Cost Sheet 2025
Cost Sheet 2025
1. The objective of the cost report is to report the cost value (suggested retail price) of the items selected to build the car. The objective is not to report the cheapest price that an item can be purcha
are using the same Gear Box they both should be reporting the same price, even though they might have purchased them for different prices, since both schools get the same value from the Gear B
2. The cost report should serve as two functions, (1) a bill of materials for the car, and (2) it should help equalize teams that choose to use items of high value with teams that use items of low value.
3. In industry it is very important to look at design and performance, as well as cost. Cost is the key driving force to many design decisions. If shocks are selected that cost Rs 1,00,000 the team sh
points in cost, but it might improve the score in the dynamic events. During design presentations these cost decisions should be discussed.
Common Mistakes
1. Teams did not use the correct template; the only template that is allowed is the template which posted for that year. If you submit an older template you will receive a score of 0.
2. Teams found prices at discount companies that were not suggested retail prices. Remember to use the current retail price of all parts.
3. Teams did not get signatures on the summary cost page. It is required that you print out the summary cost with captain and advisor approval signatures. This must be scanned and placed in the P
4. Reports were not labelled correctly.
5. Make sure everything is filled out. Don't leave anything blank (quantities, descriptions, sub-assembly times, etc.).
Submission of reports
1. All reports MUST be done using that year's template. Only one electronic copy will need to be submitted by each team and this will be for all competitions in which the team is competing. Th
an Excel file (.xls or .xlsx). Do not add pictures, drawings or other things that make this file larger.
2. REFER TO ANNEXURE 1 FOR RAW MATERIAL / PROCESS/ ASSEMBLY/ CURRENCY CONVERSION COSTS
3. REFER TO ANNEXURE 2 FOR OEM COMPONENTS COST OF SUSPENSION / BRAKES / DRIVETRAIN
4. All supporting documents (i.e.: scanned copy of the summary cost sheet with signature, cost overview, cost sheets, pictures, ,receipts, drawings) should be included in the .PDF file. Only .PDF file
5. These files must be titled as specified in the rules. File size of PDF and EXCEL put together should not exceed 10 MB
6. DO NOT SUBMIT REPORTS EMBEDDED WITH MACROS IN THE FILE OR REPORTS WITH A .XLSM EXTENSION. REPORTS SUBMITTED IN THIS FORMAT WILL NOT BE GRADED.
International Teams
All cost numbers are in Indian rupees. Non Indian teams must submit the Bills as received from the vendors, however the cost needs to be converted in Indian rupees as per the conversion rates given in annexure
1. Definition – “Retail List Price” is the full retail price either as quoted by the manufacturer or the retailer for sales of the quantity that is purchased. For example: purchased seats are
identical purchased shocks can be priced as a group of four; small bolts and nuts can be priced singularly or based on the box price; however they were purchased. The Retail List Pr
actually paid for the item and is never less than you actually paid.
2. Retail List Prices should not include sales tax, VAT taxes or packaging and shipping costs from the seller to the team's shop – provided such items are itemized separately and not b
3. Cost Documentation – “Cost Documentation” can be any of the following: (a) Receipts or invoices for the items as purchased, (b) Catalog pages showing the items and price, (c) On
a manufacturer or fabricator, or (e) Price tags provided that original tag identifies the item to which it was affixed.
4. All cost documentation must be dated either as part the document itself.
5. Purchased Items – Use the Retail List Price (Suggested Retail Price)
6. Contributed, Discounted and Sale Items – Use the Retail List Price. Even if you bought the part on sale or at a discount use the Retail List Price - do not use the sale or discount pric
7. Custom Manufactured Items – Use a quotation showing the Retail List Price. Manufacturer’s quotations must be based on the price the company would charge a typical customer - n
your team.
8. Reused, Salvaged Items or items purchased from auction sites – Use the current Retail List Price for the item. If you are reusing a part that is no longer in production, then you mus
for the nearest equivalent item that is currently available. For example: if you are reusing a brake light that’s no longer made, then you may substitute the price for an equivalent item t
9. international Purchased Items – Teams need to submit the Bill as received from vendor, however the cost needs to be converted in Indian rupees as per the conversion rates given i
10. Important Note – Keep in mind that the cost report is based on retail list price and is therefore somewhat artificial. The cost report total price is likely to be considerably higher than
11. OEM Cost library: This year in cost event, Teams are required to use the cost of the OEM components mentioned in the cost library.
List of OEM Components strictly to be used from Cost library:
• Suspension: Shock absorbers, Tires & Rims.
• Brakes: Calipers, Master cylinder.
• eBAJA Drivetrain: Battery HV, Motor, Controller, Throttle Pedal
12. Preferably, use SI standard for dimensions.
13. Make sure to read the cost guide which is included in this file on the next worksheet.
Format
This year's cost report will be a 3 level bill of materials with standardized summaries in the 12 major cost areas. The 3 levels consist of:
1. Level 1(a) is the "Summary Cost" worksheet
2. Level 1(b) Overview (optional)
3. Level 2(a) Form "ALL OEM" worksheet. This sheets come preloaded with a reasonable number of lines which may be adjusted as required and should include only procured parts except Bearing
4. Level 2(b) is the group of 10 "Sub-system Form" worksheets. Note that each of these worksheets may have multiple items.
5. Level 3 Cost documentation and Cost Overview
6. Level 4 Engineering Drawings
Documentation
1. Receipts, catalog pages, or other documentation of cost must be included in the .PDF.
2.To help make the documentation clear and readable, each receipt must have the appropriate final cost circled.
3. Each receipt should also have the section title, 'ALL OEM' Form, and Sub-System Form line number clearly marked.
4. All of these receipts must be included in the .PDF file.
5.Documentation should be in the same order as presented in the report. For example, all the engine documentation first, followed by the transmission documentation, etc.
Sample
There is a sample pair of Form 'ALL OEM' and Form 'Subsystem' at the start of the worksheets. They are identical to the others with the exception that they do not roll up to the final worksheet.
Cost Guid
The cost should reflect the prototype vehicle brought to competition excluding the costs of the required life prese
must be represented in the cost report. The prototype cost of the vehicle will be determined as the sum of the
1. All purchased parts at full retail cost (INR), even if it was actually acquired with a discount or in a foreign count
2. Receipts for all components over Rs. 200 (Indian Rupees) must be included.
(A) The receipts must be numbered and labelled, and included in the .PDF file.
(B) The full retail cost of parts must be used in the Cost Report. Discounted or wholesale prices are not to be
donated or discounted, the full retail cost for the part must still be used (or a part of similar specification).
(C) The supplier/retailer’s phone number must be included with each receipt.
(D) If the actual receipt for a part is not available, a photocopy of a page from a catalo of the part in question w
(E) Receipts that are dated less than three (3) years prior to the Competition, i.e. no older than 3 years, are va
for the previous years purchased parts used in the car. And, support it with previous years original receipt. Use c
(F) For foreign purchased parts, if current year quotations are not available then use the currency conversion
3. All modified purchased parts should use full retail cost, plus the cost of the modifications taken from the Opera
4. Fabricated/Manufactured parts use the cost for the basic material from the Materials Cost Table (refer rule boo
material is not listed in the table then a receipt for the material must be provided. The cost for making the part w
5. Fabricated/Manufactured parts do not include design time, however it should include setup time for your manu
6. Assembly labour is to be cost at Rs. 100 per hour. || Base Labour Cost = Rs 100
(A) Assembly of a component is to be included in the cost of that component.
(B) Assembly of components into a sub-assembly is to be listed as Sub-System Assembly Time (D13 on Fo
that sub-assembly appears.
(C) Assembly of a sub-assembly or assembly onto the vehicle is Vehicle Assembly Labour and should be in
sheet in column F.
7. If the holes are made in a sheet metal up to 6mm thick, rate per drill to be considered for calculation. For the h
8. All driver safety gears are mandatory and teams need to comply the Rulebook strictly. However for the purpo
excluded from calculations. The driver PPE includes helmet, neckbrace, goggles, driver suit, shoes, arm restrain
9. In case Machining is sponsored by any vendor, then Team should seek for estimate of cost from the vendor a
cost & if the estimate is less, then use the cost mentioned in annexure.
10. All the procured components should be included in "ALL OEM" sheet and only data of part to be entered not
respective sub-system form
ITEMS TO BE INCLUDED IN COSTING S
NOTE:
S.No Subsystem
1 E_Powertrain
2 Drive
3 Suspension
3 Suspension
4 Steering
5 Brakes
6 Frame
7 Body
8 Electricals
9 Fasteners
10 Miscellaneous
ITEMS TO BE INCLUDED IN COSTING SHEET 2025
These components need to be include the below mentioned list of items while preparing cost report an
2025 but not limited to it. Team should include all the functional components
Components
HV & Auxillary battery
Fuse
Motor
BMS
Controller
Heat sink
Throttle pedal
FNR/DNR Switch
Contactor
DC-DC Converter
Relay
Speed Mode Switch
CVT
Bushings
Any component that assist in power transmission
Shafts
Hub
Tyres
Gearbox
Powertrain Guards
Bearings
Differential
Rims
Joints
Springs
Dampers
Spacers
Control Arms
Uprights
Bushings
Bearings
Steering Wheels
Column
Steering Gearbox
Tie Rod
Spacers
Bushings
Bearings
Joints
Pedal
Reservoir
Master Cylinder
Brake Hoses
Pressure Switch
Calipers Disc
Connectors
Bearings
Chassis
Weld Brackets
Mounts (All subsystems)
Body Panels
Grommet
Belly Pan
Firewall Seat
Brake Light
Reverse Light
Battery
All Wiring Harness
Kill Switch
Fasteners of All Sub-system
Others
ITEMS NOT TO BE INCLUDED IN COSTING
NOTE:
S.No Subsystem
1 Safety Equipment's
2 Miscellaneous
ITEMS NOT TO BE INCLUDED IN COSTING SHEET 2025
There is no need to include the below mentioned list of items while preparing cost report and docum
Components
Guards
Padding
Transponder
Drake Mount
Fire Extinguisher
Driver Safety Equipment
Safety Harness
Transponder
Paint
Consumables (Brake Oil, Engine Oil, Gearbox Oil)
Sealants
Engine spare
Trim
Annexure 1
Block Codes
Sr No Sub-System Code
1 Engine, Intake & Exhaust PTE
2 Transmission PTT
3 Drive Train RCB
4 Steering SSB
5 Suspension SAS
6 Frame FRC
7 Body BFS
8 Electricals & Safety EEE
9 Brakes BPF
10 Standard Parts (Fasteners, Joints, etc.) STD
11 Miscellaneous MIS
1. The cost of above OEM Items is mandatory to fill. 2. Fill the 'Make' from
If Part Name is not mentioned in annexure 2, it should be drop-down
filled after 100th row.
rm
Model Qty Rs Per Qty Total Cost 6. Rs.Per Qty and Total Cost,
automatically roll in. These val
JIT NC1 & JIT RC1 1 93,000 93000.00
should not be edited
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
6. sub-system assembly time is the time it takes to assemble all the parts in that
assembly together this should include OEM part mentioned 'ALL OEM' sheet
Labour:
Item
Manufacturing Process Amount
1 Welding 9.57
2 Bending 6.00
3 Grinding 0.25
4
5
6
2. Item Name:
Material:
2
Part Name Material Density (Kg/m³)
1
2
Labour:
Item
Manufacturing Process Amount
1
2
3
4
5
6
3. Item Name:
Material:
3 Part Name Material Density (Kg/m³)
1
2
Labour:
Item
Manufacturing Process Amount
1
2
3
4
5
6
tem Form 1. Fill the 'Part
Name' & Qty
ExtendedTotal
Material Cost
Labour Cost
2. Fill the deatils of Hig
Extended Material,Density, Unit, A
Total: 51,360.13
Labour:
Amount Unit Rs/Unit Cost (Rs)
9.57 m 12.00 114.84
6.00 bend 5.00 30.00
0.25 hr 500.00 125.00
0.00
0.00
0.00
Subtotal: 269.84
Material:
Density (Kg/m³) Volume (m³) Weight (Kg) Rs/Unit Cost (Rs)
0.00 0.00
0.00 0.00
Subtotal: 0.00
Labour:
Amount Unit Rs/Unit Cost (Rs)
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal: 0.00
Material:
Density (Kg/m³) Volume (m³) Weight (Kg) Rs/Unit Cost (Rs)
0.00 0.00
0.00 0.00
Subtotal: 0.00
Labour:
Amount Unit Rs/Unit Cost (Rs)
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal: 0.00
1 E-Powertrain E-Powertrain, E-Powertrain Mountings, E-Powertrain Subframe, etc. ₹ 103,337.00 ₹ 1,461.27 ₹ 0.00 60.0 100.0 ₹ 1,461.27 ₹ 100.00 ₹ 103,337.00
2 Drive System Drive Shafts, Axles, Tyres, Rims, Hub, etc. ₹ 56,000.00 ₹ 7,730.64 ₹ 15,917.50 50.0 83.3 ₹ 7,730.64 ₹ 16,000.83 ₹ 56,000.00
3 Steering Steering Wheel, Intermediate Shafts, Gear Box, Tie Rods, etc. ₹ 300.00 ₹ 1,345.10 ₹ 5,466.75 30.0 50.0 ₹ 1,345.10 ₹ 5,516.75 ₹ 300.00
4 Suspension A Arms, Spindles, Shock Absorbers, Springs, etc. ₹ 210,134.10 ₹ 7,192.84 ₹ 8,281.00 30.0 50.0 ₹ 7,192.84 ₹ 8,331.00 ₹ 210,134.10
5 Frame Structural Members, Roll Cage, Mounts, Firewall, Seat, etc. ₹ 0.00 ₹ 25,193.35 ₹ 2,393.81 40.0 66.7 ₹ 25,193.35 ₹ 2,460.48 ₹ 0.00
6 Body Outer Covering, Fenders, Skid Plates, etc. ₹ 0.00 ₹ 1,880.00 ₹ 0.00 20.0 33.3 ₹ 1,880.00 ₹ 33.33 ₹ 0.00
7 Brakes Mech/Hyd. Components, Pedals, Lines, Fittings, Fluid, etc. ₹ 13,463.00 ₹ 214.76 ₹ 256.80 25.0 41.7 ₹ 214.76 ₹ 298.47 ₹ 13,463.00
8 Electrical Equipment Starter, Cables, Wiring, Safety Device, etc. ₹ 0.00 ₹ 1,272.00 ₹ 0.00 30.0 50.0 ₹ 1,272.00 ₹ 50.00 ₹ 0.00
9 Fasteners Nuts, Bolts, Spring Washer, etc. ₹ 2,875.69 ₹ 0.00 0.0 0.0 ₹ 2,875.69 ₹ 0.00 ₹ 0.00
10 Bearings All bearings used throughout all sub-systems ₹ 30,014.03 ₹ 0.00 ₹ 0.00 0.0 0.0 ₹ 0.00 ₹ 0.00 ₹ 30,014.03
11 Miscellaneous Other items. ₹ 640.00 ₹ 20.00 5.0 8.3 ₹ 640.00 ₹ 28.33 ₹ 0.00
Name Name
Item Subsystem Part Name Make Model Qty Rs Per Qty Total Cost
Total: ₹ 383,234.10
E Powertrain Subsystem
Item Part Name Qty Material Cost Labour Cost Extended Material
1 Battery Pack 1 ₹ 1,461.27 ₹ 0.00 ₹ 1,461.27
2 ₹ 0.00 ₹ 0.00 ₹ 0.00
3 ₹ 0.00 ₹ 0.00 ₹ 0.00
4 ₹ 0.00 ₹ 0.00 ₹ 0.00
5 ₹ 0.00 ₹ 0.00 ₹ 0.00
6 ₹ 0.00 ₹ 0.00 ₹ 0.00
7 ₹ 0.00 ₹ 0.00 ₹ 0.00
8 ₹ 0.00 ₹ 0.00 ₹ 0.00
9 ₹ 0.00 ₹ 0.00 ₹ 0.00
10 ₹ 0.00 ₹ 0.00 ₹ 0.00
11 ₹ 0.00 ₹ 0.00 ₹ 0.00
12 ₹ 0.00 ₹ 0.00 ₹ 0.00
13 ₹ 0.00 ₹ 0.00 ₹ 0.00
14 ₹ 0.00 ₹ 0.00 ₹ 0.00
15 ₹ 0.00 ₹ 0.00 ₹ 0.00
16 ₹ 0.00 ₹ 0.00 ₹ 0.00
17 ₹ 0.00 ₹ 0.00 ₹ 0.00
18 ₹ 0.00 ₹ 0.00 ₹ 0.00
19 ₹ 0.00 ₹ 0.00 ₹ 0.00
20 ₹ 0.00 ₹ 0.00 ₹ 0.00
21 ₹ 0.00 ₹ 0.00 ₹ 0.00
22 ₹ 0.00 ₹ 0.00 ₹ 0.00
23 ₹ 0.00 ₹ 0.00 ₹ 0.00
24 ₹ 0.00 ₹ 0.00 ₹ 0.00
25 ₹ 0.00 ₹ 0.00 ₹ 0.00
26 ₹ 0.00 ₹ 0.00 ₹ 0.00
27 ₹ 0.00 ₹ 0.00 ₹ 0.00
28 ₹ 0.00 ₹ 0.00 ₹ 0.00
29 ₹ 0.00 ₹ 0.00 ₹ 0.00
30 ₹ 0.00 ₹ 0.00 ₹ 0.00
31 ₹ 0.00 ₹ 0.00 ₹ 0.00
32 ₹ 0.00 ₹ 0.00 ₹ 0.00
33 ₹ 0.00 ₹ 0.00 ₹ 0.00
34 ₹ 0.00 ₹ 0.00 ₹ 0.00
35 ₹ 0.00 ₹ 0.00 ₹ 0.00
36 ₹ 0.00 ₹ 0.00 ₹ 0.00
37 ₹ 0.00 ₹ 0.00 ₹ 0.00
38 ₹ 0.00 ₹ 0.00 ₹ 0.00
39 ₹ 0.00 ₹ 0.00 ₹ 0.00
40 ₹ 0.00 ₹ 0.00 ₹ 0.00
Total:
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
2. Item Name:
Material
2
Parts Material Density (Kg/cm³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
3. Item Name:
Material
3
Parts Material Density (Kg/cm³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
4. Item Name:
Material
4
Parts Material Density (Kg/cm³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
5. Item Name:
Material
5
Parts Material Density (Kg/cm³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
6. Item Name:
Material
6
Parts Material Density (Kg/cm³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
7. Item Name:
Material
7
Parts Material Density (Kg/cm³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
8. Item Name:
Material
8
Parts Material Density (Kg/cm³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
9. Item Name:
Material
9
Parts Material Density (Kg/cm³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16. Item Name:
Material
16
Parts Material Density (Kg/cm³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
17. Item Name:
Material
17
Parts Material Density (Kg/cm³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
18. Item Name:
Material
18
Parts Material Density (Kg/cm³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
19. Item Name:
Material
19
Parts Material Density (Kg/cm³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
20. Item Name:
Material
20
Parts Material Density (Kg/cm³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
21. Item Name:
Material
21
Parts Material Density (Kg/cm³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
37. Item Name:
Material
37
Parts Material Density (Kg/cm³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
38. Item Name:
Material
38
Parts Material Density (Kg/cm³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
39. Item Name:
Material
39
Parts Material Density (Kg/cm³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
40. Item Name:
Material
40
Parts Material Density (Kg/cm³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost ExtendedTotal
₹ 0.00 ₹ 1,461.27
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 100.00 ₹ 100.00
₹ 0.00 ₹ 1,461.27
₹ 1,561.27
Total:
Labour Cost:
Item
Manufacturing Process Amount Unit
1 Conventional Lathe (TL) 4 Hr
2 Gear Cutting (GC) 3.5 Hr
3 Milling (MVO) 5 Hr
4 Gear Grinding (SG) 4 Hr
5 Heat Treatment (SA) 2.6 Kg
6 VMC(TV) 3 Hr
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1 Conventional Lathe (TL) 0.7 Hr
2 VMC (TV) 2.5 Hr
3
4
5
6
7
8
9
10
11
12
13
14
15
Drive Shafts
Labour Cost:
Item
Manufacturing Process Amount Unit
1 Milling (MCO) 1.5 Hr
2 Turning (TL) 1.5 Hr
3 VMC(TV) 2 Hr
4 Heat Treatment (SA) 1.3 Kg
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1 Conventional Lathe(TL) 1 Hr
2 Milling (MCO) 1 Hr
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1 Conventional Lathe(TL) 1.3 Hr
2 Milling (MCO) 0.6 Hr
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1 Conventional Lathe(TL) 0.5 Hr
2 VMC (TV) 0.67 Hr
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1 Conventional Lathe(TL) 0.5 Hr
2 VMC (TV) 0.67 Hr
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Item
Manufacturing Process Amount Unit
1 Sheet Rolling (FS) 0.6 Hr
2 TIG (WT) 0.4 m
3 Cutting (CH) 0.2 Hr
4 Drilling (FD) 13 Per Drill
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16. Item Name:
Material
16
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
17. Item Name:
Material
17
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
18. Item Name:
Material
18
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
19. Item Name:
Material
19
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
20. Item Name:
Material
20
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
21. Item Name:
Material
21
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
37. Item Name:
Material
37
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
38. Item Name:
Material
38
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
39. Item Name:
Material
39
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
40. Item Name:
Material
40
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost ExtendedTotal
₹ 10,150.00 ₹ 12,057.84 65
₹ 1,181.00 ₹ 1,592.92 105
₹ 1,509.00 ₹ 1,791.78 147
₹ 1,520.00 ₹ 3,364.23 189
₹ 284.00 ₹ 510.75 232
₹ 341.50 ₹ 1,280.24 274
₹ 341.50 ₹ 1,280.24 316
₹ 70.50 ₹ 878.08 358
₹ 520.00 ₹ 892.06 399
₹ 0.00 ₹ 0.00 441
₹ 0.00 ₹ 0.00 483
₹ 0.00 ₹ 0.00 525
₹ 0.00 ₹ 0.00 567
₹ 0.00 ₹ 0.00 609
₹ 0.00 ₹ 0.00 651
₹ 0.00 ₹ 0.00 693
₹ 0.00 ₹ 0.00 735
₹ 0.00 ₹ 0.00 777
₹ 0.00 ₹ 0.00 819
₹ 0.00 ₹ 0.00 861
₹ 0.00 ₹ 0.00 903
₹ 0.00 ₹ 0.00 945
₹ 0.00 ₹ 0.00 987
₹ 0.00 ₹ 0.00 1029
₹ 0.00 ₹ 0.00 1070
₹ 0.00 ₹ 0.00 1112
₹ 0.00 ₹ 0.00 1154
₹ 0.00 ₹ 0.00 1196
₹ 0.00 ₹ 0.00 1238
₹ 0.00 ₹ 0.00 1280
₹ 0.00 ₹ 0.00 1322
₹ 0.00 ₹ 0.00 1364
₹ 0.00 ₹ 0.00 1406
₹ 0.00 ₹ 0.00 1448
₹ 0.00 ₹ 0.00 1490
₹ 0.00 ₹ 0.00 1532
₹ 0.00 ₹ 0.00 1574
₹ 0.00 ₹ 0.00 1616
₹ 0.00 ₹ 0.00 1658
₹ 0.00 ₹ 0.00 1700
₹ 83.33 ₹ 83.33
₹ 15,917.50 ₹ 23,648.14
₹ 23,731.47
Total:
Labour Cost:
Item
Manufacturing Process Amount Unit
1 Bending (FB) 2 Per bend
2 Cutting (CH) 1 m
3 Welding (WT) 0.5 m
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1 Cutting(CH) 0.04 m
2 Welding(WT) 0.01 m
3 Drilling(FD) 1 Qty
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1 Milling (MCO) 1 Hr
2 Convential Leth (TL) 2.5 Hr
3 Drilling (DV) 0.3 Hr
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1 Gear Cutting (GC) 0.5 Hr
2 Drilling (DV) 0.25 Hr
3 Conventional Lathe (TL) 0.5 Hr
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1 VMC (TV) 4 Hr
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1 Cutting (CH) 0.5 m
2 Conventional lathe (MCO) 0.5 Hr
3 TIG (WT) 0.3 Hr
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1 Conventional Lath (TL) 0.5 Hr
2 Drilling (DV) 0.3 Hr
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Item
Manufacturing Process Amount Unit
1 Conventional lathe (TL) 0.5 Hr
2 TIG (WT) 0.2 m
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16. Item Name:
Material
16
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
17. Item Name:
Material
17
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
18. Item Name:
Material
18
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
19. Item Name:
Material
19
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
20. Item Name:
Material
20
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
21. Item Name:
Material
21
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
37. Item Name:
Material
37
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
38. Item Name:
Material
38
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
39. Item Name:
Material
39
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
40. Item Name:
Material
40
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost ExtendedTotal
₹ 37.50 ₹ 253.78
₹ 1.25 ₹ 555.72
₹ 560.00 ₹ 615.65
₹ 690.00 ₹ 708.57
₹ 1,800.00 ₹ 1,904.65
₹ 331.00 ₹ 694.29
₹ 200.00 ₹ 211.95
₹ 47.00 ₹ 56.97
₹ 1,800.00 ₹ 1,810.27
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 50.00 ₹ 50.00
₹ 5,466.75 ₹ 6,811.85
₹ 6,861.85
Total:
Labour Cost:
Item
Manufacturing Process Amount Unit
1 Cutting (CH) 0.23 m
2 Profile Cut (FS) 2 Qty
3 Welding (Wt) 0.23 m
4 Conventional Lathe(TL) 0.5 Hr
5 Tapping 2 Qty
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1 Cutting (CH) 0.64 m
2 Profile Cut (FS) 4 Qty
3 Welding (Wt) 0.32 m
4 Conventional Lathe(TL) 0.75 Hr
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1 Cutting (CH) 0.23 m
2 Profile cut (FS) 1 Qty
3 Welding (WT) 0.11 m
4 Tapping 1 Qty
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1 VMC (MCO) 3.1 Hr
2 Drilling (DV) 1.2 Hr
3
4
5
6
7
8
9
10
11
12
13
14
15
6. Item Name: Rear Knukle
Material
6
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1 Rear Knuckle Al 7075 0.003 456.00
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1 VMC (MCO) 3.1 Hr
2 Drilling (DV) 1.2 Hr
3
4
5
6
7
8
9
10
11
12
13
14
15
7. Item Name:
Material
7
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
8. Item Name:
Material
8
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
9. Item Name:
Material
9
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
14. Item Name:
Material
14
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
15. Item Name:
Material
15
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
21. Item Name:
Material
21
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
22. Item Name:
Material
22
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
29. Item Name:
Material
29
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
30. Item Name:
Material
30
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
36. Item Name:
Material
36
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
37. Item Name:
Material
37
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost ExtendedTotal
₹ 260.70 ₹ 1,027.50
₹ 2,955.20 ₹ 3,739.52
₹ 292.80 ₹ 2,431.52
₹ 92.30 ₹ 725.10
₹ 2,340.00 ₹ 3,979.01
₹ 2,340.00 ₹ 3,571.20
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 50.00 ₹ 50.00
₹ 8,281.00 ₹ 15,473.84
₹ 15,523.84
Total:
l
Item
Manufacturing Process Amount Unit
1 Bending (FB) 10 per bend
2 Cutting (CH) 6 m
3 TIG (WT) 20 m
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1 Sheet Metal Shearing(SA) 3.38 m
2 Drilling(FD) 15 per drill
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1 Molding (FS) 2.20 Hr
2 layering (FS) 1.30 Hr
3 Stitching (FS) 0.50 Hr
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1 Laser Cutting(CL) 0.89 m
2 Welding(WT) 1.2 m
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1 Laser Cutting(CL) 3.00 m
2 Welding(WT) 2.00 m
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1 Laser Cutting(CL) 3 m
2 Welding(WT) 2 m
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1 Laser Cutting(CL) 3 m
2 Welding(WT) 3 m
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Item
Manufacturing Process Amount Unit
1 Laser Cutting(CL) 4 m
2 Welding(WT) 3 m
3 Drilling (FD) 5 Per Drill
4
5
6
7
8
9
10
11
12
13
14
15
9. Item Name:
Material
9
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16. Item Name:
Material
16
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
17. Item Name:
Material
17
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
18. Item Name:
Material
18
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
19. Item Name:
Material
19
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
20. Item Name:
Material
20
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
21. Item Name:
Material
21
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
37. Item Name:
Material
37
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
38. Item Name:
Material
38
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
39. Item Name:
Material
39
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
40. Item Name:
Material
40
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost ExtendedTotal
₹ 810.00 ₹ 23,586.23
₹ 24.41 ₹ 1,015.19
₹ 331.50 ₹ 1,431.50
₹ 95.40 ₹ 98.16
₹ 250.00 ₹ 268.05
₹ 250.00 ₹ 264.61
₹ 285.00 ₹ 310.12
₹ 347.50 ₹ 613.30
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 66.67 ₹ 66.67
₹ 2,393.81 ₹ 27,587.16
₹ 27,653.83
Total:
Labour Cost:
Item
Part Name Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Part Name Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
3. Item Name:
Material
3
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Part Name Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
4. Item Name:
Material
4
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Part Name Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
5. Item Name:
Material
5
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Part Name Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
6. Item Name:
Material
6
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Part Name Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
7. Item Name:
Material
7
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Part Name Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
8. Item Name:
Material
8
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Item
Part Name Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
9. Item Name:
Material
9
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Part Name Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Part Name Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Part Name Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Part Name Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Part Name Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Part Name Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16. Item Name:
Material
16
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Part Name Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
17. Item Name:
Material
17
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Part Name Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
18. Item Name:
Material
18
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Part Name Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
19. Item Name:
Material
19
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Part Name Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
20. Item Name:
Material
20
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Part Name Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
21. Item Name:
Material
21
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Part Name Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Part Name Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Part Name Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Part Name Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Part Name Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Part Name Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Part Name Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Part Name Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Item
Part Name Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Part Name Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Part Name Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Part Name Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Part Name Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Part Name Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Part Name Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
37. Item Name:
Material
37
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Part Name Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
38. Item Name:
Material
38
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Part Name Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
39. Item Name:
Material
39
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Part Name Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
40. Item Name:
Material
40
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Part Name Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost ExtendedTotal
₹ 0.00 ₹ 900.00
₹ 0.00 ₹ 980.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 33.33 ₹ 33.33
₹ 0.00 ₹ 1,880.00
₹ 1,913.33
Total:
Labour Cost:
Item
Manufacturing Process Amount Unit
1 Laser Cutting(CL) 4.05 m
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1 Water Jet Cutting 0.01 m^2
2 Welding (WP) 8 Spot
3
4
5
6
7
8
9
10
11
12
13
14
15
3. Item Name:
Material
3
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
4. Item Name:
Material
4
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
5. Item Name:
Material
5
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
6. Item Name:
Material
6
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
7. Item Name:
Material
7
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
8. Item Name:
Material
8
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
9. Item Name:
Material
9
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16. Item Name:
Material
16
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
17. Item Name:
Material
17
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
18. Item Name:
Material
18
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
19. Item Name:
Material
19
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
20. Item Name:
Material
20
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
21. Item Name:
Material
21
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
37. Item Name:
Material
37
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
38. Item Name:
Material
38
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
39. Item Name:
Material
39
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
40. Item Name:
Material
40
Parts Material Density (Kg/m³) Volume (cm³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost ExtendedTotal
₹ 243.00 ₹ 355.32
₹ 13.80 ₹ 116.24
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 41.67 ₹ 41.67
₹ 256.80 ₹ 471.56
₹ 513.22
Total:
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
2. Item Name:
Material
2
Parts Material Density (Kg/m³) Volume (m³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
3. Item Name:
Material
3
Parts Material Density (Kg/m³) Volume (m³)
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
4. Item Name:
Material
4
Parts Material Density (Kg/m³) Volume (m³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
5. Item Name:
Material
5
Parts Material Density (Kg/m³) Volume (m³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
6. Item Name:
Material
6
Parts Material Density (Kg/m³) Volume (m³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
7. Item Name:
Material
7
Parts Material Density (Kg/m³) Volume (m³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
8. Item Name:
Material
8
Parts Material Density (Kg/m³) Volume (m³)
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
9. Item Name:
Material
9
Parts Material Density (Kg/m³) Volume (m³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
10. Item Name:
Material
10
Parts Material Density (Kg/m³) Volume (m³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
17. Item Name:
Material
17
Parts Material Density (Kg/m³) Volume (m³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
18. Item Name:
Material
18
Parts Material Density (Kg/m³) Volume (m³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
19. Item Name:
Material
19
Parts Material Density (Kg/m³) Volume (m³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
27. Item Name:
Material
27
Parts Material Density (Kg/m³) Volume (m³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
28. Item Name:
Material
28
Parts Material Density (Kg/m³) Volume (m³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
29. Item Name:
Material
29
Parts Material Density (Kg/m³) Volume (m³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
36. Item Name:
Material
36
Parts Material Density (Kg/m³) Volume (m³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
37. Item Name:
Material
37
Parts Material Density (Kg/m³) Volume (m³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
38. Item Name:
Material
38
Parts Material Density (Kg/m³) Volume (m³) or Qty
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount Unit
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost ExtendedTotal
₹ 0.00 ₹ 1,272.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00
₹ 50.00 ₹ 50.00
₹ 0.00 ₹ 1,272.00
₹ 1,322.00
Total: ₹ 2,875.69
BEARI
Brand
SKF
SKF
SKF
SKF
SKF
SKF
SKF
SKF
SKF
SKF
SKF
SKF
SKF
SKF
BEARINGS
Bearing Name
6010-2RS1
61812-2RS1
61814-2RS1
61906-2rz
6014 2RS1
6004 2Z
6005 2Z
6305 2Z
3062Z
61807_2
6306 2RS
16007
6004 2RS
16005 2Z
Sub-System Qty Cost Total Cost
Suspension 2 ₹ 739.86 ₹ 1,479.72
Suspension 2 ₹ 2,699.00 ₹ 5,398.00
Suspension 4 ₹ 3,118.85 ₹ 12,475.40
Steering 2 ₹ 893.70 ₹ 1,787.40
Drive 2 ₹ 1,974.47 ₹ 3,948.94
Drive 2 ₹ 226.56 ₹ 453.12
Drive 1 ₹ 251.34 ₹ 251.34
Drive 1 ₹ 1,107.70 ₹ 1,107.70
Drive 1 ₹ 505.04 ₹ 505.04
Drive 1 ₹ 1,082.40 ₹ 1,082.40
Drive 1 ₹ 509.76 ₹ 509.76
Drive 2 ₹ 247.80 ₹ 495.60
Drive 1 ₹ 265.76 ₹ 265.76
E_Powertrain 1 ₹ 253.85 ₹ 253.85
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
₹ 0.00
Labour Cost:
Item
Manufacturing Process Amount
1 Cutting 0.5
2
3
4
5
6
7
8
9
10
11
12
13
14
15
2. Item Name:
Material
2
Parts Material Density (Kg/m³)
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
3. Item Name:
Material
3
Parts Material Density (Kg/m³)
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
4. Item Name:
Material
4
Parts Material Density (Kg/m³)
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
5. Item Name:
Material
5
Parts Material Density (Kg/m³)
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
6. Item Name:
Material
6
Parts Material Density (Kg/m³)
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
7. Item Name:
Material
7
Parts Material Density (Kg/m³)
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
8. Item Name:
Material
8
Parts Material Density (Kg/m³)
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Item
Manufacturing Process Amount
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
9. Item Name:
Material
9
Parts Material Density (Kg/m³)
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16. Item Name:
Material
16
Parts Material Density (Kg/m³)
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
17. Item Name:
Material
17
Parts Material Density (Kg/m³)
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
18. Item Name:
Material
18
Parts Material Density (Kg/m³)
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
19. Item Name:
Material
19
Parts Material Density (Kg/m³)
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
20. Item Name:
Material
20
Parts Material Density (Kg/m³)
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
21. Item Name:
Material
21
Parts Material Density (Kg/m³)
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Item
Manufacturing Process Amount
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Labour Cost:
Item
Manufacturing Process Amount
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
37. Item Name:
Material
37
Parts Material Density (Kg/m³)
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
38. Item Name:
Material
38
Parts Material Density (Kg/m³)
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
39. Item Name:
Material
39
Parts Material Density (Kg/m³)
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
40. Item Name:
Material
40
Parts Material Density (Kg/m³)
1
2
3
4
5
6
7
8
9
Labour Cost:
Item
Manufacturing Process Amount
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
To Form A
Extended Material Labour Cost ExtendedTotal
₹ 640.00 ₹ 20.00 ₹ 660.00
₹ 0.00 ₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00 ₹ 0.00
₹ 0.00 ₹ 0.00 ₹ 0.00
₹ 8.33 ₹ 8.33
₹ 640.00 ₹ 20.00 ₹ 660.00
Total: ₹ 668.33