0% found this document useful (0 votes)
44 views1 page

STNECLAIRE

The document is a detailed bill of materials and labor costs for a full house wiring project by COMUTECH POWER TECHNOLOGIES. It lists various electrical components, their quantities, and associated costs, totaling $400, which includes $300 for materials and $100 for labor. The document provides a breakdown of each item required for the installation, along with their respective amounts and stages of the project.

Uploaded by

mcommodious
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
44 views1 page

STNECLAIRE

The document is a detailed bill of materials and labor costs for a full house wiring project by COMUTECH POWER TECHNOLOGIES. It lists various electrical components, their quantities, and associated costs, totaling $400, which includes $300 for materials and $100 for labor. The document provides a breakdown of each item required for the installation, along with their respective amounts and stages of the project.

Uploaded by

mcommodious
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

COMUTECH P WER TECHNOLOGIES call&app0777 098 282 / 0713 000 447

FULL HOUSE WIRING - ITEM N# / Amt MUDA hardware 1st Stage 2nd Stage TOTAL

Swan (Goose) Neck 1 15 15 36 51


Angle Iron ( 2 Bolts With Washers ) 1 10 10 10
D – Iron 1 5 5 5
Earth Electrode/ Earth Spike ( 1.2m ) 1 6 6 6
20mm BE Steel Conduit { Couplers & Nipples ) 2.5m(1) 5( 2 ) 7 7
PVC Conduits - 25mm ( Corners ) 2( 2 ) 3(1) 3 3
*+
- 20mm ( Strictly Splash type) 50 1.00 50 50
Perforated Copper Bonding Straps(With Nuts& Bolts) 1m 2 2 2
Verandah Bolts ( 30mm ) 10 1 1
Meter Board – 4 Rawl Bolts,75mm Studs Full Thread 1 20 20 20
-10mm Thick Asbestos Cement Tap Board
Angle Iron Mounting Bolts ( With Washers ) 2 2 4 4
16mm2 Cables : Red m 3
Black m 3
Copper Earth Conductor - 16 Mm2 3m 3 9
10 Mm2 m 2
Distribution Board 10 way (solar DB) 2 13(25) 38 38
Breakers - 60 A x1; 30 A x ; 20 A x4 ; 5 A x2 8 4
Cooker Unit - Cooker Controller 1 15
Sprug Connectors 2 1.50
Sprug Tube 1m 2
Doom Cover 1 2
2
6mm Cables : Red 1.30
Black 1.30
Earth 1.30
 Double Socket Outlets : Square Pin (Covers) () 5(1.5)
1.5 Mm2 Cables : * + Red 200m 0.33/m
Black 100m 0.33/m
2 -
2.5 Mm Cables : * Red 100m 0.45
Black 100m 0.45
Earth 100m 0.45
Square Boxes - Single & Flush Type 20 0.50 10 10
- Double & Flush Type 20 0.95 19 19
Light Switches - 2G2W x4 , 3G2W x3 , 1G2W 6 3.00
x7 , intermediate switch x 7
Lamp Holders –Pvc 10 1 10 10
Round Boxes (Round Box Covers ) 30(20) 0.35(0.20) 10.50 10.50
Wood Screws 200 0.04 8 8
Couplings 25mm & (Nipples 25mm) 8(8) 0.25 4 4
Couplings 20mm & (Nipples 20mm) 100(100) 0.08(0.08) 16 16
Wall Glass Lamp Cover ( With Holder ) 4 3.5
 Sphere PVC( With Holder )[Outside lights] 7 5
PVC Solvent Cement & Saddles 1( ) 3 (0.10) 3 3
Cable lugs 16mm2 x4 ; 6mm2 x ; 2.5 mm2 x3 7 3 3
Concrete Disks 9” (Chasing Combs) 1 (4) 10(0.50) 12 3
Concrete Nails 1 kg 5 5 2
Carpenters’ Branderings
Wire Nails 4” kg 2.50
TOTALs $ $
$ 240
Labor $160 $140 $ 300
Overall Totals $ 400