0% found this document useful (0 votes)
17 views1 page

Transmittal - 110310-C 1 3-1136

Uploaded by

ferdinand batara
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
17 views1 page

Transmittal - 110310-C 1 3-1136

Uploaded by

ferdinand batara
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

DT Ref No.: 110310-C.1.

3-1136
REQUEST FOR APPROVAL Date : 09-Dec-24
OF GENERAL DOCUMENT Previous DT Ref. No.
(DOCUMENT TRANSMITTAL) Date
Project: Bahrain Marina Development Project - Construction of Phase 1 Main Works

To: MSCEB Attn: Mr. S. Xavier Rex – Resident Engineer

We request approval of our following Document(s) for implementation in the above-mentioned works. We confirm that
these documents have been verified by us and are in line with the Contract. We also confirm that we have got no extra time
and/or extra cost claims, whatsoever, for implementing the details indicated in the Document. In case of any reservation on
your comments, we shall revert back to you within seven days from the receipt of commented/approved document.

Sl. No Document Ref. No. Rev Doc. Dated Subject

1 110310-C.1.3.12-PT-076 0 09-Dec-24 Tendon Stressing Report – F3- Level Roof

For the Contractor:

Name: Edward Ryan Designation: Project Director Signed:


Comments by MSCEB
1.) No objection on the Tendon Stressing Report – Tendon Stressing Report –F3- Level Roof in reference from the letter
SF/PRE-1172/23/BMD/LS/097.
2.) Contractor to ensure to back prop the PT slab upon de-shuttering until full concrete compressive strength of the PT slab has not
been achieved at site.
3.) The design and construction of the PT slabs / PT beams shall be the responsibility of NASS / SFMGC as per Project specification
and IFC requirement.
Code B

Status:
A) Approved B) Approved subject to comments C) Revise & Resubmit,Works shall proceed

D) Revise & Resubmit,Works shall NOT proceed E) Not Approved

Signed:
For MSCEB Date:

Note: The above approval does not relieve the Contractor from his responsibilities to carry out the works in accordance with
specification and IFC drawings.

REF.NO. CA/DT/20/009

You might also like