Oil Testing As Per Test Schedule For FAT

The document lists various electrical testing schedules for different customers, including details such as the rating, type of test, work order identification (WOI), and scheduled dates for testing and reporting. It includes entries for multiple companies like Asiaphill, RDSO, Siemens, and others, with a mix of routine and type tests. The schedule spans from 2024 to 2025, indicating the planned dates for oil testing and completion of reports.

Uploaded by

Venkatesh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
56 views2 pages

Oil Testing As Per Test Schedule For FAT

The document lists various electrical testing schedules for different customers, including details such as the rating, type of test, work order identification (WOI), and scheduled dates for testing and reporting. It includes entries for multiple companies like Asiaphill, RDSO, Siemens, and others, with a mix of routine and type tests. The schedule spans from 2024 to 2025, indicating the planned dates for oil testing and completion of reports.

Uploaded by

Venkatesh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

S.No Inward Sr.

No Customer RATING Test WOI FIT FAT Oil Testing as per Test Schedule
21 61 Asiaphill 20/25MVA, 67/13.2KV Routine WOI-207230664-02/11/24/00725 21.03.2024 21.03.2024
FY-2024-2025
22 1 RDSO 38/53/63 MVA, 132/27.5 kV Routine WOI-106230657-04/12/24/00726 29.04.2024 to 03.05.2024 06.05.2024 to 08.05.2024
NA
23 2 RDSO 38/53/63 MVA, 132/27.5 kV Routine WOI-106230657-05/12/24/00727 29.04.2024 to 03.05.2024 06.05.2024 to 08.05.2024

24 3 Siemens 50/60MVA, 220/11kV Type WOI-105230647-01/13/24/00728 21.04.2024 to 25.04.2024 14.05.2024 to 16.05.2024 Done

26 4 Asiaphill 20/25MVA, 67/13.2KV Routine WOI-207230664-03/11/24/00729 20.05.2024 21.05.2024 NA

27 5 RDSO 38/53/63 MVA, 132/27.5 kV Routine WOI-106230657-06/12/24/00730 16.05.2024 to 17.05.2024 21.05.2024 to 22.05.2024 NA

28 6 Siemens 50/60MVA, 220/11kV Routine WOI-105230647-02/13/24/00731 22.05.2024 23.05.2024 to 25.05.2024 Done

29 7 Asiaphill 20/25MVA, 67/13.2KV Routine WOI-207230664-04/11/24/00732 27.05.2024 28.05.2024 NA

30 8 Asiaphill 20/25MVA, 67/13.2KV Routine WOI-207230664-05/11/24/00733 28.05.2024 29.05.2024 NA

31 9 MTD 500KVA 33/0.433KV Routine UM-9072/722 31.05.2024 NA

32 10 RDSO 38/53/63 MVA, 132/27.5 kV Routine WOI-106230657-07/12/24/00734 29.05.2024 to 31.05.2024 05.06.2024 to 07.06.2024 NA

33 11 Avada 100/125 MVA, 220/33kV Type WOI-109230672-01/13/24/00735 08.06.2024 to 09.06.2024 10.06.2024 to 14.06.2024 Done

34 12 Asiaphill 20/25MVA, 67/13.2KV Routine WOI-207230664-06/11/24/00736 13.06.2024 to 14.06.2024 14.06.2024 NA

35 13 RDSO 38/53/63 MVA, 132/27.5 kV Routine WOI-106230657-08/12/24/00737 - 24.06.2024 & 25.06.2024 NA

36 14 MTD OIL ILC2 3 MVA ,33/0.690kV - UM-023/866 04.07.2023 NA

37 15 RDSO(Alwaye OCTC) Type 303619(WOI-667) 13.06.2024 to 14.06.2024 NA

38 16 RDSO 38/53/63 MVA, 132/27.5 kV Routine WOI-106230657-09/12/24/00738 08.07.2024 09.07.2024 to 10.07.2024 NA

39 17 HERO ROOF TOP 100/125 MVA, 220/33kV Type WOI-111230688-01/13/24/00739 10.07.2024 12.07.2024 to 15.07.2024 Done

40 18 RDSO 38/53/63 MVA, 132/27.5 kV Routine WOI-106230657-10/12/24/00740 17.07.2024 to 18.07.2024 19.07.2024 to 20.07.2024 NA

41 19 JSW 120/150 MVA, 220/33 kV Routine WOI-109230669-01/13/24/00741 22.07.2024 to 23.07.2024 24.07.2024 to 26.07.2024 Done

42 20 RDSO 38/53/63 MVA, 132/27.5 kV Routine WOI-106230657-11/12/24/00742 24.07.2024 to 26.07.2024 27.07.2024 to 29.07.2024
NA
43 21 RDSO 38/53/63 MVA, 132/27.5 kV Routine WOI-106230657-12/12/24/00743 - 27.07.2024 to 29.07.2025

44 22 TESLA T/F ILC 2..5 MVA ,33/0.433kV Routine TP/2020/6106 16.07.2024 07.08.2024(Report date) NA

45 23 HERO ROOF TOP 100/125 MVA, 220/33kV ROUTINE WOI-111230688-02/13/24/00744 05.08.2024 to 06.08.2024 07.08.2024 to 09.08.2024 Done

46 24 Asiaphill 20/25MVA, 67/13.2KV Routine WOI-207230664-07/11/24/00745 12.08.2024 to 13.08.2024 16.08.2024 to 18.08.2024

47 25 Asiaphill 10/12.5MVA, 67/13.2KV Routine WOI-207230665-03/11/24/00746 14.08.2023 to 15.08.2024 16.08.2024 to 18.08.2024 NA

48 26 Asiaphill 20/25MVA, 67/13.2KV Routine WOI-207230664-08/11/24/00747 15.08.2024 16.08.2024 to 18.08.2024

48 27 HINDUJA 110/130 MVA, 220/33 kV Type WOI-101240702-01/13/24/00748 14.08.2024 16.08.2024 to 20.08.2024 Done

49 28 SGPPL 84/105 MVA, 400/33-33 kV Type WOI-110230684-01/14/24/00749 24.08.2024 25.08.2024 to 28.08.2024 Done

50 29 TEPCO 20 MVA, 67.31/6.9kV Type WOI-206230661-01/11/24/00750 29.08.2024 to 31.08.2024 Done

51 30 Avada 100/125 MVA, 220/33kV Routine WOI-109230672-02/13/24/00751 01.09.2024 02.09.2024 to 05.09.2024 Done

52 31 Asiaphill 10/12.5MVA, 67/13.2KV Routine WOI-207230665-04/11/24/00752 01.09.2024 02.09.2024 NA

53 32 HINDUJA 110/130 MVA, 220/33 kV Routine WOI-101240702-02/13/24/00753 06.09.2024 07.09.2024 to 10.09.2024 Done

54 33 RDSO 38/53/63 MVA, 132/27.5 kV Routine WOI-106230657-13/12/24/00754 11.09.2024 to 12.09.2024 13.09.2024 to 14.09.2024 NA

55 34 TEPCO 20 MVA, 67.31/6.9kV Type WOI-202240703-01/11/24/00755 15.09.2024 to 18.09.2024 Done

56 35 SGPPL 84/105 MVA, 400/33-33 kV Routine WOI-110230684-02/14/24/00756 20.09.2024 20.09.2024 to 22.09.2024 Done

57 36 JSW 120/150 MVA, 220/33 kV Routine WOI-109230669-02/13/24/00757 23.09.2024 24.09.2024 to 26.09.2024 Done

58 37 RDSO 38/53/63 MVA, 132/27.5 kV Routine WOI-106230657-14/12/24/00758 27.09.2024 28.10.2024 to 29.10.2024


NA
59 38 RDSO 38/53/63 MVA, 132/27.5 kV Routine WOI-106230657-15/12/24/00759 27.09.2024 28.09.2024 to 29.09.2024

60 39 TEPCO 20 MVA, 67.31/6.9kV Routine WOI-202240706-01/11/24/00760 02.10.2024 to 03.10.2024 Done

61 40 KHIDRAT 60/70 MVA, 220/33 kV Type WOI-104240721-01/13/24/00761 05.10.2024 07.10.2024 to 11.10.2024 Done

62 41 SGPPL 84/105 MVA, 400/33-33 kV Routine WOI-110230684-03/14/24/00762 08.10.2024 to 09.10.2024 09.10.2024 to 11.10.2024 Done

63 42 TEPCO 20 MVA, 67.31/6.9kV Routine WOI-202240704-01/11/24/00763 11.10.2024 to 12.10.2024 Done

64 43 Asiaphill 20/25MVA, 67/13.2KV Routine WOI-207230664-09/11/24/00764 14.10.2024 14.10.2024 to 15.10.2024 NA

65 44 RENEW 120/160/200 MVA, 220/33-33kV Type WOI-101230626-03/13/24/00765 15.10.2024 16.10.2024 to 19.10.2024 Done

66 45 MAHINDRA 100/110 MVA, 220/33 kV Type WOI-102240705-01/13/24/00766 20.10.2024 21.10.2025 to 24.10.2025 Done

67 46 SEMBCORP 161/230 MVA, 220/33-33kV Routine WOI-105230649-01/13/24/00767 25.10.2024 26.10.2024 to 28.10.2024 Done

68 47 MAHINDRA 100/110 MVA, 220/33 kV Routine WOI-102240705-02/13/24/00768 30.10.2024 04.11.2024 to 07.11.2024 Done

69 48 ABC 120/150 MVA, 220/33 kV Type WOI-101240695-01/13/24/00769 08.11.2024 to 09.11.2024 11.11.2024-14.11.2024 Done

20.11.2024 to 22.11.2024 &


70 49 RENEW 120/160/200 MVA, 400/33-33kV Type WOI-102240707-01/14/24/00770 18.11.2024 to 19.11.2024 Done
25.11.2024 to 26.11.2024

71 50 ABC 120/150 MVA, 220/33 kV Routine WOI-101240695-02/13/24/00771 22.11.2024 23.11.2024 to 25.11.2024 Done

29.11.2024 to 30.11.2024 &


72 51 ABC 120/150 MVA, 220/33 kV Routine WOI-101240695-03/13/24/00772 28.11.2024 Done
02.12.2024

73 52 RDSO 38/53/63 MVA, 132/27.5 kV Routine WOI-106230657-16/12/24/00773 02.12.2024 03.12.2024 to 04.12.2024


NA
74 53 RDSO 38/53/63 MVA, 132/27.5 kV Routine WOI-106230657-17/12/24/00774 02.12.2024 03.12.2024 to 04.12.2024

75 54 Asiaphill 20/25MVA, 67/13.2KV Routine WOI-207230664-10/11/24/00775 04.12.2024 05.12.2024 NA

76 55 Asiaphill 20/25MVA, 67/13.2KV Routine WOI-207230664-11/11/24/00776 09.12.2024 09.12.2024 & 10.12.2024 NA

77 56 RDSO 38/53/63 MVA, 132/27.5 kV Routine WOI-106230657-18/12/24/00777 11.12.2024 to 12.12.2024 13.12.2024 to 14.12.2024 NA

78 57 Asiaphill 20/25MVA, 67/13.2KV Routine WOI-207230664-12/11/24/00778 16.12.2024 to 17.12.2024 18.12.2024 to 19.12.2024 NA

79 58 Asiaphill 10/12.5MVA, 67/13.2KV Routine WOI-207230665-05/11/24/00779 25.12.2024 & 26.12.2024 27.12.2024 NA

80 59 Avada 100/125 MVA, 220/33kV Type WOI-109230673-01/13/24/00780 24.12.2024 & 26.12.2024 27.12.2024 to 31.12.2024 Done

Note: Yellow Colour Test Repeated for same Work order


Green Colour Serial No. alloted at Stage Inspection/Internal Testing
Orange Colour ILC for Transformer & Oil
S.No Inward Sr.No Customer RATING Test WOI FIT FAT Oil Testing as per Test Schedule

Year Starting 2025


02.01.25-03.01.25 & 06.01.25-
1 60 RENEW 120/160/200 MVA, 400/33-33kV Type WOI-104240717-01/14/25/00781 01.01.2025 Done
07.01.25

2 61 Avada 100/125 MVA, 220/33kV Routine WOI-109230673-02/13/25/00782 31.12.24 to 01.01.25 03.01.25 to 05.01.25 Done

3 62 MAHINDRA 100/110 MVA, 220/33 kV Type WOI-104240724-01/13/25/00783 06.01.2025 TO 07.01.2025 08.01.2025 to 11.01.2025 Done

4 63 MAHINDRA 100/110 MVA, 220/33 kV Routine WOI-104240724-02/13/25/00784 10.01.2025 10.01.2025 TO 13.01.2025 Done

5 64 Avaada 100/125 MVA, 220/33kV Type WOI-109230674-01/13/25/00785 28.01.2025 to 29.01.2025 30.01.2025 to 03.02.2025 Done

6 65 Avaada 100/125 MVA, 220/33kV Routine WOI-109230674-02/13/25/00786 06.02.2025 07.02.2025 to 10.02.2025 Done

7 66 Asiaphill 10/12.5MVA, 67/13.2KV Routine WOI-210240749-01/11/25/00787 12.02.2025 17.02.2025 NA

8 67 Asiaphill 10/12.5MVA, 67/13.2KV Routine WOI-210240749-02/11/25/00788 17.02.2025 18.02.2025 to 19.02.2025 NA

9 68 Asiaphill 10/12.5MVA, 67/13.2KV Routine WOI-210240749-03/11/25/00789 21.02.2025 21.02.2025 NA

10 69 TEPCO 20 MVA, 67.31/6.9kV Routine WOI-204240716-01/11/25/00790 02.02.2025 to 05.02.2025 ---- Done

11 70 Avaada 100/125 MVA, 220/33kV Type WOI-112230692-01/13/25/00791 12.02.2025 13.02.2025 to 17.02.2025 Done

12 71 Avaada 100/125 MVA, 220/33kV Routine WOI-112230692-02/13/25/00792 19.02.2025 to 20.02.2025 21.02.2025 to 24.02.2025 Done

13 72 Welspon 100/125 MVA, 220/33kV Type WOI-105240726-01/13/25/00793 24.02.2025 25.02.2025 to 28.02.2025 Done
21-22.02.2025 &
14 73 TEPCO 20 MVA, 67.31/6.9kV Type WOI-206230662-01/11/25/00794 ---- Done
24- 25.02.2025

15 74 Welspon 100/125 MVA, 220/33kV Routine WOI-105240726-02/13/25/00795 04.03.2025 05.03.2025 to 07.03.2025 Done

Note: Yellow Colour Test Repeated for same Work order


Green Colour Serial No. alloted at Stage Inspection/Internal Testing
Orange Colour ILC for Transformer & Oil