0% found this document useful (0 votes)
30 views47 pages

Final Hour Revision Questions 2

The document appears to be a collection of notes or references related to engineering, construction, and project management concepts, including calculations, material specifications, and design considerations. It includes various technical terms, equations, and guidelines relevant to civil engineering practices. Additionally, it touches on topics such as growth rates in urban planning and infrastructure development.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
30 views47 pages

Final Hour Revision Questions 2

The document appears to be a collection of notes or references related to engineering, construction, and project management concepts, including calculations, material specifications, and design considerations. It includes various technical terms, equations, and guidelines relevant to civil engineering practices. Additionally, it touches on topics such as growth rates in urban planning and infrastructure development.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 47

40-50 times

initial/1st react to water


ultimate strenght

hacking

white washing

french polish

2nd class 3rd class

2nd class
additional work need to done

aesthetic/economic
strong

e. corbel

30<@<60

circle

CG

holow cone

pie(D4-d4)/64
180=R-L

chaning but no ranging


1% of total wt. of steel
on each side

PA=100+0.5pA

cement lime
foundation 1.25m3 1.5m3
super structure 1m3 1.25m3
ic=G-1/1+e
bernaulis equation
venturi meter

calculate the reynolds number.


wetted

sloping side
for terai region

for warm frontal


Hinge fixed
for hinge roller
earthenquake

Vz=Vb*k1*k2*k3
Pd=0.6Vz^2

PCC
0.2%

jun thorai value hunxa tyo ans line


h/t or l/t in meter
16*20=320

fe250

12*10^-6 11*10^-6

hand made

1.14
if 50 degree slope then no need of design
TCU
gas

local or village all over nation globally


grow rate high

rapid growth new town decrease rate of growth

-ve growth

e. 3180/1/60

(A+B)/A
joints
fast work, temporary work
old test

Rapid sand dilter

min for water supply

normal
40% 40% 100%

0 degree
NDRRMA 2074/2017

1996

2015-2030
MDG- 2000-2015
16/0.8=20

D d (1-d/D)*100
lined channel ma loss kam hunxa so dherai area cultivate hunxa

control garxa pani bahira nikalxa


slope haru ma

h:v
h:v
S:1
e. 2.5
highest

for piping and scour depth

d/s
1000/(2*30*24) mw/h
1.22 Q

for impulse
or instantaneous

yellow

NURS
20-30 kmph 30-40kmph 10-20 kmph
40-50 collector road sub-aarterial road local street or local
road
365 days less than 365 days
15th percentile = low speed limit
design speed median speed
safe speed

feeder road highway district road

for complex or overtaking= 2

offset= 4*shift
shift = Ls^2/24R

for positive

62*1/10 mm
mm
5cm to 100cm

10.3*CBR
crushing or impact test

90% for less than 20

(1.5L+5)/1-y

(L/Ls)^2
(160/80)^2
=16
1/4=0.25
15/60

Semi-grout = 5cm (low rain fall)


Full grout = 7.5cm (heavy rain )

6 months - 2 yrs
5-7 yrs daily
hidden edges

book value

1600*5=8000
total value - depreciation amount
10000-8000=2000
d. all of these
1900 1940 1957 1958

e. 2 million

(2+4*3+10)/6

LST-EST=7-5=2
NGO

30(2) Without license

with license

for VP and registrar

atleast 1 women

You might also like