07 Inspection and Testing Report

The Inspection and Testing Report (ITR) documents the quality acceptance inspection for ceramic tile flooring on the 2nd floor. The report indicates that previous non-conformities have been addressed and closed out, with satisfactory results from various inspections. All involved parties have approved the materials and workmanship, confirming compliance with project requirements.

Uploaded by

ahmed.aliport20
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
16 views2 pages

07 Inspection and Testing Report

The Inspection and Testing Report (ITR) documents the quality acceptance inspection for ceramic tile flooring on the 2nd floor. The report indicates that previous non-conformities have been addressed and closed out, with satisfactory results from various inspections. All involved parties have approved the materials and workmanship, confirming compliance with project requirements.

Uploaded by

ahmed.aliport20
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

INSPECTION AND TESTING REPORT (ITR)12

Project Title/ Work Title Please write here

Contract No. Please write here

Employer Please write here

Contractor Please write here

Date/ Time IT requested Please write here ITR Please write ITR no. Please write
for Issued here here

Work Item Quality acceptance inspection and/or testing for Flooring

Reference Contract
Clause/Section/Drawing BOQ item 24.03 and Drawing no.XXX - Ceramic tile flooring
no./BOQ item no.

Inspection and Testing


ITP item no.
Plan reference no.

Brief status of The workmanship have been routinely inspected by the works inspector and
preceding work the NC issued previously had been addressed and Closed out

Location/Work Item 2nd floor – Columns @ Axis D-F,D-E

1 Request for Inspection and Testing should be submitted well ahead of the planned time for inspection/testing –
typically 24 hours prior.
2 This template serves or the same as the common Request for Inspection and Testing (RFIT) template.

INSPECTION AND TESTING REPORT 1 of 2 XXXXX


Employer’s Representative’s Assistants’ Inspection/Testing comments

Role/ Function Comments Signatures

The measurement and visual inspection satisfies the


QA Team Lead requirements. Measurement and inspection result
attached herewith.

Surveyor The level satisfies the requirement

Laboratory
Minor corrections are needed at the finishing edge
Technician

Material
Okay… approved material is used
Inspector

HSSE officer Okay…adequate HSSE observance

The work/ materials are:

Approved
Approved as
noted
Rejected

(The inspection and testing conducted indicates satisfactory result)

Employer’s Representative (or authorized Employer’s Representative’s Assistant)


comments:

Name

Signature

Date

The contractor’s representative

Name

Signature

Date

INSPECTION AND TESTING REPORT 2 of 2 XXXXX