Madurai Joint Measurements Sheet For Dismantion Buildings
Madurai Joint Measurements Sheet For Dismantion Buildings
1 15.2.2 Nominal concrete 1:4:8 or leaner mix (including equivalent design mix) 1717.00 1,239.60 cum 2,128,393.00
Dismantling tile work in floors and roofs laid in cement mortar including
4 15.23.1 6889.00 60.50 sqm 416,785.00
stacking material within 50 metres lead - for thickness of tiles 10mm to 25mm
Dismantling steel work in built up sections in angles, tees, flats and channels
5 15.18 including all gusset plates, bolts, nuts, cutting rivets ,welding etc.including 72500.00 4.65 kg 337,125.00
dismembering and stacking within 50 metres lead
Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking
7 15.28.1 4217.00 136.00 sqm 573,512.00
the material within 50 metres lead of - G.S.sheet
Flooring PCC
Front Side RCC Building
Ground Floor
Front Side Corridor Area 1 x 1 161.17 2.45 0.30 118.46
Entry Area 1 x 1 5.30 3.00 0.10 1.59
Shops Inner 1 x 1 5.00 2.58 0.10 1.29
Shops Inner 1 x 5 5.00 3.07 0.10 7.68
Passage Area 1 x 1 3.40 5.30 0.10 1.80
Stair Area 1 x 1 3.60 4.54 0.10 1.63
Shops Inner 1 x 10 2.98 4.92 0.10 14.66
Passage Area 1 x 1 5.31 3.25 0.10 1.73
Stair Area 1 x 1 3.60 4.54 0.10 1.63
Shops Inner 1 x 4 3.36 4.92 0.10 6.61
Main Entry Area 1 x 1 7.56 5.20 0.10 3.93
Shops Inner 1 x 8 5.00 3.04 0.10 12.16
Entry Area 1 x 1 5.20 3.00 0.10 1.56
Stair Area 1 x 1 3.60 4.54 0.10 1.63
Shops Inner 1 x 9 3.19 4.97 0.10 14.27
First Floor
Front Side Corridor Area 1 x 1 161.17 2.45 0.10 39.49
Entry Area 1 x 1 5.30 3.00 0.10 1.59
Shops Inner 1 x 1 5.00 2.58 0.10 1.29
Shops Inner 1 x 5 5.00 3.07 0.10 7.68
Passage Area 1 x 1 3.40 5.30 0.10 1.80
Stair Area 1 x 1 3.60 4.54 0.10 1.63
Shops Inner 1 x 10 2.98 4.92 0.10 14.66
Passage Area 1 x 1 5.31 3.25 0.10 1.73
Stair Area 1 x 1 3.60 4.54 0.10 1.63
Shops Inner 1 x 4 3.36 4.92 0.10 6.61
Main Entry Area 1 x 1 7.56 5.20 0.10 3.93
Shops Inner 1 x 8 5.00 3.04 0.10 12.16
Entry Area 1 x 1 5.20 3.00 0.10 1.56
Stair Area 1 x 1 3.60 4.54 0.10 1.63
Shops Inner 1 x 9 3.19 4.97 0.10 14.27
Ice Plant
Floor Area 1 x 1 21.08 14.34 0.30 90.69
Chicken Shop
Floor Area Shop 1 x 1 28.20 2.63 0.30 22.25
Floor Area Shop 1 x 1 24.70 2.63 0.30 19.49
Floor Area Corridor 1 x 1 55.50 3.50 0.15 29.14
Meat shop
Floor Area Shop 1 x 1 25.07 18.07 0.30 135.90
Demolishing R.C.C work manually / by mechanical means including stacking of steel bars and disposal of
2
unserviceable material within 50 metres lead
First Floor
Column
Column 2 x 42 0.30 0.45 3.15 36.30
Parapet Column Corridor 1 x 42 0.30 0.45 1.20 6.91
Roof Beam
Beam 1 1 x 42 6.85 0.30 0.30 25.89
Beam 2 1 x 1 161.17 0.30 0.30 14.51
Beam 2 1 x 1 161.17 0.30 0.30 14.51
Roof Slab
Front Side Corridor Area 1 x 1 161.17 1.50 0.15 36.26
Entry Area 1 x 1 5.30 3.00 0.15 2.39
Shops Inner 1 x 1 5.00 2.58 0.15 1.94
Shops Inner 1 x 5 5.00 3.07 0.15 11.51
Passage Area 1 x 1 3.40 5.30 0.15 2.70
Shops Inner 1 x 10 2.98 4.92 0.15 21.99
Passage Area 1 x 1 5.31 3.25 0.15 2.59
Shops Inner 1 x 4 3.36 4.92 0.15 9.92
Main Entry Area 1 x 1 7.56 5.20 0.15 5.90
Shops Inner 1 x 8 5.00 3.04 0.15 18.24
Entry Area 1 x 1 5.20 3.00 0.15 2.34
Shops Inner 1 x 9 3.19 4.97 0.15 21.40
Ice Plant
Column
Column 1 x 20 0.30 0.50 2.99 8.98
Roof Beam
Beam 1 1 x 4 31.08 0.30 0.30 11.19
Roof Slab
Shops Area 1 x 1 173.42 0.15 26.01
Chicken Shop
Column 1 x 42 0.23 0.23 2.10 4.67
RCC Shopc Back Side Shops
Column 1 x 21 0.23 0.23 2.70 3.00
Column 1 x 11 0.23 0.23 2.70 1.57
Meat shop
Column 1 x 42 0.45 0.45 3.85 32.74
Roof Beam
Beam 1 1 x 11 18.07 0.30 0.30 17.89
Beam 2 1 x 2 27.20 0.30 0.30 4.90
Beam 3 1 x 18 4.65 0.30 0.30 7.53
Beam 4 1 x 7 2.40 0.30 0.30 1.51
Roof Slab
Shops Area 1 x 1 27.20 18.07 0.15 73.73
Demolishing brick work manually / by mechanical means including stacking of serviceable material and
3
disposal of unserviceable material within 50 metres lead - in cement mortar
Brickwork
Front Side RCC Building
Ground Floor
9'' Wall
Wall 1 1 x 42 4.54 0.23 3.15 138.15
Wall 2 1 x 2 20.56 0.23 3.15 29.79
Wall 3 1 x 2 37.63 0.23 3.15 54.53
Wall 4 1 x 2 18.84 0.23 3.15 27.30
Wall 5 1 x 2 27.74 0.23 3.15 40.20
Wall 6 1 x 2 36.62 0.23 3.15 53.06
Rolling Shutter -1 x 38 2.50 0.23 3.00 -65.55
First Floor
9'' Wall
Wall 1 1 x 42 4.54 0.23 3.15 138.15
Wall 2 1 x 2 20.56 0.23 3.15 29.79
Wall 3 1 x 2 37.63 0.23 3.15 54.53
Wall 4 1 x 2 18.84 0.23 3.15 27.30
Wall 5 1 x 2 27.74 0.23 3.15 40.20
Wall 6 1 x 2 36.62 0.23 3.15 53.06
Parapet Wall 1 x 1 161.17 0.23 1.20 44.48
Rolling Shutter -1 x 38 2.50 0.23 3.00 -65.55
Ventilation Open -1 x 37 0.60 0.23 0.60 -3.06
RCC Back Side Shops
Wall 1 1 x 22 2.23 0.23 2.10 23.70
Ice Plant
GF
Wall 1 1 x 1 132.49 0.23 3.00 91.42
FF
Wall 1 1 x 1 12.40 0.23 3.00 8.56
Wall 2 1 x 1 17.69 0.23 3.00 12.21
Wall 3 1 x 1 10.40 0.23 5.00 11.96
Chicken Shop
Wall 1 1 x 2 28.20 0.23 2.10 27.24
Wall 2 1 x 14 2.63 0.23 2.10 17.78
Wall 3 1 x 2 24.73 0.23 2.10 23.89
Meat shop
Beam 1 1 x 11 18.07 0.23 3.00 137.15
Beam 3 1 x 24 4.65 0.12 3.00 38.50
Beam 4 1 x 9 2.40 0.12 3.00 7.45
Rolling Shutter -1 x 38 2.00 0.23 3.00 -52.44
Total Quantity = 1591.00 Cum
Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50
4
metres lead - for thickness of tiles 10mm to 25mm
Flooring
Front Side RCC Building
Ground Floor
Roof Slab
Front Side Corridor Area 1 x 1 161.17 1.50 241.76
Entry Area 1 x 1 5.30 3.00 15.90
Passage Area 1 x 1 3.40 5.30 18.02
Passage Area 1 x 1 5.31 3.25 17.26
Main Entry Area 1 x 1 7.56 5.20 39.31
Entry Area 1 x 1 5.20 3.00 15.60
Roof Tile
Front Side Corridor Area 1 x 1 161.17 2.45 394.87
Entry Area 1 x 1 5.30 3.00 15.90
Shops Inner 1 x 1 5.00 2.58 12.90
Shops Inner 1 x 5 5.00 3.07 76.75
Passage Area 1 x 1 3.40 5.30 18.02
Stair Area 1 x 1 3.60 4.54 16.34
Shops Inner 1 x 10 2.98 4.92 146.62
Passage Area 1 x 1 5.31 3.25 17.26
Stair Area 1 x 1 3.60 4.54 16.34
Shops Inner 1 x 4 3.36 4.92 66.12
Main Entry Area 1 x 1 7.56 5.20 39.31
Shops Inner 1 x 8 5.00 3.04 121.60
Entry Area 1 x 1 5.20 3.00 15.60
Stair Area 1 x 1 3.60 4.54 16.34
Shops Inner 1 x 9 3.19 4.97 142.69
Chicken Shop
Floor Area Shop 1 x 1 28.20 2.63 74.17
Floor Area Shop 1 x 1 24.70 2.63 64.96
Floor Area Corridor 1 x 1 55.50 3.50 194.25
Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates,
5
bolts, nuts, cutting rivets ,welding etc.including dismembering and stacking within 50 metres lead
Chicken Shop
Floor Area Shop 1 x 1 28.20 2.63 15.00 1112.49
Floor Area Shop 1 x 1 24.70 2.63 15.00 974.42
Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats,
6
architrave, holdfasts etc. complete and stacking within 50 metres lead of area beyond 3 sq.metres
Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking the material within 50
7
metres lead of - G.S.sheet
Chicken Shop
Floor Area Shop 1 x 1 28.20 2.63 74.17
Floor Area Shop 1 x 1 24.70 2.63 64.96
Floor Area Corridor 1 x 1 55.50 3.50 194.25
1 15.2.2 Nominal concrete 1:4:8 or leaner mix (including equivalent design mix) 2.20 1,239.60 cum 2,727.10
Flooring PCC
Flooring Inner Area 1 x 1 4.50 3.00 0.15 2.03
Front Side Entrance Steps 1 x 1 1.50 0.75 0.15 0.17
Demolishing R.C.C work manually / by mechanical means including stacking of steel bars and disposal of
2
unserviceable material within 50 metres lead
Columns
Column 1 1 x 4 0.30 0.30 2.85 1.03
Roof Beam
Beam 1 1 x 2 4.50 0.30 0.30 0.81
Beam 2 1 x 2 3.00 0.30 0.30 0.54
Roof Slab
Area 1 x 1 6.10 4.60 0.15 4.21
Sunshade 1 x 1 1.50 0.60 0.10 0.09
Demolishing brick work manually / by mechanical means including stacking of serviceable material and
3
disposal of unserviceable material within 50 metres lead - in cement mortar
Brickwork
Wall 1(Outer Wall) 1 x 2 4.50 0.30 2.85 7.69
Wall 2(Outer Wall 1 x 2 2.40 0.30 2.85 4.10
Deductions
Door 1 -1 x 1 1.00 0.30 2.10 -0.63
Ventilator -1 x 3 1.00 0.30 0.60 -0.54
Front Side Entrtance Steps
Step 1 1 x 1 1.50 0.75 0.45 0.51
Step 2 1 x 1 1.50 0.50 0.15 0.11
Step 3 1 x 1 1.50 0.25 0.15 0.06
Brickwork - Basement
Wall 1 1 x 1 4.50 0.30 0.90 1.21
Wall 2 1 x 2 3.00 0.30 0.90 1.62
Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats,
4
architrave, holdfasts etc. complete and stacking within 50 metres lead of area beyond 3 sq.metres
Door 1 x 1 1.00
Ventilator 1 x 3 3.00
Total Quantity = 4.00 nos
MAJOR UPGRADATION OF MADURAI RAILWAY JUNCCTION - DISMANTLING WORKS
1 15.2.2 Nominal concrete 1:4:8 or leaner mix (including equivalent design mix) 12.00 1,239.60 cum 14,875.00
Dismantling tile work in floors and roofs laid in cement mortar including
5 15.23.1 89.00 60.50 sqm 5,385.00
stacking material within 50 metres lead - for thickness of tiles 10mm to 25mm
Dismantling steel work in built up sections in angles, tees, flats and channels
8 15.18 including all gusset plates, bolts, nuts, cutting rivets ,welding etc.including 58.00 4.65 kg 270.00
dismembering and stacking within 50 metres lead
Flooring PCC
Flooring Area 1 x 1 15.46 6.65 0.10 10.29
Front Side Ramp Area 1 x 2 3.60 1.50 0.10 1.08
Demolishing R.C.C work manually / by mechanical means including stacking of steel bars and disposal of
2
unserviceable material within 50 metres lead
Column
Column1 1 x 6 0.40 0.40 3.20 3.07
Column2 1 x 6 0.38 3.20 7.39
Roof Beam
Beam 1 1 x 1 13.06 0.30 0.30 1.18
Beam 2 1 x 2 5.93 0.30 0.30 1.07
Beam 3 1 x 1 11.26 0.30 0.30 1.01
Add Column Junctions
Column1 1 x 6 0.38 0.40 0.30 0.27
Column2 1 x 6 0.38 0.30 0.69
Lintel Beam
Beam 1 1 x 1 13.06 0.30 0.15 0.59
Beam 2 1 x 2 5.92 0.30 0.15 0.53
Beam 3 1 x 1 11.26 0.30 0.15 0.51
Roof Slab
Area 1 x 1 15.47 6.70 0.15 15.55
Projections (Front Projection Slope) 1 x 1 15.47 1.21 0.15 2.81
Demolishing brick work manually / by mechanical means including stacking of serviceable material and
3
disposal of unserviceable material within 50 metres lead - in cement mortar
Brickwork
Wall 1(Outer Wall) 1 x 1 13.06 0.23 2.85 8.56
Wall 2(Outer Wall) 1 x 1 11.26 0.23 2.85 7.38
Wall 3(Outer Wall) 1 x 2 5.97 0.23 2.85 7.83
Deductions
MAIN Door MD -1 x 2 1.50 0.23 2.10 -1.45
Window W -1 x 4 2.50 0.23 1.40 -3.22
Window W1 -1 x 1 1.40 0.23 1.40 -0.45
Terrace Floor Parapet
Wall 1 1 x 2 15.48 0.23 0.60 4.27
Wall 2 1 x 2 6.70 0.23 0.60 1.85
Total Quantity = 25.00 Cum
Dismantling aluminium/ Gypsum partitions, doors, windows, fixed glazing and false ceiling includingdisposal
4 of unserviceable material and stacking of serviceable material with in 50 meters lead as directed by Engineer-
in-charge.
Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres
5
lead - for thickness of tiles 10mm to 25mm
Flooring
Floor Area Inner 1 x 1 15.00 5.90 88.50
6 Demolishing mud phaska in terracing and disposal of material within 50 metres lead.
Dismantling cement asbestos or other hard board ceiling or partition walls including stacking of serviceable
7
materials and disposal of unserviceable materials within 50 metres lead.
Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts,
8
nuts, cutting rivets ,welding etc.including dismembering and stacking within 50 metres lead
Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats,
9
architrave, holdfasts etc. complete and stacking within 50 metres lead of area beyond 3 sq.metres
1 15.2.2 Nominal concrete 1:4:8 or leaner mix (including equivalent design mix) 15.00 1,239.60 cum 18,594.00
Dismantling tile work in floors and roofs laid in cement mortar including
4 15.23.1 stacking material within 50 metres lead - for thickness of tiles 10mm to 551.00 60.50 sqm 33,336.00
25mm
Flooring PCC
Floor Inner Area 1 x 1 21.25 6.00 0.10 12.75
Front Side Ramp Area 1 x 1 12.00 1.20 0.10 1.44
Demolishing R.C.C work manually / by mechanical means including stacking of steel bars and disposal of
2
unserviceable material within 50 metres lead
Column
Column C1 1 x 14 0.30 0.38 3.25 5.19
Column Parapet Projection 1 x 14 0.30 0.38 0.30 0.48
Roof Beam
Beam 1 1 x 2 19.27 0.30 0.30 3.47
Beam 2 1 x 7 5.54 0.30 0.30 3.49
Roof Slab
Roof Area 1 x 1 21.25 6.00 0.15 19.13
Front Side Projection 1 x 1 21.25 0.50 0.15 1.59
Open Area -1 x 1 3.80 2.64 0.15 -1.50
Entrance Sunshade 1 x 1 5.50 0.50 0.15 0.41
Lintel Beam
Outer Wall
Wall 1 1 x 2 19.27 0.23 0.15 1.33
Wall 2 1 x 4 5.54 0.23 0.15 0.76
Wall 3 1 x 1 1.64 0.23 0.15 0.06
Inner Wall
Wall 1 1 x 2 7.20 0.15 0.15 0.32
Wall 2 1 x 3 1.77 0.15 0.15 0.12
Wall 3 1 x 3 2.00 0.15 0.15 0.13
Wall 4 1 x 1 6.99 0.15 0.15 0.16
Wall 5 1 x 2 7.69 0.15 0.15 0.35
Wall 6 1 x 5 1.77 0.15 0.15 0.20
Wall 7 1 x 5 2.00 0.15 0.15 0.22
Demolishing brick work manually / by mechanical means including stacking of serviceable material and
3
disposal of unserviceable material within 50 metres lead - in cement mortar
Brickwork
Outer Wall
Wall 1(Outer Wall) 1 x 2 19.64 0.23 3.25 29.36
Wall 2(Outer Wall) 1 x 3 5.54 0.23 3.25 12.42
Wall 3(Frontier Middle) 1 x 1 1.64 0.23 3.25 1.23
Toilet Inner Walls
Ladies Rest room
Wall (Corrider Wall) 1 x 2 7.20 0.15 2.10 4.54
Wall 2(Toilet Walls) 1 x 3 1.77 0.15 2.10 1.67
Wall 3 1 x 3 2.00 0.15 2.10 1.89
Gents Rest Room
Wall 4(gents restroom) 1 x 1 6.99 0.15 2.10 2.20
Wall 5(Corrider Wall) 1 x 1 7.69 0.15 2.10 2.42
Wall 6(Toilet Walls) 1 x 5 1.77 0.15 2.10 2.79
Wall 7 1 x 5 2.00 0.15 2.10 3.15
Wall 8(Washbasin near Wall) 1 x 2 1.20 0.15 2.10 0.76
Deduction
CG Gate -1 x 2 1.20 0.23 2.10 -1.16
IG -1 x 1 0.95 0.23 2.10 -0.46
Ventilator V1 -1 x 5 1.00 0.23 0.60 -0.69
Ventilator V2 -1 x 1 0.95 0.23 0.60 -0.13
Ventilator V4 -1 x 13 0.60 0.23 0.60 -1.08
Ventilator V3 -1 x 1 0.80 0.23 0.60 -0.11
Door D1 -1 x 15 0.75 0.15 2.10 -3.54
Sliding Door -1 x 2 0.75 0.15 2.10 -0.47
Total Quantity = 55.00 Cum
Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50
4
metres lead - for thickness of tiles 10mm to 25mm
Flooring Area
Floor Inner Area 1 x 1 20.79 5.54 115.18
Front Side Ramp Area 1 x 1 12.00 1.20 14.40
Wash Area 1 x 1 1.25 0.50 0.63
Roof Tile
Roof Area 1 x 1 20.79 5.54 115.18
Dadooing Wall Tile
Ladies Toilet
W/C Toilet 1 x 4 6.92 2.10 58.13
Bath 1 x 2 6.50 2.10 27.30
PH Toilet 1 x 1 7.46 2.10 15.67
Passage Area 1 x 1 17.70 2.10 37.17
Wash Area 1 x 1 8.55 2.10 17.96
Door D1 -1 x 12 0.75 2.10 -18.90
Sliding Door -1 x 2 0.75 2.10 -3.15
Gents Toilet
W/C Toilet 1 x 4 6.14 2.10 51.58
Bath 1 x 3 6.60 2.10 41.58
W/C Toilet 1 x 1 5.78 2.10 12.14
Bath 1 x 1 6.40 2.10 13.44
PH Toilet 1 x 1 7.46 2.10 15.67
Passage Area 1 x 1 16.33 2.10 34.29
Wash Area & Urinals 1 x 1 15.96 2.10 33.52
Door -1 x 18 0.75 2.10 -28.35
Sliding Door -1 x 2 0.75 2.10 -3.15
Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats,
5
architrave, holdfasts etc. complete and stacking within 50 metres lead of area beyond 3 sq.metres
CG 1 x 0 0.00
IG 1 x 0 0.00
Ventilator V1 1 x 0 0.00
Ventilator V2 1 x 0 0.00
Ventilator V4 1 x 0 0.00
Ventilator V3 1 x 0 0.00
Door D1 1 x 0 0.00
Sliding Door 1 x 0 0.00
6 Demolishing mud phaska in terracing and disposal of material within 50 metres lead.
Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates,
7
bolts, nuts, cutting rivets ,welding etc.including dismembering and stacking within 50 metres lead
Flooring PCC
Ground Floor
Flooring Area Inner 1 x 1 19.55 5.30 0.10 10.36
Front Side Steps Area 1 x 4 1.25 0.60 0.10 0.30
First Floor
Flooring Area Inner 1 x 1 19.55 5.30 0.10 10.36
Front Side Corridor Area 1 x 1 19.55 5.30 0.10 10.36
Demolishing R.C.C work manually / by mechanical means including stacking of steel bars and disposal of
2
unserviceable material within 50 metres lead
Ground Floor
Column
Column1 1 x 12 0.39 0.39 3.15 5.75
Roof Beam
Beam 1 1 x 2 17.21 0.30 0.15 1.55
Beam 2 1 x 8 4.84 0.30 0.15 1.74
Add Column Junction
Column1 1 x 12 0.39 0.39 0.15 0.27
Lintel Beam
Wall 1 1 x 1 17.21 0.39 0.15 1.01
Wall 2 (front side ) from A 1 x 1 6.29 0.39 0.15 0.37
Wall 3 (front side ) from D 1 x 1 6.93 0.39 0.15 0.41
Wall 4 (side wall) 1 x 6 4.52 0.39 0.15 1.59
Wall 5 (toilt) 1 x 1 3.00 0.39 0.15 0.18
Wall 6 (STAIR) 1 x 1 2.23 0.39 0.15 0.13
Roof Slab
Area 1 x 1 19.55 6.80 0.15 19.94
Projections (Front Projection Slope) 1 x 1 19.55 0.45 0.20 1.76
Staircase
Flight Slab 1 1 x 1 4.36 1.50 0.15 0.98
Flight Slab 2 1 x 1 2.03 1.50 0.15 0.46
Landing 1 1 x 1 1.16 3.00 0.15 0.52
Steps 21 x 0.5 1.50 0.30 0.15 0.71
Sunshade
Wooden Window 1 x 1 3.83 0.60 0.10 0.23
Wooden Window 1 x 1 2.10 0.60 0.10 0.13
Wooden Window 1 x 1 3.94 0.60 0.10 0.24
Wooden Window 1 x 1 2.21 0.60 0.10 0.13
First Floor
Column
Column1 1 x 12 0.39 0.39 2.70 4.93
Roof Beam
Beam 1 1 x 2 17.21 0.30 0.15 1.55
Beam 2 1 x 8 4.68 0.30 0.15 1.68
Lintel Beam
Wall 1 1 x 1 17.21 0.23 0.15 0.59
Wall 2 (front side ) from A 1 x 1 6.29 0.23 0.15 0.22
Wall 3 (front side ) from D 1 x 1 6.93 0.23 0.15 0.24
Wall 4 (side wall) 1 x 6 4.52 0.23 0.15 0.94
Wall 5 (toilt) 1 x 2 3.00 0.23 0.15 0.21
Wall 6 (STAIR) 1 x 2 2.23 0.23 0.15 0.15
Roof Slab
Area 1 x 1 19.55 6.80 0.15 19.94
Projections (Front Projection Slope) 1 x 1 19.55 0.45 0.20 1.76
Sunshade
Wooden Window 1 x 1 3.83 0.60 0.10 0.23
Wooden Window 1 x 1 2.10 0.60 0.10 0.13
Wooden Window 1 x 1 3.94 0.60 0.10 0.24
Wooden Window 1 x 1 2.21 0.60 0.10 0.13
Terrace Floor
Column
Column1 1 x 12 0.23 0.23 0.30 0.19
Demolishing brick work manually / by mechanical means including stacking of serviceable material and
3
disposal of unserviceable material within 50 metres lead - in cement mortar
Ground Floor
Brickwork
Wall 1(Outer Wall) 1 x 1 17.21 0.39 2.55 17.12
Wall 2(Entrance Wall) 1 x 1 6.29 0.39 2.55 6.26
Wall 3(Entrance Wall) 1 x 1 6.93 0.39 2.55 6.89
Wall 4(Room Walls) 1 x 6 4.52 0.39 2.55 26.97
Wall 5(Toilet Area) 1 x 1 3.00 0.39 2.55 2.98
Wall 6(Toilet Area) 1 x 1 2.23 0.39 2.55 2.22
Deductions
Door DD -1 x 4 1.20 0.39 2.20 -4.12
Door D 1 (plastic) -1 x 2 0.73 0.39 2.10 -1.20
Door D 1 (steel) -1 x 1 0.65 0.39 2.10 -0.53
Window W1 -1 x 7 1.04 0.39 1.50 -4.26
Ventilatro V -1 x 2 0.90 0.39 0.60 -0.42
Front Side Entrance Steps
Steps 1 1 x 4 1.25 0.60 0.15 0.45
Steps 2 1 x 4 1.25 0.30 0.15 0.22
Stair Front
Steps 1 1 x 1 3.00 0.60 0.15 0.27
Steps 2 1 x 1 3.00 0.30 0.15 0.13
First Floor
Brickwork
Wall 1(Outer Wall) 1 x 1 17.21 0.39 2.55 17.12
Wall 2(front side ) 1 x 1 6.29 0.39 2.55 6.26
Wall 3(front side ) 1 x 1 6.93 0.39 2.55 6.89
Wall 4(Room Walls) 1 x 6 4.52 0.39 2.55 26.97
Wall 5(Toilet Walls) 1 x 2 3.00 0.39 2.55 5.97
Wall 6(Toilet Walls) 1 x 2 2.23 0.39 2.55 4.44
Wall 7(Toilet Walls) 1 x 1 1.80 0.39 2.90 2.04
Corrider Wall 1 x 1 19.55 0.10 0.90 1.76
Deductions
Door DD -1 x 4 0.90 0.39 2.10 -2.95
Door D 1 plastic -1 x 3 0.73 0.39 2.10 -1.79
Window W1 -1 x 6 1.04 0.39 1.50 -3.65
Ventilatro V -1 x 2 0.90 0.39 0.60 -0.42
Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres
4
lead - for thickness of tiles 10mm to 25mm
Roof Tile
Roof Area Inner 1 x 1 18.77 4.52 84.84
5 Demolishing mud phaska in terracing and disposal of material within 50 metres lead.
Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts,
6
nuts, cutting rivets ,welding etc.including dismembering and stacking within 50 metres lead
Grills Kg/Sqm
Ground Floor
Window W1 1 x 7 1.10 1.50 15.00 173.25
First Floor
Window W1 1 x 6 1.10 1.50 15.00 148.50
Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats,
7
architrave, holdfasts etc. complete and stacking within 50 metres lead of area beyond 3 sq.metres
Ground Floor
Door DD 1 x 4 4.00
Door D1 plastic 1 x 2 2.00
Door D2 Steel 1 x 1 1.00
Window W1 1 x 7 7.00
Ventilatro V 1 x 2 2.00
First Floor
Door WD 1 x 4 4.00
Door D1 plastic 1 x 3 3.00
Window W1 1 x 6 6.00
Ventilatro V 1 x 3 3.00
1 15.2.2 Nominal concrete 1:4:8 or leaner mix (including equivalent design mix) 26.60 1,239.60 cum 32,973.00
Dismantling tile work in floors and roofs laid in cement mortar including
4 15.23.1 275.00 60.50 sqm 16,638.00
stacking material within 50 metres lead - for thickness of tiles 10mm to 25mm
Dismantling steel work in built up sections in angles, tees, flats and channels
6 15.18 including all gusset plates, bolts, nuts, cutting rivets ,welding etc.including Err:509 4.65 kg Err:509
dismembering and stacking within 50 metres lead
Flooring PCC
Ground Floor
Room 1 1 x 2 3.66 7.10 0.10 5.20
Room 2 1 x 2 3.66 7.10 0.10 5.20
Room 3 1 x 2 3.50 7.10 0.10 4.97
Room 4 1 x 1 3.63 7.10 0.10 2.58
Room 5 1 x 1 3.77 7.10 0.10 2.68
Demolishing R.C.C work manually / by mechanical means including stacking of steel bars and disposal of unserviceable
2
material within 50 metres lead
Ground Floor
Column
Column1 1 x 24 0.30 0.50 2.50 9.00
Column2 1 x 6 0.30 0.38 2.50 1.71
Roof Beam
Beam 1 1 x 3 30.10 0.30 0.30 8.13
Beam 2 1 x 1 34.60 0.30 0.30 3.11
Beam 4 1 x 8 8.90 0.30 0.30 6.41
Beam 5 1 x 2 8.26 0.30 0.30 1.49
Add Column Junction
Column1 1 x 24 0.30 0.50 0.30 1.08
Column2 1 x 6 0.30 0.38 0.30 0.21
Lintel Beam
Long Wall
Wall 1(Outer Wall) 1 x 1 30.10 0.23 0.15 1.04
Wall 2(Center Wall) 1 x 2 14.75 0.23 0.15 1.02
Wall 3(Outer Wall) 1 x 2 13.75 0.23 0.15 0.95
Short Wall
Wall 1(Toilet Wall) 1 x 8 2.57 0.23 0.15 0.71
Wall 2(Bath Room) 1 x 8 1.34 0.23 0.15 0.37
Wall 3(Toilet Wall) 1 x 2 1.28 0.23 0.15 0.09
Wall 4(Toilet Wall) 1 x 8 1.20 0.23 0.15 0.33
Wall 5(Toilet Wall) 1 x 2 1.10 0.23 0.15 0.08
Wall 6(Toilet Wall) 1 x 2 1.22 0.23 0.15 0.08
Wall 7(Toilet Wall) 1 x 1 1.25 0.23 0.15 0.04
Wall 8(Toilet Area) 1 x 1 1.40 0.23 0.15 0.05
Wall 9(Hall Area) 1 x 2 3.66 0.23 0.15 0.25
Wall 10(Hall Area) 1 x 2 3.49 0.23 0.15 0.24
Wall 11(Hall Area) 1 x 2 3.61 0.23 0.15 0.25
Wall 12(Hall Area) 1 x 1 3.63 0.23 0.15 0.13
Wall 13(Hall Area) 1 x 1 3.77 0.23 0.15 0.13
Entrance Wall 1 x 1 3.84 0.23 0.15 0.13
Roof Slab
Roof Area 1 x 1 34.00 8.80 0.15 44.88
Projections (Front Projection Slope) 1 x 1 34.00 0.45 0.15 2.30
Deductions
Staircase Area -1 x 1 3.01 2.50 0.15 -1.13
Staircase
Flight Slab 1 1 x 1 2.31 1.30 0.15 0.45
Flight Slab 2 1 x 1 3.53 1.30 0.15 0.69
Landing 1 1 x 1 2.50 1.37 0.15 0.51
Steps 19 x 0.5 1.30 0.30 0.15 0.56
Hand Rail Wall 1 x 1 2.31 0.20 1.00 0.46
Hand Rail Wall 1 x 1 3.53 0.20 1.00 0.71
First Floor
Column
Column1 1 x 24 0.30 0.50 2.35 8.46
Column2 1 x 6 0.30 0.38 2.35 1.61
Roof Beam
Beam 1 1 x 3 30.10 0.30 0.30 8.13
Beam 2 1 x 1 34.60 0.30 0.30 3.11
Beam 4 1 x 8 8.90 0.30 0.30 6.41
Beam 5 1 x 2 8.26 0.30 0.30 1.49
Add Column Junction
Column1 1 x 24 0.30 0.50 0.30 1.08
Column2 1 x 6 0.30 0.38 0.30 0.21
Lintel Beam
Long Wall
Wall 1(Outer Wall) 1 x 1 30.10 0.30 0.15 1.35
Wall 2(Center Wall) 1 x 2 14.75 0.30 0.15 1.33
Corrider Wall 1 x 2 13.75 0.30 0.15 1.24
Short Wall
Wall 3(Hall Area) 1 x 8 2.57 0.30 0.15 0.93
Wall 4(Hall Area) 1 x 8 1.34 0.30 0.15 0.48
Wall 3(Hall Area) 1 x 2 1.28 0.30 0.15 0.12
Wall 4(Hall Area) 1 x 8 1.20 0.30 0.15 0.43
Wall 5(Hall Area) 1 x 2 1.10 0.30 0.15 0.10
Wall 6(Hall Area) 1 x 2 1.22 0.30 0.15 0.11
Wall 9(ToiletWall) 1 x 1 1.25 0.30 0.15 0.06
Wall 10(ToiletWall) 1 x 1 1.40 0.30 0.15 0.06
Wall 11(Toilet Wall) 1 x 2 3.66 0.30 0.15 0.33
Wall 12(Bath Wall) 1 x 2 3.49 0.30 0.15 0.31
Wall 13(Bath Wall) 1 x 2 3.61 0.30 0.15 0.32
Wall 14(Toilet Wall) 1 x 1 3.63 0.30 0.15 0.16
Wall 15(Toilet Wall) 1 x 1 3.77 0.30 0.15 0.17
Wall 16(Toilet Wall)
Roof Area 1 x 1 34.00 8.80 0.15 44.88
Projections (Front Projection Slope) 1 x 1 34.00 0.45 0.15 2.30
Deductions
Staircase Area -1 x 1 3.01 2.50 0.15 -1.13
Terrace Floor
Column
Column1 1 x 24 0.30 0.50 0.30 1.08
Column2 1 x 6 0.30 0.38 0.30 0.21
Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of
3
unserviceable material within 50 metres lead - in cement mortar
Ground Floor
Long Wall
Wall 1(Outer Wall) 1 x 1 29.20 0.23 2.20 14.78
Wall 2(Center Wall) 1 x 2 13.28 0.23 2.20 13.44
Wall 3(Outer Wall) 1 x 2 13.42 0.23 2.20 13.58
Short Wall
Wall 1(Toilet Wall) 1 x 8 2.57 0.23 2.20 10.40
Wall 2(Bath Room) 1 x 8 1.34 0.23 2.20 5.42
Wall 3(Toilet Wall) 1 x 2 1.28 0.23 2.20 1.30
Wall 4(Toilet Wall) 1 x 8 1.20 0.23 2.20 4.87
Wall 5(Toilet Wall) 1 x 2 1.10 0.23 2.20 1.11
Wall 6(Toilet Wall) 1 x 2 1.22 0.23 2.20 1.23
Wall 7(Toilet Wall) 1 x 1 1.25 0.23 2.20 0.63
Wall 8(Toilet Area) 1 x 1 1.40 0.23 2.20 0.71
Wall 9(Hall Area) 1 x 2 3.66 0.23 2.20 3.70
Wall 10(Hall Area) 1 x 2 3.49 0.23 2.20 3.53
Wall 11(Hall Area) 1 x 2 3.61 0.23 2.20 3.65
Wall 12(Hall Area) 1 x 1 3.63 0.23 2.20 1.84
Wall 13(Hall Area) 1 x 1 3.77 0.23 2.20 1.91
Entrance Wall 1 x 1 3.00 0.23 2.20 1.52
Deductions
Door D1 -1 x 8 0.85 0.23 2.10 -3.28
Door D2 -1 x 8 0.80 0.23 2.10 -3.09
Door D3 -1 x 8 0.65 0.23 2.10 -2.51
Window W1 -1 x 8 0.80 0.23 1.50 -2.21
Ventilator V -1 x 8 0.60 0.23 0.60 -0.66
Entrance Way -1 x 1 1.60 0.23 3.00 -1.10
Wall Open -1 x 8 1.09 0.23 2.10 -4.21
Jali Window -1 x 8 2.20 0.23 0.90 -3.64
Entry Open -1 x 8 0.90 0.23 2.10 -3.48
Deductions
Door D -1 x 1 0.90 0.23 2.10 -0.43
First Floor
Long Wall
Wall 1(Outer Wall) 1 x 1 19.30 0.23 2.20 9.77
Wall 2(Center Wall) 1 x 1 12.93 0.23 2.20 6.54
Corrider Wall 1 x 1 25.82 0.23 2.20 13.06
Short Wall
Wall 3(Hall Area) 1 x 1 3.52 0.23 2.20 1.78
Wall 4(Hall Area) 1 x 1 3.60 0.23 2.20 1.82
Wall 3(Hall Area) 1 x 1 3.50 0.23 2.20 1.77
Wall 4(Hall Area) 1 x 1 3.61 0.23 2.20 1.83
Wall 5(Hall Area) 1 x 1 3.63 0.23 2.20 1.84
Wall 6(Hall Area) 1 x 1 3.77 0.23 2.20 1.91
Wall 9(ToiletWall) 1 x 5 2.57 0.23 2.20 6.50
Wall 10(ToiletWall) 1 x 5 1.34 0.23 2.20 3.39
Wall 11(Toilet Wall) 1 x 1 1.28 0.23 2.20 0.65
Wall 12(Bath Wall) 1 x 5 1.20 0.23 2.20 3.04
Wall 13(Bath Wall) 1 x 1 1.10 0.23 2.20 0.56
Wall 14(Toilet Wall) 1 x 1 1.22 0.23 2.20 0.62
Wall 15(Toilet Wall) 1 x 1 1.25 0.23 2.20 0.63
Wall 16(Toilet Wall) 1 x 1 1.39 0.23 2.20 0.70
Corrider Wall 1 1 x 1 13.53 0.23 0.86 2.68
Corrider Wall 2 1 x 1 3.52 0.23 0.86 0.70
Corrider Wall 3 1 x 1 3.82 0.23 0.86 0.76
Deductions
Door D1 -1 x 5 0.85 0.23 2.10 -2.05
Door D2 -1 x 5 0.80 0.23 2.10 -1.93
Door D3 -1 x 5 0.65 0.23 2.10 -1.57
Window W1 -1 x 5 0.80 0.23 1.50 -1.38
Ventilator V -1 x 5 0.60 0.23 0.60 -0.41
Wall Open -1 x 5 1.09 0.23 2.10 -2.63
Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead - for
4
thickness of tiles 10mm to 25mm
Roof Tile
Roof Area Inner 1 x 1 31.25 8.80 275.00
Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts,
6
cutting rivets ,welding etc.including dismembering and stacking within 50 metres lead
Grills Kg/Sqm
Ground Floor
Window W1 1 x 8 0.80 1.50 15.00 144.00
Ventilator V 1 x 8 0.60 0.60 10.00 28.80
First Floor
Window W1 1 x 5 0.80 1.50 15.00 90.00
Ventilator V 1 x 5 0.60 0.60 10.00 18.00
Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts
7
etc. complete and stacking within 50 metres lead of area beyond 3 sq.metres
Ground Floor
Door D 1 x 1 1.00 1.00
Door D1 1 x 1 8.00 8.00
Door D2 1 x 1 8.00 8.00
Door D3 1 x 1 8.00 8.00
Window W1 1 x 1 8.00 8.00
Ventilator V 1 x 1 8.00 8.00
First Floor
Door D1 1 x 1 5.00 5.00
Door D2 1 x 1 5.00 5.00
Door D3 1 x 1 5.00 5.00
Window W1 1 x 1 5.00 5.00
Ventilator V 1 x 1 5.00 5.00
1 15.2.2 Nominal concrete 1:4:8 or leaner mix (including equivalent design mix) 24.90 1,239.60 cum 30,866.00
Dismantling tile work in floors and roofs laid in cement mortar including
4 15.23.1 284.90 60.50 sqm 17,236.00
stacking material within 50 metres lead - for thickness of tiles 10mm to 25mm
Dismantling steel work in built up sections in angles, tees, flats and channels
6 15.18 including all gusset plates, bolts, nuts, cutting rivets ,welding etc.including 933.30 4.65 kg 4,340.00
dismembering and stacking within 50 metres lead
Demolishing R.C.C work manually / by mechanical means including stacking of steel bars and disposal of unserviceable
2
material within 50 metres lead
Ground Floor
Column
Column1 1 x 12 0.40 0.50 2.50 6.00
Column2 1 x 3 0.40 0.50 2.50 1.50
Roof Beam
Wall 1(Outer Wall) 1 x 3 13.75 0.40 0.30 4.95
Wall 2(Center Wall) 1 x 1 15.20 0.40 0.30 1.82
Wall 3(Outer Wall) 1 x 4 6.95 0.40 0.30 3.34
Add Column Junction
Column1 1 x 12 0.40 0.40 0.30 0.58
Column2 1 x 6 0.40 0.40 0.30 0.29
Lintel Beam
Brickwork
Long Wall
Wall 1 1 x 1 13.75 0.40 0.15 0.83
Wall 2 1 x 2 8.65 0.40 0.15 1.04
Short Wall
Wall 1(Toilet Wall) 1 x 4 2.57 0.40 0.15 0.62
Wall 2(Bath Room) 1 x 4 1.34 0.40 0.15 0.32
Wall 3(Toilet Wall) 1 x 1 1.28 0.40 0.15 0.08
Wall 4(Toilet Wall) 1 x 4 1.20 0.40 0.15 0.29
Wall 5(Toilet Wall) 1 x 2 1.10 0.40 0.15 0.13
Wall 6(Toilet Wall) 1 x 2 1.22 0.40 0.15 0.15
Wall 7(Toilet Wall) 1 x 1 1.25 0.40 0.15 0.08
Wall 8(Toilet Area) 1 x 1 1.40 0.40 0.15 0.08
Wall 9(Hall Area) 1 x 2 3.66 0.40 0.15 0.44
Wall 10(Hall Area) 1 x 2 3.49 0.40 0.15 0.42
Wall 11(Hall Area) 1 x 2 3.61 0.40 0.15 0.43
Wall 12(Hall Area) 1 x 1 3.63 0.40 0.15 0.22
Wall 13(Hall Area) 1 x 1 3.77 0.40 0.15 0.23
Entrance Wall 1 x 1 3.84 0.40 0.15 0.23
Roof Slab
Area 1 x 1 16.00 9.40 0.15 22.56
Projections (Front Projection Slope) 1 x 1 16.00 0.45 0.15 1.08
Deductions
Staircase Area -1 x 1 3.25 2.10 0.15 -1.02
Staircase
Flight Slab 1 1 x 1 2.31 1.30 0.15 0.45
Flight Slab 2 1 x 1 3.53 1.30 0.15 0.69
Landing 1 1 x 1 2.50 1.37 0.15 0.51
Steps 19 x 0.5 1.30 0.30 0.15 0.56
Landing Beam 1 x 2 2.50 0.30 0.15 0.22
Hand Rail Wall 1 x 1 2.31 0.20 1.00 0.46
Hand Rail Wall 1 x 1 3.53 0.20 1.00 0.71
First Floor
Column
Column1 1 x 12 0.40 0.50 2.50 6.00
Column2 1 x 3 0.40 0.40 2.50 1.20
Roof Beam
Beam 1 1 x 3 13.75 0.40 0.30 4.95
Beam 2 1 x 1 15.20 0.40 0.30 1.82
Beam 4 1 x 4 6.95 0.40 0.30 3.34
Add Column Junction
Column1 1 x 12 0.40 0.40 0.30 0.58
Column2 1 x 6 0.40 0.40 0.30 0.29
Lintel Beam
Long Wall
Wall 1 1 x 1 13.75 0.40 0.15 0.83
Wall 2 1 x 2 8.65 0.40 0.15 1.04
Short Wall
Wall 1(Toilet Wall) 1 x 4 2.57 0.40 0.15 0.62
Wall 2(Bath Room) 1 x 4 1.34 0.40 0.15 0.32
Wall 3(Toilet Wall) 1 x 1 1.28 0.40 0.15 0.08
Wall 4(Toilet Wall) 1 x 4 1.20 0.40 0.15 0.29
Wall 5(Toilet Wall) 1 x 2 1.10 0.40 0.15 0.13
Wall 6(Toilet Wall) 1 x 2 1.22 0.40 0.15 0.15
Wall 7(Toilet Wall) 1 x 1 1.25 0.40 0.15 0.08
Wall 8(Toilet Area) 1 x 1 1.40 0.40 0.15 0.08
Wall 9(Hall Area) 1 x 2 3.66 0.40 0.15 0.44
Wall 10(Hall Area) 1 x 2 3.49 0.40 0.15 0.42
Wall 11(Hall Area) 1 x 2 3.61 0.40 0.15 0.43
Wall 12(Hall Area) 1 x 1 3.63 0.40 0.15 0.22
Wall 13(Hall Area) 1 x 1 3.77 0.40 0.15 0.23
Entrance Wall 1 x 1 3.84 0.40 0.15 0.23
Roof Slab
Area 1 x 1 16.00 9.40 0.15 22.56
Projections (Front Projection Slope) 1 x 1 16.00 0.45 0.15 1.08
Staircase
Flight Slab 1 1 x 1 2.31 1.30 0.15 0.45
Flight Slab 2 1 x 1 3.53 1.30 0.15 0.69
Landing 1 1 x 1 2.50 1.37 0.15 0.51
Steps 19 x 0.5 1.30 0.30 0.15 0.56
Hand Rail Wall 1 x 1 2.31 0.20 1.00 0.46
Hand Rail Wall 1 x 1 3.53 0.20 1.00 0.71
Terrace Floor
Column
Column1 1 x 12 0.40 0.50 0.30 0.72
Column2 1 x 3 0.40 0.50 0.30 0.18
Room 359 D
Light Point 1 x 12 12.00 nos
Room 359C
Light Point 1 x 13 13.00 nos
First Floor
Room 359 O & P
Tube Light set 1 x 1 1.00 nos
Room 359 M
Tube Light ( Frame only) 1 x 1 1.00 nos
Corrider x
Light Point 1 x 7 7.00 nos
Stair case
Light point 1 x 2 2.00 nos
Total 2,375,514.50
DSR DATA 2022
MAIN DATA
Sl
Code Description Unit RATE
No.
1 15.2.2 Nominal concrete 1:4:8 or leaner mix (including equivalent design mix) 15.83 1,239.60 cum 19,623.00
Dismantling tile work in floors and roofs laid in cement mortar including
5 15.23.1 147.60 60.50 sqm 8,930.00
stacking material within 50 metres lead - for thickness of tiles 10mm to 25mm
Dismantling steel work in built up sections in angles, tees, flats and channels
7 15.18 including all gusset plates, bolts, nuts, cutting rivets ,welding etc.including 387.00 4.65 kg 1,800.00
dismembering and stacking within 50 metres lead
Flooring PCC
EB Room Old Building 1 x 1 17.30 3.85 0.10 6.66
EB Room 1 x 1 18.22 4.44 0.10 8.09
Inner Platform 1 x 1 3.00 1.80 0.20 1.08
Demolishing R.C.C work manually / by mechanical means including stacking of steel bars and disposal of
2
unserviceable material within 50 metres lead
Ground Floor
Column
EB Room
Column1 1 x 12 0.30 0.45 4.15 6.72
Roof Beam
EB Room
Beam 1 1 x 2 16.95 0.30 0.30 3.05
Beam 2 1 x 6 4.10 0.30 0.30 2.21
Add Column Junctions
Column1 1 x 12 0.30 0.45 0.30 0.49
EB Room Old Building - Tie Beam
Beam 1 1 x 2 17.90 0.30 0.30 3.22
Beam 2 1 x 2 3.85 0.30 0.30 0.69
Roof Slab
EB Room Old Building 1 x 1 17.90 4.45 0.15 11.95
EB Room 1 x 1 18.75 4.90 0.15 13.78
Sunshade
EB Room Old Building
Door 1 x 2 1.30 0.60 0.10 0.16
Ventilator 1 x 3 0.70 0.60 0.10 0.13
Lintel Beam
EB Room
Wall 1 1 x 2 17.30 0.23 0.15 1.19
Wall 2 1 x 2 4.10 0.23 0.15 0.28
Wall 3 1 x 1 2.30 0.23 0.15 0.08
EB Room Old Building
Wall 1 1 x 2 17.90 0.30 0.15 1.61
Wall 2 1 x 2 3.85 0.30 0.15 0.35
Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of
3
unserviceable material within 50 metres lead - in cement mortar
Ground Floor
EB Room
Wall 1(Outer wall) 1 x 2 17.30 0.23 4.00 31.83
Wall 2(Outer wall) 1 x 2 4.10 0.23 4.00 7.54
Wall 3(inner wall) 1 x 1 2.30 0.23 4.00 2.12
Deductions
Rolling Shutter RS -1 x 1 1.82 0.23 3.00 -1.26
Window W -1 x 11 1.20 0.23 1.50 -4.55
Terrace Floor
Parapet Wall
Wall 1 1 x 2 17.30 0.23 0.50 3.98
Wall 2 1 x 2 4.10 0.23 0.50 0.94
Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and
4
disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge : In lime mortar
Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead -
5
for thickness of tiles 10mm to 25mm
Roof Tile
EB Room Old Building 1 x 1 17.30 3.85 66.61
EB Room 1 x 1 18.22 4.44 80.90
6 Demolishing mud phaska in terracing and disposal of material within 50 metres lead.
Roof Tile
EB Room Old Building 1 x 1 17.30 3.85 0.08 5.00
EB Room 1 x 1 18.22 4.44 0.08 6.07
Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts,
7
cutting rivets ,welding etc.including dismembering and stacking within 50 metres lead
Grills Kg/Sqm
EB Room
Window W1 1 x 11 1.20 1.50 15.00 297.00
EB Room Old Building
Ventilator V 1 x 1 0.75 0.60 10.00 4.50
Ventilator V1 1 x 1 0.60 0.60 10.00 3.60
Ventilator W 1 x 3 1.20 1.50 15.00 81.00
Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave,
8
holdfasts etc. complete and stacking within 50 metres lead of area beyond 3 sq.metres
EB Room
Rolling Shutter 1 x 1 1.00
Window W 1 x 11 11.00
EB Room Old Building
Door D 1 x 2 2.00
Ventilator V 1 x 1 1.00
Ventilator V1 1 x 1 1.00
Ventilator W 1 x 3 3.00
EB Room
Light Point - Tube Light 1 x 8 8.00 nos
Fan Point (Ceiling) 1 x 4 4.00 nos
EB Room Old Building
Light Point - Tube Light 1 x 4 4.00 nos
Fan Point (Ceiling) 1 x 4 4.00 nos
MAJOR UPGRADATION OF MADURAI RAILWAY JUNCCTION - DISMANTLING WORKS
1 15.2.2 Nominal concrete 1:4:8 or leaner mix (including equivalent design mix) 8.10 1,239.60 cum 10,041.00
Flooring PCC
Room Area Inner 1 x 3 2.90 6.20 0.15 8.09
Demolishing R.C.C work manually / by mechanical means including stacking of steel bars and disposal of
2
unserviceable material within 50 metres lead
Lintel Beam
Wall 1 1 x 2 9.62 0.23 0.15 0.66
Wall 2 1 x 4 6.20 0.23 0.15 0.86
Demolishing brick work manually / by mechanical means including stacking of serviceable material and
3
disposal of unserviceable material within 50 metres lead - in cement mortar
Brickwork
Wall 1 (Front Wall) 1 x 1 9.62 0.23 3.45 7.63
Wall 2 (Back Wall) 1 x 1 9.62 0.23 3.15 6.97
Wall 3 (Side Wall) 1 x 4 6.20 0.23 3.30 18.82
Deductions
Door D1 -1 x 3 1.00 0.23 2.10 -1.45
Window W1 -1 x 3 0.90 0.23 1.50 -0.93
Dismantling cement asbestos or other hard board ceiling or partition walls including stacking of serviceable
4
materials and disposal of unserviceable materials within 50 metres lead.
Roof Area
Area 1 x 1 9.62 7.27 69.94
Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height
5
including stacking the material within 50 metres lead :
Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats,
6
architrave, holdfasts etc. complete and stacking within 50 metres lead of area beyond 3 sq.metres
Door D1 1 x 3 3.00
Window W1 1 x 3 3.00
1 15.2.2 Nominal concrete 1:4:8 or leaner mix (including equivalent design mix) 34.80 1,239.60 cum 43,138.00
Dismantling tile work in floors and roofs laid in cement mortar including
5 15.23.1 389.30 60.50 sqm 23,553.00
stacking material within 50 metres lead - for thickness of tiles 10mm to 25mm
Dismantling steel work in built up sections in angles, tees, flats and channels
7 15.18 including all gusset plates, bolts, nuts, cutting rivets ,welding etc.including 1746.30 4.65 Kg 8,120.00
dismembering and stacking within 50 metres lead
Flooring PCC
Toilet Inner Area 1 x 1 2.56 7.00 0.10 1.79
Canteen Area 1 1 x 1 6.53 7.00 0.10 4.57
Canteen Area 2 1 x 1 14.17 12.27 0.10 17.39
Staff Room 1 x 1 2.74 7.00 0.10 1.92
Railway Staff Association Rest Room 1 x 1 6.04 7.00 0.10 4.23
Railway Staff Association Room 1 x 1 6.00 7.00 0.10 4.20
Outer Staff Toilet 1 x 2 1.45 2.15 0.10 0.62
Demolishing R.C.C work manually / by mechanical means including stacking of steel bars and disposal of
2
unserviceable material within 50 metres lead
Columns
Column 1 1 x 23 0.30 0.40 3.45 9.52
Lintel Beam
Wall 1 1 x 2 26.40 0.23 0.15 1.82
Wall 2 1 x 1 7.23 0.23 0.15 0.25
Wall 3 1 x 1 6.90 0.23 0.15 0.24
Wall 4 1 x 1 6.86 0.23 0.15 0.24
Wall 5 1 x 1 2.15 0.23 0.15 0.07
Wall 1 - Rectangle Area 1 x 1 11.15 0.23 0.15 0.38
Wall 1 - Triangle Area 1 x 0.5 11.15 0.23 0.15 0.19
Wall 2 - Rectangle Area 1 x 1 11.55 0.23 0.15 0.40
Wall 2 - Triangle Area 1 x 0.5 11.55 0.23 0.15 0.20
Wall 3 1 x 1 2.80 0.23 0.15 0.10
Wall 4 1 x 1 2.60 0.23 0.15 0.09
Wall 5 1 x 1 11.55 0.23 0.15 0.40
Wall 6 1 x 2 1.80 0.23 0.15 0.12
Partition Wall
Wall 1 1 x 2 2.15 0.12 0.15 0.07
Wall 2 1 x 1 7.00 0.12 0.15 0.12
Wall 3 1 x 4 1.45 0.12 0.15 0.10
Sunshade
Door 1 1 x 2 1.20 0.60 0.10 0.14
Door 2 1 x 2 1.20 0.60 0.10 0.14
Window W1 1 x 2 1.20 0.60 0.10 0.14
Window W2 1 x 9 2.10 0.60 0.10 1.13
Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of
3
unserviceable material within 50 metres lead - in cement mortar
Brickwork
Wall 1(Outer Wall) 1 x 2 26.40 0.23 3.15 38.25
Wall 2(Toilet Wall) 1 x 1 7.23 0.23 3.15 5.24
Wall 3(Railway Staff Association Restroom
1 x 1 6.90 0.23 3.15 5.00
Room)
Wall 4 1 x 1 6.86 0.23 3.15 4.97
Wall 5 1 x 1 2.15 0.23 2.50 1.24
Partition Wall
Wall 1 1 x 2 2.15 0.12 2.50 1.24
Wall 2 1 x 1 7.00 0.12 2.10 1.69
Wall 3 1 x 4 1.45 0.12 2.10 1.40
Deductions
Door 1 -1 x 7 0.80 0.12 2.10 -1.35
Deductions
Door 1 -1 x 3 1.00 0.23 2.10 -1.45
Door 2 -1 x 3 0.90 0.23 2.10 -1.30
Door 3 -1 x 5 0.80 0.23 2.10 -1.93
Window W1 -1 x 6 0.90 0.23 1.50 -1.86
Window W2 -1 x 10 1.80 0.23 1.50 -6.21
Dismantling aluminium/ Gypsum partitions, doors, windows, fixed glazing and false ceiling includingdisposal of
4 unserviceable material and stacking of serviceable material with in 50 meters lead as directed by Engineer-in-
charge.
Ceiling Area
Toilet Inner Area 1 x 1 2.56 7.00 17.92
Canteen Area 1 1 x 1 6.53 7.00 45.71
Canteen Area 2 1 x 1 14.17 12.27 173.87
Staff Room 1 x 1 2.74 7.00 19.18
Railway Staff Association Rest Room 1 x 1 6.04 7.00 42.28
Railway Staff Association Room 1 x 1 6.00 7.00 42.00
Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead -
5
for thickness of tiles 10mm to 25mm
Flooring
Toilet Inner Area 1 x 1 2.56 7.00 17.92
Canteen Area 1 1 x 1 6.53 7.00 45.71
Canteen Area 2 1 x 1 14.17 12.27 173.87
Staff Room 1 x 1 2.74 7.00 19.18
Railway Staff Association Rest Room 1 x 1 6.04 7.00 42.28
Railway Staff Association Room 1 x 1 6.00 7.00 42.00
Outer Staff Toilet 1 x 2 1.45 2.15 6.23
Skirting
Canteen Area 1 1 x 1 27.06 0.10 2.71
Canteen Area 2 1 x 1 52.88 0.10 5.29
Staff Room 1 x 1 19.48 0.10 1.95
Railway Staff Association Rest Room 1 x 1 26.08 0.10 2.61
Railway Staff Association Room 1 x 1 26.00 0.10 2.60
Door 1 -1 x 3 1.00 0.10 -0.30
Door 2 -1 x 3 0.90 0.10 -0.27
Dadooing Tile
Toilet & Bath 1 x 4 5.58 1.50 33.48
Door 3 -1 x 5 0.80 1.50 -6.00
Dismantling cement asbestos or other hard board ceiling or partition walls including stacking of serviceable
6
materials and disposal of unserviceable materials within 50 metres lead.
Roof Area
Roof Area 1 1 x 1 29.10 6.45 187.70
Roof Area 2 1 x 1 29.10 6.45 187.70
Roof Area 3 1 x 2 2.55 1.79 9.13
Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts,
7
cutting rivets ,welding etc.including dismembering and stacking within 50 metres lead
Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave,
8
holdfasts etc. complete and stacking within 50 metres lead of area beyond 3 sq.metres
Door 1 1 x 3 3.00
Door 2 1 x 3 3.00
Door 3 1 x 5 5.00
Window W1 1 x 6 6.00
Window W2 1 x 10 10.00
1 15.2.2 Nominal concrete 1:4:8 or leaner mix (including equivalent design mix) 36.90 1,239.60 cum 45,741.00
Dismantling tile work in floors and roofs laid in cement mortar including
4 15.23.1 259.08 60.50 sqm 15,674.00
stacking material within 50 metres lead - for thickness of tiles 10mm to 25mm
Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking
6 15.28.1 25.88 136.00 sqm 3,519.00
the material within 50 metres lead of - G.S.sheet
Dismantling steel work in built up sections in angles, tees, flats and channels
7 15.18 including all gusset plates, bolts, nuts, cutting rivets ,welding etc.including 97.92 4.65 Kg 455.00
dismembering and stacking within 50 metres lead
Flooring PCC
Ground Floor
Parking Area 1 1 x 1 12.07 15.68 0.10 18.93
Parking Area 2 1 x 1 18.19 4.74 0.10 8.62
Stair Room Inner Area 1 x 1 4.87 2.47 0.10 1.20
Ramp Area 1 x 2 11.92 2.64 0.10 6.29
Landing Area 1 x 1 5.54 3.30 0.10 1.83
Demolishing R.C.C work manually / by mechanical means including stacking of steel bars and disposal of
2
unserviceable material within 50 metres lead
Ground Floor
Columns
Column 1 1 x 18 0.30 0.30 1.95 3.16
Column 2 1 x 12 0.30 0.50 1.95 3.51
Column 3 1 x 2 0.60 0.80 1.95 1.87
Column 4 1 x 2 0.55 0.55 1.95 1.18
Roof Beam
Beam 1 1 x 1 16.27 0.30 0.20 0.98
Beam 2 1 x 2 11.40 0.30 0.20 1.37
Beam 3 1 x 2 18.84 0.30 0.20 2.26
Beam 4 1 x 1 2.40 0.30 0.20 0.14
Beam 1 1 x 3 19.15 0.30 0.20 3.45
Beam 2 1 x 1 18.45 0.30 0.20 1.11
Beam 3 1 x 1 18.35 0.30 0.20 1.10
Beam 4 1 x 1 4.50 0.30 0.20 0.27
Ramp Beam 1 1 x 2 2.41 0.30 0.20 0.29
Ramp Beam 2 1 x 2 2.45 0.30 0.20 0.29
Roof Slab
Area 1 1 x 1 12.60 15.91 0.15 30.07
Area 2 1 x 1 18.19 5.10 0.15 13.92
Ramp Floor Slab 1 x 2 11.92 2.68 0.10 6.39
Staircase
Flight Slab 1 1 x 1 2.70 1.20 0.20 0.65
Flight Slab 2 1 x 1 1.50 1.20 0.20 0.36
Landing Slab 1 x 1 1.14 2.47 0.20 0.56
Midlanding Beam 1 x 1 2.40 0.30 0.15 0.11
Hand Rail 1 x 1 4.20 0.20 1.00 0.84
First Floor
Columns
Column 1 1 x 17 0.30 0.30 1.95 2.98
Column 2 1 x 10 0.30 0.50 1.95 2.93
Roof Beam
Beam 1 1 x 1 16.27 0.30 0.20 0.98
Beam 2 1 x 2 11.40 0.30 0.20 1.37
Beam 3 1 x 2 18.84 0.30 0.20 2.26
Beam 4 1 x 1 2.40 0.30 0.20 0.14
Beam 1 1 x 3 19.15 0.30 0.20 3.45
Beam 2 1 x 1 18.45 0.30 0.20 1.11
Beam 3 1 x 1 18.35 0.30 0.20 1.10
Beam 4 1 x 1 4.50 0.30 0.20 0.27
Roof Slab
Area 1 1 x 1 12.60 15.91 0.15 30.07
Area 2 1 x 1 17.64 5.10 0.15 13.49
Area 3 1 x 1 12.46 1.03 0.15 1.93
Staircase
Flight Slab 1 1 x 1 2.70 1.20 0.20 0.65
Flight Slab 2 1 x 1 1.50 1.20 0.20 0.36
Landing Slab 1 x 1 1.14 2.47 0.20 0.56
Midlanding Beam 1 x 1 2.40 0.30 0.15 0.11
Hand Rail 1 x 1 4.20 0.20 1.00 0.84
Terrace Floor
Columns
Head Room
Column 1 1 x 6 0.30 0.30 2.50 1.35
Parpet Column
Column 1 1 x 11 0.30 0.30 0.45 0.45
Column 2 1 x 10 0.30 0.50 0.45 0.68
Demolishing brick work manually / by mechanical means including stacking of serviceable material and
3
disposal of unserviceable material within 50 metres lead - in cement mortar
Ground Floor
Wall 1(outer Wall) 1 x 1 16.27 0.23 0.90 3.37
Wall 2(outer Wall) 1 x 1 16.39 0.23 0.90 3.39
Wall 1(outer Wall) 1 x 1 14.05 0.23 0.90 2.91
Wall 2(outer Wall) 1 x 1 14.85 0.23 0.90 3.07
Wall 3(ramp near) 1 x 1 10.60 0.23 0.50 1.22
Wall 4(ramp near) 1 x 1 14.02 0.23 0.50 1.61
Jally Work 1 x 2 2.70 0.23 1.05 1.30
Stair Room
Wall 1 1 x 2 4.50 0.23 1.95 4.04
Wall 2 1 x 2 2.40 0.23 1.95 2.16
Deductions
Door 1 -1 x 1 1.30 0.23 2.10 -0.63
Staircase Steps 12 x 0.50 1.20 0.30 0.15 0.32
First Floor
Wall 1 1 x 1 16.27 0.23 0.90 3.37
Wall 2 1 x 1 16.39 0.23 0.90 3.39
Wall 1 1 x 1 14.05 0.23 0.90 2.91
Wall 2 1 x 1 14.85 0.23 0.90 3.07
Wall 5 1 x 2 0.80 0.23 0.90 0.33
Jally Work 1 x 2 2.70 0.23 1.05 1.30
Stair Room
Wall 1 1 x 2 4.50 0.23 1.95 4.04
Wall 2 1 x 2 2.40 0.23 1.95 2.16
Deductions
Door 1 -1 x 1 1.30 0.23 2.10 -0.63
Staircase Steps 12 x 0.50 1.20 0.30 0.15 0.32
Terrace Floor
Head Room
Wall 1 1 x 2 2.40 0.23 2.15 2.37
Wall 2 1 x 1 4.50 0.23 2.15 2.23
Parapet
Wall 1 1 x 1 46.91 0.23 0.45 4.86
Wall 2 1 x 1 4.74 0.23 0.45 0.49
Wall 3 1 x 1 14.62 0.23 0.45 1.51
Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres
4
lead - for thickness of tiles 10mm to 25mm
5 Demolishing mud phaska in terracing and disposal of material within 50 metres lead.
Dismantling cement asbestos or other hard board ceiling or partition walls including stacking of serviceable
6
materials and disposal of unserviceable materials within 50 metres lead.
Terrace Floor
Head Room Area 1 x 1 5.40 3.00 16.20
Wall 2 1 x 1 4.50 2.15 9.67
Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height
7
including stacking the material within 50 metres lead :
Terrace Floor
Head Room Purlins
Purlin RHS 1 x 4 5.40 3.20 69.12
Purlin RHS 1 x 2 4.50 3.20 28.80
Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats,
8
architrave, holdfasts etc. complete and stacking within 50 metres lead of area beyond 3 sq.metres
Ground Floor
Door 1 x 1 1.00
First Floor
Door 1 x 1 1.00
1 15.2.2 Nominal concrete 1:4:8 or leaner mix (including equivalent design mix) 31.40 1,239.60 cum 38,923.00
Dismantling tile work in floors and roofs laid in cement mortar including
4 15.23.1 84.90 60.50 sqm 5,136.00
stacking material within 50 metres lead - for thickness of tiles 10mm to 25mm
Dismantling steel work in built up sections in angles, tees, flats and channels
6 15.18 including all gusset plates, bolts, nuts, cutting rivets ,welding etc.including 322.00 4.65 kg 1,497.00
dismembering and stacking within 50 metres lead
1 15.2.2 Nominal concrete 1:4:8 or leaner mix (including equivalent design mix) 24.89 1,239.60 cum 30,857.00
Dismantling tile work in floors and roofs laid in cement mortar including
4 15.23.1 284.90 60.50 sqm 17,236.00
stacking material within 50 metres lead - for thickness of tiles 10mm to 25mm
Dismantling steel work in built up sections in angles, tees, flats and channels
6 15.18 including all gusset plates, bolts, nuts, cutting rivets ,welding etc.including 1246.00 4.65 kg 5,794.00
dismembering and stacking within 50 metres lead
Demolishing R.C.C work manually / by mechanical means including stacking of steel bars and disposal of
2
unserviceable material within 50 metres lead
Ground Floor
Column
Column1 1 x 24 0.30 0.50 2.50 9.00
Column2 1 x 6 0.30 0.38 2.50 1.71
Roof Beam
Beam 1 1 x 3 29.20 0.30 0.30 7.88
Beam 2 1 x 1 33.24 0.30 0.30 2.99
Beam 4 1 x 8 8.57 0.30 0.30 6.17
Beam 5 1 x 2 8.49 0.30 0.30 1.53
Add Column Junction
Column1 1 x 24 0.30 0.50 0.30 1.08
Column2 1 x 6 0.30 0.38 0.30 0.21
Lintel Beam
Long Wall
Wall 1 1 x 1 29.20 0.23 0.15 1.01
Wall 2 1 x 2 13.28 0.23 0.15 0.92
Wall 3 1 x 2 13.42 0.23 0.15 0.93
Short Wall
Wall 1 1 x 8 2.57 0.23 0.15 0.71
Wall 2 1 x 8 1.34 0.23 0.15 0.37
Wall 3 1 x 2 1.28 0.23 0.15 0.09
Wall 4 1 x 8 1.20 0.23 0.15 0.33
Wall 5 1 x 2 1.10 0.23 0.15 0.08
Wall 6 1 x 2 1.22 0.23 0.15 0.08
Wall 7 1 x 1 1.25 0.23 0.15 0.04
Wall 8 1 x 1 1.40 0.23 0.15 0.05
Wall 9 1 x 2 3.66 0.23 0.15 0.25
Wall 10 1 x 2 3.49 0.23 0.15 0.24
Wall 11 1 x 2 3.61 0.23 0.15 0.25
Wall 12 1 x 1 3.63 0.23 0.15 0.13
Wall 13 1 x 1 3.77 0.23 0.15 0.13
Entrance Wall 1 x 1 3.84 0.23 0.15 0.13
Roof Slab
Roof Area 1 x 1 33.70 9.07 0.15 45.85
Projections (Front Projection Slope) 1 x 1 33.70 0.45 0.15 2.27
Deductions
Staircase Area -1 x 1 3.01 2.50 0.15 -1.13
Staircase
Flight Slab 1 1 x 1 2.31 1.30 0.15 0.45
Flight Slab 2 1 x 1 3.53 1.30 0.15 0.69
Landing Slab 1 x 1 2.50 1.37 0.15 0.51
Steps 19 x 0.5 1.30 0.30 0.15 0.56
Hand Rail Wall 1 x 1 2.31 0.20 1.00 0.46
Hand Rail Wall 1 x 1 3.53 0.20 1.00 0.71
First Floor
Column
Column1 1 x 24 0.30 0.50 2.50 9.00
Column2 1 x 6 0.30 0.38 2.50 1.71
Roof Beam
Beam 1 1 x 3 29.20 0.30 0.30 7.88
Beam 2 1 x 1 33.24 0.30 0.30 2.99
Beam 4 1 x 8 8.57 0.30 0.30 6.17
Beam 5 1 x 2 8.49 0.30 0.30 1.53
Add Column Junction
Column1 1 x 24 0.30 0.50 0.30 1.08
Column2 1 x 6 0.30 0.38 0.30 0.21
Lintel Beam
Long Wall
Wall 1 1 x 1 29.20 0.23 0.15 1.01
Wall 2 1 x 2 13.28 0.23 0.15 0.92
Wall 3 1 x 2 13.42 0.23 0.15 0.93
Short Wall
Wall 1 1 x 8 2.57 0.23 0.15 0.71
Wall 2 1 x 8 1.34 0.23 0.15 0.37
Wall 3 1 x 2 1.28 0.23 0.15 0.09
Wall 4 1 x 8 1.20 0.23 0.15 0.33
Wall 5 1 x 2 1.10 0.23 0.15 0.08
Wall 6 1 x 2 1.22 0.23 0.15 0.08
Wall 7 1 x 1 1.25 0.23 0.15 0.04
Wall 8 1 x 1 1.40 0.23 0.15 0.05
Wall 9 1 x 2 3.66 0.23 0.15 0.25
Wall 10 1 x 2 3.49 0.23 0.15 0.24
Wall 11 1 x 2 3.61 0.23 0.15 0.25
Wall 12 1 x 1 3.63 0.23 0.15 0.13
Wall 13 1 x 1 3.77 0.23 0.15 0.13
Entrance Wall 1 x 1 3.84 0.23 0.15 0.13
Roof Slab
Area 1 x 1 33.70 9.07 0.15 45.85
Projections (Front Projection Slope) 1 x 1 33.70 0.45 0.15 2.27
Staircase
Flight Slab 1 1 x 1 2.31 1.30 0.15 0.45
Flight Slab 2 1 x 1 3.53 1.30 0.15 0.69
Landing 1 1 x 1 2.50 1.37 0.15 0.51
Steps 19 x 0.5 1.30 0.30 0.15 0.56
Landing Beam 1 x 2 2.50 0.30 0.15 0.22
Hand Rail Wall 1 x 1 2.31 0.20 1.00 0.46
Hand Rail Wall 1 x 1 3.53 0.20 1.00 0.71
Terrace Floor
Column
Column1 1 x 24 0.30 0.50 0.30 1.08
Column2 1 x 6 0.30 0.38 0.30 0.21
Demolishing brick work manually / by mechanical means including stacking of serviceable material and
3
disposal of unserviceable material within 50 metres lead - in cement mortar
Ground Floor
Long Wall
Wall 1(Outer Wall) 1 x 1 29.20 0.23 2.20 14.78
Wall 2(Center Wall) 1 x 2 13.28 0.23 2.20 13.44
Wall 3(Outer Wall) 1 x 2 13.42 0.23 2.20 13.58
Short Wall
Wall 1(Toilet Wall) 1 x 8 2.57 0.23 2.20 10.40
Wall 2(Bath Room) 1 x 8 1.34 0.23 2.20 5.42
Wall 3(Toilet Wall) 1 x 2 1.28 0.23 2.20 1.30
Wall 4(Toilet Wall) 1 x 8 1.20 0.23 2.20 4.87
Wall 5(Toilet Wall) 1 x 2 1.10 0.23 2.20 1.11
Wall 6(Toilet Wall) 1 x 2 1.22 0.23 2.20 1.23
Wall 7(Toilet Wall) 1 x 1 1.25 0.23 2.20 0.63
Wall 8(Toilet Area) 1 x 1 1.40 0.23 2.20 0.71
Wall 9(Hall Area) 1 x 2 3.66 0.23 2.20 3.70
Wall 10(Hall Area) 1 x 2 3.49 0.23 2.20 3.53
Wall 11(Hall Area) 1 x 2 3.61 0.23 2.20 3.65
Wall 12(Hall Area) 1 x 1 3.63 0.23 2.20 1.84
Wall 13(Hall Area) 1 x 1 3.77 0.23 2.20 1.91
Entrance Wall 1 x 1 3.84 0.23 2.20 1.94
Deductions
Door D1 -1 x 8 0.85 0.23 2.10 -3.28
Door D2 -1 x 8 0.80 0.23 2.10 -3.09
Door D3 -1 x 8 0.65 0.23 2.10 -2.51
Window W1 -1 x 8 0.80 0.23 1.50 -2.21
Ventilator V -1 x 8 0.60 0.23 0.60 -0.66
Entrance Way -1 x 1 1.60 0.23 3.00 -1.10
Wall Open -1 x 8 1.09 0.23 2.10 -4.21
Jali Window -1 x 8 2.20 0.23 0.90 -3.64
Entry Open -1 x 8 0.90 0.23 2.10 -3.48
Outer Shed 2
Wall 1 1 x 1 15.76 0.23 2.00 7.25
Wall 2 1 x 1 4.16 0.23 2.00 1.91
Wall 3 1 x 1 4.05 0.23 2.00 1.86
Deductions
Door Open -1 x 1 0.90 0.23 2.00 -0.41
First Floor
Long Wall
Wall 1(Outer Wall) 1 x 1 29.20 0.23 2.20 14.78
Wall 2(Center Wall) 1 x 2 13.28 0.23 2.20 13.44
Wall 3(Outer Wall) 1 x 2 13.42 0.23 2.20 13.58
Short Wall
Wall 1(Toilet Area) 1 x 8 2.57 0.23 2.20 10.40
Wall 2(Bath Area) 1 x 8 1.34 0.23 2.20 5.42
Wall 3(Toilet Area) 1 x 2 1.28 0.23 2.20 1.30
Wall 4(Bath Area) 1 x 8 1.20 0.23 2.20 4.87
Wall 5(Toilet area) 1 x 2 1.10 0.23 2.20 1.11
Wall 6(Toilet Wall) 1 x 2 1.22 0.23 2.20 1.23
Wall 7(Toilet Wall) 1 x 1 1.25 0.23 2.20 0.63
Wall 8(Toilet Area) 1 x 1 1.40 0.23 2.20 0.71
Wall 9(Hall Area) 1 x 2 3.66 0.23 2.20 3.70
Wall 10(Hall Area) 1 x 2 3.49 0.23 2.20 3.53
Wall 10(Hall Area) 1 x 2 3.61 0.23 2.20 3.65
Wall 10(Hall Area) 1 x 1 3.63 0.23 2.20 1.84
Wall 11(Hall Area) 1 x 1 3.77 0.23 2.20 1.91
Entrance Wall 1 x 1 3.84 0.23 2.20 1.94
Corrider Wall 1 1 x 1 13.53 0.23 0.86 2.68
Corrider Wall 2 1 x 1 3.52 0.23 0.86 0.70
Corrider Wall 3 1 x 1 3.82 0.23 0.86 0.76
Deductions
Door D1 -1 x 8 0.85 0.23 2.10 -3.28
Door D2 -1 x 8 0.80 0.23 2.10 -3.09
Door D3 -1 x 8 0.65 0.23 2.10 -2.51
Window W1 -1 x 8 0.80 0.23 1.50 -2.21
Ventilator V -1 x 8 0.60 0.23 0.60 -0.66
Wall Open -1 x 8 1.09 0.23 2.10 -4.21
Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres
4
lead - for thickness of tiles 10mm to 25mm
Roof Tile
Roof Area Inner 1 x 1 33.24 8.57 284.87
5 Demolishing mud phaska in terracing and disposal of material within 50 metres lead.
Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts,
6
nuts, cutting rivets ,welding etc.including dismembering and stacking within 50 metres lead
Grills Kg/Sqm
Ground Floor
Window W1 1 x 8 0.80 1.50 15.00 144.00
Ventilator V 1 x 8 0.60 0.60 10.00 28.80
First Floor
Window W1 1 x 8 0.80 1.50 15.00 144.00
Ventilator V 1 x 8 0.60 0.60 10.00 28.80
Shed Area
Rail Section Column 45R 1 x 10 2.00 45.00 900.00
Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats,
7
architrave, holdfasts etc. complete and stacking within 50 metres lead of area beyond 3 sq.metres
Ground Floor
Door D1 1 x 1 8.00 8.00
Door D2 1 x 1 8.00 8.00
Door D3 1 x 1 8.00 8.00
Window W1 1 x 1 8.00 8.00
Ventilator V 1 x 1 8.00 8.00
First Floor
Door D1 1 x 1 8.00 8.00
Door D2 1 x 1 8.00 8.00
Door D3 1 x 1 8.00 8.00
Window W1 1 x 1 8.00 8.00
Ventilator V 1 x 1 8.00 8.00
Dismantling cement asbestos or other hard board ceiling or partition walls including stacking of serviceable
8
materials and disposal of unserviceable materials within 50 metres lead.
1 15.2.2 Nominal concrete 1:4:8 or leaner mix (including equivalent design mix) 24.90 1,239.60 cum 30,866.00
Dismantling tile work in floors and roofs laid in cement mortar including
4 15.23.1 284.90 60.50 sqm 17,236.00
stacking material within 50 metres lead - for thickness of tiles 10mm to 25mm
Dismantling steel work in built up sections in angles, tees, flats and channels
6 15.18 including all gusset plates, bolts, nuts, cutting rivets ,welding etc.including 933.30 4.65 kg 4,340.00
dismembering and stacking within 50 metres lead
Flooring PCC
Room 1 1 x 2 3.66 6.55 0.10 4.79
Room 2 1 x 2 3.49 6.55 0.10 4.57
Room 3 1 x 2 3.61 6.55 0.10 4.73
Room 4 1 x 1 3.63 6.55 0.10 2.38
Room 5 1 x 1 3.77 6.55 0.10 2.47
Corridor Area 1 x 1 33.24 1.79 0.10 5.95
Demolishing R.C.C work manually / by mechanical means including stacking of steel bars and disposal of
2
unserviceable material within 50 metres lead
Ground Floor
Column
Column1 1 x 24 0.30 0.50 2.50 9.00
Column2 1 x 6 0.30 0.38 2.50 1.71
Roof Beam
Beam 1 1 x 3 29.20 0.30 0.30 7.88
Beam 2 1 x 1 33.24 0.30 0.30 2.99
Beam 4 1 x 8 8.57 0.30 0.30 6.17
Beam 5 1 x 2 8.49 0.30 0.30 1.53
Add Column Junction
Column1 1 x 24 0.30 0.50 0.30 1.08
Column2 1 x 6 0.30 0.38 0.30 0.21
Lintel Beam
Brickwork
Long Wall
Wall 1 1 x 1 29.20 0.23 0.15 1.01
Wall 2 1 x 2 13.28 0.23 0.15 0.92
Wall 3 1 x 2 13.42 0.23 0.15 0.93
Short Wall
Wall 1 1 x 8 2.57 0.23 0.15 0.71
Wall 2 1 x 8 1.34 0.23 0.15 0.37
Wall 3 1 x 2 1.28 0.23 0.15 0.09
Wall 4 1 x 8 1.20 0.23 0.15 0.33
Wall 5 1 x 2 1.10 0.23 0.15 0.08
Wall 6 1 x 2 1.22 0.23 0.15 0.08
Wall 7 1 x 1 1.25 0.23 0.15 0.04
Wall 8 1 x 1 1.40 0.23 0.15 0.05
Wall 9 1 x 2 3.66 0.23 0.15 0.25
Wall 10 1 x 2 3.49 0.23 0.15 0.24
Wall 11 1 x 2 3.61 0.23 0.15 0.25
Wall 12 1 x 1 3.63 0.23 0.15 0.13
Wall 13 1 x 1 3.77 0.23 0.15 0.13
Entrance Wall 1 x 1 3.84 0.23 0.15 0.13
Roof Slab
Area 1 x 1 33.70 9.07 0.15 45.85
Projections (Front Projection Slope) 1 x 1 33.70 0.45 0.15 2.27
Deductions
Staircase Area -1 x 1 3.01 2.50 0.15 -1.13
Staircase
Flight Slab 1 1 x 1 2.31 1.30 0.15 0.45
Flight Slab 2 1 x 1 3.53 1.30 0.15 0.69
Landing 1 1 x 1 2.50 1.37 0.15 0.51
Steps 19 x 0.5 1.30 0.30 0.15 0.56
Landing Beam 1 x 2 2.50 0.30 0.15 0.22
Hand Rail Wall 1 x 1 2.31 0.20 1.00 0.46
Hand Rail Wall 1 x 1 3.53 0.20 1.00 0.71
First Floor
Column
Column1 1 x 24 0.30 0.50 2.50 9.00
Column2 1 x 6 0.30 0.38 2.50 1.71
Roof Beam
Beam 1 1 x 3 29.20 0.30 0.30 7.88
Beam 2 1 x 1 33.24 0.30 0.30 2.99
Beam 4 1 x 8 8.57 0.30 0.30 6.17
Beam 5 1 x 2 8.49 0.30 0.30 1.53
Add Column Junction
Column1 1 x 24 0.30 0.50 0.30 1.08
Column2 1 x 6 0.30 0.38 0.30 0.21
Lintel Beam
Long Wall
Wall 1 1 x 1 29.20 0.23 0.15 1.01
Wall 2 1 x 2 13.28 0.23 0.15 0.92
Wall 3 1 x 2 13.42 0.23 0.15 0.93
Short Wall
Wall 1 1 x 8 2.57 0.23 0.15 0.71
Wall 2 1 x 8 1.34 0.23 0.15 0.37
Wall 3 1 x 2 1.28 0.23 0.15 0.09
Wall 4 1 x 8 1.20 0.23 0.15 0.33
Wall 5 1 x 2 1.10 0.23 0.15 0.08
Wall 6 1 x 2 1.22 0.23 0.15 0.08
Wall 7 1 x 1 1.25 0.23 0.15 0.04
Wall 8 1 x 1 1.40 0.23 0.15 0.05
Wall 9 1 x 2 3.66 0.23 0.15 0.25
Wall 10 1 x 2 3.49 0.23 0.15 0.24
Wall 11 1 x 2 3.61 0.23 0.15 0.25
Wall 12 1 x 1 3.63 0.23 0.15 0.13
Wall 13 1 x 1 3.77 0.23 0.15 0.13
Entrance Wall 1 x 1 3.84 0.23 0.15 0.13
Roof Slab
Area 1 x 1 33.70 9.07 0.15 45.85
Projections (Front Projection Slope) 1 x 1 33.70 0.45 0.15 2.27
Staircase
Flight Slab 1 1 x 1 2.31 1.30 0.15 0.45
Flight Slab 2 1 x 1 3.53 1.30 0.15 0.69
Landing 1 1 x 1 2.50 1.37 0.15 0.51
Steps 19 x 0.5 1.30 0.30 0.15 0.56
Hand Rail Wall 1 x 1 2.31 0.20 1.00 0.46
Hand Rail Wall 1 x 1 3.53 0.20 1.00 0.71
Terrace Floor
Column
Column1 1 x 24 0.30 0.50 0.30 1.08
Column2 1 x 6 0.30 0.38 0.30 0.21
Demolishing R.C.C work manually / by mechanical means including stacking of steel bars and disposal of
3
unserviceable material within 50 metres lead
Ground Floor
Long Wall
Wall 1(Outer Wall) 1 x 1 29.20 0.23 2.20 14.78
Wall 2(Center Wall) 1 x 2 13.28 0.23 2.20 13.44
Wall 3(Outer Wall) 1 x 2 13.42 0.23 2.20 13.58
Short Wall
Wall 1(Toilet Wall) 1 x 8 2.57 0.23 2.20 10.40
Wall 2(Bath Room) 1 x 8 1.34 0.23 2.20 5.42
Wall 3(Toilet Wall) 1 x 2 1.28 0.23 2.20 1.30
Wall 4(Toilet Wall) 1 x 8 1.20 0.23 2.20 4.87
Wall 5(Toilet Wall) 1 x 2 1.10 0.23 2.20 1.11
Wall 6(Toilet Wall) 1 x 2 1.22 0.23 2.20 1.23
Wall 7(Toilet Wall) 1 x 1 1.25 0.23 2.20 0.63
Wall 8(Toilet Area) 1 x 1 1.40 0.23 2.20 0.71
Wall 9(Hall Area) 1 x 2 3.66 0.23 2.20 3.70
Wall 10(Hall Area) 1 x 2 3.49 0.23 2.20 3.53
Wall 11(Hall Area) 1 x 2 3.61 0.23 2.20 3.65
Wall 12(Hall Area) 1 x 1 3.63 0.23 2.20 1.84
Wall 13(Hall Area) 1 x 1 3.77 0.23 2.20 1.91
Entrance Wall 1 x 1 3.84 0.23 2.20 1.94
Deductions
Door D1 -1 x 8 0.85 0.23 2.10 -3.28
Door D2 -1 x 8 0.80 0.23 2.10 -3.09
Door D3 -1 x 8 0.65 0.23 2.10 -2.51
Window W1 -1 x 8 0.80 0.23 1.50 -2.21
Ventilator V -1 x 8 0.60 0.23 0.60 -0.66
Entrance Way -1 x 1 1.60 0.23 3.00 -1.10
Wall Open -1 x 8 1.09 0.23 2.10 -4.21
Jali Window -1 x 8 2.20 0.23 0.90 -3.64
Entry Open -1 x 8 0.90 0.23 2.10 -3.48
First Floor
Long Wall
Wall 1(Outer Wall) 1 x 1 29.20 0.23 2.20 14.78
Wall 2(Center Wall) 1 x 2 13.28 0.23 2.20 13.44
Wall 3(Outer Wall) 1 x 2 13.42 0.23 2.20 13.58
Short Wall
Wall 1(Toilet Area) 1 x 8 2.57 0.23 2.20 10.40
Wall 2(Bath Area) 1 x 8 1.34 0.23 2.20 5.42
Wall 3(Toilet Area) 1 x 2 1.28 0.23 2.20 1.30
Wall 4(Bath Area) 1 x 8 1.20 0.23 2.20 4.87
Wall 5(Toilet area) 1 x 2 1.10 0.23 2.20 1.11
Wall 6(Toilet Wall) 1 x 2 1.22 0.23 2.20 1.23
Wall 7(Toilet Wall) 1 x 1 1.25 0.23 2.20 0.63
Wall 8(Toilet Area) 1 x 1 1.40 0.23 2.20 0.71
Wall 9(Hall Area) 1 x 2 3.66 0.23 2.20 3.70
Wall 10(Hall Area) 1 x 2 3.49 0.23 2.20 3.53
Wall 10(Hall Area) 1 x 2 3.61 0.23 2.20 3.65
Wall 10(Hall Area) 1 x 1 3.63 0.23 2.20 1.84
Wall 11(Hall Area) 1 x 1 3.77 0.23 2.20 1.91
Entrance Wall 1 x 1 3.84 0.23 2.20 1.94
Corrider Wall 1 1 x 1 13.53 0.23 0.86 2.68
Corrider Wall 2 1 x 1 3.52 0.23 0.86 0.70
Corrider Wall 3 1 x 1 3.82 0.23 0.86 0.76
Deductions
Door D1 -1 x 8 0.85 0.23 2.10 -3.28
Door D2 -1 x 8 0.80 0.23 2.10 -3.09
Door D3 -1 x 8 0.65 0.23 2.10 -2.51
Window W1 -1 x 8 0.80 0.23 1.50 -2.21
Ventilator V -1 x 8 0.60 0.23 0.60 -0.66
Wall Open -1 x 8 1.09 0.23 2.10 -4.21
Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead - for
4
thickness of tiles 10mm to 25mm
Roof Tile
Roof Area Inner 1 x 1 33.24 8.57 284.87
5 Demolishing mud phaska in terracing and disposal of material within 50 metres lead.
Roof Area Inner 1 x 1 33.24 8.57 0.08 21.37
Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts,
6
cutting rivets ,welding etc.including dismembering and stacking within 50 metres lead
Kg/Sqm
Ground Floor
Window W1 1 x 8 0.80 1.50 15.00 144.00
Ventilator V 1 x 8 0.60 0.60 10.00 28.80
First Floor
Window W1 1 x 8 0.80 1.50 15.00 144.00
Ventilator V 1 x 8 0.60 0.60 10.00 28.80
Dismantling cement asbestos or other hard board ceiling or partition walls including stacking of serviceable materials
8
and disposal of unserviceable materials within 50 metres lead.
Ground Floor
Light Point - Tube Light 1 x 6 6.00 nos
Fan Point (Ceiling) 1 x 6 6.00 nos
First Floor
Light Point - Tube Light 1 x 6 6.00 nos
Fan Point (Ceiling) 1 x 6 6.00 nos
MAJOR UPGRADATION OF MADURAI RAILWAY JUNCCTION - DISMANTLING WORKS
1 15.2.2 Nominal concrete 1:4:8 or leaner mix (including equivalent design mix) 24.90 1,239.60 cum 30,866.00
Dismantling tile work in floors and roofs laid in cement mortar including
4 15.23.1 284.90 60.50 sqm 17,236.00
stacking material within 50 metres lead - for thickness of tiles 10mm to 25mm
Dismantling steel work in built up sections in angles, tees, flats and channels
6 15.18 including all gusset plates, bolts, nuts, cutting rivets ,welding etc.including 424.00 4.65 kg 1,972.00
dismembering and stacking within 50 metres lead
Flooring PCC
Ground Floor
Room 1 1 x 2 3.66 6.55 0.10 4.79
Room 2 1 x 2 3.49 6.55 0.10 4.57
Room 3 1 x 2 3.61 6.55 0.10 4.73
Room 4 1 x 1 3.63 6.55 0.10 2.38
Room 5 1 x 1 3.77 6.55 0.10 2.47
Corridor Area 1 x 1 33.24 1.79 0.10 5.95
Demolishing R.C.C work manually / by mechanical means including stacking of steel bars and disposal of
2
unserviceable material within 50 metres lead
Ground Floor
Column
Column1 1 x 24 0.30 0.50 2.50 9.00
Column2 1 x 6 0.30 0.38 2.50 1.71
Roof Beam
Beam 1 1 x 3 29.20 0.30 0.30 7.88
Beam 2 1 x 1 33.24 0.30 0.30 2.99
Beam 4 1 x 8 8.57 0.30 0.30 6.17
Beam 5 1 x 2 8.49 0.30 0.30 1.53
Add Column Junction
Column1 1 x 24 0.30 0.50 0.30 1.08
Column2 1 x 6 0.30 0.38 0.30 0.21
Lintel Beam
Long Wall
Wall 1 1 x 1 29.20 0.23 0.15 1.01
Wall 2 1 x 2 13.28 0.23 0.15 0.92
Wall 3 1 x 2 13.42 0.23 0.15 0.93
Short Wall
Wall 1 1 x 8 2.57 0.23 0.15 0.71
Wall 2 1 x 8 1.34 0.23 0.15 0.37
Wall 3 1 x 2 1.28 0.23 0.15 0.09
Wall 4 1 x 8 1.20 0.23 0.15 0.33
Wall 5 1 x 2 1.10 0.23 0.15 0.08
Wall 6 1 x 2 1.22 0.23 0.15 0.08
Wall 7 1 x 1 1.25 0.23 0.15 0.04
Wall 8 1 x 1 1.40 0.23 0.15 0.05
Wall 9 1 x 2 3.66 0.23 0.15 0.25
Wall 10 1 x 2 3.49 0.23 0.15 0.24
Wall 11 1 x 2 3.61 0.23 0.15 0.25
Wall 12 1 x 1 3.63 0.23 0.15 0.13
Wall 13 1 x 1 3.77 0.23 0.15 0.13
Entrance Wall 1 x 1 3.84 0.23 0.15 0.13
Roof Slab
Area 1 x 1 33.70 9.07 0.15 45.85
Projections (Front Projection Slope) 1 x 1 33.70 0.45 0.15 2.27
Deductions
Staircase Area -1 x 1 3.01 2.50 0.15 -1.13
Staircase
Flight Slab 1 1 x 1 2.31 1.30 0.15 0.45
Flight Slab 2 1 x 1 3.53 1.30 0.15 0.69
Landing 1 1 x 1 2.50 1.37 0.15 0.51
Steps 19 x 0.5 1.30 0.30 0.15 0.56
Landing Beam 1 x 2 2.50 0.30 0.15 0.22
Hand Rail Wall 1 x 1 2.31 0.20 1.00 0.46
Hand Rail Wall 1 x 1 3.53 0.20 1.00 0.71
First Floor
Column
Column1 1 x 24 0.30 0.50 2.50 9.00
Column2 1 x 6 0.30 0.38 2.50 1.71
Roof Beam
Beam 1 1 x 3 29.20 0.30 0.30 7.88
Beam 2 1 x 1 33.24 0.30 0.30 2.99
Beam 4 1 x 8 8.57 0.30 0.30 6.17
Beam 5 1 x 2 8.49 0.30 0.30 1.53
Add Column Junction
Column1 1 x 24 0.30 0.50 0.30 1.08
Column2 1 x 6 0.30 0.38 0.30 0.21
Lintel Beam
Long Wall
Wall 1 1 x 1 29.20 0.23 0.15 1.01
Wall 2 1 x 2 13.28 0.23 0.15 0.92
Wall 3 1 x 2 13.42 0.23 0.15 0.93
Short Wall
Wall 1 1 x 8 2.57 0.23 0.15 0.71
Wall 2 1 x 8 1.34 0.23 0.15 0.37
Wall 3 1 x 2 1.28 0.23 0.15 0.09
Wall 4 1 x 8 1.20 0.23 0.15 0.33
Wall 5 1 x 2 1.10 0.23 0.15 0.08
Wall 6 1 x 2 1.22 0.23 0.15 0.08
Wall 7 1 x 1 1.25 0.23 0.15 0.04
Wall 8 1 x 1 1.40 0.23 0.15 0.05
Wall 9 1 x 2 3.66 0.23 0.15 0.25
Wall 10 1 x 2 3.49 0.23 0.15 0.24
Wall 11 1 x 2 3.61 0.23 0.15 0.25
Wall 12 1 x 1 3.63 0.23 0.15 0.13
Wall 13 1 x 1 3.77 0.23 0.15 0.13
Entrance Wall 1 x 1 3.84 0.23 0.15 0.13
Roof Slab
Area 1 x 1 33.70 9.07 0.15 45.85
Projections (Front Projection Slope) 1 x 1 33.70 0.45 0.15 2.27
Staircase
Flight Slab 1 1 x 1 2.31 1.30 0.15 0.45
Flight Slab 2 1 x 1 3.53 1.30 0.15 0.69
Landing Slab 1 x 1 2.50 1.37 0.15 0.51
Steps 19 x 0.5 1.30 0.30 0.15 0.56
Hand Rail Wall 1 x 1 2.31 0.20 1.00 0.46
Hand Rail Wall 1 x 1 3.53 0.20 1.00 0.71
Terrace Floor
Column
Column1 1 x 24 0.30 0.50 0.30 1.08
Column2 1 x 6 0.30 0.38 0.30 0.21
Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of
3
unserviceable material within 50 metres lead - in cement mortar
Ground Floor
Long Wall
Wall 1(Outer Wall) 1 x 1 29.20 0.23 2.20 14.78
Wall 2(Center Wall) 1 x 2 13.28 0.23 2.20 13.44
Wall 3(Outer Wall) 1 x 2 13.42 0.23 2.20 13.58
Short Wall
Wall 1(Toilet Wall) 1 x 8 2.57 0.23 2.20 10.40
Wall 2(Bath Room) 1 x 8 1.34 0.23 2.20 5.42
Wall 3(Toilet Wall) 1 x 2 1.28 0.23 2.20 1.30
Wall 4(Toilet Wall) 1 x 8 1.20 0.23 2.20 4.87
Wall 5(Toilet Wall) 1 x 2 1.10 0.23 2.20 1.11
Wall 6(Toilet Wall) 1 x 2 1.22 0.23 2.20 1.23
Wall 7(Toilet Wall) 1 x 1 1.25 0.23 2.20 0.63
Wall 8(Toilet Area) 1 x 1 1.40 0.23 2.20 0.71
Wall 9(Hall Area) 1 x 2 3.66 0.23 2.20 3.70
Wall 10(Hall Area) 1 x 2 3.49 0.23 2.20 3.53
Wall 11(Hall Area) 1 x 2 3.61 0.23 2.20 3.65
Wall 12(Hall Area) 1 x 1 3.63 0.23 2.20 1.84
Wall 13(Hall Area) 1 x 1 3.77 0.23 2.20 1.91
Entrance Wall 1 x 1 3.84 0.23 2.20 1.94
Deductions
Door D1 -1 x 8 0.85 0.23 2.10 -3.28
Door D2 -1 x 8 0.80 0.23 2.10 -3.09
Door D3 -1 x 8 0.65 0.23 2.10 -2.51
Window W1 -1 x 8 0.80 0.23 1.50 -2.21
Ventilator V -1 x 8 0.60 0.23 0.60 -0.66
Entrance Way -1 x 1 1.60 0.23 3.00 -1.10
Wall Open -1 x 8 1.09 0.23 2.10 -4.21
Jali Window -1 x 8 2.20 0.23 0.90 -3.64
Entry Open -1 x 8 0.90 0.23 2.10 -3.48
Outer Shed Area
Wall 1 1 x 1 11.63 0.23 2.50 6.69
Wall 2 1 x 4 3.32 0.23 2.50 7.64
Deductions
Door D1 -1 x 3 0.85 0.23 2.10 -1.23
First Floor
Long Wall
Wall 1(Outer Wall) 1 x 1 29.20 0.23 2.20 14.78
Wall 2(Center Wall) 1 x 2 13.28 0.23 2.20 13.44
Wall 3(Outer Wall) 1 x 2 13.42 0.23 2.20 13.58
Short Wall
Wall 1(Toilet Area) 1 x 8 2.57 0.23 2.20 10.40
Wall 2(Bath Area) 1 x 8 1.34 0.23 2.20 5.42
Wall 3(Toilet Area) 1 x 2 1.28 0.23 2.20 1.30
Wall 4(Bath Area) 1 x 8 1.20 0.23 2.20 4.87
Wall 5(Toilet area) 1 x 2 1.10 0.23 2.20 1.11
Wall 6(Toilet Wall) 1 x 2 1.22 0.23 2.20 1.23
Wall 7(Toilet Wall) 1 x 1 1.25 0.23 2.20 0.63
Wall 8(Toilet Area) 1 x 1 1.40 0.23 2.20 0.71
Wall 9(Hall Area) 1 x 2 3.66 0.23 2.20 3.70
Wall 10(Hall Area) 1 x 2 3.49 0.23 2.20 3.53
Wall 10(Hall Area) 1 x 2 3.61 0.23 2.20 3.65
Wall 10(Hall Area) 1 x 1 3.63 0.23 2.20 1.84
Wall 11(Hall Area) 1 x 1 3.77 0.23 2.20 1.91
Entrance Wall 1 x 1 3.84 0.23 2.20 1.94
Corrider Wall 1 1 x 1 13.53 0.23 0.86 2.68
Corrider Wall 2 1 x 1 3.52 0.23 0.86 0.70
Corrider Wall 3 1 x 1 3.82 0.23 0.86 0.76
Deductions
Door D1 -1 x 8 0.85 0.23 2.10 -3.28
Door D2 -1 x 8 0.80 0.23 2.10 -3.09
Door D3 -1 x 8 0.65 0.23 2.10 -2.51
Window W1 -1 x 8 0.80 0.23 1.50 -2.21
Ventilator V -1 x 8 0.60 0.23 0.60 -0.66
Wall Open -1 x 8 1.09 0.23 2.10 -4.21
Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead - for
4
thickness of tiles 10mm to 25mm
Roof Tile
Roof Area Inner 1 x 1 33.24 8.57 284.87
5 Demolishing mud phaska in terracing and disposal of material within 50 metres lead.
Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts,
6
cutting rivets ,welding etc.including dismembering and stacking within 50 metres lead
Kg/Sqm
Ground Floor
Window W1 1 x 8 0.80 1.50 15.00 144.00
Ventilator V 1 x 8 0.60 0.60 10.00 28.80
First Floor
Window W1 1 x 8 0.80 1.50 15.00 144.00
Ventilator V 1 x 8 0.60 0.60 10.00 28.80
Front Side Truss Area (60.3x3.2mm)
Circular Hollow Section Column(Horizontal) 1 x 2 2.70 4.51 24.35
Circular Hollow Section Column(Vertical) 1 x 4 1.95 4.51 35.18
Circular Hollow Section Column(Horizontal) 1 x 1 4.15 4.51 18.72
Total Quantity = 424.00 Kg
Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave,
7
holdfasts etc. complete and stacking within 50 metres lead of area beyond 3 sq.metres
Ground Floor
Door D1 1 x 1 8.00 8.00
Door D2 1 x 1 8.00 8.00
Door D3 1 x 1 8.00 8.00
Window W1 1 x 1 8.00 8.00
Ventilator V 1 x 1 8.00 8.00
First Floor
Door D1 1 x 1 5.00 5.00
Door D2 1 x 1 5.00 5.00
Door D3 1 x 1 5.00 5.00
Window W1 1 x 1 5.00 5.00
Ventilator V 1 x 1 5.00 5.00
Dismantling cement asbestos or other hard board ceiling or partition walls including stacking of serviceable materials
8
and disposal of unserviceable materials within 50 metres lead.
Ground Floor
Light Point - Tube Light 1 x 1 1.00 nos
Fan Point (Ceiling) 1 x 1 1.00 nos
First Floor
Light Point - Tube Light 1 x 1 1.00 nos
Fan Point (Ceiling) 1 x 5 5.00 nos
MAJOR UPGRADATION OF MADURAI RAILWAY JUNCCTION - DISMANTLING WORKS
1 15.2.2 Nominal concrete 1:4:8 or leaner mix (including equivalent design mix) 306.20 1,239.60 cum 379,566.00
Dismantling tile work in floors and roofs laid in cement mortar including
6 15.23.1 3658.10 60.50 sqm 221,315.00
stacking material within 50 metres lead - for thickness of tiles 10mm to 25mm
Dismantling steel work in built up sections in angles, tees, flats and channels
8 15.18 including all gusset plates, bolts, nuts, cutting rivets ,welding etc.including 1306.00 4.65 kg 6,073.00
dismembering and stacking within 50 metres lead
Flooring PCC
Terminal Building Right Side
Ground Floor
Office Of Station Manager
Area 1 1 x 1 3.00 5.00 0.10 1.50
Area 2 1 x 1 3.00 3.00 0.10 0.90
Station Director
Area 1 1 x 1 6.37 5.00 0.10 3.19
Area 2 1 x 1 6.37 3.00 0.10 1.91
Deputy Station Master Room
Area 1 1 x 1 4.90 5.00 0.10 2.45
Area 2 1 x 1 2.35 3.00 0.10 0.71
Writer Cafe 1 x 1 2.90 5.00 0.10 1.45
Elec Switch Room
Area 1 1 x 1 2.70 5.00 0.10 1.35
Area 2 1 x 1 11.95 3.00 0.10 3.58
Area 3 1 x 1 3.70 3.00 0.10 1.11
Elec Duty Staff Room 1 x 1 4.20 5.00 0.10 2.10
Onduty Station master Room
Area 1 1 x 1 6.20 5.00 0.10 3.10
Area 2 1 x 1 1.82 3.00 0.10 0.55
Area 3 1 x 1 2.00 3.00 0.10 0.60
Area 4 1 x 1 7.50 3.00 0.10 2.25
Area 5 1 x 1 50.58 3.00 0.10 15.17
Deputy Station Master 1 x 1 3.45 5.00 0.10 1.73
Chief Commercial Inspector 1 x 1 2.92 5.00 0.10 1.46
AC Waiting Room (Ladies) 1 x 1 10.67 5.00 0.10 5.34
Railway Court 1 x 1 10.12 5.00 0.10 5.06
Medical Room 1 x 1 5.00 5.00 0.10 2.50
Traffic Inspector 1 x 1 3.33 5.00 0.10 1.67
JE Work Station 1 x 1 2.96 5.00 0.10 1.48
Reserved Lounge 1 x 1 6.08 5.00 0.10 3.04
Gupta Hindi Library 1 x 1 5.82 5.00 0.10 2.91
IRCTC 1 x 1 11.70 5.00 0.10 5.85
Pantry 1 x 1 5.60 8.70 0.10 4.87
Passage 1 1 x 1 11.70 3.00 0.10 3.51
Workers Lounge 1 x 1 9.33 3.30 0.10 3.08
Garage Area 1 x 1 9.33 9.25 0.10 8.63
Concourse Area
Ground Floor
Area 1 1 x 1 4.34 7.55 0.10 3.28
Area 2 1 x 1 4.14 3.65 0.10 1.51
Area 3 1 x 1 4.60 11.50 0.10 5.29
Area 4 1 x 1 42.85 4.62 0.10 19.80
Area 5 1 x 1 53.21 10.35 0.10 55.07
Area 6 1 x 1 53.14 11.37 0.10 60.42
Area 7 1 x 1 28.18 9.46 0.10 26.66
Area 8 1 x 1 16.94 1.42 0.10 2.41
Area 9 1 x 1 9.42 11.50 0.10 10.83
Area 10 1 x 1 7.62 11.50 0.10 8.76
Portico Area 1 x 1 7.62 9.08 0.10 6.92
First Floor
Area 1 1 x 1 2.58 8.72 0.10 2.25
Area 2 1 x 1 11.40 3.37 0.10 3.84
Area 3 1 x 1 5.80 2.11 0.10 1.22
Area 4 1 x 1 1.30 6.07 0.10 0.79
Area 5 1 x 1 5.12 7.90 0.10 4.04
Demolishing R.C.C work manually / by mechanical means including stacking of steel bars and disposal of unserviceable
2
material within 50 metres lead
Ground Floor
Terminal Building Right Side
Column
Column1 1 x 111 0.50 0.50 4.10 113.77
Roof Beam
Beam 1 1 x 4 115.23 0.45 0.45 93.34
Beam 2 1 x 19 12.40 0.45 0.45 47.71
Beam 3 1 x 7 14.13 0.30 0.45 13.35
Linte Beam
Wall 1 1 x 1 3.00 0.15 0.15 0.07
Wall 2 1 x 1 2.35 0.15 0.15 0.05
Wall 3 1 x 1 1.20 0.12 0.15 0.02
Wall 1 1 x 3 94.18 0.70 0.15 29.67
Wall 2 1 x 1 19.00 0.70 0.15 1.99
Wall 3 1 x 1 11.70 0.70 0.15 1.23
Wall 4 1 x 1 21.47 0.70 0.15 2.25
Wall 5 1 x 1 80.13 0.35 0.15 4.21
Wall 6 1 x 1 9.33 0.35 0.15 0.49
Wall 7 1 x 1 10.03 0.35 0.15 0.53
Y-Direction
Wall 1 1 x 2 8.70 0.50 0.15 1.31
Wall 2 1 x 1 8.00 0.50 0.15 0.60
Wall 3 1 x 3 3.00 0.50 0.15 0.67
Wall 4 1 x 7 5.00 0.50 0.15 2.63
Wall 5 1 x 4 3.00 0.35 0.15 0.63
Wall 6 1 x 8 5.00 0.50 0.15 3.00
Wall 7 1 x 1 8.70 0.50 0.15 0.65
Wall 8 1 x 1 8.70 0.70 0.15 0.91
Wall 9 1 x 2 12.90 0.35 0.15 1.35
Wall 10 1 x 2 2.30 0.35 0.15 0.24
Roof Slab
Area 1 1 x 1 115.78 10.10 0.15 175.41
Garrage Area 1 x 1 10.03 13.60 0.15 20.46
Deduction
Stair Area -1 x 1 4.23 2.80 0.15 -1.78
First Floor
Column
Column1 1 x 111 0.50 0.50 4.10 113.77
Roof Beam
Beam 1 1 x 4 115.23 0.45 0.45 93.34
Beam 2 1 x 19 12.40 0.45 0.45 47.71
Beam 3 1 x 7 14.13 0.30 0.45 13.35
Lintel Beam
Wall 1 1 x 1 3.43 0.23 0.15 0.12
Wall 2 1 x 1 5.51 0.23 0.15 0.19
Wall 3 1 x 1 117.44 0.23 0.15 4.05
Wall 4 1 x 1 2.19 0.23 0.15 0.08
Wall 5 1 x 1 1.27 0.23 0.15 0.04
Wall 6 1 x 2 3.12 0.15 0.15 0.14
Wall 7 2 x 3 1.29 0.15 0.15 0.17
Wall 8 1 x 1 20.74 0.23 0.15 0.72
Wall 9 1 x 17 1.22 0.23 0.15 0.72
Wall 10 1 x 3 1.22 0.15 0.15 0.08
Terrace Floor
Column 1 x 111 0.50 0.50 0.90 24.98
Concourse Area
Ground Floor
Inner Circular Columns
Column C1 1 x 16 0.50 0.50 6.92 27.68
Column C2 1 x 6 1.00 1.00 6.92 41.52
Column C3 1 x 14 0.35 0.50 6.92 16.95
Column C4 1 x 10 0.35 0.35 6.92 8.48
Column C5 1 x 8 0.28 6.92 15.64
Outer Circular Columns
Column C5 1 x 28 0.28 8.00 63.30
Portico Area
Column C1 1 x 6 0.28 3.00 5.09
Staircase Column
1 x 8 0.35 0.50 1.40
Roof Beam
Beam 1 1 x 10 82.27 0.35 0.55 158.37
Beam 2 1 x 12 25.05 0.35 0.55 57.87
Beam 3 1 x 5 12.20 0.35 0.55 11.74
Beam 4 1 x 1 12.20 0.35 0.55 2.35
Portico Area
Beam 1 1 x 1 6.55 0.35 0.55 1.26
Beam 2 1 x 1 5.55 0.35 0.55 1.07
Lintel Beam
Wall 1 1 x 1 9.35 0.35 0.15 0.49
Wall 2 1 x 1 4.14 0.35 0.15 0.22
Wall 3 1 x 1 13.88 0.35 0.15 0.73
Wall 4 1 x 1 2.24 0.35 0.15 0.12
Wall 5 1 x 1 18.35 0.35 0.15 0.96
Wall 6 1 x 1 18.35 0.35 0.15 0.96
Wall 7 1 x 1 19.73 0.35 0.15 1.04
Wall 8 1 x 1 12.24 0.35 0.15 0.64
Lintel Beam
Wall 1 1 x 1 11.43 0.50 0.15 0.86
Wall 2 1 x 1 8.72 0.35 0.15 0.46
Wall 3 1 x 1 8.80 0.35 0.15 0.46
Wall 4 1 x 1 7.38 0.35 0.15 0.39
Wall 5 1 x 1 11.50 0.35 0.15 0.60
Wall 1 1 x 1 4.50 0.15 0.15 0.10
Wall 2 1 x 1 5.92 0.15 0.15 0.13
Wall 3 1 x 1 5.58 0.23 0.15 0.19
Wall 4 1 x 1 7.90 0.23 0.15 0.27
Staircase 1
Flight Slab 1 1 x 2 2.40 0.90 0.15 0.65
Landing 1 x 1 1.96 0.85 0.15 0.25
Steps 0.5 x 14 0.90 1.78 1.78 19.96
Staircase 2(circular Staircase)
Flight Slab 1 1 x 1 2.40 1.78 0.15 0.64
Steps 0.5 x 14 1.78 1.78 1.78 39.48
Staircase 3
Flight Slab 1 1 x 2 3.10 1.90 0.15 1.77
Landing 1 x 1 4.23 1.40 0.15 0.89
Steps 0.5 x 18 0.90 0.30 0.15 0.36
Staircase 4
Flight Slab 1 1 x 1 6.30 5.50 0.15 5.20
Flight Slab 2 1 x 1 2.70 5.50 0.15 2.23
Landing 1 1 x 1 5.50 1.50 0.15 1.24
Landing 2 1 x 1 5.50 2.68 0.15 2.21
Steps 0.5 x 28 0.90 0.30 0.15 0.57
Demolishing brick work manually / by mechanical means including stacking of serviceable material and
3
disposal of unserviceable material within 50 metres lead - in cement mortar
First Floor
Pantry Room
Wall 1 1 x 1 3.43 0.23 2.80 2.21
Wall 2 1 x 1 5.51 0.23 2.80 3.55
Verrandah Wall
Wall 3 1 x 1 117.91 0.23 1.20 32.54
Staircase Wall
Wall 4 1 x 1 2.19 0.23 2.80 1.41
Wall 5 1 x 1 1.88 0.23 2.80 1.21
Male & Female Dormitory Toilet Walls
Wall 6 1 x 2 3.12 0.15 2.80 2.62
Wall 7 2 x 3 1.29 0.15 2.80 3.25
Deductions
Door D3 -1 x 4 0.75 0.15 2.10 -0.95
Door D4 -1 x 12 0.90 0.15 2.10 -3.40
Door D5 -1 x 1 1.02 0.23 2.10 -0.49
Door D6 -1 x 1 1.73 0.15 2.10 -0.54
Door D8 -1 x 1 1.27 0.23 2.10 -0.61
Concourse Area
First Floor
Wall 1 1 x 1 4.50 0.15 2.80 1.89
Wall 2 1 x 1 5.92 0.15 2.80 2.49
Wall 3 1 x 1 5.58 0.23 2.80 3.59
Wall 4 1 x 1 7.90 0.23 2.80 5.09
Deductions
Door D3 -1 x 1 1.50 0.23 2.10 -0.72
Portico Area Parapet Wall
Wall 1 1 x 1 7.95 0.23 1.00 1.83
Wall 2 1 x 1 7.75 0.23 1.00 1.78
Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material
4 and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge : In lime
mortar
Ground Floor
Terminal Building Right Side
Brickwork
X-Direction
Station manager Office to Library
Wall 1 1 x 3 94.18 0.70 4.25 840.56
Irctc To Pantry
Wall 2 1 x 1 19.00 0.70 4.25 56.53
Wall 3 1 x 1 11.70 0.70 4.25 34.81
Wall 4 1 x 1 21.47 0.70 4.25 63.87
Workers Lounge To staircase
Wall 5 1 x 1 80.13 0.35 4.25 119.19
Workers Lounge
Wall 6 1 x 1 9.33 0.35 4.25 13.88
Garage Area
Wall 7 1 x 1 10.03 0.35 4.25 14.92
Y-Direction
Station Manager Room
Wall 1 1 x 2 8.70 0.50 4.25 36.97
Station Director Room
Wall 2 1 x 1 8.00 0.50 4.25 17.00
Behind Station Manager ,Elec Duty Staff,Station Director
Wall 3 1 x 3 3.00 0.50 4.25 19.13
Writers Cafe to Chief Commercial Inspector
Wall 4 1 x 7 5.00 0.50 4.25 74.38
Onduty Station Master
Wall 5 1 x 4 3.00 0.35 4.25 17.85
AC Waiting Room TO Reserved Lounge
Wall 6 1 x 8 5.00 0.50 4.25 85.00
Pantry
Wall 7 1 x 1 8.70 0.50 4.25 18.49
Wall 8 1 x 1 8.70 0.70 4.25 25.88
Workers Lounge & Garage area
Wall 9 1 x 2 12.90 0.35 4.25 38.38
Workers Lounge
Wall 10 1 x 2 2.30 0.35 4.25 6.84
Deductions
Column C1 -1 x 111 0.50 0.50 4.25 -117.94
Deductions
Door D1 -1 x 5 0.91 0.70 2.10 -6.69
Door D2 -1 x 2 0.85 0.70 2.10 -2.50
Door D3 -1 x 2 0.80 0.70 2.10 -2.35
Door D4 -1 x 1 0.80 0.35 2.10 -0.59
Door D5 -1 x 3 0.75 0.70 2.10 -3.31
Door D6 -1 x 8 1.00 0.70 2.10 -11.76
Door D7 -1 x 9 1.15 0.70 2.10 -15.21
Door D8 -1 x 1 1.20 0.35 2.10 -0.88
Door D9 -1 x 2 1.30 0.70 2.10 -3.82
Window W1 -1 x 12 1.25 0.70 1.50 -15.75
First Floor
X-Direction
Room Outer Wall
Wall 1 1 x 1 118.26 0.45 4.25 226.17
Room Centre Wall
Wall 2 1 x 1 44.00 0.45 4.25 84.15
Room Centre Wall(after Pantry)
Wall 3 1 x 1 23.94 0.45 4.25 45.79
Room Centre Wall(after dormitory Room)
Wall 4 1 x 1 21.21 0.45 4.25 40.56
Room1 Upto dormitory
Wall 5 1 x 1 74.85 0.45 4.25 143.15
dormitory Last Room
Wall 6 1 x 1 42.65 0.45 4.25 81.57
Y-Direction
ROOM 1 left Outer Wall
Wall 1 1 x 1 11.43 0.45 4.25 21.86
All Rooms Center Wall
Wall 2 1 x 15 7.32 0.45 4.25 209.99
Male Dorm Rooms
Wall 3 1 x 2 9.05 0.45 4.25 34.62
Rooms
Wall 4 1 x 7 9.05 0.30 4.25 80.77
Rooms Right Side Outer
Wall 5 1 x 1 13.43 0.30 4.25 17.12
Deductions
Column C1 -1 x 111 0.50 0.50 4.25 -117.94
Deductions
Door D1 -1 x 18 1.02 0.45 2.10 -17.35
Door D2 -1 x 27 0.91 0.45 2.10 -23.22
Door D7 -1 x 2 1.88 0.45 2.10 -3.55
Window -1 x 27 1.17 0.30 1.50 -14.22
Jalli -1 x 28 2.60 0.23 1.50 -25.12
Dismantling aluminium/ Gypsum partitions, doors, windows, fixed glazing and false ceiling including disposal of
5 unserviceable material and stacking of serviceable material with in 50 meters lead as directed by Engineer-in-
charge.
Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres
6
lead - for thickness of tiles 10mm to 25mm
Ground Floor(Vitrified)
Office Of Station Manager
Area 1 1 x 1 3.00 5.00 15.00
Area 2 1 x 1 3.00 3.00 9.00
Station Director
Area 1 1 x 1 6.37 5.00 31.85
Area 2 1 x 1 6.37 3.00 19.11
Deputy Station Master Room
Area 1 1 x 1 4.90 5.00 24.50
Area 2 1 x 1 2.35 3.00 7.05
Writer Cafe 1 x 1 2.90 5.00 14.50
Elec Switch Room
Area 1 1 x 1 2.70 5.00 13.50
Area 2 1 x 1 11.95 3.00 35.85
Area 3 1 x 1 3.70 3.00 11.10
Elec Duty Staff Room 1 x 1 4.20 5.00 21.00
Onduty Station master Room
Area 1 1 x 1 6.20 5.00 31.00
Area 2 1 x 1 1.82 3.00 5.46
Area 3 1 x 1 2.00 3.00 6.00
Area 4 1 x 1 7.50 3.00 22.50
Area 5 1 x 1 50.58 3.00 151.74
Deputy Station Master 1 x 1 3.45 5.00 17.25
Chief Commercial Inspector 1 x 1 2.92 5.00 14.60
AC Waiting Room (Ladies) 1 x 1 10.67 5.00 53.35
Railway Court 1 x 1 10.12 5.00 50.60
Medical Room 1 x 1 5.00 5.00 25.00
Traffic Inspector 1 x 1 3.33 5.00 16.65
JE Work Station 1 x 1 2.96 5.00 14.80
Reserved Lounge 1 x 1 6.08 5.00 30.40
Gupta Hindi Library 1 x 1 5.82 5.00 29.10
IRCTC 1 x 1 11.70 5.00 58.50
Pantry 1 x 1 5.60 8.70 48.72
Passage 1 1 x 1 11.70 3.00 35.10
Workers Lounge 1 x 1 9.33 3.30 30.79
Garage Area 1 x 1 9.33 9.25 86.30
Skirting
Office Of Station Manager
Area 1 1 x 1 16.00 0.10 1.60
Area 2 1 x 1 12.00 0.10 1.20
Station Director
Area 1 1 x 1 22.74 0.10 2.27
Area 2 1 x 1 18.74 0.10 1.87
Deputy Station Master Room
Area 1 1 x 1 19.80 0.10 1.98
Area 2 1 x 1 10.70 0.10 1.07
Writer Cafe 1 x 1 15.80 0.10 1.58
Elec Switch Room
Area 1 1 x 1 15.40 0.10 1.54
Area 2 1 x 1 29.90 0.10 2.99
Area 3 1 x 1 13.40 0.10 1.34
Elec Duty Staff Room 1 x 1 18.40 0.10 1.84
Onduty Station master Room
Area 1 1 x 1 22.40 0.10 2.24
Area 2 1 x 1 9.64 0.10 0.96
Area 3 1 x 1 10.00 0.10 1.00
Area 4 1 x 1 21.00 0.10 2.10
Area 5 1 x 1 107.16 0.10 10.72
Deputy Station Master 1 x 1 16.90 0.10 1.69
Chief Commercial Inspector 1 x 1 15.84 0.10 1.58
AC Waiting Room (Ladies) 1 x 1 31.34 0.10 3.13
Railway Court 1 x 1 30.24 0.10 3.02
Medical Room 1 x 1 20.00 0.10 2.00
Traffic Inspector 1 x 1 16.66 0.10 1.67
JE Work Station 1 x 1 15.92 0.10 1.59
Reserved Lounge 1 x 1 22.16 0.10 2.22
Gupta Hindi Library 1 x 1 21.64 0.10 2.16
IRCTC 1 x 1 33.40 0.10 3.34
Pantry 1 x 1 28.60 0.10 2.86
Passage 1 1 x 1 29.40 0.10 2.94
Workers Lounge 1 x 1 25.26 0.10 2.53
Garage Area 1 x 1 37.16 0.10 3.72
Deductions
Door D1 -1 x 5 0.91 0.10 -0.46
Door D2 -1 x 3 0.85 0.10 -0.26
Door D3 -1 x 11 1.00 0.10 -1.10
Door D4 -1 x 4 0.80 0.10 -0.32
Door D5 -1 x 8 0.75 0.10 -0.60
Door D6 -1 x 2 1.10 0.10 -0.22
Door D7 -1 x 1 1.10 0.10 -0.11
Door D8 -1 x 9 1.15 0.10 -1.04
Door D9 -1 x 2 1.30 0.10 -0.26
First Floor
Room 1 1 x 2 6.91 5.44 75.18
Room 2 1 x 2 5.67 5.44 61.69
Room 3 1 x 5 3.91 5.44 106.35
Pantry
Area 1 1 x 1 3.91 5.51 21.54
Area 2 1 x 1 6.11 2.03 12.40
Area 3 1 x 1 2.68 5.74 15.38
Room 4 1 x 1 3.46 5.44 18.82
Room 5 1 x 1 3.66 5.44 19.91
Room 6 1 x 1 3.61 5.44 19.64
Room 7 1 x 3 3.76 5.44 61.36
Room 8 1 x 1 6.31 9.05 57.11
Room 9 1 x 1 6.27 9.05 56.74
Room 10 1 x 1 7.18 9.05 64.98
Room 11 1 x 5 2.80 6.66 93.24
Room 12 1 x 1 2.69 6.66 17.92
Passage Area 1 1 x 1 74.85 3.48 260.48
Passage Area 2 1 x 1 42.65 2.21 94.26
Skirting
Room 1 1 x 2 24.70 0.10 4.94
Room 2 1 x 2 22.22 0.10 4.44
Room 3 1 x 5 18.70 0.10 9.35
Pantry
Area 1 1 x 1 18.84 0.10 1.88
Area 2 1 x 1 16.28 0.10 1.63
Area 3 1 x 1 16.84 0.10 1.68
Room 4 1 x 1 17.80 0.10 1.78
Room 5 1 x 1 18.20 0.10 1.82
Room 6 1 x 1 18.10 0.10 1.81
Room 7 1 x 3 18.40 0.10 5.52
Room 8 1 x 1 30.72 0.10 3.07
Room 9 1 x 1 30.64 0.10 3.06
Room 10 1 x 1 32.46 0.10 3.25
Room 11 1 x 5 23.70 0.10 11.85
Room 12 1 x 1 18.70 0.10 1.87
Passage Area 1 1 x 1 156.66 0.10 15.67
Passage Area 2 1 x 1 89.72 0.10 8.97
Deductions
Door D1 -1 x 20 1.02 0.10 -2.04
Door D2 -1 x 1 1.24 0.10 -0.12
Door D3 -1 x 4 1.88 0.10 -0.75
Door D4 -1 x 2 1.73 0.10 -0.35
Door D5 -1 x 36 0.91 0.10 -3.28
Door D6 -1 x 2 1.22 0.10 -0.24
Door D7 -1 x 8 0.86 0.10 -0.69
Wall Open 1 -1 x 1 1.03 0.10 -0.10
Wall Open 2 -1 x 1 1.27 0.10 -0.13
Wall Open 3 -1 x 0.85 1.03 0.10 -0.09
Wall Tiles
Toilet 1 1 x 1 17.68 2.10 37.13
Toilet 2 1 x 1 15.20 2.10 31.92
Toilet 3 1 x 1 17.68 2.10 37.13
Toilet 4 1 x 1 15.20 2.10 31.92
Toilet 5 1 x 4 11.68 2.10 98.11
Toilet 6 1 x 1 10.86 2.10 22.81
Toilet 7 1 x 1 11.18 2.10 23.48
Toilet 8 1 x 1 11.14 2.10 23.39
Toilet 9 1 x 2 11.44 2.10 48.05
Toilet 10 1 x 1 11.38 2.10 23.90
Toilet 11 1 x 1 6.30 2.10 13.23
Toilet 12 1 x 2 5.94 2.10 24.95
Toilet 13 1 x 2 4.58 2.10 19.24
Toilet 14 1 x 6 9.46 2.10 119.20
Toilet 15 1 x 1 9.24 2.10 19.40
Wall 1 1 x 17 2.67 2.10 95.32
Wall 2 1 x 4 3.40 2.10 28.56
Deductions
Door D1 -1 x 11 1.02 2.10 -23.56
Door D2 -1 x 11 0.91 2.10 -21.02
Door D3 -1 x 4 0.73 2.10 -6.13
Cladding
Wall 1 2 x 1 74.85 1.20 179.64
Wall 2 2 x 1 42.65 1.20 102.36
Concourse Area
Vitrified
Area 1 1 x 1 4.34 7.55 0.10 3.28
Area 2 1 x 1 4.14 3.65 0.10 1.51
Area 3 1 x 1 4.60 11.50 0.10 5.29
Area 4 1 x 1 42.85 4.62 0.10 19.80
Area 5 1 x 1 53.21 10.35 0.10 55.07
Area 6 1 x 1 53.14 11.37 0.10 60.42
Area 7 1 x 1 28.18 9.46 0.10 26.66
Area 8 1 x 1 16.94 1.42 0.10 2.41
Area 9 1 x 1 9.42 11.50 0.10 10.83
Area 10 1 x 1 7.62 11.50 0.10 8.76
Skirting
Area 1 1 x 1 23.78 0.10 2.38
Area 2 1 x 1 15.58 0.10 1.56
Area 3 1 x 1 20.74 0.10 2.07
Area 4 1 x 1 52.09 0.10 5.21
Area 5 1 x 1 21.62 0.10 2.16
Area 6 1 x 1 22.83 0.10 2.28
Area 7 1 x 1 38.24 0.10 3.82
Deductions
Wall Open 1 -1 x 2 1.50 0.10 -0.30
Door D1 -1 x 2 1.00 0.10 -0.20
Wall Open 2 -1 x 1 3.56 0.10 -0.36
Wall Open 3 -1 x 1 6.15 0.10 -0.62
Door D2 -1 x 2 1.20 0.10 -0.24
Granite Cladding
Column C1 1 x 16 2.00 1.20 38.40
Column C2 1 x 6 4.00 2.10 50.40
Staircase 4
tread 1 x 28 5.50 0.30 46.20
Riser 1 x 28 5.50 0.15 23.10
Landing 1 1 x 1 5.50 1.50 8.25
Landing 2 1 x 1 5.50 2.68 14.74
7 Demolishing mud phaska in terracing and disposal of material within 50 metres lead.
Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts,
8
nuts, cutting rivets ,welding etc.including dismembering and stacking within 50 metres lead
Grills Kg/Sqm
Terminal Building Right Side
Ground Floor
Window W1 1 x 12 1.25 1.50 15.00 337.50
Ventilator V 1 x 4 0.60 0.60 10.00 14.40
First Floor
Window 1 x 27 1.17 1.50 15.00 710.77
Ventilator V 1 x 26 0.60 0.60 10.00 93.60
Concourse Area
First Floor
Window W1 1 x 4 1.50 1.50 15.00 135.00
Ventilator V 1 x 4 0.60 0.60 10.00 14.40
Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave,
9
holdfasts etc. complete and stacking within 50 metres lead of area beyond 3 sq.metres
Dismantling wooden boardings in lining of walls and partitions, excluding supporting members but including
10
stacking within 50 metres lead :
1 15.2.2 Nominal concrete 1:4:8 or leaner mix (including equivalent design mix) 114.73 1,239.60 cum 142,223.00
Dismantling tile work in floors and roofs laid in cement mortar including
4 15.23.1 1085.50 60.50 sqm 65,673.00
stacking material within 50 metres lead - for thickness of tiles 10mm to 25mm
Dismantling steel work in built up sections in angles, tees, flats and channels
6 15.18 including all gusset plates, bolts, nuts, cutting rivets ,welding etc.including 338.00 4.65 kg 1,572.00
dismembering and stacking within 50 metres lead
Flooring Pcc
Ground Floor
Area 1 1 x 1 2.10 5.10 0.10 1.07
Area 2 1 x 1 6.07 2.40 0.10 1.46
Area 3 1 x 1 3.94 2.40 0.10 0.95
Area 4 1 x 1 4.60 2.40 0.10 1.10
Area 5 1 x 1 4.94 7.74 0.10 3.82
Area 6 1 x 1 2.54 2.63 0.10 0.67
Area 7 1 x 1 7.50 7.74 0.10 5.81
Area 8 1 x 1 4.73 4.21 0.10 1.99
Area 9 1 x 1 4.50 3.30 0.10 1.49
Area 10 1 x 1 2.50 10.37 0.10 2.59
Area 11 1 x 1 7.45 2.40 0.10 1.79
Area 12 1 x 1 3.01 4.10 0.10 1.23
Area 13 1 x 1 7.78 4.33 0.10 3.37
Area 14 1 x 1 11.10 4.84 0.10 5.37
Area 15 1 x 1 5.50 3.83 0.10 2.11
Area 16 1 x 1 1.54 3.60 0.10 0.55
Area 17 1 x 1 3.60 3.60 0.10 1.30
Area 18 1 x 1 3.30 2.50 0.10 0.83
Area 19 1 x 1 9.03 5.90 0.10 5.33
Area 20 1 x 1 4.59 0.88 0.10 0.40
Area 21 1 x 1 3.25 4.50 0.10 1.46
Area 22 1 x 1 2.02 4.50 0.10 0.91
Area 23 1 x 1 6.26 4.50 0.10 2.82
Area 24 1 x 1 4.54 4.50 0.10 2.04
Area 25 1 x 1 2.95 4.50 0.10 1.33
Area 26 1 x 1 11.02 5.90 0.10 6.50
Area 27 1 x 1 2.97 5.90 0.10 1.75
Toilet Area 1 x 1 1.75 1.40 0.10 0.25
Area 29 1 x 1 4.27 8.26 0.10 3.53
Area 30 1 x 1 20.06 10.04 0.10 20.14
Area 31 1 x 1 6.58 4.00 0.10 2.63
Area 32 1 x 1 2.33 5.83 0.10 1.36
Area 33 1 x 1 4.24 5.33 0.10 2.26
Area 34 1 x 1 6.90 3.98 0.10 2.75
Area 35 1 x 1 1.32 5.56 0.10 0.73
Area 36 1 x 1 8.68 4.56 0.10 3.96
Area 37 1 x 1 5.70 4.15 0.10 2.37
Area 38 1 x 1 8.68 4.56 0.10 3.96
Toilet 1 1 x 2 5.70 4.59 0.10 5.23
Area 39 1 x 1 12.60 4.40 0.10 5.54
Roof Slab
Area 1 1 x 1 94.18 10.10 951.22
Area 2 1 x 1 19.00 10.10 191.90
Area 3 1 x 1 10.02 13.60 136.27
Deduction
Stair Area -1 x 1 4.23 5.00 0.15 -3.17
Y-Direction
Wall 1 1 x 1 15.70 0.23 3.55 12.82
Wall 2 1 x 1 5.10 0.23 3.55 4.16
Wall 3 1 x 1 2.40 0.23 3.55 1.96
Wall 4 1 x 1 7.74 0.23 3.55 6.32
Wall 5 1 x 12 2.40 0.23 3.55 23.52
Wall 6 1 x 1 3.53 0.23 3.55 2.88
Wall 7 1 x 1 10.37 0.23 3.55 8.47
Wall 8 1 x 1 13.00 0.23 3.55 10.61
Wall 9 1 x 1 4.10 0.23 3.55 3.35
Wall 10 1 x 1 3.83 0.23 3.55 3.13
Wall 11 1 x 1 3.60 0.23 3.55 2.94
Wall 12 1 x 1 4.38 0.23 3.55 3.58
Wall 13 1 x 1 7.32 0.23 3.55 5.98
Wall 14 1 x 3 4.50 0.23 3.55 11.02
Wall 15 1 x 1 5.76 0.23 3.55 4.70
Wall 16 1 x 1 4.50 0.23 3.55 3.67
Wall 17 1 x 1 4.50 0.23 3.55 3.67
Wall 18 1 x 1 5.83 0.23 3.55 4.76
Wall 19 1 x 1 10.56 0.23 3.55 8.62
Wall 20 1 x 1 3.68 0.30 3.55 3.92
Wall 21 1 x 1 10.27 0.23 3.55 8.39
Wall 22 1 x 1 10.04 0.23 3.55 8.20
Wall 23 1 x 1 3.99 0.23 3.55 3.26
Wall 24 1 x 1 3.80 0.23 3.55 3.10
Wall 25 1 x 1 5.56 0.23 3.55 4.54
Wall 26 1 x 1 13.32 0.23 3.55 10.88
Wall 27 1 x 1 13.77 0.23 3.55 11.24
Wall 28 1 x 1 4.40 0.23 3.55 3.59
Wall 29 1 x 1 2.80 0.23 3.55 2.29
Wall 30 1 x 1 9.46 0.23 3.55 7.72
Partition Wall
Wall 1 1 x 2 1.38 0.15 3.55 1.47
Wall 2 1 x 1 2.07 0.15 3.55 1.10
Wall 3 1 x 1 5.60 0.12 0.15 0.10
Wall 4 1 x 1 2.26 0.12 0.15 0.04
Wall 5 1 x 15 1.14 0.12 0.15 0.31
Wall 6 1 x 3 4.40 0.12 0.15 0.24
Wall 7 1 x 1 2.57 0.12 0.15 0.05
Deductions
Door D1 -1 x 5 1.30 0.23 2.10 -3.14
Door D2 -1 x 1.20 0.70 2.10 -1.76
Door D3 -1 x 2 0.80 0.70 2.10 -2.35
Door D4 -1 x 1 0.80 0.35 2.10 -0.59
Door D4 -1 x 1 0.80 0.15 2.10 -0.25
Door D5 -1 x 3 0.75 0.70 2.10 -3.31
Door D6 -1 x 8 1.00 0.70 2.10 -11.76
Door D7 -1 x 9 1.15 0.70 2.10 -15.21
Door D8 -1 x 1 1.20 0.35 2.10 -0.88
Door D9 -1 x 2 1.30 0.70 2.10 -3.82
Window W1 -1 x 12 1.25 0.70 1.50 -15.75
5 Demolishing mud phaska in terracing and disposal of material within 50 metres lead.
Ground Floor
Ground Floor
Area 1 1 x 1 93.13 8.70 0.08 64.82
Area 2 1 x 1 17.80 8.70 0.08 12.39
Area 3 1 x 1 9.33 12.90 0.08 9.63
Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts,
6
cutting rivets ,welding etc.including dismembering and stacking within 50 metres lead
Grills Kg/Sqm
Ground Floor
Window W1 1 x 12 1.25 1.50 15.00 337.50
First Floor
Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave,
7
holdfasts etc. complete and stacking within 50 metres lead of area beyond 3 sq.metres
Ground Floor
Door D1 -1 x 5 0.91 0.70 2.10 -6.69
Door D2 -1 x 2 0.85 0.70 2.10 -2.50
Door D3 -1 x 2 0.80 0.70 2.10 -2.35
Door D4 -1 x 1 0.80 0.35 2.10 -0.59
Door D4 -1 x 1 0.80 0.15 2.10 -0.25
Door D5 -1 x 3 0.75 0.70 2.10 -3.31
Door D6 -1 x 8 1.00 0.70 2.10 -11.76
Door D7 -1 x 9 1.15 0.70 2.10 -15.21
Door D8 -1 x 1 1.20 0.35 2.10 -0.88
Door D9 -1 x 2 1.30 0.70 2.10 -3.82
Window W1 -1 x 12 1.25 0.70 1.50 -15.75
First Floor
Dismantling cement asbestos or other hard board ceiling or partition walls including stacking of serviceable materials
8
and disposal of unserviceable materials within 50 metres lead.
Total Quantity = 0.00
Unit
Cum
bars and disposal of
Cum
aterial and disposal of
Cum
ithin 50 metres lead -
Sqm
Cum
howkhats, architrave,
Nos
serviceable materials
Sqm
MAJOR UPGRADATION OF MADURAI RAILWAY JUNCCTION - DISMANTLING WORKS
1 15.2.2 Nominal concrete 1:4:8 or leaner mix (including equivalent design mix) 78.07 1,239.60 cum 96,776.00
Dismantling tile work in floors and roofs laid in cement mortar including
4 15.23.1 1264.10 60.50 sqm 76,478.00
stacking material within 50 metres lead - for thickness of tiles 10mm to 25mm
Dismantling steel work in built up sections in angles, tees, flats and channels
6 15.18 including all gusset plates, bolts, nuts, cutting rivets ,welding etc.including 178.00 4.65 kg 828.00
dismembering and stacking within 50 metres lead
Flooring PCC
Ground Floor
Guard Box Room
Area 1 1 x 1 3.30 2.50 0.10 0.83
Area 2 1 x 1 9.03 5.90 0.10 5.33
Area 3 1 x 1 4.59 0.88 0.10 0.40
Area 4 1 x 1 3.25 4.50 0.10 1.46
Area 5 1 x 1 2.02 4.50 0.10 0.91
Area 6 1 x 1 6.26 4.50 0.10 2.82
Area 7 1 x 1 4.54 4.50 0.10 2.04
Area 8 1 x 1 2.95 4.50 0.10 1.33
Area 9 1 x 1 11.02 5.90 0.10 6.50
Area 10 1 x 1 2.97 5.90 0.10 1.75
Toilet Area 1 x 1 1.75 1.40 0.10 0.25
Restaurant
Area 11 1 x 1 4.27 8.26 0.10 3.53
Area 12 1 x 1 20.06 10.04 0.10 20.14
Area 13 1 x 1 6.58 4.00 0.10 2.63
Area 14 1 x 1 2.33 5.83 0.10 1.36
Area 15 1 x 1 4.24 5.33 0.10 2.26
Area 16 1 x 1 6.90 3.98 0.10 2.75
Area 17 1 x 1 1.32 5.56 0.10 0.73
Area 18 1 x 1 8.68 4.56 0.10 3.96
Area 19 1 x 1 5.70 4.15 0.10 2.37
Waiting Hall
Area 20 1 x 1 8.68 4.56 0.10 3.96
Toilet 1 1 x 2 5.70 4.59 0.10 5.23
Area 21 1 x 1 12.60 4.40 0.10 5.54
Ground Floor
Column
Column1 1 x 3 0.23 0.30 3.90 0.81
Column2 1 x 7 0.60 1.00 3.90 16.38
Column3 1 x 32 0.45 0.45 3.90 25.27
Circular Column 1 x 5 0.28 3.90 5.46
Roof Beam
Beam 1 1 x 5 84.60 0.30 0.45 57.10
Beam 2 1 x 4 18.23 0.30 0.45 9.84
Beam 3 1 x 13 14.00 0.30 0.45 24.57
Lintel Beam
Wall 1 1 x 1 3.53 0.23 0.15 0.12
Wall 2 1 x 1 22.36 0.23 0.15 0.77
Wall 3 1 x 1 43.51 0.23 0.15 1.50
Wall 4 1 x 1 6.16 0.23 0.15 0.21
Wall 6 1 x 1 23.27 0.23 0.15 0.80
Wall 7 1 x 1 6.81 0.23 0.15 0.23
Wall 8 1 x 1 3.04 0.23 0.15 0.10
Wall 10 1 x 1 5.53 0.23 0.15 0.19
Wall 12 1 x 1 23.54 0.23 0.15 0.81
Wall 13 1 x 1 8.68 0.23 0.15 0.30
Wall 14 1 x 1 50.27 0.23 0.15 1.73
Wall 15 1 x 1 5.80 0.23 0.15 0.20
Wall 16 1 x 1 8.68 0.23 0.15 0.30
Wall 17 1 x 1 18.99 0.23 0.15 0.66
Wall 22 1 x 1 7.50 0.23 0.15 0.26
Wall 24 1 x 1 7.50 0.23 0.15 0.26
Wall 1 1 x 1 4.38 0.23 0.15 0.15
Wall 2 1 x 1 7.32 0.23 0.15 0.25
Wall 3 1 x 3 4.50 0.23 0.15 0.47
Wall 4 1 x 1 5.76 0.23 0.15 0.20
Wall 5 1 x 1 4.50 0.23 0.15 0.16
Wall 6 1 x 1 5.83 0.23 0.15 0.20
Wall 7 1 x 1 10.56 0.23 0.15 0.36
Wall 9 1 x 1 10.27 0.23 0.15 0.35
Wall 10 1 x 1 10.04 0.23 0.15 0.35
Wall 11 1 x 1 3.99 0.23 0.15 0.14
Wall 12 1 x 1 3.80 0.23 0.15 0.13
Wall 13 1 x 1 5.56 0.23 0.15 0.19
Wall 14 1 x 1 13.32 0.23 0.15 0.46
Wall 15 1 x 1 13.77 0.23 0.15 0.48
Wall 16 1 x 1 4.40 0.23 0.15 0.15
Wall 17 1 x 1 2.80 0.23 0.15 0.10
Wall 18 1 x 1 9.46 0.23 0.15 0.33
Wall 1 1 x 2 1.38 0.15 0.15 0.06
Wall 2 1 x 1 2.07 0.15 0.15 0.05
Wall 3 1 x 1 5.60 0.12 0.15 0.10
Wall 4 1 x 1 2.26 0.12 0.15 0.04
Wall 5 1 x 15 1.14 0.12 0.15 0.31
Wall 6 1 x 3 4.40 0.12 0.15 0.24
Wall 7 1 x 1 2.57 0.12 0.15 0.05
Roof Slab
Area 1 1 x 1 13.06 4.63 0.15 9.07
Area 2 1 x 1 13.46 4.00 0.15 8.08
Area 3 1 x 1 21.33 9.46 0.15 30.27
Area 4 1 x 1 43.74 10.50 0.15 68.89
Area 5 1 x 1 23.77 11.09 0.15 39.54
Deduction
Stair Area -1 x 1 2.41 2.00 0.15 -0.72
Y-Direction
Parcel Office
Wall 1 1 x 1 4.38 0.23 3.90 3.93
Wall 2 1 x 1 7.32 0.23 3.90 6.57
Wall 3 1 x 3 4.50 0.23 3.90 12.11
Wall 4 1 x 1 5.90 0.23 3.90 5.29
Wall 5 1 x 1 4.50 0.23 3.90 4.04
Wall 6 1 x 1 5.83 0.23 3.90 5.23
Wall 7 1 x 2 10.56 0.23 3.90 18.94
Waiting Area
Wall 10 1 x 2 10.04 0.23 3.90 18.01
Wall 11 1 x 1 4.21 0.23 3.90 3.78
Wall 12 1 x 1 3.80 0.23 3.90 3.41
Wall 13 1 x 1 5.56 0.23 3.90 4.99
Waiting Area Toilet
Wall 14 1 x 1 13.54 0.23 3.90 12.15
Wall 15 1 x 1 13.77 0.23 3.90 12.35
Wall 16 1 x 1 4.40 0.23 3.90 3.95
Wall 17 1 x 1 2.80 0.23 3.90 2.51
Wall 18 1 x 1 9.46 0.23 3.90 8.49
Partition Wall
Waiting Area Front Side
Wall 1 1 x 2 4.37 0.15 2.10 2.75
Handi Cap Toilet Near Wall
Wall 2 1 x 1 2.07 0.15 2.10 0.65
Renovation Hotel Stair Wall
Wall 3 1 x 1 3.04 0.12 2.10 0.77
Wall 4 1 x 1 2.26 0.12 2.10 0.57
Waiting Area Toilet
Wall 5 1 x 15 1.14 0.12 2.10 4.31
Wall 6 1 x 3 4.40 0.12 2.10 3.33
Waiting Hall Near Room
Wall 7 1 x 1 2.57 0.12 2.10 0.65
Column Deductions
Column C1 -1 x 16 0.45 0.45 0.15 -0.49
Deductions
Door D1 -1 x 1 1.10 0.23 2.10 -0.53
Door D4 -1 x 4 1.20 0.23 2.10 -2.32
Door D5 -1 x 1 1.28 0.23 2.10 -0.62
Door D5 -1 x 1 1.46 0.23 2.10 -0.71
Door D6 -1 x 14 0.80 0.12 2.10 -2.82
Door D7 -1 x 2 0.90 0.23 2.10 -0.87
Window W1 -1 x 4 0.90 0.23 0.70 -0.58
Window W2 -1 x 10 1.10 0.23 0.70 -1.77
Window W3 -1 x 2 0.80 0.23 0.70 -0.26
Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and
4
disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge : In lime mortar
Toilet Block
Wall 1 1 x 3 2.10 0.30 3.90 7.37
Wall 2 1 x 1 3.08 0.30 3.90 3.60
Waiting Hall
Wall 1 1 x 1 17.50 0.30 3.90 20.48
Wall 2 1 x 1 11.00 0.30 3.90 12.87
6 Demolishing mud phaska in terracing and disposal of material within 50 metres lead.
Ground Floor
Ground Floor
Area 1 1 x 1 13.06 4.63 0.08 4.84
Area 2 1 x 1 13.46 4.00 0.08 4.31
Area 3 1 x 1 21.33 9.46 0.08 16.14
Area 4 1 x 1 43.74 10.50 0.08 36.74
Area 5 1 x 1 23.77 11.09 0.08 21.09
Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts,
7
cutting rivets ,welding etc.including dismembering and stacking within 50 metres lead
Grills Kg/Sqm
Ground Floor
Window W 1 1 x 4 0.90 0.70 15.00 37.80
Window W 2 1 x 10 1.10 0.70 15.00 115.50
Window W 3 1 x 2 0.80 0.70 15.00 16.80
Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave,
8
holdfasts etc. complete and stacking within 50 metres lead of area beyond 3 sq.metres
Ground Floor
Door D1 1 x 1 1.00
Door D4 1 x 4 4.00
Door D5 1 x 1 1.00
Door D5 1 x 1 1.00
Door D6 1 x 14 14.00
Door D7 1 x 2 2.00
Window W1 1 x 4 4.00
Window W2 1 x 10 10.00
Window W3 1 x 2 2.00
Window W1 1 x 1 1.00
Buildings In Progress
1 Executive Lounge
2 Terminal Building
3 Platform(1-6)Truss
MAJOR UPGRADATION OF MADURAI RAILWAY JUNCCTION - DISMANTLING WORKS
1 15.2.2 Nominal concrete 1:4:8 or leaner mix (including equivalent design mix) 45.80 1,239.60 cum 56,774.00
Dismantling tile work in floors and roofs laid in cement mortar including
5 15.23.1 51.00 60.50 sqm 3,086.00
stacking material within 50 metres lead - for thickness of tiles 10mm to 25mm
Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking
7 15.28.1 735.00 136.00 sqm 99,960.00
the material within 50 metres lead of - G.S.sheet
Dismantling steel work in built up sections in angles, tees, flats and channels
8 15.18 including all gusset plates, bolts, nuts, cutting rivets ,welding etc.including 22624.40 4.65 kg 105,203.00
dismembering and stacking within 50 metres lead
Flooring PCC
Deck Slab-Portion
Deck Slab Below Area 1 x 1 36.70 7.30 0.10 26.79
Lift Room Front Area 1 x 1 3.53 4.46 0.10 1.57
Escalator Below Area 1 x 1 15.28 5.11 0.10 7.81
Stair Below Area 1 x 1 17.19 5.56 0.10 9.56
Demolishing R.C.C work manually / by mechanical means including stacking of steel bars and disposal of
2
unserviceable material within 50 metres lead
Deck Slab-Portion
Deck Slab Area 1 x 1 36.70 7.30 0.25 66.98
Column Below Deck Slab
Column 1 x 4 0.45 0.45 5.07 4.11
Column Top 1 x 4 1.00 1.00 1.00 4.00
Column Above Deck Slab
Column 2 x 11 0.23 0.23 3.25 3.78
Deck Slab -Beam
Beam 1 1 x 2 4.65 0.45 0.35 1.46
Beam 2 1 x 2 2.30 0.45 0.35 0.72
Connecting Beam
Beam 1 1 x 2 4.65 0.45 0.40 1.67
Beam 2 1 x 2 2.30 0.45 0.40 0.83
Side Walls
Top Area 1 x 1 36.70 0.90 0.35 11.56
Middle Portion 1 x 1 36.70 0.23 1.58 13.34
Bottom Portion Side Projection 2 x 11 0.75 0.23 0.15 0.57
Side Projection Triangle 22 x 0.5 0.75 0.23 1.58 3.00
Roof Slab
Area 1 1 x 1 36.70 3.22 0.15 17.73
Area 2 1 x 1 36.70 3.22 0.15 17.73
Roof Beam
Side Beam 1 1 x 2 36.70 0.23 0.23 3.88
Center Beam
Rectangular Area 1 x 11 4.65 0.23 0.30 3.53
Triangular Area 11 x 0.5 4.65 0.23 0.30 1.76
Escalator Below
Rcc Wall 1 x 2 4.20 0.30 0.90 2.27
Brickwork
Dismantling aluminium/ Gypsum partitions, doors, windows, fixed glazing and false ceiling includingdisposal of
4 unserviceable material and stacking of serviceable material with in 50 meters lead as directed by Engineer-in-
charge.
Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres
5
lead - for thickness of tiles 10mm to 25mm
6 Demolishing mud phaska in terracing and disposal of material within 50 metres lead.
Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking the material within 50 metres
7
lead of - G.S.sheet
Entrance Escalator
Roof Sheet Area 1 x 2 18.09 3.22 116.66
Side Area 1 x 2 18.09 6.69 242.04
Back Side Area 1 x 1 4.12 2.10 8.65
Platform 2&3- Escalator
Roof Sheet Area 1 x 2 18.09 3.22 116.66
Side Area 1 x 2 18.09 6.69 242.04
Back Side Area 1 x 1 4.12 2.10 8.65
Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts,
8
nuts, cutting rivets ,welding etc.including dismembering and stacking within 50 metres lead
Escalator Sqm/Kg
Area 1 x 1 735.00 30.00 22050.00
Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave,
9
holdfasts etc. complete and stacking within 50 metres lead of area beyond 3 sq.metres
Ground Floor
Light Point - Tube Light 1 x 85 85.00 nos
MAJOR UPGRADATION OF MADURAI RAILWAY JUNCCTION - DISMANTLING WORKS
1 15.2.2 Nominal concrete 1:4:8 or leaner mix (including equivalent design mix) 23.40 1,239.60 cum 29,007.00
Dismantling tile work in floors and roofs laid in cement mortar including
4 15.23.1 333.50 60.50 sqm 20,177.00
stacking material within 50 metres lead - for thickness of tiles 10mm to 25mm
Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking
5 15.28.1 24.20 136.00 sqm 3,291.00
the material within 50 metres lead of - G.S.sheet
Dismantling steel work in built up sections in angles, tees, flats and channels
6 15.18 including all gusset plates, bolts, nuts, cutting rivets ,welding etc.including 9911.00 4.65 kg 46,086.00
dismembering and stacking within 50 metres lead
Flooring PCC
Below Floor Area
Area 1 1 x 1 17.69 13.20 0.10 23.35
Demolishing R.C.C work manually / by mechanical means including stacking of steel bars and disposal of
2
unserviceable material within 50 metres lead
Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of
3
unserviceable material within 50 metres lead - in cement mortar
Brickwork
Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead -
4
for thickness of tiles 10mm to 25mm
Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking the material within 50 metres
5
lead of - G.S.sheet
Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts,
6
cutting rivets ,welding etc.including dismembering and stacking within 50 metres lead
Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave,
7
holdfasts etc. complete and stacking within 50 metres lead of area beyond 3 sq.metres
Total Quantity = 0.00 nos
Ground Floor
Light Point - Tube Light 1 x 19 19.00 nos
Focus Light Point 1 x 8 8.00 nos
MAJOR UPGRADATION OF MADURAI RAILWAY JUNCCTION - DISMANTLING WORKS
1 15.2.2 Nominal concrete 1:4:8 or leaner mix (including equivalent design mix) 41.60 1,239.60 cum 51,567.00
Dismantling tile work in floors and roofs laid in cement mortar including
5 15.23.1 245.00 60.50 sqm 14,823.00
stacking material within 50 metres lead - for thickness of tiles 10mm to 25mm
Dismantling steel work in built up sections in angles, tees, flats and channels
8 15.18 including all gusset plates, bolts, nuts, cutting rivets ,welding etc.including 686.00 4.65 kg 3,190.00
dismembering and stacking within 50 metres lead
Flooring PCC
Front Side Shed Area 1 x 1 3.69 3.75 0.10 1.38
HMS Office 1 x 1 4.20 3.52 0.10 1.48
Staff Room 1 x 1 5.00 2.00 0.10 1.00
Hand Wash 1 x 1 1.43 1.98 0.10 0.28
Toilet 1 x 1 1.87 1.20 0.10 0.22
Toilet 1 x 1 1.30 1.23 0.10 0.16
Toilet 1 x 1 1.37 1.40 0.10 0.19
Storage Room 1 x 1 3.50 3.40 0.10 1.19
Mini Auditorium 1 x 1 16.64 3.63 0.10 6.04
Stage Area 1 1 x 1 3.63 1.00 0.10 0.36
Stage Area 2 1 x 1 2.15 3.10 0.10 0.67
Coolie & Porter Rest Room 1 x 1 6.61 5.00 0.10 3.31
Wash Area Shed 1 x 1 3.40 3.41 0.15 1.74
Frount Side outer Area 1 x 1 235.45 0.10 23.55
Demolishing R.C.C work manually / by mechanical means including stacking of steel bars and disposal of
2
unserviceable material within 50 metres lead
Column
Column 1 1 x 2 0.30 0.50 2.80 0.84
Column 2 1 x 9 0.30 0.50 3.25 4.39
Column 3 1 x 2 0.30 0.30 3.25 0.59
Column 4 1 x 1 0.60 0.80 3.25 1.56
Column 5 1 x 10 0.23 0.23 3.10 1.64
Roof Beam
Beam 1 1 x 1 4.13 0.30 0.15 0.19
Beam 2 1 x 2 3.48 0.30 0.15 0.31
Beam 3 1 x 1 4.97 0.30 0.15 0.22
Beam 4 1 x 1 5.24 0.30 0.15 0.24
Beam 5 1 x 1 3.13 0.30 0.15 0.14
Beam 6 1 x 1 4.86 0.30 0.15 0.22
Beam 7 1 x 2 8.47 0.30 0.15 0.76
Beam 8 1 x 3 5.00 0.30 0.15 0.67
Add Column Junction
Column 1 1 x 11 0.30 0.50 0.15 0.25
Column 2 1 x 2 0.30 0.30 0.15 0.03
Column 3 1 x 1 0.60 0.80 0.15 0.07
Roof Slab
HMS Office 1 x 1 4.20 3.52 0.15 2.22
Staff Room 1 x 1 5.00 2.00 0.15 1.50
Hand Wash 1 x 1 1.43 1.98 0.15 0.42
Toilet 1 x 1 1.87 1.20 0.15 0.34
Toilet 1 x 1 1.30 1.23 0.15 0.24
Toilet 1 x 1 1.37 1.40 0.15 0.29
Storage Room 1 x 1 3.50 3.40 0.15 1.79
Coolie & Porter Rest Room 1 x 1 6.61 5.00 0.15 4.96
Lintel Beam
Mini Auditorium
Wall 1 1 x 1 18.80 0.23 0.15 0.65
Wall 2 1 x 1 13.72 0.23 0.15 0.47
Wall 3 1 x 1 3.10 0.23 0.15 0.11
Hms Office
Wall 1 1 x 2 3.48 0.23 0.15 0.24
Wall 2 1 x 1 4.13 0.23 0.15 0.14
Stsaff Room,Toilet&Storage
Wall 1 1 x 1 10.21 0.23 0.15 0.35
Wall 2 1 x 1 8.09 0.23 0.15 0.28
Wall 3 1 x 1 5.85 0.30 0.15 0.26
Wall 4 1 x 1 4.97 0.23 0.15 0.17
Wall 1 1 x 2 3.40 0.23 0.15 0.23
Wall 2 1 x 1 3.15 0.23 0.15 0.11
Wall 3 1 x 2 8.47 0.23 0.15 0.58
Sunshade
Window 1 x 1 1.20 0.60 0.10 0.07
Window 1 x 5 1.40 0.60 0.10 0.42
Door 1 x 1 1.00 0.60 0.10 0.06
Demolishing brick work manually / by mechanical means including stacking of serviceable material and
3
disposal of unserviceable material within 50 metres lead - in cement mortar
Ground Floor
Mini Auditorium
Wall 1(Outer Wall) 1 x 1 18.80 0.23 2.95 12.76
Wall 2(Outer Wall) 1 x 1 13.72 0.23 2.95 9.31
Wall 3(Outer Wall) 1 x 1 3.10 0.23 2.95 2.10
Hms Office
`gv8 1 x 2 3.48 0.23 3.10 4.96
Wall 2(Outer Wall) 1 x 1 4.13 0.23 3.10 2.94
Stsaff Room,Toilet&Storage
Wall 1 1 x 1 10.21 0.23 3.10 7.28
Wall 2 1 x 1 8.09 0.23 3.10 5.77
Wall 3 1 x 1 5.85 0.30 3.10 5.44
Wall 4 1 x 1 4.97 0.23 3.10 3.54
Wash Area
Wall 1 1 x 1 3.40 0.15 1.65 0.84
Wall 2 1 x 1 1.63 0.15 1.65 0.40
Dismantling aluminium/ Gypsum partitions, doors, windows, fixed glazing and false ceiling includingdisposal
4 of unserviceable material and stacking of serviceable material with in 50 meters lead as directed by Engineer-
in-charge.
Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres
5
lead - for thickness of tiles 10mm to 25mm
Roof Tile
Roof Area
HMS Office 1 x 1 4.20 3.52 14.78
Staff Room 1 x 1 5.00 2.00 10.00
Hand Wash 1 x 1 1.43 1.98 2.83
Toilet 1 x 1 1.87 1.20 2.24
Toilet 1 x 1 1.30 1.23 1.60
Toilet 1 x 1 1.37 1.40 1.92
Storage Room 1 x 1 3.50 3.40 11.90
Coolie & Porter Rest Room 1 x 1 6.61 5.00 33.05
Floor Area
HMS Office 1 x 1 4.20 3.52 14.78
Staff Room 1 x 1 5.00 2.00 10.00
Hand Wash 1 x 1 1.43 1.98 2.83
Toilet 1 x 1 1.87 1.20 2.24
Toilet 1 x 1 1.30 1.23 1.60
Storage Room 1 x 1 3.50 3.40 11.90
Mini Auditorium 1 x 1 16.64 3.63 60.40
Stage Area 1 1 x 1 3.63 1.00 3.63
Stage Area 2 1 x 1 2.15 3.10 6.67
Coolie & Porter Rest Room 1 x 1 6.61 5.00 33.05
Dadooing Toilet
Hand Wash 1 x 1 6.82 1.50 10.23
Toilet 1 x 1 6.14 1.50 9.21
Toilet 1 x 1 5.06 1.50 7.59
Door D2 -1 x 4 0.80 1.50 -4.80
Door D1 -1 x 2 0.90 1.50 -2.70
Skirting
HMS Office 1 x 1 15.44 0.10 1.54
Staff Room 1 x 1 14.00 0.10 1.40
Storage Room 1 x 1 13.80 0.10 1.38
Mini Auditorium 1 x 1 40.54 0.10 4.05
Stage Area 1 1 x 1 9.86 0.10 0.99
Coolie & Porter Rest Room 1 x 1 23.22 0.10 2.32
Door D1 -1 x 5 0.90 1.50 -6.75
Main Door D -1 x 2 1.20 2.10 -5.04
6 Demolishing mud phaska in terracing and disposal of material within 50 metres lead.
Roof Tile
Roof Area
HMS Office 1 x 1 4.20 3.52 0.08 1.11
Staff Room 1 x 1 5.00 2.00 0.08 0.75
Hand Wash 1 x 1 1.43 1.98 0.08 0.21
Toilet 1 x 1 1.87 1.20 0.08 0.17
Toilet 1 x 1 1.30 1.23 0.08 0.12
Storage Room 1 x 1 3.50 3.40 0.08 0.89
Coolie & Porter Rest Room 1 x 1 6.61 5.00 0.08 2.48
Total Quantity = 5.80 Cum
Dismantling cement asbestos or other hard board ceiling or partition walls including stacking of serviceable
7
materials and disposal of unserviceable materials within 50 metres lead.
Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts,
8
nuts, cutting rivets ,welding etc.including dismembering and stacking within 50 metres lead
Unit Wt
Meeting Hall
Purlins CHS 1 x 4 19.95 3.56 284.09
Top Chard Member 6 x 2 4.26 3.56 181.99
Bottom Chard Member 6 x 1 3.72 3.56 79.46
Front Side Shed
Column RHS 1 x 2 3.10 11.78 73.01
Purlins CHS 1 x 3 3.85 3.56 41.12
Purlins CHS 1 x 2 3.69 3.56 26.27
Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats,
9
architrave, holdfasts etc. complete and stacking within 50 metres lead of area beyond 3 sq.metres
Ground Floor
Light Point - Tube Light 1 x 10 10.00 nos
Fan Point (Ceiling) 1 x 8 8.00 nos
Fan Point (Wall) 1 x 1 1.00 nos
MAJOR UPGRADATION OF MADURAI RAILWAY JUNCCTION - DISMANTLING WORKS
1 15.2.2 Nominal concrete 1:4:8 or leaner mix (including equivalent design mix) 33.20 1,239.60 cum 41,155.00
Dismantling tile work in floors and roofs laid in cement mortar including
5 15.23.1 816.00 60.50 sqm 49,368.00
stacking material within 50 metres lead - for thickness of tiles 10mm to 25mm
Dismantling steel work in built up sections in angles, tees, flats and channels
8 15.18 including all gusset plates, bolts, nuts, cutting rivets ,welding etc.including 1656.00 4.65 kg 7,700.00
dismembering and stacking within 50 metres lead
Flooring PCC
Ground Floor
Waiting Area 1 x 1 7.70 6.92 0.10 5.33
Left Side Store Room 1 x 1 3.84 6.70 0.10 2.57
Inner Room 1 x 1 3.84 5.84 0.10 2.24
Reservation Counter 1 x 1 7.77 5.62 0.10 4.37
Right Side Corner Room 1 x 1 5.62 3.77 0.10 2.12
Store Room 1 x 1 3.84 6.92 0.10 2.66
Compound Wall Fornt SideArea 1 x 1 138.55 0.10 13.86
Demolishing R.C.C work manually / by mechanical means including stacking of steel bars and disposal of
2
unserviceable material within 50 metres lead
Ground Floor
Column
Column 1 1 x 15 0.30 0.45 2.70 5.47
Roof Beam
Beam 1 1 x 4 14.80 0.30 0.45 7.99
Beam 2 1 x 1 14.80 0.30 0.30 1.33
Beam 3 1 x 6 13.60 0.30 0.45 11.02
Add Column Junction
Column 1 1 x 15 0.30 0.45 0.45 0.91
Front Ramp Beam
Beam 1 1 x 1 24.94 0.30 0.30 2.24
Beam 2 1 x 8 1.50 0.30 0.30 1.08
Roof Slab
Over All Area 1 x 1 16.30 13.27 0.15 32.45
Front Side Projection 1 x 1 4.30 2.27 0.15 1.46
Right Side Projection 1 x 1 13.27 1.30 0.15 2.59
Left Side Projection 1 x 1 13.27 1.30 0.15 2.59
Front Ramp Floor Slab
Ramp Area 1 x 1 24.94 1.50 0.15 5.61
Front Side Staircase
Flight Slab 1 1 x 1 2.55 1.70 0.25 1.08
Flight Slab 2 1 x 1 3.27 1.70 0.25 1.39
Mid Landing Slab 1 x 1 1.50 1.70 0.25 0.64
Mid Landing Beam 1 x 1 1.70 0.30 0.35 0.18
Steps 0.5 x 17 1.70 0.30 0.15 0.65
Lintel Beam
Wall 1 1 x 2 14.80 0.23 0.15 1.02
Wall 2 1 x 4 11.65 0.23 0.15 1.61
Wall 3 1 x 2 3.70 0.23 0.15 0.26
Wall 4 1 x 1 7.40 0.23 0.15 0.26
Inner Concrete Shelfs
Shelf 1 1 x 1 2.70 0.70 0.10 0.19
Shelf 2 1 x 1 3.70 0.70 0.10 0.26
First Floor
Column
Column 1 1 x 15 0.30 0.45 3.05 6.18
Roof Beam
Beam 1 1 x 4 14.80 0.30 0.45 7.99
Beam 2 1 x 1 14.80 0.30 0.30 1.33
Beam 3 1 x 6 13.60 0.30 0.45 11.02
Add Column Junction
Column 1 1 x 15 0.30 0.45 0.45 0.91
Front Ramp Beam
Beam 1 1 x 1 24.94 0.30 0.30 2.24
Beam 2 1 x 8 1.50 0.30 0.30 1.08
Roof Slab
Over All Area 1 x 1 16.30 13.27 0.15 32.45
Front Side Projection 1 x 1 4.30 2.27 0.15 1.46
Right Side Projection 1 x 1 13.27 1.30 0.15 2.59
Left Side Projection 1 x 1 13.27 1.30 0.15 2.59
Sunshade
Front Side Projection 1 x 1 11.40 0.80 0.10 0.91
Window Sunshade 1 x 1 2.00 0.60 0.10 0.12
Terrace Floor
Column
Parapet Column 1 x 15 0.30 0.45 0.90 1.82
Demolishing brick work manually / by mechanical means including stacking of serviceable material and
3
disposal of unserviceable material within 50 metres lead - in cement mortar
Ground Floor
Wall 1(outer wall) 1 x 2 14.80 0.23 2.55 17.36
Wall 2(outer & center Wall) 1 x 4 11.65 0.23 2.55 27.33
Wall 3(Store Room wall ,right & left
1 x 2 3.70 0.23 2.55 4.34
side
Wall 4(ticket counter wall) 1 x 1 7.40 0.23 2.55 4.34
Deductions
DD -1 x 1 1.70 0.23 2.10 -0.82
Door D1 -1 x 3 0.95 0.23 2.10 -1.38
Door D -1 x 1 1.00 0.23 2.10 -0.48
Window (Grill Window) -1 x 1 3.70 0.23 2.10 -1.79
Window W1 -1 x 2 1.80 0.23 1.50 -1.24
Window W2 -1 x 2 1.21 0.23 1.50 -0.83
Ventilator -1 x 4 0.60 0.23 0.60 -0.33
Counter Open -1 x 4 6.40 0.23 1.68 -9.89
Rolling Shutter -1 x 1 2.10 0.23 3.00 -1.45
First Floor
Wall 1(ouetr wall) 1 x 3 14.80 0.23 2.90 29.61
Wall 2(ouetr wall) 1 x 2 11.65 0.23 2.90 15.54
Wall 3(Toilet Inner Wall) 1 x 1 1.37 0.15 2.90 0.60
Deductions
DD -1 x 1 1.70 0.23 2.10 -0.82
Door D1 -1 x 1 0.95 0.23 2.10 -0.46
Window W1 -1 x 3 1.80 0.23 1.50 -1.86
Ventilator -1 x 10 0.60 0.23 0.60 -0.83
Window (Grill Window) -1 x 3 3.70 0.23 2.10 -5.36
Corridor Front Side Wall 1 x 1 4.30 0.23 1.30 1.29
Terrace Floor
All Round Parapet Wall 1 x 1 59.50 0.23 0.90 12.32
Dismantling aluminium/ Gypsum partitions, doors, windows, fixed glazing and false ceiling includingdisposal
4 of unserviceable material and stacking of serviceable material with in 50 meters lead as directed by Engineer-
in-charge.
Ground Floor
Waiting Area 1 x 1 7.70 6.92 53.28
Left Side Store Room 1 x 1 3.84 6.70 25.73
Inner Room 1 x 1 3.84 5.84 22.43
Reservation Counter 1 x 1 7.77 5.62 43.67
Right Side Corner Room 1 x 1 5.62 3.77 21.19
Store Room 1 x 1 3.84 6.92 26.57
Front Side Ramp Area 1 x 1 24.94 1.50 37.41
Counter Top Granite
Area 1 1 x 1 2.70 0.80 2.16
Area 2 1 x 1 3.70 0.80 2.96
Counter Top Dadooing
Wall 1 1 x 1 2.70 1.70 4.59
Wall 2 1 x 1 3.70 1.70 6.29
Skirting
Waiting Area 1 x 1 29.24 0.10 2.92
Left Side Store Room 1 x 1 21.08 0.10 2.11
Inner Room 1 x 1 19.36 0.10 1.94
Reservation Counter 1 x 1 26.78 0.10 2.68
Right Side Corner Room 1 x 1 18.78 0.10 1.88
Store Room 1 x 1 21.52 0.10 2.15
Door D1 -1 x 6 0.95 0.10 -0.57
DD -1 x 1 1.70 0.10 -0.17
Door D -1 x 1 1.00 0.10 -0.10
Rolling Shutter -1 x 1 2.10 0.10 -0.21
First Floor
Waiting Area 1 x 1 15.70 6.92 108.64
Reservation Counter Area 1 x 1 15.70 5.62 88.23
Wooden Flooring
Reservation Counter Area 1 x 1 15.70 5.62 88.23
Front Side Corridor Area 1 x 1 4.30 2.27 9.76
Staircase
Tread 1 x 18 1.70 0.30 9.18
Rise 1 x 19 1.70 0.15 4.85
Landing 1 x 1 1.50 1.70 2.55
Reservation Counter Innet Toilet
Toilet 1 1 x 1 5.00 2.10 10.50
Toilet 2 1 x 1 5.00 2.10 10.50
Door D2 -1 x 2 0.80 2.10 -3.36
Skirting
Waiting Area 1 x 1 45.24 0.10 4.52
Reservation Counter Area 1 x 1 42.64 0.10 4.26
Door D1 -1 x 1 0.95 0.10 -0.10
DD -1 x 1 1.70 0.10 -0.17
Terrace Floor
Roof Tile Area 1 x 1 16.30 13.45 219.23
6 Demolishing mud phaska in terracing and disposal of material within 50 metres lead.
Terrace Floor
Roof Tile Area 1 x 1 16.30 13.45 0.08 16.44
Dismantling cement asbestos or other hard board ceiling or partition walls including stacking of serviceable
7
materials and disposal of unserviceable materials within 50 metres lead.
Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts,
8
nuts, cutting rivets ,welding etc.including dismembering and stacking within 50 metres lead
Kg/Sqm
Ground Floor
Window (Grill Window) 1 x 1 3.70 2.10 20.00 155.40
Grill Door (DD) 1 x 1 1.70 2.10 15.00 53.55
Ventilator V 1 x 4 0.60 0.60 10.00 14.40
Window W1 1 x 2 1.80 1.50 15.00 81.00
Window W 1 x 2 1.21 1.50 15.00 54.45
First Floor
Window (Grill Window) 1 x 3 3.70 2.10 20.00 466.20
Grill Door (DD) 1 x 1 1.70 2.10 15.00 53.55
Ventilator V 1 x 10 0.60 0.60 10.00 36.00
Window W1 1 x 3 1.80 1.50 15.00 121.50
Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats,
9
architrave, holdfasts etc. complete and stacking within 50 metres lead of area beyond 3 sq.metres
Ground Floor
DD 1 x 1 1.00
Door D1 1 x 3 3.00
Door D 1 x 1 1.00
Window (Grill Window) 1 x 1 1.00
Window W1 1 x 2 2.00
Window W2 1 x 2 2.00
Ventilator 1 x 4 4.00
Counter Open 1 x 4 4.00
Rolling Shutter 1 x 1 1.00
First Floor
DD 1 x 1 1.00
Door D1 1 x 3 3.00
Window W1 1 x 3 3.00
Ventilator 1 x 10 10.00
Window (Grill Window) 1 x 3 3.00
Ground Floor
Light Point - Tube Light 1 x 21 21.00 nos
Fan Point (Ceiling) 1 x 12 12.00 nos
Fan Point (Wall) 1 x 2 2.00 nos
First Floor
Light Point - Tube Light 1 x 29 29.00 nos
Fan Point (Ceiling) 1 x 9 9.00 nos
Fan Point (Wall) 1 x 5 5.00 nos
MAJOR UPGRADATION OF MADURAI RAILWAY JUNCCTION - DISMANTLING WORKS
1 15.2.2 Nominal concrete 1:4:8 or leaner mix (including equivalent design mix) 224.90 1,239.60 cum 278,786.00
Dismantling tile work in floors and roofs laid in cement mortar including
4 15.23.1 6615.20 60.50 sqm 400,220.00
stacking material within 50 metres lead - for thickness of tiles 10mm to 25mm
Dismantling steel work in built up sections in angles, tees, flats and channels
6 15.18 including all gusset plates, bolts, nuts, cutting rivets ,welding etc.including 4841.00 4.65 kg 22,511.00
dismembering and stacking within 50 metres lead
Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking
10 15.28.1 1016.50 136.00 sqm 138,244.00
the material within 50 metres lead of - G.S.sheet
Dismantling steel work in built up sections in angles, tees, flats and channels
11 15.18 including all gusset plates, bolts, nuts, cutting rivets ,welding etc.including 33201.00 4.65 kg 154,385.00
dismembering and stacking within 50 metres lead
Flooring PCC
Ground Floor
Stair Area 1 x 1 13.20 3.32 0.10 4.39
Lobby Area 1 1 x 1 8.87 6.60 0.10 5.85
Lobby Area 2 1 x 1 5.66 3.29 0.10 1.86
Lobby Area 3 1 x 1 22.37 3.05 0.10 6.82
Parcel Loading & Unloading Area 1 1 x 1 5.15 6.60 0.10 3.40
Parcel Loading & Unloading Area 2 1 x 1 8.10 3.24 0.10 2.62
Parcel Booking Counter 1 x 1 3.24 6.37 0.10 2.06
Record Room 1 x 1 2.74 4.55 0.10 1.25
Toilet 1 x 1 2.74 1.70 0.10 0.47
Parcel Booking Counter 1 x 1 2.74 6.55 0.10 1.79
Chief Parcel Supervisor 1 x 1 5.78 3.08 0.10 1.78
Store Room 1 x 1 2.75 3.06 0.10 0.84
Toilet Area 1 x 1 3.32 6.20 0.10 2.06
Stair Area 1 x 1 3.32 6.48 0.10 2.15
Lockup Rooms 1 x 2 2.86 3.07 0.10 1.76
Chief Inspector Room 1 x 1 3.73 3.07 0.10 1.15
Record Room 1 x 2 2.81 3.23 0.10 1.82
Record Room 1 x 1 5.72 3.00 0.10 1.72
Lobby Area 1 1 x 1 6.01 2.90 0.10 1.74
Lobby Area 2 1 x 1 5.66 9.59 0.10 5.43
Lobby Area 3 1 x 1 1.49 3.30 0.10 0.49
Inspector Room 1 x 1 3.20 6.29 0.10 2.01
Toilet 1 x 1 2.29 2.22 0.10 0.51
Record Room 1 1 x 1 2.29 3.84 0.10 0.88
Record Room 2 1 x 2 5.72 3.07 0.10 3.51
Bomb Squad
Room 1 1 x 1 5.72 6.28 0.10 3.59
Room 2 1 x 1 3.90 6.44 0.10 2.51
Passage Area 1 x 1 1.72 6.36 0.10 1.09
SSE/C&W Office
Room 1 1 x 1 5.72 6.29 0.10 3.60
Room 2 1 x 1 5.72 4.64 0.10 2.65
SSE/JE Office
Room 1 1 x 1 5.72 3.60 0.10 2.06
Room 2 1 x 1 5.72 7.44 0.10 4.26
SSE/ELEC/AC Office
Room 1 1 x 2 5.72 11.16 0.10 12.77
Passage Area 1 1 x 1 23.57 1.50 0.10 3.54
Stair Area 1 x 1 3.32 13.20 0.10 4.38
Room 2 1 x 1 5.72 12.89 0.10 7.37
Renovation Restaurant
Room 1 1 x 1 1.97 1.77 0.10 0.35
Room 2 1 x 1 5.00 2.00 0.10 1.00
Room 3 1 x 1 2.40 3.34 0.10 0.80
Room 4 1 x 1 5.97 6.43 0.10 3.84
Room 5 1 x 1 1.24 4.70 0.10 0.58
Room 6 1 x 1 2.40 1.50 0.10 0.36
Room 7 1 x 1 2.40 1.40 0.10 0.34
Room 8 1 x 1 3.86 1.50 0.10 0.58
Room 9 1 x 1 3.00 2.30 0.10 0.69
Room 10 1 x 1 4.10 2.53 0.10 1.04
Room 11 1 x 1 2.30 2.30 0.10 0.53
Room 12 1 x 1 2.30 1.70 0.10 0.39
Room 13 1 x 1 3.86 1.50 0.10 0.58
Room 14 1 x 1 7.33 1.70 0.10 1.25
Demolishing R.C.C work manually / by mechanical means including stacking of steel bars and disposal of unserviceable
2
material within 50 metres lead
Ground Floor
Column
Column1 1 x 104 0.40 0.40 3.25 54.08
Column2 1 x 4 0.40 0.40 3.25 2.08
Column3 1 x 3 0.40 0.60 3.25 2.34
Roof Beam
Beam 1 1 x 1 170.13 0.30 0.45 22.97
Beam 2 1 x 1 181.73 0.30 0.45 24.53
Beam 3 1 x 1 170.13 0.30 0.45 22.97
Beam 4 1 x 1 183.33 0.30 0.45 24.75
Beam 5 1 x 1 170.33 0.30 0.45 22.99
Lintel Beam
X- Direction wall
Parcel office
Wall 1 1 x 1 172.28 0.23 0.15 5.94
Wall 2 1 x 1 3.20 0.23 0.15 0.11
Wall 3 1 x 1 2.74 0.23 0.15 0.09
Wall 4 1 x 1 8.84 0.23 0.15 0.30
Wall 5 1 x 1 9.22 0.23 0.15 0.32
RPF Police Station
Wall 6 1 x 1 10.06 0.23 0.15 0.35
Wall 7 1 x 1 8.80 0.23 0.15 0.30
Wall 8 1 x 1 5.60 0.23 0.15 0.19
Wall 9 1 x 1 2.52 0.23 0.15 0.09
Wall 10 1 x 1 5.60 0.23 0.15 0.19
Wall 11 1 x 1 5.72 0.23 0.15 0.20
Bomb Squad
Wall 1 1 x 1 5.60 0.23 0.15 0.19
SSE&CW Staff Room
Wall 1 1 x 1 5.60 0.23 0.15 0.19
Wall 2 1 x 1 23.57 0.23 0.15 0.81
Stair Room
Wall 1 1 x 3 3.20 0.23 0.15 0.33
Restaurant
Wall 1 1 x 2 1.30 0.23 0.15 0.09
Wall 2 1 x 1 2.66 0.23 0.15 0.09
Wall 3 1 x 2 2.40 0.23 0.15 0.17
Wall 4 1 x 1 2.76 0.23 0.15 0.10
Wall 5 1 x 2 2.30 0.23 0.15 0.16
Wall 6 1 x 1 5.74 0.23 0.15 0.20
Wall 7 1 x 1 3.00 0.23 0.15 0.10
Wall 8 1 x 1 0.98 0.23 0.15 0.03
Wall 9 1 x 1 1.43 0.23 0.15 0.05
Upper Class waiting
Wall 1 1 x 1 9.08 0.23 0.15 0.31
Chief Travelling Inspector Office
Wall 1 1 x 1 5.60 0.23 0.15 0.19
Wall 2 1 x 1 2.02 0.23 0.15 0.07
Chief Health Inspector Office
Wall 1 1 x 1 5.60 0.23 0.15 0.19
IRTC Executive Lounge
Wall 1 1 x 1 4.09 0.23 0.15 0.14
Wall 2 1 x 1 10.96 0.23 0.15 0.38
Wall 3 1 x 1 6.49 0.23 0.15 0.22
Wall 4 1 x 1 5.20 1.23 0.15 0.96
Wall 5 1 x 1 5.00 1.23 0.15 0.92
Y-Direction Wall
Parcel office
Wall 1 1 x 2 12.40 0.23 0.15 0.86
Wall 2 1 x 2 6.20 0.23 0.15 0.43
Wall 3 1 x 1 6.55 0.23 0.15 0.23
Wall 4 1 x 2 2.97 0.23 0.15 0.20
Wall 5 1 x 1 3.06 0.23 0.15 0.11
Wall 6 1 x 1 6.55 0.23 0.15 0.23
RPF Station
Wall 1 1 x 3 11.60 0.23 0.15 1.20
Wall 2 1 x 3 3.07 0.23 0.15 0.32
Wall 3 1 x 1 5.80 0.23 0.15 0.20
Wall 4 1 x 1 6.29 1.23 0.15 1.16
Bomb Squad
Wall 1 1 x 2 12.00 0.23 0.15 0.83
SSE&CW Staff Room
Wall 1 1 x 1 5.60 0.23 0.15 0.19
Wall 2 1 x 1 10.36 0.23 0.15 0.36
Wall 3 1 x 2 10.76 1.23 0.15 3.97
Stair Room
Wall 1 1 x 1 12.40 0.23 0.15 0.43
Wall 2 1 x 1 11.95 0.23 0.15 0.41
Restaurant
Wall 1 1 x 3 12.40 0.23 0.15 1.28
Wall 2 1 x 2 2.00 0.23 0.15 0.14
Wall 3 1 x 1 2.36 0.23 0.15 0.08
Wall 4 1 x 1 1.73 0.23 0.15 0.06
Wall 5 1 x 1 2.53 0.23 0.15 0.09
Wall 6 1 x 1 3.13 0.23 0.15 0.11
Wall 7 1 x 1 6.93 0.23 0.15 0.24
Wall 8 1 x 1 4.72 0.23 0.15 0.16
Wall 9 1 x 1 4.20 0.23 0.15 0.14
Wall 10 1 x 1 2.40 0.23 0.15 0.08
Upper Class Waiting
Wall 1 1 x 3 12.88 0.23 0.15 1.33
Srair Room
Wall 1 1 x 2 12.40 0.23 0.15 0.86
Ticket Inspector Office
Wall 1 1 x 1 12.40 0.23 0.15 0.43
Health Inspector Office
Wall 1 1 x 2 12.40 0.23 0.15 0.86
IRTC Executive Lounge
Wall 1 1 x 1 4.70 0.23 0.15 0.16
Wall 2 1 x 3 3.02 0.23 0.15 0.31
Wall 3 1 x 2 1.70 0.23 0.15 0.12
Wall 4 1 x 1 6.60 0.23 0.15 0.23
Wall 5 1 x 3 1.30 0.23 0.15 0.13
Wall 6 1 x 1 12.40 0.23 0.15 0.43
Partition Wall
Wall 1 1 x 1 6.20 0.12 0.15 0.11
Wall 2 1 x 4 1.28 0.12 0.15 0.09
Wall 3 1 x 1 3.23 0.12 0.15 0.06
Wall 4 1 x 1 6.36 0.12 0.15 0.11
Wall 5 1 x 1 3.04 0.12 0.15 0.05
Wall 6 4 x 5 0.60 0.12 0.15 0.22
Wall 7 1 x 1 2.60 0.12 0.15 0.05
Wall 8 1 x 1 1.60 0.12 0.15 0.03
Wall 9 1 x 3 1.30 0.12 0.15 0.07
Wall 10 1 x 2 3.62 0.12 0.15 0.13
Wall 11 2 x 3 1.18 0.12 0.15 0.13
Wall 12 1 x 1 2.22 0.12 0.15 0.04
Wall 13 1 x 1 1.30 0.12 0.15 0.02
Wall 14 1 x 1 3.20 0.12 0.15 0.06
Wall 15 1 x 1 1.17 0.12 0.15 0.02
Roof Slab
Over All Area 1 x 1 184.53 14.93 0.15 413.25
Deductions
Staircase Area 1 -1 x 1 6.49 3.32 0.15 -3.23
Staircase Area 2 -1 x 1 6.49 3.32 0.15 -3.23
Staircase Area 3 -1 x 1 6.49 3.32 0.15 -3.23
Staircase Area 4 -1 x 1 6.49 3.32 0.15 -3.23
Staircase Area 5 -1 x 1 6.49 3.32 0.15 -3.23
Staircase
Flight Slab 1 5 x 1 4.00 1.50 0.15 4.50
Flight Slab 2 5 x 1 3.35 1.50 0.15 3.77
Landing Slab 5 x 1 1.90 3.32 0.15 4.73
Hand Rail Wall 5 x 1 4.00 0.20 1.00 4.00
Hand Rail Wall 5 x 1 3.35 0.20 1.00 3.35
Steps 110 x 0.5 1.50 0.30 0.15 3.71
First Floor
Column
Column1 1 x 73 0.40 0.40 2.95 34.46
Column2 1 x 4 0.40 0.40 0.90 0.58
Column3 1 x 2 0.40 0.60 2.95 1.42
Column3 1 x 1 0.40 0.60 0.90 0.22
Column4 1 x 30 0.40 0.40 0.90 4.32
Roof Beam
Beam 1 1 x 1 106.90 0.30 0.45 14.43
Beam 2 1 x 1 112.90 0.30 0.45 15.24
Beam 3 1 x 1 104.90 0.30 0.45 14.16
Beam 4 1 x 1 106.90 0.30 0.45 14.43
Lintel Beam
Main wall
Wall 1 1 x 1 108.13 0.23 0.15 3.73
Wall 2 1 x 1 17.21 0.23 0.15 0.59
Wall 3 1 x 1 5.60 0.23 0.15 0.19
Wall 4 1 x 1 9.27 0.23 0.15 0.32
Wall 5 1 x 1 5.70 0.23 0.15 0.20
Wall 6 1 x 1 16.80 0.23 0.15 0.58
Wall 6 1 x 1 3.21 0.23 0.15 0.11
Wall 7 1 x 1 14.40 0.23 0.15 0.50
Wall 8 1 x 1 4.13 0.23 0.15 0.14
Wall 9 1 x 2 3.20 0.23 0.15 0.22
Wall 10 1 x 1 11.70 0.23 0.15 0.40
Wall 11 1 x 1 5.72 0.23 0.15 0.20
Wall 12 1 x 1 107.38 0.23 0.15 3.70
Terrace Floor
Column
Column Projection 1 x 73 0.40 0.40 0.90 10.51
Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of
3
unserviceable material within 50 metres lead - in cement mortar
Ground Floor
Main Wall
X-Direction Wall
Parcel office
Wall 1 1 x 1 172.28 0.23 3.10 122.84
Wall 2 1 x 1 3.20 0.23 3.10 2.28
Wall 3 1 x 1 2.74 0.23 3.10 1.95
Wall 4 1 x 1 8.84 0.23 3.10 6.30
Wall 5 1 x 1 9.22 0.23 3.10 6.57
RPF Police Station
Wall 6 1 x 1 10.06 0.23 3.10 7.17
Wall 7 1 x 1 8.80 0.23 3.10 6.27
Wall 8 1 x 1 5.60 0.23 3.10 3.99
Wall 9 1 x 1 2.52 0.23 3.10 1.80
Wall 10 1 x 1 5.60 0.23 3.10 3.99
Wall 11 1 x 1 5.72 0.23 3.10 4.08
Bomb Squad
Wall 1 1 x 1 5.60 0.23 3.10 3.99
SSE&CW Staff Room
Wall 1 1 x 1 5.60 0.23 3.10 3.99
Wall 2 1 x 1 23.57 0.23 3.10 16.81
Stair Room
Wall 1 1 x 3 3.20 0.23 3.10 6.84
Restaurant
Wall 1 1 x 2 1.30 0.23 3.10 1.85
Wall 2 1 x 1 2.66 0.23 3.10 1.90
Wall 3 1 x 2 2.40 0.23 3.10 3.42
Wall 4 1 x 1 2.76 0.23 3.10 1.97
Wall 5 1 x 2 2.30 0.23 3.10 3.28
Wall 6 1 x 1 5.74 0.23 3.10 4.09
Wall 7 1 x 1 3.00 0.23 3.10 2.14
Wall 8 1 x 1 0.98 0.23 3.10 0.70
Wall 9 1 x 1 1.43 0.23 3.10 1.02
Upper Class waiting
Wall 1 1 x 1 9.08 0.23 3.10 6.47
Chief Travelling Inspector Office
Wall 1 1 x 1 5.60 0.23 3.10 3.99
Wall 2 1 x 1 2.02 0.23 3.10 1.44
Chief Health Inspector Office
Wall 1 1 x 1 5.60 0.23 3.10 3.99
IRTC Executive Lounge
Wall 1 1 x 1 4.09 0.23 3.10 2.92
Wall 2 1 x 1 10.96 0.23 3.10 7.81
Wall 3 1 x 1 6.49 0.23 3.10 4.63
Wall 4 1 x 1 5.20 0.23 3.10 3.71
Wall 5 1 x 1 5.00 0.23 3.10 3.57
Y-Direction wall
Parcel office
Wall 1 1 x 2 12.40 0.23 3.10 17.68
Wall 2 1 x 2 6.20 0.23 3.10 8.84
Wall 3 1 x 1 6.55 0.23 3.10 4.67
Wall 4 1 x 2 2.97 0.23 3.10 4.24
Wall 5 1 x 1 3.06 0.23 3.10 2.18
Wall 6 1 x 1 6.55 0.23 3.10 4.67
RPF Station
Wall 1 1 x 3 11.60 0.23 3.10 24.81
Wall 2 1 x 3 3.07 0.23 3.10 6.57
Wall 3 1 x 1 5.80 0.23 3.10 4.14
Wall 4 1 x 1 6.29 1.23 3.10 23.98
Bomb Squad
Wall 1 1 x 2 12.00 0.23 3.10 17.11
SSE&CW Staff Room
Wall 1 1 x 1 5.60 0.23 3.10 3.99
Wall 2 1 x 1 10.36 0.23 3.10 7.39
Wall 3 1 x 2 10.76 1.23 3.10 82.06
Stair Room
Wall 1 1 x 1 12.40 0.23 3.10 8.84
Wall 2 1 x 1 11.95 0.23 3.10 8.52
Restaurant
Wall 1 1 x 3 12.40 0.23 3.10 26.52
Wall 2 1 x 2 2.00 0.23 3.10 2.85
Wall 3 1 x 1 2.36 0.23 3.10 1.68
Wall 4 1 x 1 1.73 0.23 3.10 1.23
Wall 5 1 x 1 2.53 0.23 3.10 1.80
Wall 6 1 x 1 3.13 0.23 3.10 2.23
Wall 7 1 x 1 6.93 0.23 3.10 4.94
Wall 8 1 x 1 4.72 0.23 3.10 3.37
Wall 9 1 x 1 4.20 0.23 3.10 2.99
Wall 10 1 x 1 2.40 0.23 3.10 1.71
Upper Class Waiting
Wall 1 1 x 3 12.88 0.23 3.10 27.55
Srair Room
Wall 1 1 x 2 12.40 0.23 3.10 17.68
Ticket Inspector Office
Wall 1 1 x 1 12.40 0.23 3.10 8.84
Health Inspector Office
Wall 1 1 x 2 12.40 0.23 3.10 17.68
IRTC Executive Lounge
Wall 1 1 x 1 4.70 0.23 3.10 3.35
Wall 2 1 x 3 3.02 0.23 3.10 6.46
Wall 3 1 x 2 1.70 0.23 3.10 2.42
Wall 4 1 x 1 6.60 0.23 3.10 4.71
Wall 5 1 x 3 1.30 0.23 3.10 2.78
Wall 6 1 x 1 12.40 0.23 3.10 8.84
Deductions
Door DD1 -1 x 7 1.20 0.23 2.10 -4.06
Door DD3 -1 x 1 1.08 0.23 2.10 -0.52
Door D1 -1 x 9 1.00 0.23 2.10 -4.35
Door D2 -1 x 24 1.00 0.23 2.10 -11.59
Door D3 -1 x 4 1.20 0.23 2.10 -2.32
Door D4 -1 x 2 0.80 0.23 2.10 -0.77
Door D5 -1 x 2 0.70 0.23 2.10 -0.68
S.T.G1 -1 x 2 1.70 0.23 2.10 -1.64
S.T.G2 -1 x 2 0.70 0.23 2.10 -0.68
C.L.G -1 x 2 1.70 0.23 2.10 -1.64
Rolling Shutter RS -1 x 6 1.50 0.23 2.10 -4.35
Window W1 -1 x 4 1.20 0.23 1.50 -1.66
Window W2 -1 x 51 1.70 0.23 1.50 -29.91
Window W3 -1 x 21 0.90 0.23 1.50 -6.52
Window W4 -1 x 6 2.30 0.23 1.50 -4.76
Window W5 -1 x 4 1.80 0.23 1.50 -2.48
ALW 1 -1 x 2 1.70 0.23 1.50 -1.17
ALW 2 -1 x 1 2.30 0.23 1.50 -0.79
Ventilator V -1 x 8 0.60 0.23 0.60 -0.66
Wall Open -1 x 1 1.10 0.23 3.00 -0.76
Wall Open -1 x 2 0.75 0.23 2.10 -0.72
Wall Open -1 x 1 0.90 0.23 2.10 -0.43
Wall Open -1 x 1 2.40 0.23 2.10 -1.16
Partition Wall
RPF Police Station
Wall 1 1 x 1 6.20 0.12 2.10 1.56
Wall 2 1 x 4 1.28 0.12 2.10 1.29
Wall 3 1 x 1 3.23 0.12 2.10 0.81
Wall 4 1 x 1 3.04 0.12 2.10 0.77
AC Waitng Hall
Wall 5 1 x 1 6.37 0.12 2.10 1.61
Wall 6 1 x 1 1.00 0.12 2.10 0.25
Wall 7 1 x 3 1.30 0.12 2.10 0.98
Baby Feeding Room
Wall 8 1 x 2 3.62 0.12 2.10 1.82
Wall 9 2 x 3 1.18 0.12 2.10 1.78
Executive Lounge
Wall 10 1 x 1 2.22 0.12 2.10 0.56
Wall 11 1 x 1 1.30 0.12 2.10 0.33
Wall 12 1 x 1 3.20 0.12 2.10 0.81
Wall 13 1 x 1 1.17 0.12 2.10 0.29
Deductions
Door D2 -1 x 4 1.00 0.12 2.10 -1.01
Door D4 -1 x 1 0.80 0.12 2.10 -0.20
Door D5 -1 x 18 0.70 0.12 2.10 -3.18
First Floor
Main Wall
Wall 1 1 x 1 108.13 0.23 2.80 69.64
Wall 2 1 x 1 17.21 0.23 2.80 11.08
Wall 3 1 x 1 5.60 0.23 2.80 3.61
Wall 4 1 x 1 9.27 0.23 2.80 5.97
Wall 5 1 x 1 5.70 0.23 2.80 3.67
Wall 6 1 x 1 16.80 0.23 2.80 10.82
Wall 6 1 x 1 3.21 0.23 2.80 2.07
Wall 7 1 x 1 14.40 0.23 2.80 9.27
Wall 8 1 x 1 4.13 0.23 2.80 2.66
Wall 9 1 x 2 3.20 0.23 2.80 4.12
Wall 10 1 x 1 11.70 0.23 2.80 7.53
Wall 11 1 x 1 5.72 0.23 2.80 3.68
Wall 12 1 x 1 107.38 0.23 2.80 69.15
Parapet Wall
Wall 1 1 x 1 25.35 0.23 0.90 5.25
Wall 2 1 x 1 7.40 0.23 0.90 1.53
Wall 3 1 x 1 184.50 0.23 0.90 38.19
Wall 4 1 x 1 13.90 0.23 0.90 2.88
Wall 5 1 x 1 38.67 0.23 0.90 8.00
Head Room Brickwork
Wall 1 1 x 2 6.20 0.23 3.10 8.84
Wall 2 1 x 1 3.20 0.23 3.10 2.28
Wall 3 1 x 1 3.20 0.23 2.65 1.95
Open -1 x 1 3.20 0.23 2.10 -1.55
Terrace Floor
Parapet Wall
Wall 1 1 x 1 106.20 0.23 0.90 21.98
Wall 2 1 x 1 106.00 0.23 0.90 21.94
Wall 3 1 x 1 11.60 0.23 0.90 2.40
Wall 4 1 x 1 12.40 0.23 0.90 2.57
Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead - for
4
thickness of tiles 10mm to 25mm
Roof Tile
Ground Floor
Open Terrace Area 1 1 x 1 6.20 3.59 22.26
Open Terrace Area 2 1 x 1 3.59 1.40 5.03
Open Terrace Area 3 1 x 1 115.68 1.32 152.70
Open Terrace Area 4 1 x 1 41.30 14.44 596.37
First Floor
Roof Area Inner 1 x 1 115.12 12.85 1479.64
Floor Tile
Ground Floor
Stair Area 1 x 1 13.20 3.32 43.86
Lobby Area 1 1 x 1 8.87 6.60 58.54
Lobby Area 2 1 x 1 5.66 3.29 18.62
Lobby Area 3 1 x 1 22.37 3.05 68.23
Parcel Loading & Unloading Area 1 1 x 1 5.15 6.60 33.99
Parcel Loading & Unloading Area 2 1 x 1 8.10 3.24 26.24
Parcel Booking Counter 1 x 1 3.24 6.37 20.64
Record Room 1 x 1 2.74 4.55 12.47
Toilet 1 x 1 2.74 1.70 4.66
Parcel Booking Counter 1 x 1 2.74 6.55 17.95
Chief Parcel Supervisor 1 x 1 5.78 3.08 17.80
Store Room 1 x 1 2.75 3.06 8.42
Toilet Area 1 x 1 3.32 6.20 20.58
Stair Area 1 x 1 3.32 6.48 21.51
Lockup Rooms 1 x 2 2.86 3.07 17.56
Chief Inspector Room 1 x 1 3.73 3.07 11.45
Record Room 1 x 2 2.81 3.23 18.15
Record Room 1 x 1 5.72 3.00 17.16
Lobby Area 1 1 x 1 6.01 2.90 17.43
Lobby Area 2 1 x 1 5.66 9.59 54.28
Lobby Area 3 1 x 1 1.49 3.30 4.92
Inspector Room 1 x 1 3.20 6.29 20.13
Toilet 1 x 1 2.29 2.22 5.08
Record Room 1 1 x 1 2.29 3.84 8.79
Record Room 2 1 x 2 5.72 3.07 35.12
Bomb Squad
Room 1 1 x 1 5.72 6.28 35.92
Room 2 1 x 1 3.90 6.44 25.12
Passage Area 1 x 1 1.72 6.36 10.94
SSE/C&W Office
Room 1 1 x 1 5.72 6.29 35.98
Room 2 1 x 1 5.72 4.64 26.54
SSE/JE Office
Room 1 1 x 1 5.72 3.60 20.59
Room 2 1 x 1 5.72 7.44 42.56
SSE/ELEC/AC Office
Room 1 1 x 2 5.72 11.16 127.67
Passage Area 1 1 x 1 23.57 1.50 35.36
Stair Area 1 x 1 3.32 13.20 43.82
Room 2 1 x 1 5.72 12.89 73.73
Renovation Restaurant
Room 1 1 x 1 1.97 1.77 3.49
Room 2 1 x 1 5.00 2.00 10.00
Room 3 1 x 1 2.40 3.34 8.02
Room 4 1 x 1 5.97 6.43 38.39
Room 5 1 x 1 1.24 4.70 5.83
Room 6 1 x 1 2.40 1.50 3.60
Room 7 1 x 1 2.40 1.40 3.36
Room 8 1 x 1 3.86 1.50 5.79
Room 9 1 x 1 3.00 2.30 6.90
Room 10 1 x 1 4.10 2.53 10.37
Room 11 1 x 1 2.30 2.30 5.29
Room 12 1 x 1 2.30 1.70 3.91
Room 13 1 x 1 3.86 1.50 5.79
Room 14 1 x 1 7.33 1.70 12.46
Toilet Dadooing
Parcel Area
Toilet 1 1 x 1 6.88 2.10 14.45
RPF Police Station
Toilet 1 1 x 2 4.76 2.10 19.99
Toilet 2 1 x 3 4.90 2.10 30.87
Toilet 3 1 x 1 9.02 2.10 18.94
Outer Wall 1 x 1 6.20 2.10 13.02
Passage Area 1 x 1 11.83 2.10 24.84
AC Waiting Hall
Toilet 1 1 x 1 8.20 2.10 17.22
Toilet 2 1 x 1 5.26 2.10 11.05
Toilet 3 1 x 1 5.36 2.10 11.26
Toilet 4 1 x 1 6.26 2.10 13.15
Toilet 5 1 x 1 5.44 2.10 11.42
Outer Wall 1 x 1 6.37 2.10 13.38
Passage Area 1 x 1 10.53 2.10 22.11
Baby Feeding Room
Toilet 1 1 x 1 8.92 2.10 18.73
Toilet 2 1 x 2 4.60 2.10 19.32
Toilet 3 1 x 1 4.50 2.10 9.45
Toilet 4 1 x 2 4.36 2.10 18.31
Toilet 5 1 x 1 4.26 2.10 8.95
Toilet 6 1 x 1 7.08 2.10 14.87
Toilet 7 1 x 1 19.04 2.10 39.98
Chief Travelling Ticket Booking
Toilet 1 1 x 1 5.68 2.10 11.93
Chief Health Inspector Office
Toilet 1 1 x 1 7.08 2.10 14.87
Executive Lounge
Gents Toilet
Toilet 1 1 x 1 5.80 2.10 12.18
1 x 1 9.92 2.10 20.83
1 x 1 7.92 2.10 16.63
1 x 2 5.26 2.10 22.09
LadiesToilet
Toilet 2 1 x 1 5.80 2.10 12.18
1 x 1 9.92 2.10 20.83
1 x 1 7.92 2.10 16.63
1 x 2 5.26 2.10 22.09
Toilet 3 1 x 1 8.64 2.10 18.14
Deductions
Door D5 -1 x 23 0.70 2.10 -33.81
Door D2 -1 x 7 0.90 2.10 -13.23
First Floor
Police Station
Toilet Area 1 x 1 3.32 6.20 20.58
Area 1 1 x 2 2.69 3.07 16.52
Area 2 1 x 2 2.80 3.07 17.19
Area 3 1 x 1 5.72 7.76 44.39
Area 4 1 x 1 5.95 1.62 9.64
Area 5 1 x 1 5.72 7.76 44.39
Area 6 1 x 1 5.72 9.59 54.85
Area 7 1 x 1 3.87 6.37 24.65
Area 8 1 x 2 1.62 3.08 9.98
Area 9 1 x 1 11.96 1.50 17.94
Area 10 1 x 2 2.16 5.72 24.71
Area 11 1 x 1 5.78 6.37 36.82
Area 12 1 x 1 2.75 4.56 12.54
Area 13 1 x 2 2.69 2.30 12.37
Area 14 1 x 1 5.60 10.36 58.02
SSE & CW Staff Dorm
Area 15 1 x 1 2.40 1.75 4.20
Area 16 1 x 1 3.15 1.99 6.27
Area 17 1 x 1 5.78 10.90 63.00
SSE & EL Storage
Area 18 1 x 2 5.72 12.88 147.35
Toilet Area 1 x 1 3.28 6.20 20.34
TTE Dorm 1
Area 19 1 x 1 23.57 12.89 303.82
Toilet Area 1 x 1 3.32 6.20 20.58
TTE Dorm 2
Area 20 1 x 1 11.67 12.88 150.31
TTE Dorm 3
Area 21 1 x 1 4.19 12.88 53.97
Passage Area 1 x 1 1.30 13.11 17.04
Ladies TTE Dorm
Area 22 1 x 1 5.72 12.88 73.67
Area 23 1 x 1 5.72 9.30 53.20
Area 24 1 x 1 9.27 3.35 31.05
Area 25 1 x 1 3.32 2.62 8.70
Dadooing Wall Tile
Ground Floor
Wall 1 1 x 3 5.50 1.10 18.15
Wall 2 1 x 1 0.60 1.10 0.66
Wall 3 1 x 1 2.50 1.10 2.75
Skirting
Police Station
Toilet Area 1 x 1 19.04 0.10 1.90
Area 1 1 x 2 11.52 0.10 2.30
Area 2 1 x 2 11.74 0.10 2.35
Area 3 1 x 1 26.96 0.10 2.70
Area 4 1 x 1 15.14 0.10 1.51
Area 5 1 x 1 26.96 0.10 2.70
Area 6 1 x 1 30.62 0.10 3.06
Area 7 1 x 1 20.48 0.10 2.05
Area 8 1 x 2 9.40 0.10 1.88
Area 9 1 x 1 26.92 0.10 2.69
Area 10 1 x 2 15.76 0.10 3.15
Area 11 1 x 1 24.30 0.10 2.43
Area 12 1 x 1 14.62 0.10 1.46
Area 13 1 x 2 9.98 0.10 2.00
Area 14 1 x 1 31.92 0.10 3.19
SSE & CW Staff Dorm
Area 15 1 x 1 8.30 0.10 0.83
Area 16 1 x 1 10.28 0.10 1.03
Area 17 1 x 1 33.36 0.10 3.34
SSE & EL Storage
Area 18 1 x 2 37.20 0.10 7.44
Toilet Area 1 x 1 18.96 0.10 1.90
TTE Dorm 1
Area 19 1 x 1 72.92 0.10 7.29
Toilet Area 1 x 1 19.04 0.10 1.90
TTE Dorm 2
Area 20 1 x 1 49.10 0.10 4.91
TTE Dorm 3
Area 21 1 x 1 34.14 0.10 3.41
Passage Area 1 x 1 28.82 0.10 2.88
Ladies TTE Dorm
Area 22 1 x 1 37.20 0.10 3.72
Area 23 1 x 1 30.04 0.10 3.00
Area 24 1 x 1 25.24 0.10 2.52
Area 25 1 x 1 11.88 0.10 1.19
Deductions
Door D2 -1 x 26 0.90 0.10 -2.34
Door D3 -1 x 16 0.90 0.10 -1.44
Door D5 -1 x 5 0.70 0.10 -0.35
ST.G1 -1 x 1 1.70 0.10 -0.17
ST.G2 -1 x 4 0.90 0.10 -0.36
ALG.1 -1 x 2 1.70 0.10 -0.34
Toilet Dadooing
Police Station
Toilet 1 1 x 2 5.60 2.10 23.52
Toilet 2 1 x 2 5.80 2.10 24.36
Passage Area 1 x 1 15.97 2.10 33.54
Toilet 2 1 x 2 9.98 2.10 41.92
Toilet 3 1 x 1 8.30 2.10 17.43
SSE & EL Storage
Toilet 1 1 x 1 4.48 2.10 9.41
Toilet 2 1 x 2 4.60 2.10 19.32
Toilet 3 1 x 1 4.48 2.10 9.41
Toilet 4 1 x 1 4.66 2.10 9.79
Toilet 5 1 x 2 4.78 2.10 20.08
Passage Area 1 x 1 20.82 2.10 43.72
TTE Dorm 1
Toilet 1 1 x 1 4.48 2.10 9.41
Toilet 2 1 x 2 4.60 2.10 19.32
Toilet 3 1 x 1 4.48 2.10 9.41
Toilet 4 1 x 1 4.66 2.10 9.79
Toilet 5 1 x 2 4.78 2.10 20.08
Passage Area 1 x 1 22.18 2.10 46.58
Ladies TTE Dorm
Toilet 1 1 x 2 5.88 2.10 24.70
Toilet 2 1 x 3 5.76 2.10 36.29
Toilet 3 1 x 1 5.00 2.10 10.50
Toilet 4 1 x 1 5.22 2.10 10.96
Passage Area 1 1 x 1 10.53 2.10 22.11
Passage Area 2 1 x 1 13.67 2.10 28.71
Deductions
Door D5 -1 x 25 13.67 2.10 -717.68
Door D3 -1 x 2 1.20 2.10 -5.04
Door D2 -1 x 5 0.70 2.10 -7.35
Counter Slabs
Parcel Office 1 x 1 5.57 0.60 3.34
Staircase Granite
Tread 1 x 22 1.50 0.30 9.90
Riser 1 x 22 1.50 0.15 4.95
Landing 1 1 x 1 1.87 3.32 6.21
5 Demolishing mud phaska in terracing and disposal of material within 50 metres lead.
Weathering
Ground Floor
Open Terrace Area 1 1 x 1 6.20 3.59 0.08 1.67
Open Terrace Area 2 1 x 1 3.59 1.40 0.08 0.38
Open Terrace Area 3 1 x 1 115.68 1.32 0.08 11.45
Open Terrace Area 4 1 x 1 41.30 14.44 0.08 44.73
First Floor
Roof Area Inner 1 x 1 115.12 12.85 0.08 110.97
Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts,
6
cutting rivets ,welding etc.including dismembering and stacking within 50 metres lead
Grills Kg/Sqm
Ground Floor
Window W1 1 x 4 1.20 1.50 15.00 108.00
Window W2 1 x 51 1.70 1.50 15.00 1950.75
Window W3 1 x 21 0.90 1.50 15.00 425.25
Window W4 1 x 6 2.30 1.50 15.00 310.50
Window W5 1 x 4 1.80 1.50 15.00 162.00
ALW 1 1 x 2 1.70 1.50 15.00 76.50
ALW 2 1 x 1 2.30 1.50 15.00 51.75
Ventilator V 1 x 8 0.60 0.60 10.00 28.80
First Floor
Window W2 1 x 16 1.70 1.50 15.00 612.00
Window W6 1 x 30 1.50 1.50 15.00 1012.50
Ventilator V 1 x 3 0.60 0.60 10.00 10.80
Ventilator V 2 1 x 17 0.90 0.60 10.00 91.80
Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts
7
etc. complete and stacking within 50 metres lead of area beyond 3 sq.metres
Ground Floor
Door DD1 1 x 1 7 7.00
Door DD3 1 x 1 1 1.00
Door D1 1 x 1 9 9.00
Door D2 1 x 1 32 32.00
Door D3 1 x 1 4 4.00
Door D4 1 x 1 3 3.00
Door D5 1 x 1 22 22.00
S.T.G1 1 x 1 2 2.00
S.T.G2 1 x 1 2 2.00
C.L.G 1 x 1 2 2.00
Rolling Shutter RS 1 x 1 6 6.00
Window W1 1 x 1 4 4.00
Window W2 1 x 1 51 51.00
Window W3 1 x 1 21 21.00
Window W4 1 x 1 6 6.00
Window W5 1 x 1 4 4.00
ALW 1 1 x 1 2 2.00
ALW 2 1 x 1 1 1.00
Ventilator V 1 x 1 8 8.00
SD 1 x 1 1 1.00
First Floor
ST.G.1 1 x 1 1 1.00
ST.G.2 1 x 1 2 2.00
A.L.G 1 x 1 2 2.00
A.L.G 1 1 x 1 1 1.00
Door D2 1 x 1 16 16.00
Door D3 1 x 1 12 12.00
Door D5 1 x 1 26 26.00
Window W2 1 x 1 16 16.00
Window W6 1 x 1 30 30.00
Ventilator V 1 x 1 3 3.00
Ventilator V2 1 x 1 17 17.00
Dismantling aluminium/ Gypsum partitions, doors, windows, fixed glazing and false ceiling including disposal of
8
unserviceable material and stacking of serviceable material with in 50 meters lead as directed by Engineer-in-charge.
First Floor
Police Station
Wall 1 1 x 1 3.67 2.10 7.71
Wall 2 1 x 1 2.90 2.10 6.09
Wall 3 1 x 2 1.34 2.10 5.63
Wall 4 1 x 1 4.47 2.10 9.39
Wall 5 1 x 1 5.60 2.10 11.76
Wall 6 1 x 4 3.10 2.10 26.04
Wall 7 1 x 1 9.00 2.10 18.90
Wall 8 1 x 1 23.57 2.10 49.50
Wall 9 1 x 2 17.56 2.10 73.75
Wall 10 1 x 1 21.10 2.10 44.31
Wall 11 1 x 19 2.80 2.10 111.72
False Ceiling Area
AC Waiting Hall
Room 1 1 x 1 9.97 12.88 128.41
Room 2 1 x 1 3.50 6.29 22.02
Room 3 1 x 1 3.50 6.37 22.30
Upper Class Waiting Hall
Room 1 1 x 1 5.35 6.28 33.60
Room 2 1 x 1 5.35 6.37 34.08
Baby Feeding Room
Room 1 1 x 1 10.21 12.88 131.50
Toilet Area 1 x 1 3.32 6.20 20.58
Stair Area 1 x 1 3.32 6.37 21.15
Bomb Squad
Room 1 1 x 1 5.72 6.28 35.92
Room 2 1 x 1 3.90 6.44 25.12
Passage Area 1 x 1 1.72 6.36 10.94
Dismantling cement asbestos or other hard board ceiling or partition walls including stacking of serviceable materials
9
and disposal of unserviceable materials within 50 metres lead.
First Floor
Headroom Near Parcel Office 1 x 1 7.08 3.90 27.61
Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking the material within 50 metres lead of -
10
G.S.sheet
Ground Floor
Parcel Office Front Side Shed Area 1 x 1 29.51 9.56 282.12
Front Side Polycarbonate Sheet Area
Top Area 1 x 1 36.93 1.45 53.55
Side Area 1 x 1 36.93 0.60 22.16
Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts,
11
cutting rivets ,welding etc.including dismembering and stacking within 50 metres lead
KG/Meter
Parcel Office Front Side Shed
Roof Purlin (C Section) - 202C15 1 x 8 29.51 4.10 967.93
Inner Member
Top Chord (L 75x75x6) 6 x 1 9.56 6.80 390.05
Bottom Chord (L 75x75x6) 6 x 1 9.57 6.80 390.46
Intermediate Vertical (L 75x75x6) 6 x 1 1.57 6.80 64.06
Intermediate Cross (L 75x75x6) 6 x 1 7.43 6.80 303.14
Intermediate Cross (L 75x75x6) 6 x 1 7.43 6.80 303.14
Connecting Plate 6 x 6 0.0013 7850.00 353.25
Vertical Member
Steel Column 1 1 x 12 3.42 43.20 1772.93
Connecting Plate Top 2 x 12 0.0030 7850.00 565.20
Connecting Plate Bottom 1 x 12 0.0030 7850.00 282.60
Inner Member
Top Chord (L 40x40x5) 71 x 1 3.00 3.00 639.00
Bottom Chord (L 40x40x5) 71 x 1 1.80 3.00 383.40
Vertical Member
Steel Column I Section 71 x 1 0.60 25.20 1073.52
Purlin (RHS Section) 71 x 6 148.00 0.39 24746.34
Ground Floor
Light Point - Tube Light 1 x 123 123.00 nos
Light Point - CFL 1 x 7 7.00 nos
Light Point - Ceiling 1 x 16 16.00 nos
Fan Point (Ceiling) 1 x 73 73.00 nos
Fan Point (Wall) 1 x 3 3.00 nos
AC Point 1 x 13 12.00 nos
First Floor
Light Point - Tube Light 1 x 24 24.00 nos
Light Point -CFL 1 x 48 48.00 nos
Fan Point (Ceiling) 1 x 48 48.00 nos