EMTL 201
CSA W47.1/W59 Welding Procedure Project 15%
Overview
Using your knowledge of CSA W47.1 and CSA W59, produce a welding procedure specification and welding procedure
data sheet that can be used for the criteria below. You will be required to use your codebooks to search for prequalified
criteria as well as recall your knowledge from welding processes in the shop. This project is to be completed individually.
Welding Processes
Welding processes will be limited to those covered in WDSG 235/275. GMAW, FCAW, SMAW and GTAW. You may create
a procedure which uses both if you wish. Ensure that you properly address all required criteria for the chosen
process(es).
Joint Preparation
Choose any prequalified joint from CSA W59 Figure 10.1 or Figure 10.2. It can be either complete or partial penetration.
Make sure all requirements of the prequalified joint are addressed and met in your procedures.
Materials
The materials used for construction and referenced in the required documentation must reflect what is actually
available in our welding lab. This includes:
• Base Materials: 1/8” – 1/2” ASTM A36 Plate (Steel Group 1 in Table 11.1)
• Filler Materials: GMAW: E70S-6, FCAW: E70T-6, SMAW: E6010, E7018. GTAW: ER70S-2
• Shielding Gases (if applicable): 100% Argon, 95% Argon 5% CO2 Mixed, 75% Argon 25% CO2 Mixed.
• Any other materials used in construction
Welding Parameters
Welding parameters must be researched when creating these procedures. Recall information from your time in the
welding shop or resources from other classes. This includes:
• Amperage
• Current Polarity
• Welding Speed
• Number of Passes
EMTL 201 April 3, 2020 Rev. 1
WELDING ENGINEERING TECHNOLOGY - DO NOT DUPLICATE ©
Required Documents
The following documents are required for the project:
1. Cover Page – Your Format
2. Welding Procedure Specification - Your Format
3. Welding Procedure Data Sheet - Your Format
Samples and suggested information can be found in the Annexes of CSA W47.1.
Reference Code Documents
The following reference documents are required to be used for this project:
• CSA W47.1
• CSA W59
Submission
Please submit your documentation in the order listed in this document. Include a cover page that includes:
• Name
• Student Number
• Date of Submission
For final submission of the project documentation, a digital copy is required. Please submit via D2L.
EMTL 201 April 3, 2020 Rev. 1
WELDING ENGINEERING TECHNOLOGY - DO NOT DUPLICATE ©