0% found this document useful (0 votes)
24 views7 pages

Mortar Calculation Sheet

The document outlines various construction components, their dimensions, and quantities required for a project, including materials like cement, sand, and steel. It provides detailed specifications for different elements such as piers, drainage, and masonry, along with calculations for cement and sand ratios. Additionally, it includes rates and levels for different structural components and project requirements.

Uploaded by

Ankit Mann
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
24 views7 pages

Mortar Calculation Sheet

The document outlines various construction components, their dimensions, and quantities required for a project, including materials like cement, sand, and steel. It provides detailed specifications for different elements such as piers, drainage, and masonry, along with calculations for cement and sand ratios. Additionally, it includes rates and levels for different structural components and project requirements.

Uploaded by

Ankit Mann
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 7

QUANTITY

COMPONENTNUMBER LENGTH WIDTH DEPTH QUANTITY (m)


PIER 3 1
M30
PCC
PIT
EARTHWORK
REHANDLING
STEEL JOIST
MASONRY
PLASTER
DRAINAGE
SPOUT
JOINT FILLER
WEEP HOLES
SAND FILLING
REINFORCE
MENT
PAVER BLOC 2 -55.5 24 -1332 -2664
CREDIT STEEL
CREDIT
BRICKS
CREDIT JOIST
SIGN BOARD
DRAINAGE
FILTER 2 10 2 29.5 1180 33.4796975
HSR RATES TOTAL RATE LEVEL BOOK
TOP OF SLAB
BOTTOM SLAB
TOP OF LINI 757.44
BED WIDTH 20
SIDE SLOPE 1
TOP WIDTH 39
FSD 7
FREE BOARD 2.5
SHEAR PILE
SHEET KEY
U/S
ADJOINING 6.56
NSL 748.8
PIT LEVEL 742.29
TOP OF RAFT 746.29
BOTTOM RAF
PCC 743.29
THICKNESS 1
BANK LEVEL 757.5
BED LEVEL 747.94
FSL 754.94
ROAD LEVEL 759.35
Slab thicknes 1.5
Wearing coat
RAFT 0.25
THICKNESS 3
Sheet pile D/ 8.25
LEVEL KEY D 739.69
LEVEL
BED KEY U/
LEVEL 741.38
at RAFT 746.94
CHANNEL
DATA
BED WIDTH 20
SIDE SLOPE 1
FREE BOARD 2.5
FSD 7
BANKBANK
LEFT WIDTH 12
WIDTH 12
RAMP SLOPE 30
BAYS OF
WIDTH 2
BAY
AREA OF 13.5
FLOW
ATE 189
PILLARS
TOTAL 1
PILLARS 3
PITCHING TH 0.65
Apron length 10
Apron depth 2
no of apron 2
Width ofatpilla
section 2.5
bridge 29.5
Approach sla 11.48

At the point of bridge ,section become


bridge ,section becomes rectangular and hence area of trapezoidal section equals to area of rectangular
a of rectangular
GRADE QUANTITY(cumCEMENT(ton) FINE SAND(cumCOARSE SAND (cum)
1:1 (FS) 1 1.02 0.71
1:2 1 0.68 0.95
1:3 1 0.51 1.07
1:4 1 0.38 1.07
1:5 1 0.31 1.07
1:6 1 0.25 1.07
1:2(CS) 1 0.68 0.95
1:3(CS) 1 0.51 1.07
1:4(CS) 1 0.38 1.07
1:5(CS) 1 0.31 1.07
1:6(CS) 1 0.25 1.07
PROJECT
QUANTITY CEMENT(TONFINE SAND(cumCOARSE SAND (cum)
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0

You might also like