ROBT.STONE (ME) LLC (RSME) is a growing EPC and Infrastructure Contractor for Pipeline and
Process Plants in the Oil and Gas sector in MENA region. ROBT.STONE, a diversified company,
possesses immense expertise and competence and a fleet of state-of-the-art equipment for executing any
turnkey EPC / Infrastructure project from conceptual stages through execution to project delivery.
The company was established in Abu Dhabi in 2006 and has grown steadily with an outstanding
reputation for its technical accomplishments. ROBT.STONE has successfully ensured on-time delivery
of various projects in the region with a special focus on integrity, safety and quality standards.
Strong Professional Management team having a vision for investment in best human resources and
latest technologies and equipment has pushed the growth of the company upwards in the last 10 years
of its establishment in the Region.
ROBT.STONE has developed considerable expertise in various disciplines of Oil & Gas industry and
Infrastructure business in EPC and Construction projects in Middle East and North Africa (MENA)
region over the years. Company has attained 100% Annual which highlights our professional approach
towards each project and commitment of safe, quality and timely delivery which have contributed in
repeated orders from our esteemed clients.
We are a diversified company having the experience, specialist skills and our own fleet of latest
equipment for executing any EPC / Infrastructure project from conceptual stages to hand over.
In the field of Oil & Gas pipeline and Infrastructure construction works, major services we provide
includes, but not limited to:
1. Engineering, Procurement & Construction of Pipeline and plant piping works
2. Tank Fabrication, Erection works
3. Civil and Structural works
4. Electrical, Instrumentation and Telecom works
5. HDD/NDRC works
6. Hot Tapping works
7. Fabrication works (Pressure Vessel, Skids etc.)
8. Pipeline and Plant Maintenance works
Our qualified team is well versed in the multifaceted aspect of project management. The team has
access to specialist softwares with the backup of I.T support services to provide up to date reports on
Project and Cost Control and Budget. We also implement MIS (Management Information System)
Page 1 of 4
ENGINEERED EXCELLENCE
which is used to track the projects for the successful execution of projects providing benefit to both
Company and Customers
Our Senior Management team having more than two decades of International experiences is our core
strength for sustainable growth. We believe in investment in Human Capital and have strong committed
work force to take up any challenges. We speak different languages but understand local requirements
of cultures and work with local knowledge. Our people are professionals in every field, site
construction, safety, quality and project management which builds projects with “Safety in heart and
Minds”.
Our team is fully aware of local requirements of working in all the Oil and Gas fields like Habshan,
Buhasa, Huwaila, Bida Qamzan, Ruwais, Jebel Dhanna, Al Ain, Northern and Eastern Region in Abu
Dhabi and experience of working in Oil and Gas fields in Oman and Qatar. This gives us added
advantage in the REGION to take up any kind of complex projects.
We have a very strong Interface management team, they are fully aware of Local by Laws like Al
Dhafra and Police Committees, Critical Infrastructure and Coastal Protection Authority (CICPA)
permits and pass (Specially in the U.A,.E and Western region), local NOC requirements which are very
critical for successful and timely execution and completion of the project in this region.
To keep pace with the changing dimensions of new technologies in the field of Oil and Gas pipeline
construction sector as well in Telecom and Infrastructure sector, an HDD division was incorporated for
the specialized field of “Horizontal Directional Drilling” projects and has executed various projects for
Oil and Gas sector in the Region.
Our HDD division having well experienced staff and latest has been instrumental in achieving fast and
respectable position in HDD/NDRC sector in short span due to its Techinal know how and CAN DO
attitude.
1.3.1 QUALITY
At ROBT.STONE, quality is not just a system, but a culture that covers the length and breadth of our
organization. Consequently, the Quality Assurance department not only implements a system, but
maintains this culture. We firmly believe that our Clients will return only if and when their
expectations are fully met.
• Our Quality and HSE Functions are managed by independent team of professionals.
• Our Quality Management System is certified to ISO 9001:2008.
• Our regular Quality Audits critically ascertain, identify and evaluate the presence and
compliance of norms specified in our Quality Manuals.
• We implement the Quality Culture and system with a Motto “Do it Right, First time
and every time”.
Page 2 of 4
ENGINEERED EXCELLENCE
At ROBT.STONE, Safety is culture, we believe in executing projects with “Safety in Hearts and
Minds”. Safety in paramount, Safety First, in any of our acts and decision speaks about our
commitment towards safety for human life, asset and environment. We understand our social and
economic responsibilities towards Environment, Occupational Health and Safety Systems and thrive to
achieve the best in the same by implementing the systems.
• Our EOHS Management System is certified to ISO 14001:2004 & BS OHSAS
18001:2007.
• We implement Regular Auditing and Training Programs to enhance our standards of
health, Safety, environment (HSE).
• We have implemented HSE Incentive Scheme to reward safe working employees.
• We encourage our employees as well as Sub-contractors / Vendors to report near misses
and unsafe acts.
• Safety awareness has helped us achieve high rate safe man-hours without LTI.
Our certifications in Quality and HSE avow obligation to our motto “Together We Achieve Success with
Safety and Quality”.
• A dedicated team of motivated multi skilled and multi cultural employees, ready to take
any challenges in every aspect of the project.
• Our team is ready to adapt itself to the local customs and traditions of the region.
• Challenges and meeting deadlines is the passion of the TEAM ROBT.STONE.
• Our team builds relationship together with performance with Customers and local
community where ever we work.
• Our team cares about values of respect, dedication, honesty and integrity.
• We are a multicultural team of 10 nationalities working hand in hand.
• Reputation of achieving the impossible and CAN DO culture team, records like 21.3 Km
lowering of 12 Inch pipeline , 3.3km of welding and 3.6 Km of Joint coating and 4 Km
stringing of 12” pipeline in one day shows our team’s CAN DO culture.
• We maintain a large inventory of Plant and Equipment which we keep expanding to help
us keep up with the pace of new technology and thereby playing a crucial role in meeting
client requirements and executing and completing projects in time.
• Our equipment pass through stringent safety checks first internally and then certified by
Third parties before mobilization to any site.
Page 3 of 4
ENGINEERED EXCELLENCE
• We are well aware of Critical Infrastructure and Coastal Protection Authority (CICPA)
pass requirements and most of our fleet is passed to work in Oil Field projects with valid
passes (Especially in the U.A.E and Western region).
• Our long term association and agreement with local suppliers for equipment has been
instrumental in provision of uninterrupted services to clients as more equipment can
mobilized in the shortest span as per the project requirements.
1.6 FACILITIES
Our In house localized facilities give added advantage for faster mobilization and maintenance of our
resources.
• 70,000 m2 Industrial Yard / Camp Facilities in Habshan On Buhasa Road, Abu Dhabi, UAE
• 20,000 Sq Mtr. Industrial Yard at Al Falah on Sweihan Road Abu Dhabi, U.A.E
• 144,000 m2 Temporary Construction Facilities with Camp, fabrication shop at Al Dabbiya, Abu
Dhabi, U.A.E
• 20,000 Sq Mtr. Fabrication Shop ICAD - Al Ain, Abu Dhabi, U.A.E
1.7 OFFICE’S
Head Office- Abu Dhabi, UAE
Robt Stone (ME) LLC
106 - Bin Awdah Tower, Near El Dorado Cinema., Electra Street
Abu Dhabi, United Arab Emirates.
P.O Box : 39588
Tel : +971 2 6767415
Fax : +971 2 6767943
Email : [email protected]
Website : www.robtstone.ae
Page 4 of 4
ENGINEERED EXCELLENCE
REGISTRATION DETAILS
Sl No. COMPANY
1 GASCO (Abu Dhabi Gas Industries Ltd.)
2 ADCO (Abu Dhabi Company for Onshore Oil operations)
3 ADNOC (Abu Dhabi National Oil Company) - Distribution
4 ADNOC (Abu Dhabi National Oil Company) - Main
5 TAKREER (Abu Dhabi Oil Refining Company)
6 ADGAS (Abu Dhabi Gas Liquefaction Ltd.)
7 ZADCO (Zakum Development Company)
8 BOROUGE
9 ADPC (Abu Dhabi Ports Company)
10 ADWEA (Abu Dhabi Water & Electricity Authority)
11 FERTIL (Ruwais Fertilizer Industries)
12 EMARAT
13 DUSUP (Dubai Supply Authority)
14 DUBAL (Dubai Aluminum)
FACSIMILE MESSAGE
Page No 1 of 1
Date: 04-22-2015
Please be informed that based on the pre-qualification documents submitted your company name has been
included in our list of pre-qualified Contractors for the following service(s):
You are advised to quote your company Registration No. 905026 in all future correspondence.
For any future update of your Company record, please log on to our e-Registration system using the
following path:
2. Application [Log in using user ID & Password received upon acceptance of the request]
Regards,
Confidentiality Notice: The material in this fax may be confidential. If you are not the intended recipient, please notify us immediately. You
should not copy the fax or use it for any purpose or disclose its contents to any other person. Thank you
P.O. Box 665, Abu Dhabi, U.A.E • Tel: 971 2 603000 • Fax: 971 2 6037414 • Website: www.gasco.ae
Abu Dhabi Company for Onshore Petroleum Operations Ltd.(ADCO)
(ADCO)
ROBT STONE (ME) - LLC
P.O. Box No. 39588
City ABU DHABI
Country AE
Tel: 6767415
Fax: 6767943
E-mail [email protected]
ADCO Reg.No. 14887
Contractor ( PRE-QUALIFIED )
Page 1 ofCommercial
1 Support Manager
Legends:
Agency Type: AGNT-Agent, CSA-Certified Sole Agent, DSTR - Distributer, DSTR - Stockiest
Pre-Qual Status: F - Disqualified, N - Not Rated, O - Ordered, Q - Pre-Qualified, R - Rejected, E - Under Assessment
Date: 10-Mar-16
Pag 1 of 1
Manughosh Suresh
From: Jibu Jose [[email protected]]
Sent: Wednesday, July 16, 2014 2:29 PM
To: Manughosh Suresh
Cc: [email protected]
Subject: PQ Ref. No. D00433 : Prequalification (PQ) with Dubai Supply Authority (DUSUP)
Manu,
This is to inform that Robt.Stone has been successfully completed the Pre‐Qualification process with DUSUP under ref
No.:D00433 for the category “Pipeline/Plant Construction Works”.
Regards,
Jibu Jose
Contracts Engineer
Dubai Supply Authority
PO Box 8144, Dubai ‐ U.A.E.
Tel: +971 4 3012665 | +971 4 3432222
Mobile: +971 50 8341912
Dear Sir,
Please find the pre-qualification documents attached herewith as requested in the Trail mail. Should you
require further clarifications , please don’t hesitate to contact us.
Manughosh Suresh
Business Development Engineer
Mobile : +971 556165925
ROBT STONE (ME) LLC
PO Box : 39588 Tele : +971 2 6767 415
Abu Dhabi, U.A.E Fax : +971 2 6767 943
www.robtstone.ae E-Mail : [email protected]
Dear Sir(s),
We are in the process of compiling bidders list for the upcoming construction works for Margham Capacity
Increase Project at DUSUP’s Margham Gas Plant.
1
Manughosh Suresh
From: Robt Stone (ME) LLC [[email protected]]
Sent: Sunday, January 20, 2013 9:55 AM
To: [email protected]; [email protected]; 'Manughosh Suresh'; 'Prithwik Karuppali'; 'Prakash Jaison'; 'nevin'; [email protected]
Subject: FW: Registration with ZADCO
Dear All,
Best Regards,
Robt. Stone (ME) LLC
Tele : +971 2 6767 415 I Fax : +971 2 6767 943
P.O. Box : 39588 I E‐Mail : [email protected]
Website : www.robtstone.ae
Abu Dhabi, United Arab Emirates
Good morning;
Regards
Essam Mahmoud
PQ Engineer – 02/6051138
050/5702477
1
ROBT.STONE (ME) LLC - ( 101102 ) MLCAS_P **A**
2
ENGINEERED EXCELLENCE
VISION/MISSION/CORE VALUES
Sl No. ATTACHMENTS
1 VISION STATEMENT
2 MISSION STATMENT
3 CORE VALUES
ENGINEERED EXCELLENCE
Sl No. DESCRIPTION
1 Organization Chart
2 Services
ENGINEERED EXCELLENCE
DIRECTOR- PROJECTS
SUPPORT DEPARTMENTS
QA / QC HSE
BUSINESS DEVELOPMENT
I.T/SECUIRTY ADMINISTRATION HUMAN RESOURCES RISK & CONTRACTS / ESTIMATION
FABRICATION
ENGINEERING, PROCUREMENT & CONTRUCTION TANK FABRICATION CIVIL & E&I AND HDD / NDRC
n
HOT TAPING HEAVY PRESSURE
OF CROSS COUNTRY PIPELINE AND PLANT PIPING & ERECTION STRUCTURAL TELECOM VESSELS,SKIDS ETC
ENGINEERED EXCELLENCE
SERVICES OFFERED
ROBT.STONE is committed to provide reliable and professional services to all major Oil & Gas
operating companies and Infrastructure Developers in the region with utmost priority of Quality, Safety
and Care to the Environment.
Experienced locally mobilized Human Capital, Senior Management having more than two
decades of International experience in Oil and Gas and Infrastructure projects.
Awareness of Local requirements of working in the Oil and Gas fields in the region Habshan,
Buhasa, Huwaila, Bida Qamzan, Ruwais, Jebel Dhanna, Al Ain, Northern and Eastern
Region in Abu Dhabi and experience of working in Oil and Gas fields in Oman and Qatar.
Well maintained Quality Control and EOHS (Environment and Occupational Health and
Safety) System striving for constant improvements.
5. HDD/NDRC works.
Page 1 of 5
ENGINEERED EXCELLENCE
We provide solutions for EPC execution with multi-disciplinary, highly-skilled resources with local
collaboration with engineering companies. We have experience in pipeline, plant piping, maintenance
construction works for major ADNOC group companies (GASCO/ADCO/TAKREER) in Abu Dhabi,
U.A.E.
Strict compliance and implementation of EOHS systems, is the basic key to our successful execution of
projects. Quality and Safety is not just a system but a culture in our organization.
Our procurement teams works closely with discipline engineers, clients and vendors to ensure
compliance to specifications, schedules and budgets. Our material management system is linked
directly to our financial system to allow monitoring of every phase of the procurement cycle. Project
specific expeditors are used to expedite long lead items and to monitor different phases of
manufacturing along with quality team for inspections and certifications. We deploy Third Party
Inspection Agencies for procurement of materials as per criticality ratings.
With our enhanced capabilities of doing NDRC/HDD work of laying cables/ducts/pipe under road,
culverts, bridges, channels crossing etc up to 48 inch and 2 km length or more we provide overall
execution solution of Mechanical. Civil, E&I, Telecom, Structure, Piping Fabrication and erection
works for any pipeline and plant piping works.
By completing approx 700 kms of pipeline works in one calendar year, ROBT.STONE has become a
formidable pipeline contractor in the region.
We have our team of skilled and multi-disciplinary personnel locally available in the region. Our
facilities, camps, workshops and warehouses spread over various strategic locations in the UAE with
locally available own equipment fleet gives us an advantage At present we have 100+ (Permit to work)
PTW holder for various Oil & Gas clients and most of our equipment already posses valid security
passes for various locations. All these factors enable us for quick mobilization and easy access to any
work location within the Region and particularly in U.A.E.
We provide solutions for small to mid size tank for Oil and Gas, Infrastructure and Process Plant
projects. Our fabrication facilities are capable of supporting pre fabrication works which experienced
site team erect with best of quality and safety compliance.
Page 2 of 5
ENGINEERED EXCELLENCE
In house capabilities with experienced team and locally available resources to undertake Civil and
Structural works for any pipeline, plant and infrastructure projects gives us added advantage. We
undertake all civil activities in pipeline, plant constriction projects including construction of Valve
station building; pre cast foundation, berm preparation, culverts, including in situ concrete works.
Fabrication works of Structure steel support, pipe racks is also executed with in house resources and
fabrication yard facilities available.
Our Civil team has recently achieved the following milestones in TAKREER project.
We have a dedicated team for providing Turnkey solutions in E&I work for Cross country pipeline,
Process Plant and Infrastructure projects. We have a well established associations with experienced
suppliers and system integrators, Our in-house E&I team is well versed in various subjects and fields of
Electrical, Instrumentation and Control, Process Control systems, Cathodic Protection, Fire & Gas,
CCTV system and Telecommunication works.
We do take up solar system and CCTV works including laying, slicing and termination works for
FOC/SDH/CCTV cables. Erection and commission of Passive cool shelters and in field instrument
installation.
We provide solution to cross obstructions without disrupting any traffic, water flow and above ground
structures to lay pipeline/conduits/cables of different sizes and length by state of art Horizontal
Directional Drilling Technique. In short span of time with our experienced team and best HDD
machines to suit all kind of terrains, HDD TEAM has built a name in the industry. We believe that
experienced people with latest know how with suitable latest equipment is the key difference between
the success and the failure. Our team of HDD has over 15 years of International HDD experience
working on Oil and Gas and Telecom sector projects.
WALK OVER F5 track system to determine the location of the bore head on small to
mid-sized rigs.
Page 3 of 5
ENGINEERED EXCELLENCE
We have successfully completed 200 crossings, approximately 44,000 meter, in nearly all type of
terrain, across major highways, utilities, creeks, wetlands, etc. in record time.
ROBT.STONE has completed nearly 50 Hot Taps in U.A.E. We have carried out Hot Tap works for
wide range of Oil & Gas pipelines varying from 10” to 48”. We have highly qualified and experienced
hot tap welders, supervisors, Quality Control Inspectors, HSE Engineers and sophisticated equipment
dedicated for Hot tap works. Our hot tap procedures are approved with ADNOC group of companies.
Apart from ADNOC group, we have carried out Hot Tap works for:
We offer quality services in fabrication and supply of Pressure vessels, Heat Exchanger, Skid mounted
Oil and Gas Processing units, Pipeline equipments, Cyclone filters H2S Scrubber, Odorizers, Pressure
Reduction and Metering skids, for refineries, nuclear plants and other processing facilities.
Design, Manufacturing and Testing of Pressure Vessels, Heat Exchangers, Skid mounted
oil & gas processing units.
Capable of:
Design, Engineering and rerating of large Storage Tanks and low pressure Storage Tanks.
Ability to perform multiple welding process with qualified welders and also capable of
automatic welding machine operations.
Page 4 of 5
ENGINEERED EXCELLENCE
ROBT.STONE, a name synonymous with pipeline and plan maintenance works in Abu Dhabi. We
possess all the required experience resources to carry out pipeline and plant maintenance works like
Pipeline and system maintenance, mentoring gas supplies to industries and attending to maintenance
issues, Right of way maintenance, Building and General Maintenance, Patrolling of Gas facilities,
Testing, removal and replacement of flow lines.
Working experience with GASCO, Dolphin Energy and ADCO gives us added advantage to repeat our
performance in maintenance projects,
Competent staff with experience in operation and maintenance works such as gas meter
reading, billing, patrolling, isolation of gas leaks etc.
Page 5 of 5
ENGINEERED EXCELLENCE
EXPERIENCE LIST
Sl No. DESCRIPTION
1 Major Projects
2 Minor Projects
3 Hot Tap Works
4 Horizontal Directional Drilling (HDD) Works
5 Pipeline and Plant Maintenance works
ENGINEERED EXCELLENCE
EXPERIENCE LIST – MAJOR PROJECTS
Project
Sl. No. Year Client Our Role Project Title Scope of Work
Status
EPC Scope of Work includes
• High Pressure Pipe Connections to Main gas pipe line (Hot Tap, Mechanical
Tie-in) and installation of Pig traps & Hot Tap valve.
• AGI (Above Ground Installations) consisting of Pig Trap, ROV, Filtration,
Main HP Connection to NGV H2S Scrubbers with H2S online analyzer, Water dew point analyzer,
1 2016 GASCO In Progress
Contractor Filling Stations (Phase 2A) Pressure Regulation, Custody Transfer Metering and Odorizing and
associated Piping, Mechanical, Civil and E&I works.
• All associated Piping and Tie-in Works, Civil works, Electrical Works,
Instrumentation and Control works, NDT Works, Pre-commissioning,
Cathodic Protection and Painting Works
EPC works for provision of New Filters (1 working + 1 Stand-by), Metering Skid
EPC for Filtration, Metering with Flow Meter, FCV Skid, and Active Cooled Shelter with UPS System. All
Main
2 2015 GASCO And FCV Skids At Mirfa associated Piping and Tie-in Works, Civil works, Electrical Works, In Progress
Contractor
CRS Instrumentation and Control works, NDT Works, Pre-commissioning and
Painting Works.
EPC (Engineering, Procurement and Construction) works for BAB Producer (18
nos.) and Injector (8 nos.) wellheads, approximate 95 Kms of 8” and 6” flowlines,
Call-Out works Contract for
Main Work over of Gas Producer (9 nos.) well head, modification of existing flowlines
3 2015 ADCO ASR Gas Facilities in Bab In Progress
Contractor and trunklines. All associated Piping and Tie-in Works, Civil works, Electrical
(Package “A”)
Works, Instrumentation and Control works, NDT Works, Pre-commissioning,
Cathodic Protection and Painting Works.
Page 1 of 4
ENGINEERED EXCELLENCE
Project
Sl. No. Year Client Our Role Project Title Scope of Work
Status
Page 2 of 4
ENGINEERED EXCELLENCE
Project
Sl. No. Year Client Our Role Project Title Scope of Work
Status
Construction including Hydrotesting and drying of 30 kms of 20” (API 5L-X65)
Inter Refineries Pipelines (IRP and 40 kms of 10″/8” (API 5L-X60) pipelines including 116 Crossings
TAKREER Sub- (Horizontal Directional Drilling) including 1440 m of 20+6 inch road crossings
11 2013 II) Project – City Portion ( Completed
/ GS / KSS contractor and 975m 10+6” Channel crossing at Umm Al Naar, 230 Minor crossings and
20”/10”/8”)
construction of 1 No’s of SV station and 6 nos. Pipeline (Receiver/Launcher)
facilities including Civil, Mechanical, E&I works.
EPC for Replacement of Schedule of Works includes dismantling of existing skid at unit 30 & 31 and
Main Amine Filtration Package at Design / Engineering, Procurement and Construction of new Amine Filtration
15 2011 GASCO Completed
Contractor Units 30 and 31 (Habshan & Units 30 and 31 with associated Civil, Mechanical, Electrical, Instrumentation
BAB) and procurement of Filters consumables, Internals.
Construction of Cathodic
ADCO / Protection for Well Casings
Sub- Three year Contract for Civil / Installation & Construction works for Cathodic
16 2011 BSS for newly Drilled Wells Completed
contractor Protection for Well Casings.
TECHNOLOGIES (2010-2012) in ADCO
Fields.
Page 3 of 4
ENGINEERED EXCELLENCE
Project
Sl. No. Year Client Our Role Project Title Scope of Work
Status
Removal of 16” Maqta –
Baniyas Pipeline & Removal Demolition of GASCO's 18km long 16” dia Pipeline includes Corridor Fence,
Main
18 2009 GASCO of ADCO's Jarn Yaphour - Valve Stations, Pig Traps, and Control Room & ADCO's 32km long 18" dia Completed
Contractor
Umm Al Nar 18" Transfer Pipeline including Valve Stations.
Line
Installation of 8kms long Gas Pipeline (24", 16" & 12) including hot tap,
AL DAR / Natural Gas Transmission and
Sub- Highway and Canal Crossing, Launcher, Receiver Stations, Primary and
20 2008 GASCO / Distribution Supply to Yas Completed
contractor Secondary Pressure Reduction Stations and arranging Temporary Gas Supply by
QENERGY Island, Abu Dhabi.
10" PE Pipeline.
Page 4 of 4
ENGINEERED EXCELLENCE
Page 1 of 5
ENGINEERED EXCELLENCE
Sl.
Year Client Our Role Project Title Scope of Work Project Status
No.
Supply of gas to new Al Ain Cement FCV skid installation along with all Civil, Mechanical
9 2013 NPCC / ARKAN Sub Contractor Completed
plant for ARKAN and E&I works.
Variation order for EPC of NEB Construction of 1 W ell cellars and 1 of mud pits
11 chemical and hazardous material each at DY-96 and DY-97 respectively for Dabiyyah Completed
2013 ADCO Main Contractor
laydown area. Additional injector project.
Engineering, Procurement & Construction of a shed (20m x 30m) and two paved
14 Construction of NEB Chemical area (30m x30m) for storing chemicals and waste Completed
2012 ADCO Main Contractor
&Hazardous Material Laydown Area skips.
Page 2 of 5
ENGINEERED EXCELLENCE
Sl.
Year Client Our Role Project Title Scope of Work Project Status
No.
Approximately 2400 Linear Meters of Structural
Habshan 5 Utilities& Offsites Project
15 HYUNDAI Steel Welding for Piping Platforms inside Habshan 5 Completed
2012 Sub Contractor – Structural Steel welding
/ GASCO Plant.
SINOMA Welding Works in ARKAN Cement Welding of 115 joints of Dia 20" at ARKAN cement
18 2012 Main Contractor Completed
EQUIPMENT Factory factory.
Page 3 of 5
ENGINEERED EXCELLENCE
Sl.
Year Client Our Role Project Title Scope of Work Project Status
No.
Page 4 of 5
ENGINEERED EXCELLENCE
Sl.
Year Client Our Role Project Title Scope of Work Project Status
No.
Laying of High Pressure Tubing & a) High Pressure Tubing & Control Cable laying
BAEUR
30 2009 Main Contractor Control Cable & for Painting of b) Painting of Compressor Room Completed
KOMPRESSOREN
Compressor Building c) Other Finishing Works
GASCO / GULF 6" High pressure gas pipeline to Gulf 18" x 6” Cold tapping work, technical services for gas
31 2009 Main Contractor Completed
SPONGE IRON Sponge Iron Factory. pipeline installation.
GASCO Natural Gas Extension to Ajmal Supply and Installation of 4" dia Gas Pipeline 0.5 km
32 2008 Main Contractor Completed
/ AJMAL STEEL Steel Factory. long including hot tap.
GASCO / 4" Dia Pipeline for Natural Gas 4" x 850 Mtrs long On Shore Buried Gas Pipeline
35 2007 Sub Contractor Extension to Plot No 21B3 & 22B3 including Hot Tapping with GASCO Pipeline Network Completed
QENERGY
in ICAD 1 (Pipes & Skid free issued)
Page 5 of 5
ENGINEERED EXCELLENCE
2 2014 Fanoy Gas LLC Sub-contractor Split Tee Welding at ICAD 1 Installation of 1 No’s 18” x 4” Split Tee. Completed
Split Tee Welding - EPC For 1 No's of 12" x 10" Split Tee Hot Tap for Sales Gas To Masdar
2012 GASCO / ALSA Sub-contractor Supply of Sales Gas To Shams 1 at Madina Zayed Completed
8 Masdar Shams 1 SOW: Installation.
2 No's of 42" x 30" Split Tee Hot Tap for OGD 1 & 2 Pipelines
GASCO / Habshan 5 Utilities & Offsites at Habshan IGD
2011 Sub-contractor Completed
9 HYUNDAI Project
SOW: Supply & Installation.
To carry out 2" hot tapping on 1 No of 2" x 8" Split Tee Hot Tap for Condensate Pipeline
existing 8" Condensate
2011 GASCO Main Contractor Completed
10 pipeline through Service
Work Order SOW: Supply & Installation
Page 1 of 4
ENGINEERED EXCELLENCE
Sl. No. Year Client Our Role Project Title Scope of Work Project Status
Company (CBI)
GASCO / Foster 16" X 16" Hot Tapping and Stopple Plugging works on Buhasa
Wheeler / Bechtel / Onshore Gas Development Bab NGL Pipeline at MP21.
2009 Sub-contractor Completed
15 Punj Phase -3 SOW: Installation of Split Tees and Threadolet Fitting for
Lloyd Stoppling.
7 nos. of Split Sleeves on 16" Habshan - Ruwais Condensate
Fabrication and Welding of Pipeline.
Split Sleeve on 16" Habshan -
2008 GASCO Main Contractor 1 no. of Split Sleeve on 30" Bab - Maqta Gas Pipeline Completed
16 Ruwais Pipeline & 30" Bab -
Maqta Gas Pipeline SOW: Fabrication & Welding of Split Sleeves.
Natural Gas Extension to 10" X 4" Split Tee on GASCO Network in ICAD 1.
GASCO / Zones
2008 Main Contractor Ajmal Steel Completed
17 Corp / Ajmal Steel SOW: Supply & Installation.
Factory.
GASCO / Zones 18" x 18" Split Tee on GASCO Network near ADIC CRS,
Corp / Al Jaber ICAD 2 Natural Gas Pipeline Mussafah.
2008 Sub-contractor Completed
18 Energy Network
SOW: Technical Services & Split Tee Welding Works.
Services
16" x 2" Weldolet on Gas Flare Line inside GASCO Buhasa
Hot Tap & Piping Works
GASCO / Flowserve Plant.
2008 Sub-contractor inside Buhasa Completed
19 Al Mansouri
Plant SOW: Technical Services & Weldolet Welding Works.
GASCO / ESI / High Pressure Natural Gas 42" X 18" Hot Tap on Bab-Maqta-Taweelah Gas Pipeline
2008 Sub-contractor Completed
20 Toledo Pipeline for (OGD1).
Page 2 of 4
ENGINEERED EXCELLENCE
Sl. No. Year Client Our Role Project Title Scope of Work Project Status
Emirates Integrated Steel 42" X 18" Hot Tap on Thamama C - Maqta Gas Pipeline (OGD
Project 1).
GASCO / Zones 2 No's of 18" X 4" Split Tee on GASCO Network in ICAD 1.
Corp / Sergas /
Emirates
10" X 6" Split Tee on GASCO Network in ICAD 1
Line Factory /
Natural Gas Connections in
2008 German Emirati Sub-contractor Completed
21 ICAD1
Company 10" X 2" Weldolet on GASCO Network in ICAD 1
/ Union Copper Rod
Factory / Super
Cement SOW: Technical Services & Split Tee Welding Works
Qatar Petroleum / Doha Urban Pipeline 16" X 16" Hot Tapping and Stopple Plugging Works on Buhasa
2007 Sub-contractor Completed
24 Punj Lloyd Relocation Bab NGL Pipeline at MP21.
Page 3 of 4
ENGINEERED EXCELLENCE
Sl. No. Year Client Our Role Project Title Scope of Work Project Status
24" x 24", 24" x 6" & 24" x 2" Hot Tap on Al Ain - Oman Gas
Pipeline
Page 4 of 4
EXPERIENCE LIST – HDD WORKS
ENGINEERED EXCELLENCE
Crossing Length
Project Owner Main Contractor Description Road/ Highway/Utility Pipe Diameter Pipe Grade
(Mtr.)
HABSHAN I FLOWLINE ADCO CCC / SAARI ADCO / GASCO Utilities Crossing 6”, 8”, 20” API 5L X 60 1400 (Total)
IRP II PIPELINE TAKREER GS ENGINEERING Palace Road & Round About 20" + 6" API 5L X 65 1100
IRP II PIPELINE TAKREER GS ENGINEERING Sheikh Zayed Mosque Road E10 10" + 6" API 5L X 60 975
IRP II PIPELINE TAKREER GS ENGINEERING E11 Dubai-Sila Road 20" + 6" API 5L X 65 733
IRP II PIPELINE TAKREER GS ENGINEERING E22 Abu Dhabi To Al Ain Road 20" + 6" API 5L X 65 733
Page 1 of 12
EXPERIENCE LIST – HDD WORKS
ENGINEERED EXCELLENCE
Crossing Length
Project Owner Main Contractor Description Road/ Highway/Utility Pipe Diameter Pipe Grade
(Mtr.)
IRP II PIPELINE TAKREER GS ENGINEERING E22 Abu Dhabi To Al Ain Road 20" + 6" API 5L X 65 733
IRP II PIPELINE TAKREER GS ENGINEERING 12th Street Road 10" API 5L X 60 680
IRP II PIPELINE TAKREER GS ENGINEERING Musaffah To Sila Road(E11) 10" + 6" API 5L X 60 521
IRP II PIPELINE TAKREER GS ENGINEERING Asphalt Road(ICAD Shabia Road) 20" + 6" API 5L X 65 432
IRP II PIPELINE TAKREER GS ENGINEERING Mafraq-Al Guwaifat Highway 12" API 5L X 65 399
IRP II PIPELINE TAKREER GS ENGINEERING Mafraq-Al Guwaifat Highway 12" API 5L X 65 399
IRP II PIPELINE TAKREER GS ENGINEERING Mafraq-Al Guwaifat Highway 6" API 5L X 65 399
IRP II PIPELINE TAKREER GS ENGINEERING E20 Airport Road 20" + 6" API 5L X 65 364
IRP II PIPELINE TAKREER GS ENGINEERING Al Rawda Road & Shakboot Sultan Road 12" API 5L X 65 363
IRP II PIPELINE TAKREER GS ENGINEERING Al Rawda Road & Shakboot Sultan Road 12" API 5L X 65 363
IRP II PIPELINE TAKREER GS ENGINEERING Al Rawda Road & Shakboot Sultan Road 6" HDPE 363
Small By Pass Road Crossing Cricket
IRP II PIPELINE TAKREER GS ENGINEERING 20" + 6" API 5L X 65 351
Stadium
IRP II PIPELINE TAKREER GS ENGINEERING Utility Crossing 28" API 5L X 70 326
Page 2 of 12
EXPERIENCE LIST – HDD WORKS
ENGINEERED EXCELLENCE
Crossing Length
Project Owner Main Contractor Description Road/ Highway/Utility Pipe Diameter Pipe Grade
(Mtr.)
IRP II PIPELINE TAKREER GS ENGINEERING Pipeline Crossing 10" + 6" API 5L X 60 325
IRP II PIPELINE TAKREER GS ENGINEERING Proposed Road (Villa Access ) 12" API 5L X 65 320
IRP II PIPELINE TAKREER GS ENGINEERING Proposed Road (Villa Access ) 12" API 5L X 65 320
IRP II PIPELINE TAKREER GS ENGINEERING Proposed Road (Villa Access ) 6" API 5L X 65 320
IRP II PIPELINE TAKREER GS ENGINEERING Madinath Zayed Highway Crossing 28" API 5L X 70 293
IRP II PIPELINE TAKREER GS ENGINEERING Madinath Zayed Highway Crossing 28" API 5L X 70 293
IRP II PIPELINE TAKREER GS ENGINEERING Madinath Zayed Highway Crossing 6" HDPE 293
IRP II PIPELINE TAKREER GS ENGINEERING ICAD To Labour Camps Shabia Road 20" + 6" API 5L X 65 283
IRP II PIPELINE TAKREER GS ENGINEERING ICAD to Labour Camps Shabia Road 20" + 6" API 5L X 65 283
IRP II PIPELINE TAKREER GS ENGINEERING GASCO Pipeline Crossing 20" + 6" API 5L X 65 280
IRP II PIPELINE TAKREER GS ENGINEERING Cricket Stadium Road 20" + 6" API 5L X 65 277
IRP II PIPELINE TAKREER GS ENGINEERING Proposed Road - ADIA North Terminal 20" + 6" API 5L X 65 268
IRP II PIPELINE TAKREER GS ENGINEERING Small Bypass Road Cricket Stadium 10" API 5L X 60 253
IRP II PIPELINE TAKREER GS ENGINEERING E33 Airport Road 20" + 6" API 5L X 65 253
IRP II PIPELINE TAKREER GS ENGINEERING E33 Airport Road 20" + 6" API 5L X 65 253
IRP II PIPELINE TAKREER GS ENGINEERING ICAD II Road Crossing 28" API 5L X 70 248
IRP II PIPELINE TAKREER GS ENGINEERING ICAD II Road Crossing 28" API 5L X 70 248
Page 3 of 12
EXPERIENCE LIST – HDD WORKS
ENGINEERED EXCELLENCE
Crossing Length
Project Owner Main Contractor Description Road/ Highway/Utility Pipe Diameter Pipe Grade
(Mtr.)
IRP II PIPELINE TAKREER GS ENGINEERING ICAD II Road Crossing 6" HDPE 248
IRP II PIPELINE TAKREER GS ENGINEERING Rumaitha Road Crossing 28" API 5L X 70 247
IRP II PIPELINE TAKREER GS ENGINEERING Rumaitha Road Crossing 28" API 5L X 70 247
IRP II PIPELINE TAKREER GS ENGINEERING Rumaitha Road Crossing 6" HDPE 247
IRP II PIPELINE TAKREER GS ENGINEERING Al Faya-Al Quaa Road 12" API 5L X 65 244
IRP II PIPELINE TAKREER GS ENGINEERING Al Faya-Al Quaa Road 12" API 5L X 65 244
IRP II PIPELINE TAKREER GS ENGINEERING Al Faya-Al Quaa Road 6" API 5L X 65 244
IRP II PIPELINE TAKREER GS ENGINEERING Sila To Abu Dhabi Main Road 28" API 5L X 70 243
IRP II PIPELINE TAKREER GS ENGINEERING Sila To Abu Dhabi Main Road 28" API 5L X 70 243
IRP II PIPELINE TAKREER GS ENGINEERING Sila To Abu Dhabi Main Road 6" HDPE 243
IRP II PIPELINE TAKREER GS ENGINEERING Asphalt Road 20" + 6" API 5L X 65 218
IRP II PIPELINE TAKREER GS ENGINEERING Habshan Road Crossing 28" API 5L X 70 218
IRP II PIPELINE TAKREER GS ENGINEERING Habshan Road Crossing 28" API 5L X 70 218
IRP II PIPELINE TAKREER GS ENGINEERING Habshan Road Crossing 6" HDPE 218
IRP II PIPELINE TAKREER GS ENGINEERING Al Rawda Road From Truck Road 12" API 5L X 65 212
IRP II PIPELINE TAKREER GS ENGINEERING Al Rawda Road From Truck Road 12" API 5L X 65 212
IRP II PIPELINE TAKREER GS ENGINEERING Al Rawda Road From Truck Road 6" API 5L X 65 212
IRP II PIPELINE TAKREER GS ENGINEERING Proposed Road (Residential Access ) 12" API 5L X 65 205
IRP II PIPELINE TAKREER GS ENGINEERING Proposed Road (Residential Access ) 12" API 5L X 65 205
Page 4 of 12
EXPERIENCE LIST – HDD WORKS
ENGINEERED EXCELLENCE
Crossing Length
Project Owner Main Contractor Description Road/ Highway/Utility Pipe Diameter Pipe Grade
(Mtr.)
IRP II PIPELINE TAKREER GS ENGINEERING Proposed Road (Residential Access ) 6" API 5L X 65 205
IRP II PIPELINE TAKREER GS ENGINEERING Twam Street Road 12" API 5L X 65 204
IRP II PIPELINE TAKREER GS ENGINEERING Twam Street Road 12" API 5L X 65 204
IRP II PIPELINE TAKREER GS ENGINEERING Twam Street Road 6" HDPE 204
IRP II PIPELINE TAKREER GS ENGINEERING Silah To Abu Dhabi Highway 20" + 6" API 5L X 65 197
IRP II PIPELINE TAKREER GS ENGINEERING Transco Pipeline Crossing 12" API 5L X 65 197
IRP II PIPELINE TAKREER GS ENGINEERING Transco Pipeline Crossing 12" API 5L X 65 197
IRP II PIPELINE TAKREER GS ENGINEERING Abu Dhabi -Al Ain Truck Road 12" API 5L X 65 193
IRP II PIPELINE TAKREER GS ENGINEERING Abu Dhabi -Al Ain Truck Road 12" API 5L X 65 193
IRP II PIPELINE TAKREER GS ENGINEERING Abu Dhabi -Al Ain Truck Road 6" API 5L X 65 193
51st Street
IRP II PIPELINE TAKREER GS ENGINEERING 20" + 6" API 5L X 65 191
(Near Round About)
IRP II PIPELINE TAKREER GS ENGINEERING ICAD III Camp Road Crossing 28" API 5L X 70 187
IRP II PIPELINE TAKREER GS ENGINEERING ICAD III Camp Road Crossing 28" API 5L X 70 187
IRP II PIPELINE TAKREER GS ENGINEERING Road To ICAD III 12" API 5L X 65 187
IRP II PIPELINE TAKREER GS ENGINEERING Road To ICAD III 12" API 5L X 65 187
IRP II PIPELINE TAKREER GS ENGINEERING ICAD III Camp Road Crossing 6" HDPE 187
IRP II PIPELINE TAKREER GS ENGINEERING 59th Street 20" + 6" API 5L X 65 185
IRP II PIPELINE TAKREER GS ENGINEERING Link Road Khalifa Bin Zayed City 10" API 5L X 60 180
IRP II PIPELINE TAKREER GS ENGINEERING Link Road Abu Dhabi To Mussaffah Road 20" + 6" API 5L X 65 180
Page 5 of 12
EXPERIENCE LIST – HDD WORKS
ENGINEERED EXCELLENCE
Crossing Length
Project Owner Main Contractor Description Road/ Highway/Utility Pipe Diameter Pipe Grade
(Mtr.)
IRP II PIPELINE TAKREER GS ENGINEERING Link Road Khalifa City To Airport Road 20" + 6" API 5L X 65 180
IRP II PIPELINE TAKREER GS ENGINEERING Salmia Palace Road Crossing 28" API 5L X 70 177
IRP II PIPELINE TAKREER GS ENGINEERING Salmia Palace Road Crossing 28" API 5L X 70 177
IRP II PIPELINE TAKREER GS ENGINEERING Salmia Palace Road Crossing 6" HDPE 177
IRP II PIPELINE TAKREER GS ENGINEERING Access Road Cricket Stadium 10" API 5L X 60 174
IRP II PIPELINE TAKREER GS ENGINEERING Abu Dhabi -Al Ain Truck Road 12" API 5L X 65 166
IRP II PIPELINE TAKREER GS ENGINEERING Abu Dhabi -Al Ain Truck Road 6" API 5L X 65 166
IRP II PIPELINE TAKREER GS ENGINEERING Hilwa Road Crossing 28" API 5L X 70 165
IRP II PIPELINE TAKREER GS ENGINEERING Hilwa Road Crossing 28" API 5L X 70 165
IRP II PIPELINE TAKREER GS ENGINEERING Hilwa Road Crossing 6" HDPE 165
IRP II PIPELINE TAKREER GS ENGINEERING Link Road From Hameem Road 12" API 5L X 65 164
IRP II PIPELINE TAKREER GS ENGINEERING Link Road From Hameem Road 12" API 5L X 65 164
Page 6 of 12
EXPERIENCE LIST – HDD WORKS
ENGINEERED EXCELLENCE
Crossing Length
Project Owner Main Contractor Description Road/ Highway/Utility Pipe Diameter Pipe Grade
(Mtr.)
IRP II PIPELINE TAKREER GS ENGINEERING Link Road From Hameem Road 6" API 5L X 65 164
IRP II PIPELINE TAKREER GS ENGINEERING Pipeline Crossing 20" + 6" API 5L X 65 160
IRP II PIPELINE TAKREER GS ENGINEERING Dual Carriage Way Road Crossing 28" API 5L X 70 160
IRP II PIPELINE TAKREER GS ENGINEERING Dual Carriage Way Road Crossing 28" API 5L X 70 160
IRP II PIPELINE TAKREER GS ENGINEERING Dual Carriage Way Road Crossing 6" HDPE 160
IRP II PIPELINE TAKREER GS ENGINEERING Al Jumania Road Crossing 28" API 5L X 70 158
IRP II PIPELINE TAKREER GS ENGINEERING Al Jumania Road Crossing 28" API 5L X 70 158
IRP II PIPELINE TAKREER GS ENGINEERING Abu Dhabi -Al Ain Truck Road 12" API 5L X 65 158
IRP II PIPELINE TAKREER GS ENGINEERING Abu Dhabi -Al Ain Truck Road 12" API 5L X 65 158
IRP II PIPELINE TAKREER GS ENGINEERING Abu Dhabi -Al Ain Truck Road 6" API 5L X 65 158
IRP II PIPELINE TAKREER GS ENGINEERING Al Jumania Road Crossing 6" HDPE 158
By Pass Road To Heavy Vehicle
IRP II PIPELINE TAKREER GS ENGINEERING Monitoring Station(DOT) At Musaffah 10" + 6" API 5L X 60 148
E11 Road
IRP II PIPELINE TAKREER GS ENGINEERING Utility Crossing 28" API 5L X 70 148
Page 7 of 12
EXPERIENCE LIST – HDD WORKS
ENGINEERED EXCELLENCE
Crossing Length
Project Owner Main Contractor Description Road/ Highway/Utility Pipe Diameter Pipe Grade
(Mtr.)
IRP II PIPELINE TAKREER GS ENGINEERING Abu Dhabi Refinery Access Road 10" + 6" API 5L X 60 142
IRP II PIPELINE TAKREER GS ENGINEERING 26th Street Crossing 10" + 6" API 5L X 60 140
IRP II PIPELINE TAKREER GS ENGINEERING Water Pipeline Crossing 10" + 6" API 5L X 60 140
IRP II PIPELINE TAKREER GS ENGINEERING Asphalt Road 20" + 6" API 5L X 65 138
IRP II PIPELINE TAKREER GS ENGINEERING Utility Crossing (TAKREER) 28" API 5L X 70 137
IRP II PIPELINE TAKREER GS ENGINEERING Utility Crossing (TAKREER) 28" API 5L X 70 137
IRP II PIPELINE TAKREER GS ENGINEERING Utility Crossing (TAKREER) 6" HDPE 137
IRP II PIPELINE TAKREER GS ENGINEERING Farm Access Road From Truck Road 12" API 5L X 65 136
IRP II PIPELINE TAKREER GS ENGINEERING Village Access Road From Truck Road 12" API 5L X 65 136
IRP II PIPELINE TAKREER GS ENGINEERING Farm Access Road From Truck Road 12" API 5L X 65 136
IRP II PIPELINE TAKREER GS ENGINEERING Village Access Road From Truck Road 12" API 5L X 65 136
IRP II PIPELINE TAKREER GS ENGINEERING Farm Access Road From Truck Road 6" API 5L X 65 136
IRP II PIPELINE TAKREER GS ENGINEERING Village Access Road From Truck Road 6" API 5L X 65 136
Page 8 of 12
EXPERIENCE LIST – HDD WORKS
ENGINEERED EXCELLENCE
Crossing Length
Project Owner Main Contractor Description Road/ Highway/Utility Pipe Diameter Pipe Grade
(Mtr.)
IRP II PIPELINE TAKREER GS ENGINEERING Maqta Gas Pipeline Crossing 10" + 6" API 5L X 60 135
IRP II PIPELINE TAKREER GS ENGINEERING GASCO Pipeline Crossing 20" + 6" API 5L X 65 135
IRP II PIPELINE TAKREER GS ENGINEERING Utility Crossing (TAKREER) 28" API 5L X 70 133
IRP II PIPELINE TAKREER GS ENGINEERING Utility Crossing (TAKREER) 28" API 5L X 70 133
IRP II PIPELINE TAKREER GS ENGINEERING 14th Steet/Twam Street 12" API 5L X 65 133
IRP II PIPELINE TAKREER GS ENGINEERING 14th Steet/Twam Street 12" API 5L X 65 133
IRP II PIPELINE TAKREER GS ENGINEERING 14th Steet/Twam Street 6" API 5L X 65 133
IRP II PIPELINE TAKREER GS ENGINEERING Utility Crossing (TAKREER) 6" HDPE 133
IRP II PIPELINE TAKREER GS ENGINEERING Newly Constructed Road 12" API 5L X 65 131
IRP II PIPELINE TAKREER GS ENGINEERING Newly Constructed Road 12" API 5L X 65 131
IRP II PIPELINE TAKREER GS ENGINEERING Newly Constructed Road 6" API 5L X 65 131
IRP II PIPELINE TAKREER GS ENGINEERING Al Dhafra Private Road 10"+6" API 5L X 64 130
IRP I Pipeline Crossing ( Behind Sas Al
IRP II PIPELINE TAKREER GS ENGINEERING 20" + 6" API 5L X 65 130
Nakheel Villas)
IRP II PIPELINE TAKREER GS ENGINEERING Farm Access Road From Truck Road 12" API 5L X 65 130
IRP II PIPELINE TAKREER GS ENGINEERING Farm Access Road From Truck Road 12" API 5L X 65 130
IRP II PIPELINE TAKREER GS ENGINEERING Farm Access Road From Truck Road 6" API 5L X 65 130
IRP II PIPELINE TAKREER GS ENGINEERING Newly Constructed Road 12" API 5L X 65 126
IRP II PIPELINE TAKREER GS ENGINEERING Newly Constructed Road 12" API 5L X 65 126
IRP II PIPELINE TAKREER GS ENGINEERING Newly Constructed Road 6" API 5L X 65 126
Page 9 of 12
EXPERIENCE LIST – HDD WORKS
ENGINEERED EXCELLENCE
Crossing Length
Project Owner Main Contractor Description Road/ Highway/Utility Pipe Diameter Pipe Grade
(Mtr.)
IRP II PIPELINE TAKREER GS ENGINEERING Al Dhafra Air Base Road 12" API 5L X 65 123
IRP II PIPELINE TAKREER GS ENGINEERING Al Dhafra Air Base Road 12" API 5L X 65 123
IRP II PIPELINE TAKREER GS ENGINEERING Al Dhafra Air Base Road 6" API 5L X 65 123
IRP II PIPELINE TAKREER GS ENGINEERING Service Road From Al Ain Truck Road 12" API 5L X 65 122
IRP II PIPELINE TAKREER GS ENGINEERING Service Road From Al Ain Truck Road 12" API 5L X 65 122
IRP II PIPELINE TAKREER GS ENGINEERING Service Road From Al Ain Truck Road 6" API 5L X 65 122
IRP II PIPELINE TAKREER GS ENGINEERING Village Access Road From Truck Road 12" API 5L X 65 121
IRP II PIPELINE TAKREER GS ENGINEERING Village Access Road From Truck Road 12" API 5L X 65 121
IRP II PIPELINE TAKREER GS ENGINEERING Village Access Road From Truck Road 6" API 5L X 65 121
IRP II PIPELINE TAKREER GS ENGINEERING Zakher ADNOC Station Road & Wall 12" API 5L X 65 120
IRP II PIPELINE TAKREER GS ENGINEERING Zakher ADNOC Station Road & Wall 6" API 5L X 65 120
IRP II PIPELINE TAKREER GS ENGINEERING Road Inside Wadi 12" API 5L X 65 104
IRP II PIPELINE TAKREER GS ENGINEERING Road Inside Wadi 12" API 5L X 65 104
IRP II PIPELINE TAKREER GS ENGINEERING Road Inside Wadi 6" API 5L X 65 104
IRP II PIPELINE TAKREER GS ENGINEERING Zakher ADNOC Station Road & Wall 12" API 5L X 65 103
Page 10 of 12
EXPERIENCE LIST – HDD WORKS
ENGINEERED EXCELLENCE
Crossing Length
Project Owner Main Contractor Description Road/ Highway/Utility Pipe Diameter Pipe Grade
(Mtr.)
IRP II PIPELINE TAKREER GS ENGINEERING Al Dhafra Private Road 10" + 6" API 5L X 60 86
IRP II PIPELINE TAKREER GS ENGINEERING IRP I Pipeline Crossing 20" + 6" API 5L X 65 86
IRP II PIPELINE TAKREER GS ENGINEERING Farm Access Road From Truck Road 12" API 5L X 65 83
IRP II PIPELINE TAKREER GS ENGINEERING Farm Access Road From Truck Road 12" API 5L X 65 83
IRP II PIPELINE TAKREER GS ENGINEERING Farm Access Road From Truck Road 6" API 5L X 65 83
Page 11 of 12
EXPERIENCE LIST – HDD WORKS
ENGINEERED EXCELLENCE
Crossing Length
Project Owner Main Contractor Description Road/ Highway/Utility Pipe Diameter Pipe Grade
(Mtr.)
Page 12 of 12
ENGINEERED EXCELLENCE
EXPERIENCE LIST – MAINTENANCE WORKS
Page 1 of 5
ENGINEERED EXCELLENCE
1 NC-UOP-046(B) TO # 02 P1 RS-2014 Civil works and LRUT inspection Dolphin Energy 2014 In progress
6 NC-UOP-046(B) TO # 16 Passive Shelter Repair SV1, SV 2 & SV6 Dolphin Energy 2012 Completed
7 NC-UOP-046(B) TO # 17 Instrument air compressor repair works Dolphin Energy 2012 Completed
10 NC-UOP-046(B) TO#11 TRF Heater Modification 860-101/201/301 Dolphin Energy 2011 Completed
Page 2 of 5
ENGINEERED EXCELLENCE
15 NC-UOP-046(B) TO # 04 CP Cable Replacement & Shed for Junction Box Dolphin Energy 2010 Completed
Page 3 of 5
ENGINEERED EXCELLENCE
1 NO-TSD-065 EPRS Material stacking at Al Ain station Dolphin Energy 2014 In Progress
2 TO # 01 P3 RS-2014 Sand clearing from inside and outside of TFP BV-05 station Dolphin Energy 2014 In Progress
3 NC-UOP-048(D) TO # 32 P3 RS ROW maintenance works due to Rain at AFP and TFP Dolphin Energy 2013 Completed
5 NC-UOP-048(D) TO # 31 P3 RS ROW maintenance works due to Rain Dolphin Energy 2013 Completed
6 NC-UOP-048(D) TO # 30 P3 RS Washout near Al Ain Station due to TRANSCO Pipe Burst Dolphin Energy 2013 Completed
7 NC-UOP-048(D) TO # 28 P3 RS Emergency works Transco wash out Dolphin Energy 2013 Completed
10 NC-UOP-048(D) TO # 24 P3 RS Pipe stack and Lay down area in Al Ain Dolphin Energy 2012 Completed
12 NC-UOP-048(D) TO # 22 Exposed Maqta Al Ain Pipeline repair Dolphin Energy 2012 Completed
13 NC-UOP-048(D) TO # 12 Fence repair Between SV 6 and SV 7 on MAP Dolphin Energy 2011 Completed
14 NC-UOP-048(D) TO # 14 ROW Maintenance and Fence Repair Dolphin Energy 2011 Completed
15 NC-UOP-048(D) TO # 16 Washout Repair at Al Ain Station due to TRANSCO Pipe Burst Dolphin Energy 2011 Completed
Page 4 of 5
ENGINEERED EXCELLENCE
17 NC-UOP-048(D) TO # 03 Fence Modification Works on Maqta – Jebel Ali Pipeline Dolphin Energy 2010 Completed
19 NC-UOP-048(D) TO # 05 ROW & Fence Maintenance on Al Ain – Fujairah Pipeline Dolphin Energy 2010 Completed
21 NC-UOP-048(D) TO # 08 ROW maintenance (Maqta – Jabel Ali Pipeline) Dolphin Energy 2010 Completed
22 NC-UOP-048(D) TO # 09 Al Ain - Fujairah Line wash out at KP 0 + 500 Dolphin Energy 2010 Completed
1 NC-UOP-049 (C) TO # 05 P4 RS Manpower and equipment for Pigging activities Maqta and TRF Dolphin Energy 2012 Completed
3 NC-UOP-049 (C) TO # 02 Hire of Air Compressor on Weekly Basis Dolphin Energy 2011 Completed
Page 5 of 5
ENGINEERED EXCELLENCE
RESOURCES
Sl No. RESOURCE
1 Human Resources
2 Major Plant and Equipment
3 Infrastructure and Facilities
ENGINEERED EXCELLENCE
MANPOWER
POSITION NO’s
Management Staff 35
Planning & Estimation Engineers 11
Procurement / Engineering 22
Construction Engineers / Superintendent 63
Supervisors / Foreman 192
QA/QC Engineers / Inspectors 56
HSE Engineers/ Officers 58
Surveyors 7
Administration Staff 28
Material Control Staff 22
Welders 145
HDD Drillers / Trackers / Riggers 62
Fitters / Fabricators 165
Plant Operators 98
Painters / Blasters 75
Semi Skilled/Helpers 741
TOTAL 1,780
PTW ( Permit to work) HOLDERS FOR VARIOUS OIL & GAS COMPANIES IN U.A.E
DESCRIPTION NO’s
PTW holders for TAKREER 14
JPs holders for ADCO 95
PTW holders for ADNOC DISTRIBUTION 21
PTW holders for GASCO 28
PTW holders for DOLPHIN ENERGY 8
PTW holders for TRANSCO 3
Note:
• We have long term association and agreement with reputed manpower suppliers and have huge data bank
for early mobilization of skilled and semi skilled manpower on project basis as and when required.
Page 1 of 1
ENGINEERED EXCELLENCE
2 Crane 75 T / 50T / 35 T 20
Page 1 of 3
ENGINEERED EXCELLENCE
Testing Equipment
Transportation
Page 2 of 3
ENGINEERED EXCELLENCE
34 Cars Various 20
Note:
Our long term association and agreements with local suppliers for equipment has been instrumental in provision of uninterrupted services
to our clients as more equipment can be mobilized in the shortest span as per the project requirements.
Our equipment pass through stringent safety check first internally and then certified by Third parties before mobilization to any site.
We are well aware of CICPA (Critical Infrastructure and Coastal Protection Authority) pass requirements and most of our fleet is having
valid passes to work in Oil Field projects with valid CICPA passes.
Page 3 of 3
ENGINEERED EXCELLENCE
50 work stations with Computers, printers, copiers and furniture etc. Microsoft Windows, Auto CAD, Primavera
and Accounts Software. Telephones, Fax, Internet, Projector and Conference Facilities.
70 work stations with Computers, printers, copiers and furniture etc. Microsoft Windows, Auto CAD, Primavera
and Accounts Software. Telephones, Fax, Internet, Projector and Conference Facilities.
15 work stations with Computers, printers, copiers and furniture etc. Microsoft Windows, Auto CAD, Primavera
and Accounts Software. Telephones, Fax, Internet, Projector and Conference Facilities.
Page 1 of 2
ENGINEERED EXCELLENCE
70,000 Square Meters total industrial and camp facilities consisting of:
Site offices.
Stores.
Fabrication workshop.
Precast yard.
Portacabin Camp facilities
Page 2 of 2
ENGINEERED EXCELLENCE
Sl No. DESCRIPTION
1 Introduction
2 ISO 9001 Certification
3 Quality policy
4 Waste Reduction Policy
5 Quality Management System Manual Index
ENGINEERED EXCELLENCE
QUALITY SYSTEM
At ROBT.STONE, quality is not just a system, but a culture that covers the length and breadth of our
organization. Consequently, the Quality Assurance department not only implements a system, but maintains this
culture. We firmly believe that our Clients will return only if and when their expectations are fully met.
Our Quality and HSE Functions are managed by independent team of professionals, Our Quality Management
System is certified to ISO 9001:2008, Regular Quality Audits critically ascertain, identify and evaluate the
presence and compliance of norms specified in our Quality Manuals.
We implement the Quality Culture and system with a Motto “Do it Right, First time and Every Time”.
Page 1 of 1
ENGINEERED EXCELLENCE
Sl No. DESCRIPTION
1 Introduction
2 ISO 14001 Certification
3 BS OHSAS 18001 Certification
4 Environment, Occupational Health and Safety policy
5 Employee Welfare policy
6 Fog Control Policy
7 Alcohol, Drug and Substance abuse Policy
8 Environmental Purchasing Policy
9 EOHS Management System Manual Index
10 HSE Statistics
ENGINEERED EXCELLENCE
At ROBT.STONE, Safety is culture, we believe in executing projects with “Safety in Hearts and Minds”.
Safety in paramount, Safety First, in any of our acts and decision speaks about our commitment towards safety
for human life, asset and environment. We understand our social and economic responsibilities towards
Environment, Occupational Health and Safety Systems and thrive to achieve the best in the same by
implementing the systems. Our EOHS Management System is certified to ISO 14001:2004 & BS OHSAS
18001:2007.
Page 1 of 1
ENGINEERED EXCELLENCE
HSE PERFORMANCE
4 Incidents 3 3 4 2
5 Number of fatalities 0 0 0 0
SOCIAL RESPONSIBILITY
At ROBT.STONE, we believe it is our duty and social responsibility to give something back to the Community.
We believe in supporting ill-fated communities, extending our helping hand and generating awareness in our
team for voluntary contribution towards society.
Some of our social initiatives which we humbly do it without any fanfare as below, we believe our self to be
fortunate enough to help others and giving back to society from where we grow,
Active association with institutions in the UAE for raising charity funds.
Page 1 of 1
ENGINEERED EXCELLENCE
LICENCES
Sl No. DESCRIPTION
1 Commercial Trade License
2 Abu Dhabi Chamber of Commerce Certificate
3 Branch License (Dubai)
ENGINEERED EXCELLENCE
CLIENT LIST
ADCO (ABU DHABI COMPANY FOR ONSHORE OIL OPERATIONS) GASCO (ABU DHABI GAS INDUSTRIES LTD)
DOLPHIN ENERGY
EMIRATES STEEL
ROBT.STONE (ME) LLC received award of excellence in HSE for achieving
Two million man hours without Lost Time Incidents (LTI) for TAKREER
IRP-II Project
ROBT.STONE (ME) LLC Chairman and Managing Director Mr.V.K.Madan receiving award of excellence
from Mr. John Oberholzer (Project Manager, PMC) for achieving Two million man hours without Lost Time
Incidents (LTI) for IRP-II Project
ROBT.STONE (ME) LLC Managing Director Mr. V.K.Madan receiving certificate of excellence in
Execution of TAKREER – IRP-II Project from Mr. H. Sun Kim (Sr. Vice President of GS E&C, S. Korea)
Certificate of Appreciation from GS E&C, S. Korea for excellence in Pipeline welding for TAKREER
IRP-II project
ROBT.STONE (ME) LLC Managing Director Mr. V.K.Madan receiving award of appreciation from
ADNOC COE H.E. Yousef Omair Bin Yousef
Certificate of Appreciation from GS E&C, S. Korea for excellence in Pipeline lowering for TAKREER
IRP-II project
Image credit: EPA
German Chancellor Angela Merkel inaugurates Natural Gas filling station in Masdar City. ROBT.STONE
(ME) LLC executed the NGV (Natural Gas for Vehicles) project which was the first of its kind in UAE
Certificate of appreciation awarded to ROBT.STONE (ME) LLC for the successful execution and
completion of the first Natural Gas for Vehicles (NGV) project in UAE
Letter of Appreciation for High Safety and compliance to client safety standards during
execution of tie-in and pipeline commissioning works at Al Ain Cement Factory in 2012
Certificate of Appreciation from GS E&C, S. Korea for excellence in Pipeline joint coating for TAKREER
IRP-II project
Letter of Appreciation for High Safe and timely completion without any cost variations for
Dolphin Energy Pipeline rehabilitation works during 2012-2013
ROBT.STONE (ME) LLC received Excellent Supplier Award – 2012 from GASCO for outstanding works
as contractor in the year 2012.
Letter of Appreciation for strict adherence to Quality and Safety standards together with
timely completion of 10” pipeline construction works for SEWA (Sharjah Electricity and
Water Authority) in 2007
ENGINEERED EXCELLENCE
Sl No. DESCRIPTION
1 Introduction
2 HDD Division Organization Structure
3 Experience
4 Design Calculations (stress) for HDD works (Sample)
5 HDD Profile drawing (Sample)
ENGINEERED EXCELLENCE
HDD DIVISION
Page 1 of 12
ENGINEERED EXCELLENCE
As a HDD Division, we have built our business on the strength of the most experienced people in the industry and
we believe that experienced people and best equipment and technical knowledge are the difference between the
success and the failure. Our team of HDD has over 15 years of HDD experience working on Oil and Gas and
Telecom sector HDD works.
Combined with the experience and the equipment available, ROBTSTONE (ME) LLC has the most
knowledgeable, technically advanced crew available in the local industry today. With 4 Spreads of HDD
Equipment ROBT.STONE have 5 crews for the rigs for round the clock operation to be carried out at critical
locations.
We have completed 200 crossings in nearly all type of terrain, across major highways, utilities, creeks, wetlands,
etc.
Horizontal Directional Drilling (HDD) also termed as Directional Boring and Directional Drilling, is a method of
Installing Underground Pipelines and conduits from the surface along the designed Bore Path. Installation lengths
up to 3500’ have been completed and diameter up to 28” has been installed in shorter as well as longer runs.
This procedure is used for installing Gas Lines, Oil Lines, Sewer Lines, Telecommunication Cables, Power Cable
Conduits, Water Lines and Casing Pipe.
This technology has been rapidly growing and is expected to increase for the foreseeable future with the
advantages mentioned below.
Page 2 of 12
ENGINEERED EXCELLENCE
HDD technique can be used as an alternate to other techniques due to following reasons:
Shorter Construction Period
Cost Efficient
Environmental Friendly
Conventional Technique not feasible
No interruption to Surface Traffic
Secure and Safer cover depth
Longer Installation Possible
Directional Capabilities
OUR STRENGTH
Have successful track record of installation of Apprx..44,000 meter of pipelines by HDD technique.
Mobilized equipment in the Region
Aware of conducting business in the Region
Cost of execution is very low as compared to other contractors.
Innovative and technical knowledge about the subject.
Every project begins with thoughtful planning. Ground conditions are determined, surrounding utilities positively
located, bore profile is surveyed and plotted, and safety and environmental issues are considered before work
commencement. The major activities involved are as follows:
PILOT HOLE
The Pilot Hole is drilled from the entry to the exit point following the previously designed/approved profile and
alignment. The drilling tools and the Rig capacity are selected largely based on the result of the geotechnical
Page 3 of 12
ENGINEERED EXCELLENCE
Investigation and the borehole data available and the crossing size (length and the diameter). During the pilot hole
drilling directional guidance system is used to navigate the pilot hole along its pre designed profile. Guidance
systems used by us are:
Walkover System
The most commonly used equipment for determing the location of the bore head on small to mid size rigs is
called a 'walk-over' locating system. A sonde (transmitter) behind the drill head registers angle,
rotation, diggy auto insurance quotes magnetic direction and temperature data. The information is then
encoded into an electro-magnetic signal which is transmitted through the ground to the surface. At the surface
a receiver is manually positioned over the sonde signal and the signal decoded and steering directions relayed
to the operator on a remote display on the drill machine.
Downhole System
Page 4 of 12
ENGINEERED EXCELLENCE
The most commonly used type of down hole system is called a 'wire-line' and uses a wire to transmit the data
up the inside of the drill pipe. At the surface the data from the wire is decoded by a computer to provide
depth, angle, rotation, direction (azimuth) and other information. To compensate for potential magnetic
interference, an artificial electro-magnetic grid is created at the surface the steering tool locates itself beneath
the grid. We use state of the art equipment PARATRACK II for down hole steering.
HOLE ENLARGEMENT
Pilot Hole enlarging is known as “Pre Reaming”. This process is carried out after Pilot Hole. Pre Reaming is
required to provide a bore diameter large enough so that the pipeline can be installed in the drilled crossing. Based
on the final desired diameter and the soil condition the required diameter of the pre reaming and number of stages
to obtain that same is finalized. This pre reaming shall be carried out with different types of tooling for the soft
strata and rock. For softer ground the pre reaming operation is carried out by Reamers and Fly Cutters. For rock
crossings the Hole Openers are used.
PULLBACK OPERATION
Once the drilled hole has been enlarged to the required diameter and cleaned adequately, the pipeline is installed.
When applicable, the pipeline is pre-assembled in a single string and placed on rollers prior to pullback. For
pullback, a reamer is connected to the drill pipe. Behind the reamer a rotating swivel is connected allowing the
drill pipe to rotate the reamer without allowing the transfer of torque to the product pipe. The drill pipe is then
pulled back towards the entry point until the pipeline is fully installed in the hole.
Page 5 of 12
ENGINEERED EXCELLENCE
SPECIFICATIONS:
Pullback(max) 320 kN
Thrust(max) 200 kN
Spindle torque(max) 12000 N.m
Spindle Speed(high and low speed) 0-120 r/min
Incidence angle 10-24°
Engine type 4strokes,Turbo-charging,6cylinders water cooling Diesel engine
Engine rated power 162 kW/2200 rpm
Diameter of drill pipe 73 mm
Length of drill pipe 4 meters
Page 6 of 12
ENGINEERED EXCELLENCE
SPECIFICATIONS:
Pullback(max) 320 kN
Thrust(max) 200 kN
Spindle torque(max) 12000 N.m
Spindle Speed(high and low speed) 0-120 r/min
Incidence angle 10-24°
Engine type 4strokes,Turbo-charging,6cylinders water cooling Diesel engine
Engine rated power 162 kW/2200 rpm
Diameter of drill pipe 73 mm
Length of drill pipe 4 meters
Page 7 of 12
ENGINEERED EXCELLENCE
SPECIFICATIONS:
Pullback(max) 320 kN
Thrust(max) 200 kN
Spindle torque(max) 12000 N.m
Spindle Speed(high and low speed) 0-120 r/min
Incidence angle 10-24°
Engine type 4strokes,Turbo-charging,6cylinders water cooling Diesel engine
Engine rated power 162 kW/2200 rpm
Diameter of drill pipe 73 mm
Length of drill pipe 4 meters
Page 8 of 12
ENGINEERED EXCELLENCE
SPECIFICATIONS:
Pullback(max) 2450 k N
Thrust(max) 1640 k N
Spindle torque(max) 82300 Nm
Spindle Speed(high and low speed) 0-81 r/min
Incidence angle 09 -16°
Engine rated power 239 x 2 kW/2200 rpm
Diameter of drill pipe 6” – 8”
Length of drill pipe 9.8 meters
Page 9 of 12
ENGINEERED EXCELLENCE
MUD MOTOR
6 ¾” XTR Mud Motor, 1.75 Degree Fixed Bend, 7/8 Lobe 3 Stage Power Section – 01 No.
DRILL PIPES
Page 10 of 12
ENGINEERED EXCELLENCE
FLY CUTTERS AND BARREL REAMERS
Fly cutter and barrel reamers from size 12” to 64” - LOT
Page 11 of 12
ENGINEERED EXCELLENCE
APPLICATIONS OF HDD
Design & Engineering: A team of ROBT.STONE Design Engineers generates design plan and profile drawings
for crossings. The engineers have an access to Computer Aided Design systems. The plan and the profile are
based on design parameters, underground utilities and geotechnical reports provided by client. This is then sent to
site after its approval from client. During drilling the coordinates of the actual drilled path are plotted on this
profile, the path of the next drilled rod to be drilled depends on the tolerance of the plotted coordinate and the
design profile. The surveyor then prepares an “As-Built” based on the actual plotted coordinates. After
completion of work this As-Built is then submitted to the Client for future reference.
Pipeline Bundles: This application involves laying of combination of different diameter pipelines and CS conduit
in a single drilled hole. This method of laying is most common today. It not only reduces on cost but also allows
the work to be done with minimum environmental Damages. RSME Construction has done a number of bundled
crossings of combination of pipeline and CS conduits.
Large Diameter and longer length Crossings: ROBT.STONE has excelled itself in this category from
executing a 6” to 28” crossing of 1Km and more. In larger dia bundle crossing of 28 Inch with 6 Inch conduits are
pulled for length ranging from 600 meter to 1400 Meter. Our Maxi Rig can overcome the pulling requirement and
tensional requirement of large diameter crossings. RSME till date has installed over 38,000 meter of pipelines
with diameter ranging from 6” to 28”.
Rock Crossings: The myth that Horizontal Directional Drilling is only limited to soft soil, but driven by client’s
demand drilling across these crossings is no longer a myth but a reality! RSME have all the required equipment
and expertise for drilling in hard strata and rock. These crossings require use of specialized rock tooling Like Mud
Motors for drilling Pilot Hole and Hole Openers to enlarge the hole to the required diameter.
Telecommunication and Electrical Conduits: The growing popularity of Broadband services has resulted in
laying of fiber optic cable for infrastructure development .The HDD system is best suited for laying of electrical
conduits and OFC across streams, underground utilities, canals, National Highways and Municipal roads.
Beach Approaches: The use of directional drilling for landfall sections of pipelines leaves no effect on the beach
environment, installation by HDD is less time consuming ,the pipeline is not exposed to the outer atmosphere
hence it is safe from the sea strom,Waves,etc.
Page 12 of 12
ENGINEERED EXCELLENCE
CHAIRMAN AND
MANAGING DIRECTOR
DIRECTOR - PROJECTS
CORPORATE MANAGEMENT
MANPOWER
SITE ACCOUNTS
QC ENGINEER SUPERINTENDENT
PLANT & EQUIPMENT SUPERINTENDENT SAFETY ENGINEER
ENGINEER
RIG 3 – 32T RIG 4 – 160T
QC INSPECTOR 1 RIG 1 – 32T RIG 2 – 32T
RIG 1 32 TON SAFETY OFFICER 1
RIG 1 32 TON
TRACKER HDD FOREMAN TRACKER MECHANIC / TRACKER HDD FOREMAN SURVEYOR /
QC INSPECTOR 2 ELECTRICIAN TRACKER
RIG 2 32 TON SAFETY OFFICER 2
RIG 2 32 TON
Crossing Length
Project Owner Main Contractor Description Road/ Highway/Utility Pipe Diameter Pipe Grade
(Mtr.)
HABSHAN I FLOWLINE ADCO CCC / SAARI ADCO / GASCO Utilities Crossing 6”, 8”, 20” API 5L X 60 1400 (Total)
IRP II PIPELINE TAKREER GS ENGINEERING Palace Road & Round About 20" + 6" API 5L X 65 1100
IRP II PIPELINE TAKREER GS ENGINEERING Sheikh Zayed Mosque Road E10 10" + 6" API 5L X 60 975
IRP II PIPELINE TAKREER GS ENGINEERING E11 Dubai-Sila Road 20" + 6" API 5L X 65 733
IRP II PIPELINE TAKREER GS ENGINEERING E22 Abu Dhabi To Al Ain Road 20" + 6" API 5L X 65 733
Page 1 of 12
EXPERIENCE LIST – HDD WORKS
ENGINEERED EXCELLENCE
Crossing Length
Project Owner Main Contractor Description Road/ Highway/Utility Pipe Diameter Pipe Grade
(Mtr.)
IRP II PIPELINE TAKREER GS ENGINEERING E22 Abu Dhabi To Al Ain Road 20" + 6" API 5L X 65 733
IRP II PIPELINE TAKREER GS ENGINEERING 12th Street Road 10" API 5L X 60 680
IRP II PIPELINE TAKREER GS ENGINEERING Musaffah To Sila Road(E11) 10" + 6" API 5L X 60 521
IRP II PIPELINE TAKREER GS ENGINEERING Asphalt Road(ICAD Shabia Road) 20" + 6" API 5L X 65 432
IRP II PIPELINE TAKREER GS ENGINEERING Mafraq-Al Guwaifat Highway 12" API 5L X 65 399
IRP II PIPELINE TAKREER GS ENGINEERING Mafraq-Al Guwaifat Highway 12" API 5L X 65 399
IRP II PIPELINE TAKREER GS ENGINEERING Mafraq-Al Guwaifat Highway 6" API 5L X 65 399
IRP II PIPELINE TAKREER GS ENGINEERING E20 Airport Road 20" + 6" API 5L X 65 364
IRP II PIPELINE TAKREER GS ENGINEERING Al Rawda Road & Shakboot Sultan Road 12" API 5L X 65 363
IRP II PIPELINE TAKREER GS ENGINEERING Al Rawda Road & Shakboot Sultan Road 12" API 5L X 65 363
IRP II PIPELINE TAKREER GS ENGINEERING Al Rawda Road & Shakboot Sultan Road 6" HDPE 363
Small By Pass Road Crossing Cricket
IRP II PIPELINE TAKREER GS ENGINEERING 20" + 6" API 5L X 65 351
Stadium
IRP II PIPELINE TAKREER GS ENGINEERING Utility Crossing 28" API 5L X 70 326
Page 2 of 12
EXPERIENCE LIST – HDD WORKS
ENGINEERED EXCELLENCE
Crossing Length
Project Owner Main Contractor Description Road/ Highway/Utility Pipe Diameter Pipe Grade
(Mtr.)
IRP II PIPELINE TAKREER GS ENGINEERING Pipeline Crossing 10" + 6" API 5L X 60 325
IRP II PIPELINE TAKREER GS ENGINEERING Proposed Road (Villa Access ) 12" API 5L X 65 320
IRP II PIPELINE TAKREER GS ENGINEERING Proposed Road (Villa Access ) 12" API 5L X 65 320
IRP II PIPELINE TAKREER GS ENGINEERING Proposed Road (Villa Access ) 6" API 5L X 65 320
IRP II PIPELINE TAKREER GS ENGINEERING Madinath Zayed Highway Crossing 28" API 5L X 70 293
IRP II PIPELINE TAKREER GS ENGINEERING Madinath Zayed Highway Crossing 28" API 5L X 70 293
IRP II PIPELINE TAKREER GS ENGINEERING Madinath Zayed Highway Crossing 6" HDPE 293
IRP II PIPELINE TAKREER GS ENGINEERING ICAD To Labour Camps Shabia Road 20" + 6" API 5L X 65 283
IRP II PIPELINE TAKREER GS ENGINEERING ICAD to Labour Camps Shabia Road 20" + 6" API 5L X 65 283
IRP II PIPELINE TAKREER GS ENGINEERING GASCO Pipeline Crossing 20" + 6" API 5L X 65 280
IRP II PIPELINE TAKREER GS ENGINEERING Cricket Stadium Road 20" + 6" API 5L X 65 277
IRP II PIPELINE TAKREER GS ENGINEERING Proposed Road - ADIA North Terminal 20" + 6" API 5L X 65 268
IRP II PIPELINE TAKREER GS ENGINEERING Small Bypass Road Cricket Stadium 10" API 5L X 60 253
IRP II PIPELINE TAKREER GS ENGINEERING E33 Airport Road 20" + 6" API 5L X 65 253
IRP II PIPELINE TAKREER GS ENGINEERING E33 Airport Road 20" + 6" API 5L X 65 253
IRP II PIPELINE TAKREER GS ENGINEERING ICAD II Road Crossing 28" API 5L X 70 248
IRP II PIPELINE TAKREER GS ENGINEERING ICAD II Road Crossing 28" API 5L X 70 248
Page 3 of 12
EXPERIENCE LIST – HDD WORKS
ENGINEERED EXCELLENCE
Crossing Length
Project Owner Main Contractor Description Road/ Highway/Utility Pipe Diameter Pipe Grade
(Mtr.)
IRP II PIPELINE TAKREER GS ENGINEERING ICAD II Road Crossing 6" HDPE 248
IRP II PIPELINE TAKREER GS ENGINEERING Rumaitha Road Crossing 28" API 5L X 70 247
IRP II PIPELINE TAKREER GS ENGINEERING Rumaitha Road Crossing 28" API 5L X 70 247
IRP II PIPELINE TAKREER GS ENGINEERING Rumaitha Road Crossing 6" HDPE 247
IRP II PIPELINE TAKREER GS ENGINEERING Al Faya-Al Quaa Road 12" API 5L X 65 244
IRP II PIPELINE TAKREER GS ENGINEERING Al Faya-Al Quaa Road 12" API 5L X 65 244
IRP II PIPELINE TAKREER GS ENGINEERING Al Faya-Al Quaa Road 6" API 5L X 65 244
IRP II PIPELINE TAKREER GS ENGINEERING Sila To Abu Dhabi Main Road 28" API 5L X 70 243
IRP II PIPELINE TAKREER GS ENGINEERING Sila To Abu Dhabi Main Road 28" API 5L X 70 243
IRP II PIPELINE TAKREER GS ENGINEERING Sila To Abu Dhabi Main Road 6" HDPE 243
IRP II PIPELINE TAKREER GS ENGINEERING Asphalt Road 20" + 6" API 5L X 65 218
IRP II PIPELINE TAKREER GS ENGINEERING Habshan Road Crossing 28" API 5L X 70 218
IRP II PIPELINE TAKREER GS ENGINEERING Habshan Road Crossing 28" API 5L X 70 218
IRP II PIPELINE TAKREER GS ENGINEERING Habshan Road Crossing 6" HDPE 218
IRP II PIPELINE TAKREER GS ENGINEERING Al Rawda Road From Truck Road 12" API 5L X 65 212
IRP II PIPELINE TAKREER GS ENGINEERING Al Rawda Road From Truck Road 12" API 5L X 65 212
IRP II PIPELINE TAKREER GS ENGINEERING Al Rawda Road From Truck Road 6" API 5L X 65 212
IRP II PIPELINE TAKREER GS ENGINEERING Proposed Road (Residential Access ) 12" API 5L X 65 205
IRP II PIPELINE TAKREER GS ENGINEERING Proposed Road (Residential Access ) 12" API 5L X 65 205
Page 4 of 12
EXPERIENCE LIST – HDD WORKS
ENGINEERED EXCELLENCE
Crossing Length
Project Owner Main Contractor Description Road/ Highway/Utility Pipe Diameter Pipe Grade
(Mtr.)
IRP II PIPELINE TAKREER GS ENGINEERING Proposed Road (Residential Access ) 6" API 5L X 65 205
IRP II PIPELINE TAKREER GS ENGINEERING Twam Street Road 12" API 5L X 65 204
IRP II PIPELINE TAKREER GS ENGINEERING Twam Street Road 12" API 5L X 65 204
IRP II PIPELINE TAKREER GS ENGINEERING Twam Street Road 6" HDPE 204
IRP II PIPELINE TAKREER GS ENGINEERING Silah To Abu Dhabi Highway 20" + 6" API 5L X 65 197
IRP II PIPELINE TAKREER GS ENGINEERING Transco Pipeline Crossing 12" API 5L X 65 197
IRP II PIPELINE TAKREER GS ENGINEERING Transco Pipeline Crossing 12" API 5L X 65 197
IRP II PIPELINE TAKREER GS ENGINEERING Abu Dhabi -Al Ain Truck Road 12" API 5L X 65 193
IRP II PIPELINE TAKREER GS ENGINEERING Abu Dhabi -Al Ain Truck Road 12" API 5L X 65 193
IRP II PIPELINE TAKREER GS ENGINEERING Abu Dhabi -Al Ain Truck Road 6" API 5L X 65 193
51st Street
IRP II PIPELINE TAKREER GS ENGINEERING 20" + 6" API 5L X 65 191
(Near Round About)
IRP II PIPELINE TAKREER GS ENGINEERING ICAD III Camp Road Crossing 28" API 5L X 70 187
IRP II PIPELINE TAKREER GS ENGINEERING ICAD III Camp Road Crossing 28" API 5L X 70 187
IRP II PIPELINE TAKREER GS ENGINEERING Road To ICAD III 12" API 5L X 65 187
IRP II PIPELINE TAKREER GS ENGINEERING Road To ICAD III 12" API 5L X 65 187
IRP II PIPELINE TAKREER GS ENGINEERING ICAD III Camp Road Crossing 6" HDPE 187
IRP II PIPELINE TAKREER GS ENGINEERING 59th Street 20" + 6" API 5L X 65 185
IRP II PIPELINE TAKREER GS ENGINEERING Link Road Khalifa Bin Zayed City 10" API 5L X 60 180
IRP II PIPELINE TAKREER GS ENGINEERING Link Road Abu Dhabi To Mussaffah Road 20" + 6" API 5L X 65 180
Page 5 of 12
EXPERIENCE LIST – HDD WORKS
ENGINEERED EXCELLENCE
Crossing Length
Project Owner Main Contractor Description Road/ Highway/Utility Pipe Diameter Pipe Grade
(Mtr.)
IRP II PIPELINE TAKREER GS ENGINEERING Link Road Khalifa City To Airport Road 20" + 6" API 5L X 65 180
IRP II PIPELINE TAKREER GS ENGINEERING Salmia Palace Road Crossing 28" API 5L X 70 177
IRP II PIPELINE TAKREER GS ENGINEERING Salmia Palace Road Crossing 28" API 5L X 70 177
IRP II PIPELINE TAKREER GS ENGINEERING Salmia Palace Road Crossing 6" HDPE 177
IRP II PIPELINE TAKREER GS ENGINEERING Access Road Cricket Stadium 10" API 5L X 60 174
IRP II PIPELINE TAKREER GS ENGINEERING Abu Dhabi -Al Ain Truck Road 12" API 5L X 65 166
IRP II PIPELINE TAKREER GS ENGINEERING Abu Dhabi -Al Ain Truck Road 6" API 5L X 65 166
IRP II PIPELINE TAKREER GS ENGINEERING Hilwa Road Crossing 28" API 5L X 70 165
IRP II PIPELINE TAKREER GS ENGINEERING Hilwa Road Crossing 28" API 5L X 70 165
IRP II PIPELINE TAKREER GS ENGINEERING Hilwa Road Crossing 6" HDPE 165
IRP II PIPELINE TAKREER GS ENGINEERING Link Road From Hameem Road 12" API 5L X 65 164
IRP II PIPELINE TAKREER GS ENGINEERING Link Road From Hameem Road 12" API 5L X 65 164
Page 6 of 12
EXPERIENCE LIST – HDD WORKS
ENGINEERED EXCELLENCE
Crossing Length
Project Owner Main Contractor Description Road/ Highway/Utility Pipe Diameter Pipe Grade
(Mtr.)
IRP II PIPELINE TAKREER GS ENGINEERING Link Road From Hameem Road 6" API 5L X 65 164
IRP II PIPELINE TAKREER GS ENGINEERING Pipeline Crossing 20" + 6" API 5L X 65 160
IRP II PIPELINE TAKREER GS ENGINEERING Dual Carriage Way Road Crossing 28" API 5L X 70 160
IRP II PIPELINE TAKREER GS ENGINEERING Dual Carriage Way Road Crossing 28" API 5L X 70 160
IRP II PIPELINE TAKREER GS ENGINEERING Dual Carriage Way Road Crossing 6" HDPE 160
IRP II PIPELINE TAKREER GS ENGINEERING Al Jumania Road Crossing 28" API 5L X 70 158
IRP II PIPELINE TAKREER GS ENGINEERING Al Jumania Road Crossing 28" API 5L X 70 158
IRP II PIPELINE TAKREER GS ENGINEERING Abu Dhabi -Al Ain Truck Road 12" API 5L X 65 158
IRP II PIPELINE TAKREER GS ENGINEERING Abu Dhabi -Al Ain Truck Road 12" API 5L X 65 158
IRP II PIPELINE TAKREER GS ENGINEERING Abu Dhabi -Al Ain Truck Road 6" API 5L X 65 158
IRP II PIPELINE TAKREER GS ENGINEERING Al Jumania Road Crossing 6" HDPE 158
By Pass Road To Heavy Vehicle
IRP II PIPELINE TAKREER GS ENGINEERING Monitoring Station(DOT) At Musaffah 10" + 6" API 5L X 60 148
E11 Road
IRP II PIPELINE TAKREER GS ENGINEERING Utility Crossing 28" API 5L X 70 148
Page 7 of 12
EXPERIENCE LIST – HDD WORKS
ENGINEERED EXCELLENCE
Crossing Length
Project Owner Main Contractor Description Road/ Highway/Utility Pipe Diameter Pipe Grade
(Mtr.)
IRP II PIPELINE TAKREER GS ENGINEERING Abu Dhabi Refinery Access Road 10" + 6" API 5L X 60 142
IRP II PIPELINE TAKREER GS ENGINEERING 26th Street Crossing 10" + 6" API 5L X 60 140
IRP II PIPELINE TAKREER GS ENGINEERING Water Pipeline Crossing 10" + 6" API 5L X 60 140
IRP II PIPELINE TAKREER GS ENGINEERING Asphalt Road 20" + 6" API 5L X 65 138
IRP II PIPELINE TAKREER GS ENGINEERING Utility Crossing (TAKREER) 28" API 5L X 70 137
IRP II PIPELINE TAKREER GS ENGINEERING Utility Crossing (TAKREER) 28" API 5L X 70 137
IRP II PIPELINE TAKREER GS ENGINEERING Utility Crossing (TAKREER) 6" HDPE 137
IRP II PIPELINE TAKREER GS ENGINEERING Farm Access Road From Truck Road 12" API 5L X 65 136
IRP II PIPELINE TAKREER GS ENGINEERING Village Access Road From Truck Road 12" API 5L X 65 136
IRP II PIPELINE TAKREER GS ENGINEERING Farm Access Road From Truck Road 12" API 5L X 65 136
IRP II PIPELINE TAKREER GS ENGINEERING Village Access Road From Truck Road 12" API 5L X 65 136
IRP II PIPELINE TAKREER GS ENGINEERING Farm Access Road From Truck Road 6" API 5L X 65 136
IRP II PIPELINE TAKREER GS ENGINEERING Village Access Road From Truck Road 6" API 5L X 65 136
Page 8 of 12
EXPERIENCE LIST – HDD WORKS
ENGINEERED EXCELLENCE
Crossing Length
Project Owner Main Contractor Description Road/ Highway/Utility Pipe Diameter Pipe Grade
(Mtr.)
IRP II PIPELINE TAKREER GS ENGINEERING Maqta Gas Pipeline Crossing 10" + 6" API 5L X 60 135
IRP II PIPELINE TAKREER GS ENGINEERING GASCO Pipeline Crossing 20" + 6" API 5L X 65 135
IRP II PIPELINE TAKREER GS ENGINEERING Utility Crossing (TAKREER) 28" API 5L X 70 133
IRP II PIPELINE TAKREER GS ENGINEERING Utility Crossing (TAKREER) 28" API 5L X 70 133
IRP II PIPELINE TAKREER GS ENGINEERING 14th Steet/Twam Street 12" API 5L X 65 133
IRP II PIPELINE TAKREER GS ENGINEERING 14th Steet/Twam Street 12" API 5L X 65 133
IRP II PIPELINE TAKREER GS ENGINEERING 14th Steet/Twam Street 6" API 5L X 65 133
IRP II PIPELINE TAKREER GS ENGINEERING Utility Crossing (TAKREER) 6" HDPE 133
IRP II PIPELINE TAKREER GS ENGINEERING Newly Constructed Road 12" API 5L X 65 131
IRP II PIPELINE TAKREER GS ENGINEERING Newly Constructed Road 12" API 5L X 65 131
IRP II PIPELINE TAKREER GS ENGINEERING Newly Constructed Road 6" API 5L X 65 131
IRP II PIPELINE TAKREER GS ENGINEERING Al Dhafra Private Road 10"+6" API 5L X 64 130
IRP I Pipeline Crossing ( Behind Sas Al
IRP II PIPELINE TAKREER GS ENGINEERING 20" + 6" API 5L X 65 130
Nakheel Villas)
IRP II PIPELINE TAKREER GS ENGINEERING Farm Access Road From Truck Road 12" API 5L X 65 130
IRP II PIPELINE TAKREER GS ENGINEERING Farm Access Road From Truck Road 12" API 5L X 65 130
IRP II PIPELINE TAKREER GS ENGINEERING Farm Access Road From Truck Road 6" API 5L X 65 130
IRP II PIPELINE TAKREER GS ENGINEERING Newly Constructed Road 12" API 5L X 65 126
IRP II PIPELINE TAKREER GS ENGINEERING Newly Constructed Road 12" API 5L X 65 126
IRP II PIPELINE TAKREER GS ENGINEERING Newly Constructed Road 6" API 5L X 65 126
Page 9 of 12
EXPERIENCE LIST – HDD WORKS
ENGINEERED EXCELLENCE
Crossing Length
Project Owner Main Contractor Description Road/ Highway/Utility Pipe Diameter Pipe Grade
(Mtr.)
IRP II PIPELINE TAKREER GS ENGINEERING Al Dhafra Air Base Road 12" API 5L X 65 123
IRP II PIPELINE TAKREER GS ENGINEERING Al Dhafra Air Base Road 12" API 5L X 65 123
IRP II PIPELINE TAKREER GS ENGINEERING Al Dhafra Air Base Road 6" API 5L X 65 123
IRP II PIPELINE TAKREER GS ENGINEERING Service Road From Al Ain Truck Road 12" API 5L X 65 122
IRP II PIPELINE TAKREER GS ENGINEERING Service Road From Al Ain Truck Road 12" API 5L X 65 122
IRP II PIPELINE TAKREER GS ENGINEERING Service Road From Al Ain Truck Road 6" API 5L X 65 122
IRP II PIPELINE TAKREER GS ENGINEERING Village Access Road From Truck Road 12" API 5L X 65 121
IRP II PIPELINE TAKREER GS ENGINEERING Village Access Road From Truck Road 12" API 5L X 65 121
IRP II PIPELINE TAKREER GS ENGINEERING Village Access Road From Truck Road 6" API 5L X 65 121
IRP II PIPELINE TAKREER GS ENGINEERING Zakher ADNOC Station Road & Wall 12" API 5L X 65 120
IRP II PIPELINE TAKREER GS ENGINEERING Zakher ADNOC Station Road & Wall 6" API 5L X 65 120
IRP II PIPELINE TAKREER GS ENGINEERING Road Inside Wadi 12" API 5L X 65 104
IRP II PIPELINE TAKREER GS ENGINEERING Road Inside Wadi 12" API 5L X 65 104
IRP II PIPELINE TAKREER GS ENGINEERING Road Inside Wadi 6" API 5L X 65 104
IRP II PIPELINE TAKREER GS ENGINEERING Zakher ADNOC Station Road & Wall 12" API 5L X 65 103
Page 10 of 12
EXPERIENCE LIST – HDD WORKS
ENGINEERED EXCELLENCE
Crossing Length
Project Owner Main Contractor Description Road/ Highway/Utility Pipe Diameter Pipe Grade
(Mtr.)
IRP II PIPELINE TAKREER GS ENGINEERING Al Dhafra Private Road 10" + 6" API 5L X 60 86
IRP II PIPELINE TAKREER GS ENGINEERING IRP I Pipeline Crossing 20" + 6" API 5L X 65 86
IRP II PIPELINE TAKREER GS ENGINEERING Farm Access Road From Truck Road 12" API 5L X 65 83
IRP II PIPELINE TAKREER GS ENGINEERING Farm Access Road From Truck Road 12" API 5L X 65 83
IRP II PIPELINE TAKREER GS ENGINEERING Farm Access Road From Truck Road 6" API 5L X 65 83
Page 11 of 12
EXPERIENCE LIST – HDD WORKS
ENGINEERED EXCELLENCE
Crossing Length
Project Owner Main Contractor Description Road/ Highway/Utility Pipe Diameter Pipe Grade
(Mtr.)
Page 12 of 12
ENGINEERED EXCELLENCE
Page 1 of 3
ENGINEERED EXCELLENCE
Page 2 of 3
ENGINEERED EXCELLENCE
Page 3 of 3
SA
M
PL
E
Head Office (Abu Dhabi)
Facilities