Health, Safety & Environment Manual
Health, Safety & Environment Manual
Page 1 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/[ISE/01
RevisionNo.: 003
ISO 9001 : 2015 COMPANY
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
Page 2 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING
HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
Sl. TITLE
PAGE NO
No
GENERAL
ACKNOWLEDGEMENT 05
1
2 FOREWORD 06
3 ABOUT THE MANUAL 07
4 IMPLEMENTATION OF HSEMS 08
5 COMPLIANCE MATRIX 09
6 CONTROL OF MANUAL 10
7 ABBREVIATIONS 10
8 REFERENCES 11
HSEMS REQUIREMENTS
10 GENERAL REQUIREMENTS 16
POLICY
11 HSE POLICY 17
Page 3 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING
HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
PLANNING
CHECKING
25 PERFORMANCE MEASUREMENT AND MONITORING 53
26 EVALUATION OF COMPLIANCE 54
INCIDENT INVESTIGATION, NONCONFORMITY, CORRECTIVE AND
27 55
PREVENTIVE ACTION
28 HSE INTERNAL AUDIT 59
MANAGEMENT REVIEW
29 MANAGEMENT REVIEW 60
Page 4 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
ISO 9001 : 2015 CoMPANY
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
1. ACKNOWLEDGEMENT
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING firmly believes that
Occupational Health, Safety and Environment at work is the responsibility of every
employee and promotion of HSE culture is an integral part and responsibility of all
managerial functions. HSE is not viewed as a separate entity. It is fully integrated with all
execution activities and implementation of the required HSE measures is vested in the
OPCTAT|ONAI UNitS Of thE HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING
-&:[
HSE Team
HJA GROUP
Page 5 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/IISE/o1
RevisionNo.: 003
lSO900l :2015COMPANY
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
2. FOREWORD
HJA GROUP recognizes people as its most important asset and is committed to provide
safe and healthy work environment for all employees and contractors.
Management at all levels will be responsible and will be held accountable for Occupational
Health, Safety & Environment performance. At the same time, it is the duty of every
employee to work in the safe manner so as not to endanger himself and his colleagues at
the work place with no harm to the environment and optimal utilisation of resources.
To have better understanding of responsibilities and setting standards for individual
employee as well as contract workmen, "Health, Safety & Environment Management
Systems" has been developed as per the requirements of ISO 45001:2018 & ISO 14001:
2015 to cover all facets for safe & environmental friendly working.
Date:09.10.2023
q
CEO HJ AL AJMI GROUP
Page 6 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING
HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
This document defines the policies and procedures for effective implementation of an
Occupational Health, Safety & Environmental Management system for various processes
and activities carried out at this facility.
The purpose of this manual is to provide an overview of the processes and practices that
have been implemented by HAMAD JAMAN AL AJMI to ensure that all activities, products
and services satisfy the requirements and specifications of customers whilst maintaining
the highest standards of safety and environmental management.
The aim of the manual is to assist in understanding of the HAMAD JAMAN AL AJMI Health,
Safety and Environment Management Systems (HSEMS) by outlining the various parts of
HAMAD JAMAN AL AJMI ‘s management systems and providing direction to relevant
documentation.
This HSEMS Manual is developed in line with the requirements of ISO 45001:2018 & ISO
14001:2015 Standards and Integrated Management System Manual. Approval,
amendment and issue of this document shall comply with the requirements of the
procedure for Control of HSE Documents & Records.
The electronic copy holders of this document have a right to read but not to change the
document. Only the HSE Management Representative (MR) has the right to change /
modify the electronic data. All others can have access to read only copy available in IT
common drive.
Page 7 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING
HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
4. IMPLEMENTATION OF HSEMS
HSEMS MODEL
HSEMS MODEL
CONTINUAL
IMPROVEMENT
4.6
MANAGEMENT
REVIEW
4.2
HSE POLICY
4.5
CHECKING & 4.3
CORRECTIVE ACTION PLANNING
4.4
IMPLEMENTATION
OPERATION
3. Implementation and Operation – This part of the management system defines the
people, systems, strategies, resources and structures necessary to meet HSE goals.
5. Management Review – This element requires that periodically, top management will
review the HSEMS to ensure it is operating as planned and is suitable, adequate and
effective.
Page 8 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING
HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
5. COMPLIANCE MATRIX
Page 9 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING
HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
6. CONTROL OF MANUAL
2. This manual is property of HJA. No part of this document may be reproduced in any
form, in an electronic retrieval system or otherwise, without the prior written
permission of issuing and controlling authority.
7. ABBREVIATIONS
2. AP Air Pollution
Page 10 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING
HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
20. P Probability
8. REFERENCES
Page 11 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING
HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
Page 12 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING
HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
Page 13 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING
HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
Page 14 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING
HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
D: Detection
C: Control
33 Evaluation of OHS / L: Likelihood
Risks E: Exposure
C: Consequence
34 Employee An employee includes HJA employee, Contractor employee
35 Staff A staff is a person who is hired directly by HJA or by through
agency (Including Contractor) to perform a job in return for
financial or other compensation paid and is of supervisor
level or of above cadre.
36 Workmen A workman is a person employed directly by HJA or by
through agency (Including Contractor) in the premises to do
any kind of Manual, Un-skilled, Skilled Work in return for
financial or other compensation paid
Page 15 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING
HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
HJA, has established, documented, implemented, maintained & continually improving the
Environment, Health and Safety Management Systems.
The HSE Systems is based on PDCA cycle which is universally accepted method for the
management of HSE systems. The outline of PDCA applied to HSE is given below.
Page 16 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
ISO 9001 : 2015 COMPANY
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
We HJA are engaged in the, Engineering, Construction, Manufacturing and project Management for
core industries.
o Establish, Implement, Maintain, Review and continually improve our Health, Safety and
Environment (HSE) management systems in particular, with an objective to adopt best operational
management;
o Ensure that requirements are integrated in all management processes including Product realization
' Comply with all applicable legal, corporate and other requirements as subscribed/ related to our
activities;
o Strengthen HSE awareness, Training and Competency of all employees (including contractors)
while seeking their activate co-operation;
o Conserve natural resources, minimize waste generation and environmental emissions;
o Empowering our employee including contract employees, to immediately stop the work, in case of
unsafe act or condition prevailing that may cause imminent danger to life, health and environment;
We shall communicate this policy to all persons working for or on behalf of the organization and make
it available to all stake holders.
MUHAMMED JAMAN
CHIEF EXECUTIVE
Page 17 of 'l 06
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/IISE/O1
Revision No.: 003
ISO 9001 : 2015 COMPANY
THIRD INDUSTRIAL CIry, DAMMAM Date: 09.10.2023
Aim:
To clearly state the company's position on alcohol and drugs within the workplace.
Objectives:
1. To ensure the company complies with appropriate legislation.
z. To minimize the risks associated with alcohol and drugs in the workplace.
3. To have clear rules regarding alcohol and drugs in the workplace.
4. To provide employees with an education program on the adverse health effects of
alcohol and drugs.
5. To encourage the early identification of employees who may be experiencing alcohol
or drug problems.
6' To provide support for recover employees who struggling alcohol and drug problems.
7. To provide training and support to line managers to ensure they are equipped to support
employees who struggling alcoholic problems.
NB: HJA clearly states that this policy will apply equally
to all staff regardless of grade, experience
or role within the company. lf anybody noticed intoxicated or found any illegat drugs or alcohol
within the HJA premises, they willface the SaudiArabian Iegal procedures.
"i$&f;?._rfi
,/-.-l
MUHAMMED JAMAN
CHIEF EXECUTIVE
Page 18 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING
HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
HJA and its subsidiaries are committed to maintaining safe work practices and
environmental safeguards within the organization. These practices allow us to
achieve better quality of products and services that our clients expect from us and
achieve the good business practices that we have built around our company and
provide a safe and responsible work environment.
This commitment to the HSE-MS originates from the entire top management within
our organization. The HSE-MS outlines the safe work practices that we execute in
our daily operations to enhance our worldwide reputation as a responsible and safe
company that provides a superior product every time.
Page 19 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING
HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
PLANNING
Implementation of risk assessment methodologies can reduce HSE risks and help mitigate
adverse consequences by providing important information for planning and decision-
making.
• Risk / Impact assessments are conducted as appropriate for operations, projects and
services in order to identify and address potential hazards to people, facilities and the
environment.
• Risk / Impact assessments are updated as significant changes occur to processes.
• Risk/ Impact assessments are performed by competent personnel and the results of
risk assessments are addressed by appropriate management personnel.
• Concerned Department Manager shall ensure the aspects risks that have or can have
significant impacts are considered in setting its objectives and targets.
• HJA shall review and update its analysis as and when required.
• Up to date site layout diagram / process flow sheets for identification of activities
• All activities where previous records of Incidents, Accidents occurred.
• Inputs from regular Plant & Management Review meetings/ HSE inspections/
records. Records of past HSE audits.
• All routine activities (those activities which are scheduled & carried out frequently)
• All non-routine activities (those activities which are not done in scheduled time or
done occasionally)
• Examination of all existing HSE procedures and practices.
Page 20 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING
HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
• Activities of all personal having access to work place (including sub-contractors &
visitors).
• Facilities at the workshops and sites, whether provided by the organization or
others.
• Material Safety Data Sheets [MSDS] to identify the possible associated OHS
Hazards and Environmental impacts.
• Records of correspondence with legal & regulatory bodies.
• Emissions to Air, Release to Water, Energy Emitted
• Use of Raw material & Natural resources
• Waste & by-products
• Consultation with a cross section of employees, contractors.
12.1 Asses the Risk
• Risk is the combination of the likelihood of an occurrence of a hazardous event or
exposure and the severity of injury or ill health that can be caused by the event or
exposure.
• Risk assessment is a process of evaluating the risk arising from a hazard, taking into
account the adequacy of any existing controls, and deciding whether the risk is
acceptable.
• An acceptable risk is a risk that has been reduced to a level ALARP.
• Assess the impact & probability of occurrence and determine risk level for each
identified hazard / impact taking into account of existing control measures.
• The assessment matrix and processes are as follows
12.2 Assessment Matrix and Risk Rating
Risks are rated into three risk categories as defined below:
High Risk : This level of risk exposes to intolerable losses to People, Assets or
Reputation. The hazard should be eliminated or its risk reduced to tolerable levels
immediately.
Medium Risk : The hazard(s) must be managed to reduce the frequency and /or the
severity of the hazardous events to ALARP.
Low Risk : Corrections may be applied as resources allow.
Page 21 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
Probability
A B C D E
People People Reputatio
Severity Assets Environment
(Injury) (Illness) n Most Unlik Most Inevita
Likely
unlikely ely Likely ble
Single or Single or
Extensive Massive Internatio
5 multiple
Fatality
Multiple
Fatality
damage impact nal impact HIGH RISK
Serious
Injury Serious illness
Major Major National
4 requiring requiring
damage impact impact
hospitalisat hospitalisation
ion
Injury
requiring
Medical Minor Minor Minor
2
Treatment
Minor Illness
damage impact impact
MEDIUM
but not Lost
Time
First Aid
Slight Slight Slight
1 treatment
only
Slight Illness
damage impact impact LOW RISK
Severity of hazard (Impact)
People (Injury)
VALUE DESCRIPTION
5 Single or multiple Fatality
Page 22 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
People (Illness)
VALUE DESCRIPTION
5 Single or Multiple Fatalities targeting large exposed populations.
Agents with potential to cause multiple fatalities [E.g. substances with acute toxic
effects such as human carcinogens]
4 Serious illness requiring hospitalization
Agents capable of irreversible damage with serious disability or death [E.g. corrosives,
asphyxiates, or carcinogens]
3 Major Illness
Agents capable of irreversible damage without serious disability [E.g. noise, vibration,
or poorly engineered manual handling tasks].
2 Minor Illness
Agents with limited reversible health effects [E.g. irritants; or mild forms of food
poisoning caused by bacteria]
1 Slight Illness
Assets
VALUE DESCRIPTION
5 Extensive Damage – Cost in excess of US$10 Million
Environment
VALUE DESCRIPTION
5 Massive effect
A. Persistent severe environmental damage or severe nuisance extending
over a large area.
B. High terms of commercial or recreational use or nature conservation,
C. A major economic loss for the company.
D. Constantly & or highly exceeding statutory or prescribed limits
4 Major effect
1. Severe environmental damage.
2. The company is required to take extensive measures to restore polluted or
Page 23 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
Reputation
VALUE DESCRIPTION
5 International impact — International public attention. Extensive adverse
attention in international media. National/international policies with
potentially severe impact on access to new areas, grants of licenses and/or
tax legislation.
4 National impact - National public concern. Extensive adverse attention in the
national media. Regional/national policies with potentially restrictive
measures and/or impact on grant of licenses. Mobilization of action group.
3 Considerable impact - Regional public concern. Extensive adverse attention
in local media. Slight national media and/or local/regional political attention.
Adverse stance of local government and/or action groups.
2 Limited impact - Some local public concern. Some local media and/or
political attention with potentially adverse aspects for company operations.
1 Slight impact — Public awareness may exist, but there is no public
concern
Page 24 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
Page 25 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
REFERENCE
ISO 45001:2018 Clause 6.1.2 Hazard identification and assessment of risks and
1
opportunities
Page 26 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
• Legal and other requirement shall be reviewed and updated once in One year or as
and when any changes occur. The change notice of Legal and other requirement shall
be issued to the relevant personnel or department.
Page 27 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
REFERENCE
Sr.
Description
No.
1 and ISO 45001:2018 clause 6.1.3 - Determination of legal requirements and other
requirements
3 HSE Policy
HSE Objectives and targets are quantified where practicable to instil a sense of HSEMS
awareness and responsibility amongst employees in order to protect the environment and
avoid accidents.
• They are used to assess the achievements and evaluate the effectiveness of the HSEMS.
• The means and time-frame by which the objectives are to be achieved shall be identified.
• HJA shall establish, implement and maintain a programme(s) for achieving its objectives.
• The programme(s) shall be reviewed at regular intervals, and adjusted as necessary, to
ensure that the objectives are achieved.
Page 28 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
In addition to the HSE Objectives & Targets set by the Organization, Project specific HSE
Objectives & Targets shall be adhered.
Director-Operations
() Cooperate HSE Manager
(HJA GROUP)
HSE –Advisor
()
Page 29 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
Our HSEMS requires that the relevant management and accountability structure be defined. Top
management is expected to ensure that resources are available so that HSE can be implemented,
maintained, and improved.
• Management shall be responsible and have authority for undertaking the necessary
activities, providing the necessary resources and establishing policy to ensure a
structured HSE Management Systems is implemented and maintained.
• All levels of management are commensurately empowered (authorized) to discharge
their duties (responsibilities) to meet the HSEMS requirements.
• HJA has well defined roles, responsibilities, accountabilities and authorities for various
important roles defined in the organisation chart as described below.
The roles, responsibilities, authorities and accountabilities are summarised in the
following table.
Page 30 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
Page 31 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
Page 32 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
Page 33 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
Page 34 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
The purpose of this section is to establish and implement the methods and management
practices for effective training, awareness and competency of all the Personnel.
18.1 Competence
Page 35 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
Page 36 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
18.2 Training
18.3 Awareness
Page 37 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
Page 38 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
Page 39 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
19. DOCUMENTATION
Documentations are provided such that adequate information is available to ensure the
effective planning, operation and control of processes related to the Occupational Hazards,
Significant aspects, risks and to demonstrate conformance to HSEMS.
• Obsolete documents shall be promptly removed from use and any obsolete documents
that are required to be retained for legal and/or knowledge purposes shall be identified
and properly archived.
Page 40 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
Page 41 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
21.6 Retention
Page 42 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
21.7 Disposal
• The records are disposed off in the specified retention time.
• The method used for disposal is shredding or tearing unless specified
by management.
References
• Operations with potentially higher risks / significant impacts shall be managed with
special procedures.
Page 43 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
23.1 Responsibility
231.1 Director Operation’s:
• The Director Operation’s has the overall responsibility for ensuring the Health and
Safety of all employees and to protect the environment.
• He shall ensure that this procedure is implemented and that all resources are
available to ensure the complete implementation of this procedure.
Page 44 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
Page 45 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
23.1.8 Employees:
• All employees shall have thorough knowledge of the prevailing emergency
response procedure including location of assembly point.
• All employees shall proceed to assembly point without creating any panic.
• Follow the instructions of the Incident Controller / Incident Commander and
render help as and when required by him.
• Disperse after the Incident Controller / Incident Commander declares the
termination of emergency.
Page 46 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
23.2.3. Fire:
The following control measures are in place to prevent Fire:
Page 47 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
- Fire Extinguishers of various types (Foam, CO2, and Dry Powder) and
Sand Buckets are placed at appropriate locations within the yard and
offices.
- In addition to this, Fire hose reels are installed with pressurized water.
- All the gas cutting sets are covered with fire blankets.
- HJA employees and workmen are trained in Basic Fire Fighting.
- Regular Housekeeping audits HSE Inspection and yard inspection are
carried out.
- Gas cylinder storage facility is constructed in such a way that it is far
from fabrication activity and being manned by in house security
guards.
HJA is located in an area where the neighbor hood does not pose any threat in
terms of gas leakage. However the following control measures are in place to detect and
prevent gas leakage and spillage of chemicals:
- All the cylinders have protection cap to prevent valve damage in case
of an incident.
Page 48 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
The person first noticing the leak or spill shall immediately alert the concerned
for the following actions:
• Shut off the valve / arrest the leak by appropriate means.
• Provide warning signs and barriers at strategic points to prevent entry into
the area by persons.
• Where required, take adequate precautions by using proper PPE (Refer
MSDS).
• Ensure “No smoking” to prevent any fire.
• Provide first aid to any personnel affected and evacuate for further assistance.
• Evacuate the area and reach to a designated “assembly point”.
• Follow the protocol of Emergency Flow Chart
• Ensure spilled materials are collected in appropriate containers and disposed
to authorized vendors.
Page 49 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
Refer::HSE PRDS11
Page 50 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
Page 51 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
References
CHECKING
Measurement is a key step in any management process and forms the basis of continual
improvement. If measurement is not carried out correctly, the effectiveness of the HSE
management systems is undermined and there is no reliable information to inform
managers how well the Health, Safety and Environmental Risks are controlled.
Page 52 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
References
Evaluation of compliance is one of the most important and proficient instrument in HSE
activities.
• HJA shall periodically evaluate the compliance with applicable HSE Legal and
other requirements through internal audits, Management Review Meetings and
review of Register Of Regulations (ROR).
• The results of the Periodic Evaluations shall be maintained
• Compliance against legal and other requirements shall be reviewed once in 6
months by HSE Department.
Page 53 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
3 HSE Policy
Page 54 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
Non conformances or potential Non Conformances which may require the organization the
establishment of corrective and / or preventive actions may be identified through the
following means:
• Actual and near miss incidents
• Management Review findings
• Results of internal and external audits
• Customer feedback and suggestions
• Emergency response exercise
Note: The above list is not exhaustive.
Page 55 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
Page 56 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
• The investigation team shall visit the site immediately to collect and
preserve initial information prior to the site being disturbed.
• The investigation team shall ensure that all the required photographs,
statements of those involved are recorded in the initial visit, whenever
possible.
• The investigation team shall gather adequate information with an open
mind to understand the events and conditions surrounding the incident.
• Corrective and preventive action shall aim at measures of both immediate
and long term nature, to eliminate immediate and underlying causes.
• Line manager concerned shall evaluate the corrective and preventive action
for any change that it may necessitate to the existing Hazard Identification
and Risk Assessment Register.
• HSE Department shall communicate the incidents occurring within company
with its learning points in monthly HSE Committee meeting.
• HSE Department will issue a HSE Alert for certain incidents that need
specific attention with significant learning potential.
• Prompt investigation is a good demonstration of Management commitment
for HSE.
References
1 ISO 14001: 2015 Clause 10.2 Non conformity Corrective and Preventive Action
Page 57 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
Assessment of the degree to which regulatory and system requirements are met is
essential to the minimization of risk, improvement of HSE performance and maintenance of
accountability.
• Practices and operations shall be audited to assess conformance with system, legal and
other Requirements.
• The frequency and scope of audits depends on various factors such as:
The complexity of the operation
The level of risk
Significant changes in process since the previous assessment
Significant changes in management since the previous assessment
HSE performance history
As a minimum 1 Internal Audits shall be carried out in a year.
• The audit criteria, scope, frequency, methods and competencies, as well as the
responsibilities and requirements for conducting audits and reporting results shall be
defined
• The selection of auditors and conduct of audits shall ensure objectivity and impartiality
of the audit process. Auditors shall not audit their own works
References
Page 58 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
• Management reviews are critical to continual improvement and ensure that the HSEMS
will continue to meet the needs over time.
• The scope of the review shall be comprehensive, though not all elements of HSE need
to be reviewed at once.
• The input to management review shall include but not limited to:
• The output of review shall include any decisions and actions related to possible
changes to HSE policy, objectives, targets and other elements of the HSEMS,
consistent with commitment to continual improvement.
Page 59 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
Page 60 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
Page 61 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
Page 62 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
Page 63 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
equipments
- Upcoming work.
accidents.
- Importance of housekeeping.
- Material Handling
Page 64 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
Safety meeting.
Page 65 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
Page 66 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
Page 67 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
Page 68 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
Page 69 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
open.
shelves.
• Person when carrying any load shall always carry within their
Page 70 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
cause tripping.
Page 71 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
• All electrical hand tools and extension cords will be fitted with
electrical switchboards.
bulb.
girder.
Page 72 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
• Power hand tools will be equipped with only the main on/off
• All skids for panels for instruments lights etc. will be properly
circuit.
• Vapour proof globes and guards will kept in place over lights
in required areas.
Page 73 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
times.
Page 74 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
persons.
to pull the victim away from the live conductor by using a dry
conductor.
conductive material.
Page 75 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
person’s body.
Evacuate immediately.
predetermined space
Page 76 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
• Oil and Paint containers will be kept closed when not in use.
• Wiping rags and similar items will be stored in cool, dry area.
• Only products approved for such use will be used for cleaning
purposes.
equipment.
Page 77 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
anchoring point.
specifications.
party.
Page 78 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
updated.
Certificate will be made available for all cranes in use, also for
manufacturer.
Page 79 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
should be considered
- Weight
placed.
Page 80 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
Page 81 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
Page 82 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
Page 83 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
Page 84 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
Page 85 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
Page 86 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
Page 87 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
Page 88 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
Page 89 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
Page 90 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
Page 91 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
Page 92 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
Page 93 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
Page 94 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
Page 95 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
Page 96 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
Page 97 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
Page 98 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
Page 99 of 106
Document No.:
HAMAD JAMAN AL AJMI EST FOR GENERAL CONTRACTING HJA/HSE/01
Revision No.: 003
THIRD INDUSTRIAL CITY, DAMMAM Date: 09.10.2023
Fires Drill
• The Man In-Charge has to conduct a fire drill at least once in a
year on sites, offices, and workshop and maintain a writer
record for inspection.
CLASS A
• Wood
• Cloth
• Paper
• Rubber
• Many Plastics
CLASS B
CLASS C
Flammable Gases
• LPG
• Butane
• Methane
CLASS D
Combustible
• magnesium
• sodium
• potassium
• titanium
D •
•
zirconium
other
flammable
metals
Metal
CLASS K
K Cooking
Recently recognized by
NFPA 10.
*Fires involving
combustible vegetable
or animal non-saturated
cooking fats in
commercial cooking
equipment.
Water Red
Foam Cream