GSB Compaction NCR BIG BOX

The document details the determination of field dry density using the sand replacement method, as per IS 2720 Part 28, with multiple testing dates and results from a truck parking area. It includes measurements of sand density, weights before and after pouring, moisture content, dry density calculations, and compaction percentages for various test samples. The average compaction percentage achieved across tests is noted, indicating the effectiveness of the compaction process.

Uploaded by

Bittu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
42 views10 pages

GSB Compaction NCR BIG BOX

The document details the determination of field dry density using the sand replacement method, as per IS 2720 Part 28, with multiple testing dates and results from a truck parking area. It includes measurements of sand density, weights before and after pouring, moisture content, dry density calculations, and compaction percentages for various test samples. The average compaction percentage achieved across tests is noted, indicating the effectiveness of the compaction process.

Uploaded by

Bittu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 10

Determination of field dry density(IS 2720 Part28)

SAND REPLACEMENT METHOD


Agency PISL Date of Testing 21.10.2024
Location TRUCK PARKING AREA(ROAD)
Sr.No Description 11 12 13 14 15

2 Layer(WMM) TOP TOP TOP TOP TOP


1 Density of sand (gm/cc) sd 1.499 1.499 1.499 1.499 1.499
2 Weight of sand + cylinder before pouring ( gm)W1 7000 7000 7000 7000 7000
3 Weight of sand + cylinder After pouring,(gm)W2 5145 5060 5009 5060 5180
4 Weight of sand in cone (gm)W3 302.00 302.00 302.00 302.00 302.00
5 Weight of Sand in hole (gm)W4= (W1-W2-W3) 1553.00 1638.00 1689.00 1638.00 1518.00
6 Volume of Hole(CC) = V=W4/sd 1036.02 1092.73 1126.75 1092.73 1012.68
7 Weight of Soil/GSB/WMM from Hole (gm) W 2262 2375 2445 2406 2241
8 BD of Soil/GSB/WMM,Yb ( gm/CC)= W/V 2.18 2.17 2.17 2.20 2.21
9 Moisture Content 6 5.5 5 5 5.5
10 Dry density Yd=Yb/(1+(Mc/100) (gm/cc) 2.06 2.06 2.07 2.10 2.10
11 Maximum dry density (MDD) (gm/cc) 2.1 2.1 2.1 2.1 2.1
12 % of compaction achived =(Yd/MDD)*100 98.08 98.10 98.41 99.86 99.88
13 Avg Compation % 98.87
Tested by ( PISL) Checked by (ISPL)
Signature Signature
Name Name
Date Date
Determination of field dry density(IS 2720 Part28)

SAND REPLACEMENT METHOD


Agency PISL Date of Testing
Location
Sr.No Description
Layer TOP TOP TOP TOP TOP
1 Density of sand (gm/cc) sd 1.499 1.499 1.499 1.499 1.499
2 Weight of sand + cylinder before pouring ( gm)W1 7000 7000 7000 7000 7000
3 Weight of sand + cylinder After pouring,(gm)W2
4 Weight of sand in cone (gm)W3 302.00 302.00 302.00 302.00 302.00
5 Weight of Sand in hole (gm)W4= (W1-W2-W3)
6 Volume of Hole(CC) = V=W4/sd
7 Weight of Soil/GSB/WMM from Hole (gm) W
8 BD of Soil/GSB/WMM,Yb ( gm/CC)= W/V
9 Moisture Content
10 Dry density Yd=Yb/(1+(Mc/100) (gm/cc)
11 Maximum dry density (MDD) (gm/cc) 2.21 2.21 2.21 2.21 2.21
12 % of compaction achived =(Yd/MDD)*100
13 Avg Compation % #DIV/0!
Tested by ( PISL) Checked by (ISPL)
Signature Signature
Name Name
Date Date
Determination of field dry density(IS 2720 Part28)

SAND REPLACEMENT METHOD


Agency PISL Date of Testing 18.03.2025
Location TRUCK PARKING AREA(ROAD) Grid
Sr.No Description 1 2 3 4 5 6

2 LAYER(WMM)
1 Density of sand (gm/cc) sd 1.499 1.499 1.499 1.499 1.499 1.499
2 Weight of sand + cylinder before pouring ( gm)W1 7000 7000 7000 7000 7000 7000
3 Weight of sand + cylinder After pouring,(gm)W2 5200 5120 5121 5245 5140 5135
4 Weight of sand in cone (gm)W3 302.00 302.00 302.00 302.00 302.00 302.00
5 Weight of Sand in hole (gm)W4= (W1-W2-W3) 1498.00 1578.00 1577.00 1453.00 1558.00 1563.00
6 Volume of Hole(CC) = V=W4/sd 999.33 1052.70 1052.03 969.31 1039.36 1042.70
7 Weight of Soil/GSB/WMM from Hole (gm) W 2318 2420 2440 2212 2416 2416
8 BD of Soil/GSB/WMM,Yb ( gm/CC)= W/V 2.32 2.30 2.32 2.28 2.32 2.32
9 Moisture Content 5 6 5 5 6 6
10 Dry density Yd=Yb/(1+(Mc/100) (gm/cc) 2.21 2.17 2.21 2.17 2.19 2.19
11 Maximum dry density (MDD) (gm/cc) 2.22 2.22 2.22 2.22 2.22 2.22
12 % of compaction achived =(Yd/MDD)*100 99.51 97.69 99.50 97.90 98.78 98.46
13 Avg Compation % 98.68
Tested by ( PISL) Checked by (ISPL)
Signature Signature
Name Name
Date Date
Determination of field dry density(IS 2720 Part28)

SAND REPLACEMENT METHOD


Agency PISL Date of Testing 18.03.2025
Location TRUCK PARKING AREA(ROAD) Grid
Sr.No Description 1 2 3 4 5 6

2 LAYER(WMM)
1 Density of sand (gm/cc) sd 1.499 1.499 1.499 1.499 1.499 1.499
2 Weight of sand + cylinder before pouring ( gm)W1 7000 7000 7000 7000 7000 7000
3 Weight of sand + cylinder After pouring,(gm)W2 5150 5125 5125 5120 5134 5100
4 Weight of sand in cone (gm)W3 302.00 302.00 302.00 302.00 302.00 302.00
5 Weight of Sand in hole (gm)W4= (W1-W2-W3) 1548.00 1573.00 1573.00 1578.00 1564.00 1598.00
6 Volume of Hole(CC) = V=W4/sd 1032.69 1049.37 1049.37 1052.70 1043.36 1066.04
7 Weight of Soil/GSB/WMM from Hole (gm) W 2415 2452 2458 2470 2432 2500
8 BD of Soil/GSB/WMM,Yb ( gm/CC)= W/V 2.34 2.34 2.34 2.35 2.33 2.35
9 Moisture Content 6.5 5.5 6 6.5 7 7
10 Dry density Yd=Yb/(1+(Mc/100) (gm/cc) 2.20 2.21 2.21 2.20 2.18 2.19
11 Maximum dry density (MDD) (gm/cc) 2.22 2.22 2.22 2.22 2.22 2.22
12 % of compaction achived =(Yd/MDD)*100 98.91 99.77 99.54 99.24 98.13 98.73
13 Avg Compation % 99.12
Tested by ( PISL) Checked by (ISPL)
Signature Signature
Name Name
Date Date
Determination of field dry density(IS 2720 Part28)

SAND REPLACEMENT METHOD


Agency PISL Date of Testing 18.03.2025
Location TRUCK PARKING AREA(ROAD) Grid
Sr.No Description 1 2 3 4 5 6

2 LAYER(WMM)
1 Density of sand (gm/cc) sd 1.499 1.499 1.499 1.499 1.499 1.499
2 Weight of sand + cylinder before pouring ( gm)W1 7000 7000 7000 7000 7000 7000
3 Weight of sand + cylinder After pouring,(gm)W2 5049 5130 5105 5119 5160 5140
4 Weight of sand in cone (gm)W3 302.00 302.00 302.00 302.00 302.00 302.00
5 Weight of Sand in hole (gm)W4= (W1-W2-W3) 1649.00 1568.00 1593.00 1579.00 1538.00 1558.00
6 Volume of Hole(CC) = V=W4/sd 1100.07 1046.03 1062.71 1053.37 1026.02 1039.36
7 Weight of Soil/GSB/WMM from Hole (gm) W 2512 2448 2478 2498 2398 2449
8 BD of Soil/GSB/WMM,Yb ( gm/CC)= W/V 2.28 2.34 2.33 2.37 2.34 2.36
9 Moisture Content 6 6.5 6.5 7 6.5 7.5
10 Dry density Yd=Yb/(1+(Mc/100) (gm/cc) 2.15 2.20 2.19 2.22 2.19 2.19
11 Maximum dry density (MDD) (gm/cc) 2.22 2.22 2.22 2.22 2.22 2.22
12 % of compaction achived =(Yd/MDD)*100 97.04 98.98 98.62 99.83 98.85 98.73
13 Avg Compation % 98.67
Tested by ( PISL) Checked by (ISPL)
Signature Signature
Name Name
Date Date
Determination of field dry density(IS 2720 Part28)

SAND REPLACEMENT METHOD


Agency PISL Date of Testing 18.03.2025
Location TRUCK PARKING AREA(ROAD) Grid
Sr.No Description 1 2 3 4 5 6

2 LAYER(WMM)
1 Density of sand (gm/cc) sd 1.499 1.499 1.499 1.499 1.499 1.499
2 Weight of sand + cylinder before pouring ( gm)W1 7000 7000 7000 7000 7000 7000
3 Weight of sand + cylinder After pouring,(gm)W2 5125 5105 5090 5100 5145 5150
4 Weight of sand in cone (gm)W3 302.00 302.00 302.00 302.00 302.00 302.00
5 Weight of Sand in hole (gm)W4= (W1-W2-W3) 1573.00 1593.00 1608.00 1598.00 1553.00 1548.00
6 Volume of Hole(CC) = V=W4/sd 1049.37 1062.71 1072.72 1066.04 1036.02 1032.69
7 Weight of Soil/GSB/WMM from Hole (gm) W 2452 2466 2487 2512 2455 2412
8 BD of Soil/GSB/WMM,Yb ( gm/CC)= W/V 2.34 2.32 2.32 2.36 2.37 2.34
9 Moisture Content 6.5 5.5 6 7 7.5 6.5
10 Dry density Yd=Yb/(1+(Mc/100) (gm/cc) 2.19 2.20 2.19 2.20 2.20 2.19
11 Maximum dry density (MDD) (gm/cc) 2.22 2.22 2.22 2.22 2.22 2.22
12 % of compaction achived =(Yd/MDD)*100 98.83 99.08 98.52 99.20 99.29 98.79
13 Avg Compation % 98.98
Tested by ( PISL) Checked by (ISPL)
Signature Signature
Name Name
Date Date
Determination of field dry density(IS 2720 Part28)

SAND REPLACEMENT METHOD


Agency PISL Date of Testing 18.03.2025
Location TRUCK PARKING AREA(ROAD) Grid
Sr.No Description 1 2 3 4 5 6

2 LAYER(WMM)
1 Density of sand (gm/cc) sd 1.499 1.499 1.499 1.499 1.499 1.499
2 Weight of sand + cylinder before pouring ( gm)W1 7000 7000 7000 7000 7000 7000
3 Weight of sand + cylinder After pouring,(gm)W2 5136 5120 5129 5111 5102 5155
4 Weight of sand in cone (gm)W3 302.00 302.00 302.00 302.00 302.00 302.00
5 Weight of Sand in hole (gm)W4= (W1-W2-W3) 1562.00 1578.00 1569.00 1587.00 1596.00 1543.00
6 Volume of Hole(CC) = V=W4/sd 1042.03 1052.70 1046.70 1058.71 1064.71 1029.35
7 Weight of Soil/GSB/WMM from Hole (gm) W 2436 2472 2444 2458 2510 2439
8 BD of Soil/GSB/WMM,Yb ( gm/CC)= W/V 2.34 2.35 2.33 2.32 2.36 2.37
9 Moisture Content 6 6.5 6.5 5.5 7 7.5
10 Dry density Yd=Yb/(1+(Mc/100) (gm/cc) 2.21 2.20 2.19 2.20 2.20 2.20
11 Maximum dry density (MDD) (gm/cc) 2.22 2.22 2.22 2.22 2.22 2.22
12 % of compaction achived =(Yd/MDD)*100 99.34 99.32 98.76 99.13 99.24 99.29
13 Avg Compation % 99.16
Tested by ( PISL) Checked by (ISPL)
Signature Signature
Name Name
Date Date
Determination of field dry density(IS 2720 Part28)

SAND REPLACEMENT METHOD


Agency PISL Date of Testing 18.03.2025
Location TRUCK PARKING AREA(ROAD) Grid
Sr.No Description 1 2 3 4 5 6

2 LAYER(WMM)
1 Density of sand (gm/cc) sd 1.499 1.499 1.499 1.499 1.499 1.499
2 Weight of sand + cylinder before pouring ( gm)W1 7000 7000 7000 7000 7000 7000
3 Weight of sand + cylinder After pouring,(gm)W2 5149 5118 5129 5122 5098 5112
4 Weight of sand in cone (gm)W3 302.00 302.00 302.00 302.00 302.00 302.00
5 Weight of Sand in hole (gm)W4= (W1-W2-W3) 1549.00 1580.00 1569.00 1576.00 1600.00 1586.00
6 Volume of Hole(CC) = V=W4/sd 1033.36 1054.04 1046.70 1051.37 1067.38 1058.04
7 Weight of Soil/GSB/WMM from Hole (gm) W 2419 2460 2450 2498 2525 2470
8 BD of Soil/GSB/WMM,Yb ( gm/CC)= W/V 2.34 2.33 2.34 2.38 2.37 2.33
9 Moisture Content 6.5 5.5 6 7.5 7.5 7
10 Dry density Yd=Yb/(1+(Mc/100) (gm/cc) 2.20 2.21 2.21 2.21 2.20 2.18
11 Maximum dry density (MDD) (gm/cc) 2.22 2.22 2.22 2.22 2.22 2.22
12 % of compaction achived =(Yd/MDD)*100 99.01 99.65 99.47 99.56 99.12 98.28
13 Avg Compation % 99.36
Tested by ( PISL) Checked by (ISPL)
Signature Signature
Name Name
Date Date
Determination of field dry density(IS 2720 Part28)

SAND REPLACEMENT METHOD


Agency PISL Date of Testing 18.03.2025
Location TRUCK PARKING AREA(ROAD) Grid
Sr.No Description 1 2 3 4 5 6

2 LAYER(WMM)
1 Density of sand (gm/cc) sd 1.499 1.499 1.499 1.499 1.499 1.499
2 Weight of sand + cylinder before pouring ( gm)W1 7000 7000 7000 7000 7000 7000
3 Weight of sand + cylinder After pouring,(gm)W2 5122 5100 5120 5095 5085 5107
4 Weight of sand in cone (gm)W3 302.00 302.00 302.00 302.00 302.00 302.00
5 Weight of Sand in hole (gm)W4= (W1-W2-W3) 1576.00 1598.00 1578.00 1603.00 1613.00 1591.00
6 Volume of Hole(CC) = V=W4/sd 1051.37 1066.04 1052.70 1069.38 1076.05 1061.37
7 Weight of Soil/GSB/WMM from Hole (gm) W 2470 2505 2436 2487 2525 2455
8 BD of Soil/GSB/WMM,Yb ( gm/CC)= W/V 2.35 2.35 2.31 2.33 2.35 2.31
9 Moisture Content 7 6.5 6 5.5 6.5 6
10 Dry density Yd=Yb/(1+(Mc/100) (gm/cc) 2.20 2.21 2.18 2.20 2.20 2.18
11 Maximum dry density (MDD) (gm/cc) 2.22 2.22 2.22 2.22 2.22 2.22
12 % of compaction achived =(Yd/MDD)*100 98.90 99.39 98.34 99.30 99.25 98.29
13 Avg Compation % 99.03
Tested by ( PISL) Checked by (ISPL)
Signature Signature
Name Name
Date Date
Determination of field dry density(IS 2720 Part28)

SAND REPLACEMENT METHOD


Agency PISL Date of Testing 18.03.2025
Location TRUCK PARKING AREA(ROAD) Grid
Sr.No Description 1 2 3 4 5 6

2 LAYER(WMM)
1 Density of sand (gm/cc) sd 1.499 1.499 1.499 1.499 1.499 1.499
2 Weight of sand + cylinder before pouring ( gm)W1 7000 7000 7000 7000 7000 7000
3 Weight of sand + cylinder After pouring,(gm)W2 5138 5107 5125 5128 5109 5126
4 Weight of sand in cone (gm)W3 302.00 302.00 302.00 302.00 302.00 302.00
5 Weight of Sand in hole (gm)W4= (W1-W2-W3) 1560.00 1591.00 1573.00 1570.00 1589.00 1572.00
6 Volume of Hole(CC) = V=W4/sd 1040.69 1061.37 1049.37 1047.36 1060.04 1048.70
7 Weight of Soil/GSB/WMM from Hole (gm) W 2452 2487 2447 2464 2488 2462
8 BD of Soil/GSB/WMM,Yb ( gm/CC)= W/V 2.36 2.34 2.33 2.35 2.35 2.35
9 Moisture Content 6.5 6 5.5 6.5 6 7
10 Dry density Yd=Yb/(1+(Mc/100) (gm/cc) 2.21 2.21 2.21 2.21 2.21 2.19
11 Maximum dry density (MDD) (gm/cc) 2.22 2.22 2.22 2.22 2.22 2.22
12 % of compaction achived =(Yd/MDD)*100 99.65 99.57 99.56 99.50 99.74 98.83
13 Avg Compation % 99.61
Tested by ( PISL) Checked by (ISPL)
Signature Signature
Name Name
Date Date