Areas Covered During Training Period For Batch

The document outlines a 12-week training program for Batch 25, covering various topics in construction and engineering, including units and measurements, masonry works, plastering, flooring, surveying, concrete technology, reading engineering drawings, and quality and safety. Each chapter spans a specific duration and includes both theoretical and practical components. The course is designed with a focus on 60% theory and 40% practical application, culminating in revision and campus preparation activities.

Uploaded by

sivagopal1963
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
19 views7 pages

Areas Covered During Training Period For Batch

The document outlines a 12-week training program for Batch 25, covering various topics in construction and engineering, including units and measurements, masonry works, plastering, flooring, surveying, concrete technology, reading engineering drawings, and quality and safety. Each chapter spans a specific duration and includes both theoretical and practical components. The course is designed with a focus on 60% theory and 40% practical application, culminating in revision and campus preparation activities.

Uploaded by

sivagopal1963
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 7

AREAS COVERED DURING TRAINING PERIOD FOR BATCH:25( 09-10-2021 TO 08-01-2022 )

(12 WEEKS MODULE)

ORGANIZER FOR ALL SESSIONS: ER. SIVAGOPAL SINGUDASU

COURSE DESIGNED ON BASIS OF THEORY 60% & PRACTICALS 40%

GENARAL TOPICS: INTRODUCTION COMPANY PROFILE & FACULTIES.

DISCIPLANARY RULES & REGULATIONS DURING TRAINING PERIOD.

CHAPTER-1 UNIT AND MEASUREMENTS (SPAN 2 WEEKS )

What is unit & measurement?

Type of units & measurements

Conversions in linear, area & volume measurements

Mathematical signs & applications

Greater than & less than

Area calculations for land in all units

Percentage calculations

Square root calculations (without help calculator)

Capacity calculations of over head water tank & septic tank

Concrete quantity calculations for various shapes of columns

Shuttering(Form Work) calculations for various shapes of columns

Expansion of different measurements

Areas for geometric figures

Slopes calculation and design for ramps and terrace slabs


Pythagorean theorem-set right angle with 3,4,5 method.

Practical on area, volume and capacity(water tank&sump) calculations.

Practical on setting 3,4,5 tracing on ground.

Chapter -2 (span 2 weeks) – Masonry works (brick & light weight block work)

Definition of finishing work

Requirements of good finishing work

Types & mixing of mortars

Parts of brick

Introduction of tools for masonry works

Cost of construction a building

Water cement ratio and purpose in finishing works

Wastage of bulk materials

Type of walls in masonry

Type of brick work bonds in masonry

Procedure of brick work

Quality of good bricks(Field cum Lab Tests)

Cracks in brick works

Theory of plan, section & elevation

Quantity calculations, material & labour requirements

Procedure and construction of light weight block work.

Chapter -3 (span -01 week) – plaster works

Definition of plastering

Objects of plastering work

Materials requirement for plastering work


Quality check up through field tests for sand & cement

Type of river pit sand and uses at field work

Correct procedure of plastering- flip chart presentation

Procedure of internal & external plaster works

Procedure of ceiling plastering

Jambs plastering

Cracks in plastering works & remedies

Quantity calculations in plastering works

Calculate materials & labour requirements for all type of plaster works

Chapter-4 (span 1 week) Flooring works

History of tiling process

Definition of flooring work

Type of tiles & Stones

How to choose quality of tiles in market

Precautions before start tiling works

Requirement of good flooring works

Type of tile flooring finishes

Differences between ceramic & vitrified tiles

Bed mortar calculations through thumb rule

Procedure of tile flooring work

Procedure of vertical tiling works (Skrirting,Dado,Cladding)

Productivity Chart for all type of works

Chapter-5 (Span 2 weeks) Survey-Levelling

What is Surveying work?


Instruments required for survey works

Classification of Survey works (explain all type of survey works)

What is leveling work?

MSL & Bench Marks

Type of Bench Marks

Technical Terms in Levelling work

Type of Levelling Instruments

Parts of Levelling Instruments

Procedure of H.I Method

Procedure of Rise & Fall Method

Setting of Auto Level

Practical field leveling road levels

Transfer of Bench marks at Class room exercise & Field

Hand Signals in leveling works

Chapter 6 (span 1 week)- Concrete Technology

What is concrete

Type of concretes

Components of concretes

Mixing of concretes

Differences between PCC & RCC

Comparisons between volumetric & Design Mix(Materials calculation for 1m3 Concrete)

Precautions Cement storage at godowns

Concrete compressive strength test

Concrete Cube test

Concrete Slump test

Concrete Compaction- needles, vibrators


Concrete transportation-RMC- Transit Millers

Type of beams

Type of Slabs

Type of Steel bars& strengths

Weights calculation for different dia of steel bars

Chapter 7 (span 1 week)-Reading of Engineering Drawing

Necessity of reading engineering drawing by a foreman

Requirements for a drawing

Considered things before read engineering drawing

Type of drawings available in working sites

What is Drawing and necessity of drawing?

Points considered before make Engineering drawing by designers.

Conventional signs in drawing

Short forms & Full forms in engineering drawing

Chapter 8 (span 1 week) Quality & Safety

Checklist evaluation for all training related- OJT

Type of Safety’s Personal safety , materials safety

How to choose quality of materials-RMC visit

Chapter 9 (Span1 week) Revision & Campus Preparation

Waterproofing works ,Brick coba work

Role and responsibilities of civil foreman


Preparations & Trail Tests

Viva_tests for campus selections