0% found this document useful (0 votes)
31 views171 pages

Madurai Joint Measurements Sheet For Dismantion Buildings

The document provides a detailed estimation for the dismantling and demolition of structures at Goubert Market, including quantities, rates, and total costs for various construction materials and labor. The total estimated cost for the project is approximately 11.31 million, or 1.14 crore. It includes specific tasks such as demolishing concrete, brickwork, and dismantling roofing and steel work.

Uploaded by

mrs p&c so
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
31 views171 pages

Madurai Joint Measurements Sheet For Dismantion Buildings

The document provides a detailed estimation for the dismantling and demolition of structures at Goubert Market, including quantities, rates, and total costs for various construction materials and labor. The total estimated cost for the project is approximately 11.31 million, or 1.14 crore. It includes specific tasks such as demolishing concrete, brickwork, and dismantling roofing and steel work.

Uploaded by

mrs p&c so
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 171

ABSTRACT ESTIMATION - GOUBERT MARKRT DISMANTLING

S.No Item No Description of Item Quantity Rate Unit Amount

1 15.2.2 Nominal concrete 1:4:8 or leaner mix (including equivalent design mix) 1717.00 1,239.60 cum 2,128,393.00

Demolishing R.C.C work manually / by mechanical means including stacking of


2 15.3 1705.00 2,928.10 cum 4,992,411.00
steel bars and disposal of unserviceable material within 50 metres lead

Demolishing brick work manually / by mechanical means including stacking of


3 15.7.4 serviceable material and disposal of unserviceable material within 50 metres 1591.00 1,698.45 cum 2,702,234.00
lead - in cement mortar

Dismantling tile work in floors and roofs laid in cement mortar including
4 15.23.1 6889.00 60.50 sqm 416,785.00
stacking material within 50 metres lead - for thickness of tiles 10mm to 25mm

Dismantling steel work in built up sections in angles, tees, flats and channels
5 15.18 including all gusset plates, bolts, nuts, cutting rivets ,welding etc.including 72500.00 4.65 kg 337,125.00
dismembering and stacking within 50 metres lead

Dismantling doors, windows and clerestory windows (steel or wood) shutter


6 15.12.2 including chowkhats, architrave, holdfasts etc. 389.00 414.55 each 161,260.00
complete and stacking within 50 metres lead of area beyond 3 sq.metres

Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking
7 15.28.1 4217.00 136.00 sqm 573,512.00
the material within 50 metres lead of - G.S.sheet

Total Amount 11,311,720.00

Total Amount in Lakhs 114.00


Total Amount in Crore 1.14
DETAILED ESTIMATE - GOUBERT MARKET

S No. Description Nos L B H Quantity Unit

1 Nominal concrete 1:4:8 or leaner mix (including equivalent design mix)

Flooring PCC
Front Side RCC Building
Ground Floor
Front Side Corridor Area 1 x 1 161.17 2.45 0.30 118.46
Entry Area 1 x 1 5.30 3.00 0.10 1.59
Shops Inner 1 x 1 5.00 2.58 0.10 1.29
Shops Inner 1 x 5 5.00 3.07 0.10 7.68
Passage Area 1 x 1 3.40 5.30 0.10 1.80
Stair Area 1 x 1 3.60 4.54 0.10 1.63
Shops Inner 1 x 10 2.98 4.92 0.10 14.66
Passage Area 1 x 1 5.31 3.25 0.10 1.73
Stair Area 1 x 1 3.60 4.54 0.10 1.63
Shops Inner 1 x 4 3.36 4.92 0.10 6.61
Main Entry Area 1 x 1 7.56 5.20 0.10 3.93
Shops Inner 1 x 8 5.00 3.04 0.10 12.16
Entry Area 1 x 1 5.20 3.00 0.10 1.56
Stair Area 1 x 1 3.60 4.54 0.10 1.63
Shops Inner 1 x 9 3.19 4.97 0.10 14.27
First Floor
Front Side Corridor Area 1 x 1 161.17 2.45 0.10 39.49
Entry Area 1 x 1 5.30 3.00 0.10 1.59
Shops Inner 1 x 1 5.00 2.58 0.10 1.29
Shops Inner 1 x 5 5.00 3.07 0.10 7.68
Passage Area 1 x 1 3.40 5.30 0.10 1.80
Stair Area 1 x 1 3.60 4.54 0.10 1.63
Shops Inner 1 x 10 2.98 4.92 0.10 14.66
Passage Area 1 x 1 5.31 3.25 0.10 1.73
Stair Area 1 x 1 3.60 4.54 0.10 1.63
Shops Inner 1 x 4 3.36 4.92 0.10 6.61
Main Entry Area 1 x 1 7.56 5.20 0.10 3.93
Shops Inner 1 x 8 5.00 3.04 0.10 12.16
Entry Area 1 x 1 5.20 3.00 0.10 1.56
Stair Area 1 x 1 3.60 4.54 0.10 1.63
Shops Inner 1 x 9 3.19 4.97 0.10 14.27

RCC Back Side Shops


Shops Area 1 1 x 1 20.56 2.30 0.10 4.73
Shops Area 2 1 x 1 37.63 2.30 0.10 8.65

Groceries & Vegetables


Shops Area 1 1 x 10 30.60 4.30 0.30 394.74
Shops Area 2 1 x 1 30.60 3.93 0.15 18.04
Shops Area 3 1 x 1 32.22 3.93 0.15 18.99

Ice Plant
Floor Area 1 x 1 21.08 14.34 0.30 90.69

Flowers & Vegetables


Floor Area Shop 1 x 1 55.55 3.89 0.30 64.83
Floor Area Corridor 1 x 1 60.06 4.05 0.30 72.97
Floor Area Corridor 1 x 1 60.06 4.27 0.30 76.94

Floor Area Shop 1 x 1 46.80 7.90 0.30 110.92


Floor Area Corridor 1 x 1 65.50 3.28 0.15 32.23

Floor Area Shop 1 x 1 50.46 3.89 0.30 58.89


Floor Area Corridor 1 x 1 61.10 2.65 0.15 24.29

Floor Area Shop 1 x 1 57.90 9.50 0.30 165.02


Floor Area Corridor 1 x 1 65.12 3.20 0.15 31.26

Chicken Shop
Floor Area Shop 1 x 1 28.20 2.63 0.30 22.25
Floor Area Shop 1 x 1 24.70 2.63 0.30 19.49
Floor Area Corridor 1 x 1 55.50 3.50 0.15 29.14

RCC Shopc Back Side Shops


Floor Area Shop 1 x 1 29.50 2.65 0.30 23.45
Floor Area Shop 1 x 1 27.74 2.70 0.15 11.23

Meat shop
Floor Area Shop 1 x 1 25.07 18.07 0.30 135.90

Total Quantity = 1717.00 Cum

Demolishing R.C.C work manually / by mechanical means including stacking of steel bars and disposal of
2
unserviceable material within 50 metres lead

Front Side RCC Building


Ground Floor
Column
Column 2 x 42 0.30 0.45 3.15 36.30
Roof Beam
Beam 1 1 x 42 6.85 0.30 0.30 25.89
Beam 2 1 x 1 161.17 0.30 0.30 14.51
Beam 2 1 x 1 161.17 0.30 0.30 14.51
Roof Slab
Front Side Corridor Area 1 x 1 161.17 1.50 0.15 36.26
Entry Area 1 x 1 5.30 3.00 0.15 2.39
Shops Inner 1 x 1 5.00 2.58 0.15 1.94
Shops Inner 1 x 5 5.00 3.07 0.15 11.51
Passage Area 1 x 1 3.40 5.30 0.15 2.70
Shops Inner 1 x 10 2.98 4.92 0.15 21.99
Passage Area 1 x 1 5.31 3.25 0.15 2.59
Shops Inner 1 x 4 3.36 4.92 0.15 9.92
Main Entry Area 1 x 1 7.56 5.20 0.15 5.90
Shops Inner 1 x 8 5.00 3.04 0.15 18.24
Entry Area 1 x 1 5.20 3.00 0.15 2.34
Shops Inner 1 x 9 3.19 4.97 0.15 21.40
Staircase
Flight Slab 1 3 x 2 2.50 1.50 0.25 5.63
Flight Slab 2 3 x 1 2.00 1.50 0.25 2.25
Landing Slab 3 x 1 1.50 1.30 0.25 1.46
Steps 1.5 x 32 1.50 0.25 0.15 2.70

First Floor
Column
Column 2 x 42 0.30 0.45 3.15 36.30
Parapet Column Corridor 1 x 42 0.30 0.45 1.20 6.91
Roof Beam
Beam 1 1 x 42 6.85 0.30 0.30 25.89
Beam 2 1 x 1 161.17 0.30 0.30 14.51
Beam 2 1 x 1 161.17 0.30 0.30 14.51
Roof Slab
Front Side Corridor Area 1 x 1 161.17 1.50 0.15 36.26
Entry Area 1 x 1 5.30 3.00 0.15 2.39
Shops Inner 1 x 1 5.00 2.58 0.15 1.94
Shops Inner 1 x 5 5.00 3.07 0.15 11.51
Passage Area 1 x 1 3.40 5.30 0.15 2.70
Shops Inner 1 x 10 2.98 4.92 0.15 21.99
Passage Area 1 x 1 5.31 3.25 0.15 2.59
Shops Inner 1 x 4 3.36 4.92 0.15 9.92
Main Entry Area 1 x 1 7.56 5.20 0.15 5.90
Shops Inner 1 x 8 5.00 3.04 0.15 18.24
Entry Area 1 x 1 5.20 3.00 0.15 2.34
Shops Inner 1 x 9 3.19 4.97 0.15 21.40

RCC Back Side Shops


Column
Column 1 x 22 0.30 0.45 2.10 6.34

Groceries & Vegetables


Column
Column 10 x 22 0.50 0.50 3.85 211.75
Column 1 x 22 0.38 0.38 3.00 9.53
Roof Beam
Beam 1 10 x 2 31.00 0.30 0.30 55.80
Beam 2 10 x 11 43.00 0.30 0.30 425.70
Roof Slab
Shops Area 1 x 5 63.80 5.20 0.15 248.82

Ice Plant
Column
Column 1 x 20 0.30 0.50 2.99 8.98
Roof Beam
Beam 1 1 x 4 31.08 0.30 0.30 11.19
Roof Slab
Shops Area 1 x 1 173.42 0.15 26.01

Flowers & Vegetables


Floor Area Shop
Column 1 x 46 0.30 0.30 1.80 7.45
Floor Area Shop
Column 1 x 34 0.40 0.40 3.60 19.58
Floor Area Shop
Column 1 x 34 0.23 0.23 2.10 3.78
Floor Area Shop
Column 1 x 36 0.60 0.60 3.60 46.66

Chicken Shop
Column 1 x 42 0.23 0.23 2.10 4.67
RCC Shopc Back Side Shops
Column 1 x 21 0.23 0.23 2.70 3.00
Column 1 x 11 0.23 0.23 2.70 1.57

Meat shop
Column 1 x 42 0.45 0.45 3.85 32.74
Roof Beam
Beam 1 1 x 11 18.07 0.30 0.30 17.89
Beam 2 1 x 2 27.20 0.30 0.30 4.90
Beam 3 1 x 18 4.65 0.30 0.30 7.53
Beam 4 1 x 7 2.40 0.30 0.30 1.51
Roof Slab
Shops Area 1 x 1 27.20 18.07 0.15 73.73

Total Quantity = 1705.00 Cum

Demolishing brick work manually / by mechanical means including stacking of serviceable material and
3
disposal of unserviceable material within 50 metres lead - in cement mortar

Brickwork
Front Side RCC Building
Ground Floor
9'' Wall
Wall 1 1 x 42 4.54 0.23 3.15 138.15
Wall 2 1 x 2 20.56 0.23 3.15 29.79
Wall 3 1 x 2 37.63 0.23 3.15 54.53
Wall 4 1 x 2 18.84 0.23 3.15 27.30
Wall 5 1 x 2 27.74 0.23 3.15 40.20
Wall 6 1 x 2 36.62 0.23 3.15 53.06
Rolling Shutter -1 x 38 2.50 0.23 3.00 -65.55
First Floor
9'' Wall
Wall 1 1 x 42 4.54 0.23 3.15 138.15
Wall 2 1 x 2 20.56 0.23 3.15 29.79
Wall 3 1 x 2 37.63 0.23 3.15 54.53
Wall 4 1 x 2 18.84 0.23 3.15 27.30
Wall 5 1 x 2 27.74 0.23 3.15 40.20
Wall 6 1 x 2 36.62 0.23 3.15 53.06
Parapet Wall 1 x 1 161.17 0.23 1.20 44.48
Rolling Shutter -1 x 38 2.50 0.23 3.00 -65.55
Ventilation Open -1 x 37 0.60 0.23 0.60 -3.06
RCC Back Side Shops
Wall 1 1 x 22 2.23 0.23 2.10 23.70

Groceries & Vegetables


Wall 1 1 x 10 31.00 0.23 3.20 228.16
Wall 2 10 x 11 3.33 0.12 3.20 134.80
Wall 2 1 x 4 3.93 0.23 2.10 7.59

Ice Plant
GF
Wall 1 1 x 1 132.49 0.23 3.00 91.42
FF
Wall 1 1 x 1 12.40 0.23 3.00 8.56
Wall 2 1 x 1 17.69 0.23 3.00 12.21
Wall 3 1 x 1 10.40 0.23 5.00 11.96

Flowers & Vegetables


Wall 1 1 x 1 45.53 0.23 3.60 37.70
Wall 2 1 x 15 7.90 0.23 3.20 87.22
Wall 3 1 x 2 2.40 0.23 3.20 3.53
FlowerShop
Wall 1 1 x 10 2.11 0.12 2.10 5.10
Shop
Wall 1 1 x 18 9.50 0.12 3.50 68.83

Chicken Shop
Wall 1 1 x 2 28.20 0.23 2.10 27.24
Wall 2 1 x 14 2.63 0.23 2.10 17.78
Wall 3 1 x 2 24.73 0.23 2.10 23.89

RCC Shopc Back Side Shops


Wall 1 1 x 12 2.65 0.23 2.70 19.75
Wall 2 1 x 1 29.50 0.23 2.70 18.32
Wall 3 1 x 1 27.74 0.23 2.70 17.23
Wall 4 1 x 11 2.70 0.23 2.70 18.44

Meat shop
Beam 1 1 x 11 18.07 0.23 3.00 137.15
Beam 3 1 x 24 4.65 0.12 3.00 38.50
Beam 4 1 x 9 2.40 0.12 3.00 7.45
Rolling Shutter -1 x 38 2.00 0.23 3.00 -52.44
Total Quantity = 1591.00 Cum

Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50
4
metres lead - for thickness of tiles 10mm to 25mm

Flooring
Front Side RCC Building
Ground Floor
Roof Slab
Front Side Corridor Area 1 x 1 161.17 1.50 241.76
Entry Area 1 x 1 5.30 3.00 15.90
Passage Area 1 x 1 3.40 5.30 18.02
Passage Area 1 x 1 5.31 3.25 17.26
Main Entry Area 1 x 1 7.56 5.20 39.31
Entry Area 1 x 1 5.20 3.00 15.60
Roof Tile
Front Side Corridor Area 1 x 1 161.17 2.45 394.87
Entry Area 1 x 1 5.30 3.00 15.90
Shops Inner 1 x 1 5.00 2.58 12.90
Shops Inner 1 x 5 5.00 3.07 76.75
Passage Area 1 x 1 3.40 5.30 18.02
Stair Area 1 x 1 3.60 4.54 16.34
Shops Inner 1 x 10 2.98 4.92 146.62
Passage Area 1 x 1 5.31 3.25 17.26
Stair Area 1 x 1 3.60 4.54 16.34
Shops Inner 1 x 4 3.36 4.92 66.12
Main Entry Area 1 x 1 7.56 5.20 39.31
Shops Inner 1 x 8 5.00 3.04 121.60
Entry Area 1 x 1 5.20 3.00 15.60
Stair Area 1 x 1 3.60 4.54 16.34
Shops Inner 1 x 9 3.19 4.97 142.69

Groceries & Vegetables


Corridor Area 1 1 x 1 65.40 3.35 219.09
Corridor Area 2 1 x 1 63.90 2.40 153.36
Corridor Area 3 1 x 1 63.90 3.15 201.29
Corridor Area 4 1 x 1 63.90 3.15 201.29
Corridor Area 5 1 x 1 63.90 3.07 196.17
Corridor Area 6 1 x 1 63.90 3.15 201.29
Corridor Area 7 1 x 6 4.30 2.20 56.76
Corridor Area 8 1 x 1 49.00 4.30 210.70
Ice Plant (Roof Tile)
Floor Area 1 x 1 21.08 14.34 302.29

Ice Plant Surrounding Area


Corridor Area 1 1 x 1 27.33 6.45 176.28
Corridor Area 2 1 x 1 27.33 6.19 169.17
Corridor Area 3 1 x 1 23.15 3.25 75.24
Corridor Area 4 1 x 1 28.94 4.17 120.68

Flowers & Vegetables


Floor Area Corridor 1 x 1 60.06 4.05 243.24
Floor Area Corridor 1 x 1 60.06 4.27 256.46

Floor Area Shop 1 x 1 46.80 7.90 369.72


Floor Area Corridor 1 x 1 65.50 3.28 214.84

Floor Area Shop 1 x 1 50.46 3.89 196.29


Floor Area Corridor 1 x 1 61.10 2.65 161.92

Floor Area Shop 1 x 1 57.90 9.50 550.05


Floor Area Corridor 1 x 1 65.12 3.20 208.38

Chicken Shop
Floor Area Shop 1 x 1 28.20 2.63 74.17
Floor Area Shop 1 x 1 24.70 2.63 64.96
Floor Area Corridor 1 x 1 55.50 3.50 194.25

RCC Shopc Back Side Shops


Floor Area Shop 1 x 1 29.50 2.65 78.18
Floor Area Shop 1 x 1 27.74 2.70 74.90

Meat shop Roof


Floor Area Shop 1 x 1 25.07 18.07 453.01

Total Quantity = 6889.00 sqm

Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates,
5
bolts, nuts, cutting rivets ,welding etc.including dismembering and stacking within 50 metres lead

Front Side RCC Building


Staircase - Handrails
Sraircase GF to FF 1 x 3 1.00 30.00 90.00
Kg/Sqm
RCC Back Side Shops
Shops Area 1 1 x 1 20.56 2.30 15.00 709.32
Shops Area 2 1 x 1 37.63 2.30 15.00 1298.24

Groceries & Vegetables


Corridor Area 1 1 x 1 65.40 3.35 15.00 3286.35
Corridor Area 2 1 x 1 63.90 2.40 15.00 2300.40
Corridor Area 3 1 x 1 63.90 3.15 15.00 3019.28
Corridor Area 4 1 x 1 63.90 3.15 15.00 3019.28
Corridor Area 5 1 x 1 63.90 3.07 15.00 2942.60
Corridor Area 6 1 x 1 63.90 3.15 15.00 3019.28
Corridor Area 7 1 x 6 4.30 2.20 15.00 851.40
Corridor Area 8 1 x 1 49.00 4.30 15.00 3160.50

Groceries & Vegetables


Shops Area 2 1 x 1 30.60 3.93 15.00 1803.87
Shops Area 3 1 x 1 32.22 3.93 15.00 1899.37

Ice Plant (Roof Tile)


Floor Area 1 x 1 35.45 20.00 709.00

Ice Plant Surrounding Area


Corridor Area 1 1 x 1 27.33 6.45 20.00 3525.57
Corridor Area 2 1 x 1 27.33 6.19 20.00 3383.45
Corridor Area 3 1 x 1 23.15 3.25 20.00 1504.75
Corridor Area 4 1 x 1 28.94 4.17 20.00 2413.60

Flowers & Vegetables


Floor Area Shop 1 x 1 55.55 3.89 15.00 3241.34
Floor Area Shop 1 x 1 46.80 7.90 25.00 9243.00
Floor Area Shop 1 x 1 50.46 3.89 15.00 2944.34
Floor Area Shop 1 x 1 57.90 9.50 25.00 13751.25

Chicken Shop
Floor Area Shop 1 x 1 28.20 2.63 15.00 1112.49
Floor Area Shop 1 x 1 24.70 2.63 15.00 974.42

RCC Shopc Back Side Shops


Floor Area Shop 1 x 1 29.50 2.65 15.00 1172.63
Floor Area Shop 1 x 1 27.74 2.70 15.00 1123.47
Total Quantity = 72500.00 Kg

Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats,
6
architrave, holdfasts etc. complete and stacking within 50 metres lead of area beyond 3 sq.metres

Front Side RCC Building


Ground Floor
RS 1 x 38 38.00
First Floor
RS 1 x 38 38.00
Groceries & Vegetables
RS 1 x 200 200.00
Door 1 x 1 1.00
Flowers & Vegetables
RS 1 x 31 31.00
RS 1 x 32 32.00
RCC Shopc Back Side Shops
RS 1 x 11 11.00
Meat shop Roof
RS 1 x 38 38.00

Total Quantity = 389.00 nos

Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking the material within 50
7
metres lead of - G.S.sheet

RCC Back Side Shops


Shops Area 1 1 x 1 20.56 2.30 47.29
Shops Area 2 1 x 1 37.63 2.30 86.55

Groceries & Vegetables


Corridor Area 1 1 x 1 65.40 3.35 219.09
Corridor Area 2 1 x 1 63.90 2.40 153.36
Corridor Area 3 1 x 1 63.90 3.15 201.29
Corridor Area 4 1 x 1 63.90 3.15 201.29
Corridor Area 5 1 x 1 63.90 3.07 196.17
Corridor Area 6 1 x 1 63.90 3.15 201.29
Corridor Area 7 1 x 6 4.30 2.20 56.76
Corridor Area 8 1 x 1 49.00 4.30 210.70

Groceries & Vegetables


Shops Area 2 1 x 1 30.60 3.93 120.26
Shops Area 3 1 x 1 32.22 3.93 126.62

Ice Plant (Roof Tile)


Floor Area 1 x 1 35.45 35.45

Ice Plant Surrounding Area


Corridor Area 1 1 x 1 27.33 6.45 176.28
Corridor Area 2 1 x 1 27.33 6.19 169.17
Corridor Area 3 1 x 1 23.15 3.25 75.24
Corridor Area 4 1 x 1 28.94 4.17 120.68

Flowers & Vegetables


Floor Area Shop 1 x 1 55.55 3.89 216.09
Floor Area Shop 1 x 1 46.80 7.90 369.72
Floor Area Shop 1 x 1 50.46 3.89 196.29
Floor Area Shop 1 x 1 57.90 9.50 550.05

Chicken Shop
Floor Area Shop 1 x 1 28.20 2.63 74.17
Floor Area Shop 1 x 1 24.70 2.63 64.96
Floor Area Corridor 1 x 1 55.50 3.50 194.25

RCC Shopc Back Side Shops


Floor Area Shop 1 x 1 29.50 2.65 78.18
Floor Area Shop 1 x 1 27.74 2.70 74.90

Total Quantity = 4217.00 sqm


MAJOR UPGRADATION OF MADURAI RAILWAY JUNCCTION - DISMANTLING WORKS

ABSTRACT ESTIMATION - ABANDONED GLR & PUMP ROOM

S.No Item No Description of Item Quantity Rate Unit Amount

1 15.2.2 Nominal concrete 1:4:8 or leaner mix (including equivalent design mix) 2.20 1,239.60 cum 2,727.10

Demolishing R.C.C work manually / by mechanical means including stacking of


2 15.3 92.00 2,928.10 cum 269,385.20
steel bars and disposal of unserviceable material within 50 metres lead

Demolishing brick work manually / by mechanical means including stacking of


3 15.7.4 serviceable material and disposal of unserviceable material within 50 metres 14.20 1,698.45 cum 24,118.00
lead - in cement mortar

Dismantling doors, windows and clerestory windows (steel or wood) shutter


4 15.12.2 including chowkhats, architrave, holdfasts etc. 4.00 414.55 each 1,658.20
complete and stacking within 50 metres lead of area beyond 3 sq.metres

Total Amount 297,888.50

Total Amount in Lakhs 2.98


DETAILED ESTIMATE - ABANDONED GLR & PUMP ROOM

S No. Description Nos L B H Quantity Unit

1 Nominal concrete 1:4:8 or leaner mix (including equivalent design mix)

Flooring PCC
Flooring Inner Area 1 x 1 4.50 3.00 0.15 2.03
Front Side Entrance Steps 1 x 1 1.50 0.75 0.15 0.17

Total Quantity = 2.20 Cum

Demolishing R.C.C work manually / by mechanical means including stacking of steel bars and disposal of
2
unserviceable material within 50 metres lead

Columns
Column 1 1 x 4 0.30 0.30 2.85 1.03
Roof Beam
Beam 1 1 x 2 4.50 0.30 0.30 0.81
Beam 2 1 x 2 3.00 0.30 0.30 0.54
Roof Slab
Area 1 x 1 6.10 4.60 0.15 4.21
Sunshade 1 x 1 1.50 0.60 0.10 0.09

Back Side Sump


Sump Top Slab 1 x 1 11.40 13.00 0.11 16.30
Side Walls
Wall 1 1 x 2 13.00 0.45 2.65 31.01
Wall 2 1 x 3 10.60 0.45 2.65 37.92

Total Quantity = 92.00 Cum

Demolishing brick work manually / by mechanical means including stacking of serviceable material and
3
disposal of unserviceable material within 50 metres lead - in cement mortar

Brickwork
Wall 1(Outer Wall) 1 x 2 4.50 0.30 2.85 7.69
Wall 2(Outer Wall 1 x 2 2.40 0.30 2.85 4.10
Deductions
Door 1 -1 x 1 1.00 0.30 2.10 -0.63
Ventilator -1 x 3 1.00 0.30 0.60 -0.54
Front Side Entrtance Steps
Step 1 1 x 1 1.50 0.75 0.45 0.51
Step 2 1 x 1 1.50 0.50 0.15 0.11
Step 3 1 x 1 1.50 0.25 0.15 0.06
Brickwork - Basement
Wall 1 1 x 1 4.50 0.30 0.90 1.21
Wall 2 1 x 2 3.00 0.30 0.90 1.62

Total Quantity = 14.20 Cum

Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats,
4
architrave, holdfasts etc. complete and stacking within 50 metres lead of area beyond 3 sq.metres

Door 1 x 1 1.00
Ventilator 1 x 3 3.00
Total Quantity = 4.00 nos
MAJOR UPGRADATION OF MADURAI RAILWAY JUNCCTION - DISMANTLING WORKS

ABSTRACT ESTIMATION - ATM BLOCK

S.No Item No Description of Item Quantity Rate Unit Amount

1 15.2.2 Nominal concrete 1:4:8 or leaner mix (including equivalent design mix) 12.00 1,239.60 cum 14,875.00

Demolishing R.C.C work manually / by mechanical means including stacking of


2 15.3 35.00 2,928.10 cum 102,484.00
steel bars and disposal of unserviceable material within 50 metres lead

Demolishing brick work manually / by mechanical means including stacking of


3 15.7.4 serviceable material and disposal of unserviceable material within 50 metres 25.00 1,698.45 cum 42,461.00
lead - in cement mortar

Dismantling aluminium/ Gypsum partitions, doors, windows, fixed glazing and


4 15.57 false ceiling including disposal of unserviceable material and stacking of 151.00 46.50 sqm 7,022.00
serviceable material with in 50 meters lead as directed by Engineer-in-charge.

Dismantling tile work in floors and roofs laid in cement mortar including
5 15.23.1 89.00 60.50 sqm 5,385.00
stacking material within 50 metres lead - for thickness of tiles 10mm to 25mm

Demolishing mud phaska in terracing and disposal of material within 50 metres


6 15.27 7.00 753.75 Cum 5,276.00
lead.

Dismantling cement asbestos or other hard board ceiling or partition walls


7 15.41 including stacking of serviceable materials and disposal of unserviceable 89.00 46.50 sqm 4,139.00
materials within 50 metres lead.

Dismantling steel work in built up sections in angles, tees, flats and channels
8 15.18 including all gusset plates, bolts, nuts, cutting rivets ,welding etc.including 58.00 4.65 kg 270.00
dismembering and stacking within 50 metres lead

Dismantling doors, windows and clerestory windows (steel or wood) shutter


9 15.12.2 including chowkhats, architrave, holdfasts etc. 9.00 414.55 each 3,731.00
complete and stacking within 50 metres lead of area beyond 3 sq.metres

Total Amount 185,643.00

Total Amount in Lakhs 1.86


DETAILED ESTIMATE - ATM BLOCK

S No. Description Nos L B H Quantity Unit

1 Nominal concrete 1:4:8 or leaner mix (including equivalent design mix)

Flooring PCC
Flooring Area 1 x 1 15.46 6.65 0.10 10.29
Front Side Ramp Area 1 x 2 3.60 1.50 0.10 1.08

Total Quantity = 12.00 Cum

Demolishing R.C.C work manually / by mechanical means including stacking of steel bars and disposal of
2
unserviceable material within 50 metres lead

Column
Column1 1 x 6 0.40 0.40 3.20 3.07
Column2 1 x 6 0.38 3.20 7.39
Roof Beam
Beam 1 1 x 1 13.06 0.30 0.30 1.18
Beam 2 1 x 2 5.93 0.30 0.30 1.07
Beam 3 1 x 1 11.26 0.30 0.30 1.01
Add Column Junctions
Column1 1 x 6 0.38 0.40 0.30 0.27
Column2 1 x 6 0.38 0.30 0.69
Lintel Beam
Beam 1 1 x 1 13.06 0.30 0.15 0.59
Beam 2 1 x 2 5.92 0.30 0.15 0.53
Beam 3 1 x 1 11.26 0.30 0.15 0.51

Sunshade 1 x 2 1.50 0.60 0.18 0.32

Roof Slab
Area 1 x 1 15.47 6.70 0.15 15.55
Projections (Front Projection Slope) 1 x 1 15.47 1.21 0.15 2.81

Total Quantity = 35.00 Cum

Demolishing brick work manually / by mechanical means including stacking of serviceable material and
3
disposal of unserviceable material within 50 metres lead - in cement mortar

Brickwork
Wall 1(Outer Wall) 1 x 1 13.06 0.23 2.85 8.56
Wall 2(Outer Wall) 1 x 1 11.26 0.23 2.85 7.38
Wall 3(Outer Wall) 1 x 2 5.97 0.23 2.85 7.83
Deductions
MAIN Door MD -1 x 2 1.50 0.23 2.10 -1.45
Window W -1 x 4 2.50 0.23 1.40 -3.22
Window W1 -1 x 1 1.40 0.23 1.40 -0.45
Terrace Floor Parapet
Wall 1 1 x 2 15.48 0.23 0.60 4.27
Wall 2 1 x 2 6.70 0.23 0.60 1.85
Total Quantity = 25.00 Cum

Dismantling aluminium/ Gypsum partitions, doors, windows, fixed glazing and false ceiling includingdisposal
4 of unserviceable material and stacking of serviceable material with in 50 meters lead as directed by Engineer-
in-charge.

Aluminium Partition Wall


Wall 1 1 x 1 15.00 2.90 43.50
Wall 2 1 x 8 3.63 3.05 88.57
Wall 3 1 x 1 5.90 3.05 18.00

Total Quantity = 151.00 Sqm

Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres
5
lead - for thickness of tiles 10mm to 25mm

Flooring
Floor Area Inner 1 x 1 15.00 5.90 88.50

Total Quantity = 89.00 Sqm

6 Demolishing mud phaska in terracing and disposal of material within 50 metres lead.

Roof Area 1 x 1 15.00 5.90 0.08 6.64

Total Quantity = 7.00 Cum

Dismantling cement asbestos or other hard board ceiling or partition walls including stacking of serviceable
7
materials and disposal of unserviceable materials within 50 metres lead.

Ceiling Area 1 x 1 15.00 5.90 88.50

Total Quantity = 89.00 Sqm

Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts,
8
nuts, cutting rivets ,welding etc.including dismembering and stacking within 50 metres lead

SS Hand Rails Unit Wt


Top Rod (25mm Dia) 2 x 2 4.55 1.99 36.22
Vertical Rod (25mm Dia) 2 x 6 0.90 1.99 21.49

Total Quantity = 58.00 Kg

Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats,
9
architrave, holdfasts etc. complete and stacking within 50 metres lead of area beyond 3 sq.metres

Rolling shutter 1 x 2 2.00


Glass Door 1 x 2 2.00
Window 1 x 4 4.00
Window 1 1 x 1 1.00

Total Quantity = 9.00 nos

10 Existing Electrical Point Details

Light Point - wire only (without light ) 1 x 2 2.00 nos

2 pole MCB 1 x 1 1.00 nos


Single pole MCB 1 x 3 3.00 nos
Switch plate with box 3M 1 x 1 1.00 nos
6A Switch 1 5 5.00 nos
5 pin Socket 1 2 2.00 nos
3 pin Socket 1 1 1.00 nos
Main income supply panel with 125A
1 1 1.00 nos
Breaker (10 comportment)
Mettal glad socket ( without cover) 1 x 9 9.00 nos
Mettal glad socket ( with cover) 1 x 1 1.00 nos
wooden switch plate 6M 1 1 1.00 nos
Total Quantity = 27.00 nos
MAJOR UPGRADATION OF MADURAI RAILWAY JUNCCTION - DISMANTLING WORKS

ABSTRACT ESTIMATION - TOILET BLOCK

S.No Item No Description of Item Quantity Rate Unit Amount

1 15.2.2 Nominal concrete 1:4:8 or leaner mix (including equivalent design mix) 15.00 1,239.60 cum 18,594.00

Demolishing R.C.C work manually / by mechanical means including


2 15.3 stacking of steel bars and disposal of unserviceable material within 50 36.00 2,928.10 cum 105,412.00
metres lead

Demolishing brick work manually / by mechanical means including


3 15.7.4 stacking of serviceable material and disposal of unserviceable material 55.00 1,698.45 cum 93,415.00
within 50 metres lead - in cement mortar

Dismantling tile work in floors and roofs laid in cement mortar including
4 15.23.1 stacking material within 50 metres lead - for thickness of tiles 10mm to 551.00 60.50 sqm 33,336.00
25mm

Dismantling doors, windows and clerestory windows (steel or wood)


shutter including chowkhats, architrave, holdfasts etc.
6 15.12.2 0.00 414.55 each -
complete and stacking within 50 metres lead of area beyond 3
sq.metres

Demolishing mud phaska in terracing and disposal of material within 50


7 15.27 8.70 753.75 Cum 6,558.00
metres lead.

Dismantling steel work in built up sections in angles, tees, flats and


8 15.18 channels including all gusset plates, bolts, nuts, cutting rivets ,welding 76.30 4.65 kg 355.00
etc.including dismembering and stacking within 50 metres lead

Total Amount 257,670.00

Total Amount in Lakhs 2.58


DETAILED ESTIMATE - TOILET BLOCK
S No. Description Nos L B H Quantity Unit

1 Nominal concrete 1:4:8 or leaner mix (including equivalent design mix)

Flooring PCC
Floor Inner Area 1 x 1 21.25 6.00 0.10 12.75
Front Side Ramp Area 1 x 1 12.00 1.20 0.10 1.44

Total Quantity = 15.00 Cum

Demolishing R.C.C work manually / by mechanical means including stacking of steel bars and disposal of
2
unserviceable material within 50 metres lead

Column
Column C1 1 x 14 0.30 0.38 3.25 5.19
Column Parapet Projection 1 x 14 0.30 0.38 0.30 0.48
Roof Beam
Beam 1 1 x 2 19.27 0.30 0.30 3.47
Beam 2 1 x 7 5.54 0.30 0.30 3.49
Roof Slab
Roof Area 1 x 1 21.25 6.00 0.15 19.13
Front Side Projection 1 x 1 21.25 0.50 0.15 1.59
Open Area -1 x 1 3.80 2.64 0.15 -1.50
Entrance Sunshade 1 x 1 5.50 0.50 0.15 0.41
Lintel Beam
Outer Wall
Wall 1 1 x 2 19.27 0.23 0.15 1.33
Wall 2 1 x 4 5.54 0.23 0.15 0.76
Wall 3 1 x 1 1.64 0.23 0.15 0.06
Inner Wall
Wall 1 1 x 2 7.20 0.15 0.15 0.32
Wall 2 1 x 3 1.77 0.15 0.15 0.12
Wall 3 1 x 3 2.00 0.15 0.15 0.13
Wall 4 1 x 1 6.99 0.15 0.15 0.16
Wall 5 1 x 2 7.69 0.15 0.15 0.35
Wall 6 1 x 5 1.77 0.15 0.15 0.20
Wall 7 1 x 5 2.00 0.15 0.15 0.22

Total Quantity = 36.00 Cum

Demolishing brick work manually / by mechanical means including stacking of serviceable material and
3
disposal of unserviceable material within 50 metres lead - in cement mortar

Brickwork
Outer Wall
Wall 1(Outer Wall) 1 x 2 19.64 0.23 3.25 29.36
Wall 2(Outer Wall) 1 x 3 5.54 0.23 3.25 12.42
Wall 3(Frontier Middle) 1 x 1 1.64 0.23 3.25 1.23
Toilet Inner Walls
Ladies Rest room
Wall (Corrider Wall) 1 x 2 7.20 0.15 2.10 4.54
Wall 2(Toilet Walls) 1 x 3 1.77 0.15 2.10 1.67
Wall 3 1 x 3 2.00 0.15 2.10 1.89
Gents Rest Room
Wall 4(gents restroom) 1 x 1 6.99 0.15 2.10 2.20
Wall 5(Corrider Wall) 1 x 1 7.69 0.15 2.10 2.42
Wall 6(Toilet Walls) 1 x 5 1.77 0.15 2.10 2.79
Wall 7 1 x 5 2.00 0.15 2.10 3.15
Wall 8(Washbasin near Wall) 1 x 2 1.20 0.15 2.10 0.76
Deduction
CG Gate -1 x 2 1.20 0.23 2.10 -1.16
IG -1 x 1 0.95 0.23 2.10 -0.46
Ventilator V1 -1 x 5 1.00 0.23 0.60 -0.69
Ventilator V2 -1 x 1 0.95 0.23 0.60 -0.13
Ventilator V4 -1 x 13 0.60 0.23 0.60 -1.08
Ventilator V3 -1 x 1 0.80 0.23 0.60 -0.11
Door D1 -1 x 15 0.75 0.15 2.10 -3.54
Sliding Door -1 x 2 0.75 0.15 2.10 -0.47
Total Quantity = 55.00 Cum

Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50
4
metres lead - for thickness of tiles 10mm to 25mm

Flooring Area
Floor Inner Area 1 x 1 20.79 5.54 115.18
Front Side Ramp Area 1 x 1 12.00 1.20 14.40
Wash Area 1 x 1 1.25 0.50 0.63
Roof Tile
Roof Area 1 x 1 20.79 5.54 115.18
Dadooing Wall Tile
Ladies Toilet
W/C Toilet 1 x 4 6.92 2.10 58.13
Bath 1 x 2 6.50 2.10 27.30
PH Toilet 1 x 1 7.46 2.10 15.67
Passage Area 1 x 1 17.70 2.10 37.17
Wash Area 1 x 1 8.55 2.10 17.96
Door D1 -1 x 12 0.75 2.10 -18.90
Sliding Door -1 x 2 0.75 2.10 -3.15
Gents Toilet
W/C Toilet 1 x 4 6.14 2.10 51.58
Bath 1 x 3 6.60 2.10 41.58
W/C Toilet 1 x 1 5.78 2.10 12.14
Bath 1 x 1 6.40 2.10 13.44
PH Toilet 1 x 1 7.46 2.10 15.67
Passage Area 1 x 1 16.33 2.10 34.29
Wash Area & Urinals 1 x 1 15.96 2.10 33.52
Door -1 x 18 0.75 2.10 -28.35
Sliding Door -1 x 2 0.75 2.10 -3.15

Total Quantity = 551.00 sqm

Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats,
5
architrave, holdfasts etc. complete and stacking within 50 metres lead of area beyond 3 sq.metres

CG 1 x 0 0.00
IG 1 x 0 0.00
Ventilator V1 1 x 0 0.00
Ventilator V2 1 x 0 0.00
Ventilator V4 1 x 0 0.00
Ventilator V3 1 x 0 0.00
Door D1 1 x 0 0.00
Sliding Door 1 x 0 0.00

Total Quantity = 0.00 nos

6 Demolishing mud phaska in terracing and disposal of material within 50 metres lead.

Roof Area 1 x 1 20.79 5.54 0.08 8.64

Total Quantity = 8.70 Cum

Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates,
7
bolts, nuts, cutting rivets ,welding etc.including dismembering and stacking within 50 metres lead

SS Hand Rails Unit Wt


Gents Toilet Front Side
Top Rod (25mm Dia) 1 x 2 6.75 1.99 26.87
Vertical Rod (25mm Dia) 1 x 8 0.90 1.99 14.33
Ladies Toilet Front Side
Top Rod (25mm Dia) 1 x 2 5.20 1.99 20.70
Vertical Rod (25mm Dia) 1 x 8 0.90 1.99 14.33

Total Quantity = 76.30 Kg


8 Existing Electrical Point Details
Light Point - Tube Light 1 x 0 0.00 nos
DETAILED ESTIMATE -ABANDONED BUILDING
S No. Description Nos L B H Quantity Unit

1 Nominal concrete 1:4:8 or leaner mix (including equivalent design mix)

Flooring PCC
Ground Floor
Flooring Area Inner 1 x 1 19.55 5.30 0.10 10.36
Front Side Steps Area 1 x 4 1.25 0.60 0.10 0.30
First Floor
Flooring Area Inner 1 x 1 19.55 5.30 0.10 10.36
Front Side Corridor Area 1 x 1 19.55 5.30 0.10 10.36

Total Quantity = 31.40 Cum

Demolishing R.C.C work manually / by mechanical means including stacking of steel bars and disposal of
2
unserviceable material within 50 metres lead

Ground Floor
Column
Column1 1 x 12 0.39 0.39 3.15 5.75
Roof Beam
Beam 1 1 x 2 17.21 0.30 0.15 1.55
Beam 2 1 x 8 4.84 0.30 0.15 1.74
Add Column Junction
Column1 1 x 12 0.39 0.39 0.15 0.27
Lintel Beam
Wall 1 1 x 1 17.21 0.39 0.15 1.01
Wall 2 (front side ) from A 1 x 1 6.29 0.39 0.15 0.37
Wall 3 (front side ) from D 1 x 1 6.93 0.39 0.15 0.41
Wall 4 (side wall) 1 x 6 4.52 0.39 0.15 1.59
Wall 5 (toilt) 1 x 1 3.00 0.39 0.15 0.18
Wall 6 (STAIR) 1 x 1 2.23 0.39 0.15 0.13
Roof Slab
Area 1 x 1 19.55 6.80 0.15 19.94
Projections (Front Projection Slope) 1 x 1 19.55 0.45 0.20 1.76
Staircase
Flight Slab 1 1 x 1 4.36 1.50 0.15 0.98
Flight Slab 2 1 x 1 2.03 1.50 0.15 0.46
Landing 1 1 x 1 1.16 3.00 0.15 0.52
Steps 21 x 0.5 1.50 0.30 0.15 0.71
Sunshade
Wooden Window 1 x 1 3.83 0.60 0.10 0.23
Wooden Window 1 x 1 2.10 0.60 0.10 0.13
Wooden Window 1 x 1 3.94 0.60 0.10 0.24
Wooden Window 1 x 1 2.21 0.60 0.10 0.13

Hand Rail Wall 1 x 1 4.36 0.20 1.00 0.87


Hand Rail Wall 1 x 1 2.03 0.20 1.00 0.41

First Floor
Column
Column1 1 x 12 0.39 0.39 2.70 4.93
Roof Beam
Beam 1 1 x 2 17.21 0.30 0.15 1.55
Beam 2 1 x 8 4.68 0.30 0.15 1.68
Lintel Beam
Wall 1 1 x 1 17.21 0.23 0.15 0.59
Wall 2 (front side ) from A 1 x 1 6.29 0.23 0.15 0.22
Wall 3 (front side ) from D 1 x 1 6.93 0.23 0.15 0.24
Wall 4 (side wall) 1 x 6 4.52 0.23 0.15 0.94
Wall 5 (toilt) 1 x 2 3.00 0.23 0.15 0.21
Wall 6 (STAIR) 1 x 2 2.23 0.23 0.15 0.15
Roof Slab
Area 1 x 1 19.55 6.80 0.15 19.94
Projections (Front Projection Slope) 1 x 1 19.55 0.45 0.20 1.76
Sunshade
Wooden Window 1 x 1 3.83 0.60 0.10 0.23
Wooden Window 1 x 1 2.10 0.60 0.10 0.13
Wooden Window 1 x 1 3.94 0.60 0.10 0.24
Wooden Window 1 x 1 2.21 0.60 0.10 0.13

Terrace Floor
Column
Column1 1 x 12 0.23 0.23 0.30 0.19

Total Quantity = 72.50 Cum

Demolishing brick work manually / by mechanical means including stacking of serviceable material and
3
disposal of unserviceable material within 50 metres lead - in cement mortar

Ground Floor
Brickwork
Wall 1(Outer Wall) 1 x 1 17.21 0.39 2.55 17.12
Wall 2(Entrance Wall) 1 x 1 6.29 0.39 2.55 6.26
Wall 3(Entrance Wall) 1 x 1 6.93 0.39 2.55 6.89
Wall 4(Room Walls) 1 x 6 4.52 0.39 2.55 26.97
Wall 5(Toilet Area) 1 x 1 3.00 0.39 2.55 2.98
Wall 6(Toilet Area) 1 x 1 2.23 0.39 2.55 2.22
Deductions
Door DD -1 x 4 1.20 0.39 2.20 -4.12
Door D 1 (plastic) -1 x 2 0.73 0.39 2.10 -1.20
Door D 1 (steel) -1 x 1 0.65 0.39 2.10 -0.53
Window W1 -1 x 7 1.04 0.39 1.50 -4.26
Ventilatro V -1 x 2 0.90 0.39 0.60 -0.42
Front Side Entrance Steps
Steps 1 1 x 4 1.25 0.60 0.15 0.45
Steps 2 1 x 4 1.25 0.30 0.15 0.22
Stair Front
Steps 1 1 x 1 3.00 0.60 0.15 0.27
Steps 2 1 x 1 3.00 0.30 0.15 0.13

First Floor
Brickwork
Wall 1(Outer Wall) 1 x 1 17.21 0.39 2.55 17.12
Wall 2(front side ) 1 x 1 6.29 0.39 2.55 6.26
Wall 3(front side ) 1 x 1 6.93 0.39 2.55 6.89
Wall 4(Room Walls) 1 x 6 4.52 0.39 2.55 26.97
Wall 5(Toilet Walls) 1 x 2 3.00 0.39 2.55 5.97
Wall 6(Toilet Walls) 1 x 2 2.23 0.39 2.55 4.44
Wall 7(Toilet Walls) 1 x 1 1.80 0.39 2.90 2.04
Corrider Wall 1 x 1 19.55 0.10 0.90 1.76
Deductions
Door DD -1 x 4 0.90 0.39 2.10 -2.95
Door D 1 plastic -1 x 3 0.73 0.39 2.10 -1.79
Window W1 -1 x 6 1.04 0.39 1.50 -3.65
Ventilatro V -1 x 2 0.90 0.39 0.60 -0.42

Terrace Floor Parapet


Wall 1 1 x 2 19.55 0.39 0.30 4.57
Wall 2 1 x 2 5.30 0.23 0.30 0.73

Total Quantity = 121.00 Cum

Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres
4
lead - for thickness of tiles 10mm to 25mm

Roof Tile
Roof Area Inner 1 x 1 18.77 4.52 84.84

Total Quantity = 84.90 Sqm

5 Demolishing mud phaska in terracing and disposal of material within 50 metres lead.

Roof Area Inner 1 x 1 19.55 4.52 0.08 6.63

Total Quantity = 6.70 Cum

Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts,
6
nuts, cutting rivets ,welding etc.including dismembering and stacking within 50 metres lead

Grills Kg/Sqm
Ground Floor
Window W1 1 x 7 1.10 1.50 15.00 173.25
First Floor
Window W1 1 x 6 1.10 1.50 15.00 148.50

Total Quantity = 322.00 Kg

Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats,
7
architrave, holdfasts etc. complete and stacking within 50 metres lead of area beyond 3 sq.metres

Ground Floor
Door DD 1 x 4 4.00
Door D1 plastic 1 x 2 2.00
Door D2 Steel 1 x 1 1.00
Window W1 1 x 7 7.00
Ventilatro V 1 x 2 2.00
First Floor
Door WD 1 x 4 4.00
Door D1 plastic 1 x 3 3.00
Window W1 1 x 6 6.00
Ventilatro V 1 x 3 3.00

Total Quantity = 32.00 nos

8 Existing Electrical Point Details

Light Point 1 x 8 8.00 nos


Fan Point (Ceiling) 1 x 8 8.00 nos
Ground floor 0.00 nos
Room 1
Light Point 1 3 3.00 nos
Fan Point (Ceiling) 1 1 1.00 nos
5A Switch 1 3 3.00 nos
5A socket 1 1 1.00 nos
5 M box (wood) 1 1 1.00 nos
Room 2
Light Point 1 3 3.00 nos
Fan Point (Ceiling) 1 2 2.00 nos
Room 3
Light Point 1 1 1.00 nos
Fan Point (Ceiling) 1 1 1.00 nos
Tube light set 1 1 1.00 nos
Ceiling fan 1 1 1.00 nos
5A Switch 1 3 3.00 nos
5A Socket 1 1 1.00 nos
Fan Regulator 1 1 1.00 nos
12M Box (wood) 1 1 1.00 nos
Toilet: light point 1 1 1.00 nos
First floor
Room 1
Light point 1 3 3.00 nos
Fan Point (Ceiling) 1 1 1.00 nos
Room 2
Light point 1 3 3.00 nos
Fan Point (Ceiling) 1 1 1.00 nos
Tube light Frame 1 2 2.00 nos
MAJOR UPGRADATION OF MADURAI RAILWAY JUNCCTION - DISMANTLING WORKS

ABSTRACT ESTIMATION - EXISTING ABANDONED QUARTERS TYPE 1

S.No Item No Description of Item Quantity Rate Unit Amount

1 15.2.2 Nominal concrete 1:4:8 or leaner mix (including equivalent design mix) 26.60 1,239.60 cum 32,973.00

Demolishing R.C.C work manually / by mechanical means including stacking of


2 15.3 171.80 2,928.10 cum 503,048.00
steel bars and disposal of unserviceable material within 50 metres lead

Demolishing brick work manually / by mechanical means including stacking of


3 15.7.4 serviceable material and disposal of unserviceable material within 50 metres 116.60 1,698.45 cum 198,039.00
lead - in cement mortar

Dismantling tile work in floors and roofs laid in cement mortar including
4 15.23.1 275.00 60.50 sqm 16,638.00
stacking material within 50 metres lead - for thickness of tiles 10mm to 25mm

Demolishing mud phaska in terracing and disposal of material within 50 metres


5 15.27 20.70 753.75 Cum 15,603.00
lead.

Dismantling steel work in built up sections in angles, tees, flats and channels
6 15.18 including all gusset plates, bolts, nuts, cutting rivets ,welding etc.including Err:509 4.65 kg Err:509
dismembering and stacking within 50 metres lead

Dismantling doors, windows and clerestory windows (steel or wood) shutter


7 15.12.2 including chowkhats, architrave, holdfasts etc. 66.00 414.55 each 27,360.00
complete and stacking within 50 metres lead of area beyond 3 sq.metres

Dismantling cement asbestos or other hard board ceiling or partition walls


8 15.41 including stacking of serviceable materials and disposal of unserviceable Err:509 46.50 sqm Err:509
materials within 50 metres lead.

Total Amount Err:509

Total Amount in Lakhs Err:509


DETAILED ESTIMATE - EXISTING ABANDONED QUARTERS TYPE 1

S No. Description Nos L B H Quantity Unit

1 Nominal concrete 1:4:8 or leaner mix (including equivalent design mix)

Flooring PCC
Ground Floor
Room 1 1 x 2 3.66 7.10 0.10 5.20
Room 2 1 x 2 3.66 7.10 0.10 5.20
Room 3 1 x 2 3.50 7.10 0.10 4.97
Room 4 1 x 1 3.63 7.10 0.10 2.58
Room 5 1 x 1 3.77 7.10 0.10 2.68

Corrider Area 1 x 1 34.60 1.70 0.10 5.88

Total Quantity = 26.60 Cum

Demolishing R.C.C work manually / by mechanical means including stacking of steel bars and disposal of unserviceable
2
material within 50 metres lead

Ground Floor
Column
Column1 1 x 24 0.30 0.50 2.50 9.00
Column2 1 x 6 0.30 0.38 2.50 1.71
Roof Beam
Beam 1 1 x 3 30.10 0.30 0.30 8.13
Beam 2 1 x 1 34.60 0.30 0.30 3.11
Beam 4 1 x 8 8.90 0.30 0.30 6.41
Beam 5 1 x 2 8.26 0.30 0.30 1.49
Add Column Junction
Column1 1 x 24 0.30 0.50 0.30 1.08
Column2 1 x 6 0.30 0.38 0.30 0.21
Lintel Beam
Long Wall
Wall 1(Outer Wall) 1 x 1 30.10 0.23 0.15 1.04
Wall 2(Center Wall) 1 x 2 14.75 0.23 0.15 1.02
Wall 3(Outer Wall) 1 x 2 13.75 0.23 0.15 0.95
Short Wall
Wall 1(Toilet Wall) 1 x 8 2.57 0.23 0.15 0.71
Wall 2(Bath Room) 1 x 8 1.34 0.23 0.15 0.37
Wall 3(Toilet Wall) 1 x 2 1.28 0.23 0.15 0.09
Wall 4(Toilet Wall) 1 x 8 1.20 0.23 0.15 0.33
Wall 5(Toilet Wall) 1 x 2 1.10 0.23 0.15 0.08
Wall 6(Toilet Wall) 1 x 2 1.22 0.23 0.15 0.08
Wall 7(Toilet Wall) 1 x 1 1.25 0.23 0.15 0.04
Wall 8(Toilet Area) 1 x 1 1.40 0.23 0.15 0.05
Wall 9(Hall Area) 1 x 2 3.66 0.23 0.15 0.25
Wall 10(Hall Area) 1 x 2 3.49 0.23 0.15 0.24
Wall 11(Hall Area) 1 x 2 3.61 0.23 0.15 0.25
Wall 12(Hall Area) 1 x 1 3.63 0.23 0.15 0.13
Wall 13(Hall Area) 1 x 1 3.77 0.23 0.15 0.13
Entrance Wall 1 x 1 3.84 0.23 0.15 0.13

Roof Slab
Roof Area 1 x 1 34.00 8.80 0.15 44.88
Projections (Front Projection Slope) 1 x 1 34.00 0.45 0.15 2.30
Deductions
Staircase Area -1 x 1 3.01 2.50 0.15 -1.13

Staircase
Flight Slab 1 1 x 1 2.31 1.30 0.15 0.45
Flight Slab 2 1 x 1 3.53 1.30 0.15 0.69
Landing 1 1 x 1 2.50 1.37 0.15 0.51
Steps 19 x 0.5 1.30 0.30 0.15 0.56
Hand Rail Wall 1 x 1 2.31 0.20 1.00 0.46
Hand Rail Wall 1 x 1 3.53 0.20 1.00 0.71

First Floor
Column
Column1 1 x 24 0.30 0.50 2.35 8.46
Column2 1 x 6 0.30 0.38 2.35 1.61
Roof Beam
Beam 1 1 x 3 30.10 0.30 0.30 8.13
Beam 2 1 x 1 34.60 0.30 0.30 3.11
Beam 4 1 x 8 8.90 0.30 0.30 6.41
Beam 5 1 x 2 8.26 0.30 0.30 1.49
Add Column Junction
Column1 1 x 24 0.30 0.50 0.30 1.08
Column2 1 x 6 0.30 0.38 0.30 0.21

Lintel Beam
Long Wall
Wall 1(Outer Wall) 1 x 1 30.10 0.30 0.15 1.35
Wall 2(Center Wall) 1 x 2 14.75 0.30 0.15 1.33
Corrider Wall 1 x 2 13.75 0.30 0.15 1.24
Short Wall
Wall 3(Hall Area) 1 x 8 2.57 0.30 0.15 0.93
Wall 4(Hall Area) 1 x 8 1.34 0.30 0.15 0.48
Wall 3(Hall Area) 1 x 2 1.28 0.30 0.15 0.12
Wall 4(Hall Area) 1 x 8 1.20 0.30 0.15 0.43
Wall 5(Hall Area) 1 x 2 1.10 0.30 0.15 0.10
Wall 6(Hall Area) 1 x 2 1.22 0.30 0.15 0.11
Wall 9(ToiletWall) 1 x 1 1.25 0.30 0.15 0.06
Wall 10(ToiletWall) 1 x 1 1.40 0.30 0.15 0.06
Wall 11(Toilet Wall) 1 x 2 3.66 0.30 0.15 0.33
Wall 12(Bath Wall) 1 x 2 3.49 0.30 0.15 0.31
Wall 13(Bath Wall) 1 x 2 3.61 0.30 0.15 0.32
Wall 14(Toilet Wall) 1 x 1 3.63 0.30 0.15 0.16
Wall 15(Toilet Wall) 1 x 1 3.77 0.30 0.15 0.17
Wall 16(Toilet Wall)
Roof Area 1 x 1 34.00 8.80 0.15 44.88
Projections (Front Projection Slope) 1 x 1 34.00 0.45 0.15 2.30
Deductions
Staircase Area -1 x 1 3.01 2.50 0.15 -1.13
Terrace Floor
Column
Column1 1 x 24 0.30 0.50 0.30 1.08
Column2 1 x 6 0.30 0.38 0.30 0.21

Total Quantity = 171.80 Cum

Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of
3
unserviceable material within 50 metres lead - in cement mortar

Ground Floor
Long Wall
Wall 1(Outer Wall) 1 x 1 29.20 0.23 2.20 14.78
Wall 2(Center Wall) 1 x 2 13.28 0.23 2.20 13.44
Wall 3(Outer Wall) 1 x 2 13.42 0.23 2.20 13.58
Short Wall
Wall 1(Toilet Wall) 1 x 8 2.57 0.23 2.20 10.40
Wall 2(Bath Room) 1 x 8 1.34 0.23 2.20 5.42
Wall 3(Toilet Wall) 1 x 2 1.28 0.23 2.20 1.30
Wall 4(Toilet Wall) 1 x 8 1.20 0.23 2.20 4.87
Wall 5(Toilet Wall) 1 x 2 1.10 0.23 2.20 1.11
Wall 6(Toilet Wall) 1 x 2 1.22 0.23 2.20 1.23
Wall 7(Toilet Wall) 1 x 1 1.25 0.23 2.20 0.63
Wall 8(Toilet Area) 1 x 1 1.40 0.23 2.20 0.71
Wall 9(Hall Area) 1 x 2 3.66 0.23 2.20 3.70
Wall 10(Hall Area) 1 x 2 3.49 0.23 2.20 3.53
Wall 11(Hall Area) 1 x 2 3.61 0.23 2.20 3.65
Wall 12(Hall Area) 1 x 1 3.63 0.23 2.20 1.84
Wall 13(Hall Area) 1 x 1 3.77 0.23 2.20 1.91
Entrance Wall 1 x 1 3.00 0.23 2.20 1.52
Deductions
Door D1 -1 x 8 0.85 0.23 2.10 -3.28
Door D2 -1 x 8 0.80 0.23 2.10 -3.09
Door D3 -1 x 8 0.65 0.23 2.10 -2.51
Window W1 -1 x 8 0.80 0.23 1.50 -2.21
Ventilator V -1 x 8 0.60 0.23 0.60 -0.66
Entrance Way -1 x 1 1.60 0.23 3.00 -1.10
Wall Open -1 x 8 1.09 0.23 2.10 -4.21
Jali Window -1 x 8 2.20 0.23 0.90 -3.64
Entry Open -1 x 8 0.90 0.23 2.10 -3.48
Deductions
Door D -1 x 1 0.90 0.23 2.10 -0.43

First Floor
Long Wall
Wall 1(Outer Wall) 1 x 1 19.30 0.23 2.20 9.77
Wall 2(Center Wall) 1 x 1 12.93 0.23 2.20 6.54
Corrider Wall 1 x 1 25.82 0.23 2.20 13.06
Short Wall
Wall 3(Hall Area) 1 x 1 3.52 0.23 2.20 1.78
Wall 4(Hall Area) 1 x 1 3.60 0.23 2.20 1.82
Wall 3(Hall Area) 1 x 1 3.50 0.23 2.20 1.77
Wall 4(Hall Area) 1 x 1 3.61 0.23 2.20 1.83
Wall 5(Hall Area) 1 x 1 3.63 0.23 2.20 1.84
Wall 6(Hall Area) 1 x 1 3.77 0.23 2.20 1.91
Wall 9(ToiletWall) 1 x 5 2.57 0.23 2.20 6.50
Wall 10(ToiletWall) 1 x 5 1.34 0.23 2.20 3.39
Wall 11(Toilet Wall) 1 x 1 1.28 0.23 2.20 0.65
Wall 12(Bath Wall) 1 x 5 1.20 0.23 2.20 3.04
Wall 13(Bath Wall) 1 x 1 1.10 0.23 2.20 0.56
Wall 14(Toilet Wall) 1 x 1 1.22 0.23 2.20 0.62
Wall 15(Toilet Wall) 1 x 1 1.25 0.23 2.20 0.63
Wall 16(Toilet Wall) 1 x 1 1.39 0.23 2.20 0.70
Corrider Wall 1 1 x 1 13.53 0.23 0.86 2.68
Corrider Wall 2 1 x 1 3.52 0.23 0.86 0.70
Corrider Wall 3 1 x 1 3.82 0.23 0.86 0.76

Deductions
Door D1 -1 x 5 0.85 0.23 2.10 -2.05
Door D2 -1 x 5 0.80 0.23 2.10 -1.93
Door D3 -1 x 5 0.65 0.23 2.10 -1.57
Window W1 -1 x 5 0.80 0.23 1.50 -1.38
Ventilator V -1 x 5 0.60 0.23 0.60 -0.41
Wall Open -1 x 5 1.09 0.23 2.10 -2.63

Terrace Floor Parapet


Wall 1(Outer Wall) 1 x 2 30.10 0.30 0.30 5.42
Wall 2(Outer Wall) 1 x 2 8.65 0.30 0.30 1.56

Total Quantity = 116.60 Cum

Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead - for
4
thickness of tiles 10mm to 25mm

Roof Tile
Roof Area Inner 1 x 1 31.25 8.80 275.00

Total Quantity = 275.00 Sqm


5 Demolishing mud phaska in terracing and disposal of material within 50 metres lead.

Roof Area Inner 1 x 1 31.25 8.80 0.08 20.62

Total Quantity = 20.70 Cum

Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts,
6
cutting rivets ,welding etc.including dismembering and stacking within 50 metres lead

Grills Kg/Sqm
Ground Floor
Window W1 1 x 8 0.80 1.50 15.00 144.00
Ventilator V 1 x 8 0.60 0.60 10.00 28.80
First Floor
Window W1 1 x 5 0.80 1.50 15.00 90.00
Ventilator V 1 x 5 0.60 0.60 10.00 18.00

Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts
7
etc. complete and stacking within 50 metres lead of area beyond 3 sq.metres

Ground Floor
Door D 1 x 1 1.00 1.00
Door D1 1 x 1 8.00 8.00
Door D2 1 x 1 8.00 8.00
Door D3 1 x 1 8.00 8.00
Window W1 1 x 1 8.00 8.00
Ventilator V 1 x 1 8.00 8.00
First Floor
Door D1 1 x 1 5.00 5.00
Door D2 1 x 1 5.00 5.00
Door D3 1 x 1 5.00 5.00
Window W1 1 x 1 5.00 5.00
Ventilator V 1 x 1 5.00 5.00

Total Quantity = 66.00 Nos

Existing Electrical Point Details


Ground Floor
Light Point - Tube Light 1 x 8 8.00 nos
Fan Point (Ceiling) 1 x 8 8.00 nos
First Floor
Light Point - Tube Light 1 x 5 5.00 nos
Fan Point (Ceiling) 1 x 5 5.00 nos
MAJOR UPGRADATION OF MADURAI RAILWAY JUNCCTION - DISMANTLING WORKS

ABSTRACT ESTIMATION - EXISTING ABANDONED QUARTERS TYPE 3

S.No Item No Description of Item Quantity Rate Unit Amount

1 15.2.2 Nominal concrete 1:4:8 or leaner mix (including equivalent design mix) 24.90 1,239.60 cum 30,866.00

Demolishing R.C.C work manually / by mechanical means including stacking of


2 15.3 176.00 2,928.10 cum 515,346.00
steel bars and disposal of unserviceable material within 50 metres lead

Demolishing brick work manually / by mechanical means including stacking of


3 15.7.4 serviceable material and disposal of unserviceable material within 50 metres 136.90 1,698.45 cum 232,518.00
lead - in cement mortar

Dismantling tile work in floors and roofs laid in cement mortar including
4 15.23.1 284.90 60.50 sqm 17,236.00
stacking material within 50 metres lead - for thickness of tiles 10mm to 25mm

Demolishing mud phaska in terracing and disposal of material within 50 metres


5 15.27 21.40 753.75 Cum 16,130.00
lead.

Dismantling steel work in built up sections in angles, tees, flats and channels
6 15.18 including all gusset plates, bolts, nuts, cutting rivets ,welding etc.including 933.30 4.65 kg 4,340.00
dismembering and stacking within 50 metres lead

Dismantling doors, windows and clerestory windows (steel or wood) shutter


7 15.12.2 including chowkhats, architrave, holdfasts etc. 40.00 414.55 each 16,582.00
complete and stacking within 50 metres lead of area beyond 3 sq.metres

Dismantling cement asbestos or other hard board ceiling or partition walls


8 15.41 including stacking of serviceable materials and disposal of unserviceable 26.40 46.40 sqm 1,225.00
materials within 50 metres lead.

Total Amount 834,243.00

Total Amount in Lakhs 8.35


DETAILED ESTIMATE -EXISTING ABANDONED QUARTERS TYPE 3
S.no Description Nos L B H Quantity Unit
1 Nominal concrete 1:4:8 or leaner mix (including equivalent design mix)
Flooring PCC
Room 1 1 x 2 3.66 6.55 0.10 4.79
Room 2 1 x 1 3.50 6.55 0.10 2.29
Room 3 1 x 1 3.63 6.55 0.10 2.38

Corridor Area 1 x 1 16.00 1.70 0.10 2.72


Total Quantity = 12.20 Cum

Demolishing R.C.C work manually / by mechanical means including stacking of steel bars and disposal of unserviceable
2
material within 50 metres lead

Ground Floor
Column
Column1 1 x 12 0.40 0.50 2.50 6.00
Column2 1 x 3 0.40 0.50 2.50 1.50
Roof Beam
Wall 1(Outer Wall) 1 x 3 13.75 0.40 0.30 4.95
Wall 2(Center Wall) 1 x 1 15.20 0.40 0.30 1.82
Wall 3(Outer Wall) 1 x 4 6.95 0.40 0.30 3.34
Add Column Junction
Column1 1 x 12 0.40 0.40 0.30 0.58
Column2 1 x 6 0.40 0.40 0.30 0.29
Lintel Beam
Brickwork
Long Wall
Wall 1 1 x 1 13.75 0.40 0.15 0.83
Wall 2 1 x 2 8.65 0.40 0.15 1.04
Short Wall
Wall 1(Toilet Wall) 1 x 4 2.57 0.40 0.15 0.62
Wall 2(Bath Room) 1 x 4 1.34 0.40 0.15 0.32
Wall 3(Toilet Wall) 1 x 1 1.28 0.40 0.15 0.08
Wall 4(Toilet Wall) 1 x 4 1.20 0.40 0.15 0.29
Wall 5(Toilet Wall) 1 x 2 1.10 0.40 0.15 0.13
Wall 6(Toilet Wall) 1 x 2 1.22 0.40 0.15 0.15
Wall 7(Toilet Wall) 1 x 1 1.25 0.40 0.15 0.08
Wall 8(Toilet Area) 1 x 1 1.40 0.40 0.15 0.08
Wall 9(Hall Area) 1 x 2 3.66 0.40 0.15 0.44
Wall 10(Hall Area) 1 x 2 3.49 0.40 0.15 0.42
Wall 11(Hall Area) 1 x 2 3.61 0.40 0.15 0.43
Wall 12(Hall Area) 1 x 1 3.63 0.40 0.15 0.22
Wall 13(Hall Area) 1 x 1 3.77 0.40 0.15 0.23
Entrance Wall 1 x 1 3.84 0.40 0.15 0.23
Roof Slab
Area 1 x 1 16.00 9.40 0.15 22.56
Projections (Front Projection Slope) 1 x 1 16.00 0.45 0.15 1.08
Deductions
Staircase Area -1 x 1 3.25 2.10 0.15 -1.02
Staircase
Flight Slab 1 1 x 1 2.31 1.30 0.15 0.45
Flight Slab 2 1 x 1 3.53 1.30 0.15 0.69
Landing 1 1 x 1 2.50 1.37 0.15 0.51
Steps 19 x 0.5 1.30 0.30 0.15 0.56
Landing Beam 1 x 2 2.50 0.30 0.15 0.22
Hand Rail Wall 1 x 1 2.31 0.20 1.00 0.46
Hand Rail Wall 1 x 1 3.53 0.20 1.00 0.71

First Floor
Column
Column1 1 x 12 0.40 0.50 2.50 6.00
Column2 1 x 3 0.40 0.40 2.50 1.20
Roof Beam
Beam 1 1 x 3 13.75 0.40 0.30 4.95
Beam 2 1 x 1 15.20 0.40 0.30 1.82
Beam 4 1 x 4 6.95 0.40 0.30 3.34
Add Column Junction
Column1 1 x 12 0.40 0.40 0.30 0.58
Column2 1 x 6 0.40 0.40 0.30 0.29
Lintel Beam
Long Wall
Wall 1 1 x 1 13.75 0.40 0.15 0.83
Wall 2 1 x 2 8.65 0.40 0.15 1.04
Short Wall
Wall 1(Toilet Wall) 1 x 4 2.57 0.40 0.15 0.62
Wall 2(Bath Room) 1 x 4 1.34 0.40 0.15 0.32
Wall 3(Toilet Wall) 1 x 1 1.28 0.40 0.15 0.08
Wall 4(Toilet Wall) 1 x 4 1.20 0.40 0.15 0.29
Wall 5(Toilet Wall) 1 x 2 1.10 0.40 0.15 0.13
Wall 6(Toilet Wall) 1 x 2 1.22 0.40 0.15 0.15
Wall 7(Toilet Wall) 1 x 1 1.25 0.40 0.15 0.08
Wall 8(Toilet Area) 1 x 1 1.40 0.40 0.15 0.08
Wall 9(Hall Area) 1 x 2 3.66 0.40 0.15 0.44
Wall 10(Hall Area) 1 x 2 3.49 0.40 0.15 0.42
Wall 11(Hall Area) 1 x 2 3.61 0.40 0.15 0.43
Wall 12(Hall Area) 1 x 1 3.63 0.40 0.15 0.22
Wall 13(Hall Area) 1 x 1 3.77 0.40 0.15 0.23
Entrance Wall 1 x 1 3.84 0.40 0.15 0.23
Roof Slab
Area 1 x 1 16.00 9.40 0.15 22.56
Projections (Front Projection Slope) 1 x 1 16.00 0.45 0.15 1.08
Staircase
Flight Slab 1 1 x 1 2.31 1.30 0.15 0.45
Flight Slab 2 1 x 1 3.53 1.30 0.15 0.69
Landing 1 1 x 1 2.50 1.37 0.15 0.51
Steps 19 x 0.5 1.30 0.30 0.15 0.56
Hand Rail Wall 1 x 1 2.31 0.20 1.00 0.46
Hand Rail Wall 1 x 1 3.53 0.20 1.00 0.71

Terrace Floor
Column
Column1 1 x 12 0.40 0.50 0.30 0.72
Column2 1 x 3 0.40 0.50 0.30 0.18

Total Quantity = 102.00 Cum


Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of
3
unserviceable material within 50 metres lead - in cement mortar
GROUND FLOOR
Long wall
Wall 1 1 x 1 13.75 0.40 2.20 12.10
Wall 2 1 x 2 8.65 0.40 2.20 15.22
Short Wall
Wall 1(Toilet Wall) 1 x 4 2.57 0.40 2.20 9.05
Wall 2(Bath Room) 1 x 4 1.34 0.40 2.20 4.72
Wall 3(Toilet Wall) 1 x 1 1.28 0.40 2.20 1.13
Wall 4(Toilet Wall) 1 x 4 1.20 0.40 2.20 4.23
Wall 5(Toilet Wall) 1 x 2 1.10 0.40 2.20 1.94
Wall 6(Toilet Wall) 1 x 2 1.22 0.40 2.20 2.15
Wall 7(Toilet Wall) 1 x 1 1.25 0.40 2.20 1.10
Wall 8(Toilet Area) 1 x 1 1.40 0.40 2.20 1.23
Wall 9(Hall Area) 1 x 2 3.66 0.40 2.20 6.44
Wall 10(Hall Area) 1 x 2 3.49 0.40 2.20 6.14
Wall 11(Hall Area) 1 x 2 3.61 0.40 2.20 6.35
Wall 12(Hall Area) 1 x 1 3.63 0.40 2.20 3.19
Wall 13(Hall Area) 1 x 1 3.77 0.40 2.20 3.32
Deductions
Door D1 -1 x 8 0.90 0.40 1.98 -5.70
Door D2 plastic -1 x 4 0.65 0.40 1.98 -2.06
Door D3 plastic -1 x 4 0.65 0.40 1.98 -2.06
Window W1 -1 x 7 0.80 0.40 1.00 -2.24
Window W steel -1 x 1 0.80 0.40 1.00 -0.32
Ventilator V steel -1 x 4 0.80 0.40 0.60 -0.77
Wall Open kitchen -1 x 4 1.09 0.40 1.98 -3.45
Jali Window -1 x 8 2.20 0.40 1.00 -7.04
Steel Gate -1 x 2 0.98 0.40 1.97 -1.54
CupBoard (kitchen & Hall) -1 x 8 1.07 0.40 1.67 -5.72
FIRST FLOOR
Long wall
Wall 1 1 x 1 13.75 0.40 2.20 12.10
Wall 2 1 x 2 8.65 0.40 2.20 15.22
Short Wall
Wall 1(Toilet Wall) 1 x 4 2.57 0.40 2.20 9.05
Wall 2(Bath Room) 1 x 4 1.34 0.40 2.20 4.72
Wall 3(Toilet Wall) 1 x 1 1.28 0.40 2.20 1.13
Wall 4(Toilet Wall) 1 x 4 1.20 0.40 2.20 4.23
Wall 5(Toilet Wall) 1 x 2 1.10 0.40 2.20 1.94
Wall 6(Toilet Wall) 1 x 2 1.22 0.40 2.20 2.15
Wall 7(Toilet Wall) 1 x 1 1.25 0.40 2.20 1.10
Wall 8(Toilet Area) 1 x 1 1.40 0.40 2.20 1.23
Wall 9(Hall Area) 1 x 2 3.66 0.40 2.20 6.44
Wall 10(Hall Area) 1 x 2 3.49 0.40 2.20 6.14
Wall 11(Hall Area) 1 x 2 3.61 0.40 2.20 6.35
Wall 12(Hall Area) 1 x 1 3.63 0.40 2.20 3.19
Wall 13(Hall Area) 1 x 1 3.77 0.40 2.20 3.32
Deductions
Door D1 -1 x 8 0.90 0.40 1.98 -5.70
Door D2 plastic -1 x 4 0.65 0.40 1.98 -2.06
Door D3 plastic -1 x 4 0.65 0.40 1.98 -2.06
Window W1 -1 x 7 0.80 0.40 1.00 -2.24
Window W steel -1 x 1 0.80 0.40 1.00 -0.32
Ventilator V steel -1 x 4 0.80 0.40 0.60 -0.77
Wall Open kitchen -1 x 4 1.09 0.40 1.98 -3.45
Jali Window -1 x 8 2.20 0.40 1.00 -7.04
Steel Gate -1 x 2 0.98 0.40 1.97 -1.54
CupBoard (kitchen & Hall) -1 x 8 1.07 0.40 1.67 -5.72
Terrace Floor Parapet
Wall 1(Outer Wall) 1 x 2 13.50 0.40 0.30 3.24
Wall 2(Outer Wall) 1 x 2 8.32 0.40 0.30 2.00

Total Quantity = 100.10 Cum


Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead - for
#REF!
thickness of tiles 10mm to 25mm
Roof Tile
Roof Area Inner 1 x 1 16.00 9.40 150.40

Total Quantity = 150.40 Sqm


#REF! Demolishing mud phaska in terracing and disposal of material within 50 metres lead.
Roof Area Inner 1 x 1 16.00 9.40 0.08 11.28

Total Quantity = 11.30 Cum


Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts,
#REF!
cutting rivets ,welding etc.including dismembering and stacking within 50 metres lead
Kg/Sqm
Ground Floor
Window W1 1 x 4 0.80 1.00 15.00 48.00
Ventilator V 1 x 4 0.80 0.60 10.00 19.20
First Floor
Window W1 1 x 4 0.80 1.00 15.00 48.00
Ventilator V 1 x 4 0.80 0.60 10.00 19.20

Total Quantity = 134.40 Kg


Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave,
#REF!
holdfasts etc. complete and stacking within 50 metres lead of area beyond 3 sq.metres
Ground Floor
Door D1 1 x 1 8.00 8.00
Door D2 1 x 1 4.00 4.00
Door D3 1 x 1 4.00 4.00
Window W1 1 x 1 8.00 8.00
Ventilator V 1 x 1 4.00 4.00
First Floor
Door D1 1 x 1 8.00 8.00
Door D2 1 x 1 4.00 4.00
Door D3 1 x 1 4.00 4.00
Window W1 1 x 1 8.00 8.00
Ventilator V 1 x 1 4.00 4.00

Total Quantity = 28.00 Nos


Existing Electrical Point Details
Ground Floor

Room 359 D
Light Point 1 x 12 12.00 nos

Fan Point (Ceiling) 1 x 2 2.00 nos

6A Switch 1 x 14 14.00 nos

6A 5pin Socket 1 x 7 7.00 nos

Fan Regulator 1 x 2 2.00 nos

6A Switch and Socket 1 x 3 3.00 nos

6A 2Pin Socket 1 x 1 1.00 nos

Indicator 1 x 1 1.00 nos

Tube Light set 1 x 2 2.00 nos

Metter box 1 x 2 2.00 nos

20A 5Pin Switch and Socket 1 x 2 2.00 nos

Room 359C
Light Point 1 x 13 13.00 nos

Fan Point (Ceiling) 1 x 2 2.00 nos

6A Switch 1 x 15 15.00 nos

6A 5pin Socket 1 x 2 2.00 nos

Fan Regulator 1 x 3 3.00 nos

Metter box (Without metter ) 1 x 1 1.00 nos

Metter box (With metter ) 1 x 1 1.00 nos

Tube light set 1 x 3 3.00 nos

6A Switch and Socket 1 x 2 2.00 nos

Room 359 G & H


Light point 1 x 12 12.00 nos

Fan Point (Ceiling) 1 x 2 2.00 nos


Ceiling fan 1 x 2 2.00 nos

6A Switch 1 x 12 12.00 nos

6A 5pin Socket 1 x 2 2.00 nos

Metter box (With metter ) 1 x 2 2.00 nos

Fan Regulator 1 x 2 2.00 nos

Room 359 E & F


Light Point 1 x 8 8.00 nos

Fan Point (Ceiling) 1 x 2 2.00 nos

6A Switch 1 x 20 20.00 nos

6A 5pin Socket 1 x 2 2.00 nos

20A Switch 1 x 2 2.00 nos

20A 5Pin Socket 1 x 3 3.00 nos

Fan Regulator 1 x 2 2.00 nos

Metter box (With metter ) 1 x 2 2.00 nos

Tube Light set 1 x 3 3.00 nos

First Floor
Room 359 O & P
Tube Light set 1 x 1 1.00 nos

Room 359 I & J


Light Point 1 x 1 1.00 nos

Tube Light set 1 x 1 1.00 nos

Room 359 M
Tube Light ( Frame only) 1 x 1 1.00 nos

Corrider x
Light Point 1 x 7 7.00 nos

Stair case
Light point 1 x 2 2.00 nos

Main Board (Fuse Board) 1 x 1 1.00 nos


MAJOR UPGRADATION OF MADURAI RAILWAY JUNCCTION - DISMANTLING WORKS

GENERAL ABSTRACT OF COST

SI No. Description Total Amount In Lakhs

1 Civil Works 2,375,514.50

Total 2,375,514.50
DSR DATA 2022

MAIN DATA
Sl
Code Description Unit RATE
No.

Nominal concrete 1:4:8 or leaner mix (including equivalent design


1 15.2.2 cum 1,239.60
mix)

Demolishing R.C.C work manually / by mechanical means including


2 15.3 stacking of steel bars and disposal of unserviceable material within cum 2,928.10
50 metres lead

Demolishing brick work manually / by mechanical means including


3 15.7.4 stacking of serviceable material and disposal of unserviceable cum 1,698.45
material within 50 metres lead - in cement mortar

Demolishing brick work manually / by mechanical means including


stacking of serviceable material and disposal of unserviceable
4 15.7.2 cum 1,470.00
material within 50 metres lead - in lime mortar with old mughal
bricks

Dismantling tile work in floors and roofs laid in cement mortar


5 15.23.1 including stacking material within 50 metres lead - for thickness of sqm 60.50
tiles 10mm to 25mm

Dismantling steel work in built up sections in angles, tees, flats and


channels including all gusset plates, bolts, nuts, cutting
6 15.18 kg 4.65
rivets ,welding etc.including dismembering and stacking within 50
metres lead

Dismantling doors, windows and clerestory windows (steel or


wood) shutter including chowkhats, architrave, holdfasts etc.
7 15.12.2 each 414.55
complete and stacking within 50 metres lead of area beyond 3
sq.metres

Dismantling roofing including ridges, hips, valleys and gutters etc.,


8 15.28.1 sqm 136.00
and stacking the material within 50 metres lead of - G.S.sheet

Dismantling roofing including ridges, hips, valleys and gutters etc.,


9 15.28.2 sqm 63.75
and stacking the material within 50 metres lead of - Asbestos Sheet

Demolishing brick work manually / by mechanical means including


stacking of serviceable material and disposal of unserviceable
10 15.9.2 cum 2,027.10
material within 50 metres lead - in lime mortar with old mughal
bricks

Dismantling wood work in frames, trusses, purlins and rafters up to


11 15.14.1 10 metres span and 5 metres height including stacking the material cum 3,674.50
within 50 metres lead :

Demolishing mud phaska in terracing and disposal of material within 753.75


12 15.27 cum
50 metres lead.

Dismantling wooden boardings in lining of walls and partitions,


13 15.39 excluding supporting members but including stacking within 50 sqm 50.35
metres lead :
Dismantling cement asbestos or other hard board ceiling or partition
14 15.41 walls including stacking of serviceable materials and disposal of sqm 46.50
unserviceable materials within 50 metres lead.

Dismantling aluminium/ Gypsum partitions, doors, windows, fixed


glazing and false ceiling including disposal of unserviceable material
15 15.57 sqm 46.50
and stacking of serviceable material with in 50 meters lead as
directed by Engineer-in-charge.

Demolishing stone rubble masonry manually/ by mechanical means


including stacking of serviceable material and disposal of
16 15.9.1 Cum 954.80
unserviceable material within 50 metres lead as per direction of
Engineer-in-charge : In lime mortar

Demolishing stone rubble masonry manually/ by mechanical means


including stacking of serviceable material and disposal of
17 15.9.2 Cum 2,027.10
unserviceable material within 50 metres lead as per direction of
Engineer-in-charge : In Cement mortar
MAJOR UPGRADATION OF MADURAI RAILWAY JUNCCTION - DISMANTLING WORKS

ABSTRACT ESTIMATION - EB Room

S.No Item No Description of Item Quantity Rate Unit Amount

1 15.2.2 Nominal concrete 1:4:8 or leaner mix (including equivalent design mix) 15.83 1,239.60 cum 19,623.00

Demolishing R.C.C work manually / by mechanical means including stacking of


2 15.3 45.91 2,928.10 cum 134,441.00
steel bars and disposal of unserviceable material within 50 metres lead

Demolishing brick work manually / by mechanical means including stacking of


3 15.7.4 serviceable material and disposal of unserviceable material within 50 metres 40.70 1,698.45 cum 69,127.00
lead - in cement mortar

Demolishing stone rubble masonry manually/ by mechanical means including


4 15.9.1 stacking of serviceable material and disposal of unserviceable material within 56.00 954.80 cum 53,469.00
50 metres lead as per direction of Engineer-in-charge : In lime mortar

Dismantling tile work in floors and roofs laid in cement mortar including
5 15.23.1 147.60 60.50 sqm 8,930.00
stacking material within 50 metres lead - for thickness of tiles 10mm to 25mm

Demolishing mud phaska in terracing and disposal of material within 50 metres


6 15.27 11.10 753.75 Cum 8,367.00
lead.

Dismantling steel work in built up sections in angles, tees, flats and channels
7 15.18 including all gusset plates, bolts, nuts, cutting rivets ,welding etc.including 387.00 4.65 kg 1,800.00
dismembering and stacking within 50 metres lead

Dismantling doors, windows and clerestory windows (steel or wood) shutter


8 15.12.2 including chowkhats, architrave, holdfasts etc. 19.00 414.55 each 7,876.00
complete and stacking within 50 metres lead of area beyond 3 sq.metres

Total Amount 303,633.00

Total Amount in Lakhs 3.04


DETAILED ESTIMATE - EB ROOM

S.no Description Nos L B H Quantity Unit

1 Nominal concrete 1:4:8 or leaner mix (including equivalent design mix)

Flooring PCC
EB Room Old Building 1 x 1 17.30 3.85 0.10 6.66
EB Room 1 x 1 18.22 4.44 0.10 8.09
Inner Platform 1 x 1 3.00 1.80 0.20 1.08

Total Quantity = 15.83 Cum

Demolishing R.C.C work manually / by mechanical means including stacking of steel bars and disposal of
2
unserviceable material within 50 metres lead

Ground Floor
Column
EB Room
Column1 1 x 12 0.30 0.45 4.15 6.72
Roof Beam
EB Room
Beam 1 1 x 2 16.95 0.30 0.30 3.05
Beam 2 1 x 6 4.10 0.30 0.30 2.21
Add Column Junctions
Column1 1 x 12 0.30 0.45 0.30 0.49
EB Room Old Building - Tie Beam
Beam 1 1 x 2 17.90 0.30 0.30 3.22
Beam 2 1 x 2 3.85 0.30 0.30 0.69
Roof Slab
EB Room Old Building 1 x 1 17.90 4.45 0.15 11.95
EB Room 1 x 1 18.75 4.90 0.15 13.78
Sunshade
EB Room Old Building
Door 1 x 2 1.30 0.60 0.10 0.16
Ventilator 1 x 3 0.70 0.60 0.10 0.13
Lintel Beam
EB Room
Wall 1 1 x 2 17.30 0.23 0.15 1.19
Wall 2 1 x 2 4.10 0.23 0.15 0.28
Wall 3 1 x 1 2.30 0.23 0.15 0.08
EB Room Old Building
Wall 1 1 x 2 17.90 0.30 0.15 1.61
Wall 2 1 x 2 3.85 0.30 0.15 0.35

Total Quantity = 45.91 Cum

Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of
3
unserviceable material within 50 metres lead - in cement mortar

Ground Floor
EB Room
Wall 1(Outer wall) 1 x 2 17.30 0.23 4.00 31.83
Wall 2(Outer wall) 1 x 2 4.10 0.23 4.00 7.54
Wall 3(inner wall) 1 x 1 2.30 0.23 4.00 2.12
Deductions
Rolling Shutter RS -1 x 1 1.82 0.23 3.00 -1.26
Window W -1 x 11 1.20 0.23 1.50 -4.55
Terrace Floor
Parapet Wall
Wall 1 1 x 2 17.30 0.23 0.50 3.98
Wall 2 1 x 2 4.10 0.23 0.50 0.94

Total Quantity = 40.70 Cum

Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and
4
disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge : In lime mortar

EB Room Old Building


Wall 1(Outer wall) 1 x 2 17.90 0.30 4.15 44.57
Wall 2(Outer wall) 1 x 2 3.85 0.30 4.15 9.59
Deductions
Door D -1 x 2 1.10 0.30 2.10 -1.39
Ventilator W -1 x 3 1.20 0.30 1.50 -1.62
Ventilator V -1 x 1 0.75 0.30 0.60 -0.13
Ventilator V1 -1 x 1 0.60 0.30 0.60 -0.11
Terrace Floor
Parapet Wall
Wall 1 1 x 2 17.90 0.23 0.50 4.12
Wall 2 1 x 2 3.85 0.23 0.50 0.89

Total Quantity = 56.00 Cum

Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead -
5
for thickness of tiles 10mm to 25mm

Roof Tile
EB Room Old Building 1 x 1 17.30 3.85 66.61
EB Room 1 x 1 18.22 4.44 80.90

Total Quantity = 147.60 Sqm

6 Demolishing mud phaska in terracing and disposal of material within 50 metres lead.

Roof Tile
EB Room Old Building 1 x 1 17.30 3.85 0.08 5.00
EB Room 1 x 1 18.22 4.44 0.08 6.07

Total Quantity = 11.10 Cum

Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts,
7
cutting rivets ,welding etc.including dismembering and stacking within 50 metres lead

Grills Kg/Sqm
EB Room
Window W1 1 x 11 1.20 1.50 15.00 297.00
EB Room Old Building
Ventilator V 1 x 1 0.75 0.60 10.00 4.50
Ventilator V1 1 x 1 0.60 0.60 10.00 3.60
Ventilator W 1 x 3 1.20 1.50 15.00 81.00

Total Quantity = 387.00 Kg

Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave,
8
holdfasts etc. complete and stacking within 50 metres lead of area beyond 3 sq.metres

EB Room
Rolling Shutter 1 x 1 1.00
Window W 1 x 11 11.00
EB Room Old Building
Door D 1 x 2 2.00
Ventilator V 1 x 1 1.00
Ventilator V1 1 x 1 1.00
Ventilator W 1 x 3 3.00

Total Quantity = 19.00 Nos

9 Existing Electrical Point Details

EB Room
Light Point - Tube Light 1 x 8 8.00 nos
Fan Point (Ceiling) 1 x 4 4.00 nos
EB Room Old Building
Light Point - Tube Light 1 x 4 4.00 nos
Fan Point (Ceiling) 1 x 4 4.00 nos
MAJOR UPGRADATION OF MADURAI RAILWAY JUNCCTION - DISMANTLING WORKS

ABSTRACT ESTIMATION - SERVICE/UTILITY BUILDING

S.No Item No Description of Item Quantity Rate Unit Amount

1 15.2.2 Nominal concrete 1:4:8 or leaner mix (including equivalent design mix) 8.10 1,239.60 cum 10,041.00

Demolishing R.C.C work manually / by mechanical means including stacking of


2 15.3 1.60 2,928.10 cum 4,685.00
steel bars and disposal of unserviceable material within 50 metres lead

Demolishing brick work manually / by mechanical means including stacking of


3 15.7.4 serviceable material and disposal of unserviceable material within 50 metres 31.10 1,698.45 cum 52,822.00
lead - in cement mortar

Dismantling cement asbestos or other hard board ceiling or partition walls


4 15.41 including stacking of serviceable materials and disposal of unserviceable 70.00 46.50 sqm 3,255.00
materials within 50 metres lead.

Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres


5 15.14.1 0.20 3,674.50 Cum 735.00
span and 5 metres height including stacking the material within 50 metres lead :

Dismantling doors, windows and clerestory windows (steel or wood) shutter


6 15.12.2 including chowkhats, architrave, holdfasts etc. 6.00 414.55 each 2,487.00
complete and stacking within 50 metres lead of area beyond 3 sq.metres

Total Amount 74,025.00

Total Amount in Lakhs 0.75


DETAILED ESTIMATE - SERVICE/UTILITY BUILDING
S No. Description Nos L B H Quantity Unit

1 Nominal concrete 1:4:8 or leaner mix (including equivalent design mix)

Flooring PCC
Room Area Inner 1 x 3 2.90 6.20 0.15 8.09

Total Quantity = 8.10 Cum

Demolishing R.C.C work manually / by mechanical means including stacking of steel bars and disposal of
2
unserviceable material within 50 metres lead

Lintel Beam
Wall 1 1 x 2 9.62 0.23 0.15 0.66
Wall 2 1 x 4 6.20 0.23 0.15 0.86

Total Quantity = 1.60 Cum

Demolishing brick work manually / by mechanical means including stacking of serviceable material and
3
disposal of unserviceable material within 50 metres lead - in cement mortar

Brickwork
Wall 1 (Front Wall) 1 x 1 9.62 0.23 3.45 7.63
Wall 2 (Back Wall) 1 x 1 9.62 0.23 3.15 6.97
Wall 3 (Side Wall) 1 x 4 6.20 0.23 3.30 18.82
Deductions
Door D1 -1 x 3 1.00 0.23 2.10 -1.45
Window W1 -1 x 3 0.90 0.23 1.50 -0.93

Total Quantity = 31.10 Cum

Dismantling cement asbestos or other hard board ceiling or partition walls including stacking of serviceable
4
materials and disposal of unserviceable materials within 50 metres lead.

Roof Area
Area 1 x 1 9.62 7.27 69.94

Total Quantity = 70.00 Sqm

Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height
5
including stacking the material within 50 metres lead :

Roof Wooden Purlin


Rectangular Shape 1 x 3 9.62 0.05 0.10 0.14

Total Quantity = 0.20 Cum

Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats,
6
architrave, holdfasts etc. complete and stacking within 50 metres lead of area beyond 3 sq.metres

Door D1 1 x 3 3.00
Window W1 1 x 3 3.00

Total Quantity = 6.00 nos


7 Existing Electrical Point Details
Light Point - Tube Light 1 x 6 6.00 nos
Fan Point (Ceiling) 1 x 3 3.00 nos
MAJOR UPGRADATION OF MADURAI RAILWAY JUNCCTION - DISMANTLING WORKS

ABSTRACT ESTIMATION - EXISTING CANTEEN BUILDING

S.No Item No Description of Item Quantity Rate Unit Amount

1 15.2.2 Nominal concrete 1:4:8 or leaner mix (including equivalent design mix) 34.80 1,239.60 cum 43,138.00

Demolishing R.C.C work manually / by mechanical means including stacking of


2 15.3 15.90 2,928.10 cum 46,557.00
steel bars and disposal of unserviceable material within 50 metres lead

Demolishing brick work manually / by mechanical means including stacking of


3 15.7.4 serviceable material and disposal of unserviceable material within 50 metres 85.10 1,698.45 cum 144,538.00
lead - in cement mortar

Dismantling aluminium/ Gypsum partitions, doors, windows, fixed glazing and


4 15.57 false ceiling including disposal of unserviceable material and stacking of 341.00 46.50 sqm 15,857.00
serviceable material with in 50 meters lead as directed by Engineer-in-charge.

Dismantling tile work in floors and roofs laid in cement mortar including
5 15.23.1 389.30 60.50 sqm 23,553.00
stacking material within 50 metres lead - for thickness of tiles 10mm to 25mm

Dismantling cement asbestos or other hard board ceiling or partition walls


6 15.41 including stacking of serviceable materials and disposal of unserviceable 384.60 46.50 sqm 17,884.00
materials within 50 metres lead.

Dismantling steel work in built up sections in angles, tees, flats and channels
7 15.18 including all gusset plates, bolts, nuts, cutting rivets ,welding etc.including 1746.30 4.65 Kg 8,120.00
dismembering and stacking within 50 metres lead

Dismantling doors, windows and clerestory windows (steel or wood) shutter


8 15.12.2 including chowkhats, architrave, holdfasts etc. complete and stacking within 50 27.00 414.55 each 11,193.00
metres lead of area beyond 3 sq.metres

Total Amount 310,840.00

Total Amount in Lakhs 3.11


DETAILED ESTIMATE - EXISTING CANTEEN BUILDING

S No. Description Nos L B H Quantity Unit

1 Nominal concrete 1:4:8 or leaner mix (including equivalent design mix)

Flooring PCC
Toilet Inner Area 1 x 1 2.56 7.00 0.10 1.79
Canteen Area 1 1 x 1 6.53 7.00 0.10 4.57
Canteen Area 2 1 x 1 14.17 12.27 0.10 17.39
Staff Room 1 x 1 2.74 7.00 0.10 1.92
Railway Staff Association Rest Room 1 x 1 6.04 7.00 0.10 4.23
Railway Staff Association Room 1 x 1 6.00 7.00 0.10 4.20
Outer Staff Toilet 1 x 2 1.45 2.15 0.10 0.62

Total Quantity = 34.80 Cum

Demolishing R.C.C work manually / by mechanical means including stacking of steel bars and disposal of
2
unserviceable material within 50 metres lead

Columns
Column 1 1 x 23 0.30 0.40 3.45 9.52
Lintel Beam
Wall 1 1 x 2 26.40 0.23 0.15 1.82
Wall 2 1 x 1 7.23 0.23 0.15 0.25
Wall 3 1 x 1 6.90 0.23 0.15 0.24
Wall 4 1 x 1 6.86 0.23 0.15 0.24
Wall 5 1 x 1 2.15 0.23 0.15 0.07
Wall 1 - Rectangle Area 1 x 1 11.15 0.23 0.15 0.38
Wall 1 - Triangle Area 1 x 0.5 11.15 0.23 0.15 0.19
Wall 2 - Rectangle Area 1 x 1 11.55 0.23 0.15 0.40
Wall 2 - Triangle Area 1 x 0.5 11.55 0.23 0.15 0.20
Wall 3 1 x 1 2.80 0.23 0.15 0.10
Wall 4 1 x 1 2.60 0.23 0.15 0.09
Wall 5 1 x 1 11.55 0.23 0.15 0.40
Wall 6 1 x 2 1.80 0.23 0.15 0.12
Partition Wall
Wall 1 1 x 2 2.15 0.12 0.15 0.07
Wall 2 1 x 1 7.00 0.12 0.15 0.12
Wall 3 1 x 4 1.45 0.12 0.15 0.10

Sunshade
Door 1 1 x 2 1.20 0.60 0.10 0.14
Door 2 1 x 2 1.20 0.60 0.10 0.14
Window W1 1 x 2 1.20 0.60 0.10 0.14
Window W2 1 x 9 2.10 0.60 0.10 1.13

Total Quantity = 15.90 Cum

Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of
3
unserviceable material within 50 metres lead - in cement mortar

Brickwork
Wall 1(Outer Wall) 1 x 2 26.40 0.23 3.15 38.25
Wall 2(Toilet Wall) 1 x 1 7.23 0.23 3.15 5.24
Wall 3(Railway Staff Association Restroom
1 x 1 6.90 0.23 3.15 5.00
Room)
Wall 4 1 x 1 6.86 0.23 3.15 4.97
Wall 5 1 x 1 2.15 0.23 2.50 1.24

Wall 1 - Rectangle Area 1 x 1 11.15 0.23 3.15 8.08


Wall 1 - Triangle Area 1 x 0.5 11.15 0.23 1.05 1.35
Wall 2 - Rectangle Area 1 x 1 11.55 0.23 3.15 8.37
Wall 2 - Triangle Area 1 x 0.5 11.55 0.23 1.05 1.39
Wall 3(Staff Room) 1 x 1 2.80 0.23 3.15 2.03
Wall 4 1 x 1 2.60 0.23 3.15 1.88
Wall 5 1 x 1 11.55 0.23 3.15 8.37
Wall 6 1 x 2 1.80 0.23 2.50 2.07

Partition Wall
Wall 1 1 x 2 2.15 0.12 2.50 1.24
Wall 2 1 x 1 7.00 0.12 2.10 1.69
Wall 3 1 x 4 1.45 0.12 2.10 1.40
Deductions
Door 1 -1 x 7 0.80 0.12 2.10 -1.35
Deductions
Door 1 -1 x 3 1.00 0.23 2.10 -1.45
Door 2 -1 x 3 0.90 0.23 2.10 -1.30
Door 3 -1 x 5 0.80 0.23 2.10 -1.93
Window W1 -1 x 6 0.90 0.23 1.50 -1.86
Window W2 -1 x 10 1.80 0.23 1.50 -6.21

Compound Wall 1 x 1 9.16 0.40 1.80 6.60

Total Quantity = 85.10 Cum

Dismantling aluminium/ Gypsum partitions, doors, windows, fixed glazing and false ceiling includingdisposal of
4 unserviceable material and stacking of serviceable material with in 50 meters lead as directed by Engineer-in-
charge.

Ceiling Area
Toilet Inner Area 1 x 1 2.56 7.00 17.92
Canteen Area 1 1 x 1 6.53 7.00 45.71
Canteen Area 2 1 x 1 14.17 12.27 173.87
Staff Room 1 x 1 2.74 7.00 19.18
Railway Staff Association Rest Room 1 x 1 6.04 7.00 42.28
Railway Staff Association Room 1 x 1 6.00 7.00 42.00

Total Quantity = 341.00 Sqm

Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead -
5
for thickness of tiles 10mm to 25mm

Flooring
Toilet Inner Area 1 x 1 2.56 7.00 17.92
Canteen Area 1 1 x 1 6.53 7.00 45.71
Canteen Area 2 1 x 1 14.17 12.27 173.87
Staff Room 1 x 1 2.74 7.00 19.18
Railway Staff Association Rest Room 1 x 1 6.04 7.00 42.28
Railway Staff Association Room 1 x 1 6.00 7.00 42.00
Outer Staff Toilet 1 x 2 1.45 2.15 6.23
Skirting
Canteen Area 1 1 x 1 27.06 0.10 2.71
Canteen Area 2 1 x 1 52.88 0.10 5.29
Staff Room 1 x 1 19.48 0.10 1.95
Railway Staff Association Rest Room 1 x 1 26.08 0.10 2.61
Railway Staff Association Room 1 x 1 26.00 0.10 2.60
Door 1 -1 x 3 1.00 0.10 -0.30
Door 2 -1 x 3 0.90 0.10 -0.27

Dadooing Tile
Toilet & Bath 1 x 4 5.58 1.50 33.48
Door 3 -1 x 5 0.80 1.50 -6.00

Total Quantity = 389.30 Sqm

Dismantling cement asbestos or other hard board ceiling or partition walls including stacking of serviceable
6
materials and disposal of unserviceable materials within 50 metres lead.

Roof Area
Roof Area 1 1 x 1 29.10 6.45 187.70
Roof Area 2 1 x 1 29.10 6.45 187.70
Roof Area 3 1 x 2 2.55 1.79 9.13

Total Quantity = 384.60 Sqm

Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts,
7
cutting rivets ,welding etc.including dismembering and stacking within 50 metres lead

Roof Truss Kg/meter


Purlin CHS 1 x 10 12.73 3.56 453.19
CHS
Top Chord Member 1 x 9 12.80 3.56 410.11
Bottom Chord Member 1 x 9 12.70 3.56 406.91
Inter Mediate Member 1 x 9 3.28 3.56 105.09
Inter Mediate Cross Member 1 x 9 11.18 3.56 358.21

Toilet Area Truss Outer 1 x 1 2.55 5.00 12.75

Total Quantity = 1746.30 Kg

Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave,
8
holdfasts etc. complete and stacking within 50 metres lead of area beyond 3 sq.metres

Door 1 1 x 3 3.00
Door 2 1 x 3 3.00
Door 3 1 x 5 5.00
Window W1 1 x 6 6.00
Window W2 1 x 10 10.00

Total Quantity = 27.00 nos

9 Existing Electrical Point Details

Light Point - Tube Light 1 x 10 10.00 nos


Fan Point (Ceiling) 1 x 19 19.00 nos
MAJOR UPGRADATION OF MADURAI RAILWAY JUNCCTION - DISMANTLING WORKS

ABSTRACT ESTIMATION - MLTP EXISTING (EAST SIDE)

S.No Item No Description of Item Quantity Rate Unit Amount

1 15.2.2 Nominal concrete 1:4:8 or leaner mix (including equivalent design mix) 36.90 1,239.60 cum 45,741.00

Demolishing R.C.C work manually / by mechanical means including stacking of


2 15.3 141.00 2,928.10 cum 412,862.00
steel bars and disposal of unserviceable material within 50 metres lead

Demolishing brick work manually / by mechanical means including stacking of


3 15.7.4 serviceable material and disposal of unserviceable material within 50 metres 55.00 1,698.45 cum 93,415.00
lead - in cement mortar

Dismantling tile work in floors and roofs laid in cement mortar including
4 15.23.1 259.08 60.50 sqm 15,674.00
stacking material within 50 metres lead - for thickness of tiles 10mm to 25mm

Demolishing mud phaska in terracing and disposal of material within 50 metres


5 15.27 259.08 753.75 Cum 195,282.00
lead.

Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking
6 15.28.1 25.88 136.00 sqm 3,519.00
the material within 50 metres lead of - G.S.sheet

Dismantling steel work in built up sections in angles, tees, flats and channels
7 15.18 including all gusset plates, bolts, nuts, cutting rivets ,welding etc.including 97.92 4.65 Kg 455.00
dismembering and stacking within 50 metres lead

Dismantling doors, windows and clerestory windows (steel or wood) shutter


8 15.12.2 including chowkhats, architrave, holdfasts etc. 2.00 414.55 each 829.00
complete and stacking within 50 metres lead of area beyond 3 sq.metres

Total Amount 767,777.00

Total Amount in Lakhs 7.68


DETAILED ESTIMATE - EXISTING MLTP (EAST SIDE)

S No. Description Nos L B H Quantity Unit

1 Nominal concrete 1:4:8 or leaner mix (including equivalent design mix)

Flooring PCC
Ground Floor
Parking Area 1 1 x 1 12.07 15.68 0.10 18.93
Parking Area 2 1 x 1 18.19 4.74 0.10 8.62
Stair Room Inner Area 1 x 1 4.87 2.47 0.10 1.20
Ramp Area 1 x 2 11.92 2.64 0.10 6.29
Landing Area 1 x 1 5.54 3.30 0.10 1.83

Total Quantity = 36.90 Cum

Demolishing R.C.C work manually / by mechanical means including stacking of steel bars and disposal of
2
unserviceable material within 50 metres lead

Ground Floor
Columns
Column 1 1 x 18 0.30 0.30 1.95 3.16
Column 2 1 x 12 0.30 0.50 1.95 3.51
Column 3 1 x 2 0.60 0.80 1.95 1.87
Column 4 1 x 2 0.55 0.55 1.95 1.18
Roof Beam
Beam 1 1 x 1 16.27 0.30 0.20 0.98
Beam 2 1 x 2 11.40 0.30 0.20 1.37
Beam 3 1 x 2 18.84 0.30 0.20 2.26
Beam 4 1 x 1 2.40 0.30 0.20 0.14
Beam 1 1 x 3 19.15 0.30 0.20 3.45
Beam 2 1 x 1 18.45 0.30 0.20 1.11
Beam 3 1 x 1 18.35 0.30 0.20 1.10
Beam 4 1 x 1 4.50 0.30 0.20 0.27
Ramp Beam 1 1 x 2 2.41 0.30 0.20 0.29
Ramp Beam 2 1 x 2 2.45 0.30 0.20 0.29
Roof Slab
Area 1 1 x 1 12.60 15.91 0.15 30.07
Area 2 1 x 1 18.19 5.10 0.15 13.92
Ramp Floor Slab 1 x 2 11.92 2.68 0.10 6.39
Staircase
Flight Slab 1 1 x 1 2.70 1.20 0.20 0.65
Flight Slab 2 1 x 1 1.50 1.20 0.20 0.36
Landing Slab 1 x 1 1.14 2.47 0.20 0.56
Midlanding Beam 1 x 1 2.40 0.30 0.15 0.11
Hand Rail 1 x 1 4.20 0.20 1.00 0.84

First Floor
Columns
Column 1 1 x 17 0.30 0.30 1.95 2.98
Column 2 1 x 10 0.30 0.50 1.95 2.93
Roof Beam
Beam 1 1 x 1 16.27 0.30 0.20 0.98
Beam 2 1 x 2 11.40 0.30 0.20 1.37
Beam 3 1 x 2 18.84 0.30 0.20 2.26
Beam 4 1 x 1 2.40 0.30 0.20 0.14
Beam 1 1 x 3 19.15 0.30 0.20 3.45
Beam 2 1 x 1 18.45 0.30 0.20 1.11
Beam 3 1 x 1 18.35 0.30 0.20 1.10
Beam 4 1 x 1 4.50 0.30 0.20 0.27
Roof Slab
Area 1 1 x 1 12.60 15.91 0.15 30.07
Area 2 1 x 1 17.64 5.10 0.15 13.49
Area 3 1 x 1 12.46 1.03 0.15 1.93
Staircase
Flight Slab 1 1 x 1 2.70 1.20 0.20 0.65
Flight Slab 2 1 x 1 1.50 1.20 0.20 0.36
Landing Slab 1 x 1 1.14 2.47 0.20 0.56
Midlanding Beam 1 x 1 2.40 0.30 0.15 0.11
Hand Rail 1 x 1 4.20 0.20 1.00 0.84

Terrace Floor
Columns
Head Room
Column 1 1 x 6 0.30 0.30 2.50 1.35
Parpet Column
Column 1 1 x 11 0.30 0.30 0.45 0.45
Column 2 1 x 10 0.30 0.50 0.45 0.68

Total Quantity = 141.00 Cum

Demolishing brick work manually / by mechanical means including stacking of serviceable material and
3
disposal of unserviceable material within 50 metres lead - in cement mortar

Ground Floor
Wall 1(outer Wall) 1 x 1 16.27 0.23 0.90 3.37
Wall 2(outer Wall) 1 x 1 16.39 0.23 0.90 3.39
Wall 1(outer Wall) 1 x 1 14.05 0.23 0.90 2.91
Wall 2(outer Wall) 1 x 1 14.85 0.23 0.90 3.07
Wall 3(ramp near) 1 x 1 10.60 0.23 0.50 1.22
Wall 4(ramp near) 1 x 1 14.02 0.23 0.50 1.61
Jally Work 1 x 2 2.70 0.23 1.05 1.30
Stair Room
Wall 1 1 x 2 4.50 0.23 1.95 4.04
Wall 2 1 x 2 2.40 0.23 1.95 2.16
Deductions
Door 1 -1 x 1 1.30 0.23 2.10 -0.63
Staircase Steps 12 x 0.50 1.20 0.30 0.15 0.32

First Floor
Wall 1 1 x 1 16.27 0.23 0.90 3.37
Wall 2 1 x 1 16.39 0.23 0.90 3.39
Wall 1 1 x 1 14.05 0.23 0.90 2.91
Wall 2 1 x 1 14.85 0.23 0.90 3.07
Wall 5 1 x 2 0.80 0.23 0.90 0.33
Jally Work 1 x 2 2.70 0.23 1.05 1.30
Stair Room
Wall 1 1 x 2 4.50 0.23 1.95 4.04
Wall 2 1 x 2 2.40 0.23 1.95 2.16
Deductions
Door 1 -1 x 1 1.30 0.23 2.10 -0.63
Staircase Steps 12 x 0.50 1.20 0.30 0.15 0.32

Terrace Floor
Head Room
Wall 1 1 x 2 2.40 0.23 2.15 2.37
Wall 2 1 x 1 4.50 0.23 2.15 2.23
Parapet
Wall 1 1 x 1 46.91 0.23 0.45 4.86
Wall 2 1 x 1 4.74 0.23 0.45 0.49
Wall 3 1 x 1 14.62 0.23 0.45 1.51

Total Quantity = 55.00 Cum

Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres
4
lead - for thickness of tiles 10mm to 25mm

Roof Tile 1 x 1 21.59 12.00 259.08

Total Quantity = 259.08 Sqm

5 Demolishing mud phaska in terracing and disposal of material within 50 metres lead.

Roof Tile 1 x 1 21.59 12.00 259.08

Total Quantity = 259.08 Cum

Dismantling cement asbestos or other hard board ceiling or partition walls including stacking of serviceable
6
materials and disposal of unserviceable materials within 50 metres lead.

Terrace Floor
Head Room Area 1 x 1 5.40 3.00 16.20
Wall 2 1 x 1 4.50 2.15 9.67

Total Quantity = 25.88 Sqm

Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height
7
including stacking the material within 50 metres lead :

Terrace Floor
Head Room Purlins
Purlin RHS 1 x 4 5.40 3.20 69.12
Purlin RHS 1 x 2 4.50 3.20 28.80

Total Quantity = 97.92 Kg

Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats,
8
architrave, holdfasts etc. complete and stacking within 50 metres lead of area beyond 3 sq.metres

Ground Floor
Door 1 x 1 1.00
First Floor
Door 1 x 1 1.00

Total Quantity = 2.00 nos


9 Existing Electrical Point Details
Ground Floor
Light Point - Tube Light 1 x 13 13.00 nos
Light Point - CFL 1 x 9 9.00 nos
First Floor
Light Point - Tube Light 1 x 14 14.00 nos
Light Point - CFL 1 x 5 5.00 nos
MAJOR UPGRADATION OF MADURAI RAILWAY JUNCCTION - DISMANTLING WORKS

ABSTRACT ESTIMATION - OLD ACCOM BUILDING

S.No Item No Description of Item Quantity Rate Unit Amount

1 15.2.2 Nominal concrete 1:4:8 or leaner mix (including equivalent design mix) 31.40 1,239.60 cum 38,923.00

Demolishing R.C.C work manually / by mechanical means including stacking of


2 15.3 72.50 2,928.10 cum 212,287.00
steel bars and disposal of unserviceable material within 50 metres lead

Demolishing brick work manually / by mechanical means including stacking of


3 15.7.4 serviceable material and disposal of unserviceable material within 50 metres 121.00 1,698.45 cum 205,512.00
lead - in cement mortar

Dismantling tile work in floors and roofs laid in cement mortar including
4 15.23.1 84.90 60.50 sqm 5,136.00
stacking material within 50 metres lead - for thickness of tiles 10mm to 25mm

Demolishing mud phaska in terracing and disposal of material within 50 metres


5 15.27 6.70 753.75 Cum 5,050.00
lead.

Dismantling steel work in built up sections in angles, tees, flats and channels
6 15.18 including all gusset plates, bolts, nuts, cutting rivets ,welding etc.including 322.00 4.65 kg 1,497.00
dismembering and stacking within 50 metres lead

Dismantling doors, windows and clerestory windows (steel or wood) shutter


7 15.12.2 including chowkhats, architrave, holdfasts etc. 32.00 414.55 each 13,266.00
complete and stacking within 50 metres lead of area beyond 3 sq.metres

Total Amount 481,671.00

Total Amount in Lakhs 4.82


MAJOR UPGRADATION OF MADURAI RAILWAY JUNCCTION - DISMANTLING WORKS

ABSTRACT ESTIMATION - EXISTING ABANDONED QUARTERS TYPE 2

S.No Item No Description of Item Quantity Rate Unit Amount

1 15.2.2 Nominal concrete 1:4:8 or leaner mix (including equivalent design mix) 24.89 1,239.60 cum 30,857.00

Demolishing R.C.C work manually / by mechanical means including stacking of


2 15.3 175.98 2,928.10 cum 515,293.00
steel bars and disposal of unserviceable material within 50 metres lead

Demolishing brick work manually / by mechanical means including stacking of


3 15.7.4 serviceable material and disposal of unserviceable material within 50 metres 147.50 1,698.45 cum 250,521.00
lead - in cement mortar

Dismantling tile work in floors and roofs laid in cement mortar including
4 15.23.1 284.90 60.50 sqm 17,236.00
stacking material within 50 metres lead - for thickness of tiles 10mm to 25mm

Demolishing mud phaska in terracing and disposal of material within 50 metres


5 15.27 21.40 753.75 Cum 16,130.00
lead.

Dismantling steel work in built up sections in angles, tees, flats and channels
6 15.18 including all gusset plates, bolts, nuts, cutting rivets ,welding etc.including 1246.00 4.65 kg 5,794.00
dismembering and stacking within 50 metres lead

Dismantling doors, windows and clerestory windows (steel or wood) shutter


7 15.12.2 including chowkhats, architrave, holdfasts etc. complete and stacking within 50 80.00 414.55 each 33,164.00
metres lead of area beyond 3 sq.metres

Dismantling cement asbestos or other hard board ceiling or partition walls


8 15.41 including stacking of serviceable materials and disposal of unserviceable 51.00 46.50 sqm 2,372.00
materials within 50 metres lead.

Total Amount 871,367.00

Total Amount in Lakhs 8.72


DETAILED ESTIMATE - EXISTING ABANDONED QUARTERS TYPE 2

S.no Description Nos L B H Quantity Unit

1 Nominal concrete 1:4:8 or leaner mix (including equivalent design mix)


Flooring PCC
Ground Floor
Room 1 1 x 2 3.66 6.55 0.10 4.79
Room 2 1 x 2 3.49 6.55 0.10 4.57
Room 3 1 x 2 3.61 6.55 0.10 4.73
Room 4 1 x 1 3.63 6.55 0.10 2.38
Room 5 1 x 1 3.77 6.55 0.10 2.47

Corrider Area 1 x 1 33.24 1.79 0.10 5.95

Total Quantity = 24.89 Cum

Demolishing R.C.C work manually / by mechanical means including stacking of steel bars and disposal of
2
unserviceable material within 50 metres lead

Ground Floor
Column
Column1 1 x 24 0.30 0.50 2.50 9.00
Column2 1 x 6 0.30 0.38 2.50 1.71
Roof Beam
Beam 1 1 x 3 29.20 0.30 0.30 7.88
Beam 2 1 x 1 33.24 0.30 0.30 2.99
Beam 4 1 x 8 8.57 0.30 0.30 6.17
Beam 5 1 x 2 8.49 0.30 0.30 1.53
Add Column Junction
Column1 1 x 24 0.30 0.50 0.30 1.08
Column2 1 x 6 0.30 0.38 0.30 0.21
Lintel Beam
Long Wall
Wall 1 1 x 1 29.20 0.23 0.15 1.01
Wall 2 1 x 2 13.28 0.23 0.15 0.92
Wall 3 1 x 2 13.42 0.23 0.15 0.93
Short Wall
Wall 1 1 x 8 2.57 0.23 0.15 0.71
Wall 2 1 x 8 1.34 0.23 0.15 0.37
Wall 3 1 x 2 1.28 0.23 0.15 0.09
Wall 4 1 x 8 1.20 0.23 0.15 0.33
Wall 5 1 x 2 1.10 0.23 0.15 0.08
Wall 6 1 x 2 1.22 0.23 0.15 0.08
Wall 7 1 x 1 1.25 0.23 0.15 0.04
Wall 8 1 x 1 1.40 0.23 0.15 0.05
Wall 9 1 x 2 3.66 0.23 0.15 0.25
Wall 10 1 x 2 3.49 0.23 0.15 0.24
Wall 11 1 x 2 3.61 0.23 0.15 0.25
Wall 12 1 x 1 3.63 0.23 0.15 0.13
Wall 13 1 x 1 3.77 0.23 0.15 0.13
Entrance Wall 1 x 1 3.84 0.23 0.15 0.13
Roof Slab
Roof Area 1 x 1 33.70 9.07 0.15 45.85
Projections (Front Projection Slope) 1 x 1 33.70 0.45 0.15 2.27
Deductions
Staircase Area -1 x 1 3.01 2.50 0.15 -1.13
Staircase
Flight Slab 1 1 x 1 2.31 1.30 0.15 0.45
Flight Slab 2 1 x 1 3.53 1.30 0.15 0.69
Landing Slab 1 x 1 2.50 1.37 0.15 0.51
Steps 19 x 0.5 1.30 0.30 0.15 0.56
Hand Rail Wall 1 x 1 2.31 0.20 1.00 0.46
Hand Rail Wall 1 x 1 3.53 0.20 1.00 0.71

First Floor
Column
Column1 1 x 24 0.30 0.50 2.50 9.00
Column2 1 x 6 0.30 0.38 2.50 1.71
Roof Beam
Beam 1 1 x 3 29.20 0.30 0.30 7.88
Beam 2 1 x 1 33.24 0.30 0.30 2.99
Beam 4 1 x 8 8.57 0.30 0.30 6.17
Beam 5 1 x 2 8.49 0.30 0.30 1.53
Add Column Junction
Column1 1 x 24 0.30 0.50 0.30 1.08
Column2 1 x 6 0.30 0.38 0.30 0.21
Lintel Beam
Long Wall
Wall 1 1 x 1 29.20 0.23 0.15 1.01
Wall 2 1 x 2 13.28 0.23 0.15 0.92
Wall 3 1 x 2 13.42 0.23 0.15 0.93
Short Wall
Wall 1 1 x 8 2.57 0.23 0.15 0.71
Wall 2 1 x 8 1.34 0.23 0.15 0.37
Wall 3 1 x 2 1.28 0.23 0.15 0.09
Wall 4 1 x 8 1.20 0.23 0.15 0.33
Wall 5 1 x 2 1.10 0.23 0.15 0.08
Wall 6 1 x 2 1.22 0.23 0.15 0.08
Wall 7 1 x 1 1.25 0.23 0.15 0.04
Wall 8 1 x 1 1.40 0.23 0.15 0.05
Wall 9 1 x 2 3.66 0.23 0.15 0.25
Wall 10 1 x 2 3.49 0.23 0.15 0.24
Wall 11 1 x 2 3.61 0.23 0.15 0.25
Wall 12 1 x 1 3.63 0.23 0.15 0.13
Wall 13 1 x 1 3.77 0.23 0.15 0.13
Entrance Wall 1 x 1 3.84 0.23 0.15 0.13
Roof Slab
Area 1 x 1 33.70 9.07 0.15 45.85
Projections (Front Projection Slope) 1 x 1 33.70 0.45 0.15 2.27
Staircase
Flight Slab 1 1 x 1 2.31 1.30 0.15 0.45
Flight Slab 2 1 x 1 3.53 1.30 0.15 0.69
Landing 1 1 x 1 2.50 1.37 0.15 0.51
Steps 19 x 0.5 1.30 0.30 0.15 0.56
Landing Beam 1 x 2 2.50 0.30 0.15 0.22
Hand Rail Wall 1 x 1 2.31 0.20 1.00 0.46
Hand Rail Wall 1 x 1 3.53 0.20 1.00 0.71

Terrace Floor
Column
Column1 1 x 24 0.30 0.50 0.30 1.08
Column2 1 x 6 0.30 0.38 0.30 0.21

Total Quantity = 175.98 Cum

Demolishing brick work manually / by mechanical means including stacking of serviceable material and
3
disposal of unserviceable material within 50 metres lead - in cement mortar

Ground Floor
Long Wall
Wall 1(Outer Wall) 1 x 1 29.20 0.23 2.20 14.78
Wall 2(Center Wall) 1 x 2 13.28 0.23 2.20 13.44
Wall 3(Outer Wall) 1 x 2 13.42 0.23 2.20 13.58
Short Wall
Wall 1(Toilet Wall) 1 x 8 2.57 0.23 2.20 10.40
Wall 2(Bath Room) 1 x 8 1.34 0.23 2.20 5.42
Wall 3(Toilet Wall) 1 x 2 1.28 0.23 2.20 1.30
Wall 4(Toilet Wall) 1 x 8 1.20 0.23 2.20 4.87
Wall 5(Toilet Wall) 1 x 2 1.10 0.23 2.20 1.11
Wall 6(Toilet Wall) 1 x 2 1.22 0.23 2.20 1.23
Wall 7(Toilet Wall) 1 x 1 1.25 0.23 2.20 0.63
Wall 8(Toilet Area) 1 x 1 1.40 0.23 2.20 0.71
Wall 9(Hall Area) 1 x 2 3.66 0.23 2.20 3.70
Wall 10(Hall Area) 1 x 2 3.49 0.23 2.20 3.53
Wall 11(Hall Area) 1 x 2 3.61 0.23 2.20 3.65
Wall 12(Hall Area) 1 x 1 3.63 0.23 2.20 1.84
Wall 13(Hall Area) 1 x 1 3.77 0.23 2.20 1.91
Entrance Wall 1 x 1 3.84 0.23 2.20 1.94
Deductions
Door D1 -1 x 8 0.85 0.23 2.10 -3.28
Door D2 -1 x 8 0.80 0.23 2.10 -3.09
Door D3 -1 x 8 0.65 0.23 2.10 -2.51
Window W1 -1 x 8 0.80 0.23 1.50 -2.21
Ventilator V -1 x 8 0.60 0.23 0.60 -0.66
Entrance Way -1 x 1 1.60 0.23 3.00 -1.10
Wall Open -1 x 8 1.09 0.23 2.10 -4.21
Jali Window -1 x 8 2.20 0.23 0.90 -3.64
Entry Open -1 x 8 0.90 0.23 2.10 -3.48

Outer Shed 2
Wall 1 1 x 1 15.76 0.23 2.00 7.25
Wall 2 1 x 1 4.16 0.23 2.00 1.91
Wall 3 1 x 1 4.05 0.23 2.00 1.86
Deductions
Door Open -1 x 1 0.90 0.23 2.00 -0.41

First Floor
Long Wall
Wall 1(Outer Wall) 1 x 1 29.20 0.23 2.20 14.78
Wall 2(Center Wall) 1 x 2 13.28 0.23 2.20 13.44
Wall 3(Outer Wall) 1 x 2 13.42 0.23 2.20 13.58
Short Wall
Wall 1(Toilet Area) 1 x 8 2.57 0.23 2.20 10.40
Wall 2(Bath Area) 1 x 8 1.34 0.23 2.20 5.42
Wall 3(Toilet Area) 1 x 2 1.28 0.23 2.20 1.30
Wall 4(Bath Area) 1 x 8 1.20 0.23 2.20 4.87
Wall 5(Toilet area) 1 x 2 1.10 0.23 2.20 1.11
Wall 6(Toilet Wall) 1 x 2 1.22 0.23 2.20 1.23
Wall 7(Toilet Wall) 1 x 1 1.25 0.23 2.20 0.63
Wall 8(Toilet Area) 1 x 1 1.40 0.23 2.20 0.71
Wall 9(Hall Area) 1 x 2 3.66 0.23 2.20 3.70
Wall 10(Hall Area) 1 x 2 3.49 0.23 2.20 3.53
Wall 10(Hall Area) 1 x 2 3.61 0.23 2.20 3.65
Wall 10(Hall Area) 1 x 1 3.63 0.23 2.20 1.84
Wall 11(Hall Area) 1 x 1 3.77 0.23 2.20 1.91
Entrance Wall 1 x 1 3.84 0.23 2.20 1.94
Corrider Wall 1 1 x 1 13.53 0.23 0.86 2.68
Corrider Wall 2 1 x 1 3.52 0.23 0.86 0.70
Corrider Wall 3 1 x 1 3.82 0.23 0.86 0.76
Deductions
Door D1 -1 x 8 0.85 0.23 2.10 -3.28
Door D2 -1 x 8 0.80 0.23 2.10 -3.09
Door D3 -1 x 8 0.65 0.23 2.10 -2.51
Window W1 -1 x 8 0.80 0.23 1.50 -2.21
Ventilator V -1 x 8 0.60 0.23 0.60 -0.66
Wall Open -1 x 8 1.09 0.23 2.10 -4.21

Terrace Floor Parapet


Wall 1(Outer Wall) 1 x 2 26.20 0.23 0.30 3.62
Wall 2(Outer Wall) 1 x 2 8.32 0.23 0.30 1.15
Total Quantity = 147.50 Cum

Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres
4
lead - for thickness of tiles 10mm to 25mm

Roof Tile
Roof Area Inner 1 x 1 33.24 8.57 284.87

Total Quantity = 284.90 Sqm

5 Demolishing mud phaska in terracing and disposal of material within 50 metres lead.

Roof Area Inner 1 x 1 33.24 8.57 0.08 21.37

Total Quantity = 21.40 Cum

Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts,
6
nuts, cutting rivets ,welding etc.including dismembering and stacking within 50 metres lead

Grills Kg/Sqm
Ground Floor
Window W1 1 x 8 0.80 1.50 15.00 144.00
Ventilator V 1 x 8 0.60 0.60 10.00 28.80
First Floor
Window W1 1 x 8 0.80 1.50 15.00 144.00
Ventilator V 1 x 8 0.60 0.60 10.00 28.80

Shed Area
Rail Section Column 45R 1 x 10 2.00 45.00 900.00

Total Quantity = 1246.00 Kg

Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats,
7
architrave, holdfasts etc. complete and stacking within 50 metres lead of area beyond 3 sq.metres

Ground Floor
Door D1 1 x 1 8.00 8.00
Door D2 1 x 1 8.00 8.00
Door D3 1 x 1 8.00 8.00
Window W1 1 x 1 8.00 8.00
Ventilator V 1 x 1 8.00 8.00
First Floor
Door D1 1 x 1 8.00 8.00
Door D2 1 x 1 8.00 8.00
Door D3 1 x 1 8.00 8.00
Window W1 1 x 1 8.00 8.00
Ventilator V 1 x 1 8.00 8.00

Total Quantity = 80.00 Nos

Dismantling cement asbestos or other hard board ceiling or partition walls including stacking of serviceable
8
materials and disposal of unserviceable materials within 50 metres lead.

Front Side Shed Area


Wall 1 1 x 2 4.57 2.00 18.28
Wall 2 1 x 1 15.64 2.00 31.28
Wall 3 1 x 1 0.66 2.00 1.32

Total Quantity = 51.00 Sqm

9 Existing Electrical Point Details


Ground Floor
Light Point - Tube Light 1 x 6 6.00 nos
Fan Point (Ceiling) 1 x 6 6.00 nos
First Floor
Light Point - Tube Light 1 x 6 6.00 nos
Fan Point (Ceiling) 1 x 6 6.00 nos
MAJOR UPGRADATION OF MADURAI RAILWAY JUNCCTION - DISMANTLING WORKS

ABSTRACT ESTIMATION - EXISTING ABANDONED QUARTERS TYPE 3

S.No Item No Description of Item Quantity Rate Unit Amount

1 15.2.2 Nominal concrete 1:4:8 or leaner mix (including equivalent design mix) 24.90 1,239.60 cum 30,866.00

Demolishing R.C.C work manually / by mechanical means including stacking of


2 15.3 176.00 2,928.10 cum 515,346.00
steel bars and disposal of unserviceable material within 50 metres lead

Demolishing brick work manually / by mechanical means including stacking of


3 15.7.4 serviceable material and disposal of unserviceable material within 50 metres 136.90 1,698.45 cum 232,518.00
lead - in cement mortar

Dismantling tile work in floors and roofs laid in cement mortar including
4 15.23.1 284.90 60.50 sqm 17,236.00
stacking material within 50 metres lead - for thickness of tiles 10mm to 25mm

Demolishing mud phaska in terracing and disposal of material within 50 metres


5 15.27 21.40 753.75 Cum 16,130.00
lead.

Dismantling steel work in built up sections in angles, tees, flats and channels
6 15.18 including all gusset plates, bolts, nuts, cutting rivets ,welding etc.including 933.30 4.65 kg 4,340.00
dismembering and stacking within 50 metres lead

Dismantling doors, windows and clerestory windows (steel or wood) shutter


7 15.12.2 including chowkhats, architrave, holdfasts etc. 40.00 414.55 each 16,582.00
complete and stacking within 50 metres lead of area beyond 3 sq.metres

Dismantling cement asbestos or other hard board ceiling or partition walls


8 15.41 including stacking of serviceable materials and disposal of unserviceable 26.40 46.40 sqm 1,225.00
materials within 50 metres lead.

Total Amount 834,243.00

Total Amount in Lakhs 8.35


DETAILED ESTIMATE -EXISTING ABANDONED QUARTERS TYPE 3

S.no Description Nos L B H Quantity Unit

1 Nominal concrete 1:4:8 or leaner mix (including equivalent design mix)

Flooring PCC
Room 1 1 x 2 3.66 6.55 0.10 4.79
Room 2 1 x 2 3.49 6.55 0.10 4.57
Room 3 1 x 2 3.61 6.55 0.10 4.73
Room 4 1 x 1 3.63 6.55 0.10 2.38
Room 5 1 x 1 3.77 6.55 0.10 2.47
Corridor Area 1 x 1 33.24 1.79 0.10 5.95

Total Quantity = 24.90 Cum

Demolishing R.C.C work manually / by mechanical means including stacking of steel bars and disposal of
2
unserviceable material within 50 metres lead

Ground Floor
Column
Column1 1 x 24 0.30 0.50 2.50 9.00
Column2 1 x 6 0.30 0.38 2.50 1.71
Roof Beam
Beam 1 1 x 3 29.20 0.30 0.30 7.88
Beam 2 1 x 1 33.24 0.30 0.30 2.99
Beam 4 1 x 8 8.57 0.30 0.30 6.17
Beam 5 1 x 2 8.49 0.30 0.30 1.53
Add Column Junction
Column1 1 x 24 0.30 0.50 0.30 1.08
Column2 1 x 6 0.30 0.38 0.30 0.21
Lintel Beam
Brickwork
Long Wall
Wall 1 1 x 1 29.20 0.23 0.15 1.01
Wall 2 1 x 2 13.28 0.23 0.15 0.92
Wall 3 1 x 2 13.42 0.23 0.15 0.93
Short Wall
Wall 1 1 x 8 2.57 0.23 0.15 0.71
Wall 2 1 x 8 1.34 0.23 0.15 0.37
Wall 3 1 x 2 1.28 0.23 0.15 0.09
Wall 4 1 x 8 1.20 0.23 0.15 0.33
Wall 5 1 x 2 1.10 0.23 0.15 0.08
Wall 6 1 x 2 1.22 0.23 0.15 0.08
Wall 7 1 x 1 1.25 0.23 0.15 0.04
Wall 8 1 x 1 1.40 0.23 0.15 0.05
Wall 9 1 x 2 3.66 0.23 0.15 0.25
Wall 10 1 x 2 3.49 0.23 0.15 0.24
Wall 11 1 x 2 3.61 0.23 0.15 0.25
Wall 12 1 x 1 3.63 0.23 0.15 0.13
Wall 13 1 x 1 3.77 0.23 0.15 0.13
Entrance Wall 1 x 1 3.84 0.23 0.15 0.13
Roof Slab
Area 1 x 1 33.70 9.07 0.15 45.85
Projections (Front Projection Slope) 1 x 1 33.70 0.45 0.15 2.27
Deductions
Staircase Area -1 x 1 3.01 2.50 0.15 -1.13
Staircase
Flight Slab 1 1 x 1 2.31 1.30 0.15 0.45
Flight Slab 2 1 x 1 3.53 1.30 0.15 0.69
Landing 1 1 x 1 2.50 1.37 0.15 0.51
Steps 19 x 0.5 1.30 0.30 0.15 0.56
Landing Beam 1 x 2 2.50 0.30 0.15 0.22
Hand Rail Wall 1 x 1 2.31 0.20 1.00 0.46
Hand Rail Wall 1 x 1 3.53 0.20 1.00 0.71

First Floor
Column
Column1 1 x 24 0.30 0.50 2.50 9.00
Column2 1 x 6 0.30 0.38 2.50 1.71
Roof Beam
Beam 1 1 x 3 29.20 0.30 0.30 7.88
Beam 2 1 x 1 33.24 0.30 0.30 2.99
Beam 4 1 x 8 8.57 0.30 0.30 6.17
Beam 5 1 x 2 8.49 0.30 0.30 1.53
Add Column Junction
Column1 1 x 24 0.30 0.50 0.30 1.08
Column2 1 x 6 0.30 0.38 0.30 0.21
Lintel Beam
Long Wall
Wall 1 1 x 1 29.20 0.23 0.15 1.01
Wall 2 1 x 2 13.28 0.23 0.15 0.92
Wall 3 1 x 2 13.42 0.23 0.15 0.93
Short Wall
Wall 1 1 x 8 2.57 0.23 0.15 0.71
Wall 2 1 x 8 1.34 0.23 0.15 0.37
Wall 3 1 x 2 1.28 0.23 0.15 0.09
Wall 4 1 x 8 1.20 0.23 0.15 0.33
Wall 5 1 x 2 1.10 0.23 0.15 0.08
Wall 6 1 x 2 1.22 0.23 0.15 0.08
Wall 7 1 x 1 1.25 0.23 0.15 0.04
Wall 8 1 x 1 1.40 0.23 0.15 0.05
Wall 9 1 x 2 3.66 0.23 0.15 0.25
Wall 10 1 x 2 3.49 0.23 0.15 0.24
Wall 11 1 x 2 3.61 0.23 0.15 0.25
Wall 12 1 x 1 3.63 0.23 0.15 0.13
Wall 13 1 x 1 3.77 0.23 0.15 0.13
Entrance Wall 1 x 1 3.84 0.23 0.15 0.13
Roof Slab
Area 1 x 1 33.70 9.07 0.15 45.85
Projections (Front Projection Slope) 1 x 1 33.70 0.45 0.15 2.27
Staircase
Flight Slab 1 1 x 1 2.31 1.30 0.15 0.45
Flight Slab 2 1 x 1 3.53 1.30 0.15 0.69
Landing 1 1 x 1 2.50 1.37 0.15 0.51
Steps 19 x 0.5 1.30 0.30 0.15 0.56
Hand Rail Wall 1 x 1 2.31 0.20 1.00 0.46
Hand Rail Wall 1 x 1 3.53 0.20 1.00 0.71

Terrace Floor
Column
Column1 1 x 24 0.30 0.50 0.30 1.08
Column2 1 x 6 0.30 0.38 0.30 0.21

Total Quantity = 176.00 Cum

Demolishing R.C.C work manually / by mechanical means including stacking of steel bars and disposal of
3
unserviceable material within 50 metres lead

Ground Floor
Long Wall
Wall 1(Outer Wall) 1 x 1 29.20 0.23 2.20 14.78
Wall 2(Center Wall) 1 x 2 13.28 0.23 2.20 13.44
Wall 3(Outer Wall) 1 x 2 13.42 0.23 2.20 13.58
Short Wall
Wall 1(Toilet Wall) 1 x 8 2.57 0.23 2.20 10.40
Wall 2(Bath Room) 1 x 8 1.34 0.23 2.20 5.42
Wall 3(Toilet Wall) 1 x 2 1.28 0.23 2.20 1.30
Wall 4(Toilet Wall) 1 x 8 1.20 0.23 2.20 4.87
Wall 5(Toilet Wall) 1 x 2 1.10 0.23 2.20 1.11
Wall 6(Toilet Wall) 1 x 2 1.22 0.23 2.20 1.23
Wall 7(Toilet Wall) 1 x 1 1.25 0.23 2.20 0.63
Wall 8(Toilet Area) 1 x 1 1.40 0.23 2.20 0.71
Wall 9(Hall Area) 1 x 2 3.66 0.23 2.20 3.70
Wall 10(Hall Area) 1 x 2 3.49 0.23 2.20 3.53
Wall 11(Hall Area) 1 x 2 3.61 0.23 2.20 3.65
Wall 12(Hall Area) 1 x 1 3.63 0.23 2.20 1.84
Wall 13(Hall Area) 1 x 1 3.77 0.23 2.20 1.91
Entrance Wall 1 x 1 3.84 0.23 2.20 1.94
Deductions
Door D1 -1 x 8 0.85 0.23 2.10 -3.28
Door D2 -1 x 8 0.80 0.23 2.10 -3.09
Door D3 -1 x 8 0.65 0.23 2.10 -2.51
Window W1 -1 x 8 0.80 0.23 1.50 -2.21
Ventilator V -1 x 8 0.60 0.23 0.60 -0.66
Entrance Way -1 x 1 1.60 0.23 3.00 -1.10
Wall Open -1 x 8 1.09 0.23 2.10 -4.21
Jali Window -1 x 8 2.20 0.23 0.90 -3.64
Entry Open -1 x 8 0.90 0.23 2.10 -3.48

First Floor
Long Wall
Wall 1(Outer Wall) 1 x 1 29.20 0.23 2.20 14.78
Wall 2(Center Wall) 1 x 2 13.28 0.23 2.20 13.44
Wall 3(Outer Wall) 1 x 2 13.42 0.23 2.20 13.58
Short Wall
Wall 1(Toilet Area) 1 x 8 2.57 0.23 2.20 10.40
Wall 2(Bath Area) 1 x 8 1.34 0.23 2.20 5.42
Wall 3(Toilet Area) 1 x 2 1.28 0.23 2.20 1.30
Wall 4(Bath Area) 1 x 8 1.20 0.23 2.20 4.87
Wall 5(Toilet area) 1 x 2 1.10 0.23 2.20 1.11
Wall 6(Toilet Wall) 1 x 2 1.22 0.23 2.20 1.23
Wall 7(Toilet Wall) 1 x 1 1.25 0.23 2.20 0.63
Wall 8(Toilet Area) 1 x 1 1.40 0.23 2.20 0.71
Wall 9(Hall Area) 1 x 2 3.66 0.23 2.20 3.70
Wall 10(Hall Area) 1 x 2 3.49 0.23 2.20 3.53
Wall 10(Hall Area) 1 x 2 3.61 0.23 2.20 3.65
Wall 10(Hall Area) 1 x 1 3.63 0.23 2.20 1.84
Wall 11(Hall Area) 1 x 1 3.77 0.23 2.20 1.91
Entrance Wall 1 x 1 3.84 0.23 2.20 1.94
Corrider Wall 1 1 x 1 13.53 0.23 0.86 2.68
Corrider Wall 2 1 x 1 3.52 0.23 0.86 0.70
Corrider Wall 3 1 x 1 3.82 0.23 0.86 0.76
Deductions
Door D1 -1 x 8 0.85 0.23 2.10 -3.28
Door D2 -1 x 8 0.80 0.23 2.10 -3.09
Door D3 -1 x 8 0.65 0.23 2.10 -2.51
Window W1 -1 x 8 0.80 0.23 1.50 -2.21
Ventilator V -1 x 8 0.60 0.23 0.60 -0.66
Wall Open -1 x 8 1.09 0.23 2.10 -4.21

Terrace Floor Parapet


Wall 1(Outer Wall) 1 x 2 26.20 0.23 0.30 3.62
Wall 2(Outer Wall) 1 x 2 8.32 0.23 0.30 1.15

Total Quantity = 136.90 Cum

Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead - for
4
thickness of tiles 10mm to 25mm

Roof Tile
Roof Area Inner 1 x 1 33.24 8.57 284.87

Total Quantity = 284.90 Sqm

5 Demolishing mud phaska in terracing and disposal of material within 50 metres lead.
Roof Area Inner 1 x 1 33.24 8.57 0.08 21.37

Total Quantity = 21.40 Cum

Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts,
6
cutting rivets ,welding etc.including dismembering and stacking within 50 metres lead

Kg/Sqm
Ground Floor
Window W1 1 x 8 0.80 1.50 15.00 144.00
Ventilator V 1 x 8 0.60 0.60 10.00 28.80
First Floor
Window W1 1 x 8 0.80 1.50 15.00 144.00
Ventilator V 1 x 8 0.60 0.60 10.00 28.80

Front Side Truss Area (60.3x3.2mm)


Circular Hollow Section Column(Horizontal) 1 x 3 2.91 4.51 39.37
Circular Hollow Section Column(Vertical) 1 x 3 1.95 4.51 26.38
Circular Hollow Section Column(Horizontal) 1 x 2 7.97 4.51 71.89
Rail Section 45R 1 x 5 2.00 45.00 450.00

Total Quantity = 933.30 Kg


Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave,
7
holdfasts etc. complete and stacking within 50 metres lead of area beyond 3 sq.metres
Ground Floor
Door D1 1 x 1 8.00 8.00
Door D2 1 x 1 8.00 8.00
Door D3 1 x 1 8.00 8.00
Window W1 1 x 1 8.00 8.00
Ventilator V 1 x 1 8.00 8.00
First Floor
Door D1 1 x 1 8.00 8.00
Door D2 1 x 1 8.00 8.00
Door D3 1 x 1 8.00 8.00
Window W1 1 x 1 8.00 8.00
Ventilator V 1 x 1 8.00 8.00

Total Quantity = 40.00 Nos

Dismantling cement asbestos or other hard board ceiling or partition walls including stacking of serviceable materials
8
and disposal of unserviceable materials within 50 metres lead.

Front Side Shed Area


Roof Area 1 x 1 7.97 3.30 26.30

Total Quantity = 26.40 Sqm

9 Existing Electrical Point Details

Ground Floor
Light Point - Tube Light 1 x 6 6.00 nos
Fan Point (Ceiling) 1 x 6 6.00 nos
First Floor
Light Point - Tube Light 1 x 6 6.00 nos
Fan Point (Ceiling) 1 x 6 6.00 nos
MAJOR UPGRADATION OF MADURAI RAILWAY JUNCCTION - DISMANTLING WORKS

ABSTRACT ESTIMATION - SEXISTING ABANDONED QUARTERS TYPE 4

S.No Item No Description of Item Quantity Rate Unit Amount

1 15.2.2 Nominal concrete 1:4:8 or leaner mix (including equivalent design mix) 24.90 1,239.60 cum 30,866.00

Demolishing R.C.C work manually / by mechanical means including stacking of


2 15.3 176.00 2,928.10 cum 515,346.00
steel bars and disposal of unserviceable material within 50 metres lead

Demolishing brick work manually / by mechanical means including stacking of


3 15.7.4 serviceable material and disposal of unserviceable material within 50 metres 150.00 1,698.45 cum 254,768.00
lead - in cement mortar

Dismantling tile work in floors and roofs laid in cement mortar including
4 15.23.1 284.90 60.50 sqm 17,236.00
stacking material within 50 metres lead - for thickness of tiles 10mm to 25mm

Demolishing mud phaska in terracing and disposal of material within 50 metres


5 15.27 21.40 753.75 Cum 16,130.00
lead.

Dismantling steel work in built up sections in angles, tees, flats and channels
6 15.18 including all gusset plates, bolts, nuts, cutting rivets ,welding etc.including 424.00 4.65 kg 1,972.00
dismembering and stacking within 50 metres lead

Dismantling doors, windows and clerestory windows (steel or wood) shutter


7 15.12.2 including chowkhats, architrave, holdfasts etc. 25.00 414.55 each 10,364.00
complete and stacking within 50 metres lead of area beyond 3 sq.metres

Dismantling cement asbestos or other hard board ceiling or partition walls


8 15.41 including stacking of serviceable materials and disposal of unserviceable 18.00 46.50 each 837.00
materials within 50 metres lead.

Total Amount 847,519.00

Total Amount in Lakhs 8.48


DETAILED ESTIMATE - EXISTING ABANDONED QUARTERS TYPE 4

S.no Description Nos L B H Quantity Unit

1 Nominal concrete 1:4:8 or leaner mix (including equivalent design mix)

Flooring PCC
Ground Floor
Room 1 1 x 2 3.66 6.55 0.10 4.79
Room 2 1 x 2 3.49 6.55 0.10 4.57
Room 3 1 x 2 3.61 6.55 0.10 4.73
Room 4 1 x 1 3.63 6.55 0.10 2.38
Room 5 1 x 1 3.77 6.55 0.10 2.47
Corridor Area 1 x 1 33.24 1.79 0.10 5.95

Total Quantity = 24.90 Cum

Demolishing R.C.C work manually / by mechanical means including stacking of steel bars and disposal of
2
unserviceable material within 50 metres lead

Ground Floor
Column
Column1 1 x 24 0.30 0.50 2.50 9.00
Column2 1 x 6 0.30 0.38 2.50 1.71
Roof Beam
Beam 1 1 x 3 29.20 0.30 0.30 7.88
Beam 2 1 x 1 33.24 0.30 0.30 2.99
Beam 4 1 x 8 8.57 0.30 0.30 6.17
Beam 5 1 x 2 8.49 0.30 0.30 1.53
Add Column Junction
Column1 1 x 24 0.30 0.50 0.30 1.08
Column2 1 x 6 0.30 0.38 0.30 0.21
Lintel Beam
Long Wall
Wall 1 1 x 1 29.20 0.23 0.15 1.01
Wall 2 1 x 2 13.28 0.23 0.15 0.92
Wall 3 1 x 2 13.42 0.23 0.15 0.93
Short Wall
Wall 1 1 x 8 2.57 0.23 0.15 0.71
Wall 2 1 x 8 1.34 0.23 0.15 0.37
Wall 3 1 x 2 1.28 0.23 0.15 0.09
Wall 4 1 x 8 1.20 0.23 0.15 0.33
Wall 5 1 x 2 1.10 0.23 0.15 0.08
Wall 6 1 x 2 1.22 0.23 0.15 0.08
Wall 7 1 x 1 1.25 0.23 0.15 0.04
Wall 8 1 x 1 1.40 0.23 0.15 0.05
Wall 9 1 x 2 3.66 0.23 0.15 0.25
Wall 10 1 x 2 3.49 0.23 0.15 0.24
Wall 11 1 x 2 3.61 0.23 0.15 0.25
Wall 12 1 x 1 3.63 0.23 0.15 0.13
Wall 13 1 x 1 3.77 0.23 0.15 0.13
Entrance Wall 1 x 1 3.84 0.23 0.15 0.13
Roof Slab
Area 1 x 1 33.70 9.07 0.15 45.85
Projections (Front Projection Slope) 1 x 1 33.70 0.45 0.15 2.27
Deductions
Staircase Area -1 x 1 3.01 2.50 0.15 -1.13
Staircase
Flight Slab 1 1 x 1 2.31 1.30 0.15 0.45
Flight Slab 2 1 x 1 3.53 1.30 0.15 0.69
Landing 1 1 x 1 2.50 1.37 0.15 0.51
Steps 19 x 0.5 1.30 0.30 0.15 0.56
Landing Beam 1 x 2 2.50 0.30 0.15 0.22
Hand Rail Wall 1 x 1 2.31 0.20 1.00 0.46
Hand Rail Wall 1 x 1 3.53 0.20 1.00 0.71

First Floor
Column
Column1 1 x 24 0.30 0.50 2.50 9.00
Column2 1 x 6 0.30 0.38 2.50 1.71
Roof Beam
Beam 1 1 x 3 29.20 0.30 0.30 7.88
Beam 2 1 x 1 33.24 0.30 0.30 2.99
Beam 4 1 x 8 8.57 0.30 0.30 6.17
Beam 5 1 x 2 8.49 0.30 0.30 1.53
Add Column Junction
Column1 1 x 24 0.30 0.50 0.30 1.08
Column2 1 x 6 0.30 0.38 0.30 0.21
Lintel Beam
Long Wall
Wall 1 1 x 1 29.20 0.23 0.15 1.01
Wall 2 1 x 2 13.28 0.23 0.15 0.92
Wall 3 1 x 2 13.42 0.23 0.15 0.93
Short Wall
Wall 1 1 x 8 2.57 0.23 0.15 0.71
Wall 2 1 x 8 1.34 0.23 0.15 0.37
Wall 3 1 x 2 1.28 0.23 0.15 0.09
Wall 4 1 x 8 1.20 0.23 0.15 0.33
Wall 5 1 x 2 1.10 0.23 0.15 0.08
Wall 6 1 x 2 1.22 0.23 0.15 0.08
Wall 7 1 x 1 1.25 0.23 0.15 0.04
Wall 8 1 x 1 1.40 0.23 0.15 0.05
Wall 9 1 x 2 3.66 0.23 0.15 0.25
Wall 10 1 x 2 3.49 0.23 0.15 0.24
Wall 11 1 x 2 3.61 0.23 0.15 0.25
Wall 12 1 x 1 3.63 0.23 0.15 0.13
Wall 13 1 x 1 3.77 0.23 0.15 0.13
Entrance Wall 1 x 1 3.84 0.23 0.15 0.13
Roof Slab
Area 1 x 1 33.70 9.07 0.15 45.85
Projections (Front Projection Slope) 1 x 1 33.70 0.45 0.15 2.27
Staircase
Flight Slab 1 1 x 1 2.31 1.30 0.15 0.45
Flight Slab 2 1 x 1 3.53 1.30 0.15 0.69
Landing Slab 1 x 1 2.50 1.37 0.15 0.51
Steps 19 x 0.5 1.30 0.30 0.15 0.56
Hand Rail Wall 1 x 1 2.31 0.20 1.00 0.46
Hand Rail Wall 1 x 1 3.53 0.20 1.00 0.71
Terrace Floor
Column
Column1 1 x 24 0.30 0.50 0.30 1.08
Column2 1 x 6 0.30 0.38 0.30 0.21

Total Quantity = 176.00 Cum

Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of
3
unserviceable material within 50 metres lead - in cement mortar

Ground Floor
Long Wall
Wall 1(Outer Wall) 1 x 1 29.20 0.23 2.20 14.78
Wall 2(Center Wall) 1 x 2 13.28 0.23 2.20 13.44
Wall 3(Outer Wall) 1 x 2 13.42 0.23 2.20 13.58
Short Wall
Wall 1(Toilet Wall) 1 x 8 2.57 0.23 2.20 10.40
Wall 2(Bath Room) 1 x 8 1.34 0.23 2.20 5.42
Wall 3(Toilet Wall) 1 x 2 1.28 0.23 2.20 1.30
Wall 4(Toilet Wall) 1 x 8 1.20 0.23 2.20 4.87
Wall 5(Toilet Wall) 1 x 2 1.10 0.23 2.20 1.11
Wall 6(Toilet Wall) 1 x 2 1.22 0.23 2.20 1.23
Wall 7(Toilet Wall) 1 x 1 1.25 0.23 2.20 0.63
Wall 8(Toilet Area) 1 x 1 1.40 0.23 2.20 0.71
Wall 9(Hall Area) 1 x 2 3.66 0.23 2.20 3.70
Wall 10(Hall Area) 1 x 2 3.49 0.23 2.20 3.53
Wall 11(Hall Area) 1 x 2 3.61 0.23 2.20 3.65
Wall 12(Hall Area) 1 x 1 3.63 0.23 2.20 1.84
Wall 13(Hall Area) 1 x 1 3.77 0.23 2.20 1.91
Entrance Wall 1 x 1 3.84 0.23 2.20 1.94
Deductions
Door D1 -1 x 8 0.85 0.23 2.10 -3.28
Door D2 -1 x 8 0.80 0.23 2.10 -3.09
Door D3 -1 x 8 0.65 0.23 2.10 -2.51
Window W1 -1 x 8 0.80 0.23 1.50 -2.21
Ventilator V -1 x 8 0.60 0.23 0.60 -0.66
Entrance Way -1 x 1 1.60 0.23 3.00 -1.10
Wall Open -1 x 8 1.09 0.23 2.10 -4.21
Jali Window -1 x 8 2.20 0.23 0.90 -3.64
Entry Open -1 x 8 0.90 0.23 2.10 -3.48
Outer Shed Area
Wall 1 1 x 1 11.63 0.23 2.50 6.69
Wall 2 1 x 4 3.32 0.23 2.50 7.64
Deductions
Door D1 -1 x 3 0.85 0.23 2.10 -1.23

First Floor
Long Wall
Wall 1(Outer Wall) 1 x 1 29.20 0.23 2.20 14.78
Wall 2(Center Wall) 1 x 2 13.28 0.23 2.20 13.44
Wall 3(Outer Wall) 1 x 2 13.42 0.23 2.20 13.58
Short Wall
Wall 1(Toilet Area) 1 x 8 2.57 0.23 2.20 10.40
Wall 2(Bath Area) 1 x 8 1.34 0.23 2.20 5.42
Wall 3(Toilet Area) 1 x 2 1.28 0.23 2.20 1.30
Wall 4(Bath Area) 1 x 8 1.20 0.23 2.20 4.87
Wall 5(Toilet area) 1 x 2 1.10 0.23 2.20 1.11
Wall 6(Toilet Wall) 1 x 2 1.22 0.23 2.20 1.23
Wall 7(Toilet Wall) 1 x 1 1.25 0.23 2.20 0.63
Wall 8(Toilet Area) 1 x 1 1.40 0.23 2.20 0.71
Wall 9(Hall Area) 1 x 2 3.66 0.23 2.20 3.70
Wall 10(Hall Area) 1 x 2 3.49 0.23 2.20 3.53
Wall 10(Hall Area) 1 x 2 3.61 0.23 2.20 3.65
Wall 10(Hall Area) 1 x 1 3.63 0.23 2.20 1.84
Wall 11(Hall Area) 1 x 1 3.77 0.23 2.20 1.91
Entrance Wall 1 x 1 3.84 0.23 2.20 1.94
Corrider Wall 1 1 x 1 13.53 0.23 0.86 2.68
Corrider Wall 2 1 x 1 3.52 0.23 0.86 0.70
Corrider Wall 3 1 x 1 3.82 0.23 0.86 0.76
Deductions
Door D1 -1 x 8 0.85 0.23 2.10 -3.28
Door D2 -1 x 8 0.80 0.23 2.10 -3.09
Door D3 -1 x 8 0.65 0.23 2.10 -2.51
Window W1 -1 x 8 0.80 0.23 1.50 -2.21
Ventilator V -1 x 8 0.60 0.23 0.60 -0.66
Wall Open -1 x 8 1.09 0.23 2.10 -4.21

Terrace Floor Parapet


Wall 1 1 x 2 26.20 0.23 0.30 3.62
Wall 2 1 x 2 8.32 0.23 0.30 1.15

Total Quantity = 150.00 Cum

Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead - for
4
thickness of tiles 10mm to 25mm

Roof Tile
Roof Area Inner 1 x 1 33.24 8.57 284.87

Total Quantity = 284.90 Sqm

5 Demolishing mud phaska in terracing and disposal of material within 50 metres lead.

Roof Area Inner 1 x 1 33.24 8.57 0.08 21.37

Total Quantity = 21.40 Cum

Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts,
6
cutting rivets ,welding etc.including dismembering and stacking within 50 metres lead

Kg/Sqm
Ground Floor
Window W1 1 x 8 0.80 1.50 15.00 144.00
Ventilator V 1 x 8 0.60 0.60 10.00 28.80
First Floor
Window W1 1 x 8 0.80 1.50 15.00 144.00
Ventilator V 1 x 8 0.60 0.60 10.00 28.80
Front Side Truss Area (60.3x3.2mm)
Circular Hollow Section Column(Horizontal) 1 x 2 2.70 4.51 24.35
Circular Hollow Section Column(Vertical) 1 x 4 1.95 4.51 35.18
Circular Hollow Section Column(Horizontal) 1 x 1 4.15 4.51 18.72
Total Quantity = 424.00 Kg

Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave,
7
holdfasts etc. complete and stacking within 50 metres lead of area beyond 3 sq.metres

Ground Floor
Door D1 1 x 1 8.00 8.00
Door D2 1 x 1 8.00 8.00
Door D3 1 x 1 8.00 8.00
Window W1 1 x 1 8.00 8.00
Ventilator V 1 x 1 8.00 8.00
First Floor
Door D1 1 x 1 5.00 5.00
Door D2 1 x 1 5.00 5.00
Door D3 1 x 1 5.00 5.00
Window W1 1 x 1 5.00 5.00
Ventilator V 1 x 1 5.00 5.00

Total Quantity = 25.00 Nos

Dismantling cement asbestos or other hard board ceiling or partition walls including stacking of serviceable materials
8
and disposal of unserviceable materials within 50 metres lead.

Front Side Shed Area


Wall 1 1 x 1 4.15 2.60 10.79
Wall 2 1 x 1 2.71 2.60 7.05

Total Quantity = 18.00 Sqm

9 Existing Electrical Point Details

Ground Floor
Light Point - Tube Light 1 x 1 1.00 nos
Fan Point (Ceiling) 1 x 1 1.00 nos
First Floor
Light Point - Tube Light 1 x 1 1.00 nos
Fan Point (Ceiling) 1 x 5 5.00 nos
MAJOR UPGRADATION OF MADURAI RAILWAY JUNCCTION - DISMANTLING WORKS

ABSTRACT ESTIMATION - Various Station Office

S.No Item No Description of Item Quantity Rate Unit Amount

1 15.2.2 Nominal concrete 1:4:8 or leaner mix (including equivalent design mix) 306.20 1,239.60 cum 379,566.00

Demolishing R.C.C work manually / by mechanical means including stacking of


2 15.3 1910.50 2,928.10 cum 5,594,135.00
steel bars and disposal of unserviceable material within 50 metres lead

Demolishing brick work manually / by mechanical means including stacking of


3 15.7.4 serviceable material and disposal of unserviceable material within 50 metres 91.20 1,698.45 cum 154,899.00
lead - in cement mortar

Demolishing stone rubble masonry manually/ by mechanical means including


4 15.9.1 stacking of serviceable material and disposal of unserviceable material within 2586.90 954.80 cum 2,469,972.00
50 metres lead as per direction of Engineer-in-charge : In lime mortar

Dismantling aluminium/ Gypsum partitions, doors, windows, fixed glazing and


5 15.57 false ceiling including disposal of unserviceable material and stacking of 46.50 sqm
serviceable material with in 50 meters lead as directed by Engineer-in-charge.

Dismantling tile work in floors and roofs laid in cement mortar including
6 15.23.1 3658.10 60.50 sqm 221,315.00
stacking material within 50 metres lead - for thickness of tiles 10mm to 25mm

Demolishing mud phaska in terracing and disposal of material within 50 metres


7 15.27 282.70 753.75 Cum 213,085.00
lead.

Dismantling steel work in built up sections in angles, tees, flats and channels
8 15.18 including all gusset plates, bolts, nuts, cutting rivets ,welding etc.including 1306.00 4.65 kg 6,073.00
dismembering and stacking within 50 metres lead

Dismantling doors, windows and clerestory windows (steel or wood) shutter


9 15.12.2 including chowkhats, architrave, holdfasts etc. 152.00 414.55 each 63,012.00
complete and stacking within 50 metres lead of area beyond 3 sq.metres

Dismantling wooden boardings in lining of walls and partitions, excluding


10 15.39 127.00 50.35 sqm 6,394.00
supporting members but including stacking within 50 metres lead :

Total Amount 9,108,451.00

Total Amount in Lakhs 91.09


DETAILED ESTIMATE - VARIOUS STATION OFFICE (Terminal Right side)

S.no Description Nos L B H Quantity Unit

1 Nominal concrete 1:4:8 or leaner mix (including equivalent design mix)

Flooring PCC
Terminal Building Right Side
Ground Floor
Office Of Station Manager
Area 1 1 x 1 3.00 5.00 0.10 1.50
Area 2 1 x 1 3.00 3.00 0.10 0.90
Station Director
Area 1 1 x 1 6.37 5.00 0.10 3.19
Area 2 1 x 1 6.37 3.00 0.10 1.91
Deputy Station Master Room
Area 1 1 x 1 4.90 5.00 0.10 2.45
Area 2 1 x 1 2.35 3.00 0.10 0.71
Writer Cafe 1 x 1 2.90 5.00 0.10 1.45
Elec Switch Room
Area 1 1 x 1 2.70 5.00 0.10 1.35
Area 2 1 x 1 11.95 3.00 0.10 3.58
Area 3 1 x 1 3.70 3.00 0.10 1.11
Elec Duty Staff Room 1 x 1 4.20 5.00 0.10 2.10
Onduty Station master Room
Area 1 1 x 1 6.20 5.00 0.10 3.10
Area 2 1 x 1 1.82 3.00 0.10 0.55
Area 3 1 x 1 2.00 3.00 0.10 0.60
Area 4 1 x 1 7.50 3.00 0.10 2.25
Area 5 1 x 1 50.58 3.00 0.10 15.17
Deputy Station Master 1 x 1 3.45 5.00 0.10 1.73
Chief Commercial Inspector 1 x 1 2.92 5.00 0.10 1.46
AC Waiting Room (Ladies) 1 x 1 10.67 5.00 0.10 5.34
Railway Court 1 x 1 10.12 5.00 0.10 5.06
Medical Room 1 x 1 5.00 5.00 0.10 2.50
Traffic Inspector 1 x 1 3.33 5.00 0.10 1.67
JE Work Station 1 x 1 2.96 5.00 0.10 1.48
Reserved Lounge 1 x 1 6.08 5.00 0.10 3.04
Gupta Hindi Library 1 x 1 5.82 5.00 0.10 2.91
IRCTC 1 x 1 11.70 5.00 0.10 5.85
Pantry 1 x 1 5.60 8.70 0.10 4.87
Passage 1 1 x 1 11.70 3.00 0.10 3.51
Workers Lounge 1 x 1 9.33 3.30 0.10 3.08
Garage Area 1 x 1 9.33 9.25 0.10 8.63
Concourse Area
Ground Floor
Area 1 1 x 1 4.34 7.55 0.10 3.28
Area 2 1 x 1 4.14 3.65 0.10 1.51
Area 3 1 x 1 4.60 11.50 0.10 5.29
Area 4 1 x 1 42.85 4.62 0.10 19.80
Area 5 1 x 1 53.21 10.35 0.10 55.07
Area 6 1 x 1 53.14 11.37 0.10 60.42
Area 7 1 x 1 28.18 9.46 0.10 26.66
Area 8 1 x 1 16.94 1.42 0.10 2.41
Area 9 1 x 1 9.42 11.50 0.10 10.83
Area 10 1 x 1 7.62 11.50 0.10 8.76
Portico Area 1 x 1 7.62 9.08 0.10 6.92
First Floor
Area 1 1 x 1 2.58 8.72 0.10 2.25
Area 2 1 x 1 11.40 3.37 0.10 3.84
Area 3 1 x 1 5.80 2.11 0.10 1.22
Area 4 1 x 1 1.30 6.07 0.10 0.79
Area 5 1 x 1 5.12 7.90 0.10 4.04

Total Quantity = 306.20 Cum

Demolishing R.C.C work manually / by mechanical means including stacking of steel bars and disposal of unserviceable
2
material within 50 metres lead

Ground Floor
Terminal Building Right Side
Column
Column1 1 x 111 0.50 0.50 4.10 113.77
Roof Beam
Beam 1 1 x 4 115.23 0.45 0.45 93.34
Beam 2 1 x 19 12.40 0.45 0.45 47.71
Beam 3 1 x 7 14.13 0.30 0.45 13.35
Linte Beam
Wall 1 1 x 1 3.00 0.15 0.15 0.07
Wall 2 1 x 1 2.35 0.15 0.15 0.05
Wall 3 1 x 1 1.20 0.12 0.15 0.02
Wall 1 1 x 3 94.18 0.70 0.15 29.67
Wall 2 1 x 1 19.00 0.70 0.15 1.99
Wall 3 1 x 1 11.70 0.70 0.15 1.23
Wall 4 1 x 1 21.47 0.70 0.15 2.25
Wall 5 1 x 1 80.13 0.35 0.15 4.21
Wall 6 1 x 1 9.33 0.35 0.15 0.49
Wall 7 1 x 1 10.03 0.35 0.15 0.53

Y-Direction
Wall 1 1 x 2 8.70 0.50 0.15 1.31
Wall 2 1 x 1 8.00 0.50 0.15 0.60
Wall 3 1 x 3 3.00 0.50 0.15 0.67
Wall 4 1 x 7 5.00 0.50 0.15 2.63
Wall 5 1 x 4 3.00 0.35 0.15 0.63
Wall 6 1 x 8 5.00 0.50 0.15 3.00
Wall 7 1 x 1 8.70 0.50 0.15 0.65
Wall 8 1 x 1 8.70 0.70 0.15 0.91
Wall 9 1 x 2 12.90 0.35 0.15 1.35
Wall 10 1 x 2 2.30 0.35 0.15 0.24
Roof Slab
Area 1 1 x 1 115.78 10.10 0.15 175.41
Garrage Area 1 x 1 10.03 13.60 0.15 20.46
Deduction
Stair Area -1 x 1 4.23 2.80 0.15 -1.78
First Floor
Column
Column1 1 x 111 0.50 0.50 4.10 113.77
Roof Beam
Beam 1 1 x 4 115.23 0.45 0.45 93.34
Beam 2 1 x 19 12.40 0.45 0.45 47.71
Beam 3 1 x 7 14.13 0.30 0.45 13.35
Lintel Beam
Wall 1 1 x 1 3.43 0.23 0.15 0.12
Wall 2 1 x 1 5.51 0.23 0.15 0.19
Wall 3 1 x 1 117.44 0.23 0.15 4.05
Wall 4 1 x 1 2.19 0.23 0.15 0.08
Wall 5 1 x 1 1.27 0.23 0.15 0.04
Wall 6 1 x 2 3.12 0.15 0.15 0.14
Wall 7 2 x 3 1.29 0.15 0.15 0.17
Wall 8 1 x 1 20.74 0.23 0.15 0.72
Wall 9 1 x 17 1.22 0.23 0.15 0.72
Wall 10 1 x 3 1.22 0.15 0.15 0.08

Wall 1 1 x 1 118.26 0.45 0.15 7.98


Wall 2 1 x 1 44.00 0.45 0.15 2.97
Wall 3 1 x 1 23.94 0.45 0.15 1.62
Wall 4 1 x 1 21.21 0.45 0.15 1.43
Wall 5 1 x 1 74.85 0.45 0.15 5.05
Wall 6 1 x 1 42.65 0.45 0.15 2.88

Wall 1 1 x 1 11.43 0.45 0.15 0.77


Wall 2 1 x 15 7.32 0.45 0.15 7.41
Wall 3 1 x 2 9.05 0.45 0.15 1.22
Wall 4 1 x 7 9.05 0.30 0.15 2.85
Wall 5 1 x 7 13.43 0.30 0.15 4.23
Wall 6 1 x 1 11.99 0.50 0.15 0.90
Wall 7 1 x 1 8.72 0.35 0.15 0.46
Roof Slab
Area 1 1 x 1 118.26 12.40 0.15 219.96
Area 2 1 x 1 20.74 2.19 0.15 6.81
Deduction
Stair Area -1 x 1 2.10 1.96 0.15 -0.62

Terrace Floor
Column 1 x 111 0.50 0.50 0.90 24.98

Concourse Area
Ground Floor
Inner Circular Columns
Column C1 1 x 16 0.50 0.50 6.92 27.68
Column C2 1 x 6 1.00 1.00 6.92 41.52
Column C3 1 x 14 0.35 0.50 6.92 16.95
Column C4 1 x 10 0.35 0.35 6.92 8.48
Column C5 1 x 8 0.28 6.92 15.64
Outer Circular Columns
Column C5 1 x 28 0.28 8.00 63.30
Portico Area
Column C1 1 x 6 0.28 3.00 5.09

Staircase Column
1 x 8 0.35 0.50 1.40
Roof Beam
Beam 1 1 x 10 82.27 0.35 0.55 158.37
Beam 2 1 x 12 25.05 0.35 0.55 57.87
Beam 3 1 x 5 12.20 0.35 0.55 11.74
Beam 4 1 x 1 12.20 0.35 0.55 2.35
Portico Area
Beam 1 1 x 1 6.55 0.35 0.55 1.26
Beam 2 1 x 1 5.55 0.35 0.55 1.07

Lintel Beam
Wall 1 1 x 1 9.35 0.35 0.15 0.49
Wall 2 1 x 1 4.14 0.35 0.15 0.22
Wall 3 1 x 1 13.88 0.35 0.15 0.73
Wall 4 1 x 1 2.24 0.35 0.15 0.12
Wall 5 1 x 1 18.35 0.35 0.15 0.96
Wall 6 1 x 1 18.35 0.35 0.15 0.96
Wall 7 1 x 1 19.73 0.35 0.15 1.04
Wall 8 1 x 1 12.24 0.35 0.15 0.64

Wall 1 1 x 1 11.50 0.35 0.15 0.60


Wall 2 1 x 1 2.10 0.35 0.15 0.11
Wall 3 1 x 1 6.90 0.35 0.15 0.36
Wall 3 1 x 1 9.28 0.30 0.15 0.42
Wall 4 1 x 2 11.50 0.35 0.15 1.21
Wall 5 1 x 2 4.62 0.35 0.15 0.49
Roof Slab
Slab Area 1 1 x 1 9.35 12.20 0.15 17.11
Slab Area 2 1 x 1 43.55 4.97 0.15 32.47
Slab Area 3 1 x 1 53.21 10.35 0.15 82.61
Slab Area 4 1 x 1 55.14 11.37 0.15 94.04
Slab Area 5 1 x 1 28.18 9.46 0.15 39.99
Slab Area 6 1 x 1 16.94 1.42 0.15 3.61
Slab Area 7 1 x 1 9.42 7.64 0.15 10.80
Slab Area 8 1 x 1 3.92 3.86 0.15 2.27
Slab Area 3 1 x 1 8.32 12.32 0.15 15.38
Portico Area 1 x 1 7.95 8.73 0.15 10.41
Concourse Area (M.Floor)
Area 1 1 x 1 8.37 3.44 0.15 4.32
Area 2 1 x 1 12.24 3.50 0.15 6.43
Area 3 1 x 1 6.31 2.21 0.15 2.09
Area 4 1 x 1 1.68 6.27 0.15 1.58
Area 5 1 x 1 5.70 8.48 0.15 7.25

Lintel Beam
Wall 1 1 x 1 11.43 0.50 0.15 0.86
Wall 2 1 x 1 8.72 0.35 0.15 0.46
Wall 3 1 x 1 8.80 0.35 0.15 0.46
Wall 4 1 x 1 7.38 0.35 0.15 0.39
Wall 5 1 x 1 11.50 0.35 0.15 0.60
Wall 1 1 x 1 4.50 0.15 0.15 0.10
Wall 2 1 x 1 5.92 0.15 0.15 0.13
Wall 3 1 x 1 5.58 0.23 0.15 0.19
Wall 4 1 x 1 7.90 0.23 0.15 0.27

Staircase 1
Flight Slab 1 1 x 2 2.40 0.90 0.15 0.65
Landing 1 x 1 1.96 0.85 0.15 0.25
Steps 0.5 x 14 0.90 1.78 1.78 19.96
Staircase 2(circular Staircase)
Flight Slab 1 1 x 1 2.40 1.78 0.15 0.64
Steps 0.5 x 14 1.78 1.78 1.78 39.48
Staircase 3
Flight Slab 1 1 x 2 3.10 1.90 0.15 1.77
Landing 1 x 1 4.23 1.40 0.15 0.89
Steps 0.5 x 18 0.90 0.30 0.15 0.36
Staircase 4
Flight Slab 1 1 x 1 6.30 5.50 0.15 5.20
Flight Slab 2 1 x 1 2.70 5.50 0.15 2.23
Landing 1 1 x 1 5.50 1.50 0.15 1.24
Landing 2 1 x 1 5.50 2.68 0.15 2.21
Steps 0.5 x 28 0.90 0.30 0.15 0.57

Total Quantity = 1910.50 Cum

Demolishing brick work manually / by mechanical means including stacking of serviceable material and
3
disposal of unserviceable material within 50 metres lead - in cement mortar

Terminal Building Right Side


Ground Floor
Station Manager
Wall 1 1 x 1 3.00 0.15 2.80 1.26
Deputy Station Master
Wall 2 1 x 1 2.35 0.15 2.80 0.99
Onduty Station Master
Wall 3 1 x 1 1.20 0.12 2.80 0.40
Deductions
Door D4 -1 x 2 0.80 0.15 2.10 -0.50

First Floor
Pantry Room
Wall 1 1 x 1 3.43 0.23 2.80 2.21
Wall 2 1 x 1 5.51 0.23 2.80 3.55
Verrandah Wall
Wall 3 1 x 1 117.91 0.23 1.20 32.54
Staircase Wall
Wall 4 1 x 1 2.19 0.23 2.80 1.41
Wall 5 1 x 1 1.88 0.23 2.80 1.21
Male & Female Dormitory Toilet Walls
Wall 6 1 x 2 3.12 0.15 2.80 2.62
Wall 7 2 x 3 1.29 0.15 2.80 3.25

Outer Wall With Staircase Wall


Wall 8 1 x 1 20.74 0.23 2.80 13.36
Rooms Toilet Walls
Wall 9 1 x 17 1.22 0.23 2.80 13.36
Wall 10 1 x 3 1.22 0.15 2.80 1.54
StairCase Curve Wall
Wall 11 1 x 1 6.25 0.23 2.80 4.02

Deductions
Door D3 -1 x 4 0.75 0.15 2.10 -0.95
Door D4 -1 x 12 0.90 0.15 2.10 -3.40
Door D5 -1 x 1 1.02 0.23 2.10 -0.49
Door D6 -1 x 1 1.73 0.15 2.10 -0.54
Door D8 -1 x 1 1.27 0.23 2.10 -0.61

Concourse Area
First Floor
Wall 1 1 x 1 4.50 0.15 2.80 1.89
Wall 2 1 x 1 5.92 0.15 2.80 2.49
Wall 3 1 x 1 5.58 0.23 2.80 3.59
Wall 4 1 x 1 7.90 0.23 2.80 5.09
Deductions
Door D3 -1 x 1 1.50 0.23 2.10 -0.72
Portico Area Parapet Wall
Wall 1 1 x 1 7.95 0.23 1.00 1.83
Wall 2 1 x 1 7.75 0.23 1.00 1.78

Total Quantity = 91.20 Cum

Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material
4 and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge : In lime
mortar

Ground Floor
Terminal Building Right Side
Brickwork
X-Direction
Station manager Office to Library
Wall 1 1 x 3 94.18 0.70 4.25 840.56
Irctc To Pantry
Wall 2 1 x 1 19.00 0.70 4.25 56.53
Wall 3 1 x 1 11.70 0.70 4.25 34.81
Wall 4 1 x 1 21.47 0.70 4.25 63.87
Workers Lounge To staircase
Wall 5 1 x 1 80.13 0.35 4.25 119.19
Workers Lounge
Wall 6 1 x 1 9.33 0.35 4.25 13.88
Garage Area
Wall 7 1 x 1 10.03 0.35 4.25 14.92

Y-Direction
Station Manager Room
Wall 1 1 x 2 8.70 0.50 4.25 36.97
Station Director Room
Wall 2 1 x 1 8.00 0.50 4.25 17.00
Behind Station Manager ,Elec Duty Staff,Station Director
Wall 3 1 x 3 3.00 0.50 4.25 19.13
Writers Cafe to Chief Commercial Inspector
Wall 4 1 x 7 5.00 0.50 4.25 74.38
Onduty Station Master
Wall 5 1 x 4 3.00 0.35 4.25 17.85
AC Waiting Room TO Reserved Lounge
Wall 6 1 x 8 5.00 0.50 4.25 85.00
Pantry
Wall 7 1 x 1 8.70 0.50 4.25 18.49
Wall 8 1 x 1 8.70 0.70 4.25 25.88
Workers Lounge & Garage area
Wall 9 1 x 2 12.90 0.35 4.25 38.38
Workers Lounge
Wall 10 1 x 2 2.30 0.35 4.25 6.84
Deductions
Column C1 -1 x 111 0.50 0.50 4.25 -117.94
Deductions
Door D1 -1 x 5 0.91 0.70 2.10 -6.69
Door D2 -1 x 2 0.85 0.70 2.10 -2.50
Door D3 -1 x 2 0.80 0.70 2.10 -2.35
Door D4 -1 x 1 0.80 0.35 2.10 -0.59
Door D5 -1 x 3 0.75 0.70 2.10 -3.31
Door D6 -1 x 8 1.00 0.70 2.10 -11.76
Door D7 -1 x 9 1.15 0.70 2.10 -15.21
Door D8 -1 x 1 1.20 0.35 2.10 -0.88
Door D9 -1 x 2 1.30 0.70 2.10 -3.82
Window W1 -1 x 12 1.25 0.70 1.50 -15.75

First Floor
X-Direction
Room Outer Wall
Wall 1 1 x 1 118.26 0.45 4.25 226.17
Room Centre Wall
Wall 2 1 x 1 44.00 0.45 4.25 84.15
Room Centre Wall(after Pantry)
Wall 3 1 x 1 23.94 0.45 4.25 45.79
Room Centre Wall(after dormitory Room)
Wall 4 1 x 1 21.21 0.45 4.25 40.56
Room1 Upto dormitory
Wall 5 1 x 1 74.85 0.45 4.25 143.15
dormitory Last Room
Wall 6 1 x 1 42.65 0.45 4.25 81.57
Y-Direction
ROOM 1 left Outer Wall
Wall 1 1 x 1 11.43 0.45 4.25 21.86
All Rooms Center Wall
Wall 2 1 x 15 7.32 0.45 4.25 209.99
Male Dorm Rooms
Wall 3 1 x 2 9.05 0.45 4.25 34.62
Rooms
Wall 4 1 x 7 9.05 0.30 4.25 80.77
Rooms Right Side Outer
Wall 5 1 x 1 13.43 0.30 4.25 17.12
Deductions
Column C1 -1 x 111 0.50 0.50 4.25 -117.94
Deductions
Door D1 -1 x 18 1.02 0.45 2.10 -17.35
Door D2 -1 x 27 0.91 0.45 2.10 -23.22
Door D7 -1 x 2 1.88 0.45 2.10 -3.55
Window -1 x 27 1.17 0.30 1.50 -14.22
Jalli -1 x 28 2.60 0.23 1.50 -25.12

Concourse Area(Front Side)


Ground Floor
Ticket Counter
Wall 1 1 x 1 9.35 0.35 7.92 25.92
Wall 2 1 x 1 4.14 0.35 7.92 11.48
Wall 3 1 x 1 13.88 0.35 7.92 38.48
Wall 4 1 x 1 2.27 0.35 6.92 5.50
Concourse Entrance Left Side
Wall 5 1 x 1 18.35 0.35 6.92 44.44
Concourse Entrance Right Side
Wall 6 1 x 1 18.35 0.35 6.92 44.44
Cloak Room
Wall 7 1 x 1 19.73 0.35 7.02 48.48
Wall 8 1 x 1 12.24 0.35 7.02 30.07
Wall 9 1 x 1 11.50 0.35 7.92 31.88
Y-Direction
Ticket Counter
Wall 10 1 x 1 2.10 0.35 7.92 5.82
Wall 11 1 x 1 6.90 0.35 7.92 19.13
Staircase Near
Wall 12 1 x 1 9.28 0.30 7.02 19.54
Cloak Room
Wall 13 1 x 2 11.50 0.35 7.02 56.51
Wall 14 1 x 2 4.62 0.35 7.02 22.70
Deductions
Door D1 -1 x 1 1.20 0.35 2.10 -0.88
Door D2 -1 x 1 1.00 0.30 2.10 -0.63
Entrance Open -1 x 1 6.15 0.35 2.10 -4.52
Window W1 -1 x 1 6.15 0.35 2.10 -4.52
Deductions
Column Deductions
Column C3 -1 x 6 0.35 0.50 7.25 -7.61
Column C4 -1 x 11 0.35 0.35 7.25 -9.77
First Floor
Office Room
Wall 1 1 x 1 12.50 0.50 7.02 43.87
Wall 2 1 x 1 8.72 0.35 7.02 21.43
Wall 3 1 x 1 8.80 0.35 7.02 21.62
Wall 4 1 x 1 7.38 0.35 7.02 18.13
Wall 5 1 x 1 11.50 0.35 7.02 28.26
Deductions
Window W1 -1 x 4 1.50 0.35 1.50 -3.15
Column Deductions
Column C3 -1 x 4 0.50 0.50 7.02 -7.02

Total Quantity = 2586.90 Cum

Dismantling aluminium/ Gypsum partitions, doors, windows, fixed glazing and false ceiling including disposal of
5 unserviceable material and stacking of serviceable material with in 50 meters lead as directed by Engineer-in-
charge.

Terminal Right Side


Ground Floor
Office Station Manager Room 1 x 1 5.00 3.00 15.00
Station Diretor Room 1 x 1 6.95 5.00 34.75
1st Floor Rooms
Room 1 1 x 2 6.91 5.44 75.18
Room 2 1 x 2 5.67 5.44 61.69
Room 3 1 x 5 3.91 5.44 106.35
Room 4 1 x 1 3.46 5.44 18.82
Room 5 1 x 1 3.66 5.44 19.91
Room 6 1 x 1 3.61 5.44 19.64
Room 7 1 x 3 3.76 5.44 61.36
Room 8 1 x 1 6.31 9.05 57.11
Room 9 1 x 1 6.27 9.05 56.74
Room 10 1 x 1 7.18 9.05 64.98
Room 11 1 x 5 2.80 6.66 93.24
Room 12 1 x 1 2.69 6.66 17.92

Concourse Area(Front Side)


Ground Floor
Wall Panneling 1 x 1 18.35 2.00 36.70
Counter Wall 1 x 1 11.50 8.00 92.00
Reservation Counter
Wall 1 1 x 1 9.46 3.00 28.38
Wall 2 1 x 2 4.34 3.00 26.04
Cloak Room
Wall 1 1 x 1 11.50 3.00 34.50

Wall 1 1 x 1 11.33 3.00 33.99


Wall 2 1 x 3 3.22 3.00 28.98
False Ceiling
Slab Area 1 1 x 1 55.14 4.20 231.59
Cloak Room Slab Area 1 x 1 11.50 7.62 87.63

Total Quantity = 1302.50 Sqm

Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres
6
lead - for thickness of tiles 10mm to 25mm

Terminal Building Right Side


Wall Tiles
Ground Floor
Station Manager Toilet 1 x 1 8.60 2.10 18.06
Deputy Station Master Toilet 1 x 1 6.70 2.10 14.07
Onduty Station Master Toilet 1 x 1 10.24 2.10 21.50
Deductions
Door D1 -1 x 2 0.80 2.10 -3.36
Door D2 -1 x 1 0.75 2.10 -1.58
Door D3 -1 x 1 0.77 2.10 -1.62

Ground Floor(Vitrified)
Office Of Station Manager
Area 1 1 x 1 3.00 5.00 15.00
Area 2 1 x 1 3.00 3.00 9.00
Station Director
Area 1 1 x 1 6.37 5.00 31.85
Area 2 1 x 1 6.37 3.00 19.11
Deputy Station Master Room
Area 1 1 x 1 4.90 5.00 24.50
Area 2 1 x 1 2.35 3.00 7.05
Writer Cafe 1 x 1 2.90 5.00 14.50
Elec Switch Room
Area 1 1 x 1 2.70 5.00 13.50
Area 2 1 x 1 11.95 3.00 35.85
Area 3 1 x 1 3.70 3.00 11.10
Elec Duty Staff Room 1 x 1 4.20 5.00 21.00
Onduty Station master Room
Area 1 1 x 1 6.20 5.00 31.00
Area 2 1 x 1 1.82 3.00 5.46
Area 3 1 x 1 2.00 3.00 6.00
Area 4 1 x 1 7.50 3.00 22.50
Area 5 1 x 1 50.58 3.00 151.74
Deputy Station Master 1 x 1 3.45 5.00 17.25
Chief Commercial Inspector 1 x 1 2.92 5.00 14.60
AC Waiting Room (Ladies) 1 x 1 10.67 5.00 53.35
Railway Court 1 x 1 10.12 5.00 50.60
Medical Room 1 x 1 5.00 5.00 25.00
Traffic Inspector 1 x 1 3.33 5.00 16.65
JE Work Station 1 x 1 2.96 5.00 14.80
Reserved Lounge 1 x 1 6.08 5.00 30.40
Gupta Hindi Library 1 x 1 5.82 5.00 29.10
IRCTC 1 x 1 11.70 5.00 58.50
Pantry 1 x 1 5.60 8.70 48.72
Passage 1 1 x 1 11.70 3.00 35.10
Workers Lounge 1 x 1 9.33 3.30 30.79
Garage Area 1 x 1 9.33 9.25 86.30
Skirting
Office Of Station Manager
Area 1 1 x 1 16.00 0.10 1.60
Area 2 1 x 1 12.00 0.10 1.20
Station Director
Area 1 1 x 1 22.74 0.10 2.27
Area 2 1 x 1 18.74 0.10 1.87
Deputy Station Master Room
Area 1 1 x 1 19.80 0.10 1.98
Area 2 1 x 1 10.70 0.10 1.07
Writer Cafe 1 x 1 15.80 0.10 1.58
Elec Switch Room
Area 1 1 x 1 15.40 0.10 1.54
Area 2 1 x 1 29.90 0.10 2.99
Area 3 1 x 1 13.40 0.10 1.34
Elec Duty Staff Room 1 x 1 18.40 0.10 1.84
Onduty Station master Room
Area 1 1 x 1 22.40 0.10 2.24
Area 2 1 x 1 9.64 0.10 0.96
Area 3 1 x 1 10.00 0.10 1.00
Area 4 1 x 1 21.00 0.10 2.10
Area 5 1 x 1 107.16 0.10 10.72
Deputy Station Master 1 x 1 16.90 0.10 1.69
Chief Commercial Inspector 1 x 1 15.84 0.10 1.58
AC Waiting Room (Ladies) 1 x 1 31.34 0.10 3.13
Railway Court 1 x 1 30.24 0.10 3.02
Medical Room 1 x 1 20.00 0.10 2.00
Traffic Inspector 1 x 1 16.66 0.10 1.67
JE Work Station 1 x 1 15.92 0.10 1.59
Reserved Lounge 1 x 1 22.16 0.10 2.22
Gupta Hindi Library 1 x 1 21.64 0.10 2.16
IRCTC 1 x 1 33.40 0.10 3.34
Pantry 1 x 1 28.60 0.10 2.86
Passage 1 1 x 1 29.40 0.10 2.94
Workers Lounge 1 x 1 25.26 0.10 2.53
Garage Area 1 x 1 37.16 0.10 3.72
Deductions
Door D1 -1 x 5 0.91 0.10 -0.46
Door D2 -1 x 3 0.85 0.10 -0.26
Door D3 -1 x 11 1.00 0.10 -1.10
Door D4 -1 x 4 0.80 0.10 -0.32
Door D5 -1 x 8 0.75 0.10 -0.60
Door D6 -1 x 2 1.10 0.10 -0.22
Door D7 -1 x 1 1.10 0.10 -0.11
Door D8 -1 x 9 1.15 0.10 -1.04
Door D9 -1 x 2 1.30 0.10 -0.26
First Floor
Room 1 1 x 2 6.91 5.44 75.18
Room 2 1 x 2 5.67 5.44 61.69
Room 3 1 x 5 3.91 5.44 106.35
Pantry
Area 1 1 x 1 3.91 5.51 21.54
Area 2 1 x 1 6.11 2.03 12.40
Area 3 1 x 1 2.68 5.74 15.38
Room 4 1 x 1 3.46 5.44 18.82
Room 5 1 x 1 3.66 5.44 19.91
Room 6 1 x 1 3.61 5.44 19.64
Room 7 1 x 3 3.76 5.44 61.36
Room 8 1 x 1 6.31 9.05 57.11
Room 9 1 x 1 6.27 9.05 56.74
Room 10 1 x 1 7.18 9.05 64.98
Room 11 1 x 5 2.80 6.66 93.24
Room 12 1 x 1 2.69 6.66 17.92
Passage Area 1 1 x 1 74.85 3.48 260.48
Passage Area 2 1 x 1 42.65 2.21 94.26
Skirting
Room 1 1 x 2 24.70 0.10 4.94
Room 2 1 x 2 22.22 0.10 4.44
Room 3 1 x 5 18.70 0.10 9.35
Pantry
Area 1 1 x 1 18.84 0.10 1.88
Area 2 1 x 1 16.28 0.10 1.63
Area 3 1 x 1 16.84 0.10 1.68
Room 4 1 x 1 17.80 0.10 1.78
Room 5 1 x 1 18.20 0.10 1.82
Room 6 1 x 1 18.10 0.10 1.81
Room 7 1 x 3 18.40 0.10 5.52
Room 8 1 x 1 30.72 0.10 3.07
Room 9 1 x 1 30.64 0.10 3.06
Room 10 1 x 1 32.46 0.10 3.25
Room 11 1 x 5 23.70 0.10 11.85
Room 12 1 x 1 18.70 0.10 1.87
Passage Area 1 1 x 1 156.66 0.10 15.67
Passage Area 2 1 x 1 89.72 0.10 8.97
Deductions
Door D1 -1 x 20 1.02 0.10 -2.04
Door D2 -1 x 1 1.24 0.10 -0.12
Door D3 -1 x 4 1.88 0.10 -0.75
Door D4 -1 x 2 1.73 0.10 -0.35
Door D5 -1 x 36 0.91 0.10 -3.28
Door D6 -1 x 2 1.22 0.10 -0.24
Door D7 -1 x 8 0.86 0.10 -0.69
Wall Open 1 -1 x 1 1.03 0.10 -0.10
Wall Open 2 -1 x 1 1.27 0.10 -0.13
Wall Open 3 -1 x 0.85 1.03 0.10 -0.09
Wall Tiles
Toilet 1 1 x 1 17.68 2.10 37.13
Toilet 2 1 x 1 15.20 2.10 31.92
Toilet 3 1 x 1 17.68 2.10 37.13
Toilet 4 1 x 1 15.20 2.10 31.92
Toilet 5 1 x 4 11.68 2.10 98.11
Toilet 6 1 x 1 10.86 2.10 22.81
Toilet 7 1 x 1 11.18 2.10 23.48
Toilet 8 1 x 1 11.14 2.10 23.39
Toilet 9 1 x 2 11.44 2.10 48.05
Toilet 10 1 x 1 11.38 2.10 23.90
Toilet 11 1 x 1 6.30 2.10 13.23
Toilet 12 1 x 2 5.94 2.10 24.95
Toilet 13 1 x 2 4.58 2.10 19.24
Toilet 14 1 x 6 9.46 2.10 119.20
Toilet 15 1 x 1 9.24 2.10 19.40
Wall 1 1 x 17 2.67 2.10 95.32
Wall 2 1 x 4 3.40 2.10 28.56
Deductions
Door D1 -1 x 11 1.02 2.10 -23.56
Door D2 -1 x 11 0.91 2.10 -21.02
Door D3 -1 x 4 0.73 2.10 -6.13
Cladding
Wall 1 2 x 1 74.85 1.20 179.64
Wall 2 2 x 1 42.65 1.20 102.36
Concourse Area
Vitrified
Area 1 1 x 1 4.34 7.55 0.10 3.28
Area 2 1 x 1 4.14 3.65 0.10 1.51
Area 3 1 x 1 4.60 11.50 0.10 5.29
Area 4 1 x 1 42.85 4.62 0.10 19.80
Area 5 1 x 1 53.21 10.35 0.10 55.07
Area 6 1 x 1 53.14 11.37 0.10 60.42
Area 7 1 x 1 28.18 9.46 0.10 26.66
Area 8 1 x 1 16.94 1.42 0.10 2.41
Area 9 1 x 1 9.42 11.50 0.10 10.83
Area 10 1 x 1 7.62 11.50 0.10 8.76
Skirting
Area 1 1 x 1 23.78 0.10 2.38
Area 2 1 x 1 15.58 0.10 1.56
Area 3 1 x 1 20.74 0.10 2.07
Area 4 1 x 1 52.09 0.10 5.21
Area 5 1 x 1 21.62 0.10 2.16
Area 6 1 x 1 22.83 0.10 2.28
Area 7 1 x 1 38.24 0.10 3.82
Deductions
Wall Open 1 -1 x 2 1.50 0.10 -0.30
Door D1 -1 x 2 1.00 0.10 -0.20
Wall Open 2 -1 x 1 3.56 0.10 -0.36
Wall Open 3 -1 x 1 6.15 0.10 -0.62
Door D2 -1 x 2 1.20 0.10 -0.24
Granite Cladding
Column C1 1 x 16 2.00 1.20 38.40
Column C2 1 x 6 4.00 2.10 50.40

Counter Slab 1 x 1 11.50 0.60 6.90

Cloak Room 1 x 1 11.50 0.90 10.35


Counter Slab(Cloak Room) 1 x 1 11.50 0.60 6.90

Staircase 4
tread 1 x 28 5.50 0.30 46.20
Riser 1 x 28 5.50 0.15 23.10
Landing 1 1 x 1 5.50 1.50 8.25
Landing 2 1 x 1 5.50 2.68 14.74

First Floor (vitrified)


Area 1 1 x 1 2.58 8.72 22.50
Area 2 1 x 1 11.40 3.37 38.42
Area 3 1 x 1 5.80 2.11 12.24
Area 4 1 x 1 1.30 6.07 7.89
Area 5 1 x 1 5.12 7.90 40.45
Skirting
Area 1 1 x 1 25.70 0.10 2.57
Area 2 1 x 1 37.75 0.10 3.78
Area 3 1 x 1 26.50 0.10 2.65
Deductions
Door D1 -1 x 2 1.50 0.10 -0.30

Portico Area 1 x 1 7.95 7.75 0.10 6.16

Total Quantity = 3658.10 Sqm

7 Demolishing mud phaska in terracing and disposal of material within 50 metres lead.

Terminal Building Right Side


First Floor
Area 1 1 x 1 117.50 11.71 0.08 110.07
Area 2 1 x 1 16.17 1.95 0.08 2.52
Area 3 1 x 1 16.17 12.90 0.08 16.69
Concourse Area
Area 1 1 x 1 28.18 9.46 0.08 21.33
Area 2 1 x 1 35.7.8 2.97 0.08 0.24
Area 3 1 x 1 55.14 8.20 0.08 36.17
Area 4 1 x 1 53.46 10.35 0.08 44.26
Area 5 1 x 1 42.85 4.62 0.08 15.84
Area 6 1 x 1 3.92 8.28 0.08 2.60
Area 7 1 x 1 7.71 4.27 0.08 2.63
Area 8 1 x 1 11.14 3.22 0.08 2.87
Area 9 1 x 1 7.96 11.50 0.08 7.33
Area 10 1 x 1 8.73 7.75 0.08 5.41
Concourse 1st Floor Roof
Area 1 1 x 1 2.58 8.72 0.08 1.80
Area 2 1 x 1 11.40 3.37 0.08 3.07
Area 3 1 x 1 5.80 2.11 0.08 0.98
Area 4 1 x 1 1.30 6.07 0.08 0.63
Area 5 1 x 1 5.12 7.90 0.08 3.24

Portico Area 1 x 1 7.95 7.75 0.08 4.93

Total Quantity = 282.70 Cum

Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts,
8
nuts, cutting rivets ,welding etc.including dismembering and stacking within 50 metres lead

Grills Kg/Sqm
Terminal Building Right Side
Ground Floor
Window W1 1 x 12 1.25 1.50 15.00 337.50
Ventilator V 1 x 4 0.60 0.60 10.00 14.40
First Floor
Window 1 x 27 1.17 1.50 15.00 710.77
Ventilator V 1 x 26 0.60 0.60 10.00 93.60
Concourse Area
First Floor
Window W1 1 x 4 1.50 1.50 15.00 135.00
Ventilator V 1 x 4 0.60 0.60 10.00 14.40

Total Quantity = 1306.00 Kg

Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave,
9
holdfasts etc. complete and stacking within 50 metres lead of area beyond 3 sq.metres

Terminal Building Right Side


Ground Floor
Door D1 1 x 1 5.00 5.00
Door D2 1 x 1 2.00 2.00
Door D3 1 x 1 2.00 2.00
Door D4 1 x 1 1.00 1.00
Door D4 1 x 1 1.00 1.00
Door D5 1 x 1 3.00 3.00
Door D6 1 x 1 8.00 8.00
Door D7 1 x 1 9.00 9.00
Door D8 1 x 1 1.00 1.00
Door D9 1 x 1 2.00 2.00
Window W1 1 x 1 12.00 12.00
First Floor
Door D1 1 x 1 18.00 18.00
Door D2 1 x 1 27.00 27.00
Door D3 1 x 1 4.00 4.00
Door D4 1 x 1 12.00 12.00
Door D5 1 x 1 1.00 1.00
Door D6 1 x 1 1.00 1.00
Door D7 1 x 1 2.00 2.00
Door D8 1 x 1 1.00 1.00
Window 1 x 1 27.00 27.00
Concourse Area
Ground Floor
Door D1 1 x 1 1.00 1.00
Door D2 1 x 1 3.00 3.00
Door D3 1 x 1 1.00 1.00
Door D4 1 x 1 3.00 3.00
First Floor
Door D1 1 x 1 1.00 1.00
Window 1 x 1 4.00 4.00

Total Quantity = 152.00 Nos

Dismantling wooden boardings in lining of walls and partitions, excluding supporting members but including
10
stacking within 50 metres lead :

Terminal Building Right Side


Wooden Walls
Dormitory 1
Wall 1 1 x 1 6.31 2.10 13.25
Wall 2 1 x 1 6.25 2.10 13.13
Wall 3 1 x 1 3.51 2.10 7.37
Dormitory 2
Wall 1 1 x 1 6.27 2.10 13.17
Wall 2 1 x 2 6.64 2.10 27.89
Wall 3 1 x 4 2.31 2.10 19.40
Dormitory 3
Wall 1 1 x 1 7.18 2.10 15.08
Wall 2 1 x 2 6.64 2.10 27.89
Wall 3 1 x 2 2.31 2.10 9.70
Wall 4 1 x 2 3.22 2.10 13.52
Deductions
Door D -1 x 15 0.91 2.10 -28.67
Door D -1 x 2 1.15 2.10 -4.83

Total Quantity = 127.00 Sqm

11 Existing Electrical Point Details

VARIOUS STATION OFFICE (Terminal Right side)


Ground Floor
Light Point - Tube Light 1 x 37 37.00 nos
Light Point - Ceiling 1 x 14 14.00 nos
Fan Point (Ceiling) 1 x 24 24.00 nos
Fan Point (Wall) 1 x 5 5.00 nos
First Floor
Light Point - Ceiling 1 x 126 126.00 nos
Fan Point (Ceiling) 1 x 26 26.00 nos
AC Point 1 x 24 24.00 nos
Concourse Area
Ground Floor
Light Point - Tube Light 1 x 29 29.00 nos
Light Point - CFL 1 x 3 3.00 nos
Fan Point (Ceiling) 1 x 17 17.00 nos
Fan Point (Wall) 1 x 2 2.00 nos
MAJOR UPGRADATION OF MADURAI RAILWAY JUNCCTION - DISMANTLING WORKS

ABSTRACT ESTIMATION - TERMINAL BUILDING

S.No Item No Description of Item Quantity Rate Unit Amount

1 15.2.2 Nominal concrete 1:4:8 or leaner mix (including equivalent design mix) 114.73 1,239.60 cum 142,223.00

Demolishing R.C.C work manually / by mechanical means including stacking of


2 15.3 1276.22 2,928.10 cum 3,736,892.00
steel bars and disposal of unserviceable material within 50 metres lead

Demolishing brick work manually / by mechanical means including stacking of


3 15.7.4 serviceable material and disposal of unserviceable material within 50 metres 457.80 1,698.45 cum 777,550.00
lead - in cement mortar

Dismantling tile work in floors and roofs laid in cement mortar including
4 15.23.1 1085.50 60.50 sqm 65,673.00
stacking material within 50 metres lead - for thickness of tiles 10mm to 25mm

Demolishing mud phaska in terracing and disposal of material within 50 metres


5 15.27 86.90 753.75 Cum 65,501.00
lead.

Dismantling steel work in built up sections in angles, tees, flats and channels
6 15.18 including all gusset plates, bolts, nuts, cutting rivets ,welding etc.including 338.00 4.65 kg 1,572.00
dismembering and stacking within 50 metres lead

Dismantling doors, windows and clerestory windows (steel or wood) shutter


7 15.12.2 including chowkhats, architrave, holdfasts etc. -64.00 414.55 each (26,531.00)
complete and stacking within 50 metres lead of area beyond 3 sq.metres

Dismantling cement asbestos or other hard board ceiling or partition walls


8 15.41 including stacking of serviceable materials and disposal of unserviceable 0.00 46.50 each -
materials within 50 metres lead.

Total Amount 4,762,880.00

Total Amount in Lakhs 47.63


DETAILED ESTIMATE - Termianl Building (East Side)
S.no Description Nos L B H Quantity

1 Nominal concrete 1:4:8 or leaner mix (including equivalent design mix)

Flooring Pcc
Ground Floor
Area 1 1 x 1 2.10 5.10 0.10 1.07
Area 2 1 x 1 6.07 2.40 0.10 1.46
Area 3 1 x 1 3.94 2.40 0.10 0.95
Area 4 1 x 1 4.60 2.40 0.10 1.10
Area 5 1 x 1 4.94 7.74 0.10 3.82
Area 6 1 x 1 2.54 2.63 0.10 0.67
Area 7 1 x 1 7.50 7.74 0.10 5.81
Area 8 1 x 1 4.73 4.21 0.10 1.99
Area 9 1 x 1 4.50 3.30 0.10 1.49
Area 10 1 x 1 2.50 10.37 0.10 2.59
Area 11 1 x 1 7.45 2.40 0.10 1.79
Area 12 1 x 1 3.01 4.10 0.10 1.23
Area 13 1 x 1 7.78 4.33 0.10 3.37
Area 14 1 x 1 11.10 4.84 0.10 5.37
Area 15 1 x 1 5.50 3.83 0.10 2.11
Area 16 1 x 1 1.54 3.60 0.10 0.55
Area 17 1 x 1 3.60 3.60 0.10 1.30
Area 18 1 x 1 3.30 2.50 0.10 0.83
Area 19 1 x 1 9.03 5.90 0.10 5.33
Area 20 1 x 1 4.59 0.88 0.10 0.40
Area 21 1 x 1 3.25 4.50 0.10 1.46
Area 22 1 x 1 2.02 4.50 0.10 0.91
Area 23 1 x 1 6.26 4.50 0.10 2.82
Area 24 1 x 1 4.54 4.50 0.10 2.04
Area 25 1 x 1 2.95 4.50 0.10 1.33
Area 26 1 x 1 11.02 5.90 0.10 6.50
Area 27 1 x 1 2.97 5.90 0.10 1.75
Toilet Area 1 x 1 1.75 1.40 0.10 0.25
Area 29 1 x 1 4.27 8.26 0.10 3.53
Area 30 1 x 1 20.06 10.04 0.10 20.14
Area 31 1 x 1 6.58 4.00 0.10 2.63
Area 32 1 x 1 2.33 5.83 0.10 1.36
Area 33 1 x 1 4.24 5.33 0.10 2.26
Area 34 1 x 1 6.90 3.98 0.10 2.75
Area 35 1 x 1 1.32 5.56 0.10 0.73
Area 36 1 x 1 8.68 4.56 0.10 3.96
Area 37 1 x 1 5.70 4.15 0.10 2.37
Area 38 1 x 1 8.68 4.56 0.10 3.96
Toilet 1 1 x 2 5.70 4.59 0.10 5.23
Area 39 1 x 1 12.60 4.40 0.10 5.54

Total Quantity = 114.73


Demolishing R.C.C work manually / by mechanical means including stacking of steel bars and disposal of
2
unserviceable material within 50 metres lead
Ground Floor
Column
Column1 1 x
Column2 1 x
Column3 1 x
Roof Beam
Beam 1 1 x
Beam 2 1 x

Roof Slab
Area 1 1 x 1 94.18 10.10 951.22
Area 2 1 x 1 19.00 10.10 191.90
Area 3 1 x 1 10.02 13.60 136.27
Deduction
Stair Area -1 x 1 4.23 5.00 0.15 -3.17

Total Quantity = 1276.22


Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of
3
unserviceable material within 50 metres lead - in cement mortar
Ground Floor
Brickwork
X-Direction
Wall 1 1 x 1 2.53 0.23 3.55 2.07
Wall 2 1 x 1 29.13 0.23 3.55 23.78
Wall 3 1 x 1 3.52 0.23 3.55 2.87
Wall 4 1 x 1 22.36 0.23 3.55 18.26
Wall 5 1 x 1 43.51 0.23 3.55 35.53
Wall 6 1 x 1 6.16 0.23 3.55 5.03
Wall 7 1 x 1 17.40 0.23 3.55 14.21
Wall 8 1 x 1 23.27 0.23 3.55 19.00
Wall 9 1 x 1 6.81 0.23 3.55 5.56
Wall 10 1 x 1 3.04 0.23 3.55 2.48
Wall 11 1 x 1 3.32 0.23 3.55 2.71
Wall 12 1 x 1 5.53 0.23 3.55 4.52
Wall 13 1 x 1 4.73 0.23 3.55 3.86
Wall 14 1 x 1 23.54 0.23 3.55 19.22
Wall 15 1 x 1 8.68 0.23 3.55 7.09
Wall 16 1 x 1 50.27 0.23 3.55 41.05
Wall 17 1 x 1 5.80 0.23 3.55 4.74
Wall 18 1 x 1 8.68 0.23 3.55 7.09
Wall 19 1 x 1 18.99 0.23 3.55 15.51
Wall 20 1 x 1 17.59 0.23 3.55 14.36
Wall 21 1 x 1 5.37 0.23 3.55 4.38
Wall 22 1 x 1 32.77 0.23 3.55 26.76
Wall 23 1 x 1 3.60 0.23 3.55 2.94
Wall 24 1 x 1 7.50 0.23 3.55 6.12
Wall 25 1 x 1 11.60 0.60 3.55 24.71
Wall 26 1 x 1 7.50 0.23 3.55 6.12

Y-Direction
Wall 1 1 x 1 15.70 0.23 3.55 12.82
Wall 2 1 x 1 5.10 0.23 3.55 4.16
Wall 3 1 x 1 2.40 0.23 3.55 1.96
Wall 4 1 x 1 7.74 0.23 3.55 6.32
Wall 5 1 x 12 2.40 0.23 3.55 23.52
Wall 6 1 x 1 3.53 0.23 3.55 2.88
Wall 7 1 x 1 10.37 0.23 3.55 8.47
Wall 8 1 x 1 13.00 0.23 3.55 10.61
Wall 9 1 x 1 4.10 0.23 3.55 3.35
Wall 10 1 x 1 3.83 0.23 3.55 3.13
Wall 11 1 x 1 3.60 0.23 3.55 2.94
Wall 12 1 x 1 4.38 0.23 3.55 3.58
Wall 13 1 x 1 7.32 0.23 3.55 5.98
Wall 14 1 x 3 4.50 0.23 3.55 11.02
Wall 15 1 x 1 5.76 0.23 3.55 4.70
Wall 16 1 x 1 4.50 0.23 3.55 3.67
Wall 17 1 x 1 4.50 0.23 3.55 3.67
Wall 18 1 x 1 5.83 0.23 3.55 4.76
Wall 19 1 x 1 10.56 0.23 3.55 8.62
Wall 20 1 x 1 3.68 0.30 3.55 3.92
Wall 21 1 x 1 10.27 0.23 3.55 8.39
Wall 22 1 x 1 10.04 0.23 3.55 8.20
Wall 23 1 x 1 3.99 0.23 3.55 3.26
Wall 24 1 x 1 3.80 0.23 3.55 3.10
Wall 25 1 x 1 5.56 0.23 3.55 4.54
Wall 26 1 x 1 13.32 0.23 3.55 10.88
Wall 27 1 x 1 13.77 0.23 3.55 11.24
Wall 28 1 x 1 4.40 0.23 3.55 3.59
Wall 29 1 x 1 2.80 0.23 3.55 2.29
Wall 30 1 x 1 9.46 0.23 3.55 7.72

Partition Wall
Wall 1 1 x 2 1.38 0.15 3.55 1.47
Wall 2 1 x 1 2.07 0.15 3.55 1.10
Wall 3 1 x 1 5.60 0.12 0.15 0.10
Wall 4 1 x 1 2.26 0.12 0.15 0.04
Wall 5 1 x 15 1.14 0.12 0.15 0.31
Wall 6 1 x 3 4.40 0.12 0.15 0.24
Wall 7 1 x 1 2.57 0.12 0.15 0.05

Deductions
Door D1 -1 x 5 1.30 0.23 2.10 -3.14
Door D2 -1 x 1.20 0.70 2.10 -1.76
Door D3 -1 x 2 0.80 0.70 2.10 -2.35
Door D4 -1 x 1 0.80 0.35 2.10 -0.59
Door D4 -1 x 1 0.80 0.15 2.10 -0.25
Door D5 -1 x 3 0.75 0.70 2.10 -3.31
Door D6 -1 x 8 1.00 0.70 2.10 -11.76
Door D7 -1 x 9 1.15 0.70 2.10 -15.21
Door D8 -1 x 1 1.20 0.35 2.10 -0.88
Door D9 -1 x 2 1.30 0.70 2.10 -3.82
Window W1 -1 x 12 1.25 0.70 1.50 -15.75

Total Quantity = 457.80


Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead -
4
for thickness of tiles 10mm to 25mm
Roof Tile
Ground Floor
Area 1 1 x 1 93.13 8.70 810.23
Area 2 1 x 1 17.80 8.70 154.86
Area 3 1 x 1 9.33 12.90 120.36

Total Quantity = 1085.50

5 Demolishing mud phaska in terracing and disposal of material within 50 metres lead.

Ground Floor
Ground Floor
Area 1 1 x 1 93.13 8.70 0.08 64.82
Area 2 1 x 1 17.80 8.70 0.08 12.39
Area 3 1 x 1 9.33 12.90 0.08 9.63

Total Quantity = 86.90

Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts,
6
cutting rivets ,welding etc.including dismembering and stacking within 50 metres lead

Grills Kg/Sqm
Ground Floor
Window W1 1 x 12 1.25 1.50 15.00 337.50

First Floor

Total Quantity = 338.00

Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave,
7
holdfasts etc. complete and stacking within 50 metres lead of area beyond 3 sq.metres

Ground Floor
Door D1 -1 x 5 0.91 0.70 2.10 -6.69
Door D2 -1 x 2 0.85 0.70 2.10 -2.50
Door D3 -1 x 2 0.80 0.70 2.10 -2.35
Door D4 -1 x 1 0.80 0.35 2.10 -0.59
Door D4 -1 x 1 0.80 0.15 2.10 -0.25
Door D5 -1 x 3 0.75 0.70 2.10 -3.31
Door D6 -1 x 8 1.00 0.70 2.10 -11.76
Door D7 -1 x 9 1.15 0.70 2.10 -15.21
Door D8 -1 x 1 1.20 0.35 2.10 -0.88
Door D9 -1 x 2 1.30 0.70 2.10 -3.82
Window W1 -1 x 12 1.25 0.70 1.50 -15.75
First Floor

Total Quantity = -64.00

Dismantling cement asbestos or other hard board ceiling or partition walls including stacking of serviceable materials
8
and disposal of unserviceable materials within 50 metres lead.
Total Quantity = 0.00
Unit

Cum
bars and disposal of

Cum
aterial and disposal of
Cum
ithin 50 metres lead -

Sqm

Cum

set plates, bolts, nuts,


Kg

howkhats, architrave,

Nos

serviceable materials
Sqm
MAJOR UPGRADATION OF MADURAI RAILWAY JUNCCTION - DISMANTLING WORKS

ABSTRACT ESTIMATION - TERMINAL BUILDING(East Side)

S.No Item No Description of Item Quantity Rate Unit Amount

1 15.2.2 Nominal concrete 1:4:8 or leaner mix (including equivalent design mix) 78.07 1,239.60 cum 96,776.00

Demolishing R.C.C work manually / by mechanical means including stacking of


2 15.3 308.32 2,928.10 cum 902,793.00
steel bars and disposal of unserviceable material within 50 metres lead

Demolishing brick work manually / by mechanical means including stacking of


3 15.7.4 serviceable material and disposal of unserviceable material within 50 metres 319.70 1,698.45 cum 542,994.00
lead - in cement mortar

Demolishing stone rubble masonry manually/ by mechanical means including


4 15.9.1 stacking of serviceable material and disposal of unserviceable material within 954.80 cum
50 metres lead as per direction of Engineer-in-charge : In lime mortar

Dismantling tile work in floors and roofs laid in cement mortar including
4 15.23.1 1264.10 60.50 sqm 76,478.00
stacking material within 50 metres lead - for thickness of tiles 10mm to 25mm

Demolishing mud phaska in terracing and disposal of material within 50 metres


5 15.27 83.20 753.75 Cum 62,712.00
lead.

Dismantling steel work in built up sections in angles, tees, flats and channels
6 15.18 including all gusset plates, bolts, nuts, cutting rivets ,welding etc.including 178.00 4.65 kg 828.00
dismembering and stacking within 50 metres lead

Dismantling doors, windows and clerestory windows (steel or wood) shutter


7 15.12.2 including chowkhats, architrave, holdfasts etc. 40.00 414.55 each 16,582.00
complete and stacking within 50 metres lead of area beyond 3 sq.metres

Dismantling cement asbestos or other hard board ceiling or partition walls


8 15.41 including stacking of serviceable materials and disposal of unserviceable Err:509 46.50 each Err:509
materials within 50 metres lead.

Total Amount Err:509

Total Amount in Lakhs Err:509


DETAILED ESTIMATE - Termianl Building (East Side)
S.no Description Nos L B H Quantity Unit

1 Nominal concrete 1:4:8 or leaner mix (including equivalent design mix)

Flooring PCC
Ground Floor
Guard Box Room
Area 1 1 x 1 3.30 2.50 0.10 0.83
Area 2 1 x 1 9.03 5.90 0.10 5.33
Area 3 1 x 1 4.59 0.88 0.10 0.40
Area 4 1 x 1 3.25 4.50 0.10 1.46
Area 5 1 x 1 2.02 4.50 0.10 0.91
Area 6 1 x 1 6.26 4.50 0.10 2.82
Area 7 1 x 1 4.54 4.50 0.10 2.04
Area 8 1 x 1 2.95 4.50 0.10 1.33
Area 9 1 x 1 11.02 5.90 0.10 6.50
Area 10 1 x 1 2.97 5.90 0.10 1.75
Toilet Area 1 x 1 1.75 1.40 0.10 0.25
Restaurant
Area 11 1 x 1 4.27 8.26 0.10 3.53
Area 12 1 x 1 20.06 10.04 0.10 20.14
Area 13 1 x 1 6.58 4.00 0.10 2.63
Area 14 1 x 1 2.33 5.83 0.10 1.36
Area 15 1 x 1 4.24 5.33 0.10 2.26
Area 16 1 x 1 6.90 3.98 0.10 2.75
Area 17 1 x 1 1.32 5.56 0.10 0.73
Area 18 1 x 1 8.68 4.56 0.10 3.96
Area 19 1 x 1 5.70 4.15 0.10 2.37
Waiting Hall
Area 20 1 x 1 8.68 4.56 0.10 3.96
Toilet 1 1 x 2 5.70 4.59 0.10 5.23
Area 21 1 x 1 12.60 4.40 0.10 5.54

Total Quantity = 78.07 Cum


Demolishing R.C.C work manually / by mechanical means including stacking of steel bars and disposal of
2
unserviceable material within 50 metres lead

Ground Floor
Column
Column1 1 x 3 0.23 0.30 3.90 0.81
Column2 1 x 7 0.60 1.00 3.90 16.38
Column3 1 x 32 0.45 0.45 3.90 25.27
Circular Column 1 x 5 0.28 3.90 5.46
Roof Beam
Beam 1 1 x 5 84.60 0.30 0.45 57.10
Beam 2 1 x 4 18.23 0.30 0.45 9.84
Beam 3 1 x 13 14.00 0.30 0.45 24.57

Lintel Beam
Wall 1 1 x 1 3.53 0.23 0.15 0.12
Wall 2 1 x 1 22.36 0.23 0.15 0.77
Wall 3 1 x 1 43.51 0.23 0.15 1.50
Wall 4 1 x 1 6.16 0.23 0.15 0.21
Wall 6 1 x 1 23.27 0.23 0.15 0.80
Wall 7 1 x 1 6.81 0.23 0.15 0.23
Wall 8 1 x 1 3.04 0.23 0.15 0.10
Wall 10 1 x 1 5.53 0.23 0.15 0.19
Wall 12 1 x 1 23.54 0.23 0.15 0.81
Wall 13 1 x 1 8.68 0.23 0.15 0.30
Wall 14 1 x 1 50.27 0.23 0.15 1.73
Wall 15 1 x 1 5.80 0.23 0.15 0.20
Wall 16 1 x 1 8.68 0.23 0.15 0.30
Wall 17 1 x 1 18.99 0.23 0.15 0.66
Wall 22 1 x 1 7.50 0.23 0.15 0.26
Wall 24 1 x 1 7.50 0.23 0.15 0.26
Wall 1 1 x 1 4.38 0.23 0.15 0.15
Wall 2 1 x 1 7.32 0.23 0.15 0.25
Wall 3 1 x 3 4.50 0.23 0.15 0.47
Wall 4 1 x 1 5.76 0.23 0.15 0.20
Wall 5 1 x 1 4.50 0.23 0.15 0.16
Wall 6 1 x 1 5.83 0.23 0.15 0.20
Wall 7 1 x 1 10.56 0.23 0.15 0.36
Wall 9 1 x 1 10.27 0.23 0.15 0.35
Wall 10 1 x 1 10.04 0.23 0.15 0.35
Wall 11 1 x 1 3.99 0.23 0.15 0.14
Wall 12 1 x 1 3.80 0.23 0.15 0.13
Wall 13 1 x 1 5.56 0.23 0.15 0.19
Wall 14 1 x 1 13.32 0.23 0.15 0.46
Wall 15 1 x 1 13.77 0.23 0.15 0.48
Wall 16 1 x 1 4.40 0.23 0.15 0.15
Wall 17 1 x 1 2.80 0.23 0.15 0.10
Wall 18 1 x 1 9.46 0.23 0.15 0.33
Wall 1 1 x 2 1.38 0.15 0.15 0.06
Wall 2 1 x 1 2.07 0.15 0.15 0.05
Wall 3 1 x 1 5.60 0.12 0.15 0.10
Wall 4 1 x 1 2.26 0.12 0.15 0.04
Wall 5 1 x 15 1.14 0.12 0.15 0.31
Wall 6 1 x 3 4.40 0.12 0.15 0.24
Wall 7 1 x 1 2.57 0.12 0.15 0.05

Roof Slab
Area 1 1 x 1 13.06 4.63 0.15 9.07
Area 2 1 x 1 13.46 4.00 0.15 8.08
Area 3 1 x 1 21.33 9.46 0.15 30.27
Area 4 1 x 1 43.74 10.50 0.15 68.89
Area 5 1 x 1 23.77 11.09 0.15 39.54
Deduction
Stair Area -1 x 1 2.41 2.00 0.15 -0.72

Total Quantity = 308.32 Cum


Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of
3
unserviceable material within 50 metres lead - in cement mortar
Ground Floor
Brickwork
X-Direction
Parcel Room
Wall 1 1 x 1 3.53 0.23 3.90 3.17
Wall 2 1 x 1 22.36 0.23 3.90 20.06
Toilet Near Wall To Waiting Hall Toilet
Wall 3 1 x 1 43.51 0.23 3.90 39.03
Near Wall Waiting
Wall 4 1 x 1 6.16 0.23 3.90 5.53
Parcel Room Centre Wall
Wall 6 1 x 1 23.27 0.23 3.90 20.87
Wall 7 1 x 1 6.81 0.23 3.90 6.11
Wall 8 1 x 1 3.04 0.23 3.90 2.73
Wall 10 1 x 1 5.53 0.23 3.90 4.96
Parcel Room Backside Wall
Wall 12 1 x 1 23.77 0.23 3.90 21.32
Wall 13 1 x 1 8.68 0.23 3.90 7.79
Back Side Outer Wall
Wall 14 1 x 1 50.27 0.23 3.90 45.09
Renovation Hotel
Wall 15 1 x 1 5.80 0.23 3.90 5.20
Wall 16 1 x 1 8.68 0.23 3.90 7.79
Waiting Room Back Wall
Wall 17 1 x 1 18.99 0.23 3.90 17.03

Y-Direction
Parcel Office
Wall 1 1 x 1 4.38 0.23 3.90 3.93
Wall 2 1 x 1 7.32 0.23 3.90 6.57
Wall 3 1 x 3 4.50 0.23 3.90 12.11
Wall 4 1 x 1 5.90 0.23 3.90 5.29
Wall 5 1 x 1 4.50 0.23 3.90 4.04
Wall 6 1 x 1 5.83 0.23 3.90 5.23
Wall 7 1 x 2 10.56 0.23 3.90 18.94
Waiting Area
Wall 10 1 x 2 10.04 0.23 3.90 18.01
Wall 11 1 x 1 4.21 0.23 3.90 3.78
Wall 12 1 x 1 3.80 0.23 3.90 3.41
Wall 13 1 x 1 5.56 0.23 3.90 4.99
Waiting Area Toilet
Wall 14 1 x 1 13.54 0.23 3.90 12.15
Wall 15 1 x 1 13.77 0.23 3.90 12.35
Wall 16 1 x 1 4.40 0.23 3.90 3.95
Wall 17 1 x 1 2.80 0.23 3.90 2.51
Wall 18 1 x 1 9.46 0.23 3.90 8.49

Partition Wall
Waiting Area Front Side
Wall 1 1 x 2 4.37 0.15 2.10 2.75
Handi Cap Toilet Near Wall
Wall 2 1 x 1 2.07 0.15 2.10 0.65
Renovation Hotel Stair Wall
Wall 3 1 x 1 3.04 0.12 2.10 0.77
Wall 4 1 x 1 2.26 0.12 2.10 0.57
Waiting Area Toilet
Wall 5 1 x 15 1.14 0.12 2.10 4.31
Wall 6 1 x 3 4.40 0.12 2.10 3.33
Waiting Hall Near Room
Wall 7 1 x 1 2.57 0.12 2.10 0.65
Column Deductions
Column C1 -1 x 16 0.45 0.45 0.15 -0.49

Deductions
Door D1 -1 x 1 1.10 0.23 2.10 -0.53
Door D4 -1 x 4 1.20 0.23 2.10 -2.32
Door D5 -1 x 1 1.28 0.23 2.10 -0.62
Door D5 -1 x 1 1.46 0.23 2.10 -0.71
Door D6 -1 x 14 0.80 0.12 2.10 -2.82
Door D7 -1 x 2 0.90 0.23 2.10 -0.87
Window W1 -1 x 4 0.90 0.23 0.70 -0.58
Window W2 -1 x 10 1.10 0.23 0.70 -1.77
Window W3 -1 x 2 0.80 0.23 0.70 -0.26

Jali -1 x 3 1.70 0.23 2.50 -2.93


Window W1 -1 x 3 1.20 0.23 1.40 -1.16
Window W2 -1 x 1 2.50 0.23 2.10 -1.21
Window W3 -1 x 1 1.80 0.23 2.10 -0.87
Window W4 -1 x 1 1.35 0.23 2.10 -0.65
Window W5 -1 x 1 3.50 0.23 2.10 -1.69
Window W6 -1 x 6 1.20 0.23 2.10 -3.48
Shutter 1 -1 x 1 2.80 0.23 1.74 -1.12
Shutter 2 -1 x 1 2.00 0.23 2.43 -1.12
Door D1 -1 x 1 1.20 0.23 2.10 -0.58

Total Quantity = 319.70 Cum

Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and
4
disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge : In lime mortar

Toilet Block
Wall 1 1 x 3 2.10 0.30 3.90 7.37
Wall 2 1 x 1 3.08 0.30 3.90 3.60
Waiting Hall
Wall 1 1 x 1 17.50 0.30 3.90 20.48
Wall 2 1 x 1 11.00 0.30 3.90 12.87

Wall 1 1 x 1 10.33 0.30 3.90 12.09


Deductions
Door D -1 x 2 0.80 0.30 2.10 -1.01
Ventilator V -1 x 2 0.60 0.30 0.60 -0.22
Door D 1 -1 x 1 1.43 0.30 2.10 -0.90

Total Quantity = 54.30 Cum


Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead -
5
for thickness of tiles 10mm to 25mm
Roof Tile
Ground Floor
Area 1 1 x 1 13.06 4.63 60.47
Area 2 1 x 1 13.46 4.00 53.84
Area 3 1 x 1 21.33 9.46 201.78
Area 4 1 x 1 43.74 10.50 459.27
Area 5 1 x 1 23.77 11.09 263.61
Skirting
Area 1 1 x 1 11.60 0.10 1.16
Area 2 1 x 1 29.86 0.10 2.99
Area 3 1 x 1 10.94 0.10 1.09
Area 4 1 x 1 15.50 0.10 1.55
Area 5 1 x 1 13.04 0.10 1.30
Area 6 1 x 1 21.52 0.10 2.15
Area 7 1 x 1 18.08 0.10 1.81
Area 8 1 x 1 14.90 0.10 1.49
Area 9 1 x 1 33.84 0.10 3.38
Area 10 1 x 1 17.74 0.10 1.77
Area 11 1 x 1 25.06 0.10 2.51
Area 12 1 x 1 60.20 0.10 6.02
Area 13 1 x 1 21.16 0.10 2.12
Area 14 1 x 1 16.32 0.10 1.63
Area 15 1 x 1 19.14 0.10 1.91
Area 16 1 x 1 21.76 0.10 2.18
Area 17 1 x 1 13.76 0.10 1.38
Area 18 1 x 1 26.84 0.10 2.68
Area 19 1 x 1 19.70 0.10 1.97
Area 20 1 x 1 26.48 0.10 2.65
Area 21 1 x 1 34.00 0.10 3.40
Dadooing
Toilet 1 1 x 3 5.68 2.10 35.78
Toilet 2 1 x 7 4.24 2.10 62.33
Toilet 3 1 x 4 4.14 2.10 34.78
Passage Area 1 1 x 1 23.08 2.10 48.47
Passage Area 2 1 x 1 22.58 2.10 47.42
Deduction
Door D1 -1 x 28 0.80 2.10 -47.04
Door D2 -1 x 2 0.90 2.10 -3.78

Total Quantity = 1264.10 Sqm

6 Demolishing mud phaska in terracing and disposal of material within 50 metres lead.

Ground Floor
Ground Floor
Area 1 1 x 1 13.06 4.63 0.08 4.84
Area 2 1 x 1 13.46 4.00 0.08 4.31
Area 3 1 x 1 21.33 9.46 0.08 16.14
Area 4 1 x 1 43.74 10.50 0.08 36.74
Area 5 1 x 1 23.77 11.09 0.08 21.09

Total Quantity = 83.20 Cum

Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts,
7
cutting rivets ,welding etc.including dismembering and stacking within 50 metres lead

Grills Kg/Sqm
Ground Floor
Window W 1 1 x 4 0.90 0.70 15.00 37.80
Window W 2 1 x 10 1.10 0.70 15.00 115.50
Window W 3 1 x 2 0.80 0.70 15.00 16.80

Ventilator 1 x 2 0.60 0.60 10.00 7.20

Total Quantity = 178.00 Kg

Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave,
8
holdfasts etc. complete and stacking within 50 metres lead of area beyond 3 sq.metres

Ground Floor
Door D1 1 x 1 1.00
Door D4 1 x 4 4.00
Door D5 1 x 1 1.00
Door D5 1 x 1 1.00
Door D6 1 x 14 14.00
Door D7 1 x 2 2.00
Window W1 1 x 4 4.00
Window W2 1 x 10 10.00
Window W3 1 x 2 2.00
Window W1 1 x 1 1.00

Total Quantity = 40.00 Nos


Dismantling cement asbestos or other hard board ceiling or partition walls including stacking of serviceable materials
9
and disposal of unserviceable materials within 50 metres lead.

Total Quantity = 0.00 Nos

10 Existing Electrical Point Details

(Terminal East side)


Ground Floor
Light Point - Tube Light 1 x 106 106.00 nos
Light Point - focus 1 x 2 2.00 nos
Fan Point (Ceiling) 1 x 52 52.00 nos
Fan Point (Wall) 1 x 3 3.00 nos
MADURAI DISMANTLING WORKS(Finished Buildings)
S.NO
1 Store Room
2 Canteen Building
3 Sump Room
4 MLTP
5 ATM Building
6 Toilet Block
7 Member Association Building
8 Staff Quarters
9 Platform(6) Toilets
10 Platform(2&3) Toilets
11 Platform(4&5) Toilets
12 Reservation Counter
13 HMS & Coolie Porter Rest Room
14 Steel Fob
15 Concrete Fob

Buildings In Progress
1 Executive Lounge
2 Terminal Building
3 Platform(1-6)Truss
MAJOR UPGRADATION OF MADURAI RAILWAY JUNCCTION - DISMANTLING WORKS

ABSTRACT ESTIMATION - FOOT OVER BRIDGE

S.No Item No Description of Item Quantity Rate Unit Amount

1 15.2.2 Nominal concrete 1:4:8 or leaner mix (including equivalent design mix) 45.80 1,239.60 cum 56,774.00

Demolishing R.C.C work manually / by mechanical means including stacking of


2 15.3 342.60 2,928.10 cum 1,003,167.00
steel bars and disposal of unserviceable material within 50 metres lead

Demolishing brick work manually / by mechanical means including stacking of


3 15.7.4 serviceable material and disposal of unserviceable material within 50 metres 0.00 1,698.45 cum -
lead - in cement mortar

Dismantling aluminium/ Gypsum partitions, doors, windows, fixed glazing and


4 15.57 false ceiling including disposal of unserviceable material and stacking of 0.00 46.50 sqm -
serviceable material with in 50 meters lead as directed by Engineer-in-charge.

Dismantling tile work in floors and roofs laid in cement mortar including
5 15.23.1 51.00 60.50 sqm 3,086.00
stacking material within 50 metres lead - for thickness of tiles 10mm to 25mm

Demolishing mud phaska in terracing and disposal of material within 50 metres


6 15.27 0.00 753.75 Cum -
lead.

Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking
7 15.28.1 735.00 136.00 sqm 99,960.00
the material within 50 metres lead of - G.S.sheet

Dismantling steel work in built up sections in angles, tees, flats and channels
8 15.18 including all gusset plates, bolts, nuts, cutting rivets ,welding etc.including 22624.40 4.65 kg 105,203.00
dismembering and stacking within 50 metres lead

Dismantling doors, windows and clerestory windows (steel or wood) shutter


9 15.12.2 including chowkhats, architrave, holdfasts etc. 0.00 414.55 each -
complete and stacking within 50 metres lead of area beyond 3 sq.metres

Total Amount 1,268,190.00

Total Amount in Lakhs 12.69


DETAILED ESTIMATE -RCC FOB

S No. Description Nos L B H Quantity Unit

1 Nominal concrete 1:4:8 or leaner mix (including equivalent design mix)

Flooring PCC
Deck Slab-Portion
Deck Slab Below Area 1 x 1 36.70 7.30 0.10 26.79
Lift Room Front Area 1 x 1 3.53 4.46 0.10 1.57
Escalator Below Area 1 x 1 15.28 5.11 0.10 7.81
Stair Below Area 1 x 1 17.19 5.56 0.10 9.56

Total Quantity = 45.80 Cum

Demolishing R.C.C work manually / by mechanical means including stacking of steel bars and disposal of
2
unserviceable material within 50 metres lead

Entrance Staircase - Platform 1


Column Below Flight Slab
Column1 1 x 2 0.30 0.45 0.45 0.12
Column2 1 x 2 0.30 0.45 1.40 0.38
Column3 1 x 4 0.30 0.45 2.00 1.08
Column4 1 x 4 0.30 0.45 4.10 2.21
Column Above Flight Slab
Column1 1 x 2 0.23 0.23 3.00 0.32
Column2 1 x 2 0.23 0.23 3.00 0.32
Column3 1 x 4 0.23 0.23 3.00 0.63
Column4 1 x 4 0.23 0.23 3.00 0.63
Column5 1 x 2 0.23 0.23 3.20 0.34

Flight Slab 1 1 x 1 5.04 4.30 0.20 4.33


Flight Slab 2 1 x 1 4.75 4.30 0.20 4.09
Flight Slab 3 1 x 1 3.65 4.30 0.20 3.14
Landing Slab 1 1 x 1 4.30 1.58 0.20 1.36
Landing Slab 2 1 x 1 4.30 1.58 0.20 1.36
Beam
Flight Slab Beam 1 x 2 16.60 0.30 0.20 1.99
Landing Slab 1-Beam
Beam 1 1 x 2 4.07 0.45 0.20 0.73
Beam 2 1 x 2 1.60 0.45 0.20 0.29
Landing Slab 2-Beam
Beam 1 1 x 2 4.07 0.45 0.20 0.73
Beam 2 1 x 2 1.60 0.45 0.20 0.29
Connecting Beam
Beam 1 1 x 2 3.77 0.30 0.30 0.68
Beam 2 1 x 2 1.30 0.30 0.30 0.23
Roof Slab
Area 1 1 x 1 17.61 3.22 0.15 8.51
Area 2 1 x 1 17.61 3.22 0.15 8.51
Roof Beam
Side Beam 1 1 x 2 17.61 0.23 0.23 1.86
Center Beam
Rectangular Area 1 x 7 3.85 0.23 0.30 1.86
Triangular Area 7 x 0.5 3.85 0.23 0.30 0.93

Steps 43 x 0.5 4.30 0.30 0.15 4.16

Entrance Staircase - Front Side


Column Below Flight Slab
Column1 1 x 2 0.30 0.45 0.45 0.12
Column2 1 x 2 0.30 0.45 1.40 0.38
Column3 1 x 4 0.30 0.45 2.00 1.08
Column4 1 x 4 0.30 0.45 4.10 2.21
Column Above Flight Slab
Column1 1 x 2 0.23 0.23 3.00 0.32
Column2 1 x 2 0.23 0.23 3.00 0.32
Column3 1 x 4 0.23 0.23 3.00 0.63
Column4 1 x 4 0.23 0.23 3.00 0.63
Column5 1 x 2 0.23 0.23 3.20 0.34

Flight Slab 1 1 x 1 5.04 4.30 0.20 4.33


Flight Slab 2 1 x 1 4.75 4.30 0.20 4.09
Flight Slab 3 1 x 1 3.65 4.30 0.20 3.14
Landing Slab 1 1 x 1 4.30 1.58 0.20 1.36
Landing Slab 2 1 x 1 4.30 1.58 0.20 1.36
Beam
Flight Slab Beam 1 x 2 16.60 0.30 0.20 1.99
Landing Slab 1-Beam
Beam 1 1 x 2 4.07 0.45 0.20 0.73
Beam 2 1 x 2 1.60 0.45 0.20 0.29
Landing Slab 2-Beam
Beam 1 1 x 2 4.07 0.45 0.20 0.73
Beam 2 1 x 2 1.60 0.45 0.20 0.29
Connecting Beam
Beam 1 1 x 2 3.77 0.30 0.30 0.68
Beam 2 1 x 2 1.30 0.30 0.30 0.23
Roof Slab
Area 1 1 x 1 17.61 3.22 0.15 8.51
Area 2 1 x 1 17.61 3.22 0.15 8.51
Roof Beam
Side Beam 1 1 x 2 17.61 0.23 0.23 1.86
Center Beam
Rectangular Area 1 x 7 3.85 0.23 0.30 1.86
Triangular Area 7 x 0.5 3.85 0.23 0.30 0.93

Steps 43 x 0.5 4.30 0.30 0.15 4.16

Deck Slab-Portion
Deck Slab Area 1 x 1 36.70 7.30 0.25 66.98
Column Below Deck Slab
Column 1 x 4 0.45 0.45 5.07 4.11
Column Top 1 x 4 1.00 1.00 1.00 4.00
Column Above Deck Slab
Column 2 x 11 0.23 0.23 3.25 3.78
Deck Slab -Beam
Beam 1 1 x 2 4.65 0.45 0.35 1.46
Beam 2 1 x 2 2.30 0.45 0.35 0.72
Connecting Beam
Beam 1 1 x 2 4.65 0.45 0.40 1.67
Beam 2 1 x 2 2.30 0.45 0.40 0.83
Side Walls
Top Area 1 x 1 36.70 0.90 0.35 11.56
Middle Portion 1 x 1 36.70 0.23 1.58 13.34
Bottom Portion Side Projection 2 x 11 0.75 0.23 0.15 0.57
Side Projection Triangle 22 x 0.5 0.75 0.23 1.58 3.00
Roof Slab
Area 1 1 x 1 36.70 3.22 0.15 17.73
Area 2 1 x 1 36.70 3.22 0.15 17.73
Roof Beam
Side Beam 1 1 x 2 36.70 0.23 0.23 3.88
Center Beam
Rectangular Area 1 x 11 4.65 0.23 0.30 3.53
Triangular Area 11 x 0.5 4.65 0.23 0.30 1.76

Lift Room Passage&Esacalator Area


Column Below Deck Slab
Column 1 x 4 0.23 0.23 6.07 1.28
Column Above Deck Slab
Column 1 x 4 0.23 0.23 3.25 0.69
Beam @ Plinth Level
Beam 1 1 x 2 3.90 0.23 0.30 0.54
Beam 2 1 x 2 4.00 0.23 0.30 0.55
Beam @ Mid Level
Beam 1 1 x 2 3.90 0.23 0.30 0.54
Beam 2 1 x 2 4.00 0.23 0.30 0.55
Beam @ Roof Level
Beam 1 1 x 2 3.90 0.23 0.30 0.54
Beam 2 1 x 2 4.00 0.23 0.30 0.55
Roof Beam
Side Beam 1 1 x 2 6.53 0.23 0.23 0.69
Center Beam
Rectangular Area 1 x 2 4.00 0.23 0.30 0.55
Triangular Area 2 x 0.5 4.00 0.23 0.30 0.28
Lift Room Beam 1 x 2 4.46 0.23 0.30 0.62
Side Walls
Wall 1 1 x 1 6.07 0.23 1.58 2.21
Wall 2 1 x 1 2.17 0.23 1.58 0.79
Wall 3 1 x 2 1.96 0.23 1.58 1.42
Wall 4 1 x 1 2.27 0.23 1.58 0.82
Wall 5 1 x 1 4.02 0.23 1.58 1.46
Wall 6 1 x 1 1.96 0.23 1.58 0.71
Wall 7 1 x 1 0.95 0.23 3.43 0.75

Lift Room Walls


Wall 1 1 x 2 3.50 0.23 10.10 16.26
Wall 2 1 x 2 2.00 0.23 10.10 9.29
Lift Door Open -1 x 2 1.00 0.23 2.10 -0.97
Roof Beam
Side Beam 1 1 x 2 4.46 0.23 0.38 0.78

Escalator Below
Rcc Wall 1 x 2 4.20 0.30 0.90 2.27

Staircase - Proposed Platform


Column Below Flight Slab
Column1 1 x 2 0.30 0.45 0.45 0.12
Column2 1 x 2 0.30 0.45 1.40 0.38
Column3 1 x 4 0.30 0.45 2.00 1.08
Column4 1 x 4 0.30 0.45 4.10 2.21
Column Above Flight Slab
Column1 1 x 2 0.23 0.23 3.00 0.32
Column2 1 x 2 0.23 0.23 3.00 0.32
Column3 1 x 4 0.23 0.23 3.00 0.63
Column4 1 x 4 0.23 0.23 3.00 0.63
Column5 1 x 2 0.23 0.23 3.20 0.34

Flight Slab 1 1 x 1 5.04 2.10 0.20 2.12


Flight Slab 2 1 x 1 4.75 2.10 0.20 2.00
Flight Slab 3 1 x 1 3.65 2.10 0.20 1.53
Landing Slab 1 1 x 1 4.30 1.58 0.20 1.36
Landing Slab 2 1 x 1 4.30 1.58 0.20 1.36
Beam
Flight Slab Beam 1 x 2 16.60 0.30 0.20 1.99
Landing Slab 1-Beam
Beam 1 1 x 2 2.10 0.45 0.20 0.38
Beam 2 1 x 2 1.60 0.45 0.20 0.29
Landing Slab 2-Beam
Beam 1 1 x 2 2.10 0.45 0.20 0.38
Beam 2 1 x 2 1.60 0.45 0.20 0.29
Connecting Beam
Beam 1 1 x 2 3.77 0.30 0.30 0.68
Beam 2 1 x 2 1.30 0.30 0.30 0.23
Roof Slab
Area 1 1 x 1 17.61 3.18 0.15 8.40
Area 2 1 x 1 17.61 3.18 0.15 8.40
Roof Beam
Side Beam 1 1 x 2 17.61 0.23 0.23 1.86
Center Beam
Rectangular Area 1 x 7 1.65 0.23 0.30 0.80
Triangular Area 7 x 0.5 1.65 0.23 0.30 0.40

Steps 43 x 0.5 2.10 0.30 0.15 2.03

Total Quantity = 342.60 Cum


Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal
3
of unserviceable material within 50 metres lead - in cement mortar

Brickwork

Total Quantity = 0.00 Cum

Dismantling aluminium/ Gypsum partitions, doors, windows, fixed glazing and false ceiling includingdisposal of
4 unserviceable material and stacking of serviceable material with in 50 meters lead as directed by Engineer-in-
charge.

Total Quantity = 0.00 Sqm

Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres
5
lead - for thickness of tiles 10mm to 25mm

Lift Room Passage&Esacalator Area


Floor Area 1 1 x 1 4.25 1.73 7.35
Floor Area 2 1 x 1 6.19 3.90 24.14
Floor Area 3 1 x 1 4.00 2.40 9.60
Lift Front Wall Dadooing
Wall 1 1 x 1 5.75 1.60 9.20

Total Quantity = 51.00 Sqm

6 Demolishing mud phaska in terracing and disposal of material within 50 metres lead.

Total Quantity = 0.00 Cum

Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking the material within 50 metres
7
lead of - G.S.sheet

Entrance Escalator
Roof Sheet Area 1 x 2 18.09 3.22 116.66
Side Area 1 x 2 18.09 6.69 242.04
Back Side Area 1 x 1 4.12 2.10 8.65
Platform 2&3- Escalator
Roof Sheet Area 1 x 2 18.09 3.22 116.66
Side Area 1 x 2 18.09 6.69 242.04
Back Side Area 1 x 1 4.12 2.10 8.65

Total Quantity = 735.00 Sqm

Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts,
8
nuts, cutting rivets ,welding etc.including dismembering and stacking within 50 metres lead

Hand Rails Unit Wt


Staircase Platform 1
Top Rod (25mm Dia) Circular 2 x 1 17.61 1.85 65.16
Vertical Rod (25mm Dia) Square 2 x 74 1.00 1.50 222.00
Staircase Platform Front Side
Top Rod (25mm Dia) Circular 2 x 1 17.61 1.85 65.16
Vertical Rod (25mm Dia) Square 2 x 74 1.00 1.50 222.00

Escalator Sqm/Kg
Area 1 x 1 735.00 30.00 22050.00

Total Quantity = 22624.40 Kg

Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave,
9
holdfasts etc. complete and stacking within 50 metres lead of area beyond 3 sq.metres

Total Quantity = 0.00 nos

10 Existing Electrical Point Details

Ground Floor
Light Point - Tube Light 1 x 85 85.00 nos
MAJOR UPGRADATION OF MADURAI RAILWAY JUNCCTION - DISMANTLING WORKS

ABSTRACT ESTIMATION - FOOT OVER BRIDGE

S.No Item No Description of Item Quantity Rate Unit Amount

1 15.2.2 Nominal concrete 1:4:8 or leaner mix (including equivalent design mix) 23.40 1,239.60 cum 29,007.00

Demolishing R.C.C work manually / by mechanical means including stacking of


2 15.3 45.40 2,928.10 cum 132,936.00
steel bars and disposal of unserviceable material within 50 metres lead

Demolishing brick work manually / by mechanical means including stacking of


3 15.7.4 serviceable material and disposal of unserviceable material within 50 metres 0.00 1,698.45 cum -
lead - in cement mortar

Dismantling tile work in floors and roofs laid in cement mortar including
4 15.23.1 333.50 60.50 sqm 20,177.00
stacking material within 50 metres lead - for thickness of tiles 10mm to 25mm

Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking
5 15.28.1 24.20 136.00 sqm 3,291.00
the material within 50 metres lead of - G.S.sheet

Dismantling steel work in built up sections in angles, tees, flats and channels
6 15.18 including all gusset plates, bolts, nuts, cutting rivets ,welding etc.including 9911.00 4.65 kg 46,086.00
dismembering and stacking within 50 metres lead

Dismantling doors, windows and clerestory windows (steel or wood) shutter


7 15.12.2 including chowkhats, architrave, holdfasts etc. 0.00 414.55 each -
complete and stacking within 50 metres lead of area beyond 3 sq.metres

Total Amount 231,497.00

Total Amount in Lakhs 2.32


DETAILED ESTIMATE -STEEL FOB

S No. Description Nos L B H Quantity Unit

1 Nominal concrete 1:4:8 or leaner mix (including equivalent design mix)

Flooring PCC
Below Floor Area
Area 1 1 x 1 17.69 13.20 0.10 23.35

Total Quantity = 23.40 Cum

Demolishing R.C.C work manually / by mechanical means including stacking of steel bars and disposal of
2
unserviceable material within 50 metres lead

Entrance Staircase - Terminal Inner


Column Below Flight Slab
Column Pedestal 1 1 x 18 0.85 0.85 1.00 13.00
Column Pedestal 2 1 x 2 0.45 0.45 1.00 0.41
Column Pedestal 3 1 x 2 0.45 0.45 1.00 0.41

Stair Front Steps


Step 1 1 x 1 1.50 0.30 0.15 0.07
Step 2 1 x 1 1.20 0.30 0.15 0.05
Step 3 1 x 1 0.90 0.30 0.15 0.04
Step 4 1 x 1 0.60 0.30 0.15 0.03
Steps 25 x 0.5 5.10 0.30 0.15 2.87
Steps 13 x 0.5 6.20 0.30 0.15 1.81

Flight Slab 1 1 x 1 4.58 5.00 0.20 4.58


Flight Slab 2 1 x 1 3.65 5.00 0.20 3.65
Flight Slab 3 1 x 1 4.35 6.20 0.20 5.39
Landing Slab 1 1 x 1 5.10 2.00 0.20 2.04
Landing Slab 2 1 x 1 6.20 5.10 0.20 6.32
Landing Slab 3 1 x 1 6.20 3.80 0.20 4.71

Total Quantity = 45.40 Cum

Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of
3
unserviceable material within 50 metres lead - in cement mortar

Brickwork

Total Quantity = 0.00 Cum

Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead -
4
for thickness of tiles 10mm to 25mm

Column Pedestal Dadooing


Column Pedestal Sides 1 x 18 3.40 1.00 61.20
Column Pedestal Top 1 x 18 0.90 0.90 14.58

Below Floor Area


Area 1 x 1 17.69 13.20 233.51
Deck Slab Area 1 x 1 6.20 3.90 24.18

Total Quantity = 333.50 Sqm

Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking the material within 50 metres
5
lead of - G.S.sheet

Bottom Sheet Area


Deck Slab Area 1 x 1 6.20 3.90 24.18

Total Quantity = 24.20 Sqm

Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts,
6
cutting rivets ,welding etc.including dismembering and stacking within 50 metres lead

Hand Rails Unit Wt


Entrance Staircase
Top Rod RHS (0.05*0.05*0.06) 1 x 1 26.25 1.18 30.91
Bottom Rod RHS (0.05*0.05*0.06) 1 x 1 26.25 1.18 30.91
Vertical Rod SHS (0.02*0.02*0.02) 1 x 262.5 1.00 0.06 16.49
Top Rod RHS (0.05*0.05*0.06) 1 x 1 20.25 1.18 23.84
Bottom Rod RHS (0.05*0.05*0.06) 1 x 1 20.25 1.18 23.84

Steel Structures Below Flight Slab


Steel Beam - Isection 2 x 1 22.44 19.65 881.89
Cross Beam Channel Section 1 x 12 5.00 4.51 270.60
Cross Beam Channel Section 1 x 12 5.00 4.51 270.60
Cross Beam Channel Section 1 x 6 6.00 4.51 162.36
Steel Column 1 1 x 2 2.20 55.10 242.44
Steel Column 2 1 x 8 2.65 55.10 1168.12
Steel Column 3 1 x 10 4.80 55.10 2644.80
Connecting Beam 1 x 1 16.02 55.10 882.70
Connecting Beam 1 x 1 20.54 55.10 1131.75
Steel Beam - Isection 1 x 2 11.30 19.65 444.09
Connecting Beam 1 x 8 4.37 19.65 686.96

Base Plate 1 1 x 18 0.0013 7850.00 176.63


Base Plate 2 1 x 4 0.0030 7850.00 94.20
Connecting Plate 1 1 x 18 0.0013 7850.00 176.63
Connecting Plate 2 1 x 4 0.0030 7850.00 94.20
Bolts & Nuts 2 x 72 0.50 72.00
Steel Beam - Isection 1 x 4 4.89 19.65 384.35

Total Quantity = 9911.00 Kg

Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave,
7
holdfasts etc. complete and stacking within 50 metres lead of area beyond 3 sq.metres
Total Quantity = 0.00 nos

8 Existing Electrical Point Details

Ground Floor
Light Point - Tube Light 1 x 19 19.00 nos
Focus Light Point 1 x 8 8.00 nos
MAJOR UPGRADATION OF MADURAI RAILWAY JUNCCTION - DISMANTLING WORKS

ABSTRACT ESTIMATION - ATM BUILDING

S.No Item No Description of Item Quantity Rate Unit Amount

1 15.2.2 Nominal concrete 1:4:8 or leaner mix (including equivalent design mix) 41.60 1,239.60 cum 51,567.00

Demolishing R.C.C work manually / by mechanical means including stacking of


2 15.3 33.80 2,928.10 cum 98,970.00
steel bars and disposal of unserviceable material within 50 metres lead

Demolishing brick work manually / by mechanical means including stacking of


3 15.7.4 serviceable material and disposal of unserviceable material within 50 metres 77.60 1,698.45 cum 131,800.00
lead - in cement mortar

Dismantling aluminium/ Gypsum partitions, doors, windows, fixed glazing and


4 15.57 false ceiling including disposal of unserviceable material and stacking of 70.70 46.50 sqm 3,288.00
serviceable material with in 50 meters lead as directed by Engineer-in-charge.

Dismantling tile work in floors and roofs laid in cement mortar including
5 15.23.1 245.00 60.50 sqm 14,823.00
stacking material within 50 metres lead - for thickness of tiles 10mm to 25mm

Demolishing mud phaska in terracing and disposal of material within 50 metres


6 15.27 5.80 753.75 Cum 4,372.00
lead.

Dismantling cement asbestos or other hard board ceiling or partition walls


7 15.41 including stacking of serviceable materials and disposal of unserviceable 101.00 46.50 sqm 4,697.00
materials within 50 metres lead.

Dismantling steel work in built up sections in angles, tees, flats and channels
8 15.18 including all gusset plates, bolts, nuts, cutting rivets ,welding etc.including 686.00 4.65 kg 3,190.00
dismembering and stacking within 50 metres lead

Dismantling doors, windows and clerestory windows (steel or wood) shutter


9 15.12.2 including chowkhats, architrave, holdfasts etc. 17.00 414.55 each 7,047.00
complete and stacking within 50 metres lead of area beyond 3 sq.metres

Total Amount 319,754.00

Total Amount in Lakhs 3.20


DETAILED ESTIMATE - PORTERS REST ROOM

S No. Description Nos L B H Quantity Unit

1 Nominal concrete 1:4:8 or leaner mix (including equivalent design mix)

Flooring PCC
Front Side Shed Area 1 x 1 3.69 3.75 0.10 1.38
HMS Office 1 x 1 4.20 3.52 0.10 1.48
Staff Room 1 x 1 5.00 2.00 0.10 1.00
Hand Wash 1 x 1 1.43 1.98 0.10 0.28
Toilet 1 x 1 1.87 1.20 0.10 0.22
Toilet 1 x 1 1.30 1.23 0.10 0.16
Toilet 1 x 1 1.37 1.40 0.10 0.19
Storage Room 1 x 1 3.50 3.40 0.10 1.19
Mini Auditorium 1 x 1 16.64 3.63 0.10 6.04
Stage Area 1 1 x 1 3.63 1.00 0.10 0.36
Stage Area 2 1 x 1 2.15 3.10 0.10 0.67
Coolie & Porter Rest Room 1 x 1 6.61 5.00 0.10 3.31
Wash Area Shed 1 x 1 3.40 3.41 0.15 1.74
Frount Side outer Area 1 x 1 235.45 0.10 23.55

Total Quantity = 41.60 Cum

Demolishing R.C.C work manually / by mechanical means including stacking of steel bars and disposal of
2
unserviceable material within 50 metres lead

Column
Column 1 1 x 2 0.30 0.50 2.80 0.84
Column 2 1 x 9 0.30 0.50 3.25 4.39
Column 3 1 x 2 0.30 0.30 3.25 0.59
Column 4 1 x 1 0.60 0.80 3.25 1.56
Column 5 1 x 10 0.23 0.23 3.10 1.64

Roof Beam
Beam 1 1 x 1 4.13 0.30 0.15 0.19
Beam 2 1 x 2 3.48 0.30 0.15 0.31
Beam 3 1 x 1 4.97 0.30 0.15 0.22
Beam 4 1 x 1 5.24 0.30 0.15 0.24
Beam 5 1 x 1 3.13 0.30 0.15 0.14
Beam 6 1 x 1 4.86 0.30 0.15 0.22
Beam 7 1 x 2 8.47 0.30 0.15 0.76
Beam 8 1 x 3 5.00 0.30 0.15 0.67
Add Column Junction
Column 1 1 x 11 0.30 0.50 0.15 0.25
Column 2 1 x 2 0.30 0.30 0.15 0.03
Column 3 1 x 1 0.60 0.80 0.15 0.07

Roof Slab
HMS Office 1 x 1 4.20 3.52 0.15 2.22
Staff Room 1 x 1 5.00 2.00 0.15 1.50
Hand Wash 1 x 1 1.43 1.98 0.15 0.42
Toilet 1 x 1 1.87 1.20 0.15 0.34
Toilet 1 x 1 1.30 1.23 0.15 0.24
Toilet 1 x 1 1.37 1.40 0.15 0.29
Storage Room 1 x 1 3.50 3.40 0.15 1.79
Coolie & Porter Rest Room 1 x 1 6.61 5.00 0.15 4.96

Lintel Beam
Mini Auditorium
Wall 1 1 x 1 18.80 0.23 0.15 0.65
Wall 2 1 x 1 13.72 0.23 0.15 0.47
Wall 3 1 x 1 3.10 0.23 0.15 0.11
Hms Office
Wall 1 1 x 2 3.48 0.23 0.15 0.24
Wall 2 1 x 1 4.13 0.23 0.15 0.14
Stsaff Room,Toilet&Storage
Wall 1 1 x 1 10.21 0.23 0.15 0.35
Wall 2 1 x 1 8.09 0.23 0.15 0.28
Wall 3 1 x 1 5.85 0.30 0.15 0.26
Wall 4 1 x 1 4.97 0.23 0.15 0.17
Wall 1 1 x 2 3.40 0.23 0.15 0.23
Wall 2 1 x 1 3.15 0.23 0.15 0.11
Wall 3 1 x 2 8.47 0.23 0.15 0.58

Sunshade
Window 1 x 1 1.20 0.60 0.10 0.07
Window 1 x 5 1.40 0.60 0.10 0.42
Door 1 x 1 1.00 0.60 0.10 0.06

Inner Concrete Shelfs


Shelf 1 2 x 2 4.34 0.90 0.10 1.56
Shelf 2 1 x 2 2.68 0.90 0.10 0.48
Separate Walls 2 x 5 0.90 0.20 1.00 1.80
Separate Walls 1 x 4 0.90 0.20 1.00 0.72
Wash Area Inner Water tank
Wall 1 1 x 2 2.00 0.20 1.00 0.80
Wall 2 1 x 2 1.00 0.20 1.00 0.40

Total Quantity = 33.80 Cum

Demolishing brick work manually / by mechanical means including stacking of serviceable material and
3
disposal of unserviceable material within 50 metres lead - in cement mortar

Ground Floor
Mini Auditorium
Wall 1(Outer Wall) 1 x 1 18.80 0.23 2.95 12.76
Wall 2(Outer Wall) 1 x 1 13.72 0.23 2.95 9.31
Wall 3(Outer Wall) 1 x 1 3.10 0.23 2.95 2.10
Hms Office
`gv8 1 x 2 3.48 0.23 3.10 4.96
Wall 2(Outer Wall) 1 x 1 4.13 0.23 3.10 2.94
Stsaff Room,Toilet&Storage
Wall 1 1 x 1 10.21 0.23 3.10 7.28
Wall 2 1 x 1 8.09 0.23 3.10 5.77
Wall 3 1 x 1 5.85 0.30 3.10 5.44
Wall 4 1 x 1 4.97 0.23 3.10 3.54

Wall 1 1 x 2 3.40 0.23 3.10 4.85


Wall 2 1 x 1 3.15 0.23 3.10 2.25
Wall 3 1 x 2 8.47 0.23 3.10 12.08
Deductions
Main Door D -1 x 2 1.20 0.23 2.10 -1.16
Door D1 -1 x 5 0.90 0.23 2.10 -2.17
Door D2 -1 x 3 0.80 0.23 2.10 -1.16
Window -1 x 5 1.00 0.23 1.50 -1.73
Ventilator -1 x 2 0.90 0.23 0.60 -0.25

Terrace Floor - Parapet Wall


Hms Office
Wall 1 1 x 2 3.48 0.23 0.60 0.96
Wall 2 1 x 1 4.13 0.23 0.60 0.57
Stsaff Room,Toilet&Storage
Wall 1 1 x 1 10.21 0.23 0.60 1.41
Toilet 1 x 1 8.09 0.23 0.60 1.12
Wall 3 1 x 1 5.85 0.30 0.60 1.05
Wall 4 1 x 1 4.97 0.23 0.60 0.69
Wall 1 1 x 2 3.40 0.23 0.60 0.94
Wall 2 1 x 1 3.15 0.23 0.60 0.43
Wall 3 1 x 2 8.47 0.23 0.60 2.34

Wash Area
Wall 1 1 x 1 3.40 0.15 1.65 0.84
Wall 2 1 x 1 1.63 0.15 1.65 0.40

Total Quantity = 77.60 Cum

Dismantling aluminium/ Gypsum partitions, doors, windows, fixed glazing and false ceiling includingdisposal
4 of unserviceable material and stacking of serviceable material with in 50 meters lead as directed by Engineer-
in-charge.

Thermacol False Ceiling


Mini Auditorium 1 x 1 16.64 3.63 60.40
Stage Area 1 1 x 1 3.63 1.00 3.63
Stage Area 2 1 x 1 2.15 3.10 6.67

Total Quantity = 70.70 Sqm

Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres
5
lead - for thickness of tiles 10mm to 25mm

Roof Tile
Roof Area
HMS Office 1 x 1 4.20 3.52 14.78
Staff Room 1 x 1 5.00 2.00 10.00
Hand Wash 1 x 1 1.43 1.98 2.83
Toilet 1 x 1 1.87 1.20 2.24
Toilet 1 x 1 1.30 1.23 1.60
Toilet 1 x 1 1.37 1.40 1.92
Storage Room 1 x 1 3.50 3.40 11.90
Coolie & Porter Rest Room 1 x 1 6.61 5.00 33.05

Floor Area
HMS Office 1 x 1 4.20 3.52 14.78
Staff Room 1 x 1 5.00 2.00 10.00
Hand Wash 1 x 1 1.43 1.98 2.83
Toilet 1 x 1 1.87 1.20 2.24
Toilet 1 x 1 1.30 1.23 1.60
Storage Room 1 x 1 3.50 3.40 11.90
Mini Auditorium 1 x 1 16.64 3.63 60.40
Stage Area 1 1 x 1 3.63 1.00 3.63
Stage Area 2 1 x 1 2.15 3.10 6.67
Coolie & Porter Rest Room 1 x 1 6.61 5.00 33.05
Dadooing Toilet
Hand Wash 1 x 1 6.82 1.50 10.23
Toilet 1 x 1 6.14 1.50 9.21
Toilet 1 x 1 5.06 1.50 7.59
Door D2 -1 x 4 0.80 1.50 -4.80
Door D1 -1 x 2 0.90 1.50 -2.70

Skirting
HMS Office 1 x 1 15.44 0.10 1.54
Staff Room 1 x 1 14.00 0.10 1.40
Storage Room 1 x 1 13.80 0.10 1.38
Mini Auditorium 1 x 1 40.54 0.10 4.05
Stage Area 1 1 x 1 9.86 0.10 0.99
Coolie & Porter Rest Room 1 x 1 23.22 0.10 2.32
Door D1 -1 x 5 0.90 1.50 -6.75
Main Door D -1 x 2 1.20 2.10 -5.04

Total Quantity = 245.00 Sqm

6 Demolishing mud phaska in terracing and disposal of material within 50 metres lead.

Roof Tile
Roof Area
HMS Office 1 x 1 4.20 3.52 0.08 1.11
Staff Room 1 x 1 5.00 2.00 0.08 0.75
Hand Wash 1 x 1 1.43 1.98 0.08 0.21
Toilet 1 x 1 1.87 1.20 0.08 0.17
Toilet 1 x 1 1.30 1.23 0.08 0.12
Storage Room 1 x 1 3.50 3.40 0.08 0.89
Coolie & Porter Rest Room 1 x 1 6.61 5.00 0.08 2.48
Total Quantity = 5.80 Cum

Dismantling cement asbestos or other hard board ceiling or partition walls including stacking of serviceable
7
materials and disposal of unserviceable materials within 50 metres lead.

Sheet Roof Area


Meeting Hall 1 x 1 19.95 4.26 84.99
HMS Room Front Side Shed 1 x 1 3.93 3.84 15.09

Total Quantity = 101.00 Sqm

Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts,
8
nuts, cutting rivets ,welding etc.including dismembering and stacking within 50 metres lead

Unit Wt
Meeting Hall
Purlins CHS 1 x 4 19.95 3.56 284.09
Top Chard Member 6 x 2 4.26 3.56 181.99
Bottom Chard Member 6 x 1 3.72 3.56 79.46
Front Side Shed
Column RHS 1 x 2 3.10 11.78 73.01
Purlins CHS 1 x 3 3.85 3.56 41.12
Purlins CHS 1 x 2 3.69 3.56 26.27

Total Quantity = 686.00 Kg

Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats,
9
architrave, holdfasts etc. complete and stacking within 50 metres lead of area beyond 3 sq.metres

Main Door D 1 x 2 2.00


Door D1 1 x 5 5.00
Door D2 1 x 3 3.00
Window 1 x 5 5.00
Ventilator 1 x 2 2.00

Total Quantity = 17.00 nos

10 Existing Electrical Point Details

Ground Floor
Light Point - Tube Light 1 x 10 10.00 nos
Fan Point (Ceiling) 1 x 8 8.00 nos
Fan Point (Wall) 1 x 1 1.00 nos
MAJOR UPGRADATION OF MADURAI RAILWAY JUNCCTION - DISMANTLING WORKS

ABSTRACT ESTIMATION - RESERVATION COUNTER

S.No Item No Description of Item Quantity Rate Unit Amount

1 15.2.2 Nominal concrete 1:4:8 or leaner mix (including equivalent design mix) 33.20 1,239.60 cum 41,155.00

Demolishing R.C.C work manually / by mechanical means including stacking of


2 15.3 155.00 2,928.10 cum 453,856.00
steel bars and disposal of unserviceable material within 50 metres lead

Demolishing brick work manually / by mechanical means including stacking of


3 15.7.4 serviceable material and disposal of unserviceable material within 50 metres 95.30 1,698.45 cum 161,862.00
lead - in cement mortar

Dismantling aluminium/ Gypsum partitions, doors, windows, fixed glazing and


4 15.57 false ceiling including disposal of unserviceable material and stacking of 223.50 46.50 sqm 10,393.00
serviceable material with in 50 meters lead as directed by Engineer-in-charge.

Dismantling tile work in floors and roofs laid in cement mortar including
5 15.23.1 816.00 60.50 sqm 49,368.00
stacking material within 50 metres lead - for thickness of tiles 10mm to 25mm

Demolishing mud phaska in terracing and disposal of material within 50 metres


6 15.27 16.50 753.75 Cum 12,437.00
lead.

Dismantling cement asbestos or other hard board ceiling or partition walls


7 15.41 including stacking of serviceable materials and disposal of unserviceable 0.00 46.50 sqm -
materials within 50 metres lead.

Dismantling steel work in built up sections in angles, tees, flats and channels
8 15.18 including all gusset plates, bolts, nuts, cutting rivets ,welding etc.including 1656.00 4.65 kg 7,700.00
dismembering and stacking within 50 metres lead

Dismantling doors, windows and clerestory windows (steel or wood) shutter


9 15.12.2 including chowkhats, architrave, holdfasts etc. 39.00 414.55 each 16,167.00
complete and stacking within 50 metres lead of area beyond 3 sq.metres

Total Amount 752,938.00

Total Amount in Lakhs 7.53


DETAILED ESTIMATE -EXISTING RESERVATION OFFICE BUILDING

S No. Description Nos L B H Quantity Unit

1 Nominal concrete 1:4:8 or leaner mix (including equivalent design mix)

Flooring PCC
Ground Floor
Waiting Area 1 x 1 7.70 6.92 0.10 5.33
Left Side Store Room 1 x 1 3.84 6.70 0.10 2.57
Inner Room 1 x 1 3.84 5.84 0.10 2.24
Reservation Counter 1 x 1 7.77 5.62 0.10 4.37
Right Side Corner Room 1 x 1 5.62 3.77 0.10 2.12
Store Room 1 x 1 3.84 6.92 0.10 2.66
Compound Wall Fornt SideArea 1 x 1 138.55 0.10 13.86

Total Quantity = 33.20 Cum

Demolishing R.C.C work manually / by mechanical means including stacking of steel bars and disposal of
2
unserviceable material within 50 metres lead

Ground Floor
Column
Column 1 1 x 15 0.30 0.45 2.70 5.47
Roof Beam
Beam 1 1 x 4 14.80 0.30 0.45 7.99
Beam 2 1 x 1 14.80 0.30 0.30 1.33
Beam 3 1 x 6 13.60 0.30 0.45 11.02
Add Column Junction
Column 1 1 x 15 0.30 0.45 0.45 0.91
Front Ramp Beam
Beam 1 1 x 1 24.94 0.30 0.30 2.24
Beam 2 1 x 8 1.50 0.30 0.30 1.08
Roof Slab
Over All Area 1 x 1 16.30 13.27 0.15 32.45
Front Side Projection 1 x 1 4.30 2.27 0.15 1.46
Right Side Projection 1 x 1 13.27 1.30 0.15 2.59
Left Side Projection 1 x 1 13.27 1.30 0.15 2.59
Front Ramp Floor Slab
Ramp Area 1 x 1 24.94 1.50 0.15 5.61
Front Side Staircase
Flight Slab 1 1 x 1 2.55 1.70 0.25 1.08
Flight Slab 2 1 x 1 3.27 1.70 0.25 1.39
Mid Landing Slab 1 x 1 1.50 1.70 0.25 0.64
Mid Landing Beam 1 x 1 1.70 0.30 0.35 0.18
Steps 0.5 x 17 1.70 0.30 0.15 0.65
Lintel Beam
Wall 1 1 x 2 14.80 0.23 0.15 1.02
Wall 2 1 x 4 11.65 0.23 0.15 1.61
Wall 3 1 x 2 3.70 0.23 0.15 0.26
Wall 4 1 x 1 7.40 0.23 0.15 0.26
Inner Concrete Shelfs
Shelf 1 1 x 1 2.70 0.70 0.10 0.19
Shelf 2 1 x 1 3.70 0.70 0.10 0.26

First Floor
Column
Column 1 1 x 15 0.30 0.45 3.05 6.18
Roof Beam
Beam 1 1 x 4 14.80 0.30 0.45 7.99
Beam 2 1 x 1 14.80 0.30 0.30 1.33
Beam 3 1 x 6 13.60 0.30 0.45 11.02
Add Column Junction
Column 1 1 x 15 0.30 0.45 0.45 0.91
Front Ramp Beam
Beam 1 1 x 1 24.94 0.30 0.30 2.24
Beam 2 1 x 8 1.50 0.30 0.30 1.08
Roof Slab
Over All Area 1 x 1 16.30 13.27 0.15 32.45
Front Side Projection 1 x 1 4.30 2.27 0.15 1.46
Right Side Projection 1 x 1 13.27 1.30 0.15 2.59
Left Side Projection 1 x 1 13.27 1.30 0.15 2.59
Sunshade
Front Side Projection 1 x 1 11.40 0.80 0.10 0.91
Window Sunshade 1 x 1 2.00 0.60 0.10 0.12

Terrace Floor
Column
Parapet Column 1 x 15 0.30 0.45 0.90 1.82

Total Quantity = 155.00 Cum

Demolishing brick work manually / by mechanical means including stacking of serviceable material and
3
disposal of unserviceable material within 50 metres lead - in cement mortar

Ground Floor
Wall 1(outer wall) 1 x 2 14.80 0.23 2.55 17.36
Wall 2(outer & center Wall) 1 x 4 11.65 0.23 2.55 27.33
Wall 3(Store Room wall ,right & left
1 x 2 3.70 0.23 2.55 4.34
side
Wall 4(ticket counter wall) 1 x 1 7.40 0.23 2.55 4.34
Deductions
DD -1 x 1 1.70 0.23 2.10 -0.82
Door D1 -1 x 3 0.95 0.23 2.10 -1.38
Door D -1 x 1 1.00 0.23 2.10 -0.48
Window (Grill Window) -1 x 1 3.70 0.23 2.10 -1.79
Window W1 -1 x 2 1.80 0.23 1.50 -1.24
Window W2 -1 x 2 1.21 0.23 1.50 -0.83
Ventilator -1 x 4 0.60 0.23 0.60 -0.33
Counter Open -1 x 4 6.40 0.23 1.68 -9.89
Rolling Shutter -1 x 1 2.10 0.23 3.00 -1.45

Front Side Compound Wall


Wall 1 1 x 1 12.73 0.23 1.50 4.39
Wall 2 1 x 1 18.33 0.23 1.50 6.32
Gate -1 x 1 1.50 0.23 2.00 -0.69

First Floor
Wall 1(ouetr wall) 1 x 3 14.80 0.23 2.90 29.61
Wall 2(ouetr wall) 1 x 2 11.65 0.23 2.90 15.54
Wall 3(Toilet Inner Wall) 1 x 1 1.37 0.15 2.90 0.60
Deductions
DD -1 x 1 1.70 0.23 2.10 -0.82
Door D1 -1 x 1 0.95 0.23 2.10 -0.46
Window W1 -1 x 3 1.80 0.23 1.50 -1.86
Ventilator -1 x 10 0.60 0.23 0.60 -0.83
Window (Grill Window) -1 x 3 3.70 0.23 2.10 -5.36
Corridor Front Side Wall 1 x 1 4.30 0.23 1.30 1.29

Terrace Floor
All Round Parapet Wall 1 x 1 59.50 0.23 0.90 12.32

Total Quantity = 95.30 Cum

Dismantling aluminium/ Gypsum partitions, doors, windows, fixed glazing and false ceiling includingdisposal
4 of unserviceable material and stacking of serviceable material with in 50 meters lead as directed by Engineer-
in-charge.

Aluminium Partition Wall


Ground Floor
Left Corner Room Inner
Wall 1 1 x 1 2.47 2.70 6.67
Wall 2 1 x 1 1.42 2.70 3.83
Ticket Counter Room Inner
Wall 1 1 x 1 2.32 2.70 6.26
Wall 2 1 x 1 3.71 2.70 10.02
Wall 3 1 x 1 6.40 1.70 10.88
First Floor
Ticket Counter Room Inner
Wall 1 1 x 2 2.46 3.05 15.01
Wall 2 1 x 1 9.30 3.05 28.37
Wall 3 1 x 1 3.29 3.05 10.03
Wall 4 1 x 1 5.62 3.05 17.14
Wall 5 1 x 1 5.40 3.05 16.47
Front Side Room
Wall 1 1 x 1 2.20 3.05 6.71
Wall 2 1 x 1 1.25 3.05 3.81

False Ceiling Area


First Floor
Reservation Counter Area 1 x 1 15.70 5.62 88.23

Total Quantity = 223.50 Sqm


Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres
5
lead - for thickness of tiles 10mm to 25mm

Ground Floor
Waiting Area 1 x 1 7.70 6.92 53.28
Left Side Store Room 1 x 1 3.84 6.70 25.73
Inner Room 1 x 1 3.84 5.84 22.43
Reservation Counter 1 x 1 7.77 5.62 43.67
Right Side Corner Room 1 x 1 5.62 3.77 21.19
Store Room 1 x 1 3.84 6.92 26.57
Front Side Ramp Area 1 x 1 24.94 1.50 37.41
Counter Top Granite
Area 1 1 x 1 2.70 0.80 2.16
Area 2 1 x 1 3.70 0.80 2.96
Counter Top Dadooing
Wall 1 1 x 1 2.70 1.70 4.59
Wall 2 1 x 1 3.70 1.70 6.29
Skirting
Waiting Area 1 x 1 29.24 0.10 2.92
Left Side Store Room 1 x 1 21.08 0.10 2.11
Inner Room 1 x 1 19.36 0.10 1.94
Reservation Counter 1 x 1 26.78 0.10 2.68
Right Side Corner Room 1 x 1 18.78 0.10 1.88
Store Room 1 x 1 21.52 0.10 2.15
Door D1 -1 x 6 0.95 0.10 -0.57
DD -1 x 1 1.70 0.10 -0.17
Door D -1 x 1 1.00 0.10 -0.10
Rolling Shutter -1 x 1 2.10 0.10 -0.21

First Floor
Waiting Area 1 x 1 15.70 6.92 108.64
Reservation Counter Area 1 x 1 15.70 5.62 88.23
Wooden Flooring
Reservation Counter Area 1 x 1 15.70 5.62 88.23
Front Side Corridor Area 1 x 1 4.30 2.27 9.76
Staircase
Tread 1 x 18 1.70 0.30 9.18
Rise 1 x 19 1.70 0.15 4.85
Landing 1 x 1 1.50 1.70 2.55
Reservation Counter Innet Toilet
Toilet 1 1 x 1 5.00 2.10 10.50
Toilet 2 1 x 1 5.00 2.10 10.50
Door D2 -1 x 2 0.80 2.10 -3.36
Skirting
Waiting Area 1 x 1 45.24 0.10 4.52
Reservation Counter Area 1 x 1 42.64 0.10 4.26
Door D1 -1 x 1 0.95 0.10 -0.10
DD -1 x 1 1.70 0.10 -0.17

Terrace Floor
Roof Tile Area 1 x 1 16.30 13.45 219.23

Total Quantity = 816.00 Sqm

6 Demolishing mud phaska in terracing and disposal of material within 50 metres lead.

Terrace Floor
Roof Tile Area 1 x 1 16.30 13.45 0.08 16.44

Total Quantity = 16.50 Cum

Dismantling cement asbestos or other hard board ceiling or partition walls including stacking of serviceable
7
materials and disposal of unserviceable materials within 50 metres lead.

Total Quantity = 0.00 Sqm

Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts,
8
nuts, cutting rivets ,welding etc.including dismembering and stacking within 50 metres lead

Kg/Sqm
Ground Floor
Window (Grill Window) 1 x 1 3.70 2.10 20.00 155.40
Grill Door (DD) 1 x 1 1.70 2.10 15.00 53.55
Ventilator V 1 x 4 0.60 0.60 10.00 14.40
Window W1 1 x 2 1.80 1.50 15.00 81.00
Window W 1 x 2 1.21 1.50 15.00 54.45

First Floor
Window (Grill Window) 1 x 3 3.70 2.10 20.00 466.20
Grill Door (DD) 1 x 1 1.70 2.10 15.00 53.55
Ventilator V 1 x 10 0.60 0.60 10.00 36.00
Window W1 1 x 3 1.80 1.50 15.00 121.50

Front Ramp Side Handrails


Horizontal Pipe Hollow Section 2 x 1 24.94 2.41 120.21
Vertical Hollow Section 2 x 50 1.00 3.02 302.00
Horizontal Pipe Hollow Section 2 x 2 24.94 0.47 46.89
Front Side Staircase
Horizontal Hollow Section 2 x 1 7.32 2.41 35.28
Vertical Hollow Section 2 x 19 1.00 3.02 114.76

Total Quantity = 1656.00 Kg

Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats,
9
architrave, holdfasts etc. complete and stacking within 50 metres lead of area beyond 3 sq.metres

Ground Floor
DD 1 x 1 1.00
Door D1 1 x 3 3.00
Door D 1 x 1 1.00
Window (Grill Window) 1 x 1 1.00
Window W1 1 x 2 2.00
Window W2 1 x 2 2.00
Ventilator 1 x 4 4.00
Counter Open 1 x 4 4.00
Rolling Shutter 1 x 1 1.00

First Floor
DD 1 x 1 1.00
Door D1 1 x 3 3.00
Window W1 1 x 3 3.00
Ventilator 1 x 10 10.00
Window (Grill Window) 1 x 3 3.00

Total Quantity = 39.00 nos

10 Existing Electrical Point Details

Ground Floor
Light Point - Tube Light 1 x 21 21.00 nos
Fan Point (Ceiling) 1 x 12 12.00 nos
Fan Point (Wall) 1 x 2 2.00 nos
First Floor
Light Point - Tube Light 1 x 29 29.00 nos
Fan Point (Ceiling) 1 x 9 9.00 nos
Fan Point (Wall) 1 x 5 5.00 nos
MAJOR UPGRADATION OF MADURAI RAILWAY JUNCCTION - DISMANTLING WORKS

ABSTRACT ESTIMATION - EXECUTIVE LOUNGE

S.No Item No Description of Item Quantity Rate Unit Amount

1 15.2.2 Nominal concrete 1:4:8 or leaner mix (including equivalent design mix) 224.90 1,239.60 cum 278,786.00

Demolishing R.C.C work manually / by mechanical means including stacking of


2 15.3 1166.30 2,928.10 cum 3,415,043.00
steel bars and disposal of unserviceable material within 50 metres lead

Demolishing brick work manually / by mechanical means including stacking of


3 15.7.4 serviceable material and disposal of unserviceable material within 50 metres 1005.50 1,698.45 cum 1,707,791.00
lead - in cement mortar

Dismantling tile work in floors and roofs laid in cement mortar including
4 15.23.1 6615.20 60.50 sqm 400,220.00
stacking material within 50 metres lead - for thickness of tiles 10mm to 25mm

Demolishing mud phaska in terracing and disposal of material within 50 metres


5 15.27 169.20 753.75 Cum 127,534.00
lead.

Dismantling steel work in built up sections in angles, tees, flats and channels
6 15.18 including all gusset plates, bolts, nuts, cutting rivets ,welding etc.including 4841.00 4.65 kg 22,511.00
dismembering and stacking within 50 metres lead

Dismantling doors, windows and clerestory windows (steel or wood) shutter


7 15.12.2 including chowkhats, architrave, holdfasts etc. 314.00 414.55 each 130,169.00
complete and stacking within 50 metres lead of area beyond 3 sq.metres

Dismantling aluminium/ Gypsum partitions, doors, windows, fixed glazing and


8 15.57 false ceiling including disposal of unserviceable material and stacking of 1232.70 46.50 sqm 57,321.00
serviceable material with in 50 meters lead as directed by Engineer-in-charge.

Dismantling cement asbestos or other hard board ceiling or partition walls


9 15.41 including stacking of serviceable materials and disposal of unserviceable 27.70 46.50 each 1,288.00
materials within 50 metres lead.

Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking
10 15.28.1 1016.50 136.00 sqm 138,244.00
the material within 50 metres lead of - G.S.sheet

Dismantling steel work in built up sections in angles, tees, flats and channels
11 15.18 including all gusset plates, bolts, nuts, cutting rivets ,welding etc.including 33201.00 4.65 kg 154,385.00
dismembering and stacking within 50 metres lead

Total Amount 6,433,293.00


MAJOR UPGRADATION OF MADURAI RAILWAY JUNCCTION - DISMANTLING WORKS

ABSTRACT ESTIMATION - EXECUTIVE LOUNGE

S.No Item No Description of Item Quantity Rate Unit Amount

Total Amount in Lakhs 64.34


DETAILED ESTIMATE - PARCEL OFFICE & RAILWAY OFFICERS REST ROOM

S.no Description Nos L B H Quantity Unit

1 Nominal concrete 1:4:8 or leaner mix (including equivalent design mix)

Flooring PCC
Ground Floor
Stair Area 1 x 1 13.20 3.32 0.10 4.39
Lobby Area 1 1 x 1 8.87 6.60 0.10 5.85
Lobby Area 2 1 x 1 5.66 3.29 0.10 1.86
Lobby Area 3 1 x 1 22.37 3.05 0.10 6.82
Parcel Loading & Unloading Area 1 1 x 1 5.15 6.60 0.10 3.40
Parcel Loading & Unloading Area 2 1 x 1 8.10 3.24 0.10 2.62
Parcel Booking Counter 1 x 1 3.24 6.37 0.10 2.06
Record Room 1 x 1 2.74 4.55 0.10 1.25
Toilet 1 x 1 2.74 1.70 0.10 0.47
Parcel Booking Counter 1 x 1 2.74 6.55 0.10 1.79
Chief Parcel Supervisor 1 x 1 5.78 3.08 0.10 1.78
Store Room 1 x 1 2.75 3.06 0.10 0.84
Toilet Area 1 x 1 3.32 6.20 0.10 2.06
Stair Area 1 x 1 3.32 6.48 0.10 2.15
Lockup Rooms 1 x 2 2.86 3.07 0.10 1.76
Chief Inspector Room 1 x 1 3.73 3.07 0.10 1.15
Record Room 1 x 2 2.81 3.23 0.10 1.82
Record Room 1 x 1 5.72 3.00 0.10 1.72
Lobby Area 1 1 x 1 6.01 2.90 0.10 1.74
Lobby Area 2 1 x 1 5.66 9.59 0.10 5.43
Lobby Area 3 1 x 1 1.49 3.30 0.10 0.49
Inspector Room 1 x 1 3.20 6.29 0.10 2.01
Toilet 1 x 1 2.29 2.22 0.10 0.51
Record Room 1 1 x 1 2.29 3.84 0.10 0.88
Record Room 2 1 x 2 5.72 3.07 0.10 3.51
Bomb Squad
Room 1 1 x 1 5.72 6.28 0.10 3.59
Room 2 1 x 1 3.90 6.44 0.10 2.51
Passage Area 1 x 1 1.72 6.36 0.10 1.09
SSE/C&W Office
Room 1 1 x 1 5.72 6.29 0.10 3.60
Room 2 1 x 1 5.72 4.64 0.10 2.65
SSE/JE Office
Room 1 1 x 1 5.72 3.60 0.10 2.06
Room 2 1 x 1 5.72 7.44 0.10 4.26
SSE/ELEC/AC Office
Room 1 1 x 2 5.72 11.16 0.10 12.77
Passage Area 1 1 x 1 23.57 1.50 0.10 3.54
Stair Area 1 x 1 3.32 13.20 0.10 4.38
Room 2 1 x 1 5.72 12.89 0.10 7.37
Renovation Restaurant
Room 1 1 x 1 1.97 1.77 0.10 0.35
Room 2 1 x 1 5.00 2.00 0.10 1.00
Room 3 1 x 1 2.40 3.34 0.10 0.80
Room 4 1 x 1 5.97 6.43 0.10 3.84
Room 5 1 x 1 1.24 4.70 0.10 0.58
Room 6 1 x 1 2.40 1.50 0.10 0.36
Room 7 1 x 1 2.40 1.40 0.10 0.34
Room 8 1 x 1 3.86 1.50 0.10 0.58
Room 9 1 x 1 3.00 2.30 0.10 0.69
Room 10 1 x 1 4.10 2.53 0.10 1.04
Room 11 1 x 1 2.30 2.30 0.10 0.53
Room 12 1 x 1 2.30 1.70 0.10 0.39
Room 13 1 x 1 3.86 1.50 0.10 0.58
Room 14 1 x 1 7.33 1.70 0.10 1.25

Area 1 1 x 1 4.30 2.39 0.10 1.03


Area 2 1 x 1 7.53 6.03 0.10 4.54
Area 3 1 x 1 4.60 4.42 0.10 2.03
Room 1 1 x 1 3.00 2.16 0.10 0.65
Room 2 1 x 1 3.00 2.16 0.10 0.65
Room 3 1 x 1 2.70 4.23 0.10 1.14
Stair Area 1 x 1 3.32 13.20 0.10 4.38
AC Waiting Hall
Room 1 1 x 1 9.97 12.88 0.10 12.84
Room 2 1 x 1 3.50 6.29 0.10 2.20
Room 3 1 x 1 3.50 6.37 0.10 2.23
Upper Class Waiting Hall
Room 1 1 x 1 5.35 6.28 0.10 3.36
Room 2 1 x 1 5.35 6.37 0.10 3.41
Baby Feeding Room
Room 1 1 x 1 10.21 12.88 0.10 13.15
Toilet Area 1 x 1 3.32 6.20 0.10 2.06
Stair Area 1 x 1 3.32 6.37 0.10 2.11
Chief Travelling Inspector Office
Room 1 1 x 1 5.72 6.28 0.10 3.59
Room 2 1 x 1 5.72 6.37 0.10 3.64
Traffic Department Store Room
Room 1 1 x 1 5.72 12.88 0.10 7.37
Health Inspec Office
Room 1 1 x 1 5.66 6.28 0.10 3.56
Room 2 1 x 1 2.42 6.37 0.10 1.54
Room 3 1 x 1 3.20 6.37 0.10 2.04
IRTC Executive Lounge
Room 1 1 x 1 4.09 4.47 0.10 1.83
Room 2 1 x 1 3.51 3.02 0.10 1.06
Room 3 1 x 1 3.66 3.02 0.10 1.11
Room 4 1 x 1 1.17 3.02 0.10 0.35
Room 5 1 x 1 1.30 3.02 0.10 0.39
Room 6 1 x 1 3.24 1.47 0.10 0.48
Room 7 1 x 1 3.25 3.02 0.10 0.98
Room 8 1 x 1 2.75 1.70 0.10 0.47
Room 9 1 x 1 1.11 1.30 0.10 0.14
Room 10 1 x 1 1.65 1.30 0.10 0.21
Room 11 1 x 1 2.10 1.30 0.10 0.27
Room 12 1 x 1 5.20 4.90 0.10 2.55
Passage Area 1 1 x 1 7.26 1.45 0.10 1.05
Passage Area 2 1 x 1 18.03 1.65 0.10 2.97
Passage Area 3 1 x 1 23.46 6.37 0.10 14.94
Total Quantity = 224.90 Cum

Demolishing R.C.C work manually / by mechanical means including stacking of steel bars and disposal of unserviceable
2
material within 50 metres lead

Ground Floor
Column
Column1 1 x 104 0.40 0.40 3.25 54.08
Column2 1 x 4 0.40 0.40 3.25 2.08
Column3 1 x 3 0.40 0.60 3.25 2.34
Roof Beam
Beam 1 1 x 1 170.13 0.30 0.45 22.97
Beam 2 1 x 1 181.73 0.30 0.45 24.53
Beam 3 1 x 1 170.13 0.30 0.45 22.97
Beam 4 1 x 1 183.33 0.30 0.45 24.75
Beam 5 1 x 1 170.33 0.30 0.45 22.99

Beam 1 1 x 26 13.75 0.30 0.45 48.26


Beam 2 1 x 2 12.95 0.30 0.45 3.50
Beam 3 1 x 6 13.35 0.30 0.45 10.81
Add Column Junctions
Column1 1 x 104 0.40 0.40 0.45 7.49
Column2 1 x 4 0.40 0.40 0.45 0.29
Column3 1 x 3 0.40 0.60 0.45 0.32

Lintel Beam
X- Direction wall
Parcel office
Wall 1 1 x 1 172.28 0.23 0.15 5.94
Wall 2 1 x 1 3.20 0.23 0.15 0.11
Wall 3 1 x 1 2.74 0.23 0.15 0.09
Wall 4 1 x 1 8.84 0.23 0.15 0.30
Wall 5 1 x 1 9.22 0.23 0.15 0.32
RPF Police Station
Wall 6 1 x 1 10.06 0.23 0.15 0.35
Wall 7 1 x 1 8.80 0.23 0.15 0.30
Wall 8 1 x 1 5.60 0.23 0.15 0.19
Wall 9 1 x 1 2.52 0.23 0.15 0.09
Wall 10 1 x 1 5.60 0.23 0.15 0.19
Wall 11 1 x 1 5.72 0.23 0.15 0.20
Bomb Squad
Wall 1 1 x 1 5.60 0.23 0.15 0.19
SSE&CW Staff Room
Wall 1 1 x 1 5.60 0.23 0.15 0.19
Wall 2 1 x 1 23.57 0.23 0.15 0.81
Stair Room
Wall 1 1 x 3 3.20 0.23 0.15 0.33
Restaurant
Wall 1 1 x 2 1.30 0.23 0.15 0.09
Wall 2 1 x 1 2.66 0.23 0.15 0.09
Wall 3 1 x 2 2.40 0.23 0.15 0.17
Wall 4 1 x 1 2.76 0.23 0.15 0.10
Wall 5 1 x 2 2.30 0.23 0.15 0.16
Wall 6 1 x 1 5.74 0.23 0.15 0.20
Wall 7 1 x 1 3.00 0.23 0.15 0.10
Wall 8 1 x 1 0.98 0.23 0.15 0.03
Wall 9 1 x 1 1.43 0.23 0.15 0.05
Upper Class waiting
Wall 1 1 x 1 9.08 0.23 0.15 0.31
Chief Travelling Inspector Office
Wall 1 1 x 1 5.60 0.23 0.15 0.19
Wall 2 1 x 1 2.02 0.23 0.15 0.07
Chief Health Inspector Office
Wall 1 1 x 1 5.60 0.23 0.15 0.19
IRTC Executive Lounge
Wall 1 1 x 1 4.09 0.23 0.15 0.14
Wall 2 1 x 1 10.96 0.23 0.15 0.38
Wall 3 1 x 1 6.49 0.23 0.15 0.22
Wall 4 1 x 1 5.20 1.23 0.15 0.96
Wall 5 1 x 1 5.00 1.23 0.15 0.92

Y-Direction Wall
Parcel office
Wall 1 1 x 2 12.40 0.23 0.15 0.86
Wall 2 1 x 2 6.20 0.23 0.15 0.43
Wall 3 1 x 1 6.55 0.23 0.15 0.23
Wall 4 1 x 2 2.97 0.23 0.15 0.20
Wall 5 1 x 1 3.06 0.23 0.15 0.11
Wall 6 1 x 1 6.55 0.23 0.15 0.23
RPF Station
Wall 1 1 x 3 11.60 0.23 0.15 1.20
Wall 2 1 x 3 3.07 0.23 0.15 0.32
Wall 3 1 x 1 5.80 0.23 0.15 0.20
Wall 4 1 x 1 6.29 1.23 0.15 1.16
Bomb Squad
Wall 1 1 x 2 12.00 0.23 0.15 0.83
SSE&CW Staff Room
Wall 1 1 x 1 5.60 0.23 0.15 0.19
Wall 2 1 x 1 10.36 0.23 0.15 0.36
Wall 3 1 x 2 10.76 1.23 0.15 3.97
Stair Room
Wall 1 1 x 1 12.40 0.23 0.15 0.43
Wall 2 1 x 1 11.95 0.23 0.15 0.41
Restaurant
Wall 1 1 x 3 12.40 0.23 0.15 1.28
Wall 2 1 x 2 2.00 0.23 0.15 0.14
Wall 3 1 x 1 2.36 0.23 0.15 0.08
Wall 4 1 x 1 1.73 0.23 0.15 0.06
Wall 5 1 x 1 2.53 0.23 0.15 0.09
Wall 6 1 x 1 3.13 0.23 0.15 0.11
Wall 7 1 x 1 6.93 0.23 0.15 0.24
Wall 8 1 x 1 4.72 0.23 0.15 0.16
Wall 9 1 x 1 4.20 0.23 0.15 0.14
Wall 10 1 x 1 2.40 0.23 0.15 0.08
Upper Class Waiting
Wall 1 1 x 3 12.88 0.23 0.15 1.33
Srair Room
Wall 1 1 x 2 12.40 0.23 0.15 0.86
Ticket Inspector Office
Wall 1 1 x 1 12.40 0.23 0.15 0.43
Health Inspector Office
Wall 1 1 x 2 12.40 0.23 0.15 0.86
IRTC Executive Lounge
Wall 1 1 x 1 4.70 0.23 0.15 0.16
Wall 2 1 x 3 3.02 0.23 0.15 0.31
Wall 3 1 x 2 1.70 0.23 0.15 0.12
Wall 4 1 x 1 6.60 0.23 0.15 0.23
Wall 5 1 x 3 1.30 0.23 0.15 0.13
Wall 6 1 x 1 12.40 0.23 0.15 0.43

Partition Wall
Wall 1 1 x 1 6.20 0.12 0.15 0.11
Wall 2 1 x 4 1.28 0.12 0.15 0.09
Wall 3 1 x 1 3.23 0.12 0.15 0.06
Wall 4 1 x 1 6.36 0.12 0.15 0.11
Wall 5 1 x 1 3.04 0.12 0.15 0.05
Wall 6 4 x 5 0.60 0.12 0.15 0.22
Wall 7 1 x 1 2.60 0.12 0.15 0.05
Wall 8 1 x 1 1.60 0.12 0.15 0.03
Wall 9 1 x 3 1.30 0.12 0.15 0.07
Wall 10 1 x 2 3.62 0.12 0.15 0.13
Wall 11 2 x 3 1.18 0.12 0.15 0.13
Wall 12 1 x 1 2.22 0.12 0.15 0.04
Wall 13 1 x 1 1.30 0.12 0.15 0.02
Wall 14 1 x 1 3.20 0.12 0.15 0.06
Wall 15 1 x 1 1.17 0.12 0.15 0.02

Roof Slab
Over All Area 1 x 1 184.53 14.93 0.15 413.25
Deductions
Staircase Area 1 -1 x 1 6.49 3.32 0.15 -3.23
Staircase Area 2 -1 x 1 6.49 3.32 0.15 -3.23
Staircase Area 3 -1 x 1 6.49 3.32 0.15 -3.23
Staircase Area 4 -1 x 1 6.49 3.32 0.15 -3.23
Staircase Area 5 -1 x 1 6.49 3.32 0.15 -3.23

Staircase
Flight Slab 1 5 x 1 4.00 1.50 0.15 4.50
Flight Slab 2 5 x 1 3.35 1.50 0.15 3.77
Landing Slab 5 x 1 1.90 3.32 0.15 4.73
Hand Rail Wall 5 x 1 4.00 0.20 1.00 4.00
Hand Rail Wall 5 x 1 3.35 0.20 1.00 3.35
Steps 110 x 0.5 1.50 0.30 0.15 3.71

Sunshade & Inner concrete shelfs


Sunshade
Sunshade 1 x 24 5.60 0.68 0.10 9.14
Sunshade 1 x 1 3.20 0.68 0.10 0.22
Rcc Shelfs
Parcel Area
Slab 1 2 x 5 12.89 0.60 0.12 9.28
Slab 2 2 x 7 0.60 0.12 2.10 2.12
SSE Room
Slab 1 1 x 5 6.29 0.60 0.12 2.26
Wall 1 1 x 5 0.60 0.12 2.10 0.76
JE Room
Slab 1 1 x 5 7.44 0.60 0.12 2.68
Wall 1 1 x 5 0.60 0.12 2.10 0.76
Chief Travelling Ticket Inspector Office
Slab 1 1 x 5 6.28 0.60 0.12 2.26
Wall 1 1 x 5 0.60 0.12 2.10 0.76
Slab 1 1 x 5 4.72 0.60 0.12 1.70
Wall 1 1 x 4 0.60 0.12 2.10 0.60

First Floor
Column
Column1 1 x 73 0.40 0.40 2.95 34.46
Column2 1 x 4 0.40 0.40 0.90 0.58
Column3 1 x 2 0.40 0.60 2.95 1.42
Column3 1 x 1 0.40 0.60 0.90 0.22
Column4 1 x 30 0.40 0.40 0.90 4.32

Roof Beam
Beam 1 1 x 1 106.90 0.30 0.45 14.43
Beam 2 1 x 1 112.90 0.30 0.45 15.24
Beam 3 1 x 1 104.90 0.30 0.45 14.16
Beam 4 1 x 1 106.90 0.30 0.45 14.43

Beam 1 1 x 2 12.95 0.30 0.45 3.50


Beam 2 1 x 6 13.35 0.30 0.45 10.81
Beam 3 1 x 15 13.75 0.30 0.45 27.84

Lintel Beam
Main wall
Wall 1 1 x 1 108.13 0.23 0.15 3.73
Wall 2 1 x 1 17.21 0.23 0.15 0.59
Wall 3 1 x 1 5.60 0.23 0.15 0.19
Wall 4 1 x 1 9.27 0.23 0.15 0.32
Wall 5 1 x 1 5.70 0.23 0.15 0.20
Wall 6 1 x 1 16.80 0.23 0.15 0.58
Wall 6 1 x 1 3.21 0.23 0.15 0.11
Wall 7 1 x 1 14.40 0.23 0.15 0.50
Wall 8 1 x 1 4.13 0.23 0.15 0.14
Wall 9 1 x 2 3.20 0.23 0.15 0.22
Wall 10 1 x 1 11.70 0.23 0.15 0.40
Wall 11 1 x 1 5.72 0.23 0.15 0.20
Wall 12 1 x 1 107.38 0.23 0.15 3.70

Wall 1 1 x 2 11.60 0.23 0.15 0.80


Wall 2 1 x 6 12.00 0.23 0.15 2.48
Wall 3 1 x 2 3.07 0.23 0.15 0.21
Wall 4 1 x 1 6.37 0.23 0.15 0.22
Wall 5 1 x 1 2.30 0.23 0.15 0.08
Wall 6 1 x 1 1.73 0.23 0.15 0.06
Wall 7 1 x 9 12.40 0.23 0.15 3.85
Wall 8 1 x 1 12.88 0.23 0.15 0.44
Wall 9 1 x 1 8.82 0.23 0.15 0.30
Partition Wall
Wall 1 1 x 1 6.20 0.12 0.15 0.11
Wall 2 1 x 3 1.40 0.12 0.15 0.08
Wall 3 1 x 1 0.95 0.12 0.15 0.02
Wall 4 2 x 1 4.00 0.12 0.15 0.14
Wall 5 2 x 3 1.07 0.12 0.15 0.12
Wall 6 2 x 1 6.20 0.12 0.15 0.22
Wall 7 2 x 3 1.16 0.12 0.15 0.13
Wall 8 1 x 1 9.24 0.12 0.15 0.17
Wall 9 1 x 6 1.73 0.12 0.15 0.19
Roof Slab
Over all Roof slab area 1 x 1 115.12 15.01 0.15 259.19

Terrace Floor
Column
Column Projection 1 x 73 0.40 0.40 0.90 10.51

Total Quantity = 1166.30 Cum

Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of
3
unserviceable material within 50 metres lead - in cement mortar

Ground Floor
Main Wall
X-Direction Wall
Parcel office
Wall 1 1 x 1 172.28 0.23 3.10 122.84
Wall 2 1 x 1 3.20 0.23 3.10 2.28
Wall 3 1 x 1 2.74 0.23 3.10 1.95
Wall 4 1 x 1 8.84 0.23 3.10 6.30
Wall 5 1 x 1 9.22 0.23 3.10 6.57
RPF Police Station
Wall 6 1 x 1 10.06 0.23 3.10 7.17
Wall 7 1 x 1 8.80 0.23 3.10 6.27
Wall 8 1 x 1 5.60 0.23 3.10 3.99
Wall 9 1 x 1 2.52 0.23 3.10 1.80
Wall 10 1 x 1 5.60 0.23 3.10 3.99
Wall 11 1 x 1 5.72 0.23 3.10 4.08
Bomb Squad
Wall 1 1 x 1 5.60 0.23 3.10 3.99
SSE&CW Staff Room
Wall 1 1 x 1 5.60 0.23 3.10 3.99
Wall 2 1 x 1 23.57 0.23 3.10 16.81
Stair Room
Wall 1 1 x 3 3.20 0.23 3.10 6.84
Restaurant
Wall 1 1 x 2 1.30 0.23 3.10 1.85
Wall 2 1 x 1 2.66 0.23 3.10 1.90
Wall 3 1 x 2 2.40 0.23 3.10 3.42
Wall 4 1 x 1 2.76 0.23 3.10 1.97
Wall 5 1 x 2 2.30 0.23 3.10 3.28
Wall 6 1 x 1 5.74 0.23 3.10 4.09
Wall 7 1 x 1 3.00 0.23 3.10 2.14
Wall 8 1 x 1 0.98 0.23 3.10 0.70
Wall 9 1 x 1 1.43 0.23 3.10 1.02
Upper Class waiting
Wall 1 1 x 1 9.08 0.23 3.10 6.47
Chief Travelling Inspector Office
Wall 1 1 x 1 5.60 0.23 3.10 3.99
Wall 2 1 x 1 2.02 0.23 3.10 1.44
Chief Health Inspector Office
Wall 1 1 x 1 5.60 0.23 3.10 3.99
IRTC Executive Lounge
Wall 1 1 x 1 4.09 0.23 3.10 2.92
Wall 2 1 x 1 10.96 0.23 3.10 7.81
Wall 3 1 x 1 6.49 0.23 3.10 4.63
Wall 4 1 x 1 5.20 0.23 3.10 3.71
Wall 5 1 x 1 5.00 0.23 3.10 3.57
Y-Direction wall
Parcel office
Wall 1 1 x 2 12.40 0.23 3.10 17.68
Wall 2 1 x 2 6.20 0.23 3.10 8.84
Wall 3 1 x 1 6.55 0.23 3.10 4.67
Wall 4 1 x 2 2.97 0.23 3.10 4.24
Wall 5 1 x 1 3.06 0.23 3.10 2.18
Wall 6 1 x 1 6.55 0.23 3.10 4.67
RPF Station
Wall 1 1 x 3 11.60 0.23 3.10 24.81
Wall 2 1 x 3 3.07 0.23 3.10 6.57
Wall 3 1 x 1 5.80 0.23 3.10 4.14
Wall 4 1 x 1 6.29 1.23 3.10 23.98
Bomb Squad
Wall 1 1 x 2 12.00 0.23 3.10 17.11
SSE&CW Staff Room
Wall 1 1 x 1 5.60 0.23 3.10 3.99
Wall 2 1 x 1 10.36 0.23 3.10 7.39
Wall 3 1 x 2 10.76 1.23 3.10 82.06
Stair Room
Wall 1 1 x 1 12.40 0.23 3.10 8.84
Wall 2 1 x 1 11.95 0.23 3.10 8.52
Restaurant
Wall 1 1 x 3 12.40 0.23 3.10 26.52
Wall 2 1 x 2 2.00 0.23 3.10 2.85
Wall 3 1 x 1 2.36 0.23 3.10 1.68
Wall 4 1 x 1 1.73 0.23 3.10 1.23
Wall 5 1 x 1 2.53 0.23 3.10 1.80
Wall 6 1 x 1 3.13 0.23 3.10 2.23
Wall 7 1 x 1 6.93 0.23 3.10 4.94
Wall 8 1 x 1 4.72 0.23 3.10 3.37
Wall 9 1 x 1 4.20 0.23 3.10 2.99
Wall 10 1 x 1 2.40 0.23 3.10 1.71
Upper Class Waiting
Wall 1 1 x 3 12.88 0.23 3.10 27.55
Srair Room
Wall 1 1 x 2 12.40 0.23 3.10 17.68
Ticket Inspector Office
Wall 1 1 x 1 12.40 0.23 3.10 8.84
Health Inspector Office
Wall 1 1 x 2 12.40 0.23 3.10 17.68
IRTC Executive Lounge
Wall 1 1 x 1 4.70 0.23 3.10 3.35
Wall 2 1 x 3 3.02 0.23 3.10 6.46
Wall 3 1 x 2 1.70 0.23 3.10 2.42
Wall 4 1 x 1 6.60 0.23 3.10 4.71
Wall 5 1 x 3 1.30 0.23 3.10 2.78
Wall 6 1 x 1 12.40 0.23 3.10 8.84
Deductions
Door DD1 -1 x 7 1.20 0.23 2.10 -4.06
Door DD3 -1 x 1 1.08 0.23 2.10 -0.52
Door D1 -1 x 9 1.00 0.23 2.10 -4.35
Door D2 -1 x 24 1.00 0.23 2.10 -11.59
Door D3 -1 x 4 1.20 0.23 2.10 -2.32
Door D4 -1 x 2 0.80 0.23 2.10 -0.77
Door D5 -1 x 2 0.70 0.23 2.10 -0.68
S.T.G1 -1 x 2 1.70 0.23 2.10 -1.64
S.T.G2 -1 x 2 0.70 0.23 2.10 -0.68
C.L.G -1 x 2 1.70 0.23 2.10 -1.64
Rolling Shutter RS -1 x 6 1.50 0.23 2.10 -4.35
Window W1 -1 x 4 1.20 0.23 1.50 -1.66
Window W2 -1 x 51 1.70 0.23 1.50 -29.91
Window W3 -1 x 21 0.90 0.23 1.50 -6.52
Window W4 -1 x 6 2.30 0.23 1.50 -4.76
Window W5 -1 x 4 1.80 0.23 1.50 -2.48
ALW 1 -1 x 2 1.70 0.23 1.50 -1.17
ALW 2 -1 x 1 2.30 0.23 1.50 -0.79
Ventilator V -1 x 8 0.60 0.23 0.60 -0.66
Wall Open -1 x 1 1.10 0.23 3.00 -0.76
Wall Open -1 x 2 0.75 0.23 2.10 -0.72
Wall Open -1 x 1 0.90 0.23 2.10 -0.43
Wall Open -1 x 1 2.40 0.23 2.10 -1.16

Partition Wall
RPF Police Station
Wall 1 1 x 1 6.20 0.12 2.10 1.56
Wall 2 1 x 4 1.28 0.12 2.10 1.29
Wall 3 1 x 1 3.23 0.12 2.10 0.81
Wall 4 1 x 1 3.04 0.12 2.10 0.77
AC Waitng Hall
Wall 5 1 x 1 6.37 0.12 2.10 1.61
Wall 6 1 x 1 1.00 0.12 2.10 0.25
Wall 7 1 x 3 1.30 0.12 2.10 0.98
Baby Feeding Room
Wall 8 1 x 2 3.62 0.12 2.10 1.82
Wall 9 2 x 3 1.18 0.12 2.10 1.78
Executive Lounge
Wall 10 1 x 1 2.22 0.12 2.10 0.56
Wall 11 1 x 1 1.30 0.12 2.10 0.33
Wall 12 1 x 1 3.20 0.12 2.10 0.81
Wall 13 1 x 1 1.17 0.12 2.10 0.29
Deductions
Door D2 -1 x 4 1.00 0.12 2.10 -1.01
Door D4 -1 x 1 0.80 0.12 2.10 -0.20
Door D5 -1 x 18 0.70 0.12 2.10 -3.18

First Floor
Main Wall
Wall 1 1 x 1 108.13 0.23 2.80 69.64
Wall 2 1 x 1 17.21 0.23 2.80 11.08
Wall 3 1 x 1 5.60 0.23 2.80 3.61
Wall 4 1 x 1 9.27 0.23 2.80 5.97
Wall 5 1 x 1 5.70 0.23 2.80 3.67
Wall 6 1 x 1 16.80 0.23 2.80 10.82
Wall 6 1 x 1 3.21 0.23 2.80 2.07
Wall 7 1 x 1 14.40 0.23 2.80 9.27
Wall 8 1 x 1 4.13 0.23 2.80 2.66
Wall 9 1 x 2 3.20 0.23 2.80 4.12
Wall 10 1 x 1 11.70 0.23 2.80 7.53
Wall 11 1 x 1 5.72 0.23 2.80 3.68
Wall 12 1 x 1 107.38 0.23 2.80 69.15

Wall 1 1 x 2 11.60 0.23 2.80 14.94


Wall 2 1 x 6 12.00 0.23 2.80 46.37
Wall 3 1 x 2 3.07 0.23 2.80 3.95
Wall 4 1 x 1 6.37 0.23 2.80 4.10
Wall 5 1 x 1 2.30 0.23 2.80 1.48
Wall 6 1 x 1 1.73 0.23 2.80 1.11
Wall 7 1 x 9 12.40 0.23 2.80 71.87
Wall 8 1 x 1 12.88 0.23 2.80 8.29
Wall 9 1 x 1 8.82 0.23 2.80 5.68
Deductions
ST.G.1 -1 x 1 1.70 0.23 2.10 -0.82
ST.G.2 -1 x 2 0.90 0.23 2.10 -0.87
A.L.G -1 x 2 1.50 0.23 2.10 -1.45
A.L.G 1 -1 x 1 1.70 0.23 2.10 -0.82
Door D2 -1 x 16 0.90 0.23 2.10 -6.96
Door D3 -1 x 12 1.20 0.23 2.10 -6.96
Door D5 -1 x 3 0.70 0.23 2.10 -1.01
Window W2 -1 x 16 1.70 0.23 1.50 -9.38
Window W6 -1 x 30 1.50 0.23 1.50 -15.52
Ventilator V -1 x 3 0.60 0.23 0.60 -0.25
Ventilator V2 -1 x 17 0.90 0.23 0.60 -2.11
Partition Wall
Police Station
Wall 1 1 x 1 6.20 0.12 2.10 1.56
Wall 2 1 x 3 1.40 0.12 2.10 1.06
Wall 3 1 x 1 0.95 0.12 2.10 0.24
Sse/EL Storage& TTE Dorm
Wall 4 2 x 1 4.00 0.12 2.10 2.02
Wall 5 2 x 3 1.07 0.12 2.10 1.62
Wall 6 2 x 1 6.20 0.12 2.10 3.12
Wall 7 2 x 3 1.16 0.12 2.10 1.75
Ladies TTE Dorm
Wall 8 1 x 1 9.24 0.12 2.10 2.33
Wall 9 1 x 6 1.73 0.12 2.10 2.62
Deductions
Door D5 -1 x 23 0.70 0.12 2.10 -4.06

Parapet Wall
Wall 1 1 x 1 25.35 0.23 0.90 5.25
Wall 2 1 x 1 7.40 0.23 0.90 1.53
Wall 3 1 x 1 184.50 0.23 0.90 38.19
Wall 4 1 x 1 13.90 0.23 0.90 2.88
Wall 5 1 x 1 38.67 0.23 0.90 8.00
Head Room Brickwork
Wall 1 1 x 2 6.20 0.23 3.10 8.84
Wall 2 1 x 1 3.20 0.23 3.10 2.28
Wall 3 1 x 1 3.20 0.23 2.65 1.95
Open -1 x 1 3.20 0.23 2.10 -1.55

Terrace Floor
Parapet Wall
Wall 1 1 x 1 106.20 0.23 0.90 21.98
Wall 2 1 x 1 106.00 0.23 0.90 21.94
Wall 3 1 x 1 11.60 0.23 0.90 2.40
Wall 4 1 x 1 12.40 0.23 0.90 2.57

Total Quantity = 1005.50 Cum

Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead - for
4
thickness of tiles 10mm to 25mm

Roof Tile
Ground Floor
Open Terrace Area 1 1 x 1 6.20 3.59 22.26
Open Terrace Area 2 1 x 1 3.59 1.40 5.03
Open Terrace Area 3 1 x 1 115.68 1.32 152.70
Open Terrace Area 4 1 x 1 41.30 14.44 596.37
First Floor
Roof Area Inner 1 x 1 115.12 12.85 1479.64

Floor Tile
Ground Floor
Stair Area 1 x 1 13.20 3.32 43.86
Lobby Area 1 1 x 1 8.87 6.60 58.54
Lobby Area 2 1 x 1 5.66 3.29 18.62
Lobby Area 3 1 x 1 22.37 3.05 68.23
Parcel Loading & Unloading Area 1 1 x 1 5.15 6.60 33.99
Parcel Loading & Unloading Area 2 1 x 1 8.10 3.24 26.24
Parcel Booking Counter 1 x 1 3.24 6.37 20.64
Record Room 1 x 1 2.74 4.55 12.47
Toilet 1 x 1 2.74 1.70 4.66
Parcel Booking Counter 1 x 1 2.74 6.55 17.95
Chief Parcel Supervisor 1 x 1 5.78 3.08 17.80
Store Room 1 x 1 2.75 3.06 8.42
Toilet Area 1 x 1 3.32 6.20 20.58
Stair Area 1 x 1 3.32 6.48 21.51
Lockup Rooms 1 x 2 2.86 3.07 17.56
Chief Inspector Room 1 x 1 3.73 3.07 11.45
Record Room 1 x 2 2.81 3.23 18.15
Record Room 1 x 1 5.72 3.00 17.16
Lobby Area 1 1 x 1 6.01 2.90 17.43
Lobby Area 2 1 x 1 5.66 9.59 54.28
Lobby Area 3 1 x 1 1.49 3.30 4.92
Inspector Room 1 x 1 3.20 6.29 20.13
Toilet 1 x 1 2.29 2.22 5.08
Record Room 1 1 x 1 2.29 3.84 8.79
Record Room 2 1 x 2 5.72 3.07 35.12
Bomb Squad
Room 1 1 x 1 5.72 6.28 35.92
Room 2 1 x 1 3.90 6.44 25.12
Passage Area 1 x 1 1.72 6.36 10.94
SSE/C&W Office
Room 1 1 x 1 5.72 6.29 35.98
Room 2 1 x 1 5.72 4.64 26.54
SSE/JE Office
Room 1 1 x 1 5.72 3.60 20.59
Room 2 1 x 1 5.72 7.44 42.56
SSE/ELEC/AC Office
Room 1 1 x 2 5.72 11.16 127.67
Passage Area 1 1 x 1 23.57 1.50 35.36
Stair Area 1 x 1 3.32 13.20 43.82
Room 2 1 x 1 5.72 12.89 73.73
Renovation Restaurant
Room 1 1 x 1 1.97 1.77 3.49
Room 2 1 x 1 5.00 2.00 10.00
Room 3 1 x 1 2.40 3.34 8.02
Room 4 1 x 1 5.97 6.43 38.39
Room 5 1 x 1 1.24 4.70 5.83
Room 6 1 x 1 2.40 1.50 3.60
Room 7 1 x 1 2.40 1.40 3.36
Room 8 1 x 1 3.86 1.50 5.79
Room 9 1 x 1 3.00 2.30 6.90
Room 10 1 x 1 4.10 2.53 10.37
Room 11 1 x 1 2.30 2.30 5.29
Room 12 1 x 1 2.30 1.70 3.91
Room 13 1 x 1 3.86 1.50 5.79
Room 14 1 x 1 7.33 1.70 12.46

Area 1 1 x 1 4.30 2.39 10.28


Area 2 1 x 1 7.53 6.03 45.41
Area 3 1 x 1 4.60 4.42 20.33
Room 1 1 x 1 3.00 2.16 6.48
Room 2 1 x 1 3.00 2.16 6.48
Room 3 1 x 1 2.70 4.23 11.42
Stair Area 1 x 1 3.32 13.20 43.82
AC Waiting Hall
Room 1 1 x 1 9.97 12.88 128.41
Room 2 1 x 1 3.50 6.29 22.02
Room 3 1 x 1 3.50 6.37 22.30
Upper Class Waiting Hall
Room 1 1 x 1 5.35 6.28 33.60
Room 2 1 x 1 5.35 6.37 34.08
Baby Feeding Room
Room 1 1 x 1 10.21 12.88 131.50
Toilet Area 1 x 1 3.32 6.20 20.58
Stair Area 1 x 1 3.32 6.37 21.15
Chief Travelling Inspector Office
Room 1 1 x 1 5.72 6.28 35.92
Room 2 1 x 1 5.72 6.37 36.44
Traffic Department Store Room
Room 1 1 x 1 5.72 12.88 73.67
Health Inspec Office
Room 1 1 x 1 5.66 6.28 35.56
Room 2 1 x 1 2.42 6.37 15.42
Room 3 1 x 1 3.20 6.37 20.38
IRTC Executive Lounge
Room 1 1 x 1 4.09 4.47 18.28
Room 2 1 x 1 3.51 3.02 10.60
Room 3 1 x 1 3.66 3.02 11.05
Room 4 1 x 1 1.17 3.02 3.53
Room 5 1 x 1 1.30 3.02 3.93
Room 6 1 x 1 3.24 1.47 4.76
Room 7 1 x 1 3.25 3.02 9.82
Room 8 1 x 1 2.75 1.70 4.68
Room 9 1 x 1 1.11 1.30 1.44
Room 10 1 x 1 1.65 1.30 2.15
Room 11 1 x 1 2.10 1.30 2.73
Room 12 1 x 1 5.20 4.90 25.48
Passage Area 1 1 x 1 7.26 1.45 10.53
Passage Area 2 1 x 1 18.03 1.65 29.75
Passage Area 3 1 x 1 23.46 6.37 149.44
Skirting
Stair Area 1 x 1 19.04 0.10 1.90
Lobby Area 1 1 x 1 30.94 0.10 3.09
Lobby Area 2 1 x 1 17.90 0.10 1.79
Lobby Area 3 1 x 1 50.84 0.10 5.08
Parcel Loading & Unloading Area 1 1 x 1 23.50 0.10 2.35
Parcel Loading & Unloading Area 2 1 x 1 22.68 0.10 2.27
Parcel Booking Counter 1 x 1 19.02 0.10 1.90
Record Room 1 x 1 14.58 0.10 1.46
Parcel Booking Counter 1 x 1 18.58 0.10 1.86
Chief Parcel Supervisor 1 x 1 17.72 0.10 1.77
Store Room 1 x 1 11.62 0.10 1.16
Stair Area 1 x 1 19.60 0.10 1.96
Lockup Rooms 1 x 2 11.86 0.10 2.37
Chief Inspector Room 1 x 1 13.60 0.10 1.36
Record Room 1 x 2 12.08 0.10 2.42
Record Room 1 x 1 17.44 0.10 1.74
Lobby Area 1 1 x 1 17.82 0.10 1.78
Lobby Area 2 1 x 1 30.50 0.10 3.05
Lobby Area 3 1 x 1 9.58 0.10 0.96
Inspector Room 1 x 1 18.98 0.10 1.90
Record Room 1 1 x 1 12.26 0.10 1.23
Record Room 2 1 x 2 17.58 0.10 3.52
Bomb Squad
Room 1 1 x 1 24.00 0.10 2.40
Room 2 1 x 1 20.68 0.10 2.07
Passage Area 1 x 1 20.68 0.10 2.07
SSE/C&W Office
Room 1 1 x 1 24.02 0.10 2.40
Room 2 1 x 1 20.72 0.10 2.07
SSE/JE Office
Room 1 1 x 1 18.64 0.10 1.86
Room 2 1 x 1 26.32 0.10 2.63
SSE/ELEC/AC Office
Room 1 1 x 2 33.76 0.10 6.75
Passage Area 1 1 x 1 50.14 0.10 5.01
Stair Area 1 x 1 33.04 0.10 3.30
Room 2 1 x 1 37.22 0.10 3.72
Renovation Restaurant
Room 1 1 x 1 7.48 0.10 0.75
Room 2 1 x 1 14.00 0.10 1.40
Room 3 1 x 1 11.48 0.10 1.15
Room 4 1 x 1 24.80 0.10 2.48
Room 5 1 x 1 11.88 0.10 1.19
Room 6 1 x 1 7.80 0.10 0.78
Room 7 1 x 1 7.60 0.10 0.76
Room 8 1 x 1 10.72 0.10 1.07
Room 9 1 x 1 10.60 0.10 1.06
Room 10 1 x 1 13.26 0.10 1.33
Room 11 1 x 1 9.20 0.10 0.92
Room 12 1 x 1 8.00 0.10 0.80
Room 13 1 x 1 10.72 0.10 1.07
Room 14 1 x 1 18.06 0.10 1.81

Area 1 1 x 1 13.38 0.10 1.34


Area 2 1 x 1 27.12 0.10 2.71
Area 3 1 x 1 18.04 0.10 1.80
Room 1 1 x 1 10.32 0.10 1.03
Room 2 1 x 1 10.32 0.10 1.03
Room 3 1 x 1 13.86 0.10 1.39
Stair Area 1 x 1 33.04 0.10 3.30
AC Waiting Hall
Room 1 1 x 1 45.70 0.10 4.57
Room 2 1 x 1 19.58 0.10 1.96
Room 3 1 x 1 19.74 0.10 1.97
Upper Class Waiting Hall
Room 1 1 x 1 19.56 0.10 1.96
Room 2 1 x 1 19.74 0.10 1.97
Baby Feeding Room
Room 1 1 x 1 46.18 0.10 4.62
Stair Area 1 x 1 19.38 0.10 1.94
Chief Travelling Inspector Office
Room 1 1 x 1 24.00 0.10 2.40
Room 2 1 x 1 24.18 0.10 2.42
Traffic Department Store Room
Room 1 1 x 1 37.20 0.10 3.72
Health Inspec Office
Room 1 1 x 1 23.88 0.10 2.39
Room 2 1 x 1 17.58 0.10 1.76
Room 3 1 x 1 19.14 0.10 1.91
IRTC Executive Lounge
Room 1 1 x 1 17.12 0.10 1.71
Room 2 1 x 1 13.06 0.10 1.31
Room 3 1 x 1 13.36 0.10 1.34
Room 4 1 x 1 8.38 0.10 0.84
Room 5 1 x 1 8.64 0.10 0.86
Room 6 1 x 1 9.42 0.10 0.94
Room 7 1 x 1 12.54 0.10 1.25
Room 8 1 x 1 8.90 0.10 0.89
Room 9 1 x 1 4.82 0.10 0.48
Room 10 1 x 1 5.90 0.10 0.59
Room 11 1 x 1 6.80 0.10 0.68
Room 12 1 x 1 20.20 0.10 2.02
Passage Area 1 1 x 1 17.50 0.10 1.75
Passage Area 2 1 x 1 39.36 0.10 3.94
Passage Area 3 1 x 1 59.66 0.10 5.97
Deductions
Door DD1 -1 x 8 1.20 0.10 -0.96
Door DD3 -1 x 2 1.20 0.10 -0.24
Rollling Shutter -1 x 2 1.70 0.10 -0.34
CL.Gate -1 x 1 1.70 0.10 -0.17
ST.Gate1 -1 x 2 1.70 0.10 -0.34
ST.Gate2 -1 x 2 0.70 0.10 -0.14
Door D2 -1 x 34 0.90 0.10 -3.06
Door D5 -1 x 2 0.70 0.10 -0.14
Door D1 -1 x 6 1.00 0.10 -0.60
Door D3 -1 x 4 1.20 0.10 -0.48
Wall Open -1 x 1 1.10 0.10 -0.11
Wall Open -1 x 2 0.75 0.10 -0.15
Wall Open -1 x 1 0.90 0.10 -0.09
Wall Open -1 x 1 2.40 0.10 -0.24

Toilet Dadooing
Parcel Area
Toilet 1 1 x 1 6.88 2.10 14.45
RPF Police Station
Toilet 1 1 x 2 4.76 2.10 19.99
Toilet 2 1 x 3 4.90 2.10 30.87
Toilet 3 1 x 1 9.02 2.10 18.94
Outer Wall 1 x 1 6.20 2.10 13.02
Passage Area 1 x 1 11.83 2.10 24.84
AC Waiting Hall
Toilet 1 1 x 1 8.20 2.10 17.22
Toilet 2 1 x 1 5.26 2.10 11.05
Toilet 3 1 x 1 5.36 2.10 11.26
Toilet 4 1 x 1 6.26 2.10 13.15
Toilet 5 1 x 1 5.44 2.10 11.42
Outer Wall 1 x 1 6.37 2.10 13.38
Passage Area 1 x 1 10.53 2.10 22.11
Baby Feeding Room
Toilet 1 1 x 1 8.92 2.10 18.73
Toilet 2 1 x 2 4.60 2.10 19.32
Toilet 3 1 x 1 4.50 2.10 9.45
Toilet 4 1 x 2 4.36 2.10 18.31
Toilet 5 1 x 1 4.26 2.10 8.95
Toilet 6 1 x 1 7.08 2.10 14.87
Toilet 7 1 x 1 19.04 2.10 39.98
Chief Travelling Ticket Booking
Toilet 1 1 x 1 5.68 2.10 11.93
Chief Health Inspector Office
Toilet 1 1 x 1 7.08 2.10 14.87
Executive Lounge
Gents Toilet
Toilet 1 1 x 1 5.80 2.10 12.18
1 x 1 9.92 2.10 20.83
1 x 1 7.92 2.10 16.63
1 x 2 5.26 2.10 22.09
LadiesToilet
Toilet 2 1 x 1 5.80 2.10 12.18
1 x 1 9.92 2.10 20.83
1 x 1 7.92 2.10 16.63
1 x 2 5.26 2.10 22.09
Toilet 3 1 x 1 8.64 2.10 18.14
Deductions
Door D5 -1 x 23 0.70 2.10 -33.81
Door D2 -1 x 7 0.90 2.10 -13.23
First Floor
Police Station
Toilet Area 1 x 1 3.32 6.20 20.58
Area 1 1 x 2 2.69 3.07 16.52
Area 2 1 x 2 2.80 3.07 17.19
Area 3 1 x 1 5.72 7.76 44.39
Area 4 1 x 1 5.95 1.62 9.64
Area 5 1 x 1 5.72 7.76 44.39
Area 6 1 x 1 5.72 9.59 54.85
Area 7 1 x 1 3.87 6.37 24.65
Area 8 1 x 2 1.62 3.08 9.98
Area 9 1 x 1 11.96 1.50 17.94
Area 10 1 x 2 2.16 5.72 24.71
Area 11 1 x 1 5.78 6.37 36.82
Area 12 1 x 1 2.75 4.56 12.54
Area 13 1 x 2 2.69 2.30 12.37
Area 14 1 x 1 5.60 10.36 58.02
SSE & CW Staff Dorm
Area 15 1 x 1 2.40 1.75 4.20
Area 16 1 x 1 3.15 1.99 6.27
Area 17 1 x 1 5.78 10.90 63.00
SSE & EL Storage
Area 18 1 x 2 5.72 12.88 147.35
Toilet Area 1 x 1 3.28 6.20 20.34
TTE Dorm 1
Area 19 1 x 1 23.57 12.89 303.82
Toilet Area 1 x 1 3.32 6.20 20.58
TTE Dorm 2
Area 20 1 x 1 11.67 12.88 150.31
TTE Dorm 3
Area 21 1 x 1 4.19 12.88 53.97
Passage Area 1 x 1 1.30 13.11 17.04
Ladies TTE Dorm
Area 22 1 x 1 5.72 12.88 73.67
Area 23 1 x 1 5.72 9.30 53.20
Area 24 1 x 1 9.27 3.35 31.05
Area 25 1 x 1 3.32 2.62 8.70
Dadooing Wall Tile
Ground Floor
Wall 1 1 x 3 5.50 1.10 18.15
Wall 2 1 x 1 0.60 1.10 0.66
Wall 3 1 x 1 2.50 1.10 2.75
Skirting
Police Station
Toilet Area 1 x 1 19.04 0.10 1.90
Area 1 1 x 2 11.52 0.10 2.30
Area 2 1 x 2 11.74 0.10 2.35
Area 3 1 x 1 26.96 0.10 2.70
Area 4 1 x 1 15.14 0.10 1.51
Area 5 1 x 1 26.96 0.10 2.70
Area 6 1 x 1 30.62 0.10 3.06
Area 7 1 x 1 20.48 0.10 2.05
Area 8 1 x 2 9.40 0.10 1.88
Area 9 1 x 1 26.92 0.10 2.69
Area 10 1 x 2 15.76 0.10 3.15
Area 11 1 x 1 24.30 0.10 2.43
Area 12 1 x 1 14.62 0.10 1.46
Area 13 1 x 2 9.98 0.10 2.00
Area 14 1 x 1 31.92 0.10 3.19
SSE & CW Staff Dorm
Area 15 1 x 1 8.30 0.10 0.83
Area 16 1 x 1 10.28 0.10 1.03
Area 17 1 x 1 33.36 0.10 3.34
SSE & EL Storage
Area 18 1 x 2 37.20 0.10 7.44
Toilet Area 1 x 1 18.96 0.10 1.90
TTE Dorm 1
Area 19 1 x 1 72.92 0.10 7.29
Toilet Area 1 x 1 19.04 0.10 1.90
TTE Dorm 2
Area 20 1 x 1 49.10 0.10 4.91
TTE Dorm 3
Area 21 1 x 1 34.14 0.10 3.41
Passage Area 1 x 1 28.82 0.10 2.88
Ladies TTE Dorm
Area 22 1 x 1 37.20 0.10 3.72
Area 23 1 x 1 30.04 0.10 3.00
Area 24 1 x 1 25.24 0.10 2.52
Area 25 1 x 1 11.88 0.10 1.19
Deductions
Door D2 -1 x 26 0.90 0.10 -2.34
Door D3 -1 x 16 0.90 0.10 -1.44
Door D5 -1 x 5 0.70 0.10 -0.35
ST.G1 -1 x 1 1.70 0.10 -0.17
ST.G2 -1 x 4 0.90 0.10 -0.36
ALG.1 -1 x 2 1.70 0.10 -0.34

Toilet Dadooing
Police Station
Toilet 1 1 x 2 5.60 2.10 23.52
Toilet 2 1 x 2 5.80 2.10 24.36
Passage Area 1 x 1 15.97 2.10 33.54
Toilet 2 1 x 2 9.98 2.10 41.92
Toilet 3 1 x 1 8.30 2.10 17.43
SSE & EL Storage
Toilet 1 1 x 1 4.48 2.10 9.41
Toilet 2 1 x 2 4.60 2.10 19.32
Toilet 3 1 x 1 4.48 2.10 9.41
Toilet 4 1 x 1 4.66 2.10 9.79
Toilet 5 1 x 2 4.78 2.10 20.08
Passage Area 1 x 1 20.82 2.10 43.72
TTE Dorm 1
Toilet 1 1 x 1 4.48 2.10 9.41
Toilet 2 1 x 2 4.60 2.10 19.32
Toilet 3 1 x 1 4.48 2.10 9.41
Toilet 4 1 x 1 4.66 2.10 9.79
Toilet 5 1 x 2 4.78 2.10 20.08
Passage Area 1 x 1 22.18 2.10 46.58
Ladies TTE Dorm
Toilet 1 1 x 2 5.88 2.10 24.70
Toilet 2 1 x 3 5.76 2.10 36.29
Toilet 3 1 x 1 5.00 2.10 10.50
Toilet 4 1 x 1 5.22 2.10 10.96
Passage Area 1 1 x 1 10.53 2.10 22.11
Passage Area 2 1 x 1 13.67 2.10 28.71
Deductions
Door D5 -1 x 25 13.67 2.10 -717.68
Door D3 -1 x 2 1.20 2.10 -5.04
Door D2 -1 x 5 0.70 2.10 -7.35

Front Side Platform Dadooing


Parcel Area 1 x 1 24.13 1.70 41.02
RPF & Bomb Squad 1 x 1 36.05 1.70 61.29
SSE/EL 1 x 1 6.30 1.70 10.71
Renovation Restaurant 1 x 1 6.43 1.70 10.93
Renovation Restaurant 1 x 1 8.96 1.70 15.23
Renovation Restaurant 1 x 1 5.95 1.70 10.12
AC Waiting Hall & Baby Feeding Room 1 x 1 30.23 1.70 51.39
Chief Health Inspector Office 1 x 1 18.35 1.70 31.20
Deductions
Steel Door -1 x 3 1.70 1.70 -8.67
Rolling Shutter -1 x 1 1.40 1.70 -2.38
Door DD1 -1 x 4 1.20 1.70 -8.16
Door D3 -1 x 3 1.20 1.70 -6.12

Counter Slabs
Parcel Office 1 x 1 5.57 0.60 3.34

Staircase Granite
Tread 1 x 22 1.50 0.30 9.90
Riser 1 x 22 1.50 0.15 4.95
Landing 1 1 x 1 1.87 3.32 6.21

Total Quantity = 6615.20 Sqm

5 Demolishing mud phaska in terracing and disposal of material within 50 metres lead.

Weathering
Ground Floor
Open Terrace Area 1 1 x 1 6.20 3.59 0.08 1.67
Open Terrace Area 2 1 x 1 3.59 1.40 0.08 0.38
Open Terrace Area 3 1 x 1 115.68 1.32 0.08 11.45
Open Terrace Area 4 1 x 1 41.30 14.44 0.08 44.73
First Floor
Roof Area Inner 1 x 1 115.12 12.85 0.08 110.97

Total Quantity = 169.20 Cum

Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts,
6
cutting rivets ,welding etc.including dismembering and stacking within 50 metres lead

Grills Kg/Sqm
Ground Floor
Window W1 1 x 4 1.20 1.50 15.00 108.00
Window W2 1 x 51 1.70 1.50 15.00 1950.75
Window W3 1 x 21 0.90 1.50 15.00 425.25
Window W4 1 x 6 2.30 1.50 15.00 310.50
Window W5 1 x 4 1.80 1.50 15.00 162.00
ALW 1 1 x 2 1.70 1.50 15.00 76.50
ALW 2 1 x 1 2.30 1.50 15.00 51.75
Ventilator V 1 x 8 0.60 0.60 10.00 28.80

First Floor
Window W2 1 x 16 1.70 1.50 15.00 612.00
Window W6 1 x 30 1.50 1.50 15.00 1012.50
Ventilator V 1 x 3 0.60 0.60 10.00 10.80
Ventilator V 2 1 x 17 0.90 0.60 10.00 91.80

Total Quantity = 4841.00 Kg

Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts
7
etc. complete and stacking within 50 metres lead of area beyond 3 sq.metres

Ground Floor
Door DD1 1 x 1 7 7.00
Door DD3 1 x 1 1 1.00
Door D1 1 x 1 9 9.00
Door D2 1 x 1 32 32.00
Door D3 1 x 1 4 4.00
Door D4 1 x 1 3 3.00
Door D5 1 x 1 22 22.00
S.T.G1 1 x 1 2 2.00
S.T.G2 1 x 1 2 2.00
C.L.G 1 x 1 2 2.00
Rolling Shutter RS 1 x 1 6 6.00
Window W1 1 x 1 4 4.00
Window W2 1 x 1 51 51.00
Window W3 1 x 1 21 21.00
Window W4 1 x 1 6 6.00
Window W5 1 x 1 4 4.00
ALW 1 1 x 1 2 2.00
ALW 2 1 x 1 1 1.00
Ventilator V 1 x 1 8 8.00
SD 1 x 1 1 1.00

First Floor
ST.G.1 1 x 1 1 1.00
ST.G.2 1 x 1 2 2.00
A.L.G 1 x 1 2 2.00
A.L.G 1 1 x 1 1 1.00
Door D2 1 x 1 16 16.00
Door D3 1 x 1 12 12.00
Door D5 1 x 1 26 26.00
Window W2 1 x 1 16 16.00
Window W6 1 x 1 30 30.00
Ventilator V 1 x 1 3 3.00
Ventilator V2 1 x 1 17 17.00

Total Quantity = 314.00 Nos

Dismantling aluminium/ Gypsum partitions, doors, windows, fixed glazing and false ceiling including disposal of
8
unserviceable material and stacking of serviceable material with in 50 meters lead as directed by Engineer-in-charge.

Aluminium Partition Wall


RPF Station
Wall 1 1 x 1 2.51 2.10 5.27
Bomb Squad
Wall 2 1 x 1 3.87 2.10 8.13
Wall 3 1 x 1 3.04 2.10 6.38
SSE & CW Staff Room
Wall 4 1 x 1 4.64 2.10 9.74
Bomb Squad Room
Wall 5 1 x 1 6.37 2.10 13.38
Baby Feeding Room
Wall 6 1 x 1 2.17 2.10 4.56
Wall 7 1 x 1 2.38 2.10 5.00
Chief Ticket Inspector Room
Wall 8 1 x 1 1.20 2.10 2.52
Wall 9 1 x 1 1.72 2.10 3.61
Wall 10 1 x 1 4.00 2.10 8.40
Wall 11 1 x 1 2.90 2.10 6.09
Executive Lounge
Wall 12 1 x 1 1.62 2.10 3.40
Wall 13 1 x 1 2.02 2.10 4.24
Wall 14 1 x 1 6.37 2.10 13.38

First Floor
Police Station
Wall 1 1 x 1 3.67 2.10 7.71
Wall 2 1 x 1 2.90 2.10 6.09
Wall 3 1 x 2 1.34 2.10 5.63
Wall 4 1 x 1 4.47 2.10 9.39
Wall 5 1 x 1 5.60 2.10 11.76
Wall 6 1 x 4 3.10 2.10 26.04
Wall 7 1 x 1 9.00 2.10 18.90
Wall 8 1 x 1 23.57 2.10 49.50
Wall 9 1 x 2 17.56 2.10 73.75
Wall 10 1 x 1 21.10 2.10 44.31
Wall 11 1 x 19 2.80 2.10 111.72
False Ceiling Area
AC Waiting Hall
Room 1 1 x 1 9.97 12.88 128.41
Room 2 1 x 1 3.50 6.29 22.02
Room 3 1 x 1 3.50 6.37 22.30
Upper Class Waiting Hall
Room 1 1 x 1 5.35 6.28 33.60
Room 2 1 x 1 5.35 6.37 34.08
Baby Feeding Room
Room 1 1 x 1 10.21 12.88 131.50
Toilet Area 1 x 1 3.32 6.20 20.58
Stair Area 1 x 1 3.32 6.37 21.15
Bomb Squad
Room 1 1 x 1 5.72 6.28 35.92
Room 2 1 x 1 3.90 6.44 25.12
Passage Area 1 x 1 1.72 6.36 10.94

IRTC Executive Lounge


Room 1 1 x 1 4.09 4.47 18.28
Room 2 1 x 1 3.51 3.02 10.60
Room 3 1 x 1 3.66 3.02 11.05
Room 4 1 x 1 1.17 3.02 3.53
Room 5 1 x 1 1.30 3.02 3.93
Room 6 1 x 1 3.24 1.47 4.76
Room 7 1 x 1 3.25 3.02 9.82
Room 8 1 x 1 2.75 1.70 4.68
Room 9 1 x 1 1.11 1.30 1.44
Room 10 1 x 1 1.65 1.30 2.15
Room 11 1 x 1 2.10 1.30 2.73
Room 12 1 x 1 5.20 4.90 25.48
Passage Area 1 1 x 1 7.26 1.45 10.53
Passage Area 2 1 x 1 18.03 1.65 29.75
Passage Area 3 1 x 1 23.46 6.37 149.44

Total Quantity = 1232.70 Sqm

Dismantling cement asbestos or other hard board ceiling or partition walls including stacking of serviceable materials
9
and disposal of unserviceable materials within 50 metres lead.

First Floor
Headroom Near Parcel Office 1 x 1 7.08 3.90 27.61

Total Quantity = 27.70 Sqm

Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking the material within 50 metres lead of -
10
G.S.sheet

Ground Floor
Parcel Office Front Side Shed Area 1 x 1 29.51 9.56 282.12
Front Side Polycarbonate Sheet Area
Top Area 1 x 1 36.93 1.45 53.55
Side Area 1 x 1 36.93 0.60 22.16

Top Area 1 x 1 148.00 1.45 214.60


Side Area 1 x 1 148.00 0.60 88.80
Side Projection Area 1 x 1 148.00 1.50 222.00
Top GI Sheet Area 1 x 1 148.00 0.90 133.20

Total Quantity = 1016.50 Sqm

Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts,
11
cutting rivets ,welding etc.including dismembering and stacking within 50 metres lead

KG/Meter
Parcel Office Front Side Shed
Roof Purlin (C Section) - 202C15 1 x 8 29.51 4.10 967.93
Inner Member
Top Chord (L 75x75x6) 6 x 1 9.56 6.80 390.05
Bottom Chord (L 75x75x6) 6 x 1 9.57 6.80 390.46
Intermediate Vertical (L 75x75x6) 6 x 1 1.57 6.80 64.06
Intermediate Cross (L 75x75x6) 6 x 1 7.43 6.80 303.14
Intermediate Cross (L 75x75x6) 6 x 1 7.43 6.80 303.14
Connecting Plate 6 x 6 0.0013 7850.00 353.25
Vertical Member
Steel Column 1 1 x 12 3.42 43.20 1772.93
Connecting Plate Top 2 x 12 0.0030 7850.00 565.20
Connecting Plate Bottom 1 x 12 0.0030 7850.00 282.60

Front Side Truss


Inner Member
Top Chord (L 40x40x5) 19 x 1 1.41 3.00 80.37
Bottom Chord (L 40x40x5) 19 x 1 0.80 3.00 45.60
Vertical Member
Steel Column I Section 19 x 1 0.60 25.20 287.28
Purlin (RHS Section) 19 x 2 37.00 0.39 551.86

Inner Member
Top Chord (L 40x40x5) 71 x 1 3.00 3.00 639.00
Bottom Chord (L 40x40x5) 71 x 1 1.80 3.00 383.40
Vertical Member
Steel Column I Section 71 x 1 0.60 25.20 1073.52
Purlin (RHS Section) 71 x 6 148.00 0.39 24746.34

Total Quantity = 33201.00 Kg

12 Existing Electrical Point Details

Ground Floor
Light Point - Tube Light 1 x 123 123.00 nos
Light Point - CFL 1 x 7 7.00 nos
Light Point - Ceiling 1 x 16 16.00 nos
Fan Point (Ceiling) 1 x 73 73.00 nos
Fan Point (Wall) 1 x 3 3.00 nos
AC Point 1 x 13 12.00 nos
First Floor
Light Point - Tube Light 1 x 24 24.00 nos
Light Point -CFL 1 x 48 48.00 nos
Fan Point (Ceiling) 1 x 48 48.00 nos