AREAS COVERED DURING TRAINING PERIOD FOR BATCH:25( 09-10-2021 TO 08-01-2022 )
(12 WEEKS MODULE)
ORGANIZER FOR ALL SESSIONS: ER. SIVAGOPAL SINGUDASU
COURSE DESIGNED ON BASIS OF THEORY 60% & PRACTICALS 40%
GENARAL TOPICS: INTRODUCTION COMPANY PROFILE & FACULTIES.
DISCIPLANARY RULES & REGULATIONS DURING TRAINING PERIOD.
CHAPTER-1 UNIT AND MEASUREMENTS (SPAN 2 WEEKS )
What is unit & measurement?
Type of units & measurements
Conversions in linear, area & volume measurements
Mathematical signs & applications
Greater than & less than
Area calculations for land in all units
Percentage calculations
Square root calculations (without help calculator)
Capacity calculations of over head water tank & septic tank
Concrete quantity calculations for various shapes of columns
Shuttering(Form Work) calculations for various shapes of columns
Expansion of different measurements
Areas for geometric figures
Slopes calculation and design for ramps and terrace slabs
Pythagorean theorem-set right angle with 3,4,5 method.
Practical on area, volume and capacity(water tank&sump) calculations.
Practical on setting 3,4,5 tracing on ground.
Chapter -2 (span 2 weeks) – Masonry works (brick & light weight block work)
Definition of finishing work
Requirements of good finishing work
Types & mixing of mortars
Parts of brick
Introduction of tools for masonry works
Cost of construction a building
Water cement ratio and purpose in finishing works
Wastage of bulk materials
Type of walls in masonry
Type of brick work bonds in masonry
Procedure of brick work
Quality of good bricks(Field cum Lab Tests)
Cracks in brick works
Theory of plan, section & elevation
Quantity calculations, material & labour requirements
Procedure and construction of light weight block work.
Chapter -3 (span -01 week) – plaster works
Definition of plastering
Objects of plastering work
Materials requirement for plastering work
Quality check up through field tests for sand & cement
Type of river pit sand and uses at field work
Correct procedure of plastering- flip chart presentation
Procedure of internal & external plaster works
Procedure of ceiling plastering
Jambs plastering
Cracks in plastering works & remedies
Quantity calculations in plastering works
Calculate materials & labour requirements for all type of plaster works
Chapter-4 (span 1 week) Flooring works
History of tiling process
Definition of flooring work
Type of tiles & Stones
How to choose quality of tiles in market
Precautions before start tiling works
Requirement of good flooring works
Type of tile flooring finishes
Differences between ceramic & vitrified tiles
Bed mortar calculations through thumb rule
Procedure of tile flooring work
Procedure of vertical tiling works (Skrirting,Dado,Cladding)
Productivity Chart for all type of works
Chapter-5 (Span 2 weeks) Survey-Levelling
What is Surveying work?
Instruments required for survey works
Classification of Survey works (explain all type of survey works)
What is leveling work?
MSL & Bench Marks
Type of Bench Marks
Technical Terms in Levelling work
Type of Levelling Instruments
Parts of Levelling Instruments
Procedure of H.I Method
Procedure of Rise & Fall Method
Setting of Auto Level
Practical field leveling road levels
Transfer of Bench marks at Class room exercise & Field
Hand Signals in leveling works
Chapter 6 (span 1 week)- Concrete Technology
What is concrete
Type of concretes
Components of concretes
Mixing of concretes
Differences between PCC & RCC
Comparisons between volumetric & Design Mix(Materials calculation for 1m3 Concrete)
Precautions Cement storage at godowns
Concrete compressive strength test
Concrete Cube test
Concrete Slump test
Concrete Compaction- needles, vibrators
Concrete transportation-RMC- Transit Millers
Type of beams
Type of Slabs
Type of Steel bars& strengths
Weights calculation for different dia of steel bars
Chapter 7 (span 1 week)-Reading of Engineering Drawing
Necessity of reading engineering drawing by a foreman
Requirements for a drawing
Considered things before read engineering drawing
Type of drawings available in working sites
What is Drawing and necessity of drawing?
Points considered before make Engineering drawing by designers.
Conventional signs in drawing
Short forms & Full forms in engineering drawing
Chapter 8 (span 1 week) Quality & Safety
Checklist evaluation for all training related- OJT
Type of Safety’s Personal safety , materials safety
How to choose quality of materials-RMC visit
Chapter 9 (Span1 week) Revision & Campus Preparation
Waterproofing works ,Brick coba work
Role and responsibilities of civil foreman
Preparations & Trail Tests
Viva_tests for campus selections