Atty. Micah Danielle S.
Tormon, CPA
OPERATIONS MANAGEMENT Example: Subway or Chipotle,
AND TOTAL QUALITY ingredients are arranged to build
MANAGEMENT MIDTERMS the burrito
REVIEWER
Facility design must be
Chapter 6: Facility and Work integrated with and support
Design job and process design
FACILITY LAYOUT Advantages of product layout:
- Refers to specific higher output rates, lower WIP
arrangement of physical inventories, less materials
facilities handling, higher labor and
equipment utilization, and simple
Facility layout studies are planning and control systems
necessary whenever:
(1)A new facility is constructed Disadvantages of product
(2)There is a significant change layout:
in demand or throughput breakdown of one piece of
volume equipment can cause the
(3)A new good or service is entire process to shut down
introduced to the customer Change in product design or
benefit package introduction of new products
(4)Different processes, may require major changes in
equipment, and/or the layout (flexibility is
technology are installed limited) less flexible and
expensive to change
Objective of layout studies: Require more costly,
minimize delays in materials specialized equipment
handling and customer movement, Provide little job satisfaction –
maintain flexibility, use labor and high division of labor often
space effectively, promote high required, leads to monotony
employee morale and customer
satisfaction
A good layout should support
the ability of operations to
accomplish its mission
FOUR MAJOR LAYOUT
PATTERNS:
1. Product Layout – arrangement 2. Process Layout – consists of a
based on the sequence of functional grouping of
operations that is performed equipment or activities that do
during the manufacturing of a similar work
good or delivery of a service
- Smooth and logical flow where Example: all drill presses or fax
all goods or services move in a machines may be grouped together
continuous path from one in one department and all milling or
process stage to the next, using data entry machines in another
the same sequence of work
tasks and activities Examples: Job Shops handle a wide
variety of customized orders
Atty. Micah Danielle S. Tormon, CPA
improve overall level of
Provide more flexibility and quality
generally require lower
investment in equipment Machine are closely linked,
additional floor space
If piece of equipment fails, it
generally does not affect the Because workers have
entire system greater responsibility in a
cellular manufacturing
Diversity of jobs leads to system, they become more
increased worker satisfaction aware of their contribution to
the final product
Limitations:
Low equipment utilization
High materials-handling costs
More complicated planning
and control systems
Higher worker skill
requirements
4. Fixed-position Layout –
consolidates the resources
necessary to manufacture a
good or deliver a service, such
as people, materials, and
equipment, in one physical
3. Cellular Layout – design is not location
according to the functional
characteristics of equipment, Stationary work in process
but rather is based on self-
contained groups of equipments Synonymous with “project”
(called cells) needed for classification of processes
producing a particular set of
goods or services Examples: major hardware and
software installations, sporting
Developed by Toyota Motor events, and concerts
Company
FACILITY LAYOUT IN SERVICE
Group technology – cellular ORGANIZATIONS
layouts facilitate the processing of
families of parts with similar
processing requirements
Materials-handling
requirements are reduced, the basic tradeoff between
enabling workers to product and process layouts
concentrate on production concern the degree of
rather than moving parts specialization versus
between machines flexibility
Quicker response to quality
problems within sells -
Atty. Micah Danielle S. Tormon, CPA
must consider volume of - Worker must remain idle until
demand, range of types of storage space becomes
services offered, degree of available
personalization of the
services offered, degree of 2. Lack-of-work delay – occurs
personalization, skill of whenever one stage completes
employees and cost work and no units from the
previous stage are awaiting
need the ability to provide a processing
wide variety of services use a - Described as “starving” the
process layout immediate successor
workstation
service organizations that - Cause bottlenecks limiting
provide highly standardized the throughput of the entire
services tend to use product process
layouts
Important type of product layout:
the design of service facilities Assembly line
requires the clever - Product layout dedicated to
integration of layout with the combining the components of
servicescape and process a good or service that has
design to support service been created previously
encounters
DESIGNING PRODUCT LAYOUT Assembly-Line Balancing
In flow shops generally - Technique to group tasks
consist of a fixed sequence of among workstations so that
workstations each workstation has- in the
ideal case- the same amount
Workstations – separated by of work
buffers (queues of WIP) to store - Focuses on organizing work
work waiting for processing, and efficiently in flow shops
are often linked by gravity
conveyors to allow easy transfer of No idle time per workstation,
work and the output of the first
station becomes the input of
the next station
Flow is constant and
continuous and no bottleneck
workstation
Three types of information to
know:
Two sources of delay: 1. The set of tasks to be
performed and the time
1. Flow-blocking delay – blocking required to perform each task
delay, occurs when a work 2. The precedence relations
center completes a unit but among the task – the
cannot release it because the in- sequence in which tasks
process storage at the next must be performed
stage is full 3. The desired output rate or
forecast of demand for the
assembly line
Atty. Micah Danielle S. Tormon, CPA
imbalance among
Important concept in assembly-line workstations
balancing: Cycle time
- Interval between successive
outputs coming off the
assembly line
- Could be manufactured
goods or services-related
outcomes
Cycle time (CT) cannot be
smaller than the largest Line Balancing Approaches
operation time, nor can it be With a large number of tasks,
larger than the sum of all the number of possible
operation time workstation configurations
can be very large, making
Maximum operation time ≤ CT ≤ the balancing problem very
Sum of operation times complex
CT = AR The longest task time rule can be
formalized as follows:
A = available time to produce the Choose a set of “assignable
output tasks” — those for which all
R = normally the demand forecast immediate predecessors
have already been assigned
If the required cycle time is Assign the assignable task
smaller than the largest task with the longest task time
time, then the work content first. Break ties by choosing
must be redefined by the lowest task number
splitting some tasks into Construct new set of
smaller elements assignable candidates
Minimum number of DESIGNING PROCESS LAYOUTS
workstations required: Concerned with the
= sum of task times / cycle time arrangement of departments
or work centers relative to
Additional equations about the each other
performance of an assembly line:
Two approaches commonly used:
Total available time = (no. of 1. Focuses on costs associated
workstations)(cycle time) with moving materials or the
inconvenience that customers
Total idle time = total available might experience in moving
time – minimum no. of workstations between physical locations
Assembly-line efficiency = Widely used in manufacturing
minimum no. of workstations / (no. Starts with an initial layout
of workstations x cycle time) and data on the historical or
forecasted volume between
Balance delay = 1 – Assembly- departments and materials-
line efficiency handling costs
Represents the amount of
idle time that results from
Atty. Micah Danielle S. Tormon, CPA
2. When it is difficult to obtain Operations managers who
data on costs or volumes design jobs for individual
moved between departments workers need to understand
how the physical
Useful in many service environment can affect
applications such as offices, people
laboratories, retail stores,
and so on Benefits of Proper Workplace
User constructs preference Increased engagement
table that specifies how Reduced absenteeism
important it is for two Enhanced creativity and
departments to be close to innovation
one another Cost savings
Optimize the total closeness
rating of the layout JOB DESIGN
Job – set of tasks an individual
WORKPLACE AND JOB DESIGN performs
Workplace design – planning and Job Design – involves determining
arrangement of physical spaces the specific job tasks and
within an organization to optimize responsibilities, the work
workflow, collaboration and environment, and the methods by
employee well-being which the tasks will be carried out
to meet the goals of operations
Well designed workplace
should allow maximum Two Broad Objectives that must be
efficiency and effectiveness satisfied:
as the work task or activity is
performed and may also 1.) Meet the firm’s competitive
need to facilitate service priorities (cost, efficiency,
management skill flexibility, quality, and time)
2.) Make the job safe, satisfying,
Key Questions to ask when and motivating for the worker
Designing the Workplaces:
Sociotechnical approach – to job
1. Who will use the workplace? Will design and and provides useful
the workstation be shared? How ideas for operations managers
much space is required?
2. How will the work be performed? Job enlargement – horizontal
What tasks are required? How expansion of the job to give the
much time does each task take? worker more variety-although not
How much time is required to set necessarily more responsibility
up for the workday or for a
particular job? Job enrichment – vertical
3. What technology is needed? expansion of job duties to give the
4. What must the employee be able worker more responsibility
to see?
5. What environmental and safety Common teams:
issues need to be addressed? Are Natural work teams –
all employees trained on performs entire job, rather
emergency evacuation than specialized, assembly
procedures and plans? line work
Atty. Micah Danielle S. Tormon, CPA
Virtual team – members WORKFORCE ETHICS AND
communicate by computer, GLOBAL SUPPLY CHAINS
take turns as leaders, and
join and leave the team as Ethical trade – retailers, brands,
necessary and their suppliers take
Self-managed team – responsibility for improving the
empowered work teams that working conditions of the people
also assume many traditional who make the products they sell
management responsibilities
Ethical Trade Initiative (ETI) –
Teams not only enrich jobs; leading alliance of companies,
they also provide numerous trade unions, and non-
benefits for quality and governmental organizations that
productivity promotes respect for workers’
rights around the globe
SAFETY, ERGONOMICS, AND
THE WORK ENVIRONMENT 1. Employment is freely chosen
2. Freedom of association and
Safety – one of the most important the right to collective
aspects of workplace design bargaining are respected
3. Working conditions are safe
Occupational Safety and Health and hygienic
Act (OSHA) 1970 – to provide safe 4. Child labor shall not be used
and healthful working conditions 5. Living wages are paid
and reduce hazards in the work 6. Working hours are not
environment excessive
- Requires employers to furnish 7. No discrimination is practices
to each of their employees a 8. Regular employment is
place of employment free provided
from recognized hazards that 9. No harsh or inhumane
cause death or serious treatment is allowed
physical harm
Safety is a function of the
job, the person performing
the job, and the surrounding
environment
Ergonomics – concerned with
improving productivity and safety
by designing workplace,
equipment, instruments,
computers, workstations, and so on
that take into account the physical
capabilities of people
Objectives: reduce fatigue, the cost
of training, human errors, the cost
of doing the job, and energy
requirements while increasing
accuracy, speed, reliability, and
flexibility
Atty. Micah Danielle S. Tormon, CPA
Good forecasts are needed in
all organizations to drive
analyses and decisions
related to operations
Poor forecasting can result to
poor inventory and staffing
decisions, resulting in part
shortages, inadequate
customer service, and many
customer complaints
Many firms integrate
forecasting with value chain
and capacity management
systems to make better
operational decisions
FORECASTING AND DEMAND
PLANNING
o Organizations make many
different types of forecasts
Top managers: need long range
forecasts expressed in total sales
dollars for use in financial planning
and for sizing and locating new
facilities
Lower organizational levels:
managers need to aggregate
forecasts of sales volume for their
products in units that is more
meaningful to them
Accurate forecasts – needed
OPERATIONS MANAGEMENT throughout the value chain and are
AND TOTAL QUALITY used by all functional areas of an
MANAGEMENT MIDTERMS organization
REVIEWER
Chapter 7: Forecasting and
Demand Planning
Forecasting
- Process of projecting the
values of one or more
variables into the future
- Key component in many
types of integrated operating
systems BASIC CONCEPTS IN
FORECASTING
Atty. Micah Danielle S. Tormon, CPA
Forecast Planning Horizon – time or over successive periods of
length of time on which a forecast time
is based - Provides the date for
understanding how the
Long-range forecasts variable that we wish to
cover a planning horizon to 1 forecast change historically
to 10 years and are Statistical methods of
necessary to plan for the forecasting are based on this
expansion of facilities and to analysis of historical data
determine needs for land,
labor, and equipment Five Characteristics: trend,
seasonal, cyclical, random
Intermediate-range forecasts variation, and irregular (one-time)
cover a 3-to-12 month period variation
are needed to plan workforce
levels, allocate budget Trend – underlying pattern of
among divisions, schedule growth or decline in a time series
jobs and resources, and - Shows gradual shifts or
establish purchasing plans movements to relatively
higher or lower values over a
Short-range forecasts longer period of time
focus on the planning horizon - Increasing / decreasing,
of up to three months and linear / nonlinear
are used by operations
managers to plan production
schedules and assign workers
to jobs, determine short-term
capacity requirement and aid
shipping requirements
Forecasts of future demand
are needed at all levels of
organizational decision
making
Time bucket – unit of measure for Seasonal patterns –
the time period used in a forecast characterized by repeatable
- Might be a year, quarter, periods of ups and downs over a
month, week, day, hour or short periods of time
even a minute - Generally think they occur
over a year, but similar
Long-term planning horizon - repeatable patterns might
> a firm might forecast in occur over the weeks during
yearly time buckets a month, over days during a
Short-range planning horizon week, or hours during a day
-> time bucket might be an
hour or less Cyclical patterns – regular
patterns in a data series that take
Data Patterns in Time Series place over long periods of time
Time Series – set of observations Random variation (noise) –
measured at successive points in unexplained deviation of a time
series from a predictable pattern
Atty. Micah Danielle S. Tormon, CPA
such as a trend, seasonal, or STATISTICAL FORECASTING
cyclical pattern MODELS
- Caused by short term, Can be classified as either
unanticipated, and non statistical or judgemental
recurring factors and is
unpredictable Statistical forecasting – based
on the assumption that the future
Irregular variation – one-time will be an extrapolation of the past
variation that is explainable
Categorized as time series
Selecting the right planning methods (extrapolate
horizon length and time historical time-series data)
bucket size for the right and regression methods
situation is an important part (extrapolate historical time
of forecasting series data)
Forecast Errors and Accuracy Simple Moving Average
Based on the idea of
All forecasts are subject to averaging fluctuations in a
error, and understanding the time series to identify the
nature and size of errors is underlying direction in which
important to making good the time series is changing
decisions
Moving Average (MA) Forecast
Forecast error – difference - An average of the most
between the observed value of the recent “k” observations in a
time series and the forecast time series
MA methods work best for
short planning horizons when
there is no major trend,
seasonal, or business cycle
pattern.
As the value “k” increases,
MSE is influenced much more by the forecast reacts slowly to
large forecasts errors than by small recent changes in the time
errors (because the errors are series data
squared) As the “k” vale decreases,
The measurement scale the forecasts reacts more
factor in MAPE is eliminated quickly
by dividing the absolute error
by the time-series data value, Single Exponential Smoothing
making it easier to interpret - Forecasting technique that
The selection of the best uses a weighted average of
measure of forecast accuracy past time-series values to
is not a simple matter; forecast the value of the time
indeed, forecasting experts series in the next period
often disagree on which
measure should be used Forecasts are based on
averages using and
weighting the most recent
Atty. Micah Danielle S. Tormon, CPA
actual demand more than
older demand data When no historical data is
available, judgmental
forecasting is possible
Several Approaches:
Do not try to include trend or
seasonal effects
Grassroots forecasting – asking
those who are close to the end
Disadvantage: if the time series
consumer, such as salespeople,
exhibit a positive trend, the
about the customers’ purchasing
forecast will lag the actual values
plans
and overshoot the actual values if a
negative trend exists
Delphi method – complicated
method
REGRESSION AS A
- Consists of forecasting by
FORECASTING APPROACH
expert opinion by gathering
judgments and opinions of
Regression Analysis
key personnel based on their
- Method for building a
experience and knowledge of
statistical model that defines
the situation
a relationship between a
- Group of people, possibly
single dependent variable
from both inside and outside
and one or more independent
the organization, is asked to
variables, all of which are
make a prediction
numerical
FORECASTING IN PRACTICE
Managers use a variety of
Simple linear regression finds judgmental and quantitative
the best values of a and b forecasting techniques
using the method of least
squares Forecasters should also
monitor a forecast to
Causal Forecasting Models with determine when it might be
Multiple Regression advantageous to change or
update the model
Multiple Linear Regression
Model – a linear regression model Statistical methods alone
with more than one independent cannot account for such
variable factors as sales promotions,
competitive strategies,
Multiple regression provides a unusual economic
technique for building disturbances, new products,
forecasting models that not large one-time orders, labor
only forecasting models that complications, etc.
not only incorporate time but
other potential causal Statistical forecasts are often
variables adjusted to account for
qualitative factors
JUDGMENTAL FORECASTING
- Relies upon opinions and Forecasters should also
expertise of people in monitor a forecast to
developing forecasts
Atty. Micah Danielle S. Tormon, CPA
determine when it might be
advantageous to change or
update the model
A tracking signal provides a
method for doing this by
quantifying bias
The tendency of forecasts to
consistently be larger or
smaller than the actual
values of the time series
Ten Practical Principles of
Forecasting:
1. Use quantitative rather
qualitative methods
2. Limit subjective adjustments
of quantitative forecasts
3. Adjust for events expected in
the future
4. Ask experts to justify their
forecasts in writing
5. Use structured procedures to
integrate judgmental and
quantitative methods
6. Combine forecasts from
approaches that differ
7. If combining forecasts, begin
with equal weights
8. Compare past performance of
various forecasting methods
9. Seek feedback about
forecasts
10. Use multiple measures
of forecast accuracy