Work Quantity Rate Unit Amount
No.
Labour charges for Additional Earth work
Excavation in all kinds of soils for replacement of
damaged pipes
Mazdoor catogery - I 2 0.00 No 0.00

Mazdoor catogery - II 2 0.00 No 0.00


Labour charges for Lowering,laying and jointing
PVC rigid pipes
Plumber - II class 1 0.00 No 0.00

Rate for 9m length (6 Nos) 0.00

Rate for 1m length 0.00

f. 160mm Dia PVC Pipe (4KSC)

Total for 6 locations


Supply and delivery of 160mm Dia PVC pipes
9 0.00 m 0.00
(1.50m x6 Nos = 9m)
Supply and delivery of 160mm Dia PVC Coupler 12 0.00 No 0.00
Labour charges for Additional Earth work
Excavation in all kinds of soils for replacement of
damaged pipes
Mazdoor catogery - I 2 0.00 No 0.00

Mazdoor catogery - II 2 0.00 No 0.00


Labour charges for Lowering,laying and jointing
PVC rigid pipes
Plumber - II class 1 0.00 No 0.00

Rate for 9m length (6 Nos) 0.00

Rate for 1m length 0.00

g. 180mm Dia PVC Pipe (4KSC)

Total for 6 locations


Supply and delivery of 180mm Dia PVC pipes
9 0.00 m 0.00
(1.50m x 6Nos = 9m)
Supply and delivery of 180mm Dia PVC Coupler 12 0.00 No 0.00
Labour charges for Additional Earth work
Excavation in all kinds of soils for replacement of
damaged pipes
Mazdoor catogery - I 2 0.00 No 0.00

Mazdoor catogery - II 2 0.00 No 0.00

425
Sl.
Description of item of Work Quantity Rate Unit Amount
No.
cutting charges for damaged PVC pipes 12 0.00 No 0.00

cutting charges for New PVC pipes 5 0.00 No 0.00


Labour charges for Lowering,laying and jointing
PVC rigid pipes
Fitter(Pipe laying) - II class 1 0.00 No 0.00

Plumber - II class 1 0.00 No 0.00

Rate for 9m length (6 Nos) 0.00

Rate for 1m length 0.00

h. 200mm Dia PVC Pipe (4KSC)

Total for 6 locations


Supply and delivery of 200mm Dia PVC pipes
9 0.00 m 0.00
(1.50m x6 Nos = 9m)
Supply and delivery of 200mm Dia PVC Coupler 12 0.00 No 0.00
Labour charges for Additional Earth work
Excavation in all kinds of soils for replacement of
damaged pipes
Mazdoor catogery - I 2 0.00 No 0.00

Mazdoor catogery - II 2 0.00 No 0.00

cutting charges for damaged PVC pipes 12 0.00 No 0.00

cutting charges for New PVC pipes 5 0.00 No 0.00


Labour charges for Lowering,laying and jointing
PVC rigid pipes
Fitter(Pipe laying) - II class 1 0.00 No 0.00

Plumber - II class 1 0.00 No 0.00

Rate for 9m length (6 Nos) 0.00

Rate for 1m length 0.00

426
DATA FOR REPLACEMENT OF UNDER GROUND UTILITIES
(HSC PIPES, D SYSTEM &P MAIN PIPES )
Sl.
Description of item of Work Quantity Rate Unit Amount
No.
Replacement of Underground Utilities (HDPE Pipes) damaged during Earthwork excavations for
pipe laying works including cost of additional earthwork excavation in all soils, including BT
cutting, CC roads , removal of slushy soil and replacing the pipeline with sound pipe, including
supply and delivery of HDPE pipes, couplers, jointing materials and required specials, cutting,
threading, conveying , laying, jointing and cost of refilling for the additional earthwork etc
complete and as directed by the TWAD board officers.
a. 50mm Dia HDPE Pipe PE 100 -PN 6

Total for 8 locations


Supply and delivery of 50mm Dia HDPE pipes (PN6)
12 0.00 m 0.00
(1.50m x 8 Nos = 12m)
Labour charges for Additional Earth work Excavation
in all kinds of soils for replacement of damaged pipes
Mazdoor catogery - I 2 0.00 No 0.00

Mazdoor catogery - II 2 0.00 No 0.00


Labour charges for Lowering and laying of HDPE
pipes
Plumber - II class 1 0.00 No 0.00
Labour charges for butt fusion/electro fusion welding
16 0.00 No 0.00
joints of HDPE pipes
Rate for 12m length (8 Nos) 0.00

Rate for 1m length 0.00

b. 63mm Dia HDPE Pipe PE 100 -PN 6

Total for 8 locations


Supply and delivery of 63mm Dia HDPE pipes (PN6)
12 0.00 m 0.00
(1.50m x 8 Nos =12m)
Labour charges for Additional Earth work Excavation
in all kinds of soils for replacement of damaged pipes
Mazdoor catogery - I 2 0.00 No 0.00

Mazdoor catogery - II 2 0.00 No 0.00


Labour charges for Lowering and laying of HDPE
pipes
Plumber - II class 1 0.00 No 0.00
Labour charges for butt fusion/electro fusion welding
16 0.00 No 0.00
joints of HDPE pipes
Rate for 12m length (8 Nos) 0.00

Rate for 1m length 0.00

c. 75mm Dia HDPE Pipe PE 100 -PN 6

427
Sl.
Description of item of Work Quantity Rate Unit Amount
No.
Total for 8 locations
Supply and delivery of 75mm Dia HDPE pipes (PN6)
12 0.00 m 0.00
(1.50m x 8 Nos = 12m)
Labour charges for Additional Earth work Excavation
in all kinds of soils for replacement of damaged pipes
Mazdoor catogery - I 2 0.00 No 0.00

Mazdoor catogery - II 2 0.00 No 0.00


Labour charges for Lowering and laying of HDPE
pipes
Plumber - II class 1 0.00 No 0.00
Labour charges for butt fusion/electro fusion welding
16 0.00 No 0.00
joints of HDPE pipes
Rate for 12m length (8 Nos) 0.00

Rate for 1m length 0.00

d. 90mm Dia HDPE Pipe - PE 100 -PN 6

Total for 8 locations


Supply and delivery of 90mm Dia HDPE pipes (PN6)
12 0.00 m 0.00
(1.50m x 8 Nos = 12m)
Labour charges for Additional Earth work Excavation
in all kinds of soils for replacement of damaged pipes
Mazdoor catogery - I 2 0.00 No 0.00

Mazdoor catogery - II 2 0.00 No 0.00


Labour charges for Lowering and laying of HDPE
pipes
Plumber - II class 1 0.00 No 0.00
Labour charges for butt fusion/electro fusion welding
16 0.00 No 0.00
joints of HDPE pipes
Rate for 12m length (8 Nos) 0.00

Rate for 1m length 0.00

e. 110mm Dia HDPE Pipe- PE 100 -PN 6

Total for 6 locations


Supply and delivery of 110mm Dia HDPE pipes (PN6)
9 0.00 m 0.00
(1.50m x 6 Nos = 9m)
Labour charges for Additional Earth work Excavation
in all kinds of soils for replacement of damaged pipes
Mazdoor catogery - I 2 0.00 No 0.00

Mazdoor catogery - II 2 0.00 No 0.00

428
Sl.
Description of item of Work Quantity Rate Unit Amount
No.
Labour charges for Lowering and laying of HDPE
pipes
Plumber - II class 1 0.00 No 0.00
Labour charges for butt fusion/electro fusion welding
12 0.00 No 0.00
joints of HDPE pipes
Rate for 9m length (6 Nos) 0.00

Rate for 1m length 0.00

f. 125mm Dia HDPE Pipe - PE 100 -PN 6

Total for 6 locations


Supply and delivery of 125mm Dia HDPE pipes (PN6)
9 0.00 m 0.00
(1.50m x 6 Nos = 9m)
Labour charges for Additional Earth work Excavation
in all kinds of soils for replacement of damaged pipes
Mazdoor catogery - I 2 0.00 No 0.00

Mazdoor catogery - II 2 0.00 No 0.00


Labour charges for Lowering and laying of HDPE
pipes
Plumber - II class 1 0.00 No 0.00
Labour charges for butt fusion/electro fusion welding
12 0.00 No 0.00
joints of HDPE pipes
Rate for 9m length (6 Nos) 0.00

Rate for 1m length 0.00

g. 140mm Dia HDPE Pipe - PE 100 -PN 6

Total for 6 locations (1.50m x 6 Nos)


Supply and delivery of 140mm Dia HDPE pipes (PN6)
9 0.00 m 0.00
(1.50m x 6 Nos = 9m)
Labour charges for Additional Earth work Excavation
in all kinds of soils for replacement of damaged pipes
Mazdoor catogery - I 2 0.00 No 0.00

Mazdoor catogery - II 2 0.00 No 0.00


Labour charges for Lowering and laying of HDPE
pipes
Plumber - II class 1 0.00 No 0.00
Labour charges for butt fusion/electro fusion welding
12 0.00 No 0.00
joints of HDPE pipes
Rate for 9m length (6 Nos) 0.00

Rate for 1m length 0.00

429
Sl.
Description of item of Work Quantity Rate Unit Amount
No.
h. 160mm Dia HDPE Pipe - PE 100 -PN 6

Total for 6 locations


Supply and delivery of 160mm Dia HDPE pipes (PN6)
9 0.00 m 0.00
(1.50m x 6 Nos = 9m)
Labour charges for Additional Earth work Excavation
in all kinds of soils for replacement of damaged pipes
Mazdoor catogery - I 2 0.00 No 0.00

Mazdoor catogery - II 2 0.00 No 0.00


Labour charges for Lowering and laying of HDPE
pipes
Plumber - II class 1 0.00 No 0.00
Labour charges for butt fusion/electro fusion welding
12 0.00 No 0.00
joints of HDPE pipes
Rate for 9m length (6 Nos) 0.00

Rate for 1m length 0.00

i. 200mm Dia HDPE Pipe - PE 100 -PN 6

Total for 6 locations


Supply and delivery of 200mm Dia HDPE pipes (PN6)
9 0.00 m 0.00
(1.50m x 6 Nos = 9m)
Labour charges for Additional Earth work Excavation
in all kinds of soils for replacement of damaged pipes
Mazdoor catogery - I 2 0.00 No 0.00

Mazdoor catogery - II 2 0.00 No 0.00

cutting charges for damaged HDPE pipes 12 0.00 No 0.00

cutting charges for New HDPE pipes 6 0.00 No 0.00


Labour charges for Lowering and laying of HDPE
pipes
Fitter(Pipe laying) - II class 1 0.00 No 0.00
Labour charges for butt fusion/electro fusion welding
12 0.00 No 0.00
joints of HDPE pipes
Rate for 9m length (6 Nos) 0.00

Rate for 1m length 0.00

430
DATA FOR REPLACEMENT OF UNDER GROUND UTILITIES
(HSC PIPES, D SYSTEM &P MAIN PIPES )
Sl.
Description of item of Work Quantity Rate Unit Amount
No.
I. Replacement of Underground Utilities (AC Pipe) damaged during earthwork excavation
for pipe laying works including cost of additional earthwork excavation in all soil strata,
including BT/CC road cutting, removal of slushy soil and replacing the pipeline with next
available higher size PVC pipe, including supply and delivery of PVC pipes, couplers,
jointing materials and required specials, cutting, conveying , laying, jointing and cost of
refilling for the additional earthtrench etc complete and as directed by the TWAD board
officers.
a. 80mm Dia AC Pipe

Total for 3 locations


Supply and delivery of 140 mm Dia PVC pipes
9 0.00 m 0.00
(6KSC) (3m x 3 Nos = 9m)
Supply and delivery of 140 mm Dia PVCCoupler 6 0.00 No 0.00
Labour charges for Additional Earth work
Excavation in all kinds of soils for replacement of
damaged pipes
Mazdoor catogery - I 1 0 No 0

Mazdoor catogery - II 1 0 No 0.00

cutting charges for New AC pipes 6 0.00 No 0.00

cutting charges for New PVC pipes 3 0.00 No 0.00


Labour charges for Lowering,laying and jointing
PVC rigid pipes
Fitter(Pipe laying) - II class 1 0 No 0.00

Plumber - II class 1 0 No 0.00

Cost of cement 0.0149 0 tonne 0.00

Cost of Yarn 1.73 0 Kg 0.00

Rate for 9m length (3 Nos) 0.00

Rate for 1m length 0.00

b. 100mm Dia AC Pipe

Total for 3 locations


Supply and delivery of 140 mm Dia PVC pipes
9 0.00 m 0.00
(6KSC) (3m x 3 Nos = 9m)
Supply and delivery of 140 mm Dia PVC Coupler 6 0.00 No 0.00
Labour charges for Additional Earth work
Excavation in all kinds of soils for replacement of
damaged pipes
Mazdoor catogery - I 2 0 No 0

431
Sl.
Description of item of Work Quantity Rate Unit Amount
No.
Mazdoor catogery - II 3 0 No 0.00

cutting charges for damaged AC pipes 6 0.00 No 0.00

cutting charges for New PVC pipes 5 0.00 No 0.00


Labour charges for Lowering,laying and jointing
PVC rigid pipes
Fitter(Pipe laying) - II class 1 0 No 0.00

Plumber - II class 1 0 No 0.00

Cost of cement 0.013 0 tonne 0.00

Cost of Yarn 4.42 0 Kg 0.00

Rate for 9m length (3 Nos) 0.00

Rate for 1m length 0.00

c. 125mm Dia AC Pipe

Total for 3 locations


Supply and delivery of 180mm Dia PVC pipes
9 0.00 m 0.00
(6KSC) (3m x 3 Nos = 9m)
Supply and delivery of 180mm Dia PVC Coupler 6 0.00 No 0.00
Labour charges for Additional Earth work
Excavation in all kinds of soils for replacement of
damaged pipes
Mazdoor catogery - I 1.5 0 No 0.00

Mazdoor catogery - II 6 0 No 0.00

cutting charges for damaged AC pipes 6 0.00 No 0.00

cutting charges for New PVC pipes 4 0.00 No 0.00


Labour charges for Lowering,laying and jointing
PVC rigid pipes
Fitter(Pipe laying) - II class 1 0 No 0.00

Plumber - II class 1 0 No 0.00

Cost of cement 0.007 0 tonne 0.00

Cost of Yarn 1.59 0 Kg 0.00

Rate for 9m length (3 Nos) 0.00

Rate for 1m length 0.00

432
Sl.
Description of item of Work Quantity Rate Unit Amount
No.
Replacement of Under ground utilities (AC Pipe)
Damaged during Earthwork excavations for
pipe laying works including cost of additional
earthwork excavation in all soil strata, including
BT/CC road cutting , removal of slushy soil and
replacing the pipeline with next available higher
II.
sound DI pipe to suit jointing, including supply
and delivery of DI K7 pipes, jointing materials
and required specials, cutting,conveying ,
laying,jointing and cost for refilling the additional
earth trench etc complete and as directed by the
TWAD board officers.
a. 150mm Dia AC Pipe

Total for 2 locations


Supply and delivery of mm 200 Dia DI Pipe(3m
6 0.00 m 0.00
x 2 Nos = 6m)
Labour charges for Additional Earth work
Excavation in all kinds of soils for replacement of
damaged pipes
Mazdoor catogery - I 2 0 No 0.00

Mazdoor catogery - II 2 0 No 0.00

cutting charges for damaged AC pipes 4 0.00 No 0.00


Labour charges for Lowering,laying and jointing
DI pipes
Fitter(Pipe laying) - II class 1 0 No 0.00

Plumber - II class 1 0 No 0.00


Labour charges for Cement Joint including cost of
6 0.00 No 0.00
cement and yarn
Rate for 6m length (2 Nos) 0.00

Rate for 1m length 0.00

b. 200mm Dia AC Pipe

Total for 2 locations


Supply and delivery of 250mm Dia DI S/S Pipe(3m
6 0.00 m 0.00
x 2 Nos = 6m)
Labour charges for Additional Earth work
Excavation in all kinds of soils for replacement of
damaged pipes
Mazdoor catogery - I 2 0 No 0.00

Mazdoor catogery - II 2 0 No 0.00

cutting charges for damaged AC pipes 4 0.00 No 0.00

433
Sl.
Description of item of Work Quantity Rate Unit Amount
No.
Labour charges for Lowering,laying and jointing
DI pipes
Fitter(Pipe laying) - II class 1 0 No 0.00

Plumber - II class 1 0 No 0.00


Labour charges for Cement Joint including cost of
6 0.00 No 0.00
cement and yarn
Rate for 6m length (2 Nos) 0.00

Rate for 1m length 0.00

c. 250mm Dia AC Pipe

Total for 2 locations


Supply and delivery of 300 mm Dia DI S/S Pipe
6 0.00 m 0.00
(3m x 2 Nos = 6m)
Labour charges for Additional Earth work
Excavation in all kinds of soils for replacement of
damaged pipes
Mazdoor catogery - I 2 0 No 0.00

Mazdoor catogery - II 2 0 No 0.00

cutting charges for damaged AC pipes 4 0.00 No 0.00


Labour charges for Lowering,laying and jointing
DI pipes
Fitter(Pipe laying) - II class 1 0 No 0.00

Plumber - II class 1 0 No 0.00


Labour charges for Cement Joint including cost of
6 0.00 No 0.00
cement and yarn
Rate for 6m length (2 Nos) 0.00

Rate for 1m length 0.00

d. 300 mm Dia AC Pipe

Total for 2 locations


Supply and delivery of 350 mm Dia DI S/S Pipe
6 0.00 m 0.00
(3m x 2 Nos = 6m)
Labour charges for Additional Earth work
Excavation in all kinds of soils for replacement of
damaged pipes
Mazdoor catogery - I 2 0 No 0.00

Mazdoor catogery - II 2 0 No 0.00

cutting charges for damaged AC pipes 4 0.00 No 0.00

434
Sl.
Description of item of Work Quantity Rate Unit Amount
No.
Labour charges for Lowering,laying and jointing
DI pipes
Fitter(Pipe laying) - II class 1 0 No 0.00

Plumber - II class 1 0 No 0.00


Labour charges for Cement Joint including cost of
6 0.00 No 0.00
cement and yarn
Rate for 6m length (2 Nos) 0.00

Rate for 1m length 0.00

e. 350mm Dia AC Pipe

Total for 2 locations


Supply and delivery of 400 mm Dia DI S/S Pipe
6 0.00 m 0.00
(3m x 2 Nos =6m)
Labour charges for Additional Earth work
Excavation in all kinds of soils for replacement of
damaged pipes
Mazdoor catogery - I 2 0 No 0.00

Mazdoor catogery - II 2 0 No 0.00

cutting charges for damaged AC pipes 4 0.00 No 0.00


Labour charges for Lowering,laying and jointing
DI pipes
Fitter(Pipe laying) - II class 1 0 No 0.00

Plumber - II class 1 0 No 0.00


Labour charges for Cement Joint including cost of
6 0.00 No 0.00
cement and yarn
Rate for 6m length (2 Nos) 0.00

Rate for 1m length 0.00

f. 400mm Dia AC Pipe

Total for 2 locations


Supply and delivery of 450mm Dia DI S/S Pipe
6 0.00 m 0.00
(3m x 2 Nos = 6m)
Labour charges for Additional Earth work
Excavation in all kinds of soils for replacement of
damaged pipes
Mazdoor catogery - I 2 0 No 0.00

Mazdoor catogery - II 2 0 No 0.00

cutting charges for damaged AC pipes 4 0.00 No 0.00

435
Sl.
Description of item of Work Quantity Rate Unit Amount
No.
Labour charges for Lowering,laying and jointing
DI pipes
Fitter(Pipe laying) - II class 1 0 No 0.00

Plumber - II class 1 0 No 0.00


Labour charges for Cement Joint including cost of
6 0.00 No 0.00
cement and yarn
Rate for 6m length (2 Nos) 0.00

Rate for 1m length 0.00