RSME Company Profile

Robt. Stone (ME) LLC is an EPC and Infrastructure Contractor based in Abu Dhabi, specializing in pipeline and process plant projects in the Oil and Gas sector across the MENA region. Established in 2006, the company has built a strong reputation for timely project delivery, safety, and quality, supported by a skilled management team and advanced equipment. The company is registered with various oil and gas entities and offers a wide range of services including engineering, procurement, construction, and maintenance works.

Uploaded by

usama5956
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
318 views148 pages

RSME Company Profile

Robt. Stone (ME) LLC is an EPC and Infrastructure Contractor based in Abu Dhabi, specializing in pipeline and process plant projects in the Oil and Gas sector across the MENA region. Established in 2006, the company has built a strong reputation for timely project delivery, safety, and quality, supported by a skilled management team and advanced equipment. The company is registered with various oil and gas entities and offers a wide range of services including engineering, procurement, construction, and maintenance works.

Uploaded by

usama5956
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 148

0

COMPANY PROFILE

ROBT. STONE (ME) LLC


P.O. Box : 39588
Abu Dhabi, U.A.E.
Tele : +971 2 6767415
Fax : +971 2 6767943
E-Mail : [email protected]
company overview 1

COMPANY PROFILE Registration with oil & gas companies 2

Vision, Mission and core values 3

Company organization structure 4

services 5

experience list 6

resources 7

Quality system 8

Hse management 9

social responsibility 10

licenses 11

client list 12

awards and appreciations 13

Horizontal directional drilling 14


ENGINEERED EXCELLENCE

Robt. Stone (ME) LLC


P.O. Box. 39588,
Abu Dhabi, UAE.
Tel: 00971 2 6767415
Fax: 00971 2 6767943
ENGINEERED EXCELLENCE

COMPANY OVERVIEW
1.1 INTRODUCTION

ROBT.STONE (ME) LLC (RSME) is a growing EPC and Infrastructure Contractor for Pipeline and
Process Plants in the Oil and Gas sector in MENA region. ROBT.STONE, a diversified company,
possesses immense expertise and competence and a fleet of state-of-the-art equipment for executing any
turnkey EPC / Infrastructure project from conceptual stages through execution to project delivery.

The company was established in Abu Dhabi in 2006 and has grown steadily with an outstanding
reputation for its technical accomplishments. ROBT.STONE has successfully ensured on-time delivery
of various projects in the region with a special focus on integrity, safety and quality standards.

Strong Professional Management team having a vision for investment in best human resources and
latest technologies and equipment has pushed the growth of the company upwards in the last 10 years
of its establishment in the Region.

1.2 OUR EXPERTISE

ROBT.STONE has developed considerable expertise in various disciplines of Oil & Gas industry and
Infrastructure business in EPC and Construction projects in Middle East and North Africa (MENA)
region over the years. Company has attained 100% Annual which highlights our professional approach
towards each project and commitment of safe, quality and timely delivery which have contributed in
repeated orders from our esteemed clients.

We are a diversified company having the experience, specialist skills and our own fleet of latest
equipment for executing any EPC / Infrastructure project from conceptual stages to hand over.

In the field of Oil & Gas pipeline and Infrastructure construction works, major services we provide
includes, but not limited to:
1. Engineering, Procurement & Construction of Pipeline and plant piping works
2. Tank Fabrication, Erection works
3. Civil and Structural works
4. Electrical, Instrumentation and Telecom works
5. HDD/NDRC works
6. Hot Tapping works
7. Fabrication works (Pressure Vessel, Skids etc.)
8. Pipeline and Plant Maintenance works

Our qualified team is well versed in the multifaceted aspect of project management. The team has
access to specialist softwares with the backup of I.T support services to provide up to date reports on
Project and Cost Control and Budget. We also implement MIS (Management Information System)

Page 1 of 4
ENGINEERED EXCELLENCE
which is used to track the projects for the successful execution of projects providing benefit to both
Company and Customers

Our Senior Management team having more than two decades of International experiences is our core
strength for sustainable growth. We believe in investment in Human Capital and have strong committed
work force to take up any challenges. We speak different languages but understand local requirements
of cultures and work with local knowledge. Our people are professionals in every field, site
construction, safety, quality and project management which builds projects with “Safety in heart and
Minds”.

Our team is fully aware of local requirements of working in all the Oil and Gas fields like Habshan,
Buhasa, Huwaila, Bida Qamzan, Ruwais, Jebel Dhanna, Al Ain, Northern and Eastern Region in Abu
Dhabi and experience of working in Oil and Gas fields in Oman and Qatar. This gives us added
advantage in the REGION to take up any kind of complex projects.

We have a very strong Interface management team, they are fully aware of Local by Laws like Al
Dhafra and Police Committees, Critical Infrastructure and Coastal Protection Authority (CICPA)
permits and pass (Specially in the U.A,.E and Western region), local NOC requirements which are very
critical for successful and timely execution and completion of the project in this region.

To keep pace with the changing dimensions of new technologies in the field of Oil and Gas pipeline
construction sector as well in Telecom and Infrastructure sector, an HDD division was incorporated for
the specialized field of “Horizontal Directional Drilling” projects and has executed various projects for
Oil and Gas sector in the Region.

Our HDD division having well experienced staff and latest has been instrumental in achieving fast and
respectable position in HDD/NDRC sector in short span due to its Techinal know how and CAN DO
attitude.

1.3.1 QUALITY

At ROBT.STONE, quality is not just a system, but a culture that covers the length and breadth of our
organization. Consequently, the Quality Assurance department not only implements a system, but
maintains this culture. We firmly believe that our Clients will return only if and when their
expectations are fully met.

• Our Quality and HSE Functions are managed by independent team of professionals.
• Our Quality Management System is certified to ISO 9001:2008.
• Our regular Quality Audits critically ascertain, identify and evaluate the presence and
compliance of norms specified in our Quality Manuals.
• We implement the Quality Culture and system with a Motto “Do it Right, First time
and every time”.

Page 2 of 4
ENGINEERED EXCELLENCE

1.3.2 EOHS (Environment, Occupational Health and Safety System)

At ROBT.STONE, Safety is culture, we believe in executing projects with “Safety in Hearts and
Minds”. Safety in paramount, Safety First, in any of our acts and decision speaks about our
commitment towards safety for human life, asset and environment. We understand our social and
economic responsibilities towards Environment, Occupational Health and Safety Systems and thrive to
achieve the best in the same by implementing the systems.
• Our EOHS Management System is certified to ISO 14001:2004 & BS OHSAS
18001:2007.
• We implement Regular Auditing and Training Programs to enhance our standards of
health, Safety, environment (HSE).
• We have implemented HSE Incentive Scheme to reward safe working employees.
• We encourage our employees as well as Sub-contractors / Vendors to report near misses
and unsafe acts.
• Safety awareness has helped us achieve high rate safe man-hours without LTI.

Our certifications in Quality and HSE avow obligation to our motto “Together We Achieve Success with
Safety and Quality”.

ROBT.STONE, through its technical proficiency, organizational ability, commitment to Environment,


Health, Safety and Quality has won the confidence of the clients to satisfy their project requirements
in an increasingly competitive market.

1.4 HUMAN RESOURCES

• A dedicated team of motivated multi skilled and multi cultural employees, ready to take
any challenges in every aspect of the project.
• Our team is ready to adapt itself to the local customs and traditions of the region.
• Challenges and meeting deadlines is the passion of the TEAM ROBT.STONE.
• Our team builds relationship together with performance with Customers and local
community where ever we work.
• Our team cares about values of respect, dedication, honesty and integrity.
• We are a multicultural team of 10 nationalities working hand in hand.
• Reputation of achieving the impossible and CAN DO culture team, records like 21.3 Km
lowering of 12 Inch pipeline , 3.3km of welding and 3.6 Km of Joint coating and 4 Km
stringing of 12” pipeline in one day shows our team’s CAN DO culture.

1.5 EQUIPMENT AND TECHNOLOGY

• We maintain a large inventory of Plant and Equipment which we keep expanding to help
us keep up with the pace of new technology and thereby playing a crucial role in meeting
client requirements and executing and completing projects in time.

• Our equipment pass through stringent safety checks first internally and then certified by
Third parties before mobilization to any site.

Page 3 of 4
ENGINEERED EXCELLENCE

• We are well aware of Critical Infrastructure and Coastal Protection Authority (CICPA)
pass requirements and most of our fleet is passed to work in Oil Field projects with valid
passes (Especially in the U.A.E and Western region).
• Our long term association and agreement with local suppliers for equipment has been
instrumental in provision of uninterrupted services to clients as more equipment can
mobilized in the shortest span as per the project requirements.

1.6 FACILITIES
Our In house localized facilities give added advantage for faster mobilization and maintenance of our
resources.

• 70,000 m2 Industrial Yard / Camp Facilities in Habshan On Buhasa Road, Abu Dhabi, UAE
• 20,000 Sq Mtr. Industrial Yard at Al Falah on Sweihan Road Abu Dhabi, U.A.E
• 144,000 m2 Temporary Construction Facilities with Camp, fabrication shop at Al Dabbiya, Abu
Dhabi, U.A.E
• 20,000 Sq Mtr. Fabrication Shop ICAD - Al Ain, Abu Dhabi, U.A.E

1.7 OFFICE’S
Head Office- Abu Dhabi, UAE
Robt Stone (ME) LLC
106 - Bin Awdah Tower, Near El Dorado Cinema., Electra Street
Abu Dhabi, United Arab Emirates.
P.O Box : 39588
Tel : +971 2 6767415
Fax : +971 2 6767943
Email : [email protected]
Website : www.robtstone.ae

Projects Office – Mussafah, Abu Dhabi, UAE


Robt Stone (ME) LLC
Behind Al Safeer Mall, Mussafah
Abu Dhabi, United Arab Emirates
Tel : +971 2 5532550
Fax : +971 2 5532552
Email : [email protected]

Branch Office – DMCC Dubai, UAE


ROBT STONE (ME) LLC
901, Fortune Tower, Jumeirah Lake Towers, Sheikh Zayed Road
Dubai, United Arab Emirates
P.O Box : 123340
Tel : +971 4 4289404
Fax : +971 4 4289403
Email : [email protected]

Page 4 of 4
ENGINEERED EXCELLENCE
REGISTRATION DETAILS

Sl No. COMPANY
1 GASCO (Abu Dhabi Gas Industries Ltd.)
2 ADCO (Abu Dhabi Company for Onshore Oil operations)
3 ADNOC (Abu Dhabi National Oil Company) - Distribution
4 ADNOC (Abu Dhabi National Oil Company) - Main
5 TAKREER (Abu Dhabi Oil Refining Company)
6 ADGAS (Abu Dhabi Gas Liquefaction Ltd.)
7 ZADCO (Zakum Development Company)
8 BOROUGE
9 ADPC (Abu Dhabi Ports Company)
10 ADWEA (Abu Dhabi Water & Electricity Authority)
11 FERTIL (Ruwais Fertilizer Industries)
12 EMARAT
13 DUSUP (Dubai Supply Authority)
14 DUBAL (Dubai Aluminum)
FACSIMILE MESSAGE

Page No 1 of 1
Date: 04-22-2015

To : ROBT. STONE( ME) -LLC Fax No : 0097126767943


From : Ahmed Saeed Al Zaabi Fax No : 6037022
Head, Supply Chain Management Support Department Tel No : 6037442

Subject : Registration and Pre-qualification as Contractor

Please be informed that based on the pre-qualification documents submitted your company name has been
included in our list of pre-qualified Contractors for the following service(s):

♦ OIL & GAS PLANTS / FACILITIES - CONSTRUCTION WORKS


♦ PIPELINES: TIE - INS WORKS / HOT TAPS
♦ PIPELINES CONSTRUCTION - ONSHORE
♦ FENCING AND GATES CONSTRUCTION
♦ PIPING & SPOOLS (STEEL) - FABRICATION / INSTALLATION / REPAIRS / RENEWAL
♦ PIPELINE MAINTENANCE SERVICES - ONSHORE
♦ METERING SYSTEMS AND PROVER LOOP - MAINTENANCE
♦ PRESSURE REGULATING STATIONS - MAINTENANCE
♦ BLASTING & PAINTING - TANKS, VESSELS, COLUMNS, PIPING-ETC.
♦ NATURAL GAS, SYNTHETIC (SNG) : INSTALLATION AND MODIFICATION
♦ NATURAL GAS, COMPRESSED (CNG) : PACKAGED INSTALLATIONS
♦ NATURAL GAS PIPE WORKS : INSTALLATION AND MODIFICATION
♦ NATURAL GAS NETWORK - EPC WORKS (STEEL/ PE SYSTEMS)
♦ DIRECTIONAL & HORIZONTAL DRILLING SERVICES

You are advised to quote your company Registration No. 905026 in all future correspondence.

For any future update of your Company record, please log on to our e-Registration system using the
following path:

www.gasco.ae-> e-Services -> e-Registration and following the 2 stages:

1. Request [to be accessed by clicking - Click here ]

2. Application [Log in using user ID & Password received upon acceptance of the request]

Regards,

Ahmed Saeed Al Zaabi


Head, Supply Chain Management Support Department
The GASCO, HSE Policy has three Strategic Objectives:
♦ No harm to People
♦ Protect the Environment
♦ Improve Asset Integrity

Confidentiality Notice: The material in this fax may be confidential. If you are not the intended recipient, please notify us immediately. You
should not copy the fax or use it for any purpose or disclose its contents to any other person. Thank you

P.O. Box 665, Abu Dhabi, U.A.E • Tel: 971 2 603000 • Fax: 971 2 6037414 • Website: www.gasco.ae
Abu Dhabi Company for Onshore Petroleum Operations Ltd.(ADCO)
(ADCO)
ROBT STONE (ME) - LLC
P.O. Box No. 39588
City ABU DHABI
Country AE

Tel: 6767415
Fax: 6767943
E-mail [email protected]
ADCO Reg.No. 14887
Contractor ( PRE-QUALIFIED )

License Name Issue Date Expiry Date


DEDL 23/02/2016 22/02/2017
ADCCI 28/02/2016 22/02/2017

Owner/ Sponsor OwType (%) Holding Nationality Country


FARIS SARI AHMED ESSA AL MAZROUEI P 51 AE United Arab Emirates
RENU MADAN O 10 NZ United Arab Emirates
ROBT STONE (HK) LIMITED O 19 HK United Arab Emirates
VIJAY KUMAR MADAN O 20 NZ United Arab Emirates

Contractor Details Status


210100 Pipelines Onshore - Epc Q
230190 Tunneling / Non - Destructive Road Crossings (Ndrc) Q
240180 Oil & Gas Plant / Projects - Construction Works (Me & I) Q
250060 Flowlines & Wellhead Installation Works Q
250130 Pipelines: Tie - Ins Works / Hot Taps Q
250160 Pipelines Construction - Onshore Q
570200 Welding and Pipeline Maintenance Services Q

Page 1 ofCommercial
1 Support Manager

Legends:
Agency Type: AGNT-Agent, CSA-Certified Sole Agent, DSTR - Distributer, DSTR - Stockiest
Pre-Qual Status: F - Disqualified, N - Not Rated, O - Ordered, Q - Pre-Qualified, R - Rejected, E - Under Assessment

Date: 10-Mar-16

Pag 1 of 1
Manughosh Suresh
From: Jibu Jose [[email protected]]
Sent: Wednesday, July 16, 2014 2:29 PM
To: Manughosh Suresh
Cc: [email protected]
Subject: PQ Ref. No. D00433 : Prequalification (PQ) with Dubai Supply Authority (DUSUP)

Manu,

This is to inform that Robt.Stone has been successfully completed the Pre‐Qualification process with DUSUP under ref
No.:D00433 for the category “Pipeline/Plant Construction Works”.

Regards,

Jibu Jose
Contracts Engineer
Dubai Supply Authority
PO Box 8144, Dubai ‐ U.A.E.
Tel: +971 4 3012665 | +971 4 3432222
Mobile: +971 50 8341912

From: Manughosh Suresh [mailto:[email protected]]


Sent: Monday, February 24, 2014 5:04 PM
To: Jibu Jose
Cc: [email protected]; [email protected]; [email protected]; [email protected]
Subject: RE: PQ Ref. No. D00273 : Prequalification (PQ) Revalidation Request from Dubai Supply Authority (DUSUP)

Dear Sir,

Please find the pre-qualification documents attached herewith as requested in the Trail mail. Should you
require further clarifications , please don’t hesitate to contact us.

Thanks & Regards,

Manughosh Suresh
Business Development Engineer
Mobile : +971 556165925
ROBT STONE (ME) LLC
PO Box : 39588 Tele : +971 2 6767 415
Abu Dhabi, U.A.E Fax : +971 2 6767 943
www.robtstone.ae E-Mail : [email protected]

From: Jibu Jose <[email protected]>


Sent: Thursday, 20 February 2014 12:48
To: [email protected]
Cc: [email protected]; [email protected]; 'Dipesh P' ([email protected])
Subject: PQ Ref. No. D00273 : Prequalification (PQ) Revalidation Request from Dubai Supply Authority (DUSUP)

Dear Sir(s),

We are in the process of compiling bidders list for the upcoming construction works for Margham Capacity
Increase Project at DUSUP’s Margham Gas Plant.

1
Manughosh Suresh
From: Robt Stone (ME) LLC [[email protected]]
Sent: Sunday, January 20, 2013 9:55 AM
To: [email protected]; [email protected]; 'Manughosh Suresh'; 'Prithwik Karuppali'; 'Prakash Jaison'; 'nevin'; [email protected]
Subject: FW: Registration with ZADCO

Dear All,

This is for your information and action.

Best Regards,
Robt. Stone (ME) LLC
Tele : +971 2 6767 415 I Fax : +971 2 6767 943
P.O. Box : 39588 I E‐Mail : [email protected]
Website : www.robtstone.ae
Abu Dhabi, United Arab Emirates

From: Essam Mahmoud Daher (ZADCO CMDS) [mailto:[email protected]]


Sent: Sunday, January 20, 2013 9:46 AM
To: '[email protected]'
Subject: Registration with ZADCO

Good morning;

Registration with ZADCO as mentioned below.

Regards

Essam Mahmoud
PQ Engineer – 02/6051138
050/5702477

1
ROBT.STONE (ME) LLC - ( 101102 ) MLCAS_P **A**

Phone: 0097126767415 - Fax: 0097126767943


Contact: V.K. MADAN - Email: [email protected]
Associate Associate Associate
Work Group Description MLCAS_C Status
Code Name Type
WG210100 PIPELINES ONSHORE-EPC NOTEVAL
WG230140 SITE PREPARATION WORKS NOTEVAL
WG250130 PIPELINES: TIE-INS WORKS/HOT TAPS NOTEVAL

WG250160 PIPELINES CONSTRUCTION-ONSHORE NOTEVAL

CATHODIC PROTECTION SYSTEMS WORKS


WG260020 NOTEVAL
(SUPPLY AND INSTALLATION)

WG310160 FENCING AND GATES CONSTRUCTION NOTEVAL


WG331020 HOT TAPPING WORKS NOTEVAL

PIPING AND SPOOLS (STEEL)-


WG331070 NOTEVAL
FABRICATION/INSTALLATION/REPAIRS/RENEWAL

WG374080 DISMANTLING NOTEVAL

2
ENGINEERED EXCELLENCE

VISION/MISSION/CORE VALUES

Sl No. ATTACHMENTS
1 VISION STATEMENT
2 MISSION STATMENT
3 CORE VALUES
ENGINEERED EXCELLENCE

COMPANY ORGANISATION STRUCTURE

Sl No. DESCRIPTION
1 Organization Chart
2 Services
ENGINEERED EXCELLENCE

CHAIRMAN & MANAGING DIRECTOR

CHIEF FINANCIAL OFFICER

DIRECTOR- PROJECTS
SUPPORT DEPARTMENTS

QA / QC HSE

PROJECT CONTROLS INTERFACE MAINTENANCE

FINANCE ACCOUNTS INTERNAL AUDIT

BUSINESS DEVELOPMENT
I.T/SECUIRTY ADMINISTRATION HUMAN RESOURCES RISK & CONTRACTS / ESTIMATION

FABRICATION
ENGINEERING, PROCUREMENT & CONTRUCTION TANK FABRICATION CIVIL & E&I AND HDD / NDRC
n
HOT TAPING HEAVY PRESSURE
OF CROSS COUNTRY PIPELINE AND PLANT PIPING & ERECTION STRUCTURAL TELECOM VESSELS,SKIDS ETC
ENGINEERED EXCELLENCE

ROBT.STONE (ME) LLC

EPC WORKS CIVIL & STRUCTURAL HDD / NDRC FABRICATION OF


PRESSURE VESSELS & SKIDS
 Cross-country pipelines  Pipeline  Oil lines
 Process plants  Plant works  Gas lines  Filtration / Separation
 Water lines  Infrastructure Development  Water lines  Knock out vessels
 Utility services  Sectionalizing valve stations  Telecommunications and  Reactor vessels
 Pressure Reduction / power cables / conduits  Columns

n

Metering Stations Evaporators


 E&I building and control
rooms

PIPELINE AND PLANT


TANK FABRICATION & ERECTION E&I AND TELECOM HOT TAPING MAINTENANCE
 Major Plant shut down / upgrade
 Oil & Gas  Power / Earthing / Lighting  Gas lines works
 Water  Instruments and Control Valves  Civil, Mechanical and E&I
 Fire water  RTU and F&G system maintenance works for Pipeline
 Fiber Optic Network and Plants
 DCS / SCADA  Patrolling and Maintenance works
 Flow lines
ENGINEERED EXCELLENCE

SERVICES OFFERED

ROBT.STONE is committed to provide reliable and professional services to all major Oil & Gas
operating companies and Infrastructure Developers in the region with utmost priority of Quality, Safety
and Care to the Environment.

Why We, Our key success factors are:

 Own fleet of equipment in the region.

 Experienced locally mobilized Human Capital, Senior Management having more than two
decades of International experience in Oil and Gas and Infrastructure projects.

 Awareness of Local requirements of working in the Oil and Gas fields in the region Habshan,
Buhasa, Huwaila, Bida Qamzan, Ruwais, Jebel Dhanna, Al Ain, Northern and Eastern
Region in Abu Dhabi and experience of working in Oil and Gas fields in Oman and Qatar.

 Well maintained Quality Control and EOHS (Environment and Occupational Health and
Safety) System striving for constant improvements.

 In house expertise of specialized activities such as Hot Tapping, HDD (Horizontal


Directional Drilling) etc.

We offer following services:

1. Engineering, Procurement & Construction of Pipeline and plant piping works.

2. Tank Fabrication, Erection works.

3. Civil and Structural works.

4. Electrical, Instrumentation and Telecom works.

5. HDD/NDRC works.

6. Hot Tapping works.

7. Fabrication works (Pressure Vessel, Skids etc).

8. Pipeline and Plant Maintenance works.

Page 1 of 5
ENGINEERED EXCELLENCE

1.0 EPC (ENGINEERING PROCUREMENT AND CONSTRUCTION) – CROSS COUNTRY


PIPELINE AND PLANT PIPING

We provide solutions for EPC execution with multi-disciplinary, highly-skilled resources with local
collaboration with engineering companies. We have experience in pipeline, plant piping, maintenance
construction works for major ADNOC group companies (GASCO/ADCO/TAKREER) in Abu Dhabi,
U.A.E.

Strict compliance and implementation of EOHS systems, is the basic key to our successful execution of
projects. Quality and Safety is not just a system but a culture in our organization.

Our procurement teams works closely with discipline engineers, clients and vendors to ensure
compliance to specifications, schedules and budgets. Our material management system is linked
directly to our financial system to allow monitoring of every phase of the procurement cycle. Project
specific expeditors are used to expedite long lead items and to monitor different phases of
manufacturing along with quality team for inspections and certifications. We deploy Third Party
Inspection Agencies for procurement of materials as per criticality ratings.

With our enhanced capabilities of doing NDRC/HDD work of laying cables/ducts/pipe under road,
culverts, bridges, channels crossing etc up to 48 inch and 2 km length or more we provide overall
execution solution of Mechanical. Civil, E&I, Telecom, Structure, Piping Fabrication and erection
works for any pipeline and plant piping works.

By completing approx 700 kms of pipeline works in one calendar year, ROBT.STONE has become a
formidable pipeline contractor in the region.

We have our team of skilled and multi-disciplinary personnel locally available in the region. Our
facilities, camps, workshops and warehouses spread over various strategic locations in the UAE with
locally available own equipment fleet gives us an advantage At present we have 100+ (Permit to work)
PTW holder for various Oil & Gas clients and most of our equipment already posses valid security
passes for various locations. All these factors enable us for quick mobilization and easy access to any
work location within the Region and particularly in U.A.E.

2.0 TANK FABRICATION AND ERECTION

We provide solutions for small to mid size tank for Oil and Gas, Infrastructure and Process Plant
projects. Our fabrication facilities are capable of supporting pre fabrication works which experienced
site team erect with best of quality and safety compliance.

Page 2 of 5
ENGINEERED EXCELLENCE

3.0 CIVIL AND STRUCTURAL WORKS

In house capabilities with experienced team and locally available resources to undertake Civil and
Structural works for any pipeline, plant and infrastructure projects gives us added advantage. We
undertake all civil activities in pipeline, plant constriction projects including construction of Valve
station building; pre cast foundation, berm preparation, culverts, including in situ concrete works.

Fabrication works of Structure steel support, pipe racks is also executed with in house resources and
fabrication yard facilities available.

Our Civil team has recently achieved the following milestones in TAKREER project.

 900,000 running meters (13,500,000 m3) of ROW / Maintenance Road construction.


 900,000 running meters (2,700,000 m3) of Trenching / Excavation works.
 900,000 running meters (720,000 m3) of Berm / pipeline crown construction.
 15,000 m3 Pre-cast / In Situ Concrete works.

4.0 ELECTRICAL AND INSTRUMENTATION, TELECOM WORKS

We have a dedicated team for providing Turnkey solutions in E&I work for Cross country pipeline,
Process Plant and Infrastructure projects. We have a well established associations with experienced
suppliers and system integrators, Our in-house E&I team is well versed in various subjects and fields of
Electrical, Instrumentation and Control, Process Control systems, Cathodic Protection, Fire & Gas,
CCTV system and Telecommunication works.

We do take up solar system and CCTV works including laying, slicing and termination works for
FOC/SDH/CCTV cables. Erection and commission of Passive cool shelters and in field instrument
installation.

5.0 HORIZONTAL DIRECTIONAL DRILLING (HDD) DIVISON

We provide solution to cross obstructions without disrupting any traffic, water flow and above ground
structures to lay pipeline/conduits/cables of different sizes and length by state of art Horizontal
Directional Drilling Technique. In short span of time with our experienced team and best HDD
machines to suit all kind of terrains, HDD TEAM has built a name in the industry. We believe that
experienced people with latest know how with suitable latest equipment is the key difference between
the success and the failure. Our team of HDD has over 15 years of International HDD experience
working on Oil and Gas and Telecom sector projects.

We use modern and proven technologies such as:

 WALK OVER F5 track system to determine the location of the bore head on small to
mid-sized rigs.

Page 3 of 5
ENGINEERED EXCELLENCE

 PARATRAK II Wireless steering system – A down-hole system using wire to transmit


the data up the inside of drill pipe for steering purpose of drill heads.

We have successfully completed 200 crossings, approximately 44,000 meter, in nearly all type of
terrain, across major highways, utilities, creeks, wetlands, etc. in record time.

6.0 HOT TAPPING WORKS

ROBT.STONE has completed nearly 50 Hot Taps in U.A.E. We have carried out Hot Tap works for
wide range of Oil & Gas pipelines varying from 10” to 48”. We have highly qualified and experienced
hot tap welders, supervisors, Quality Control Inspectors, HSE Engineers and sophisticated equipment
dedicated for Hot tap works. Our hot tap procedures are approved with ADNOC group of companies.
Apart from ADNOC group, we have carried out Hot Tap works for:

 Dolphin Energy Limited, Abu Dhabi.

 Qatar Petroleum, Qatar.

 Bechtel , Abu Dhabi.

 Al Ain Cement Factory, Al Ain Abu Dhabi.

 Chicago Bridge & Iron (CBI), Abu Dhabi.

7.0 FABRICATION OF PRESSURE VESSELS AND SKIDS

We offer quality services in fabrication and supply of Pressure vessels, Heat Exchanger, Skid mounted
Oil and Gas Processing units, Pipeline equipments, Cyclone filters H2S Scrubber, Odorizers, Pressure
Reduction and Metering skids, for refineries, nuclear plants and other processing facilities.

We provide an advantage of having local fabrication facility through an associate company,


Technofutura spanning over 20,000 Sq Meter area in ICAD, Al Ain, Abu Dhabi

 Fabrication Shop is certified by ASME with U, U2, A, S and PP stamps.

 Design, Manufacturing and Testing of Pressure Vessels, Heat Exchangers, Skid mounted
oil & gas processing units.

Capable of:

 Design, Engineering and rerating of large Storage Tanks and low pressure Storage Tanks.

 Calculations and recommendations for repairs.

 Alterations or replacement of existing storage tanks and storage tank components.

 Ability to perform multiple welding process with qualified welders and also capable of
automatic welding machine operations.

Page 4 of 5
ENGINEERED EXCELLENCE

8.0 PIPELINE AND PLANT MAINTENANCE WORKS

ROBT.STONE, a name synonymous with pipeline and plan maintenance works in Abu Dhabi. We
possess all the required experience resources to carry out pipeline and plant maintenance works like
Pipeline and system maintenance, mentoring gas supplies to industries and attending to maintenance
issues, Right of way maintenance, Building and General Maintenance, Patrolling of Gas facilities,
Testing, removal and replacement of flow lines.

Working experience with GASCO, Dolphin Energy and ADCO gives us added advantage to repeat our
performance in maintenance projects,

 Fully equipped emergency response vehicles.

 Competent staff with experience in operation and maintenance works such as gas meter
reading, billing, patrolling, isolation of gas leaks etc.

Page 5 of 5
ENGINEERED EXCELLENCE

EXPERIENCE LIST

Sl No. DESCRIPTION
1 Major Projects
2 Minor Projects
3 Hot Tap Works
4 Horizontal Directional Drilling (HDD) Works
5 Pipeline and Plant Maintenance works
ENGINEERED EXCELLENCE
EXPERIENCE LIST – MAJOR PROJECTS
Project
Sl. No. Year Client Our Role Project Title Scope of Work
Status
EPC Scope of Work includes
• High Pressure Pipe Connections to Main gas pipe line (Hot Tap, Mechanical
Tie-in) and installation of Pig traps & Hot Tap valve.
• AGI (Above Ground Installations) consisting of Pig Trap, ROV, Filtration,
Main HP Connection to NGV H2S Scrubbers with H2S online analyzer, Water dew point analyzer,
1 2016 GASCO In Progress
Contractor Filling Stations (Phase 2A) Pressure Regulation, Custody Transfer Metering and Odorizing and
associated Piping, Mechanical, Civil and E&I works.
• All associated Piping and Tie-in Works, Civil works, Electrical Works,
Instrumentation and Control works, NDT Works, Pre-commissioning,
Cathodic Protection and Painting Works
EPC works for provision of New Filters (1 working + 1 Stand-by), Metering Skid
EPC for Filtration, Metering with Flow Meter, FCV Skid, and Active Cooled Shelter with UPS System. All
Main
2 2015 GASCO And FCV Skids At Mirfa associated Piping and Tie-in Works, Civil works, Electrical Works, In Progress
Contractor
CRS Instrumentation and Control works, NDT Works, Pre-commissioning and
Painting Works.

EPC (Engineering, Procurement and Construction) works for BAB Producer (18
nos.) and Injector (8 nos.) wellheads, approximate 95 Kms of 8” and 6” flowlines,
Call-Out works Contract for
Main Work over of Gas Producer (9 nos.) well head, modification of existing flowlines
3 2015 ADCO ASR Gas Facilities in Bab In Progress
Contractor and trunklines. All associated Piping and Tie-in Works, Civil works, Electrical
(Package “A”)
Works, Instrumentation and Control works, NDT Works, Pre-commissioning,
Cathodic Protection and Painting Works.

Pipeline Construction works for approx. 270 kms of Onshore Pipelines of


various diameters 28”/24”/20”/16”/12”/10”/8”/6”/4” including Construction of
7 nos. of Block Valve stations, 60 nos. Pig Launcher/Receiver stations inside the
Al Dabbiya Surface Facilities Onshore and Offshore Clusters, approx 8 Kms of Horizontal Directional Drilling
ADCO / Sub-
4 2015 Phase III Project - Onshore Crossings, Hydro Testing for entire Pipeline Network including Onshore and In Progress
TECNIMONT contractor
Pipeline Works Offshore sections, Pre commissioning Works including Cleaning, Gauging,
Flushing, Swabbing, Drying, Calliper Pigging, Preservation and Intelligent
Pigging, All associated E&I Works, Cathodic Protection (CP) Works and
Decommissioning/De-Oiling of existing pipelines.

Page 1 of 4
ENGINEERED EXCELLENCE
Project
Sl. No. Year Client Our Role Project Title Scope of Work
Status

SMP (Structural, Mechanical and Piping) Works, Package B including:


• Structural erection and alignment works
Sub- Rumaitha/ Shanayel Phase III • Mechanical Equipment Erection & alignment works
5 2015 ADCO / GS In Progress
contractor Project • Piping (CS, SS, Alloy steel, Non Ferrous, Cladded, GRE) welding, Valve
& support installation including all NDT services
• Painting and Insulation Works

EPC Services for Batch -II PMRFs as listed below:


• Installation of Motorized Actuated valves at Booster and MOL pump
Recycle Line.
Main EPC for Batch II PMRF’s - • Facilities for the collection and Recovery of spent Lube Oil/Crude Oil at
6 2015 ADCO In Progress
Contractor Buhasa CDS.
• Installation of Gas Detector system & ESD valves at Gas Injection Line for
44 Gas Wells.
• Connection for Gas Lifts Flare System to Train 1 Flare Header.

Engineering, Procurement and


ADNOC Main Construction (EPC) for Scope of works covers Engineering, Procurement, and Construction of 14 nos.
7 2014 In Progress
DISTRIBUTION Contractor Additional NGV Filling NGV stations and all associated Civil, Mechanical, Piping and E&I work.
Stations

Provision of welding and pipeline maintenance services for replacement of 8″


(API 5L Gr. B), 6″ (API 5L X65 & Gr. B) and 4″ (API 5L Gr. B) flow lines for
Main
8 2014 ADCO Construction of Flow lines three years in ADCO fields including ROW preparation, welding, NDT, coating, In Progress
Contractor
Cathodic protection, pipe laying, crossings including HDD, Hydro testing,
pigging, removal of redundant flow lines etc

High pressure pipeline


Main EPC project for supply of gas from existing GASCO pipeline for 4 no's of
9 2013 GASCO connection to NGV filling Completed
Contractor ADNOC petrol stations to be converted into CNG filling stations.
stations phase II

Construction including Hydrotesting and drying of 220 kms of 28"(API 5L-


Inter Refineries Pipelines X70), 320 kms of 12″ (API 5L-X65) and 80 kms of 10″ (API 5L-X60) pipeline
Sub-
10 2013 TAKREER / GS approximately 139 Crossings (Horizontal Directional Drilling), 470 minor Completed
contractor (IRP II) Project (28”/12”/10”)
crossings, Construction of 9 No’s of SV stations and 3 nos. Pipeline
(Receiver/Launcher) facilities including Civil, Mechanical, E&I works.

Page 2 of 4
ENGINEERED EXCELLENCE
Project
Sl. No. Year Client Our Role Project Title Scope of Work
Status
Construction including Hydrotesting and drying of 30 kms of 20” (API 5L-X65)
Inter Refineries Pipelines (IRP and 40 kms of 10″/8” (API 5L-X60) pipelines including 116 Crossings
TAKREER Sub- (Horizontal Directional Drilling) including 1440 m of 20+6 inch road crossings
11 2013 II) Project – City Portion ( Completed
/ GS / KSS contractor and 975m 10+6” Channel crossing at Umm Al Naar, 230 Minor crossings and
20”/10”/8”)
construction of 1 No’s of SV station and 6 nos. Pipeline (Receiver/Launcher)
facilities including Civil, Mechanical, E&I works.

Construction of 20" Gas Pipeline from GASCO to Fertil - 2 including 3 Nos of


Hot Taps, Launcher Station Including Installation of Gas Cyclone Filters,
Construction of 20" Gas Pressure Reduction Skid, Metering Skid, Gas Filters, Pig Launcher with
Main
12 2012 NPCC / FERTIL Pipeline from GASCO to Completed
Contractor associated piping works & Control room Building. Construction of Receiver
FERTIL - 2.
Station including installation of Pig Receiver ROV's, MOV's & associated
piping.

Excavation, dewatering and Surface preparation for application of protective


DOLPHIN Main Pipeline Rehabilitation
13 2012 coating Completed
ENERGY LTD Contractor program me 2012- 2013
(STOPAQ) for 6km of 30" Maqta Al Ain pipeline at various locations.

Habshan 5 Utilities &


GASCO Sub- Offsites Project – Tie-ins at Construction of 65 No’s of Tie-ins of Dia ranging from 2’’ to 36’’ in Habshan
14 2011 Completed
/ HYUNDAI contractor Habshan 0, 2, 3, 4, and Plant.
BAB CDS

EPC for Replacement of Schedule of Works includes dismantling of existing skid at unit 30 & 31 and
Main Amine Filtration Package at Design / Engineering, Procurement and Construction of new Amine Filtration
15 2011 GASCO Completed
Contractor Units 30 and 31 (Habshan & Units 30 and 31 with associated Civil, Mechanical, Electrical, Instrumentation
BAB) and procurement of Filters consumables, Internals.

Construction of Cathodic
ADCO / Protection for Well Casings
Sub- Three year Contract for Civil / Installation & Construction works for Cathodic
16 2011 BSS for newly Drilled Wells Completed
contractor Protection for Well Casings.
TECHNOLOGIES (2010-2012) in ADCO
Fields.

NGD 37 - EPC Works for


Main EPC works for converting 17 No's of Existing Fuel Stations to NGV, including
17 2009 GASCO NGV Filling Stations in Abu Completed
Contractor Civil, Mechanical and Electrical & Instrumentation works.
Dhabi & Sharjah.

Page 3 of 4
ENGINEERED EXCELLENCE
Project
Sl. No. Year Client Our Role Project Title Scope of Work
Status
Removal of 16” Maqta –
Baniyas Pipeline & Removal Demolition of GASCO's 18km long 16” dia Pipeline includes Corridor Fence,
Main
18 2009 GASCO of ADCO's Jarn Yaphour - Valve Stations, Pig Traps, and Control Room & ADCO's 32km long 18" dia Completed
Contractor
Umm Al Nar 18" Transfer Pipeline including Valve Stations.
Line

Installation of Pipelines, Hot Taps and Pressure Reduction Station facilities


GASCO / Sub- Natural Gas Distribution
19 2008 for 7 nos. of ADNOC CNG Stations in Abu Dhabi and Al Ain inclusive of Completed
QENERGY contractor Network – NGD 07
civil, building, mechanical, electrical and instrumentation scope.

Installation of 8kms long Gas Pipeline (24", 16" & 12) including hot tap,
AL DAR / Natural Gas Transmission and
Sub- Highway and Canal Crossing, Launcher, Receiver Stations, Primary and
20 2008 GASCO / Distribution Supply to Yas Completed
contractor Secondary Pressure Reduction Stations and arranging Temporary Gas Supply by
QENERGY Island, Abu Dhabi.
10" PE Pipeline.

Page 4 of 4
ENGINEERED EXCELLENCE

EXPERIENCE LIST – MINOR PROJECTS


Sl.
Year Client Our Role Project Title Scope of Work Project Status
No.

Demolition of Existing Structure, Cutting and


Dismantling of Existing Piping, Chemical
Rehabilitation of Hot Oil System at
1 2016 ADCO Main Contractor Lines/Tubing and Cable tray. In Progress
Rumaitha CPP Phase I
Civil, Structural, Piping and E&I Works including
Painting, Insulation and Fire Proofing works.

Scope of Work includes Construction of 7 nos. of


Construction of Corrosion Concrete Corrosion Monitoring Access Pits,
2 2016 ADCO Main Contractor Monitoring Access Pits for Bu Hasa Fabrication & Installation of ladders, frames, supports, In Progress
pipelines manholes, gratings, lifting facility for tools and
Fencing Works.

EPC works including Installation of Metering Skid and


ROV, Supply and Installation of Active Cooled
DOLPHIN
EPC Works for TFP/AFP Shelter, LV Switchgear, UPS, F&G Panel, RTU /
3 2014 ENERGY Main Contractor Completed
Interconnection Meters SCADA Modification and associated Civil, Structural
LIMITED
and E&I works for the TFP / AFP
INTERCONNECTION METERS at FRS and BV-06

Scope of works includes Mechanical and Electrical


Works including; Demolition of Existing Hypochlorite
Installation of Chlorination Tank solution TOTE system, Installation of new Tank and
4 2015 GASCO Main Contractor Completed
Package in Asab-2 Mixer motor along with associated platform and piping
connections and supports, Supply and Installation of
piping support and associated Electrical Works

Scope of Works involves Supply and Installation of


NOBLE STEEL
Supply and Installation of Pressure Pressure Reducing Skid and Tie-in from GASCO
5 2014 INDUSTRIES Main Contractor Completed
Reduction Skid and Pipeline Tie-in. facility, Piping Construction Works and
LLC
Commissioning.

EPC works includes replacement of Hot Gas bypass


piping in three units 52, 53 and 54 of GASCO
EPC for Hot gas bypass piping for
6 2014 GASCO Main Contractor Habshan 1 NGL filtration plant. Replacement of Completed
Habshan 1 Sulphur Unit
Control valves, related Mechanical, Structural and
Electrical and Instrumentation works.

Page 1 of 5
ENGINEERED EXCELLENCE

Sl.
Year Client Our Role Project Title Scope of Work Project Status
No.

EPC works including Civil, Mechanical and Piping


ADCO Tank Farm Facilities modification / up gradation of Tank Farm Facilities
7 2014 ADCO Main Contractor modification and Concrete pit (Fire water Tanks, Foam Skids, Fire Monitors, Completed
construction works Chemical Sheds, other small tanks etc) and
Construction of Concrete pits at ADCO - Jebel Dhana.

Scope of works involves performing the following


services on call basis for 3 years at both onshore and
offshore locations:
Construction of Concrete Well Cellar
8 2014 ADCO Main Contractor • Construction of Concrete Well Cellar. In Progress
and Mud Waste Pits.
• Construction of Concrete Mud Pit.
• Breakings of Concrete Slab to accommodate
well cellar and / or waste pit in existing clusters.

Supply of gas to new Al Ain Cement FCV skid installation along with all Civil, Mechanical
9 2013 NPCC / ARKAN Sub Contractor Completed
plant for ARKAN and E&I works.

Cold cutting and removal of bypass lines, removal of


Removal of 24” and 36” by pass
10 2013 ADCO / TDW Sub Contractor sandwich valves, installation of blind flanges, Completed
arrangements at MP 21
torquing, nitrogen purging of 24” and 36” lines.

Variation order for EPC of NEB Construction of 1 W ell cellars and 1 of mud pits
11 chemical and hazardous material each at DY-96 and DY-97 respectively for Dabiyyah Completed
2013 ADCO Main Contractor
laydown area. Additional injector project.

To carry out Civil / Installation / Construction scope


of works for Installation, pre commissioning and
12 BSS TECH Sub Contractor Civil works at GASCO Ruwais Completed
2013 commissioning of CP systems as per GASCO
/ GASCO
standards.

Replacement of 20" Transfer line from RDS 2 to


Replacement of 20" Transfer Line
13 CDS including Cleaning and flushing of 6.5 km of Completed
Main Contractor Portion from Remote Degassing
2012 ADCO existing line and Welding, Hydrotesting of new 400m
Station to Central Degassing Station.
section and tie in to the existing 20" line

Engineering, Procurement & Construction of a shed (20m x 30m) and two paved
14 Construction of NEB Chemical area (30m x30m) for storing chemicals and waste Completed
2012 ADCO Main Contractor
&Hazardous Material Laydown Area skips.

Page 2 of 5
ENGINEERED EXCELLENCE

Sl.
Year Client Our Role Project Title Scope of Work Project Status
No.
Approximately 2400 Linear Meters of Structural
Habshan 5 Utilities& Offsites Project
15 HYUNDAI Steel Welding for Piping Platforms inside Habshan 5 Completed
2012 Sub Contractor – Structural Steel welding
/ GASCO Plant.

27 km of Trenching including laying of FOC


EPC works for Permanent Telecom
Conduits for Etisalat Cable. This also includes 2 No's
16 Main Contractor Services at Habshan 5 Utilities & Completed
2012 GASCO of NDRC and interfacing with various Authorities
Offsites Project at Habshan
for NOC's.

Testing and Commissioning works at Testing and commissioning of 48 Km 20" pipeline to


17 Main Contractor Completed
2012 NPCC Al Ain Cement Factory Al Ain Cement Factory.

SINOMA Welding Works in ARKAN Cement Welding of 115 joints of Dia 20" at ARKAN cement
18 2012 Main Contractor Completed
EQUIPMENT Factory factory.

ICAD BENA Factory Valve Pit &


19 2011 GASCO Main Contractor Valve Pit & Line Replacement Completed
Line Replacement

Welding, spectacle blinds, pipe fabrication &


Leak Testing Assembly of metering assembly including testing & painting, structural
20 2011 GGS Main Contractor Completed
skid materials supply and fabrication including painting,
miscellaneous works.

Full replacement of internal Steam Coils, Complete


stripping of all external piping, hot insulation, (Steam,
SGP Sulphur Pit Inspection & Coil Sulphur, Condensate & all other associated external
21 2011 GASCO Main Contractor piping) Blasting, Painting & Re-insulation works. Completed
Replacement
Removal & complete replacement of doors / covers
located on the sulphur pit, including internal and
external concrete walls repair works.

EPC works for phase - 1 by cutting the existing 14"


line at two locations and introducing piping
New Metering System Tie - In at
22 2011 GASCO Main Contractor arrangement of two 14" X 12" tees, two 14" RB ball Completed
GASCO Buhasa - EPC Works
valves, two 12" FB ball valves and one 2" drain and
related piping & blind flanges.

Page 3 of 5
ENGINEERED EXCELLENCE

Sl.
Year Client Our Role Project Title Scope of Work Project Status
No.

EPC works for phase - 1 by cutting the existing 14"


line at two locations and introducing piping
23 2011 GASCO Main Contractor New Metering System Tie - In at arrangement of two 14" X 12" tees, two 14" RB ball Completed
GASCO ASAB - 0 EPC Works valves, two12" FB ball valves and one 2" drain and
related piping & blind flanges.

Procurement (Other than Client Free Issue materials),


Construction and Construction related Engineering
Construction work: BC to IC including Mechanical, Electrical and Instrumentation
24 2011 DUSUP Main Contractor Completed
Conversion Project scope, Installation, Testing, Pre Commissioning,
Commissioning Assistance of all Piping and all
associated works.

This Scope of Work includes carrying out MFL


Carry Out Inspection & Repair As
inspection of the Water Tank of Size 20 Mtr Dia X 10
25 2010 GASCO Main Contractor Per API 650 To Water Tank 81-TK- Completed
Mtr Height, Repair works for the corroded plates, and
101-B
internal painting of the Tank.

This Scope of Work covers lifting of supports,


scaffolding, application of blasting / painting on
Rehabilitation Of The 67 Nos
support plates / affected area on top of flare line,
26 2010 GASCO Main Contractor Supports Welded On Top Of Completed
application of Belzona 1121, settling back of supports,
Habshan - 0 Flare Piping
finishing of the support plate / pipe gaps with Belzona
and final painting on support plates.

Removal of Gas Receiving facilities Demolition of 8 km long 4” dia pipeline including


27 2010 GASCO Main Contractor Completed
at Mirfa Power plant demolition of CRS and pig launcher station

Removal of 2.7 Km long 24” dia Gas pipeline inside


Removal of 24” Maqta- ADPS Umm-Al- Nar Refinery including de-commissioning
28 2010 GASCO Main Contractor Completed
Pipeline o f 22 Km long Maqta – ADPS Pipeline and Quick
shut down.

Re-Routing of the 2” Gas Supply to


29 2009 GASCO Main Contractor Piping and structural work Completed
Bainounah PRS in Meena

Page 4 of 5
ENGINEERED EXCELLENCE

Sl.
Year Client Our Role Project Title Scope of Work Project Status
No.

Laying of High Pressure Tubing & a) High Pressure Tubing & Control Cable laying
BAEUR
30 2009 Main Contractor Control Cable & for Painting of b) Painting of Compressor Room Completed
KOMPRESSOREN
Compressor Building c) Other Finishing Works

GASCO / GULF 6" High pressure gas pipeline to Gulf 18" x 6” Cold tapping work, technical services for gas
31 2009 Main Contractor Completed
SPONGE IRON Sponge Iron Factory. pipeline installation.

GASCO Natural Gas Extension to Ajmal Supply and Installation of 4" dia Gas Pipeline 0.5 km
32 2008 Main Contractor Completed
/ AJMAL STEEL Steel Factory. long including hot tap.

1) Supply and installation of safety signs and fencing.


DOLPHIN ENERGY EGDS Upgrade Works - Civil & 2) Installation crash barriers for GASCO pipeline
33 2007 Sub Contractor Completed
/ PUNJ LLOYD FOC Works. network in Eastern
Area.

ADCO / EPC of Cathodic Protection of W ell


Civil / Installation / Construction works for Cathodic
34 2007 BSS Sub Contractor Casings in ADCO Fields Completed
Protection of W ell Casing
TECHNOLOGIES (Buhasa/Huwailia).

GASCO / 4" Dia Pipeline for Natural Gas 4" x 850 Mtrs long On Shore Buried Gas Pipeline
35 2007 Sub Contractor Extension to Plot No 21B3 & 22B3 including Hot Tapping with GASCO Pipeline Network Completed
QENERGY
in ICAD 1 (Pipes & Skid free issued)

Onshore Fuel Oil Pipeline for filling


36 2007 SEWA Main Contractor 10" dia x 1.01 km long On Shore Buried Oil Pipeline Completed
of MFO Tanks 5&6

Page 5 of 5
ENGINEERED EXCELLENCE

EXPERIENCE LIST – HOT TAP WORKS


Sl. No. Year Client Our Role Project Title Scope of Work Project Status

Hot Tap Welding Works at


1 2015 SHELL / TFS Sub-contractor Installation of 1 No’s 20” x 10” Split Tee Completed
Um Qasr Terminal, Iraq

2 2014 Fanoy Gas LLC Sub-contractor Split Tee Welding at ICAD 1 Installation of 1 No’s 18” x 4” Split Tee. Completed

Provision of Nitrogen from


Supply and Installation of 1 No’s Weldolet (6”x2”) and 1 No’s
3 2014 GASCO Main Contractor BOROUGE to GASCO SGP Completed
2” Hot Tap valve.
– Hot Tapping for Tie-in Line
TAKREER / GS Split Tee Welding – IRP-II Installation of 1 No’s of 16” x 10” Split Tee welding works at
4 2014 Sub-contractor Completed
Engineering project SV4 station in Tariff.
Weldolet works for
Installation of 2 No’s of 42” x 3” weldolet welding in Ruwais
connecting existing High
5 2014 GASCO Main Contractor and Habshan respectively. Completed
pressure pipeline to 3
1 No’s of 12” x 3” weldolet welding works in Asab.
ADNOC stations
Split Tee Welding - Natural
DEL/GASCO / Installation of 1 No's of 30" x 20" Split Tee Hot Tap for Sales
6 2012 Sub-contractor Gas Supply to Arkan Cement Completed
NPCC/CAT Gas Arkan Cement Factory
Factory
Supply and Installation of 14" X 10", 42" X 16" & 30" X 16"
7 2012 GASCO/NPCC Sub-contractor Natural Gas Supply to Fertil 2 Completed
Split Tee Hot Tap for Natural Gas Connection to Fertil 2

Split Tee Welding - EPC For 1 No's of 12" x 10" Split Tee Hot Tap for Sales Gas To Masdar
2012 GASCO / ALSA Sub-contractor Supply of Sales Gas To Shams 1 at Madina Zayed Completed
8 Masdar Shams 1 SOW: Installation.
2 No's of 42" x 30" Split Tee Hot Tap for OGD 1 & 2 Pipelines
GASCO / Habshan 5 Utilities & Offsites at Habshan IGD
2011 Sub-contractor Completed
9 HYUNDAI Project
SOW: Supply & Installation.
To carry out 2" hot tapping on 1 No of 2" x 8" Split Tee Hot Tap for Condensate Pipeline
existing 8" Condensate
2011 GASCO Main Contractor Completed
10 pipeline through Service
Work Order SOW: Supply & Installation

30"x10" Split Tee Connection to existing Header Bab Manifold


Replacement of 10" & 16" Area
2011 GASCO / EMCO Sub-contractor Completed
11 Gas Pipeline GASCO - BAB
SOW: Supply & Installation

GASCO/ Tecnicas 18” x 12” Hot Tap Tee Welding


2010 Reunidas / Chicago Sub-contractor Borouge 2 Project Completed
12
Bridge & Iron SOW: Installation.

Page 1 of 4
ENGINEERED EXCELLENCE

Sl. No. Year Client Our Role Project Title Scope of Work Project Status

Company (CBI)

3 nos. of 3" Hot Taps on 30" Maqta-Al Ain Gas Pipeline at


Khalifa City in Abu Dhabi and Markhania in Al Ain
GASCO / Dolphin Natural Gas Distribution 1 no. of 3" Hot Tap on 48" Maqta - Jebel Ali Gas Pipeline at
2009 Sub-contractor Completed
13 Energy / QEnergy Network - NGD 07 Samha in Abu Dhabi.

SOW: Supply & Installation.

42" X 4" Hot Tap on Habshan - Maqta Gas Pipeline at Mussafah.


Natural Gas Distribution
2009 GASCO / QEnergy Sub-contractor Completed
14 Network -NGD 07 12" X 2" Hot Tap on the branch of Maqta - Al Ain Gas Pipeline.
SOW: Supply & Installation.

GASCO / Foster 16" X 16" Hot Tapping and Stopple Plugging works on Buhasa
Wheeler / Bechtel / Onshore Gas Development Bab NGL Pipeline at MP21.
2009 Sub-contractor Completed
15 Punj Phase -3 SOW: Installation of Split Tees and Threadolet Fitting for
Lloyd Stoppling.
7 nos. of Split Sleeves on 16" Habshan - Ruwais Condensate
Fabrication and Welding of Pipeline.
Split Sleeve on 16" Habshan -
2008 GASCO Main Contractor 1 no. of Split Sleeve on 30" Bab - Maqta Gas Pipeline Completed
16 Ruwais Pipeline & 30" Bab -
Maqta Gas Pipeline SOW: Fabrication & Welding of Split Sleeves.

Natural Gas Extension to 10" X 4" Split Tee on GASCO Network in ICAD 1.
GASCO / Zones
2008 Main Contractor Ajmal Steel Completed
17 Corp / Ajmal Steel SOW: Supply & Installation.
Factory.
GASCO / Zones 18" x 18" Split Tee on GASCO Network near ADIC CRS,
Corp / Al Jaber ICAD 2 Natural Gas Pipeline Mussafah.
2008 Sub-contractor Completed
18 Energy Network
SOW: Technical Services & Split Tee Welding Works.
Services
16" x 2" Weldolet on Gas Flare Line inside GASCO Buhasa
Hot Tap & Piping Works
GASCO / Flowserve Plant.
2008 Sub-contractor inside Buhasa Completed
19 Al Mansouri
Plant SOW: Technical Services & Weldolet Welding Works.

GASCO / ESI / High Pressure Natural Gas 42" X 18" Hot Tap on Bab-Maqta-Taweelah Gas Pipeline
2008 Sub-contractor Completed
20 Toledo Pipeline for (OGD1).

Page 2 of 4
ENGINEERED EXCELLENCE

Sl. No. Year Client Our Role Project Title Scope of Work Project Status

Emirates Integrated Steel 42" X 18" Hot Tap on Thamama C - Maqta Gas Pipeline (OGD
Project 1).

SOW: Supply & Installation.

GASCO / Zones 2 No's of 18" X 4" Split Tee on GASCO Network in ICAD 1.
Corp / Sergas /
Emirates
10" X 6" Split Tee on GASCO Network in ICAD 1
Line Factory /
Natural Gas Connections in
2008 German Emirati Sub-contractor Completed
21 ICAD1
Company 10" X 2" Weldolet on GASCO Network in ICAD 1
/ Union Copper Rod
Factory / Super
Cement SOW: Technical Services & Split Tee Welding Works

GASCO / Zones 18" X 3" Weldolet on GASCO Network in ICAD 1


Corp / Fanoy Gas /
Natural Gas Reducing
2007 Future Pipe Sub-contractor 18" x 6" Split Tee on GASCO Network in ICAD 1 Completed
22 Metering Stations
Industries / Al
Ghurair Iron & Steel SOW: Technical Services & Split tee Welding Works

12" x 12" Hot Tapping and Stopple Plugging on Multi Product


Pipeline at Doha.
Qatar Petroleum / Doha Urban Pipeline
2007 Sub-contractor Completed
23 Punj Lloyd Relocation 16" x 12" Hot Tap Connection on Gas Pipeline

SOW: Technical Services

18"X18" Split Tee on AGD1 Condensate Pipeline at Habshan.

Qatar Petroleum / Doha Urban Pipeline 16" X 16" Hot Tapping and Stopple Plugging Works on Buhasa
2007 Sub-contractor Completed
24 Punj Lloyd Relocation Bab NGL Pipeline at MP21.

SOW: Technical Services

GASCO / Zones 18" x 4" Split Tee on GASCO Network in ICAD 1


4" Dia Pipeline for Natural
Corp / QEnergy /
2007 Sub-contractor Gas Extension to Plot No Completed
25 Styropak Plastics / Al
21B3 & 22B3 in ICAD 1 SOW: Supply & Installation.
Reyadh Plastics

Page 3 of 4
ENGINEERED EXCELLENCE

Sl. No. Year Client Our Role Project Title Scope of Work Project Status

30" x 24" Hot Tap on Maqta - Al Ain Gas Pipeline

24" x 24", 24" x 6" & 24" x 2" Hot Tap on Al Ain - Oman Gas
Pipeline

48" x 12" Hot Tap on Maqta - Jebel Ali Gas Pipeline

36" x 30" Hot Tap on Maqta - Taweelah Gas Pipeline at Maqta


EGDS Upgrade for East and Manifold
2007 Dolphin Energy /
26 Sub-contractor West Completed
CCIC 18" x 18" Hot Tap Maqta - Umm Al Nar Gas Pipeline at Maqta
Systems Project
Manifold

24" x 24" Hot Tap on Maqta ADPS Gas Pipeline at Maqta


Manifold

42" x 42" Hot Tap on Thamama C - Maqta Gas Pipeline at


Maqta Manifold

SOW: Technical Services.

Page 4 of 4
EXPERIENCE LIST – HDD WORKS
ENGINEERED EXCELLENCE

Crossing Length
Project Owner Main Contractor Description Road/ Highway/Utility Pipe Diameter Pipe Grade
(Mtr.)

PIPELINE & WELDING


ADCO ROBT.STONE Road Crossing 6” API 5L X 60 100
MAINTENANCE SERVICES
PIPELINE & WELDING
ADCO ROBT.STONE Road Crossing 4” API 5L X 60 188
MAINTENANCE SERVICES
PIPELINE & WELDING
ADCO ROBT.STONE Road Crossing 4’ API 5L X 60 100
MAINTENANCE SERVICES
PIPELINE & WELDING
ADCO ROBT.STONE Road Crossing 4” API 5L X 60 105
MAINTENANCE SERVICES
PIPELINE & WELDING
ADCO ROBT.STONE Road Crossing 6” API 5L X 60 96
MAINTENANCE SERVICES
PIPELINE & WELDING
ADCO ROBT.STONE Road Crossing 4” API 5L X 60 102
MAINTENANCE SERVICES
PIPELINE & WELDING
ADCO ROBT.STONE Road Crossing 4” API 5L X 60 114
MAINTENANCE SERVICES
PIPELINE & WELDING
ADCO ROBT.STONE Road Crossing 6” API 5L X 60 96
MAINTENANCE SERVICES
PIPELINE & WELDING
ADCO ROBT.STONE Road Crossing 6” API 5L X 60 84
MAINTENANCE SERVICES
PIPELINE & WELDING
ADCO ROBT.STONE Road Crossing 4” API 5L X 60 103
MAINTENANCE SERVICES
Big Access Road Crossing To Cricket
IRP II PIPELINE TAKREER GS ENGINEERING 20" + 6" API 5L X 65 1440
Stadium

E11 Dubai-Sila Road& Dubai-Sweihan


IRP II PIPELINE TAKREER GS ENGINEERING 20" + 6" API 5L X 65 1400
Interchange

HABSHAN I FLOWLINE ADCO CCC / SAARI ADCO / GASCO Utilities Crossing 6”, 8”, 20” API 5L X 60 1400 (Total)

IRP II PIPELINE TAKREER GS ENGINEERING Palace Road & Round About 20" + 6" API 5L X 65 1100

IRP II PIPELINE TAKREER GS ENGINEERING Sheikh Zayed Mosque Road E10 10" + 6" API 5L X 60 975

IRP II PIPELINE TAKREER GS ENGINEERING E11 Dubai-Sila Road 20" + 6" API 5L X 65 733

IRP II PIPELINE TAKREER GS ENGINEERING E22 Abu Dhabi To Al Ain Road 20" + 6" API 5L X 65 733

Page 1 of 12
EXPERIENCE LIST – HDD WORKS
ENGINEERED EXCELLENCE

Crossing Length
Project Owner Main Contractor Description Road/ Highway/Utility Pipe Diameter Pipe Grade
(Mtr.)

IRP II PIPELINE TAKREER GS ENGINEERING E22 Abu Dhabi To Al Ain Road 20" + 6" API 5L X 65 733

IRP II PIPELINE TAKREER GS ENGINEERING 12th Street Road 10" API 5L X 60 680

IRP II PIPELINE TAKREER GS ENGINEERING Musaffah To Sila Road(E11) 10" + 6" API 5L X 60 521

E20-Abudhabi-Al Ain Road& Dodsal 52"


IRP II PIPELINE TAKREER GS ENGINEERING 20" + 6" API 5L X 65 469
Pipeline Crossing

IRP II PIPELINE TAKREER GS ENGINEERING Asphalt Road(ICAD Shabia Road) 20" + 6" API 5L X 65 432

IRP II PIPELINE TAKREER GS ENGINEERING Mafraq-Al Guwaifat Highway 12" API 5L X 65 399

IRP II PIPELINE TAKREER GS ENGINEERING Mafraq-Al Guwaifat Highway 12" API 5L X 65 399

IRP II PIPELINE TAKREER GS ENGINEERING Mafraq-Al Guwaifat Highway 6" API 5L X 65 399

IRP II PIPELINE TAKREER GS ENGINEERING E20 Airport Road 20" + 6" API 5L X 65 364

IRP II PIPELINE TAKREER GS ENGINEERING Al Rawda Road & Shakboot Sultan Road 12" API 5L X 65 363

IRP II PIPELINE TAKREER GS ENGINEERING Al Rawda Road & Shakboot Sultan Road 12" API 5L X 65 363

IRP II PIPELINE TAKREER GS ENGINEERING Al Rawda Road & Shakboot Sultan Road 6" HDPE 363
Small By Pass Road Crossing Cricket
IRP II PIPELINE TAKREER GS ENGINEERING 20" + 6" API 5L X 65 351
Stadium
IRP II PIPELINE TAKREER GS ENGINEERING Utility Crossing 28" API 5L X 70 326

IRP II PIPELINE TAKREER GS ENGINEERING Utility Crossing 28" API 5L X 70 326

IRP II PIPELINE TAKREER GS ENGINEERING Utility Crossing 12" API 5L X 65 326

IRP II PIPELINE TAKREER GS ENGINEERING Utility Crossing 12" API 5L X 65 326

IRP II PIPELINE TAKREER GS ENGINEERING Utility Crossing 6" API 5L X 65 326

Page 2 of 12
EXPERIENCE LIST – HDD WORKS
ENGINEERED EXCELLENCE

Crossing Length
Project Owner Main Contractor Description Road/ Highway/Utility Pipe Diameter Pipe Grade
(Mtr.)

IRP II PIPELINE TAKREER GS ENGINEERING Pipeline Crossing 10" + 6" API 5L X 60 325

IRP II PIPELINE TAKREER GS ENGINEERING Proposed Road (Villa Access ) 12" API 5L X 65 320

IRP II PIPELINE TAKREER GS ENGINEERING Proposed Road (Villa Access ) 12" API 5L X 65 320

IRP II PIPELINE TAKREER GS ENGINEERING Proposed Road (Villa Access ) 6" API 5L X 65 320

IRP II PIPELINE TAKREER GS ENGINEERING Madinath Zayed Highway Crossing 28" API 5L X 70 293

IRP II PIPELINE TAKREER GS ENGINEERING Madinath Zayed Highway Crossing 28" API 5L X 70 293

IRP II PIPELINE TAKREER GS ENGINEERING Madinath Zayed Highway Crossing 6" HDPE 293

IRP II PIPELINE TAKREER GS ENGINEERING ICAD To Labour Camps Shabia Road 20" + 6" API 5L X 65 283

IRP II PIPELINE TAKREER GS ENGINEERING ICAD to Labour Camps Shabia Road 20" + 6" API 5L X 65 283

IRP II PIPELINE TAKREER GS ENGINEERING GASCO Pipeline Crossing 20" + 6" API 5L X 65 280

IRP II PIPELINE TAKREER GS ENGINEERING Cricket Stadium Road 20" + 6" API 5L X 65 277

IRP II PIPELINE TAKREER GS ENGINEERING Proposed Road - ADIA North Terminal 20" + 6" API 5L X 65 268

IRP II PIPELINE TAKREER GS ENGINEERING Small Bypass Road Cricket Stadium 10" API 5L X 60 253

IRP II PIPELINE TAKREER GS ENGINEERING E33 Airport Road 20" + 6" API 5L X 65 253

IRP II PIPELINE TAKREER GS ENGINEERING E33 Airport Road 20" + 6" API 5L X 65 253

IRP II PIPELINE TAKREER GS ENGINEERING ICAD II Road Crossing 28" API 5L X 70 248

IRP II PIPELINE TAKREER GS ENGINEERING ICAD II Road Crossing 28" API 5L X 70 248

IRP II PIPELINE TAKREER GS ENGINEERING Road To ICAD II 12" API 5L X 65 248

IRP II PIPELINE TAKREER GS ENGINEERING Road To ICAD II 12" API 5L X 65 248

Page 3 of 12
EXPERIENCE LIST – HDD WORKS
ENGINEERED EXCELLENCE

Crossing Length
Project Owner Main Contractor Description Road/ Highway/Utility Pipe Diameter Pipe Grade
(Mtr.)

IRP II PIPELINE TAKREER GS ENGINEERING ICAD II Road Crossing 6" HDPE 248

IRP II PIPELINE TAKREER GS ENGINEERING Rumaitha Road Crossing 28" API 5L X 70 247

IRP II PIPELINE TAKREER GS ENGINEERING Rumaitha Road Crossing 28" API 5L X 70 247

IRP II PIPELINE TAKREER GS ENGINEERING Rumaitha Road Crossing 6" HDPE 247

IRP II PIPELINE TAKREER GS ENGINEERING Al Faya-Al Quaa Road 12" API 5L X 65 244

IRP II PIPELINE TAKREER GS ENGINEERING Al Faya-Al Quaa Road 12" API 5L X 65 244

IRP II PIPELINE TAKREER GS ENGINEERING Al Faya-Al Quaa Road 6" API 5L X 65 244

IRP II PIPELINE TAKREER GS ENGINEERING Sila To Abu Dhabi Main Road 28" API 5L X 70 243

IRP II PIPELINE TAKREER GS ENGINEERING Sila To Abu Dhabi Main Road 28" API 5L X 70 243

IRP II PIPELINE TAKREER GS ENGINEERING Sila To Abu Dhabi Main Road 6" HDPE 243

IRP II PIPELINE TAKREER GS ENGINEERING Asphalt Road 20" + 6" API 5L X 65 218

IRP II PIPELINE TAKREER GS ENGINEERING Habshan Road Crossing 28" API 5L X 70 218

IRP II PIPELINE TAKREER GS ENGINEERING Habshan Road Crossing 28" API 5L X 70 218

IRP II PIPELINE TAKREER GS ENGINEERING Habshan Road Crossing 6" HDPE 218

IRP II PIPELINE TAKREER GS ENGINEERING Al Rawda Road From Truck Road 12" API 5L X 65 212

IRP II PIPELINE TAKREER GS ENGINEERING Al Rawda Road From Truck Road 12" API 5L X 65 212

IRP II PIPELINE TAKREER GS ENGINEERING Al Rawda Road From Truck Road 6" API 5L X 65 212

IRP II PIPELINE TAKREER GS ENGINEERING Proposed Road (Residential Access ) 12" API 5L X 65 205

IRP II PIPELINE TAKREER GS ENGINEERING Proposed Road (Residential Access ) 12" API 5L X 65 205

Page 4 of 12
EXPERIENCE LIST – HDD WORKS
ENGINEERED EXCELLENCE

Crossing Length
Project Owner Main Contractor Description Road/ Highway/Utility Pipe Diameter Pipe Grade
(Mtr.)

IRP II PIPELINE TAKREER GS ENGINEERING Proposed Road (Residential Access ) 6" API 5L X 65 205

IRP II PIPELINE TAKREER GS ENGINEERING Twam Street Road 12" API 5L X 65 204

IRP II PIPELINE TAKREER GS ENGINEERING Twam Street Road 12" API 5L X 65 204

IRP II PIPELINE TAKREER GS ENGINEERING Twam Street Road 6" HDPE 204

IRP II PIPELINE TAKREER GS ENGINEERING Silah To Abu Dhabi Highway 20" + 6" API 5L X 65 197

IRP II PIPELINE TAKREER GS ENGINEERING Transco Pipeline Crossing 12" API 5L X 65 197

IRP II PIPELINE TAKREER GS ENGINEERING Transco Pipeline Crossing 12" API 5L X 65 197

IRP II PIPELINE TAKREER GS ENGINEERING Abu Dhabi -Al Ain Truck Road 12" API 5L X 65 193

IRP II PIPELINE TAKREER GS ENGINEERING Abu Dhabi -Al Ain Truck Road 12" API 5L X 65 193

IRP II PIPELINE TAKREER GS ENGINEERING Abu Dhabi -Al Ain Truck Road 6" API 5L X 65 193

51st Street
IRP II PIPELINE TAKREER GS ENGINEERING 20" + 6" API 5L X 65 191
(Near Round About)

IRP II PIPELINE TAKREER GS ENGINEERING ICAD III Camp Road Crossing 28" API 5L X 70 187

IRP II PIPELINE TAKREER GS ENGINEERING ICAD III Camp Road Crossing 28" API 5L X 70 187

IRP II PIPELINE TAKREER GS ENGINEERING Road To ICAD III 12" API 5L X 65 187

IRP II PIPELINE TAKREER GS ENGINEERING Road To ICAD III 12" API 5L X 65 187

IRP II PIPELINE TAKREER GS ENGINEERING ICAD III Camp Road Crossing 6" HDPE 187

IRP II PIPELINE TAKREER GS ENGINEERING 59th Street 20" + 6" API 5L X 65 185

IRP II PIPELINE TAKREER GS ENGINEERING Link Road Khalifa Bin Zayed City 10" API 5L X 60 180

IRP II PIPELINE TAKREER GS ENGINEERING Link Road Abu Dhabi To Mussaffah Road 20" + 6" API 5L X 65 180

Page 5 of 12
EXPERIENCE LIST – HDD WORKS
ENGINEERED EXCELLENCE

Crossing Length
Project Owner Main Contractor Description Road/ Highway/Utility Pipe Diameter Pipe Grade
(Mtr.)

IRP II PIPELINE TAKREER GS ENGINEERING Link Road Khalifa City To Airport Road 20" + 6" API 5L X 65 180

IRP II PIPELINE TAKREER GS ENGINEERING Salmia Palace Road Crossing 28" API 5L X 70 177

IRP II PIPELINE TAKREER GS ENGINEERING Salmia Palace Road Crossing 28" API 5L X 70 177

IRP II PIPELINE TAKREER GS ENGINEERING Salmia Palace Road Crossing 6" HDPE 177

IRP II PIPELINE TAKREER GS ENGINEERING Utility Crossing 28" API 5L X 70 175

IRP II PIPELINE TAKREER GS ENGINEERING Utility Crossing 28" API 5L X 70 175

IRP II PIPELINE TAKREER GS ENGINEERING Utility Crossing 6" HDPE 175

IRP II PIPELINE TAKREER GS ENGINEERING Access Road Cricket Stadium 10" API 5L X 60 174

12th Street Road Crossing(Branch From


IRP II PIPELINE TAKREER GS ENGINEERING 20" + 6" API 5L X 65 174
Air Port Road)
IRP II PIPELINE TAKREER GS ENGINEERING Abu Dhabi -Al Ain Truck Road 12" API 5L X 65 166

IRP II PIPELINE TAKREER GS ENGINEERING Abu Dhabi -Al Ain Truck Road 12" API 5L X 65 166

IRP II PIPELINE TAKREER GS ENGINEERING Abu Dhabi -Al Ain Truck Road 6" API 5L X 65 166

IRP II PIPELINE TAKREER GS ENGINEERING Hilwa Road Crossing 28" API 5L X 70 165

IRP II PIPELINE TAKREER GS ENGINEERING Hilwa Road Crossing 28" API 5L X 70 165

IRP II PIPELINE TAKREER GS ENGINEERING Hilwa Road Crossing 6" HDPE 165

IRP II PIPELINE TAKREER GS ENGINEERING Utility Crossing 28" API 5L X 70 164

IRP II PIPELINE TAKREER GS ENGINEERING Utility Crossing 28" API 5L X 70 164

IRP II PIPELINE TAKREER GS ENGINEERING Link Road From Hameem Road 12" API 5L X 65 164

IRP II PIPELINE TAKREER GS ENGINEERING Link Road From Hameem Road 12" API 5L X 65 164

Page 6 of 12
EXPERIENCE LIST – HDD WORKS
ENGINEERED EXCELLENCE

Crossing Length
Project Owner Main Contractor Description Road/ Highway/Utility Pipe Diameter Pipe Grade
(Mtr.)

IRP II PIPELINE TAKREER GS ENGINEERING Link Road From Hameem Road 6" API 5L X 65 164

IRP II PIPELINE TAKREER GS ENGINEERING Utility Crossing 6" HDPE 164

New Truck Road (Bypass From Al Ain


IRP II PIPELINE TAKREER GS ENGINEERING 12" API 5L X 65 163
Truck Road)
New Truck Road(Bypass From Al Ain
IRP II PIPELINE TAKREER GS ENGINEERING 12" API 5L X 65 163
Truck Road
New Truck Road (Bypass From Al Ain
IRP II PIPELINE TAKREER GS ENGINEERING 6" API 5L X 65 163
Truck Road)
IRP II PIPELINE TAKREER GS ENGINEERING Dubai-Selah 20" + 6" API 5L X 65 160

IRP II PIPELINE TAKREER GS ENGINEERING Pipeline Crossing 20" + 6" API 5L X 65 160

IRP II PIPELINE TAKREER GS ENGINEERING Dual Carriage Way Road Crossing 28" API 5L X 70 160

IRP II PIPELINE TAKREER GS ENGINEERING Dual Carriage Way Road Crossing 28" API 5L X 70 160

IRP II PIPELINE TAKREER GS ENGINEERING Dual Carriage Way Road Crossing 6" HDPE 160

IRP II PIPELINE TAKREER GS ENGINEERING Al Jumania Road Crossing 28" API 5L X 70 158

IRP II PIPELINE TAKREER GS ENGINEERING Al Jumania Road Crossing 28" API 5L X 70 158

IRP II PIPELINE TAKREER GS ENGINEERING Abu Dhabi -Al Ain Truck Road 12" API 5L X 65 158

IRP II PIPELINE TAKREER GS ENGINEERING Abu Dhabi -Al Ain Truck Road 12" API 5L X 65 158

IRP II PIPELINE TAKREER GS ENGINEERING Abu Dhabi -Al Ain Truck Road 6" API 5L X 65 158

IRP II PIPELINE TAKREER GS ENGINEERING Al Jumania Road Crossing 6" HDPE 158
By Pass Road To Heavy Vehicle
IRP II PIPELINE TAKREER GS ENGINEERING Monitoring Station(DOT) At Musaffah 10" + 6" API 5L X 60 148
E11 Road
IRP II PIPELINE TAKREER GS ENGINEERING Utility Crossing 28" API 5L X 70 148

IRP II PIPELINE TAKREER GS ENGINEERING Utility Crossing 28" API 5L X 70 148

Page 7 of 12
EXPERIENCE LIST – HDD WORKS
ENGINEERED EXCELLENCE

Crossing Length
Project Owner Main Contractor Description Road/ Highway/Utility Pipe Diameter Pipe Grade
(Mtr.)

IRP II PIPELINE TAKREER GS ENGINEERING Utility Crossing 6" HDPE 148

By Pass Road To Heavy Vehicle


IRP II PIPELINE TAKREER GS ENGINEERING Monitoring Station(DOT) At Musaffah 10" + 6" API 5L X 60 146
E11 Road

Access Road To Substation(TRANSCO),


IRP II PIPELINE TAKREER GS ENGINEERING 10" + 6" API 5L X 60 145
Battery Energy Storage

Access Road To Petrol Station Out Going


IRP II PIPELINE TAKREER GS ENGINEERING 10" + 6" API 5L X 60 143
(Mussaffah To Tarif)

IRP II PIPELINE TAKREER GS ENGINEERING Abu Dhabi Refinery Access Road 10" + 6" API 5L X 60 142

IRP II PIPELINE TAKREER GS ENGINEERING 26th Street Crossing 10" + 6" API 5L X 60 140

IRP II PIPELINE TAKREER GS ENGINEERING Water Pipeline Crossing 10" + 6" API 5L X 60 140

IRP II PIPELINE TAKREER GS ENGINEERING Road 10" + 6" API 5L X 60 139

IRP II PIPELINE TAKREER GS ENGINEERING Asphalt Road 20" + 6" API 5L X 65 138

IRP II PIPELINE TAKREER GS ENGINEERING Utility Crossing (TAKREER) 28" API 5L X 70 137

IRP II PIPELINE TAKREER GS ENGINEERING Utility Crossing (TAKREER) 28" API 5L X 70 137

IRP II PIPELINE TAKREER GS ENGINEERING Utility Crossing (TAKREER) 6" HDPE 137

IRP II PIPELINE TAKREER GS ENGINEERING Farm Access Road From Truck Road 12" API 5L X 65 136

IRP II PIPELINE TAKREER GS ENGINEERING Village Access Road From Truck Road 12" API 5L X 65 136

IRP II PIPELINE TAKREER GS ENGINEERING Farm Access Road From Truck Road 12" API 5L X 65 136

IRP II PIPELINE TAKREER GS ENGINEERING Village Access Road From Truck Road 12" API 5L X 65 136

IRP II PIPELINE TAKREER GS ENGINEERING Farm Access Road From Truck Road 6" API 5L X 65 136

IRP II PIPELINE TAKREER GS ENGINEERING Village Access Road From Truck Road 6" API 5L X 65 136

Page 8 of 12
EXPERIENCE LIST – HDD WORKS
ENGINEERED EXCELLENCE

Crossing Length
Project Owner Main Contractor Description Road/ Highway/Utility Pipe Diameter Pipe Grade
(Mtr.)

IRP II PIPELINE TAKREER GS ENGINEERING Maqta Gas Pipeline Crossing 10" + 6" API 5L X 60 135

IRP II PIPELINE TAKREER GS ENGINEERING GASCO Pipeline Crossing 20" + 6" API 5L X 65 135

IRP II PIPELINE TAKREER GS ENGINEERING Utility Crossing (TAKREER) 28" API 5L X 70 133

IRP II PIPELINE TAKREER GS ENGINEERING Utility Crossing (TAKREER) 28" API 5L X 70 133

IRP II PIPELINE TAKREER GS ENGINEERING 14th Steet/Twam Street 12" API 5L X 65 133

IRP II PIPELINE TAKREER GS ENGINEERING 14th Steet/Twam Street 12" API 5L X 65 133

IRP II PIPELINE TAKREER GS ENGINEERING 14th Steet/Twam Street 6" API 5L X 65 133

IRP II PIPELINE TAKREER GS ENGINEERING Utility Crossing (TAKREER) 6" HDPE 133

IRP II PIPELINE TAKREER GS ENGINEERING Newly Constructed Road 12" API 5L X 65 131

IRP II PIPELINE TAKREER GS ENGINEERING Newly Constructed Road 12" API 5L X 65 131

IRP II PIPELINE TAKREER GS ENGINEERING Newly Constructed Road 6" API 5L X 65 131

IRP II PIPELINE TAKREER GS ENGINEERING Al Dhafra Private Road 10"+6" API 5L X 64 130
IRP I Pipeline Crossing ( Behind Sas Al
IRP II PIPELINE TAKREER GS ENGINEERING 20" + 6" API 5L X 65 130
Nakheel Villas)
IRP II PIPELINE TAKREER GS ENGINEERING Farm Access Road From Truck Road 12" API 5L X 65 130

IRP II PIPELINE TAKREER GS ENGINEERING Farm Access Road From Truck Road 12" API 5L X 65 130

IRP II PIPELINE TAKREER GS ENGINEERING Farm Access Road From Truck Road 6" API 5L X 65 130

IRP II PIPELINE TAKREER GS ENGINEERING Newly Constructed Road 12" API 5L X 65 126

IRP II PIPELINE TAKREER GS ENGINEERING Newly Constructed Road 12" API 5L X 65 126

IRP II PIPELINE TAKREER GS ENGINEERING Newly Constructed Road 6" API 5L X 65 126

Page 9 of 12
EXPERIENCE LIST – HDD WORKS
ENGINEERED EXCELLENCE

Crossing Length
Project Owner Main Contractor Description Road/ Highway/Utility Pipe Diameter Pipe Grade
(Mtr.)

IRP II PIPELINE TAKREER GS ENGINEERING Al Dhafra Air Base Road 12" API 5L X 65 123

IRP II PIPELINE TAKREER GS ENGINEERING Al Dhafra Air Base Road 12" API 5L X 65 123

IRP II PIPELINE TAKREER GS ENGINEERING Al Dhafra Air Base Road 6" API 5L X 65 123

IRP II PIPELINE TAKREER GS ENGINEERING Service Road From Al Ain Truck Road 12" API 5L X 65 122

IRP II PIPELINE TAKREER GS ENGINEERING Service Road From Al Ain Truck Road 12" API 5L X 65 122

IRP II PIPELINE TAKREER GS ENGINEERING Service Road From Al Ain Truck Road 6" API 5L X 65 122

IRP II PIPELINE TAKREER GS ENGINEERING Village Access Road From Truck Road 12" API 5L X 65 121

IRP II PIPELINE TAKREER GS ENGINEERING Village Access Road From Truck Road 12" API 5L X 65 121

IRP II PIPELINE TAKREER GS ENGINEERING Village Access Road From Truck Road 6" API 5L X 65 121

IRP II PIPELINE TAKREER GS ENGINEERING Zakher ADNOC Station Road & Wall 12" API 5L X 65 120

IRP II PIPELINE TAKREER GS ENGINEERING Zakher ADNOC Station Road & Wall 6" API 5L X 65 120

IRP II PIPELINE TAKREER GS ENGINEERING Utility Crossing 28" API 5L X 70 110

IRP II PIPELINE TAKREER GS ENGINEERING Utility Crossing 28" API 5L X 70 110

IRP II PIPELINE TAKREER GS ENGINEERING Utility Crossing 6" HDPE 110

IRP II PIPELINE TAKREER GS ENGINEERING Road Inside Wadi 12" API 5L X 65 104

IRP II PIPELINE TAKREER GS ENGINEERING Road Inside Wadi 12" API 5L X 65 104

IRP II PIPELINE TAKREER GS ENGINEERING Road Inside Wadi 6" API 5L X 65 104

IRP II PIPELINE TAKREER GS ENGINEERING Zakher ADNOC Station Road & Wall 12" API 5L X 65 103

IRP II PIPELINE TAKREER GS ENGINEERING Road 8"+6" API 5L X 60 100

Page 10 of 12
EXPERIENCE LIST – HDD WORKS
ENGINEERED EXCELLENCE

Crossing Length
Project Owner Main Contractor Description Road/ Highway/Utility Pipe Diameter Pipe Grade
(Mtr.)

Link Road From Truck Road Round


IRP II PIPELINE TAKREER GS ENGINEERING 12" API 5L X 65 99
About
Link Road From Truck Road Round
IRP II PIPELINE TAKREER GS ENGINEERING 12" API 5L X 65 99
About
Link Road From Truck Road Round
IRP II PIPELINE TAKREER GS ENGINEERING 6" API 5L X 65 99
About

IRP 1 Pipeline Crossing ( Behind Sas Al


IRP II PIPELINE TAKREER GS ENGINEERING 10" + 6" API 5L X 60 96
Nakheel Villas)

IRP II PIPELINE TAKREER GS ENGINEERING Road 8"+6" API 5L X 60 96

IRP II PIPELINE TAKREER GS ENGINEERING Al Dhafra Private Road 10"+6" API 5L X 65 90

IRP II PIPELINE TAKREER GS ENGINEERING Road 10" + 6" API 5L X 60 89

IRP II PIPELINE TAKREER GS ENGINEERING TRANSCO Pipeline Crossing 12" API 5L X 65 88

IRP II PIPELINE TAKREER GS ENGINEERING Transco Pipeline Crossing 12" API 5L X 65 88

IRP II PIPELINE TAKREER GS ENGINEERING TRANSCO Pipeline Crossing 6" API 5L X 65 88

IRP II PIPELINE TAKREER GS ENGINEERING Concrete Wall 10" + 6" API 5L X 60 87

IRP II PIPELINE TAKREER GS ENGINEERING Al Dhafra Private Road 10" + 6" API 5L X 60 86

IRP II PIPELINE TAKREER GS ENGINEERING IRP I Pipeline Crossing 20" + 6" API 5L X 65 86

IRP II PIPELINE TAKREER GS ENGINEERING Al Dhafra Private Road 8" API 5L X 61 83

IRP II PIPELINE TAKREER GS ENGINEERING Road 10" + 6" API 5L X 60 83

IRP II PIPELINE TAKREER GS ENGINEERING Farm Access Road From Truck Road 12" API 5L X 65 83

IRP II PIPELINE TAKREER GS ENGINEERING Farm Access Road From Truck Road 12" API 5L X 65 83

IRP II PIPELINE TAKREER GS ENGINEERING Farm Access Road From Truck Road 6" API 5L X 65 83

IRP II PIPELINE TAKREER GS ENGINEERING Pipeline Crossing 10" + 6" API 5L X 60 80

Page 11 of 12
EXPERIENCE LIST – HDD WORKS
ENGINEERED EXCELLENCE

Crossing Length
Project Owner Main Contractor Description Road/ Highway/Utility Pipe Diameter Pipe Grade
(Mtr.)

IRP II PIPELINE TAKREER GS ENGINEERING Road 10" + 6" API 5L X 60 80

IRP II PIPELINE TAKREER GS ENGINEERING Al Dhafra Private Road 8" API 5L X 62 60

IRP II PIPELINE TAKREER GS ENGINEERING Al Dhafra Private Road 8"+6" API 5L X 66 60

IRP II PIPELINE TAKREER GS ENGINEERING Al Dhafra Private Road 10" API 5L X 66 58

IRP II PIPELINE TAKREER GS ENGINEERING Al Dhafra Private Road 10+6" API 5L X 67 58

IRP II PIPELINE TAKREER GS ENGINEERING Al Dhafra Private Road 10"+6" API 5L X 63 53

Page 12 of 12
ENGINEERED EXCELLENCE
EXPERIENCE LIST – MAINTENANCE WORKS

Sr No. Project Reference Description Client Year Status

OPERATION AND MAINTENANCE WORKS

Provision of welding and pipeline


1 Contract No.15474.02 maintenance services for replacement of ADCO 2014 In Progress
flowlines for three years in ADCO fields

Monitoring of Launcher, Receiver stations &


2 SWO - 5000000177 patrolling of Approximately 47 kilometer Al Ain Cement Factory 2014 Completed
pipeline.

Emergency Operation & Maintenance


3 SWO 5040199 GASCO 2011 Completed
Services (EOM) for ICAD Facilities.

Agreement No: Carryout Inspection & Repair as per API 650


4 GASCO 2010 Completed
158633101/2010 to Water Tank 81-TK-101B

Supply, Installation & Welding of Split


5 SWO - ITT No: 1590371 Sleeve (2.7m) on 16" Habshan Ruwais GASCO 2010 Completed
Condensate Pipeline

Supply, Installation & Welding of Split


6 Agreement No: 144318 Sleeve (7 no’s) on 16" Habshan Ruwais GASCO 2008 Completed
Condensate Pipeline

Emergency Repair Work on 30" BAB -


7 SWO 131045.101 GASCO 2008 Completed
MAQTA Gas Pipeline

81-TK-101 A, API 650 Water Tank


8 SWO 126883 GASCO 2007 Completed
Inspection & Repair

Page 1 of 5
ENGINEERED EXCELLENCE

Sr No. Project Reference Description Client Year Status

PIPELINE AND SYSTEMS MAINTENANCE

1 NC-UOP-046(B) TO # 02 P1 RS-2014 Civil works and LRUT inspection Dolphin Energy 2014 In progress

2 NC-UOP-046(B) TO # 21 P1 RS Installation of 863-PCV-006 at UOBS Dolphin Energy 2014 Completed

3 NC-UOP-046(B) TO # 20 P1 RS Servicing of Valves Dolphin Energy 2013 Completed

4 NC-UOP-046(B) TO # 18 P1 RS Installation of valves - TFP projects Dolphin Energy 2012 Completed

5 NC-UOP-046(B) TO # 19 P1 RS Assistance for PV maintenance at TRF Dolphin Energy 2012 Completed

6 NC-UOP-046(B) TO # 16 Passive Shelter Repair SV1, SV 2 & SV6 Dolphin Energy 2012 Completed

7 NC-UOP-046(B) TO # 17 Instrument air compressor repair works Dolphin Energy 2012 Completed

8 NC-UOP-046(B) TO # 09 Repairing of Air Compressor in TRF Dolphin Energy 2011 Completed

9 NC-UOP-046(B) TO # 10 Qidfa UFM Calibration Dolphin Energy 2011 Completed

10 NC-UOP-046(B) TO#11 TRF Heater Modification 860-101/201/301 Dolphin Energy 2011 Completed

11 NC-UOP-046(B) TO#12 Inergen Cylinder Testing Dolphin Energy 2011 Completed

Page 2 of 5
ENGINEERED EXCELLENCE

Sr No. Project Reference Description Client Year Status

PIPELINE AND SYSTEMS MAINTENANCE

Monitoring & Control of DEL Facilities on 30” MAQTA-


12 NC-UOP-046(B) TO # 02 Dolphin Energy 2010 Completed
AL-AIN Gas Pipeline at SV6 & SV9

Modification of Inergen System at LCR Taweelah,


Replacement of Existing Manual Call point by New
13 NC-UOP-046(B) TO # 01 Rev.1 Explosion Proof ESD Pushbutton, Cable Laying and Dolphin Energy 2010 Completed
Termination for F&G, HVAC, Modification of FACP
Panel.

Repair of Rectifier Unit at Jabel Ali and Replacement of


14 NC-UOP-046(B) TO # 03 CP Rectifier Controller Unit at SV3, Maqta Jabel Ali Dolphin Energy 2010 Completed
Pipeline.

15 NC-UOP-046(B) TO # 04 CP Cable Replacement & Shed for Junction Box Dolphin Energy 2010 Completed

16 NC-UOP-046(B) TO # 05 SV Solar System Replacement Dolphin Energy 2010 Completed

CIPS & DCVG for 36” Maqta to Umm Al Nar U/G


17 NC-UOP-046(B) TO # 06 Dolphin Energy 2010 Completed
Pipeline

Metering Maintenance Network & Installation of O2


18 NC-UOP-046(B) TO # 07 Dolphin Energy 2010 Completed
Analyzer

19 NC-UOP-046(B) TO # 08 Maqta RTU Segregation Dolphin Energy 2010 Completed

Page 3 of 5
ENGINEERED EXCELLENCE

Sr No. Project Reference Description Client Year Status

RIGHT OF WAY MAINTENANCE

1 NO-TSD-065 EPRS Material stacking at Al Ain station Dolphin Energy 2014 In Progress

2 TO # 01 P3 RS-2014 Sand clearing from inside and outside of TFP BV-05 station Dolphin Energy 2014 In Progress

3 NC-UOP-048(D) TO # 32 P3 RS ROW maintenance works due to Rain at AFP and TFP Dolphin Energy 2013 Completed

4 NC-UOP-048(D) TO # 29 P3 RS UOP House Keeping Dolphin Energy 2013 Completed

5 NC-UOP-048(D) TO # 31 P3 RS ROW maintenance works due to Rain Dolphin Energy 2013 Completed

6 NC-UOP-048(D) TO # 30 P3 RS Washout near Al Ain Station due to TRANSCO Pipe Burst Dolphin Energy 2013 Completed

7 NC-UOP-048(D) TO # 28 P3 RS Emergency works Transco wash out Dolphin Energy 2013 Completed

Installation of Perimeter Fence at Tie-in Station (KP 42+900


8 NC-UOP-048(D) TO # 27 P3 RS Dolphin Energy 2013 Completed
MJPL)

9 NC-UOP-048(D) TO # 26 P3 RS Fencing at Qidfa Station Dolphin Energy 2013 Completed

10 NC-UOP-048(D) TO # 24 P3 RS Pipe stack and Lay down area in Al Ain Dolphin Energy 2012 Completed

ROW repair works for Al Ain-Fujairah Pipeline (AFP) and


11 NC-UOP-048(D) TO # 25 P3 RS Dolphin Energy 2012 Completed
Taweelah-Fujairah Pipeline (TFP)

12 NC-UOP-048(D) TO # 22 Exposed Maqta Al Ain Pipeline repair Dolphin Energy 2012 Completed

13 NC-UOP-048(D) TO # 12 Fence repair Between SV 6 and SV 7 on MAP Dolphin Energy 2011 Completed

14 NC-UOP-048(D) TO # 14 ROW Maintenance and Fence Repair Dolphin Energy 2011 Completed

15 NC-UOP-048(D) TO # 16 Washout Repair at Al Ain Station due to TRANSCO Pipe Burst Dolphin Energy 2011 Completed

Washout Repair at Al Ain Fujairah Pipeline KP .500 due to


16 NC-UOP-048(D) TO # 2 Dolphin Energy 2010 Completed
damaged pipeline of TRANSCO

Page 4 of 5
ENGINEERED EXCELLENCE

Sr No. Project Reference Description Client Year Status

RIGHT OF WAY MAINTENANCE

17 NC-UOP-048(D) TO # 03 Fence Modification Works on Maqta – Jebel Ali Pipeline Dolphin Energy 2010 Completed

18 NC-UOP-048(D) TO # 04 Additional Fencing at Al Ain Station Dolphin Energy 2010 Completed

19 NC-UOP-048(D) TO # 05 ROW & Fence Maintenance on Al Ain – Fujairah Pipeline Dolphin Energy 2010 Completed

20 NC-UOP-048(D) TO # 06 Al Ain Station Flooding Dolphin Energy 2010 Completed

21 NC-UOP-048(D) TO # 08 ROW maintenance (Maqta – Jabel Ali Pipeline) Dolphin Energy 2010 Completed

22 NC-UOP-048(D) TO # 09 Al Ain - Fujairah Line wash out at KP 0 + 500 Dolphin Energy 2010 Completed

Re-instatement of wash out area at KM 135.4 of Al-Ain -


23 NC-UOP-048(D) TO # 01 R1 Dolphin Energy 2010 Completed
Fujairah Pipeline

PROVISION OF LABOUR, EQUIPMENT & MATERIALS

1 NC-UOP-049 (C) TO # 05 P4 RS Manpower and equipment for Pigging activities Maqta and TRF Dolphin Energy 2012 Completed

2 NC-UOP-049 (C) TO # 01 Hire of Showel Dolphin Energy 2011 Completed

3 NC-UOP-049 (C) TO # 02 Hire of Air Compressor on Weekly Basis Dolphin Energy 2011 Completed

BUILDING GENERAL MAINTENANCE

Supply and Installation of 5 Mtr wide Gate along with 1 meter


1 NC-UOP-047(C) TO # 01 Dolphin Energy 2011 Completed
Man access Gate.

2 NC-UOP-047(C) TO # 02 HVAC System Upgrade Dolphin Energy 2011 Completed

Page 5 of 5
ENGINEERED EXCELLENCE

RESOURCES

Sl No. RESOURCE
1 Human Resources
2 Major Plant and Equipment
3 Infrastructure and Facilities
ENGINEERED EXCELLENCE

MANPOWER

POSITION NO’s
Management Staff 35
Planning & Estimation Engineers 11
Procurement / Engineering 22
Construction Engineers / Superintendent 63
Supervisors / Foreman 192
QA/QC Engineers / Inspectors 56
HSE Engineers/ Officers 58
Surveyors 7
Administration Staff 28
Material Control Staff 22
Welders 145
HDD Drillers / Trackers / Riggers 62
Fitters / Fabricators 165
Plant Operators 98
Painters / Blasters 75
Semi Skilled/Helpers 741
TOTAL 1,780

PTW ( Permit to work) HOLDERS FOR VARIOUS OIL & GAS COMPANIES IN U.A.E

DESCRIPTION NO’s
PTW holders for TAKREER 14
JPs holders for ADCO 95
PTW holders for ADNOC DISTRIBUTION 21
PTW holders for GASCO 28
PTW holders for DOLPHIN ENERGY 8
PTW holders for TRANSCO 3

Note:
• We have long term association and agreement with reputed manpower suppliers and have huge data bank
for early mobilization of skilled and semi skilled manpower on project basis as and when required.

Page 1 of 1
ENGINEERED EXCELLENCE

PLANT & EQUIPMENT


Sl. # DESCRIPTION CAPACITY QTY.
Lifting and Construction Equipment

1 Pipelayer/Side Boom 583 / 572 35

2 Crane 75 T / 50T / 35 T 20

3 Excavator / JCB / Telehandler CAT 320 / JCB 3C 39

4 HDD Rig spread 160T / 50T / 40T 4

5 Downhole tools for Drilling Various LOT

6 Rock tools for Drilling Various LOT

7 Mud motor for Drilling Various 2

8 Welding Machines / Rectifiers 400 / 300 AMP 109

9 Compressors 935 cfm/375 cfm 16

10 Generator 30/50/100/250 KVA 15

11 Pipe bending Machine Various 2

12 Pipe Cutter - Cold cutting Various Lot

13 Internal / External Line Up Clamps Various Lot

14 Rolly Cradles Various Lot

15 Concrete vibrators Various 12

Page 1 of 3
ENGINEERED EXCELLENCE

Sl. # DESCRIPTION CAPACITY QTY.


16 Concrete mixer Lombardini 15

17 Rollers / Plate Compactors Various 19

18 Container Store / Site Office 20 / 40 FT. 38

Testing Equipment

19 Hydrotest Equip, Cabin with dead weight tester Various 5

20 Filling pump / Pressurizing pump / Dewatering Various 15

21 Drying Equipment Sullair 1

22 Holiday Detector Elcometer - 25KV/Spy – 40KV Various 12

23 Survey Instruments / Total Station Various 14

24 GPS Garmin, Sigma 5

25 Digi Clamp meter FLUKE, 375K 10

26 Pipe / Cable Detector Various 8

27 OTDR Machine Various 2

28 Splicing Machine Various 2

Transportation

29 Truck with Mobile Crane Hiab 14

30 Mini Loader Power Plus 1

Page 2 of 3
ENGINEERED EXCELLENCE

Sl. # DESCRIPTION CAPACITY QTY.


31 Trailers 20/40 Tons 25

32 Fuel Truck 3000 GL 5

33 Pickup 1/3 Ton 30

34 Cars Various 20

35 Land Cruiser /Fortuner 4x4 Various 25

36 Bus 9/15/30/50/56 Seater 34

37 Dump Truck Various 16

38 Water Tanker Various 10

Note:
 Our long term association and agreements with local suppliers for equipment has been instrumental in provision of uninterrupted services
to our clients as more equipment can be mobilized in the shortest span as per the project requirements.
 Our equipment pass through stringent safety check first internally and then certified by Third parties before mobilization to any site.
 We are well aware of CICPA (Critical Infrastructure and Coastal Protection Authority) pass requirements and most of our fleet is having
valid passes to work in Oil Field projects with valid CICPA passes.

Page 3 of 3
ENGINEERED EXCELLENCE

INFRASTRUCTURE AND FACILITIES


Head Office- ABU DHABI, U.A.E

ROBT.STONE (ME) LLC.


106, Bin Awdah Tower, Electra Street, Abu Dhabi.

Details: 400 Square Meters office space.

50 work stations with Computers, printers, copiers and furniture etc. Microsoft Windows, Auto CAD, Primavera
and Accounts Software. Telephones, Fax, Internet, Projector and Conference Facilities.

Project Office- MUSAFFAH, ABU DHABI, U.A.E

ROBT.STONE (ME) LLC.


Sector no: 9, Building no: ME96, Behind Al Safeer Mall, Musaffah, Abu Dhabi.

Details: 480 Square Meters office space.

70 work stations with Computers, printers, copiers and furniture etc. Microsoft Windows, Auto CAD, Primavera
and Accounts Software. Telephones, Fax, Internet, Projector and Conference Facilities.

Branch Office-DUBAI, U.A.E

ROBT.STONE (ME) LLC.


901, Fortune Tower, Jumeirah Lakes Towers, Sheikh Zayed Road, P.O. Box 123340, Dubai.

Details: 100 Square Meters office space.

15 work stations with Computers, printers, copiers and furniture etc. Microsoft Windows, Auto CAD, Primavera
and Accounts Software. Telephones, Fax, Internet, Projector and Conference Facilities.

Page 1 of 2
ENGINEERED EXCELLENCE

INFRASTRUCTURE AND FACILITIES


Industrial Yard / Camp Facilities in Habshan on Buhasa Road, Abu Dhabi, U.A.E

70,000 Square Meters total industrial and camp facilities consisting of:
 Site offices.
 Stores.
 Fabrication workshop.
 Precast yard.
 Portacabin Camp facilities

Industrial Yard in Sweihan Road, Abu Dhabi, U.A.E


20,000 Square Meters total industrial yard, consists of:
 Centre Stores.
 W are houses.
 Fabrication shop.
 Paining and Blasting Yard.
 Equipment maintenance workshop.

Industrial Yard / Camp Facilities, Al Dabbiya, Abu Dhabi, U.A.E


144,000 Square Meters total industrial yard, consists of:
 Site offices.
 Stores.
 Fabrication workshop.
 Precast yard.
 Portacabin Camp facilities

Fabrication Shop in ICAD, Al Ain, U.A.E

20,000 Square Meters of fabrication shop, consists of:


 Site offices.
 Fabrication / testing facility.
 Storage yard.

Page 2 of 2
ENGINEERED EXCELLENCE

QUALITY ASSURANCE AND QUALITY CONTROL

Sl No. DESCRIPTION
1 Introduction
2 ISO 9001 Certification
3 Quality policy
4 Waste Reduction Policy
5 Quality Management System Manual Index
ENGINEERED EXCELLENCE

QUALITY SYSTEM

At ROBT.STONE, quality is not just a system, but a culture that covers the length and breadth of our
organization. Consequently, the Quality Assurance department not only implements a system, but maintains this
culture. We firmly believe that our Clients will return only if and when their expectations are fully met.

Our Quality and HSE Functions are managed by independent team of professionals, Our Quality Management
System is certified to ISO 9001:2008, Regular Quality Audits critically ascertain, identify and evaluate the
presence and compliance of norms specified in our Quality Manuals.

We implement the Quality Culture and system with a Motto “Do it Right, First time and Every Time”.

Page 1 of 1
ENGINEERED EXCELLENCE

HEALTH SAFETY AND ENVIRONMENT

Sl No. DESCRIPTION
1 Introduction
2 ISO 14001 Certification
3 BS OHSAS 18001 Certification
4 Environment, Occupational Health and Safety policy
5 Employee Welfare policy
6 Fog Control Policy
7 Alcohol, Drug and Substance abuse Policy
8 Environmental Purchasing Policy
9 EOHS Management System Manual Index
10 HSE Statistics
ENGINEERED EXCELLENCE

EOHS (ENVIRONMENT, OCCUPTIONALHEALTH SAFETY SYSTEM)

At ROBT.STONE, Safety is culture, we believe in executing projects with “Safety in Hearts and Minds”.
Safety in paramount, Safety First, in any of our acts and decision speaks about our commitment towards safety
for human life, asset and environment. We understand our social and economic responsibilities towards
Environment, Occupational Health and Safety Systems and thrive to achieve the best in the same by
implementing the systems. Our EOHS Management System is certified to ISO 14001:2004 & BS OHSAS
18001:2007.

Page 1 of 1
ENGINEERED EXCELLENCE

HSE PERFORMANCE

SL.NO HSE PARAMETERS 2013 2014 2015 2016

1 Total Hours Worked 1,850,274 3,147,735 1,733,803 1,761,898 (till date)

2 Reported Near Misses / Unsafe acts 7 4 76 29

3 First Aid cases 5 5 12 1

4 Incidents 3 3 4 2

5 Number of fatalities 0 0 0 0

6 Number of lost time injuries (LTI) 1 0 0 0

7 Frequency rate for each corresponding year 0.1 0 0 0

8 Man Days Lost 5 0 0 0

9 Severity Rate 0.5 0 0 0

10 Number of Environmental Incidents 0 0 0 0

No.of LTI Cases Man−days Lost due to LTI


* Frequency Rate = Total Man−hours worked x 200,000 * Severity Rate = Total Man−hours worked x 200,000
ENGINEERED EXCELLENCE

SOCIAL RESPONSIBILITY

At ROBT.STONE, we believe it is our duty and social responsibility to give something back to the Community.
We believe in supporting ill-fated communities, extending our helping hand and generating awareness in our
team for voluntary contribution towards society.

Some of our social initiatives which we humbly do it without any fanfare as below, we believe our self to be
fortunate enough to help others and giving back to society from where we grow,

 Sponsorship of education for children of our needy work force.

 Contribution towards flood victims in India.

 Contribution towards building community centre in Pakistan.

 Underprivileged orphan / blind school contributions In India.

 Active association with institutions in the UAE for raising charity funds.

Page 1 of 1
ENGINEERED EXCELLENCE

LICENCES

Sl No. DESCRIPTION
1 Commercial Trade License
2 Abu Dhabi Chamber of Commerce Certificate
3 Branch License (Dubai)
ENGINEERED EXCELLENCE
CLIENT LIST

 ADCO (ABU DHABI COMPANY FOR ONSHORE OIL OPERATIONS)  GASCO (ABU DHABI GAS INDUSTRIES LTD)

 ADNOC (ABU DHABI NATIONAL OIL COMPANY)  GS ENGINEERING & CONSTRUCTION

 AL AIN CEMENT FACTORY  HYUNDAI

 AJMAL STEEL  KAZSTROY SERVICES

 AL JABER ENERGY  NPCC (NATIONAL PETROLEUM CONSTRUCTION COMPANY)

 ALDAR  PUNJ LLOYD

 BAUER KOMPRESSOREN  QATAR PETROLEUM

 BECHTEL CORPORATION  QENERGY

 BOROUGE  SEWA (SHARJAH ELECTRICITY & WATER AUTHORITY)

 BSS TECHNOLOGIES  TAKREER (ABU DHABI OIL REFINING COMPANY)

 CBI (CHICAGO BRIDGE & IRON COMPANY)  TDW (T.D.WILLIAMS)

 CCC (CONSOLIDATED CONTRACTORS COMPANY)  TECNICAS REUNIDAS

 DOLPHIN ENERGY

 DUSUP (DUBAI SUPPLY AUTHORITY)

 EMIRATES STEEL
ROBT.STONE (ME) LLC received award of excellence in HSE for achieving
Two million man hours without Lost Time Incidents (LTI) for TAKREER
IRP-II Project
ROBT.STONE (ME) LLC Chairman and Managing Director Mr.V.K.Madan receiving award of excellence
from Mr. John Oberholzer (Project Manager, PMC) for achieving Two million man hours without Lost Time
Incidents (LTI) for IRP-II Project
ROBT.STONE (ME) LLC Managing Director Mr. V.K.Madan receiving certificate of excellence in
Execution of TAKREER – IRP-II Project from Mr. H. Sun Kim (Sr. Vice President of GS E&C, S. Korea)
Certificate of Appreciation from GS E&C, S. Korea for excellence in Pipeline welding for TAKREER
IRP-II project
ROBT.STONE (ME) LLC Managing Director Mr. V.K.Madan receiving award of appreciation from
ADNOC COE H.E. Yousef Omair Bin Yousef
Certificate of Appreciation from GS E&C, S. Korea for excellence in Pipeline lowering for TAKREER
IRP-II project
Image credit: EPA

German Chancellor Angela Merkel inaugurates Natural Gas filling station in Masdar City. ROBT.STONE
(ME) LLC executed the NGV (Natural Gas for Vehicles) project which was the first of its kind in UAE
Certificate of appreciation awarded to ROBT.STONE (ME) LLC for the successful execution and
completion of the first Natural Gas for Vehicles (NGV) project in UAE
Letter of Appreciation for High Safety and compliance to client safety standards during
execution of tie-in and pipeline commissioning works at Al Ain Cement Factory in 2012
Certificate of Appreciation from GS E&C, S. Korea for excellence in Pipeline joint coating for TAKREER
IRP-II project
Letter of Appreciation for High Safe and timely completion without any cost variations for
Dolphin Energy Pipeline rehabilitation works during 2012-2013
ROBT.STONE (ME) LLC received Excellent Supplier Award – 2012 from GASCO for outstanding works
as contractor in the year 2012.
Letter of Appreciation for strict adherence to Quality and Safety standards together with
timely completion of 10” pipeline construction works for SEWA (Sharjah Electricity and
Water Authority) in 2007
ENGINEERED EXCELLENCE

HDD (HORIZONTAL DIRECTIONAL DRILLING) DIVISION

Sl No. DESCRIPTION
1 Introduction
2 HDD Division Organization Structure
3 Experience
4 Design Calculations (stress) for HDD works (Sample)
5 HDD Profile drawing (Sample)
ENGINEERED EXCELLENCE

ROBT.STONE (ME) LLC

HDD DIVISION

Page 1 of 12
ENGINEERED EXCELLENCE

We built reputation on our Commitment to our Clients and their Projects.


ROBT.STONE
Horizontal Directional Drilling (HDD) Division
Can get around your obstacles confidently,
It may be laying pipelines, conduits, cables under busy roads
Or
Under water creeks, we do without disrupting traffic, without diverting waters and do it right the first time
in record time.
The specialization of the company is in the areas of Pipeline, piping, flow lines for Oil and Gas sector, Civil
works and other Infrastructure Projects.

As a HDD Division, we have built our business on the strength of the most experienced people in the industry and
we believe that experienced people and best equipment and technical knowledge are the difference between the
success and the failure. Our team of HDD has over 15 years of HDD experience working on Oil and Gas and
Telecom sector HDD works.

Combined with the experience and the equipment available, ROBTSTONE (ME) LLC has the most
knowledgeable, technically advanced crew available in the local industry today. With 4 Spreads of HDD
Equipment ROBT.STONE have 5 crews for the rigs for round the clock operation to be carried out at critical
locations.

We have completed 200 crossings in nearly all type of terrain, across major highways, utilities, creeks, wetlands,
etc.

Horizontal Directional Drilling (HDD) also termed as Directional Boring and Directional Drilling, is a method of
Installing Underground Pipelines and conduits from the surface along the designed Bore Path. Installation lengths
up to 3500’ have been completed and diameter up to 28” has been installed in shorter as well as longer runs.

This procedure is used for installing Gas Lines, Oil Lines, Sewer Lines, Telecommunication Cables, Power Cable
Conduits, Water Lines and Casing Pipe.

This technology has been rapidly growing and is expected to increase for the foreseeable future with the
advantages mentioned below.

Page 2 of 12
ENGINEERED EXCELLENCE

HDD technique can be used as an alternate to other techniques due to following reasons:
 Shorter Construction Period
 Cost Efficient
 Environmental Friendly
 Conventional Technique not feasible
 No interruption to Surface Traffic
 Secure and Safer cover depth
 Longer Installation Possible
 Directional Capabilities

OUR STRENGTH

 Have successful track record of installation of Apprx..44,000 meter of pipelines by HDD technique.
 Mobilized equipment in the Region
 Aware of conducting business in the Region
 Cost of execution is very low as compared to other contractors.
 Innovative and technical knowledge about the subject.

THE HDD SITE PLANNING

Every project begins with thoughtful planning. Ground conditions are determined, surrounding utilities positively
located, bore profile is surveyed and plotted, and safety and environmental issues are considered before work
commencement. The major activities involved are as follows:

 Prior Location & Marking of Existing Pipeline and Utilities


 Established Visible Exclusion Zone Along R.O.W Working Area
 Marking of Proposed HDD Centerline & Limits
 Daily Tool Box Meetings
 Availability of Work Permits
 Radio Communications
 Established & Approved Risk Assessment

PILOT HOLE

The Pilot Hole is drilled from the entry to the exit point following the previously designed/approved profile and
alignment. The drilling tools and the Rig capacity are selected largely based on the result of the geotechnical

Page 3 of 12
ENGINEERED EXCELLENCE

Investigation and the borehole data available and the crossing size (length and the diameter). During the pilot hole
drilling directional guidance system is used to navigate the pilot hole along its pre designed profile. Guidance
systems used by us are:

 Walkover System

The most commonly used equipment for determing the location of the bore head on small to mid size rigs is
called a 'walk-over' locating system. A sonde (transmitter) behind the drill head registers angle,
rotation, diggy auto insurance quotes magnetic direction and temperature data. The information is then
encoded into an electro-magnetic signal which is transmitted through the ground to the surface. At the surface
a receiver is manually positioned over the sonde signal and the signal decoded and steering directions relayed
to the operator on a remote display on the drill machine.

 Downhole System

Page 4 of 12
ENGINEERED EXCELLENCE

The most commonly used type of down hole system is called a 'wire-line' and uses a wire to transmit the data
up the inside of the drill pipe. At the surface the data from the wire is decoded by a computer to provide
depth, angle, rotation, direction (azimuth) and other information. To compensate for potential magnetic
interference, an artificial electro-magnetic grid is created at the surface the steering tool locates itself beneath
the grid. We use state of the art equipment PARATRACK II for down hole steering.

HOLE ENLARGEMENT

Pilot Hole enlarging is known as “Pre Reaming”. This process is carried out after Pilot Hole. Pre Reaming is
required to provide a bore diameter large enough so that the pipeline can be installed in the drilled crossing. Based
on the final desired diameter and the soil condition the required diameter of the pre reaming and number of stages
to obtain that same is finalized. This pre reaming shall be carried out with different types of tooling for the soft
strata and rock. For softer ground the pre reaming operation is carried out by Reamers and Fly Cutters. For rock
crossings the Hole Openers are used.

PULLBACK OPERATION

Once the drilled hole has been enlarged to the required diameter and cleaned adequately, the pipeline is installed.
When applicable, the pipeline is pre-assembled in a single string and placed on rollers prior to pullback. For
pullback, a reamer is connected to the drill pipe. Behind the reamer a rotating swivel is connected allowing the
drill pipe to rotate the reamer without allowing the transfer of torque to the product pipe. The drill pipe is then
pulled back towards the entry point until the pipeline is fully installed in the hole.

Page 5 of 12
ENGINEERED EXCELLENCE

HDD RIGS FLEET:

HORIZONTAL DIRECTIONAL DRILLING RIG (32T) – 1 No

SPECIFICATIONS:

Pullback(max) 320 kN
Thrust(max) 200 kN
Spindle torque(max) 12000 N.m
Spindle Speed(high and low speed) 0-120 r/min
Incidence angle 10-24°
Engine type 4strokes,Turbo-charging,6cylinders water cooling Diesel engine
Engine rated power 162 kW/2200 rpm
Diameter of drill pipe 73 mm
Length of drill pipe 4 meters

Page 6 of 12
ENGINEERED EXCELLENCE

HORIZONTAL DIRECTIONAL DRILLING RIG (32T) – 1 No

SPECIFICATIONS:

Pullback(max) 320 kN
Thrust(max) 200 kN
Spindle torque(max) 12000 N.m
Spindle Speed(high and low speed) 0-120 r/min
Incidence angle 10-24°
Engine type 4strokes,Turbo-charging,6cylinders water cooling Diesel engine
Engine rated power 162 kW/2200 rpm
Diameter of drill pipe 73 mm
Length of drill pipe 4 meters

Page 7 of 12
ENGINEERED EXCELLENCE

HORIZONTAL DIRECTIONAL DRILLING RIG (32T) – 1 No

SPECIFICATIONS:

Pullback(max) 320 kN
Thrust(max) 200 kN
Spindle torque(max) 12000 N.m
Spindle Speed(high and low speed) 0-120 r/min
Incidence angle 10-24°
Engine type 4strokes,Turbo-charging,6cylinders water cooling Diesel engine
Engine rated power 162 kW/2200 rpm
Diameter of drill pipe 73 mm
Length of drill pipe 4 meters

Page 8 of 12
ENGINEERED EXCELLENCE

HORIZONTAL DIRECTIONAL DRILLING RIG (160T) – 01 No

SPECIFICATIONS:

Pullback(max) 2450 k N
Thrust(max) 1640 k N
Spindle torque(max) 82300 Nm
Spindle Speed(high and low speed) 0-81 r/min
Incidence angle 09 -16°
Engine rated power 239 x 2 kW/2200 rpm
Diameter of drill pipe 6” – 8”
Length of drill pipe 9.8 meters

Page 9 of 12
ENGINEERED EXCELLENCE
MUD MOTOR

6 ¾” XTR Mud Motor, 1.75 Degree Fixed Bend, 7/8 Lobe 3 Stage Power Section – 01 No.

DRILL PIPES

5 ½” FH DRILL PIPES, Range 2,Grade S 135,Weight 21.9 PPF - 2800 meters

Page 10 of 12
ENGINEERED EXCELLENCE
FLY CUTTERS AND BARREL REAMERS

Fly cutter and barrel reamers from size 12” to 64” - LOT

Page 11 of 12
ENGINEERED EXCELLENCE
APPLICATIONS OF HDD

Design & Engineering: A team of ROBT.STONE Design Engineers generates design plan and profile drawings
for crossings. The engineers have an access to Computer Aided Design systems. The plan and the profile are
based on design parameters, underground utilities and geotechnical reports provided by client. This is then sent to
site after its approval from client. During drilling the coordinates of the actual drilled path are plotted on this
profile, the path of the next drilled rod to be drilled depends on the tolerance of the plotted coordinate and the
design profile. The surveyor then prepares an “As-Built” based on the actual plotted coordinates. After
completion of work this As-Built is then submitted to the Client for future reference.

Pipeline Bundles: This application involves laying of combination of different diameter pipelines and CS conduit
in a single drilled hole. This method of laying is most common today. It not only reduces on cost but also allows
the work to be done with minimum environmental Damages. RSME Construction has done a number of bundled
crossings of combination of pipeline and CS conduits.

Large Diameter and longer length Crossings: ROBT.STONE has excelled itself in this category from
executing a 6” to 28” crossing of 1Km and more. In larger dia bundle crossing of 28 Inch with 6 Inch conduits are
pulled for length ranging from 600 meter to 1400 Meter. Our Maxi Rig can overcome the pulling requirement and
tensional requirement of large diameter crossings. RSME till date has installed over 38,000 meter of pipelines
with diameter ranging from 6” to 28”.

Rock Crossings: The myth that Horizontal Directional Drilling is only limited to soft soil, but driven by client’s
demand drilling across these crossings is no longer a myth but a reality! RSME have all the required equipment
and expertise for drilling in hard strata and rock. These crossings require use of specialized rock tooling Like Mud
Motors for drilling Pilot Hole and Hole Openers to enlarge the hole to the required diameter.

Telecommunication and Electrical Conduits: The growing popularity of Broadband services has resulted in
laying of fiber optic cable for infrastructure development .The HDD system is best suited for laying of electrical
conduits and OFC across streams, underground utilities, canals, National Highways and Municipal roads.

Beach Approaches: The use of directional drilling for landfall sections of pipelines leaves no effect on the beach
environment, installation by HDD is less time consuming ,the pipeline is not exposed to the outer atmosphere
hence it is safe from the sea strom,Waves,etc.

Page 12 of 12
ENGINEERED EXCELLENCE

ORGANOGRAM FOR HDD DIVISION

CHAIRMAN AND
MANAGING DIRECTOR

CHIEF FINANCIAL OFFICER

DIRECTOR - PROJECTS
CORPORATE MANAGEMENT

MANPOWER

PROJECT / SITE MANAGEMENT

MANPOWER GENERAL MANAGER

SITE ACCOUNTS

QC ENGINEER SUPERINTENDENT
PLANT & EQUIPMENT SUPERINTENDENT SAFETY ENGINEER
ENGINEER
RIG 3 – 32T RIG 4 – 160T
QC INSPECTOR 1 RIG 1 – 32T RIG 2 – 32T
RIG 1 32 TON SAFETY OFFICER 1
RIG 1 32 TON
TRACKER HDD FOREMAN TRACKER MECHANIC / TRACKER HDD FOREMAN SURVEYOR /
QC INSPECTOR 2 ELECTRICIAN TRACKER
RIG 2 32 TON SAFETY OFFICER 2
RIG 2 32 TON

QC INSPECTOR 3 DRILLER DRILLER HELPERS DRILLER DRILLER


RIG 3 32 TON SAFETY OFFICER 3
RIG 3 32 TON

QC INSPECTOR 4 RIGGERS / RIGGERS / RIGGERS / RIGGERS /


RIG 4 160 TON SAFETY OFFICER 4
HELPER HELPER HELPER HELPER RIG 4 160 TON

Note: We possess enough manpower to deploy for Day / Night shifts


[Publish Date]
EXPERIENCE LIST – HDD WORKS
ENGINEERED EXCELLENCE

Crossing Length
Project Owner Main Contractor Description Road/ Highway/Utility Pipe Diameter Pipe Grade
(Mtr.)

PIPELINE & WELDING


ADCO ROBT.STONE Road Crossing 6” API 5L X 60 100
MAINTENANCE SERVICES
PIPELINE & WELDING
ADCO ROBT.STONE Road Crossing 4” API 5L X 60 188
MAINTENANCE SERVICES
PIPELINE & WELDING
ADCO ROBT.STONE Road Crossing 4’ API 5L X 60 100
MAINTENANCE SERVICES
PIPELINE & WELDING
ADCO ROBT.STONE Road Crossing 4” API 5L X 60 105
MAINTENANCE SERVICES
PIPELINE & WELDING
ADCO ROBT.STONE Road Crossing 6” API 5L X 60 96
MAINTENANCE SERVICES
PIPELINE & WELDING
ADCO ROBT.STONE Road Crossing 4” API 5L X 60 102
MAINTENANCE SERVICES
PIPELINE & WELDING
ADCO ROBT.STONE Road Crossing 4” API 5L X 60 114
MAINTENANCE SERVICES
PIPELINE & WELDING
ADCO ROBT.STONE Road Crossing 6” API 5L X 60 96
MAINTENANCE SERVICES
PIPELINE & WELDING
ADCO ROBT.STONE Road Crossing 6” API 5L X 60 84
MAINTENANCE SERVICES
PIPELINE & WELDING
ADCO ROBT.STONE Road Crossing 4” API 5L X 60 103
MAINTENANCE SERVICES
Big Access Road Crossing To Cricket
IRP II PIPELINE TAKREER GS ENGINEERING 20" + 6" API 5L X 65 1440
Stadium

E11 Dubai-Sila Road& Dubai-Sweihan


IRP II PIPELINE TAKREER GS ENGINEERING 20" + 6" API 5L X 65 1400
Interchange

HABSHAN I FLOWLINE ADCO CCC / SAARI ADCO / GASCO Utilities Crossing 6”, 8”, 20” API 5L X 60 1400 (Total)

IRP II PIPELINE TAKREER GS ENGINEERING Palace Road & Round About 20" + 6" API 5L X 65 1100

IRP II PIPELINE TAKREER GS ENGINEERING Sheikh Zayed Mosque Road E10 10" + 6" API 5L X 60 975

IRP II PIPELINE TAKREER GS ENGINEERING E11 Dubai-Sila Road 20" + 6" API 5L X 65 733

IRP II PIPELINE TAKREER GS ENGINEERING E22 Abu Dhabi To Al Ain Road 20" + 6" API 5L X 65 733

Page 1 of 12
EXPERIENCE LIST – HDD WORKS
ENGINEERED EXCELLENCE

Crossing Length
Project Owner Main Contractor Description Road/ Highway/Utility Pipe Diameter Pipe Grade
(Mtr.)

IRP II PIPELINE TAKREER GS ENGINEERING E22 Abu Dhabi To Al Ain Road 20" + 6" API 5L X 65 733

IRP II PIPELINE TAKREER GS ENGINEERING 12th Street Road 10" API 5L X 60 680

IRP II PIPELINE TAKREER GS ENGINEERING Musaffah To Sila Road(E11) 10" + 6" API 5L X 60 521

E20-Abudhabi-Al Ain Road& Dodsal 52"


IRP II PIPELINE TAKREER GS ENGINEERING 20" + 6" API 5L X 65 469
Pipeline Crossing

IRP II PIPELINE TAKREER GS ENGINEERING Asphalt Road(ICAD Shabia Road) 20" + 6" API 5L X 65 432

IRP II PIPELINE TAKREER GS ENGINEERING Mafraq-Al Guwaifat Highway 12" API 5L X 65 399

IRP II PIPELINE TAKREER GS ENGINEERING Mafraq-Al Guwaifat Highway 12" API 5L X 65 399

IRP II PIPELINE TAKREER GS ENGINEERING Mafraq-Al Guwaifat Highway 6" API 5L X 65 399

IRP II PIPELINE TAKREER GS ENGINEERING E20 Airport Road 20" + 6" API 5L X 65 364

IRP II PIPELINE TAKREER GS ENGINEERING Al Rawda Road & Shakboot Sultan Road 12" API 5L X 65 363

IRP II PIPELINE TAKREER GS ENGINEERING Al Rawda Road & Shakboot Sultan Road 12" API 5L X 65 363

IRP II PIPELINE TAKREER GS ENGINEERING Al Rawda Road & Shakboot Sultan Road 6" HDPE 363
Small By Pass Road Crossing Cricket
IRP II PIPELINE TAKREER GS ENGINEERING 20" + 6" API 5L X 65 351
Stadium
IRP II PIPELINE TAKREER GS ENGINEERING Utility Crossing 28" API 5L X 70 326

IRP II PIPELINE TAKREER GS ENGINEERING Utility Crossing 28" API 5L X 70 326

IRP II PIPELINE TAKREER GS ENGINEERING Utility Crossing 12" API 5L X 65 326

IRP II PIPELINE TAKREER GS ENGINEERING Utility Crossing 12" API 5L X 65 326

IRP II PIPELINE TAKREER GS ENGINEERING Utility Crossing 6" API 5L X 65 326

Page 2 of 12
EXPERIENCE LIST – HDD WORKS
ENGINEERED EXCELLENCE

Crossing Length
Project Owner Main Contractor Description Road/ Highway/Utility Pipe Diameter Pipe Grade
(Mtr.)

IRP II PIPELINE TAKREER GS ENGINEERING Pipeline Crossing 10" + 6" API 5L X 60 325

IRP II PIPELINE TAKREER GS ENGINEERING Proposed Road (Villa Access ) 12" API 5L X 65 320

IRP II PIPELINE TAKREER GS ENGINEERING Proposed Road (Villa Access ) 12" API 5L X 65 320

IRP II PIPELINE TAKREER GS ENGINEERING Proposed Road (Villa Access ) 6" API 5L X 65 320

IRP II PIPELINE TAKREER GS ENGINEERING Madinath Zayed Highway Crossing 28" API 5L X 70 293

IRP II PIPELINE TAKREER GS ENGINEERING Madinath Zayed Highway Crossing 28" API 5L X 70 293

IRP II PIPELINE TAKREER GS ENGINEERING Madinath Zayed Highway Crossing 6" HDPE 293

IRP II PIPELINE TAKREER GS ENGINEERING ICAD To Labour Camps Shabia Road 20" + 6" API 5L X 65 283

IRP II PIPELINE TAKREER GS ENGINEERING ICAD to Labour Camps Shabia Road 20" + 6" API 5L X 65 283

IRP II PIPELINE TAKREER GS ENGINEERING GASCO Pipeline Crossing 20" + 6" API 5L X 65 280

IRP II PIPELINE TAKREER GS ENGINEERING Cricket Stadium Road 20" + 6" API 5L X 65 277

IRP II PIPELINE TAKREER GS ENGINEERING Proposed Road - ADIA North Terminal 20" + 6" API 5L X 65 268

IRP II PIPELINE TAKREER GS ENGINEERING Small Bypass Road Cricket Stadium 10" API 5L X 60 253

IRP II PIPELINE TAKREER GS ENGINEERING E33 Airport Road 20" + 6" API 5L X 65 253

IRP II PIPELINE TAKREER GS ENGINEERING E33 Airport Road 20" + 6" API 5L X 65 253

IRP II PIPELINE TAKREER GS ENGINEERING ICAD II Road Crossing 28" API 5L X 70 248

IRP II PIPELINE TAKREER GS ENGINEERING ICAD II Road Crossing 28" API 5L X 70 248

IRP II PIPELINE TAKREER GS ENGINEERING Road To ICAD II 12" API 5L X 65 248

IRP II PIPELINE TAKREER GS ENGINEERING Road To ICAD II 12" API 5L X 65 248

Page 3 of 12
EXPERIENCE LIST – HDD WORKS
ENGINEERED EXCELLENCE

Crossing Length
Project Owner Main Contractor Description Road/ Highway/Utility Pipe Diameter Pipe Grade
(Mtr.)

IRP II PIPELINE TAKREER GS ENGINEERING ICAD II Road Crossing 6" HDPE 248

IRP II PIPELINE TAKREER GS ENGINEERING Rumaitha Road Crossing 28" API 5L X 70 247

IRP II PIPELINE TAKREER GS ENGINEERING Rumaitha Road Crossing 28" API 5L X 70 247

IRP II PIPELINE TAKREER GS ENGINEERING Rumaitha Road Crossing 6" HDPE 247

IRP II PIPELINE TAKREER GS ENGINEERING Al Faya-Al Quaa Road 12" API 5L X 65 244

IRP II PIPELINE TAKREER GS ENGINEERING Al Faya-Al Quaa Road 12" API 5L X 65 244

IRP II PIPELINE TAKREER GS ENGINEERING Al Faya-Al Quaa Road 6" API 5L X 65 244

IRP II PIPELINE TAKREER GS ENGINEERING Sila To Abu Dhabi Main Road 28" API 5L X 70 243

IRP II PIPELINE TAKREER GS ENGINEERING Sila To Abu Dhabi Main Road 28" API 5L X 70 243

IRP II PIPELINE TAKREER GS ENGINEERING Sila To Abu Dhabi Main Road 6" HDPE 243

IRP II PIPELINE TAKREER GS ENGINEERING Asphalt Road 20" + 6" API 5L X 65 218

IRP II PIPELINE TAKREER GS ENGINEERING Habshan Road Crossing 28" API 5L X 70 218

IRP II PIPELINE TAKREER GS ENGINEERING Habshan Road Crossing 28" API 5L X 70 218

IRP II PIPELINE TAKREER GS ENGINEERING Habshan Road Crossing 6" HDPE 218

IRP II PIPELINE TAKREER GS ENGINEERING Al Rawda Road From Truck Road 12" API 5L X 65 212

IRP II PIPELINE TAKREER GS ENGINEERING Al Rawda Road From Truck Road 12" API 5L X 65 212

IRP II PIPELINE TAKREER GS ENGINEERING Al Rawda Road From Truck Road 6" API 5L X 65 212

IRP II PIPELINE TAKREER GS ENGINEERING Proposed Road (Residential Access ) 12" API 5L X 65 205

IRP II PIPELINE TAKREER GS ENGINEERING Proposed Road (Residential Access ) 12" API 5L X 65 205

Page 4 of 12
EXPERIENCE LIST – HDD WORKS
ENGINEERED EXCELLENCE

Crossing Length
Project Owner Main Contractor Description Road/ Highway/Utility Pipe Diameter Pipe Grade
(Mtr.)

IRP II PIPELINE TAKREER GS ENGINEERING Proposed Road (Residential Access ) 6" API 5L X 65 205

IRP II PIPELINE TAKREER GS ENGINEERING Twam Street Road 12" API 5L X 65 204

IRP II PIPELINE TAKREER GS ENGINEERING Twam Street Road 12" API 5L X 65 204

IRP II PIPELINE TAKREER GS ENGINEERING Twam Street Road 6" HDPE 204

IRP II PIPELINE TAKREER GS ENGINEERING Silah To Abu Dhabi Highway 20" + 6" API 5L X 65 197

IRP II PIPELINE TAKREER GS ENGINEERING Transco Pipeline Crossing 12" API 5L X 65 197

IRP II PIPELINE TAKREER GS ENGINEERING Transco Pipeline Crossing 12" API 5L X 65 197

IRP II PIPELINE TAKREER GS ENGINEERING Abu Dhabi -Al Ain Truck Road 12" API 5L X 65 193

IRP II PIPELINE TAKREER GS ENGINEERING Abu Dhabi -Al Ain Truck Road 12" API 5L X 65 193

IRP II PIPELINE TAKREER GS ENGINEERING Abu Dhabi -Al Ain Truck Road 6" API 5L X 65 193

51st Street
IRP II PIPELINE TAKREER GS ENGINEERING 20" + 6" API 5L X 65 191
(Near Round About)

IRP II PIPELINE TAKREER GS ENGINEERING ICAD III Camp Road Crossing 28" API 5L X 70 187

IRP II PIPELINE TAKREER GS ENGINEERING ICAD III Camp Road Crossing 28" API 5L X 70 187

IRP II PIPELINE TAKREER GS ENGINEERING Road To ICAD III 12" API 5L X 65 187

IRP II PIPELINE TAKREER GS ENGINEERING Road To ICAD III 12" API 5L X 65 187

IRP II PIPELINE TAKREER GS ENGINEERING ICAD III Camp Road Crossing 6" HDPE 187

IRP II PIPELINE TAKREER GS ENGINEERING 59th Street 20" + 6" API 5L X 65 185

IRP II PIPELINE TAKREER GS ENGINEERING Link Road Khalifa Bin Zayed City 10" API 5L X 60 180

IRP II PIPELINE TAKREER GS ENGINEERING Link Road Abu Dhabi To Mussaffah Road 20" + 6" API 5L X 65 180

Page 5 of 12
EXPERIENCE LIST – HDD WORKS
ENGINEERED EXCELLENCE

Crossing Length
Project Owner Main Contractor Description Road/ Highway/Utility Pipe Diameter Pipe Grade
(Mtr.)

IRP II PIPELINE TAKREER GS ENGINEERING Link Road Khalifa City To Airport Road 20" + 6" API 5L X 65 180

IRP II PIPELINE TAKREER GS ENGINEERING Salmia Palace Road Crossing 28" API 5L X 70 177

IRP II PIPELINE TAKREER GS ENGINEERING Salmia Palace Road Crossing 28" API 5L X 70 177

IRP II PIPELINE TAKREER GS ENGINEERING Salmia Palace Road Crossing 6" HDPE 177

IRP II PIPELINE TAKREER GS ENGINEERING Utility Crossing 28" API 5L X 70 175

IRP II PIPELINE TAKREER GS ENGINEERING Utility Crossing 28" API 5L X 70 175

IRP II PIPELINE TAKREER GS ENGINEERING Utility Crossing 6" HDPE 175

IRP II PIPELINE TAKREER GS ENGINEERING Access Road Cricket Stadium 10" API 5L X 60 174

12th Street Road Crossing(Branch From


IRP II PIPELINE TAKREER GS ENGINEERING 20" + 6" API 5L X 65 174
Air Port Road)
IRP II PIPELINE TAKREER GS ENGINEERING Abu Dhabi -Al Ain Truck Road 12" API 5L X 65 166

IRP II PIPELINE TAKREER GS ENGINEERING Abu Dhabi -Al Ain Truck Road 12" API 5L X 65 166

IRP II PIPELINE TAKREER GS ENGINEERING Abu Dhabi -Al Ain Truck Road 6" API 5L X 65 166

IRP II PIPELINE TAKREER GS ENGINEERING Hilwa Road Crossing 28" API 5L X 70 165

IRP II PIPELINE TAKREER GS ENGINEERING Hilwa Road Crossing 28" API 5L X 70 165

IRP II PIPELINE TAKREER GS ENGINEERING Hilwa Road Crossing 6" HDPE 165

IRP II PIPELINE TAKREER GS ENGINEERING Utility Crossing 28" API 5L X 70 164

IRP II PIPELINE TAKREER GS ENGINEERING Utility Crossing 28" API 5L X 70 164

IRP II PIPELINE TAKREER GS ENGINEERING Link Road From Hameem Road 12" API 5L X 65 164

IRP II PIPELINE TAKREER GS ENGINEERING Link Road From Hameem Road 12" API 5L X 65 164

Page 6 of 12
EXPERIENCE LIST – HDD WORKS
ENGINEERED EXCELLENCE

Crossing Length
Project Owner Main Contractor Description Road/ Highway/Utility Pipe Diameter Pipe Grade
(Mtr.)

IRP II PIPELINE TAKREER GS ENGINEERING Link Road From Hameem Road 6" API 5L X 65 164

IRP II PIPELINE TAKREER GS ENGINEERING Utility Crossing 6" HDPE 164

New Truck Road (Bypass From Al Ain


IRP II PIPELINE TAKREER GS ENGINEERING 12" API 5L X 65 163
Truck Road)
New Truck Road(Bypass From Al Ain
IRP II PIPELINE TAKREER GS ENGINEERING 12" API 5L X 65 163
Truck Road
New Truck Road (Bypass From Al Ain
IRP II PIPELINE TAKREER GS ENGINEERING 6" API 5L X 65 163
Truck Road)
IRP II PIPELINE TAKREER GS ENGINEERING Dubai-Selah 20" + 6" API 5L X 65 160

IRP II PIPELINE TAKREER GS ENGINEERING Pipeline Crossing 20" + 6" API 5L X 65 160

IRP II PIPELINE TAKREER GS ENGINEERING Dual Carriage Way Road Crossing 28" API 5L X 70 160

IRP II PIPELINE TAKREER GS ENGINEERING Dual Carriage Way Road Crossing 28" API 5L X 70 160

IRP II PIPELINE TAKREER GS ENGINEERING Dual Carriage Way Road Crossing 6" HDPE 160

IRP II PIPELINE TAKREER GS ENGINEERING Al Jumania Road Crossing 28" API 5L X 70 158

IRP II PIPELINE TAKREER GS ENGINEERING Al Jumania Road Crossing 28" API 5L X 70 158

IRP II PIPELINE TAKREER GS ENGINEERING Abu Dhabi -Al Ain Truck Road 12" API 5L X 65 158

IRP II PIPELINE TAKREER GS ENGINEERING Abu Dhabi -Al Ain Truck Road 12" API 5L X 65 158

IRP II PIPELINE TAKREER GS ENGINEERING Abu Dhabi -Al Ain Truck Road 6" API 5L X 65 158

IRP II PIPELINE TAKREER GS ENGINEERING Al Jumania Road Crossing 6" HDPE 158
By Pass Road To Heavy Vehicle
IRP II PIPELINE TAKREER GS ENGINEERING Monitoring Station(DOT) At Musaffah 10" + 6" API 5L X 60 148
E11 Road
IRP II PIPELINE TAKREER GS ENGINEERING Utility Crossing 28" API 5L X 70 148

IRP II PIPELINE TAKREER GS ENGINEERING Utility Crossing 28" API 5L X 70 148

Page 7 of 12
EXPERIENCE LIST – HDD WORKS
ENGINEERED EXCELLENCE

Crossing Length
Project Owner Main Contractor Description Road/ Highway/Utility Pipe Diameter Pipe Grade
(Mtr.)

IRP II PIPELINE TAKREER GS ENGINEERING Utility Crossing 6" HDPE 148

By Pass Road To Heavy Vehicle


IRP II PIPELINE TAKREER GS ENGINEERING Monitoring Station(DOT) At Musaffah 10" + 6" API 5L X 60 146
E11 Road

Access Road To Substation(TRANSCO),


IRP II PIPELINE TAKREER GS ENGINEERING 10" + 6" API 5L X 60 145
Battery Energy Storage

Access Road To Petrol Station Out Going


IRP II PIPELINE TAKREER GS ENGINEERING 10" + 6" API 5L X 60 143
(Mussaffah To Tarif)

IRP II PIPELINE TAKREER GS ENGINEERING Abu Dhabi Refinery Access Road 10" + 6" API 5L X 60 142

IRP II PIPELINE TAKREER GS ENGINEERING 26th Street Crossing 10" + 6" API 5L X 60 140

IRP II PIPELINE TAKREER GS ENGINEERING Water Pipeline Crossing 10" + 6" API 5L X 60 140

IRP II PIPELINE TAKREER GS ENGINEERING Road 10" + 6" API 5L X 60 139

IRP II PIPELINE TAKREER GS ENGINEERING Asphalt Road 20" + 6" API 5L X 65 138

IRP II PIPELINE TAKREER GS ENGINEERING Utility Crossing (TAKREER) 28" API 5L X 70 137

IRP II PIPELINE TAKREER GS ENGINEERING Utility Crossing (TAKREER) 28" API 5L X 70 137

IRP II PIPELINE TAKREER GS ENGINEERING Utility Crossing (TAKREER) 6" HDPE 137

IRP II PIPELINE TAKREER GS ENGINEERING Farm Access Road From Truck Road 12" API 5L X 65 136

IRP II PIPELINE TAKREER GS ENGINEERING Village Access Road From Truck Road 12" API 5L X 65 136

IRP II PIPELINE TAKREER GS ENGINEERING Farm Access Road From Truck Road 12" API 5L X 65 136

IRP II PIPELINE TAKREER GS ENGINEERING Village Access Road From Truck Road 12" API 5L X 65 136

IRP II PIPELINE TAKREER GS ENGINEERING Farm Access Road From Truck Road 6" API 5L X 65 136

IRP II PIPELINE TAKREER GS ENGINEERING Village Access Road From Truck Road 6" API 5L X 65 136

Page 8 of 12
EXPERIENCE LIST – HDD WORKS
ENGINEERED EXCELLENCE

Crossing Length
Project Owner Main Contractor Description Road/ Highway/Utility Pipe Diameter Pipe Grade
(Mtr.)

IRP II PIPELINE TAKREER GS ENGINEERING Maqta Gas Pipeline Crossing 10" + 6" API 5L X 60 135

IRP II PIPELINE TAKREER GS ENGINEERING GASCO Pipeline Crossing 20" + 6" API 5L X 65 135

IRP II PIPELINE TAKREER GS ENGINEERING Utility Crossing (TAKREER) 28" API 5L X 70 133

IRP II PIPELINE TAKREER GS ENGINEERING Utility Crossing (TAKREER) 28" API 5L X 70 133

IRP II PIPELINE TAKREER GS ENGINEERING 14th Steet/Twam Street 12" API 5L X 65 133

IRP II PIPELINE TAKREER GS ENGINEERING 14th Steet/Twam Street 12" API 5L X 65 133

IRP II PIPELINE TAKREER GS ENGINEERING 14th Steet/Twam Street 6" API 5L X 65 133

IRP II PIPELINE TAKREER GS ENGINEERING Utility Crossing (TAKREER) 6" HDPE 133

IRP II PIPELINE TAKREER GS ENGINEERING Newly Constructed Road 12" API 5L X 65 131

IRP II PIPELINE TAKREER GS ENGINEERING Newly Constructed Road 12" API 5L X 65 131

IRP II PIPELINE TAKREER GS ENGINEERING Newly Constructed Road 6" API 5L X 65 131

IRP II PIPELINE TAKREER GS ENGINEERING Al Dhafra Private Road 10"+6" API 5L X 64 130
IRP I Pipeline Crossing ( Behind Sas Al
IRP II PIPELINE TAKREER GS ENGINEERING 20" + 6" API 5L X 65 130
Nakheel Villas)
IRP II PIPELINE TAKREER GS ENGINEERING Farm Access Road From Truck Road 12" API 5L X 65 130

IRP II PIPELINE TAKREER GS ENGINEERING Farm Access Road From Truck Road 12" API 5L X 65 130

IRP II PIPELINE TAKREER GS ENGINEERING Farm Access Road From Truck Road 6" API 5L X 65 130

IRP II PIPELINE TAKREER GS ENGINEERING Newly Constructed Road 12" API 5L X 65 126

IRP II PIPELINE TAKREER GS ENGINEERING Newly Constructed Road 12" API 5L X 65 126

IRP II PIPELINE TAKREER GS ENGINEERING Newly Constructed Road 6" API 5L X 65 126

Page 9 of 12
EXPERIENCE LIST – HDD WORKS
ENGINEERED EXCELLENCE

Crossing Length
Project Owner Main Contractor Description Road/ Highway/Utility Pipe Diameter Pipe Grade
(Mtr.)

IRP II PIPELINE TAKREER GS ENGINEERING Al Dhafra Air Base Road 12" API 5L X 65 123

IRP II PIPELINE TAKREER GS ENGINEERING Al Dhafra Air Base Road 12" API 5L X 65 123

IRP II PIPELINE TAKREER GS ENGINEERING Al Dhafra Air Base Road 6" API 5L X 65 123

IRP II PIPELINE TAKREER GS ENGINEERING Service Road From Al Ain Truck Road 12" API 5L X 65 122

IRP II PIPELINE TAKREER GS ENGINEERING Service Road From Al Ain Truck Road 12" API 5L X 65 122

IRP II PIPELINE TAKREER GS ENGINEERING Service Road From Al Ain Truck Road 6" API 5L X 65 122

IRP II PIPELINE TAKREER GS ENGINEERING Village Access Road From Truck Road 12" API 5L X 65 121

IRP II PIPELINE TAKREER GS ENGINEERING Village Access Road From Truck Road 12" API 5L X 65 121

IRP II PIPELINE TAKREER GS ENGINEERING Village Access Road From Truck Road 6" API 5L X 65 121

IRP II PIPELINE TAKREER GS ENGINEERING Zakher ADNOC Station Road & Wall 12" API 5L X 65 120

IRP II PIPELINE TAKREER GS ENGINEERING Zakher ADNOC Station Road & Wall 6" API 5L X 65 120

IRP II PIPELINE TAKREER GS ENGINEERING Utility Crossing 28" API 5L X 70 110

IRP II PIPELINE TAKREER GS ENGINEERING Utility Crossing 28" API 5L X 70 110

IRP II PIPELINE TAKREER GS ENGINEERING Utility Crossing 6" HDPE 110

IRP II PIPELINE TAKREER GS ENGINEERING Road Inside Wadi 12" API 5L X 65 104

IRP II PIPELINE TAKREER GS ENGINEERING Road Inside Wadi 12" API 5L X 65 104

IRP II PIPELINE TAKREER GS ENGINEERING Road Inside Wadi 6" API 5L X 65 104

IRP II PIPELINE TAKREER GS ENGINEERING Zakher ADNOC Station Road & Wall 12" API 5L X 65 103

IRP II PIPELINE TAKREER GS ENGINEERING Road 8"+6" API 5L X 60 100

Page 10 of 12
EXPERIENCE LIST – HDD WORKS
ENGINEERED EXCELLENCE

Crossing Length
Project Owner Main Contractor Description Road/ Highway/Utility Pipe Diameter Pipe Grade
(Mtr.)

Link Road From Truck Road Round


IRP II PIPELINE TAKREER GS ENGINEERING 12" API 5L X 65 99
About
Link Road From Truck Road Round
IRP II PIPELINE TAKREER GS ENGINEERING 12" API 5L X 65 99
About
Link Road From Truck Road Round
IRP II PIPELINE TAKREER GS ENGINEERING 6" API 5L X 65 99
About

IRP 1 Pipeline Crossing ( Behind Sas Al


IRP II PIPELINE TAKREER GS ENGINEERING 10" + 6" API 5L X 60 96
Nakheel Villas)

IRP II PIPELINE TAKREER GS ENGINEERING Road 8"+6" API 5L X 60 96

IRP II PIPELINE TAKREER GS ENGINEERING Al Dhafra Private Road 10"+6" API 5L X 65 90

IRP II PIPELINE TAKREER GS ENGINEERING Road 10" + 6" API 5L X 60 89

IRP II PIPELINE TAKREER GS ENGINEERING TRANSCO Pipeline Crossing 12" API 5L X 65 88

IRP II PIPELINE TAKREER GS ENGINEERING Transco Pipeline Crossing 12" API 5L X 65 88

IRP II PIPELINE TAKREER GS ENGINEERING TRANSCO Pipeline Crossing 6" API 5L X 65 88

IRP II PIPELINE TAKREER GS ENGINEERING Concrete Wall 10" + 6" API 5L X 60 87

IRP II PIPELINE TAKREER GS ENGINEERING Al Dhafra Private Road 10" + 6" API 5L X 60 86

IRP II PIPELINE TAKREER GS ENGINEERING IRP I Pipeline Crossing 20" + 6" API 5L X 65 86

IRP II PIPELINE TAKREER GS ENGINEERING Al Dhafra Private Road 8" API 5L X 61 83

IRP II PIPELINE TAKREER GS ENGINEERING Road 10" + 6" API 5L X 60 83

IRP II PIPELINE TAKREER GS ENGINEERING Farm Access Road From Truck Road 12" API 5L X 65 83

IRP II PIPELINE TAKREER GS ENGINEERING Farm Access Road From Truck Road 12" API 5L X 65 83

IRP II PIPELINE TAKREER GS ENGINEERING Farm Access Road From Truck Road 6" API 5L X 65 83

IRP II PIPELINE TAKREER GS ENGINEERING Pipeline Crossing 10" + 6" API 5L X 60 80

Page 11 of 12
EXPERIENCE LIST – HDD WORKS
ENGINEERED EXCELLENCE

Crossing Length
Project Owner Main Contractor Description Road/ Highway/Utility Pipe Diameter Pipe Grade
(Mtr.)

IRP II PIPELINE TAKREER GS ENGINEERING Road 10" + 6" API 5L X 60 80

IRP II PIPELINE TAKREER GS ENGINEERING Al Dhafra Private Road 8" API 5L X 62 60

IRP II PIPELINE TAKREER GS ENGINEERING Al Dhafra Private Road 8"+6" API 5L X 66 60

IRP II PIPELINE TAKREER GS ENGINEERING Al Dhafra Private Road 10" API 5L X 66 58

IRP II PIPELINE TAKREER GS ENGINEERING Al Dhafra Private Road 10+6" API 5L X 67 58

IRP II PIPELINE TAKREER GS ENGINEERING Al Dhafra Private Road 10"+6" API 5L X 63 53

Page 12 of 12
ENGINEERED EXCELLENCE

Page 1 of 3
ENGINEERED EXCELLENCE

Page 2 of 3
ENGINEERED EXCELLENCE

Page 3 of 3
SA
M
PL
E
Head Office (Abu Dhabi)

Robt Stone (ME) LLC


106 - Bin Awdah Tower, Near El Dorado Cinema.
Electra Street, Abu Dhabi, United Arab Emirates.
P.O Box : 39588
Tele : +971 2 6767415
Fax : +971 2 6767943
Email : [email protected]

Project Office (Musaffah)

Behind Al Safeer Mall, Mussafah.


Abu Dhabi, United Arab Emirates.
Tele : +971 2 5532550
Fax : +971 2 5532552

Branch Office (DMCC, Dubai)

901, Fortune Tower, Jumeirah Lake Towers,


Sheikh Zayed Road
Dubai, United Arab Emirates.
P.O Box : 123340
Tele : +971 4 4289404
Fax : +971 4 4289403

Facilities

Industrial Yard Industrial Yard


Habshan, Buhasa Road Al Falah, Sweihan Road
Abu Dhabi, UAE Abu Dhabi, UAE
Industrial Yard / Camp Fabrication Shop
Tarif, Habshan Road ICAD Industrial area
Abu Dhabi, UAE Al Ain, UAE

You might also like