0% found this document useful (0 votes)
59 views97 pages

Sunningdale Suspended Ceilings Bill

The document is the 7th running account bill for the construction and renovation work at Government M.V.M College Bhopal, contracted to M/S Madan Tripathi. It outlines the contract details, including the probable amount, completion dates, and various work items with their respective quantities and costs. The bill includes detailed descriptions of work completed, such as dismantling, waterproofing, and plastering, along with associated measurements and rates.

Uploaded by

harikrishan sahu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
59 views97 pages

Sunningdale Suspended Ceilings Bill

The document is the 7th running account bill for the construction and renovation work at Government M.V.M College Bhopal, contracted to M/S Madan Tripathi. It outlines the contract details, including the probable amount, completion dates, and various work items with their respective quantities and costs. The bill includes detailed descriptions of work completed, such as dismantling, waterproofing, and plastering, along with associated measurements and rates.

Uploaded by

harikrishan sahu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 97

FLY SHEET

7th RUNNING ACCOUNT BILL

1 Name of Contractor : M/S MADAN TRIPATHI

CONSTRUCTION OF COMPUTER CENTRE


BLOCK
2 Name of Work : AND RENOVATION WORK OF
AUDITORIUM AT GOVERNMENT M.V.M
COLLEGE BHOPAL.

3 Serial No of Bill : 7th Running Bill

4 Agreement No : 20/PIU/2019-2020 DATE 10-02-2020

5 Work order No Date :

Probable amount of
6 Contract (PAC) : Rs 147.34 Lacs

7 Rate of Contract 23.89% Below SOR

8 Time Period 12 month i/c rainy seasons

9 Due Date of completion as 6/30/2021


per agreement :

10 Date of actual Completion : Work in Progress

Page 1 of 97
XVII-E-47 P.W.Account Form No 27
P.W.D (Full Sheet)
Project Engineer P.W.D. P.I.U.
Bhopal ................... Sub. Division
NOTES Divisional Project Engineer P.W.D. P.I.U.
Bhopal. Division
Chapter X Paragraph 284. 288 & 289
of the PW Account Code
7th RUNNING
_____________________________________
_____
ACCOUNT BILL "C"
(1) This form provides only for
payment for work or supplies Cash Book Voucher
measured.
(2) The full name of the work as given No.......................................
Date..................................................................
in the estimate should be entered on ....
the bill except in the case of bill for Name of Company : M/S.MADAN TRIPATHI
stock material the purpose of supply
applicable to the case should be filled
in and the last screed out.
(3) If the outlay on the work is Name of Work : CONSTRUCTION OF
seconded by sub- head the total for COMPUTER CENTRE BLOCK
each sub- head should be shown in AND RENOVATION WORK OF
column 5 of account l , and against AUDITORIUM AT GOVERNMENT M.V.M
the total there should be an entry in COLLEGE BHOPAL M.P.
column 6 also. In no other case
should any entries be made in column
Purpose of Supply :
6
Serial No of Bill : 7th & Running Bill

(4) In part I the second signature is No & Date of his last :


necessary only when the officer who bill for the work
prepare the bill is not the officer who
authorises the payment. In such case
(5) The figure against item 3 in part III Reference to From
(memorandum of payment ) should
agree with the total of figures against Agreement No : 20/PIU/2019-2020 DATE 10-
lines 4 and 5 if the net amount to be 02-2020
paid is the payment should be made
Work order No& Date : Dated.
in cash the pay order being altered
suitably and the alteration attested by
dated initial in the pay order will be PAC :- Rs147.34Lacs
the net amount line 5(c) and the Due Date of completion :
payees acknowledgment should be
for the goss amount 5 (a+b+c) the as per agreement
payment should be attested by some
known person when the payee`s
acknowledgement is given by a seal
(6) Part IV is reserved for any Date of actual Completion : Work in
remarks which the disbursing officer Progress
or the Divisional officer may wish to
record in respect of the execution of
the work check up measurement of
To be filled in other then agreement
on the "K" Form

Page 2
FOURTH RUNNING ACCOUNT BILL

CONSTRUCTION OF COMPUTER CENTRE BLOCK


AND RENOVATION WORK OF AUDITORIUM AT GOVERNMENT M.V.M COLLEGE BHOPAL
20/PIU/2019-20 Dt.10/02/2020
AMOUNT
S. Unit Qty SOR Description of Items Rate Since
No No. Up to Date previous
Bill
PART A - RENOVATION

Dismantling cement asbestos or other


1 15.38 hard board ceiling or
partition walls including stacking of
serviceable materials and
disposal of unserviceable materials
within 50 metres lead.
1116.19 QTY BF TMB ,P-04R
Sqm 1116.19 Total 11.70 13059 0

Removal of old Tarfelt i/c disposal as


2 15.25 directed by Engineer in
charge
963.78 QTY BF TMB ,P-04R
Sqm 963.78 Total 7.83 7546 0

Removing mortar from and cleaning


3 15.10 stones and concrete
articles

15.10.2 In cement mortar


17.41 QTY BF TMB ,P-04R
CUM 17.41 Total 145.80 2538 0

Grading roof for water proofing


4 22.14 treatment with
Cement concrete 1:2:4 (1 cement: 2
sand : 4 graded stone
22.14.1 aggregate 20 mm nominal size)

57.83 QTY BF TMB ,P-04R


CUM 57.83 Total 4112.10 237790 0

Extra for providing and mixing water


proofing material as per IS
standard in cement concrete work
5 4.12 quantity as prescribed by the
manufacturer

241.80 QTY BF TMB ,P-04R


116.75 QTY BF 1356 ,PG-6L
Per
50kg 358.55 Total 39.60 14198 0
bag

Page 3 of 97
AMOUNT
S. Unit Qty SOR Description of Items Rate Since
No No. Up to Date previous
Bill

Providing and laying water proofing


treatment on roofs of slabs
by applying cement slurry mixed with
water proofing cement
compound consisting of applying :
a) after surface preparation, first layer
of slurry of cement @
6 22.6 0.488 kg/sqm mixed with water
proofing cement compound @
0.253 kg/sqm.
22.6
b) laying second layer of Fibre glass
cloth when the first layer is
still green. Overlaps of joints of fibre
cloth should not be less
than 10 cm.
c) third layer of 1.5 mm thickness
consisting of slurry of cement
@ 1.289 kg/sqm mixed with water
proofing cement compound @
0.670 kg/sqm and sand @ 1.289
kg/sqm. This will be allowed to
air cure for 4 hours followed by water
curing for 48 hours. The PR 80%
entire treatment will be taken upto
30cm on parapet wall and
tucked into groove in parapet all
around.

963.78 QTY BF TMB ,P-05L


QTY BF 1356 ,PG-6R
CUM 963.78 Total FR 304.20 243.74 234908 0

Dismantling wood work in frames,


trusses, purlins and rafters
upto 10 metres span and 5 metres
7 15.16 height including stacking the
material within 50 metres lead:

Page 4 of 97
AMOUNT
S. Unit Qty SOR Description of Items Rate Since
No No. Up to Date previous
Bill
Of sectional area below 40 square
15.16.2 centimetres.
2093.54 QTY BF TMB ,P-05L
rm 2093.54 Total 3.69 7725 0

Dismantling wooden boardings in


lining of walls and
8 15.36 partitions, excluding supporting
members but including
stacking within 50 metres lead :
15.36.3 Thickness above 25 mm upto 40 mm
149.44 QTY BF TMB ,P-05L
sqm 149.44 Total 19.80 2959 0

Providing and fixing false ceiling at all


height including
providing and fixing of frame work
9 12.49 made of special PR
sections, power pressed from M.S.
sheets and galvanized
with zinc coating of 120 gms/sqm
(both side inclusive) as
12.5 mm thick tapered edge gypsum
12.49.3 moisture PR 0.80
resistant board

FR = 828.00
105.07 QTY BF MB ,PG
27.33
sqm 132.40 Total 700.00 92680 29638

Providing and fixing of Mineral Fibre


Acoustical
Suspended Ceiling System with
10 12.62 16mm thick tegular edge PR
tiles of size 595x595mm as approved
by Engineer-incharge,
in true horizontal level suspended on
inter locking
FR = 1658.70
278.66 QTY BF MB ,PG
40.92 QTY BF MB 1356 ,PG 11
sqm 319.58 Total 1250.00 399475 120815

Removing white or colour wash by


scrapping and sand papering
and preparing the surface smooth
11 14.27. including necessary repairs to PR
scratches etc. complete

1369.45 QTY BF MB - 1356 ,PG - 08


sqm 1369.45 Total 4.59 6286 0

Page 5 of 97
AMOUNT
S. Unit Qty SOR Description of Items Rate Since
No No. Up to Date previous
Bill
Applying one coat of water thinnable
cement primer of
12 13.46 approved brand and manufacture on PR
wall surface :

13.46.1 Water thinnable cement primer.


1369.45 QTY BF MB - 1356 ,PG - 10
951.28
sqm 2320.73 Total 21.60 50128 20548

Providing and applying white cement


based putty of average
thickness 1 mm, of approved brand
and manufacturer, Like
birla white /JK white or equivalent,
13 13.41 over the plastered wall
surface to prepare the surface even
and smooth i/c all cost of
material, labour and scaffold etc in all
position complete.
733.00 QTY BF MB - 1356 ,PG - 10
951.28
145.99
sqm 1830.27 Total 66.60 121896 30691

Providing and applying white cement


based putty of average
thickness 1 mm, of approved brand
and manufacturer, Like
birla white /JK white or equivalent,
14 2.30 over the plastered wall PR
surface to prepare the surface even
and smooth i/c all cost of
material, labour and scaffold etc in all
position complete.
Treatment of existing masonry using
chemical
2.30.4 emulsion @ one litre per hole at 300
mm
interval including drilling 10mm dia
and 200mm
With Chlorpyriphos/ Lindane E.C.
2.30.4.1 20%
with 1% concentration
256.52 QTY BF MB ,PG
Rm 256.52 Total 45.00 11543 0

Providing and applying white cement


based putty of average
thickness 1 mm, of approved brand
and manufacturer, Like
birla white /JK white or equivalent,
15 2.30 over the plastered wall PR
surface to prepare the surface even
and smooth i/c all cost of
material, labour and scaffold etc in all
position complete.

Page 6 of 97
AMOUNT
S. Unit Qty SOR Description of Items Rate Since
No No. Up to Date previous
Bill
Along external wall where the apron is
not
2.30.1 provided using chemical emulsion @
7.5 litres /
sqm of the vertical surface of the
substructure to
With Chlorpyriphos/ Lindane E.C.
2.30.1.1 20%
with 1% concentration.
70.00 QTY BF MB ,PG
Rm 70.00 Total 32.40 2268 0

Providing and fixing M.S. grills of


required pattern in frames
of windows etc. with M.S. flats, square
or round bars etc.
including priming coat with approved
16 9.43 steel primer all PR
complete.

Fixed to openings /wooden frames


with rawl plugs
9.43.2 screws etc

397.15 QTY BF MB ,PG


6.80
kg 403.95 Total 90.00 36356 612

Providing and fixing M.S. Tubular


frames for doors, windows,
ventilators and cupboard with
rectangular/ L-Type sections,
made of 1.60 mm thick M.S. Sheet,
17 10.14 joints mitred, welded and PR
grinded finish, with profiles of required
size, as per drawing,
including fixing of necessary butt
hinges, stays and screws
and applying
Fixing a priming
withsteel
15x3 mm lugscoat
10ofcm. long
approved
embedded in primer
10.14.1 cement concrete block 15x10x10 cm S
of Cement
Concrete 1:3:6 (1 Cement : 3 sand : 6
graded stone
299.41 QTY BF MB 1356 ,PG 09
36.21
kg 335.62 Total 104.58 35099 3787

Brick work with fly ash lime bricks


(FALG Bricks) conforming
to IS:12894-2002, in super structure
18 6.7 above plinth level up to
floor II level in

Page 7 of 97
AMOUNT
S. Unit Qty SOR Description of Items Rate Since
No No. Up to Date previous
Bill

6.7.3 having 50 kg / cm2 average


compressive strength

6.7.3.2 Cement
sand)
mortar 1:6 (1 cement : 6

6.63 QTY BF MB-1358 , PG- 20


48.93
CUM 55.56 Total 3990.00 221684 195230

Repairs to plaster of thickness 12mm


to 20mm in patches of area
2.5 sq. metres and under including
cutting the patch in proper
shape, raking out joints and preparing
and plastering the surface
of the walls complete including
19 14.1 disposal of rubbish to the
dumping ground within 50metres
lead :

14.1.1 With
sand)
cement mortar 1:4 (1 cement : 4

63.45 QTY BF MB 1356 , P - 09


SQM 63.45 Total 162.00 10279 0

Dismantling doors, windows and


clerestory windows (steel or
wood) shutter including chowkhats,
architrave, holdfasts etc.
complete and stacking within 50
20 15.14 metres lead :

15.14.1 Of area 3 sq. metres and below


9.00 QTY BF MB 1356 , P - 08
Nos 9.00 Total 76.50 689 0

15.14.2 Of area beyond 3 sq. metres


7.00 QTY BF MB 1356 , P - 08
Nos 7.00 Total 105.30 737 0

Page 8 of 97
AMOUNT
S. Unit Qty SOR Description of Items Rate Since
No No. Up to Date previous
Bill
Providing and fixing ISI marked flush
door shutters
conforming to IS: 2202 (Part I)
decorative type, core of block
board construction with frame of 1st
class hard wood and well
matched teak 3 ply veneering with
vertical grains or cross
21 9.18 bands and face veneers on both faces
of shutters of such as
duro board, century or equivelant
make

30 mm thick including ISI marked


9.18.2 Stainless Steel butt
hinges with necessary screws.

20.07 QTY BF MB 1356 , P - 08


SQM 20.07 Total 3294.00 66111 66111

Demolishing brick work manually/ by


mechanical means
including stacking of serviceable
material and disposal of
22 15.6 unserviceable material within 50
metres lead as per direction
of Engineer-in-charge

15.6.3 In cement mortar


2.42 QTY BF MB 1356 , P - 08
CUM 2.42 Total 438.30 1061 1061

PART B - COMPUTER BLOCK

Earth work in excavation by


mechanical means (Hydraulic
excavator )/ manual means over
areas (exceeding 30cm in depth. 1.5m
in width as well as 10 sqm on plan)
including dressing of sides and
1 2.6 ramming of bottom disposal of
excavated earth, lead upto 50m and
lift upto 1.5m, disposed earth to be
levelled and neatly dressed. (No extra
lift is payable if work is done by
mechanical means)

All kinds of soil


27.84 QTY BF TMB ,P-05L
Cum 27.84 Total 116.10 3232 0

Page 9 of 97
AMOUNT
S. Unit Qty SOR Description of Items Rate Since
No No. Up to Date previous
Bill
Earth work in excavation/ by
mechanical means
(HydraulicExcavator)/ manual means
over areas (exceeding 30 cm in depth,
2 2.7 1.5m in width as well as 10 sqm on
plan) including dressing of sides and
ramming of bottom disposal of
excavated earth, lead up to 50 m and
lift up to 1.5 m, disposed earth to
2.7.3 be
Hard levelled and neatly
rock (blasting dressed.
prohibited)
142.62 QTY BF TMB ,P-05R
Cum 142.62 Total 441.90 63024 0

4.1 Providing and laying in position


3 4.1 cement concrete of specified grade
excluding the cost of centering and
shuttering - All work up to plinth level :

4.1.2 4.1.2 With 40mm nominal size


graded stone aggregate.
4.1.2.1 4.1.2.1 M 15 - Grade concrete
21.92 QTY BF TMB ,P-05R
Cum 21.92 Total 3962.70 86862 0

Centering and shuttering including


4 4.3 strutting, propping etc. and removal of
form work for :

4.3.1 Foundations, footings, bases for


columns.
45.41 QTY BF TMB ,P-06L
Sqm 45.41 Total 152.10 6907 0

Reinforcement for R.C.C. work


including straightening, cutting,
bending, placing in position and
binding up to floor two level
including cost of binding wire, all
wastage and lappage /overlap
5 5.16 (overlaps shall be provided as per
requirement of IS 13920 for ductile
detailing, IS 456 Design & SP
34 Reinforcement detailing) etc
complete ( Note :- Spacer bar
(chairs) shall be paid seperately as
shown in the drawing and as per
direction of engineer in charge

Thermo-Mechanically Treated bars.


5.16 (TMT) Fe 500 D conforming to IS
1786

Page 10 of 97
AMOUNT
S. Unit Qty SOR Description of Items Rate Since
No No. Up to Date previous
Bill
24281.43 QTY BF TMB ,P-06L
430.18 QTY BF ,P-06L
537.19
70.90
Kg 25319.70 Total 60.00 1519182 62296

Providing and laying / erecting design


mix in situ or precast or combination
of in siti and precast
cement concrete of specified grade as
per approved design of
R.C.C work prepared by only weight
batching and machine
mixing at site/yard/RMC plant
includind transportation to any
lead by any means such as chute ,
6 5.44 conveyor belt ,truck
,RMCtransit mixer etc, placed /
erected by any mechanical
meanssuch as bucket hoist ,
pump,crane , hydraetc. Including
cost of all materials such as
admixtures/plastizers to achieve the
designed retarded/accelerate setting
time and suitable
workability ,centering ,shuttering ,strut
ting,compacting and

All work up to plinth level ( footing ,


raft,pedestal R.C.C drain,
5.44.1 R.C.C retaining wall , R.C.C Pier ,
plinth beam , grade slab
,curtain wall, poles R.C.C barrier etc.)

5.44.1.1 M-20 Grade Concrete


71.40 QTY BF TMB ,P-06R
QTY BF MB 1358, P
QTY BF MB 1358, P
Cum 71.40 Total 5000.00 357000 0

Page 11 of 97
AMOUNT
S. Unit Qty SOR Description of Items Rate Since
No No. Up to Date previous
Bill
Filling available excavated earth
(excluding hard
rock/Ordinary rock) in trenches, plinth,
sides of foundations
etc. in layers not exceeding 20cm in
7 2.25 depth, consolidating
each deposited layer by ramming and
watering, lead up to
50 m and lift upto 1.5 m.

27.84 QTY BF TMB ,P-07L


Cum 27.84 Total 64.80 1804 0

Supplying and filling in plinth with soil


(other than B.C.
soil) having MDD not less then 1.85
t/m³ under floors
including watering ramming
compacting (minimum of
7 2.28.2 compacting 95% of MDD) in layers
not exceeding 15cm in
depth and dressing
complete.

201.74 QTY BF TMB ,P-07L


Cum 201.74 Total 225.00 45392 0

Supplying and filling in plinth with hard


muram/hard copra
having MDD not less then 2.0 t/m³
under floors including
watering ramming compacting
(minimum of compacting
8 2.28.1 95% of MDD) in layers not exceeding
20cm in thick and
dressing complete. (Note-maximum
thick thickness of this
layer to be provided shall be 30cm.)

41.29 QTY BF MB-1358 , PG- 12R


Cum 41.29 Total 270.00 11148 0

Page 12 of 97
AMOUNT
S. Unit Qty SOR Description of Items Rate Since
No No. Up to Date previous
Bill
Preconstruction antitermite treatment
to the building under
construction by providing
122.40
Stage 1: Treating the bottom and the
sides (upto 30cm hight
9 2.32 of the excavated trench @ 5 litter per
sqm of the surface
area.
2.32
Stage 2: After masonry/RCC work, the
backfill in the
immdiate contact with the foundation
structure treatment @
252.72 QTY BF MB-1358 , PG- 13L
SQM 252.72 Total 122.40 30933 0

Supplying and filling in plinth with


crusher stone dust /
coarse sand under floors including,
watering, ramming
10 2.27 consolidating in layers not exceeding
20cm in depth and
dressing complete

20.65 QTY BF MB-1358 , PG- 13R


CUM 20.65 Total 604.80 12489 0

Providing and laying in position


cement concrete of specified
grade excluding the cost of centering
11 4.1 and shuttering - All work up
to plinth level

4.1.1 With 20mm nominal size graded stone


aggregate.
4.1.1.3 M 15 – Grade concrete
20.65 QTY BF MB-1358 , PG- 14L
CUM 20.65 Total 4023.90 83094 0

R.C.C With Shuttering : Providind and


laying / erecting design
mix in situ or precast or combination
of in siti and precast
12 5.44 cement concrete of specified grade as
per approved design of
R.C.C work prepared by only weight
batching and machine
mixing at site/yard/RMC plant
includind transportation to any
All work up to floor two level walls
5.44.2 ( any thickness ) coloumn
,piller pier , post and struts etc
5.44.2.1 M - 20
31.96 QTY BF MB-1358 , PG- 14R
3.78

Page 13 of 97
AMOUNT
S. Unit Qty SOR Description of Items Rate Since
No No. Up to Date previous
Bill
CUM 35.74 Total 5270.00 188350 19921

R.C.C With Shuttering : Providind and


laying / erecting design
mix in situ or precast or combination
of in siti and precast
13 5.44 cement concrete of specified grade as
per approved design of
R.C.C work prepared by only weight
batching and machine
Suspended floor roof having
mixing at site/yard/RMC plantslope of
any degree
includind , landing to any
transportation
,balconies ,access platform, floor
5.44.3 beam , girders, bressumers and
cantilevers, shelves,
chujjas,lintels,bands , staircases and
5.44.3.1 spiral
M - 20
staircases, coffer slab.
99.67 QTY BF MB-1358 , PG- 15L
6.19 QTY BF MB-1358 , PG-

CUM 105.86 Total 5390.00 570585 33364

Providing and laying cement concrete


in retaining walls, return
walls, walls (any thickness) including
attached pilasters, columns,
14 4.2 pillars, posts, struts, buttresses, string
or lacing courses, parapets,
coping, bed blocks, anchor blocks,
plain window sills, fillets etc.
up to floor two level, excluding the
cost of centering, shuttering
4.2.1 With 20mm nominal size graded stone
aggregate
4.2.1.3 M 15 – Grade concrete
2.55 QTY BF MB-1358 , PG- 16L
4.21 QTY BF MB-1358 , PG- 20

CUM 6.76 Total 4242.60 28663 17861

Brick work with fly ash lime bricks


(FALG Bricks) conforming
to IS:12894-2002, in super structure
15 6.7 above plinth level up to
floor II level in

6.7.3 having 50 kg / cm2 average


compressive strength

6.7.3.2 Cement
sand)
mortar 1:6 (1 cement : 6

51.14 QTY BF MB-1358 , PG- 20


CUM 51.14 Total 3990.00 204049 0

Page 14 of 97
AMOUNT
S. Unit Qty SOR Description of Items Rate Since
No No. Up to Date previous
Bill
Providing and fixing M.S. grills of
required pattern in frames
of windows etc. with M.S. flats, square
or round bars etc.
including priming coat with approved
16 9.43 steel primer all PR
complete.

Fixed to openings /wooden frames


with rawl plugs
9.43.2 screws etc

437.41 QTY BF MB 1358 ,PG 21


742.23
kg 1179.64 Total 90.00 106168 66801

Providing and fixing M.S. grills of


required pattern in frames
of windows etc. with M.S. flats, square
or round bars etc.
including priming coat with approved
17 10.14 steel primer all PR
complete.

Fixed to openings /wooden frames


with rawl plugs
10.14.1 screws etc

219.86 QTY BF MB 1358 ,PG 21


101.65
kg 321.51 Total 104.58 33624 10631

Half brick masonry with fly ash lime


Gypsum bricks (FALG
bricks) conforming to IS : 12894, in
super structure above
plinth and upto floor two level with 2
18 6.15 nos 10mm dia. M.S Bar at
every third course of brick masonary
which shall be paid
separately.

having 50 kg/cm2 average


6.15.3 compressive strength
Cement mortar 1 : 4 (1 cement : 4
6.15.3.2 sand)
133.05
sqm 133.05 Total 459.00 61070 61070

19 13.8 6 mm cement plaster of mix


13.8.1 1:3 (1 cement : 3 sand)

Page 15 of 97
AMOUNT
S. Unit Qty SOR Description of Items Rate Since
No No. Up to Date previous
Bill
250.64
sqm 250.64 Total 86.40 21655 21655

20 13.1 12 mm cement plaster of mix :


13.1.2 1:4 (1 cement : 4 sand)
269.76
sqm 269.76 Total 99.00 26706 26706

15 mm cement plaster on the rough


21 13.2 side of single or half
brick wall of mix

13.2.2 1:4 (1 cement : 4 sand)


231.08
sqm 231.08 Total 115.20 26620 26620

Page 16 of 97
AMOUNT
S. Unit Qty SOR Description of Items Rate Since
No No. Up to Date previous
Bill
5065573 815418
TOTAL CIVIL AMOUNT (A)

0 0
TOTAL ELECTRICAL AMOUNT (B)

5065573 815418
TOTAL (A+B)

1208646 194559
Less 23.86% Below SOR rate as per
agreement
3856927 620859
TOTAL

462831 74503
Add GST 12%

4319758 695362
Net Payble Amount

Page 17 of 97
FIFTH RUNNING ACCOUNT BILL

CONSTRUCTION OF COMPUTER CENTRE BLOCK


AND RENOVATION WORK OF AUDITORIUM AT GOVERNMENT M.V.M COLLEGE BHOPAL
20/PIU/2019-20 Dt.10/02/2020
AMOUNT
S. Unit Qty SOR Description of Items Rate
No No. Since
Up to Date previous Bill

1 2 3 4 5 6 7 8
PART A - RENOVATION

Dismantling cement asbestos or other


1 15.38 hard board ceiling or
partition walls including stacking of
serviceable materials and
disposal of unserviceable materials
within 50 metres lead.
1116.19 QTY BF TMB ,P-04R
Sqm 1116.19 Total 11.70 13059 0

Removal of old Tarfelt i/c disposal as


directed by Engineer in
charge
2 15.25

963.78 QTY BF TMB ,P-04R


QTY BF 1356 ,PG-5R
Sqm 963.78 Total 7.83 7546 0

Removing mortar from and cleaning


3 15.10 stones and concrete
articles

15.10.2 In cement mortar


17.41 QTY BF TMB ,P-04R
QTY BF 1356 ,PG-5R
CUM 17.41 Total 145.80 2538 0

Grading roof for water proofing


4 22.14 treatment with
Cement concrete 1:2:4 (1 cement: 2
sand : 4 graded stone
22.14.1 aggregate 20 mm nominal size)

57.83 QTY BF TMB ,P-04R


QTY BF 1356 ,PG-6L
CUM 57.83 Total 4112.10 237790 0

Extra for providing and mixing water


proofing material as per IS
standard in cement concrete work
5 4.12 quantity as prescribed by the
manufacturer

358.55 QTY BF TMB ,P-04R


QTY BF 1356 ,PG-
Per
50kg 358.55 Total 39.60 14198 0
bag

Page 18 of 97
AMOUNT
S. Unit Qty SOR Description of Items Rate
No No. Since
Up to Date previous Bill

Providing and laying water proofing


treatment on roofs of slabs
by applying cement slurry mixed with
water proofing cement
compound consisting of applying :
a) after surface preparation, first layer
of slurry of cement @
6 22.6 0.488 kg/sqm mixed with water
proofing cement compound @
0.253 kg/sqm.
22.6
b) laying second layer of Fibre glass
cloth when the first layer is
still green. Overlaps of joints of fibre
cloth should not be less
than 10 cm.
c) third layer of 1.5 mm thickness
consisting of slurry of cement
@ 1.289 kg/sqm mixed with water
proofing cement compound @
0.670 kg/sqm and sand @ 1.289
kg/sqm. This will be allowed to
air cure for 4 hours followed by water
curing for 48 hours. The PR 80%
entire treatment will be taken upto
30cm on parapet wall and
tucked into groove in parapet all
around.

963.78 QTY BF TMB ,P-05L


QTY BF 1356 ,PG-6R
CUM 963.78 Total FR 304.20 243.74 234908 0

Dismantling wood work in frames,


trusses, purlins and rafters
upto 10 metres span and 5 metres
7 15.16 height including stacking the
material within 50 metres lead:

Of sectional area below 40 square


15.16.2 centimetres.
2093.54 QTY BF TMB ,P-05L
rm 2093.54 Total 3.69 7725 0

Dismantling wooden boardings in


lining of walls and
8 15.36 partitions, excluding supporting
members but including
stacking within 50 metres lead :
15.36.3 Thickness above 25 mm upto 40 mm
149.44 QTY BF TMB ,P-05L
sqm 149.44 Total 19.80 2959 0

Providing and fixing false ceiling at all


height including
providing and fixing of frame work
9 12.49 made of special PR
sections, power pressed from M.S.
sheets and galvanized
with zinc coating of 120 gms/sqm
(both side inclusive) as

Page 19 of 97
AMOUNT
S. Unit Qty SOR Description of Items Rate
No No. Since
Up to Date previous Bill

12.5 mm thick tapered edge gypsum


12.49.3 moisture PR 0.80
resistant board

FR = 828.00
105.07 QTY BF MB ,PG
35.45 QTY BF MB 1356 ,PG 14
sqm 140.52 Total 600.00 84312 21270

Providing and fixing of Mineral Fibre


Acoustical
Suspended Ceiling System with
10 12.62 16mm thick tegular edge PR
tiles of size 595x595mm as approved
by Engineer-incharge,
in true horizontal level suspended on
inter locking
FR = 1658.70
278.66 QTY BF MB ,PG
40.92 QTY BF MB 1356 ,PG 14
sqm 319.58 Total 1200.00 383496 104836

Removing white or colour wash


by scrapping and sand
papering
11 14.27. and preparing the surface PR
smooth including necessary
repairs to
scratches etc. complete

1369.45 QTY BF MB - 1356 ,PG - 08


951.28 QTY BF MB - 1356 ,PG - 13
sqm 2320.73 Total 4.59 10652 4366

Applying one coat of water


thinnable cement primer of
12 13.46 approved brand and PR
manufacture on wall surface :
Water thinnable cement
13.46.1
primer.
1369.45 QTY BF MB - 1356 ,PG - 10
1426.92 QTY BF MB - 1356 ,PG - 14
sqm 2796.37 Total 21.60 60402 30822

Providing and applying white


cement based putty of average
thickness 1 mm, of approved
brand and manufacturer, Like
13 13.41 birla white /JK white or PR
equivalent, over the plastered
wall
surface to prepare the surface
even and smooth i/c all cost of
733.62 QTY BF MB - 1356 ,PG - 10
951.28 QTY BF MB - 1356 ,PG - 15
148.02 QTY BF MB - 1356 ,PG - 15
sqm 1832.92 Total 66.60 122072 30867

Page 20 of 97
AMOUNT
S. Unit Qty SOR Description of Items Rate
No No. Since
Up to Date previous Bill

Diluting and injecting chemical


emulsion for
POSTCONSTRUCTIONAL anti-
14 2.30 termite treatment (excluding the PR
cost of chemical emulsion) :

Treatment of existing masonry


using chemical
2.30.4 emulsion @ one litre per hole
at 300 mm
interval including drilling 10mm
dia and
With 200mm
Chlorpyriphos/ Lindane
2.30.4.1 E.C. 20%
with 1% concentration
256.52 QTY BF MB ,PG
Rm 256.52 Total 45.00 11543 0

Diluting and injecting chemical


emulsion for
POSTCONSTRUCTIONAL anti-
15 2.30 termite treatment (excluding the PR
cost of chemical emulsion) :

Along external wall where the


apron is not
2.30.1 provided using chemical
emulsion @ 7.5 litres /
sqm of the vertical surface of
the substructure
With to Lindane
Chlorpyriphos/
2.30.1.1 E.C. 20%
with 1% concentration.
70.00 QTY BF MB ,PG
Rm 70.00 Total 32.40 2268 0

Providing and fixing M.S. grills


of required pattern in frames
of windows etc. with M.S. flats,
square or round bars etc.
16 9.43 including priming coat with PR
approved steel primer all
complete.

Fixed to openings /wooden


frames with rawl plugs
9.43.2 screws etc

397.15 QTY BF MB ,PG


6.80 QTY BF MB 1356 ,PG15
kg 403.95 Total 90.00 36356 612

Page 21 of 97
AMOUNT
S. Unit Qty SOR Description of Items Rate
No No. Since
Up to Date previous Bill

Providing and fixing M.S.


Tubular frames for doors,
windows,
ventilators and cupboard with
17 10.14 rectangular/ L-Type sections, PR
made of 1.60 mm thick M.S.
Sheet, joints mitred, welded
and
grinded finish, with profiles of
Fixing
requiredwith 15x3
size, as mm lugs 10
per drawing,
cm. long embedded in
10.14.1 cement concrete block S
15x10x10 cm of Cement
Concrete 1:3:6 (1 Cement : 3
299.41 QTY BF
sand : 6MB 1356 stone
graded ,PG 09
36.21 QTY BF MB 1356 ,PG 15
kg 335.62 Total 104.58 35099 3787

Brick work with fly ash lime bricks


(FALG Bricks) conforming
to IS:12894-2002, in super structure
18 6.7 above plinth level up to
floor II level in

6.7.3 having 50 kg / cm2 average


compressive strength

6.7.3.2 Cement
sand)
mortar 1:6 (1 cement : 6

6.63 QTY BF MB-1358 , PG- 20


CUM 6.63 Total 3990.00 26454 0

Repairs to plaster of thickness 12mm


to 20mm in patches of area
2.5 sq. metres and under including
cutting the patch in proper
shape, raking out joints and preparing
and plastering the surface
of the walls complete including
19 14.1 disposal of rubbish to the
dumping ground within 50metres
lead :

14.1.1 With
sand)
cement mortar 1:4 (1 cement : 4

63.45 QTY BF MB 1356 , P - 09


SQM 63.45 Total 162.00 10279 0

Dismantling doors, windows and


clerestory windows (steel or
wood) shutter including chowkhats,
architrave, holdfasts etc.
complete and stacking within 50
20 15.14 metres lead :

15.14.1 Of area 3 sq. metres and below

Page 22 of 97
AMOUNT
S. Unit Qty SOR Description of Items Rate
No No. Since
Up to Date previous Bill

9.00 QTY BF MB 1356 , P - 08


Nos 9.00 Total 76.50 689 0

15.14.2 Of area beyond 3 sq. metres


7.00 QTY BF MB 1356 , P - 08
Nos 7.00 Total 105.30 737 0

Demolishing brick work manually/ by


mechanical means
including stacking of serviceable
15.6 material and disposal of
unserviceable material within 50
metres lead as per direction
of Engineer-in-charge.

15.6.3 In cement mortar


2.42 QTY BF MB 1356 , P - 13
Cum 2.42 Total 438.30 1061 1061

Providing and fixing ISI marked flush door


shutters
conforming to IS: 2202 (Part I) decorative
type, core of block
9.18 board construction with frame of 1st class
hard wood and well
matched teak 3 ply veneering with vertical
grains or cross
bands and face veneers on both faces of
shutters of such as
30 mm thick including ISI marked
9.18.2 Stainless Steel butt
hinges with necessary screws.
20.07 QTY BF MB 1356 , P - 13
Sqm 20.07 Total 3294.00 66111 66111

Finishing walls with Deluxe Multi surface


paint system for
interiors and exteriors using Primer as per
manufacturers
13.57 specifications :

Two or more coats applied on


walls @ 1.25 ltr/10
13.57.1 sqm. over and including one coat FR= 72.90
of Special primer
applied @ 0.75 ltr / 10 sqm.

2495.88 QTY BF MB 1356 , P - 13


Sqm 2495.88 Total 50.00 124794 124794
PR

PART B - COMPUTER BLOCK

Page 23 of 97
AMOUNT
S. Unit Qty SOR Description of Items Rate
No No. Since
Up to Date previous Bill

Earth work in excavation by


mechanical means (Hydraulic
excavator )/ manual means over
areas (exceeding 30cm in depth. 1.5m
in width as well as 10 sqm on plan)
including dressing of sides and
ramming of bottom disposal of
excavated earth, lead upto 50m and
1 2.6 lift upto 1.5m, disposed earth to be
levelled and neatly dressed. (No extra
lift is payable if work is done by
mechanical means)

All kinds of soil


27.84 QTY BF TMB ,P-05L
Cum 27.84 Total 116.10 3232 0
Earth work in excavation/ by
mechanical means
(HydraulicExcavator)/ manual means
over areas (exceeding 30 cm in depth,
2 2.7 1.5m in width as well as 10 sqm on
plan) including dressing of sides and
ramming of bottom disposal of
excavated earth, lead up to 50 m and
lift up to 1.5 m, disposed earth to
2.7.3 be
Hard levelled and neatly
rock (blasting dressed.
prohibited)
142.62 QTY BF TMB ,P-05R
Cum 142.62 Total 441.90 63024 0

4.1 Providing and laying in position


3 4.1 cement concrete of specified grade
excluding the cost of centering and
shuttering - All work up to plinth level :

4.1.2 4.1.2 With 40mm nominal size


graded stone aggregate.
4.1.2.1 4.1.2.1 M 15 - Grade concrete
21.92 QTY BF TMB ,P-05R
Cum 21.92 Total 3962.70 86862 0

Centering and shuttering including


4 4.3 strutting, propping etc. and removal of
form work for :

4.3.1 Foundations, footings, bases for


columns.
45.41 QTY BF TMB ,P-06L
Sqm 45.41 Total 152.10 6907 0

Page 24 of 97
AMOUNT
S. Unit Qty SOR Description of Items Rate
No No. Since
Up to Date previous Bill

Reinforcement for R.C.C. work


including straightening, cutting,
bending, placing in position and
binding up to floor two level
including cost of binding wire, all
wastage and lappage /overlap
5 5.16 (overlaps shall be provided as per
requirement of IS 13920 for ductile
detailing, IS 456 Design & SP
34 Reinforcement detailing) etc
complete ( Note :- Spacer bar
(chairs) shall be paid seperately as
shown in the drawing and as per
direction of engineer in charge

Thermo-Mechanically Treated bars.


5.16 (TMT) Fe 500 D conforming to IS
1786
24281.43 QTY BF TMB ,P-06L
138.96 QTY BF T 1358 ,P- 29
430.18 QTY BF T 1357 ,P- 26
537.19 QTY BF T 1357 ,P- 28
Kg 25387.76 Total 60.00 1523266 66380

Providing and laying / erecting design


mix in situ or precast or combination
of in siti and precast
cement concrete of specified grade as
per approved design of
R.C.C work prepared by only weight
batching and machine
mixing at site/yard/RMC plant
includind transportation to any
lead by any means such as chute ,
6 5.44 conveyor belt ,truck
,RMCtransit mixer etc, placed /
erected by any mechanical
meanssuch as bucket hoist ,
pump,crane , hydraetc. Including
cost of all materials such as
admixtures/plastizers to achieve the
designed retarded/accelerate setting
time and suitable
workability ,centering ,shuttering ,strut
ting,compacting and

All work up to plinth level ( footing ,


raft,pedestal R.C.C drain,
5.44.1 R.C.C retaining wall , R.C.C Pier ,
plinth beam , grade slab
,curtain wall, poles R.C.C barrier etc.)

5.44.1.1 M-20 Grade Concrete


71.40 QTY BF TMB ,P-06R
QTY BF MB 1358, P
QTY BF MB 1358, P
Cum 71.40 Total 5000.00 357000 0

Page 25 of 97
AMOUNT
S. Unit Qty SOR Description of Items Rate
No No. Since
Up to Date previous Bill

Filling available excavated earth


(excluding hard
rock/Ordinary rock) in trenches, plinth,
sides of foundations
etc. in layers not exceeding 20cm in
7 2.25 depth, consolidating
each deposited layer by ramming and
watering, lead up to
50 m and lift upto 1.5 m.

27.84 QTY BF TMB ,P-07L


Cum 27.84 Total 64.80 1804 0

Supplying and filling in plinth with soil


(other than B.C.
soil) having MDD not less then 1.85
t/m³ under floors
including watering ramming
compacting (minimum of
7 2.28.2 compacting 95% of MDD) in layers
not exceeding 15cm in
depth and dressing
complete.

201.74 QTY BF TMB ,P-07L


Cum 201.74 Total 225.00 45392 0

Supplying and filling in plinth with hard


muram/hard copra
having MDD not less then 2.0 t/m³
under floors including
watering ramming compacting
(minimum of compacting
8 2.28.1 95% of MDD) in layers not exceeding
20cm in thick and
dressing complete. (Note-maximum
thick thickness of this
layer to be provided shall be 30cm.)

41.29 QTY BF MB-1358 , PG- 12R


Cum 41.29 Total 270.00 11148 0

Preconstruction antitermite treatment


to the building under
construction by providing
122.40
Stage 1: Treating the bottom and the
sides (upto 30cm hight
9 2.32 of the excavated trench @ 5 litter per
sqm of the surface
area.
2.32
Stage 2: After masonry/RCC work, the
backfill in the
immdiate contact with the foundation
structure treatment @
252.72 QTY BF MB-1358 , PG- 13L
SQM 252.72 Total 122.40 30933 0

Page 26 of 97
AMOUNT
S. Unit Qty SOR Description of Items Rate
No No. Since
Up to Date previous Bill

Supplying and filling in plinth with


crusher stone dust /
coarse sand under floors including,
watering, ramming
10 2.27 consolidating in layers not exceeding
20cm in depth and
dressing complete

20.65 QTY BF MB-1358 , PG- 13R


CUM 20.65 Total 604.80 12489 0

Providing and laying in position


cement concrete of specified
grade excluding the cost of centering
11 4.1 and shuttering - All work up
to plinth level

4.1.1With 20mm nominal size graded stone


aggregate.
4.1.1.3 M 15 – Grade concrete
20.65 QTY BF MB-1358 , PG- 14L
CUM 20.65 Total 4023.90 83094 0

R.C.C With Shuttering : Providind and


laying / erecting design
mix in situ or precast or combination
of in siti and precast
12 5.44 cement concrete of specified grade as
per approved design of
R.C.C work prepared by only weight
batching and machine
mixing at site/yard/RMC plant
includind transportation to any
All work up to floor two level walls
5.44.2 ( any thickness ) coloumn
,piller pier , post and struts etc
5.44.2.1 M - 20
31.96 QTY BF MB-1358 , PG- 14R
3.78 QTY BF MB-1358 , PG-
QTY BF MB-1358 , PG-
CUM 35.74 Total 5270.00 188350 19921

R.C.C With Shuttering : Providind and


laying / erecting design
mix in situ or precast or combination
of in siti and precast
13 5.44 cement concrete of specified grade as
per approved design of
R.C.C work prepared by only weight
batching and machine
Suspended floor roof having
mixing at site/yard/RMC plantslope of
any degree
includind , landing to any
transportation
,balconies ,access platform, floor
5.44.3 beam , girders, bressumers and
cantilevers, shelves,
chujjas,lintels,bands , staircases and
5.44.3.1 spiral
M - 20
staircases, coffer slab.
99.67 QTY BF MB-1358 , PG- 15L
6.19 QTY BF MB-1358 , PG- 26
QTY BF MB-1358 , PG-
CUM 105.86 Total 5390.00 570585 33364
Page 27 of 97
AMOUNT
S. Unit Qty SOR Description of Items Rate
No No. Since
Up to Date previous Bill

Providing and laying cement concrete


in retaining walls, return
walls, walls (any thickness) including
attached pilasters, columns,
14 4.2 pillars, posts, struts, buttresses, string
or lacing courses, parapets,
coping, bed blocks, anchor blocks,
plain window sills, fillets etc.
up to floor two level, excluding the
cost of centering, shuttering
4.2.1 With 20mm nominal size graded stone
aggregate
4.2.1.3 M 15 – Grade concrete
2.55 QTY BF MB-1358 , PG- 16L
4.21 QTY BF MB-1358 , PG- 30
CUM 6.76 Total 4242.60 28663 17861

Brick work with fly ash lime bricks


(FALG Bricks) conforming
to IS:12894-2002, in super structure
15 6.7 above plinth level up to
floor II level in

6.7.3 having 50 kg / cm2 average


compressive strength

6.7.3.2 Cement
sand)
mortar 1:6 (1 cement : 6

51.14 QTY BF MB-1358 , PG- 20


48.93 QTY BF MB-1358 , PG- 28
CUM 100.07 Total 3990.00 399279 195230

Providing and fixing M.S. grills of


required pattern in frames
of windows etc. with M.S. flats,
square or round bars etc.
16 9.43 including priming coat with PR
approved steel primer all
complete.

Fixed to openings /wooden


frames with rawl plugs
9.43.2 screws etc

437.41 QTY BF MB 1358 ,PG 21


742.23 QTY BF MB 1358 ,PG 32
kg 1179.64 Total 90.00 106168 66801

Providing and fixing M.S. grills


of required pattern in frames
of windows etc. with M.S. flats,
17 10.14 square or round bars etc. PR
including priming coat with
approved steel primer all
complete.

Page 28 of 97
AMOUNT
S. Unit Qty SOR Description of Items Rate
No No. Since
Up to Date previous Bill

Fixed to openings /wooden


10.14.1 frames with rawl plugs
screws etc
219.86 QTY BF MB 1358 ,PG 21
101.65 QTY BF MB 1358 ,PG 33
kg 321.51 Total 104.58 33624 10631

Half brick masonry with fly ash


lime Gypsum bricks (FALG
bricks) conforming to IS : 12894,
in super structure above
17 6.15 plinth and upto floor two level with PR
2 nos 10mm dia. M.S Bar at
every third course of brick
masonary which shall be paid
separately.

6.15.3 having 50 kg/cm2


average compressive strength
Cement mortar 1 : 4 (1 cement : 4
6.15.3.2
sand)
133.05 QTY BF MB 1358 ,PG 27
Sqm 133.05 Total 459.00 61070 61070

17 13.8 6 mm cement plaster of mix :


13.8.1 1:3 (1 cement : 3 sand)
250.64 QTY BF MB 1358 ,PG 31
319.79 QTY BF MB 1358 ,PG
Sqm 570.43 Total 86.40 49285 49285

Providing and fixing chicken mesh


as per ISI specification and in the
required width with 50mm long
17 13.3 Bombay nails on vertical and PR
horizontal junctions of RCC and
brick wall including scaffolding
and all lead and lift etc. complete
before plastering upt 10 meter
height
123.17 QTY BF MB 1358 ,PG 32
Sqm 123.17 Total 86.40 10642 10642

17 13.1 12 mm cement plaster of mix :


13.1.2 1:3 (1 cement : 3 sand)
269.76 QTY BF MB 1358 ,PG 33
Sqm 269.76 Total 99.00 26706 26706

15 mm cement plaster on the


17 13.2rough side of single or half brick
wall of mix :
13.2.2 1:6 (1 cement : 6 sand)
231.08 QTY BF MB 1358 ,PG 34
Sqm 231.08 Total 115.20 26620 26620
5223192 973037
TOTAL CIVIL AMOUNT (A)

Page 29 of 97
AMOUNT
S. Unit Qty SOR Description of Items Rate
No No. Since
Up to Date previous Bill

369590 0.00
TOTAL ELECTRICAL AMOUNT (B)

5592782 973037
TOTAL (A+B)

1334438 232167
Less 23.86% Below SOR rate as per
agreement
4258344 740870
TOTAL

Page 30 of 97
7th RUNNING ACCOUNT BILL

CONSTRUCTION OF COMPUTER CENTRE BLOCK


AND RENOVATION WORK OF AUDITORIUM AT GOVERNMENT M.V.M COLLEGE BHOPAL
20/PIU/2019-20 Dt.10/02/2020
AMOUNT
S. Qty Unit SOR Description of Items Rate
No No. Since
Up to Date previous Bill
PART A - RENOVATION

Dismantling cement asbestos or other


1 15.38 hard board ceiling or
partition walls including stacking of
serviceable materials and
disposal of unserviceable materials
within 50 metres lead.
1116.195 QTY BF TMB ,P-04R
1116.195 Sqm Total 11.70 13059 0

Removal of old Tarfelt i/c disposal as


2 15.25 directed by Engineer in
charge
963.78 QTY BF TMB ,P-04R
963.78 Sqm Total 7.83 7546 0

Removing mortar from and cleaning


3 15.10 stones and concrete
articles
15.10.2 In cement mortar
17.40573 QTY BF TMB ,P-04R
17.40573 CUM Total 145.80 2538 0

Grading roof for water proofing


4 22.14 treatment with
Cement concrete 1:2:4 (1 cement: 2
sand : 4 graded stone
22.14.1 aggregate 20 mm nominal size)

57.8268 QTY BF TMB ,P-04R


57.8268 CUM Total 4112.10 237790 0

Extra for providing and mixing water


proofing material as per IS
standard in cement concrete work
5 4.12 quantity as prescribed by the
manufacturer

358.546 QTY BF TMB ,P-04R

358.546
Per 50kg bag Total 39.60 14198 0

Page 31 of 97
AMOUNT
S. Qty Unit SOR Description of Items Rate
No No. Since
Up to Date previous Bill
Providing and laying water proofing
treatment on roofs of slabs
by applying cement slurry mixed with
water proofing cement
compound consisting of applying :
a) after surface preparation, first layer
of slurry of cement @
6 22.6 0.488 kg/sqm mixed with water
proofing cement compound @
0.253 kg/sqm.
22.6
b) laying second layer of Fibre glass
cloth when the first layer is
still green. Overlaps of joints of fibre
cloth should not be less
than 10 cm.
c) third layer of 1.5 mm thickness
consisting of slurry of cement
@ 1.289 kg/sqm mixed with water
proofing cement compound @
0.670 kg/sqm and sand @ 1.289
kg/sqm. This will be allowed to
air cure for 4 hours followed by water
curing for 48 hours. The PR 80%
entire treatment will be taken upto
30cm on parapet wall and
tucked into groove in parapet all
around.

963.78 QTY BF TMB ,P-05L


963.78 CUM Total FR 304.20 243.74 234908 0

Dismantling wood work in frames,


trusses, purlins and rafters
upto 10 metres span and 5 metres
7 15.16 height including stacking the
material within 50 metres lead:

Of sectional area below 40 square


15.16.2 centimetres.
2093.54 QTY BF TMB ,P-05L
2093.54 rm Total 3.69 7725 0

Dismantling wooden boardings in


lining of walls and
8 15.36 partitions, excluding supporting
members but including
stacking within 50 metres lead :
15.36.3 Thickness above 25 mm upto 40 mm
149.44 QTY BF TMB ,P-05L
149.44 sqm Total 19.80 2959 0

Providing and fixing false ceiling at all


height including
providing and fixing of frame work
9 12.49 made of special FR 828
sections, power pressed from M.S.
sheets and galvanized
with zinc coating of 120 gms/sqm
(both side inclusive) as
12.5 mm thick tapered edge gypsum
12.49.3 moisture 0.80
resistant board

FR = 828.00
140.52 QTY BF MB ,PG PR
140.52 sqm Total 800.00 112416 0

Page 32 of 97
AMOUNT
S. Qty Unit SOR Description of Items Rate
No No. Since
Up to Date previous Bill
Providing and fixing of Mineral Fibre
Acoustical
Suspended Ceiling System with
10 12.62 16mm thick tegular edge
tiles of size 595x595mm as approved
by Engineer-incharge,
in true horizontal level suspended on
inter locking
FR = 1658.70
319.58 QTY BF MB ,PG PR
319.58 sqm Total , FR 1658.70 1500.00 479370 0

Removing white or colour wash by


scrapping and sand papering
and preparing the surface smooth
11 14.27. including necessary repairs to
scratches etc. complete

2320.73 QTY BF MB - 1356 ,PG - 08


707.2614 QTY BF MB - 1356 ,PG - 20
3027.991 sqm Total 4.59 13898 3246

Applying one coat of water thinnable


cement primer of
12 13.46 approved brand and manufacture on
wall surface :

13.46.1 Water thinnable cement primer.


2796.37 QTY BF MB - 1356 ,PG - 10
2796.37 sqm Total 21.60 60402 0

Providing and applying white cement


based putty of average
thickness 1 mm, of approved brand
and manufacturer, Like
birla white /JK white or equivalent,
13 13.41 over the plastered wall
surface to prepare the surface even
and smooth i/c all cost of
material, labour and scaffold etc in all
position complete.
1832.92 QTY BF MB - 1356 ,PG - 10
294.51 QTY BF MB - 1356 ,PG - 20
2127.43 sqm Total 66.60 141687 19615

Diluting and injecting chemical


emulsion for
POSTCONSTRUCTIONAL anti-
termite treatment (excluding the cost
14 2.30 of chemical emulsion) :

Treatment of existing masonry using


chemical
2.30.4 emulsion @ one litre per hole at 300
mm
interval including drilling 10mm dia
and 200mm
With Chlorpyriphos/ Lindane E.C.
2.30.4.1 20%
with 1% concentration
256.52 QTY BF MB ,PG
256.52 Rm Total 45.00 11543 0

Page 33 of 97
AMOUNT
S. Qty Unit SOR Description of Items Rate
No No. Since
Up to Date previous Bill
Diluting and injecting chemical
emulsion for
POSTCONSTRUCTIONAL anti-
termite treatment (excluding the cost
15 2.30 of chemical emulsion) :

Along external wall where the apron is


not
2.30.1 provided using chemical emulsion @
7.5 litres /
sqm of the vertical surface of the
substructure to
With Chlorpyriphos/ Lindane E.C.
2.30.1.1 20%
with 1% concentration.
70 QTY BF MB ,PG
70 Rm Total 32.40 2268 0

Providing and fixing M.S. grills of


required pattern in frames
of windows etc. with M.S. flats, square
or round bars etc.
including priming coat with approved
16 9.43 steel primer all
complete.

Fixed to openings /wooden frames


with rawl plugs
9.43.2 screws etc

403.95 QTY BF MB ,PG


403.95 kg Total 90.00 36356 0

Providing and fixing M.S. Tubular


frames for doors, windows,
ventilators and cupboard with
rectangular/ L-Type sections,
made of 1.60 mm thick M.S. Sheet,
17 10.14 joints mitred, welded and
grinded finish, with profiles of required
size, as per drawing,
including fixing of necessary butt
hinges, stays and screws
and applying
Fixing a priming
with 15x3 mm lugscoat
10ofcm. long
approved
embeddedsteelin primer
10.14.1 cement concrete block 15x10x10 cm
of Cement
Concrete 1:3:6 (1 Cement : 3 sand : 6
graded stone
335.62 QTY BF MB 1356 ,PG 09
335.62 kg Total 104.58 35099 0

Brick work with fly ash lime bricks


(FALG Bricks) conforming
to IS:12894-2002, in super structure
18 6.7 above plinth level up to
floor II level in

6.7.3 having 50 kg / cm2 average


compressive strength

6.7.3.2 Cement
sand)
mortar 1:6 (1 cement : 6

6.63 QTY BF MB-1358 , PG- 20

Page 34 of 97
AMOUNT
S. Qty Unit SOR Description of Items Rate
No No. Since
Up to Date previous Bill
6.63 CUM Total 3990.00 26454 0

Repairs to plaster of thickness 12mm


to 20mm in patches of area
2.5 sq. metres and under including
cutting the patch in proper
shape, raking out joints and preparing
and plastering the surface
of the walls complete including
19 14.1 disposal of rubbish to the
dumping ground within 50metres
lead :

14.1.1 With
sand)
cement mortar 1:4 (1 cement : 4

63.45 QTY BF MB 1356 , P - 09


63.45 SQM Total 162.00 10279 0

Dismantling doors, windows and


clerestory windows (steel or
wood) shutter including chowkhats,
architrave, holdfasts etc.
complete and stacking within 50
20 15.14 metres lead :

15.14.1 Of area 3 sq. metres and below


9 QTY BF MB 1356 , P - 08
9 Nos Total 76.50 689 0

15.14.2 Of area beyond 3 sq. metres


7 QTY BF MB 1356 , P - 08
7 Nos Total 105.30 737 0

Demolishing brick work manually/ by


mechanical means
including stacking of serviceable
21 15.6 material and disposal of
unserviceable material within 50
metres lead as per direction
of Engineer-in-charge.

15.6.3 In cement mortar


2.42 QTY BF MB 1356 , P - 13
2.42 Cum Total 438.30 1061 0

Providing and fixing ISI marked flush


door shutters
conforming to IS: 2202 (Part I)
22 9.18 decorative type, core of block
board construction with frame of 1st
class hard wood and well
matched teak 3 ply veneering with
vertical grains or cross
bands and face veneers on both faces
of shutters
30 mm thickofincluding
such as ISI marked
9.18.2 Stainless Steel butt
hinges with necessary screws.
20.07 QTY BF MB 1356 , P - 13
20.07 Sqm Total 3294.00 66111 0

Page 35 of 97
AMOUNT
S. Qty Unit SOR Description of Items Rate
No No. Since
Up to Date previous Bill
Finishing walls with Deluxe Multi
surface paint system for
interiors and exteriors using Primer as
23 13.57 per manufacturers
specifications :

Two or more coats applied on walls @


13.57.1 1.25 ltr/10
sqm. over and including one coat of FR= 72.90
Special primer
applied @ 0.75 ltr / 10 sqm.

2495.88 QTY BF MB 1356 , P - 13


2495.88 Sqm Total 60.00 149753 0
PR

Providing and installation of acoustical


wall panelling wood
finish Slats made out of HDF board ,
Melamine / veneer
laminated finish, perforated wooden
grooved slats (2mm
grooves @ 8mm centers) / (2mm
Slats @16mm pitch) / (2mm
24 9.148 grooves @ 32mm centers) / (2mm R= 4661.10
grooves @ 64mm centers),
backlined with black acoustical fleece,
tongue-groove edge for
a seamless look, FR grade, of lineal
dimension size 128mm x
2440mm x 16mm thick having density
1000Kg /m3, weight
131.94 12.8Kgs/m2
QTY MB installed
BF The 1356 by using GI strut
system. GI st , P - 13
131.94 Sqm Total 2500.00 329850 0
PR

Providing and laying vitrified floor tiles


Multi/Double
Charged (Minimum tooop layer
thickness 2.0 mm) Nano
Polished self design, in different sizes
with water
absoroption less than 0.05% and
conforming to IS: 15622
25 11.90 of approved make in all colours &
shades, 1st quality
premium in flooring. laid on 12 mm
thick cement mortar
1:4 (1 cement:4 sand) including
grouting the joints with
white cement and matching pigments
etc. complete.
In light shade glossy/rustic/satin
11.90.1 finished
(b) Size 800x800 mm thikness 11‐12
11.90.1B mm
306.37 QTY BF MB 1356 , P - 21
306.37 Sqm Total ,FR 1010.70 800.00 245096 245096
PR

Finishing walls with Acrylic Smooth


26 13.55 exterior paint of
required shade:

Page 36 of 97
AMOUNT
S. Qty Unit SOR Description of Items Rate
No No. Since
Up to Date previous Bill
New work (Two or more coat applied
@ 1.67 ltr/10
sqm over and including priming coat
13.55.1 of exterior
primer applied @ 2.20 kg/ 10 sqm).

294.51 QTY BF MB 1356 , P - 21


619.13 QTY BF MB 1356 , P - 21
913.64 Sqm Total 78.30 71538 71538

Providing and fixing Chlorinated


Polyvinyl Chloride (CPVC)
pipes, having thermal stability for hot
and cold water supply
including all CPVC plain and brass
27 18.8 threaded fittings i/c fixing the
pipe with clamps at 1.00 m spacing.
This includes jointing of
pipes and fittings with one step CPVC
solvent cement and the
cost of cutting chases and making
Concealed
good the sameworkincluding
includingtesting
cutting
chases and making good the
walls etc.,
18.8.2 20 mm nominal outer dia .Pipes
81 QTY BF MB 1356 , P - 18
81 Rm Total 210.60 17059 17059

18.8.3 25 mm nominal outer dia .Pipes


18 QTY BF MB 1356 , P - 18
18 Rm Total 259.20 4666 4666

Providing and fixing uPVC trap of self


cleaning design complet.
28 17.61 Including cost of cutting and making
good the wall and floors

17.61.1 100 mm inlet and 75 mm outlet


12 QTY BF MB 1356 , P - 19
12 No. Total 465.30 5584 5584

Providing and fixing unplasticised


Rigid PVC soil and waste
29 17.58 pipes conforming to IS: 13592 Type B
including jointing with
seal ring conforming to IS : 5382
leaving 10 mm gap for thermal
17.58.1 75mm diameter OD (minimum wall
thickness 3.2
11.75 QTY BF MB 1356 , P - 19
11.75 Rm Total 122.40 1438 1438

17.58.2 110 mm diameter OD (minimum wall


thickness 3.2
8.5 QTY BF MB 1356 , P - 19
8.5 Rm Total 214.20 1821 1821

Providing and fixing unplasticised


PVC moulded fittings/
30 17.59 accessories for unplasticised Rigid
PVC soil and waste pipes
conforming to IS: 13592 Type A
including jointing with seal ring
17.59.1.2 coupler
11 QTY BF MB 1356 , P -
11 each Total 138.60 1525 1525

Page 37 of 97
AMOUNT
S. Qty Unit SOR Description of Items Rate
No No. Since
Up to Date previous Bill
17.59.5.2 Bend
8 QTY BF MB 1356 , P -
8 each Total 154.80 1238 1238

17.59.4.2 Bend
5 QTY BF MB 1356 , P -
5 each Total 239.40 1197 1197

Providing and fixing water closet


squatting pan (Indian type W.C.
31 17.1 pan) with 100mm sand cast Iron P or
S trap, uPVC P or S trap, 10
litre low level white P.V.C. flushing
cistern,Vitreous
White including flushOrissa
china pipe, pattern
W.C. pan of size
17.1.1 580x440mm with integral type foot
rests.

6 QTY BF MB 1356 , P - 22
6 each Total 2695.50 16173 16173

PART B - COMPUTER BLOCK

Earth work in excavation by


mechanical means (Hydraulic
excavator )/ manual means over
areas (exceeding 30cm in depth. 1.5m
in width as well as 10 sqm on plan)
including dressing of sides and
ramming of bottom disposal of
excavated earth, lead upto 50m and
1 2.6 lift upto 1.5m, disposed earth to be
levelled and neatly dressed. (No extra
lift is payable if work is done by
mechanical means)

All kinds of soil


27.84 QTY BF TMB ,P-05L
27.84 Cum Total 116.10 3232 0
Earth work in excavation/ by
mechanical means
(HydraulicExcavator)/ manual means
over areas (exceeding 30 cm in depth,
2 2.7 1.5m in width as well as 10 sqm on
plan) including dressing of sides and
ramming of bottom disposal of
excavated earth, lead up to 50 m and
lift up to 1.5 m, disposed earth to
2.7.3 be
Hard levelled and neatly
rock (blasting dressed.
prohibited)
142.62 QTY BF TMB ,P-05R
142.62 Cum Total 441.90 63024 0

4.1 Providing and laying in position


3 4.1 cement concrete of specified grade
excluding the cost of centering and
shuttering - All work up to plinth level :

4.1.2 4.1.2 With 40mm nominal size


graded stone aggregate.
4.1.2.1 4.1.2.1 M 15 - Grade concrete
21.92 QTY BF TMB ,P-05R

Page 38 of 97
AMOUNT
S. Qty Unit SOR Description of Items Rate
No No. Since
Up to Date previous Bill
21.92 Cum Total 3962.70 86862 0

Centering and shuttering including


4 4.3 strutting, propping etc. and removal of
form work for :

4.3.1 Foundations, footings, bases for


columns.
45.41 QTY BF TMB ,P-06L
45.41 Sqm Total 152.10 6907 0

Reinforcement for R.C.C. work


including straightening, cutting,
bending, placing in position and
binding up to floor two level
including cost of binding wire, all
wastage and lappage /overlap
5 5.16 (overlaps shall be provided as per
requirement of IS 13920 for ductile
detailing, IS 456 Design & SP
34 Reinforcement detailing) etc
complete ( Note :- Spacer bar
(chairs) shall be paid seperately as
shown in the drawing and as per
direction of engineer in charge

Thermo-Mechanically Treated bars.


5.16 (TMT) Fe 500 D conforming to IS
1786
25387.76 QTY BF TMB ,P-06L
25387.76 Kg Total 60.00 1523266 0

Providing and laying / erecting design


mix in situ or precast or combination
of in siti and precast
cement concrete of specified grade as
per approved design of
R.C.C work prepared by only weight
batching and machine
mixing at site/yard/RMC plant
includind transportation to any
lead by any means such as chute ,
6 5.44 conveyor belt ,truck
,RMCtransit mixer etc, placed /
erected by any mechanical
meanssuch as bucket hoist ,
pump,crane , hydraetc. Including
cost of all materials such as
admixtures/plastizers to achieve the
designed retarded/accelerate setting
time and suitable
workability ,centering ,shuttering ,strut
ting,compacting and

All work up to plinth level ( footing ,


raft,pedestal R.C.C drain,
5.44.1 R.C.C retaining wall , R.C.C Pier ,
plinth beam , grade slab
,curtain wall, poles R.C.C barrier etc.)

5.44.1.1 M-20 Grade Concrete


71.4 QTY BF TMB ,P-06R
71.4 Cum Total 5000.00 357000 0

Page 39 of 97
AMOUNT
S. Qty Unit SOR Description of Items Rate
No No. Since
Up to Date previous Bill

Filling available excavated earth


(excluding hard
rock/Ordinary rock) in trenches, plinth,
sides of foundations
etc. in layers not exceeding 20cm in
7 2.25 depth, consolidating
each deposited layer by ramming and
watering, lead up to
50 m and lift upto 1.5 m.

27.84 QTY BF TMB ,P-07L


27.84 Cum Total 64.80 1804 0

Supplying and filling in plinth with soil


(other than B.C.
soil) having MDD not less then 1.85
t/m³ under floors
including watering ramming
compacting (minimum of
7 2.28.2 compacting 95% of MDD) in layers
not exceeding 15cm in
depth and dressing
complete.

201.74 QTY BF TMB ,P-07L


201.74 Cum Total 225.00 45392 0

Supplying and filling in plinth with hard


muram/hard copra
having MDD not less then 2.0 t/m³
under floors including
watering ramming compacting
(minimum of compacting
8 2.28.1 95% of MDD) in layers not exceeding
20cm in thick and
dressing complete. (Note-maximum
thick thickness of this
layer to be provided shall be 30cm.)

41.29 QTY BF MB-1358 , PG- 12R


41.29 Cum Total 270.00 11148 0

Preconstruction antitermite treatment


to the building under
construction by providing
122.40
Stage 1: Treating the bottom and the
sides (upto 30cm hight
9 2.32 of the excavated trench @ 5 litter per
sqm of the surface
area.
2.32
Stage 2: After masonry/RCC work, the
backfill in the
immdiate contact with the foundation
structure treatment @
252.72 QTY BF MB-1358 , PG- 13L
252.72 SQM Total 122.40 30933 0

Page 40 of 97
AMOUNT
S. Qty Unit SOR Description of Items Rate
No No. Since
Up to Date previous Bill
Supplying and filling in plinth with
crusher stone dust /
coarse sand under floors including,
watering, ramming
10 2.27 consolidating in layers not exceeding
20cm in depth and
dressing complete

20.65 QTY BF MB-1358 , PG- 13R


20.65 CUM Total 604.80 12489 0

Providing and laying in position


cement concrete of specified
grade excluding the cost of centering
11 4.1 and shuttering - All work up
to plinth level

With 20mm nominal size graded stone


4.1.1
aggregate.
4.1.1.3 M 15 – Grade concrete
20.65 QTY BF MB-1358 , PG- 14L
20.65 CUM Total 4023.90 83094 0

R.C.C With Shuttering : Providind and


laying / erecting design
mix in situ or precast or combination
of in siti and precast
12 5.44 cement concrete of specified grade as
per approved design of
R.C.C work prepared by only weight
batching and machine
mixing at site/yard/RMC plant
includind transportation to any
All work up to floor two level walls
5.44.2 ( any thickness ) coloumn
,piller pier , post and struts etc
5.44.2.1 M - 20
35.74 QTY BF MB-1358 , PG- 14R
35.74 CUM Total 5270.00 188350 0

R.C.C With Shuttering : Providind and


laying / erecting design
mix in situ or precast or combination
of in siti and precast
13 5.44 cement concrete of specified grade as
per approved design of
R.C.C work prepared by only weight
batching and machine
Suspended floor roof having
mixing at site/yard/RMC plantslope of
any degree
includind , landing to any
transportation
,balconies ,access platform, floor
5.44.3 beam , girders, bressumers and
cantilevers, shelves,
chujjas,lintels,bands , staircases and
5.44.3.1 spiral
M - 20
staircases, coffer slab.
105.86 QTY BF MB-1358 , PG- 15L
105.86 CUM Total 5390.00 570585 0

Providing and laying cement concrete


in retaining walls, return
walls, walls (any thickness) including
attached pilasters, columns,
14 4.2 pillars, posts, struts, buttresses, string
or lacing courses, parapets,
coping, bed blocks, anchor blocks,
plain window sills, fillets etc.
up to floor two level, excluding the
cost of centering, shuttering

Page 41 of 97
AMOUNT
S. Qty Unit SOR Description of Items Rate
No No. Since
Up to Date previous Bill
With 20mm nominal size graded stone
4.2.1
aggregate
4.2.1.3 M 15 – Grade concrete
6.756 QTY BF MB-1358 , PG- 16L
1.69 QTY BF MB-1357 , PG- 30
8.446 CUM Total 4242.60 35833 7170

Brick work with fly ash lime bricks


(FALG Bricks) conforming
to IS:12894-2002, in super structure
15 6.7 above plinth level up to
floor II level in

6.7.3 having 50 kg / cm2 average


compressive strength

6.7.3.2 Cement
sand)
mortar 1:6 (1 cement : 6

100.07 QTY BF MB-1358 , PG- 20


100.07 CUM Total 3990.00 399279 0

Providing and fixing M.S. grills of


required pattern in frames
of windows etc. with M.S. flats, square
or round bars etc.
including priming coat with approved
16 9.43 steel primer all
complete.

Fixed to openings /wooden frames


with rawl plugs
9.43.2 screws etc

1179.64 QTY BF MB 1358 ,PG 21


1179.64 kg Total 90.00 106168 0

Providing and fixing M.S. grills of


required pattern in frames
of windows etc. with M.S. flats, square
or round bars etc.
including priming coat with approved
17 10.14 steel primer all
complete.

Fixed to openings /wooden frames


with rawl plugs
10.14.1 screws etc

321.51 QTY BF MB 1358 ,PG 21


321.51 kg Total 104.58 33624 0

Page 42 of 97
AMOUNT
S. Qty Unit SOR Description of Items Rate
No No. Since
Up to Date previous Bill
Half brick masonry with fly ash lime
Gypsum bricks (FALG
bricks) conforming to IS : 12894, in
super structure above
plinth and upto floor two level with 2
17 6.15 nos 10mm dia. M.S Bar at
every third course of brick masonary
which shall be paid
separately.

having 50 kg/cm2
6.15.3 average compressive strength
Cement mortar 1 : 4 (1 cement : 4
6.15.3.2 sand)
133.05 QTY BF MB 1358 ,PG 27
133.05 Sqm Total 459.00 61070 0

17 13.8 6 mm cement plaster of mix :


13.8.1 1:3 (1 cement : 3 sand)
250.64 QTY BF MB 1358 ,PG 31
343.84 QTY BF MB 1358 ,PG 37
594.48 Sqm Total 86.40 51363 2078

Providing and fixing chicken mesh as


per ISI specification and in the
17 13.3 required width with 50mm long
Bombay nails on vertical and
horizontal junctions of RCC and brick
wall including scaffolding and all lead
and lift etc. complete before plastering
upt 10 meter height
123.17 QTY BF MB 1358 ,PG 32
123.17 Sqm Total 86.40 10642 0

17 13.1 12 mm cement plaster of mix :


13.1.2 1:3 (1 cement : 3 sand)
269.76 QTY BF MB 1358 ,PG 33
515 QTY BF MB 1358 ,PG 38
784.76 Sqm Total 99.00 77691 23884

17 13.2
15 mm cement plaster on the rough
side of single or half brick wall of mix :
13.2.2 1:6 (1 cement : 6 sand)
231.08 QTY BF MB 1358 ,PG 34
153.22 QTY BF MB 1358 ,PG
384.3 Sqm Total 115.20 44271 17651

Providing and fixing 18mm thick gang


saw cut mirror
polished (premoulded and
prepolished) machine cut for
kitchen platforms, vanity counters,
window sills , facias and
similar locations of required size of
18 11.22 approved shade, colour FR 1901.7
and texture laid over 20mm thick base
cement mortar 1:4
(1 cement : 4 sand) with joints treated
with white cement,
mixed with matching pigment, epoxy
touch ups, including
rubbing, curing moulding and
polishing to edge to give

Page 43 of 97
AMOUNT
S. Qty Unit SOR Description of Items Rate
No No. Since
Up to Date previous Bill

Granite coarse grained light black /


11.22.2 dark red/off
white with crystal of other colours and
various
pattern
9.86 QTY BF MB 1358 ,PG 35 PR
9.86 Sqm Total , FR = 1901.70 1800.00 17748 0

Providing and applying white cement


based putty of average
thickness 1 mm, of approved brand
and manufacturer, Like
birla white /JK white or equivalent,
19 13.41 over the plastered wall
surface to prepare the surface even
and smooth i/c all cost of
material, labour and scaffold etc in all
position complete.
751.48 QTY BF MB - 1358 ,PG - 36
1721.27 QTY BF MB - 1358 ,PG - 39
56.78 QTY BF MB - 1358 ,PG - 42
2529.53 sqm Total 66.60 168467 118418

20 13.3 20 mm cement plaster of mix :


13.3.2 1:6 (1 cement : 6 sand)
709.22 QTY BF MB - 1358 ,PG - 38
709.22 sqm Total , FR =140.40/- 140.40 99574 49952

Providing and fixing Chlorinated


Polyvinyl Chloride (CPVC)
pipes, having thermal stability for hot
and cold water supply
including all CPVC plain and brass
21 18.8 threaded fittings i/c fixing the
pipe with clamps at 1.00 m spacing.
This includes jointing of
pipes and fittings with one step CPVC
solvent cement and the
cost of cutting chases and making
good the same
Concealed workincluding
includingtesting
cutting
18.8.2 chases and making good the
walls etc.,
20 mm nominal outer dia .Pipes
42.15 QTY BF MB - 1357 ,PG - 29
42.15 Rm Total , 210.60 8877 8877

Concealed work including cutting


22 18.8.3 chases and making good the
walls etc.,
25 mm nominal outer dia .Pipes
71.4 QTY BF MB - 1357 ,PG - 29
71.4 Rm Total , 259.20 18507 18507

Providing and placing on terrace (at


all floor levels) polyethylene
water storage tank ISI : 12701 marked
with cover and suitable
23 18.49 locking arrangement and making
necessary holes for inlet, outlet
and overflow pipes but without fittings
and the base support for
tank
Concealed work including cutting
chases and making good the
walls etc.,

Page 44 of 97
AMOUNT
S. Qty Unit SOR Description of Items Rate
No No. Since
Up to Date previous Bill
4500 QTY BF MB - 1357 ,PG - 31
4500 ltr Total , 6.30 28350 28350

Providing and fixing unplasticised


Rigid PVC soil and waste
pipes conforming to IS: 13592 Type B
including jointing with
24 17.58.2 seal ring conforming to IS : 5382
leaving 10 mm gap for thermal
expansion. Single socketed pipes for
working pressure of 4
kg/sqcm.
110 mm diameter OD (minimum wall
thickness 3.2mm)
26 QTY BF MB - 1357 ,PG - 30
26 Rm Total , 214.20 5569 5569

Providing and fixing unplasticised


PVC moulded fittings/
25 17.59 accessories for unplasticised Rigid
PVC soil and waste pipes
conforming to IS: 13592 Type A
including jointing with seal ring
25a 17.59.1.2 coupler
13 QTY BF MB 1357 , P - 30
13 each Total 138.60 1802 1802

25b 17.59.5.2 Bend


23 QTY BF MB 1357 , P - 30
23 each Total 154.80 3560 3560

25c 17.59.4.2 Sigle T


8 QTY BF MB 1357 , P - 30
8 each Total 239.40 1915 1915

Providing and fixing on wall face


Unplasticised Rigid PVC
26 12.32 rain water pipes conforming to IS :
13592 Type A including
jointing with seal ring conforming to IS
: 5382 leaving 10
12.32.2 110 mm diameter (minimum wall
thickness 2.2mm)
130.24 QTY BF MB 1357 , P - 31
130.24 Rm Total 214.20 27897 27897

Providing and fixing on wall face


Unplasticised - PVC
27 12.33 moulded fittings/ accessories for
Unplasticised Rigid PVC
rain water pipes conforming to IS :
13592 Type A including
12.33.6.2 shoe 110 mm diameter (minimum wall
thickness 2.2mm)
13 QTY BF MB 1357 , P - 31
13 each Total 270.00 3510 3510

Providing and laying vitrified floor tiles


Multi/Double
28 11.90 Charged (Minimum tooop layer
thickness 2.0 mm) Nano
Polished self design, in different sizes
with water
In light shade glossy/rustic/satin
11.90.1 finished

11.90.1A (a)
mm
Size 600x600 mm thikness 9‐10

331.58 QTY BF MB 1358 , P - 40


331.58 sqm Total 903.60 299616 299616

Page 45 of 97
AMOUNT
S. Qty Unit SOR Description of Items Rate
No No. Since
Up to Date previous Bill
Providing and laying rectified Glazed
Ceramic floor tiles
300x300 mm or more (having
thickness 9 to 10mm) of 1st
quality conforming to IS : 15622 of
29 11.49 approved make in
colours White, Ivory, Grey, Fume Red
Brown, laid on
20mm thick cement mortar 1:4 (1
Cement : 4 sand)
including grouting the joints with white
27.29 QTY BFand
cement MB 1358 , P - 40
27.29 sqm Total 579.60 15817 15817

Providing and laying rectified Glazed


Ceramic wall tiles
300x450 mm or more (thickness to be
specified by the
manufacturer) of 1st quality
30 11.50 conforming to IS : 15622 of
approved make in colours White,
Ivory, Grey, Fume Red
Brown, laid on 12 mm thick cement
mortar 1:3 (1 Cement :
3 sand) prepared same day when
102.9 QTY BFisMB
mortar still 1358
green, i.e.
P-
102.9 sqm Total 628.20 64642 64642

Providing and fixing false ceiling at all


height including
providing and fixing of frame work
31 12.49 made of special FR 828
sections, power pressed from M.S.
sheets and galvanized
with zinc coating of 120 gms/sqm
(both side inclusive) as
12.5 mm thick tapered edge gypsum
12.49.3 moisture
resistant board

FR = 828.00
56.78 QTY BF MB ,PG PR
56.78 sqm Total 800.00 45424 45424

Providing and fixing of Mineral Fibre


Acoustical
Suspended Ceiling System with
32 12.62 16mm thick tegular edge
tiles of size 595x595mm as approved
by Engineer-incharge,
in true horizontal level suspended on
inter locking
FR = 1658.70
151.99 QTY BF MB 1358 ,PG 42 PR
151.99 sqm Total , FR 1658.70 1500.00 227985 227985

Grading roof for water proofing


33 22.14 treatment with
Cement concrete 1:2:4 (1 cement: 2
sand : 4 graded stone
22.14.1 aggregate 20 mm nominal size)

20.47 QTY BF MB1358, ,P-43


20.47 CUM Total 4112.10 84175 84175

Page 46 of 97
AMOUNT
S. Qty Unit SOR Description of Items Rate
No No. Since
Up to Date previous Bill
Extra for providing and mixing water
proofing material as per IS
standard in cement concrete work
34 4.12 quantity as prescribed by the
manufacturer

126.91 QTY BF MB1358, ,P-

126.91
Per 50kg bag Total 39.60 5026 5026

Providing and laying water proofing


treatment on roofs of slabs
by applying cement slurry mixed with
water proofing cement
compound consisting of applying :
35 22.6 a) after surface preparation, first layer
of slurry of cement @
0.488 kg/sqm mixed with water
proofing cement compound @
0.253 kg/sqm.
22.6
c) third layer of 1.5 mm thickness
consisting of slurry of cement
@ 1.289 kg/sqm mixed with water
proofing cement compound @
0.670 kg/sqm and sand @ 1.289 PR 80%
kg/sqm. This will be allowed to
air cure for 4 hours followed by water
curing for 48 hours. The
entire treatment will be taken upto
30cm on parapet wall and
227.99 QTY BF MB1358, ,P-
227.99 CUM Total FR 304.20 243.74 55569 55569

Providing and laying gang saw cut 18


mm thick, mirror
polished pre moulded (wherever
required) and pre polished
machine cut granite stone of required
size and shape of
approved shade, colour and texture in
flooring laid over
20mm thick base of cement mortar
1:4 (1cement : 4 sand)
36 11.29 including grouting the joints with white
cement mixed with
matching pigment, epoxy touch ups
etc. complete as per
direction of engineer-in-Charge

11.29.1 Area of slab over 0.50 sqm


11.29.1.2 Course grained light Black/light Red/
off White
51.09 QTY BF MB1358, ,P-43
51.09 sqm Total 1922.40 98215 98215

Page 47 of 97
AMOUNT
S. Qty Unit SOR Description of Items Rate
No No. Since
Up to Date previous Bill
Providing and laying vitrified floor tiles
Multi/Double
Charged (Minimum tooop layer
thickness 2.0 mm) Nano
Polished self design, in different sizes
with water
absoroption less than 0.05% and
conforming to IS: 15622
of approved make in all colours &
shades, 1st
37 11.91 quality/premium in skirting. laid on 12
mm thick cement
mortar 1:3 (1 cement:3 sand)
including grouting the joints
with white cement and matching
pigments etc. complete

11.91.1 In light shade glossy/rustic/satin


finished
(a) Size 600x600 mm thikness 9‐10
mm
8.32 QTY BF MB1358, ,P-44
8.32 sqm Total 893.70 7436 7436

Providing and fixing Unplasticised -


PVC pipe clips of
approved design to Unplasticised -
PVC rain water pipes by
means of bombay nail of required
38 12.34 length including making
good the wall etc. complete.

12.342 110 mm (minimum wall thickness


2.2mm)
130 QTY BF MB1357, ,P- 31
130 no. Total 102.60 13338 13338

TOTAL CIVIL AMOUNT (A) 7473078 1626579

TOTAL ELECTRICAL AMOUNT (B) 650366 0.00

TOTAL (A+B) 8123444 1626579

Less 23.86% Below SOR rate as per 1938254 388102


agreement

TOTAL 6185190 1238477

Add GST 12% 742223 148617

Net Payble Amount 6927413 1387094

Page 48 of 97
6TH RUNNING ACCOUNT BILL

CONSTRUCTION OF COMPUTER CENTRE BLOCK


AND RENOVATION WORK OF AUDITORIUM AT GOVERNMENT M.V.M COLLEGE BHOPAL
20/PIU/2019-20 Dt.10/02/2020
AMOUNT
S. Qty Unit SOR Description of Items Rate
No No. Since
Up to Date previous Bill
PART A - RENOVATION

Dismantling cement asbestos or other


1 15.38 hard board ceiling or
partition walls including stacking of
serviceable materials and
disposal of unserviceable materials
within 50 metres lead.
1116.19 QTY BF TMB ,P-04R
1116.19 Sqm Total 11.70 13059 0

Removal of old Tarfelt i/c disposal as


2 15.25 directed by Engineer in
charge
963.78 QTY BF TMB ,P-04R
QTY BF 1356 ,PG-5R
963.78 Sqm Total 7.83 7546 0

Removing mortar from and cleaning


3 15.10 stones and concrete
articles
15.10.2 In cement mortar
17.41 QTY BF TMB ,P-04R
QTY BF 1356 ,PG-5R
17.41 CUM Total 145.80 2538 0

Grading roof for water proofing


4 22.14 treatment with
Cement concrete 1:2:4 (1 cement: 2
sand : 4 graded stone
22.14.1 aggregate 20 mm nominal size)

57.83 QTY BF TMB ,P-04R


QTY BF 1356 ,PG-6L
57.83 CUM Total 4112.10 237790 0

Extra for providing and mixing water


proofing material as per IS
standard in cement concrete work
5 4.12 quantity as prescribed by the
manufacturer

358.55 QTY BF TMB ,P-04R


QTY BF 1356 ,PG-
Per
358.55 50kg Total 39.60 14198 0
bag

Page 49 of 97
AMOUNT
S. Qty Unit SOR Description of Items Rate
No No. Since
Up to Date previous Bill
Providing and laying water proofing
treatment on roofs of slabs
by applying cement slurry mixed with
water proofing cement
compound consisting of applying :
a) after surface preparation, first layer
of slurry of cement @
6 22.6 0.488 kg/sqm mixed with water
proofing cement compound @
0.253 kg/sqm.
22.6
b) laying second layer of Fibre glass
cloth when the first layer is
still green. Overlaps of joints of fibre
cloth should not be less
than 10 cm.
c) third layer of 1.5 mm thickness
consisting of slurry of cement
@ 1.289 kg/sqm mixed with water
proofing cement compound @
0.670 kg/sqm and sand @ 1.289
kg/sqm. This will be allowed to
air cure for 4 hours followed by water
curing for 48 hours. The PR 80%
entire treatment will be taken upto
30cm on parapet wall and
tucked into groove in parapet all
around.

963.78 QTY BF TMB ,P-05L


QTY BF 1356 ,PG-6R
963.78 CUM Total FR 304.20 243.74 234908 0

Dismantling wood work in frames,


trusses, purlins and rafters
upto 10 metres span and 5 metres
7 15.16 height including stacking the
material within 50 metres lead:

Of sectional area below 40 square


15.16.2 centimetres.
2093.54 QTY BF TMB ,P-05L
2093.54 rm Total 3.69 7725 0

Dismantling wooden boardings in


lining of walls and
8 15.36 partitions, excluding supporting
members but including
stacking within 50 metres lead :
15.36.3 Thickness above 25 mm upto 40 mm
149.44 QTY BF TMB ,P-05L
149.44 sqm Total 19.80 2959 0

Providing and fixing false ceiling at all


height including
providing and fixing of frame work
9 12.49 made of special FR 828
sections, power pressed from M.S.
sheets and galvanized
with zinc coating of 120 gms/sqm
(both side inclusive) as
12.5 mm thick tapered edge gypsum
12.49.3 moisture 0.80
resistant board

FR = 828.00
140.52 QTY BF MB ,PG PR
140.52 sqm Total 800.00 112416 28104

Page 50 of 97
AMOUNT
S. Qty Unit SOR Description of Items Rate
No No. Since
Up to Date previous Bill
Providing and fixing of Mineral Fibre
Acoustical
Suspended Ceiling System with
10 12.62 16mm thick tegular edge
tiles of size 595x595mm as approved
by Engineer-incharge,
in true horizontal level suspended on
inter locking
FR = 1658.70
319.58 QTY BF MB ,PG PR
319.58 sqm Total , FR 1658.70 1500.00 479370 95874

Removing white or colour wash by


scrapping and sand papering
and preparing the surface smooth
11 14.27. including necessary repairs to
scratches etc. complete

1369.45 QTY BF MB - 1356 ,PG - 08


951.28 QTY BF MB - 1356 ,PG - 13
2320.73 sqm Total 4.59 10652 0

Applying one coat of water thinnable


cement primer of
12 13.46 approved brand and manufacture on
wall surface :

13.46.1 Water thinnable cement primer.


2796.37 QTY BF MB - 1356 ,PG - 10
2796.37 sqm Total 21.60 60402 0

Providing and applying white cement


based putty of average
thickness 1 mm, of approved brand
and manufacturer, Like
birla white /JK white or equivalent,
13 13.41 over the plastered wall
surface to prepare the surface even
and smooth i/c all cost of
material, labour and scaffold etc in all
position complete.
1832.92 QTY BF MB - 1356 ,PG - 10
1832.92 sqm Total 66.60 122072 0

Diluting and injecting chemical


emulsion for
POSTCONSTRUCTIONAL anti-
termite treatment (excluding the cost
14 2.30 of chemical emulsion) :

Treatment of existing masonry using


chemical
2.30.4 emulsion @ one litre per hole at 300
mm
interval including drilling 10mm dia
and 200mm
With Chlorpyriphos/ Lindane E.C.
2.30.4.1 20%
with 1% concentration
256.52 QTY BF MB ,PG
256.52 Rm Total 45.00 11543 0

Diluting and injecting chemical


emulsion for
POSTCONSTRUCTIONAL anti-
termite treatment (excluding the cost
15 2.30 of chemical emulsion) :

Page 51 of 97
AMOUNT
S. Qty Unit SOR Description of Items Rate
No No. Since
Up to Date previous Bill
Along external wall where the apron is
not
2.30.1 provided using chemical emulsion @
7.5 litres /
sqm of the vertical surface of the
substructure to
With Chlorpyriphos/ Lindane E.C.
2.30.1.1 20%
with 1% concentration.
70.00 QTY BF MB ,PG
70.00 Rm Total 32.40 2268 0

Providing and fixing M.S. grills of


required pattern in frames
of windows etc. with M.S. flats, square
or round bars etc.
including priming coat with approved
16 9.43 steel primer all
complete.

Fixed to openings /wooden frames


with rawl plugs
9.43.2 screws etc

403.95 QTY BF MB ,PG


403.95 kg Total 90.00 36356 0

Providing and fixing M.S. Tubular


frames for doors, windows,
ventilators and cupboard with
rectangular/ L-Type sections,
made of 1.60 mm thick M.S. Sheet,
17 10.14 joints mitred, welded and
grinded finish, with profiles of required
size, as per drawing,
including fixing of necessary butt
hinges, stays and screws
and applying
Fixing a priming
with 15x3 mm lugscoat
10ofcm. long
approved
embeddedsteelin primer
10.14.1 cement concrete block 15x10x10 cm
of Cement
Concrete 1:3:6 (1 Cement : 3 sand : 6
graded stone
335.62 QTY BF MB 1356 ,PG 09
335.62 kg Total 104.58 35099 0

Brick work with fly ash lime bricks


(FALG Bricks) conforming
to IS:12894-2002, in super structure
18 6.7 above plinth level up to
floor II level in

6.7.3 having 50 kg / cm2 average


compressive strength

6.7.3.2 Cement
sand)
mortar 1:6 (1 cement : 6

6.63 QTY BF MB-1358 , PG- 20


6.63 CUM Total 3990.00 26454 0

Page 52 of 97
AMOUNT
S. Qty Unit SOR Description of Items Rate
No No. Since
Up to Date previous Bill
Repairs to plaster of thickness 12mm
to 20mm in patches of area
2.5 sq. metres and under including
cutting the patch in proper
shape, raking out joints and preparing
and plastering the surface
of the walls complete including
19 14.1 disposal of rubbish to the
dumping ground within 50metres
lead :

14.1.1 With
sand)
cement mortar 1:4 (1 cement : 4

63.45 QTY BF MB 1356 , P - 09


63.45 SQM Total 162.00 10279 0

Dismantling doors, windows and


clerestory windows (steel or
wood) shutter including chowkhats,
architrave, holdfasts etc.
complete and stacking within 50
20 15.14 metres lead :

15.14.1 Of area 3 sq. metres and below


9.00 QTY BF MB 1356 , P - 08
9.00 Nos Total 76.50 689 0

15.14.2 Of area beyond 3 sq. metres


7.00 QTY BF MB 1356 , P - 08
7.00 Nos Total 105.30 737 0

Demolishing brick work manually/ by


mechanical means
including stacking of serviceable
15.6 material and disposal of
unserviceable material within 50
metres lead as per direction
of Engineer-in-charge.

15.6.3 In cement mortar


2.42 QTY BF MB 1356 , P - 13
2.42 Cum Total 438.30 1061 0

Providing and fixing ISI marked flush


door shutters
conforming to IS: 2202 (Part I)
9.18 decorative type, core of block
board construction with frame of 1st
class hard wood and well
matched teak 3 ply veneering with
vertical grains or cross
bands and face veneers on both faces
of shutters
30 mm thickofincluding
such as ISI marked
9.18.2 Stainless Steel butt
hinges with necessary screws.
20.07 QTY BF MB 1356 , P - 13
20.07 Sqm Total 3294.00 66111 0

Finishing walls with Deluxe Multi


surface paint system for
interiors and exteriors using Primer as
13.57 per manufacturers
specifications :

Page 53 of 97
AMOUNT
S. Qty Unit SOR Description of Items Rate
No No. Since
Up to Date previous Bill

Two or more coats applied on walls @


13.57.1 1.25 ltr/10
sqm. over and including one coat of FR= 72.90
Special primer
applied @ 0.75 ltr / 10 sqm.

2495.88 QTY BF MB 1356 , P - 13


2495.88 Sqm Total 60.00 149753 24959
PR

Providing and installation of acoustical


wall panelling wood
finish Slats made out of HDF board ,
Melamine / veneer
laminated finish, perforated wooden
grooved slats (2mm
9.148 grooves @ 8mm centers) / (2mm FR= 72.90
Slats @16mm pitch) / (2mm
grooves @ 32mm centers) / (2mm
grooves @ 64mm centers),
backlined with black acoustical fleece,
tongue-groove edge for
131.94 aQTY
seamless look,
BF MBsize
1356 FR
, Pgrade,
- x of lineal
dimension 128mm
131.94 Sqm Total 2500.00 329850 329850
PR
PART B - COMPUTER BLOCK

Earth work in excavation by


mechanical means (Hydraulic
excavator )/ manual means over
areas (exceeding 30cm in depth. 1.5m
in width as well as 10 sqm on plan)
including dressing of sides and
ramming of bottom disposal of
excavated earth, lead upto 50m and
1 2.6 lift upto 1.5m, disposed earth to be
levelled and neatly dressed. (No extra
lift is payable if work is done by
mechanical means)

All kinds of soil


27.84 QTY BF TMB ,P-05L
27.84 Cum Total 116.10 3232 0
Earth work in excavation/ by
mechanical means
(HydraulicExcavator)/ manual means
over areas (exceeding 30 cm in depth,
2 2.7 1.5m in width as well as 10 sqm on
plan) including dressing of sides and
ramming of bottom disposal of
excavated earth, lead up to 50 m and
lift up to 1.5 m, disposed earth to
2.7.3 be
Hard levelled and neatly
rock (blasting dressed.
prohibited)
142.62 QTY BF TMB ,P-05R
142.62 Cum Total 441.90 63024 0

4.1 Providing and laying in position


3 4.1 cement concrete of specified grade
excluding the cost of centering and
shuttering - All work up to plinth level :

4.1.2 4.1.2 With 40mm nominal size


graded stone aggregate.
4.1.2.1 4.1.2.1 M 15 - Grade concrete
21.92 QTY BF TMB ,P-05R
21.92 Cum Total 3962.70 86862 0
Page 54 of 97
AMOUNT
S. Qty Unit SOR Description of Items Rate
No No. Since
Up to Date previous Bill

Centering and shuttering including


4 4.3 strutting, propping etc. and removal of
form work for :

4.3.1 Foundations, footings, bases for


columns.
45.41 QTY BF TMB ,P-06L
45.41 Sqm Total 152.10 6907 0

Reinforcement for R.C.C. work


including straightening, cutting,
bending, placing in position and
binding up to floor two level
including cost of binding wire, all
wastage and lappage /overlap
5 5.16 (overlaps shall be provided as per
requirement of IS 13920 for ductile
detailing, IS 456 Design & SP
34 Reinforcement detailing) etc
complete ( Note :- Spacer bar
(chairs) shall be paid seperately as
shown in the drawing and as per
direction of engineer in charge

Thermo-Mechanically Treated bars.


5.16 (TMT) Fe 500 D conforming to IS
1786
25387.76 QTY BF TMB ,P-06L
25387.76 Kg Total 60.00 1523266 0

Providing and laying / erecting design


mix in situ or precast or combination
of in siti and precast
cement concrete of specified grade as
per approved design of
R.C.C work prepared by only weight
batching and machine
mixing at site/yard/RMC plant
includind transportation to any
lead by any means such as chute ,
6 5.44 conveyor belt ,truck
,RMCtransit mixer etc, placed /
erected by any mechanical
meanssuch as bucket hoist ,
pump,crane , hydraetc. Including
cost of all materials such as
admixtures/plastizers to achieve the
designed retarded/accelerate setting
time and suitable
workability ,centering ,shuttering ,strut
ting,compacting and

All work up to plinth level ( footing ,


raft,pedestal R.C.C drain,
5.44.1 R.C.C retaining wall , R.C.C Pier ,
plinth beam , grade slab
,curtain wall, poles R.C.C barrier etc.)

5.44.1.1 M-20 Grade Concrete


71.40 QTY BF TMB ,P-06R
71.40 Cum Total 5000.00 357000 0

Page 55 of 97
AMOUNT
S. Qty Unit SOR Description of Items Rate
No No. Since
Up to Date previous Bill
Filling available excavated earth
(excluding hard
rock/Ordinary rock) in trenches, plinth,
sides of foundations
etc. in layers not exceeding 20cm in
7 2.25 depth, consolidating
each deposited layer by ramming and
watering, lead up to
50 m and lift upto 1.5 m.

27.84 QTY BF TMB ,P-07L


27.84 Cum Total 64.80 1804 0

Supplying and filling in plinth with soil


(other than B.C.
soil) having MDD not less then 1.85
t/m³ under floors
including watering ramming
compacting (minimum of
7 2.28.2 compacting 95% of MDD) in layers
not exceeding 15cm in
depth and dressing
complete.

201.74 QTY BF TMB ,P-07L


201.74 Cum Total 225.00 45392 0

Supplying and filling in plinth with hard


muram/hard copra
having MDD not less then 2.0 t/m³
under floors including
watering ramming compacting
(minimum of compacting
8 2.28.1 95% of MDD) in layers not exceeding
20cm in thick and
dressing complete. (Note-maximum
thick thickness of this
layer to be provided shall be 30cm.)

41.29 QTY BF MB-1358 , PG- 12R


41.29 Cum Total 270.00 11148 0

Preconstruction antitermite treatment


to the building under
construction by providing
122.40
Stage 1: Treating the bottom and the
sides (upto 30cm hight
9 2.32 of the excavated trench @ 5 litter per
sqm of the surface
area.
2.32
Stage 2: After masonry/RCC work, the
backfill in the
immdiate contact with the foundation
structure treatment @
252.72 QTY BF MB-1358 , PG- 13L
252.72 SQM Total 122.40 30933 0

Supplying and filling in plinth with


crusher stone dust /
coarse sand under floors including,
watering, ramming
10 2.27 consolidating in layers not exceeding
20cm in depth and
dressing complete

Page 56 of 97
AMOUNT
S. Qty Unit SOR Description of Items Rate
No No. Since
Up to Date previous Bill

20.65 QTY BF MB-1358 , PG- 13R


20.65 CUM Total 604.80 12489 0

Providing and laying in position


cement concrete of specified
grade excluding the cost of centering
11 4.1 and shuttering - All work up
to plinth level

With 20mm nominal size graded stone


4.1.1
aggregate.
4.1.1.3 M 15 – Grade concrete
20.65 QTY BF MB-1358 , PG- 14L
20.65 CUM Total 4023.90 83094 0

R.C.C With Shuttering : Providind and


laying / erecting design
mix in situ or precast or combination
of in siti and precast
12 5.44 cement concrete of specified grade as
per approved design of
R.C.C work prepared by only weight
batching and machine
mixing at site/yard/RMC plant
includind transportation to any
All work up to floor two level walls
5.44.2 ( any thickness ) coloumn
,piller pier , post and struts etc
5.44.2.1 M - 20
35.74 QTY BF MB-1358 , PG- 14R
35.74 CUM Total 5270.00 188350 0

R.C.C With Shuttering : Providind and


laying / erecting design
mix in situ or precast or combination
of in siti and precast
13 5.44 cement concrete of specified grade as
per approved design of
R.C.C work prepared by only weight
batching and machine
Suspended floor roof having
mixing at site/yard/RMC plantslope of
any degree
includind , landing to any
transportation
,balconies ,access platform, floor
5.44.3 beam , girders, bressumers and
cantilevers, shelves,
chujjas,lintels,bands , staircases and
5.44.3.1 spiral
M - 20
staircases, coffer slab.
105.86 QTY BF MB-1358 , PG- 15L
105.86 CUM Total 5390.00 570585 0

Providing and laying cement concrete


in retaining walls, return
walls, walls (any thickness) including
attached pilasters, columns,
14 4.2 pillars, posts, struts, buttresses, string
or lacing courses, parapets,
coping, bed blocks, anchor blocks,
plain window sills, fillets etc.
up to floor two level, excluding the
cost of centering, shuttering
4.2.1 With 20mm nominal size graded stone
aggregate
4.2.1.3 M 15 – Grade concrete
6.76 QTY BF MB-1358 , PG- 16L
6.76 CUM Total 4242.60 28663 0

Brick work with fly ash lime bricks


(FALG Bricks) conforming
to IS:12894-2002, in super structure
15 6.7 above plinth level up to
floor II level in

Page 57 of 97
AMOUNT
S. Qty Unit SOR Description of Items Rate
No No. Since
Up to Date previous Bill

6.7.3 having 50 kg / cm2 average


compressive strength

6.7.3.2 Cement
sand)
mortar 1:6 (1 cement : 6

100.07 QTY BF MB-1358 , PG- 20


100.07 CUM Total 3990.00 399279 0

Providing and fixing M.S. grills of


required pattern in frames
of windows etc. with M.S. flats, square
or round bars etc.
including priming coat with approved
16 9.43 steel primer all
complete.

Fixed to openings /wooden frames


with rawl plugs
9.43.2 screws etc

1179.64 QTY BF MB 1358 ,PG 21


1179.64 kg Total 90.00 106168 0

Providing and fixing M.S. grills of


required pattern in frames
of windows etc. with M.S. flats, square
or round bars etc.
including priming coat with approved
17 10.14 steel primer all
complete.

Fixed to openings /wooden frames


with rawl plugs
10.14.1 screws etc

321.51 QTY BF MB 1358 ,PG 21


321.51 kg Total 104.58 33624 0

Half brick masonry with fly ash lime


Gypsum bricks (FALG
bricks) conforming to IS : 12894, in
super structure above
plinth and upto floor two level with 2
17 6.15 nos 10mm dia. M.S Bar at
every third course of brick masonary
which shall be paid
separately.

having 50 kg/cm2
6.15.3 average compressive strength
Cement mortar 1 : 4 (1 cement : 4
6.15.3.2 sand)
133.05 QTY BF MB 1358 ,PG 27
133.05 Sqm Total 459.00 61070 0

17 13.8 6 mm cement plaster of mix :


13.8.1 1:3 (1 cement : 3 sand)
570.43 QTY BF MB 1358 ,PG 31
570.43 Sqm Total 86.40 49285 0

Page 58 of 97
AMOUNT
S. Qty Unit SOR Description of Items Rate
No No. Since
Up to Date previous Bill

Providing and fixing chicken mesh as


per ISI specification and in the
17 13.3 required width with 50mm long
Bombay nails on vertical and
horizontal junctions of RCC and brick
wall including scaffolding and all lead
and lift etc. complete before plastering
upt 10 meter height
123.17 QTY BF MB 1358 ,PG 32
123.17 Sqm Total 86.40 10642 0

17 13.1 12 mm cement plaster of mix :


13.1.2 1:3 (1 cement : 3 sand)
269.76 QTY BF MB 1358 ,PG 33
273.75 QTY BF MB 1358 ,PG 35
543.51 Sqm Total 99.00 53807 27101

17 13.215 mm cement plaster on the rough


side of single or half brick wall of mix :
13.2.2 1:6 (1 cement : 6 sand)
231.08 QTY BF MB 1358 ,PG 34
231.08 Sqm Total 115.20 26620 0

Providing and fixing 18mm thick gang


saw cut mirror
polished (premoulded and
prepolished) machine cut for
kitchen platforms, vanity counters,
window sills , facias and
similar locations of required size of
18 11.22 approved shade, colour FR 1901.7
and texture laid over 20mm thick base
cement mortar 1:4
(1 cement : 4 sand) with joints treated
with white cement,
mixed with matching pigment, epoxy
touch ups, including
rubbing, curing moulding and
polishing to edge to give
Granite coarse grained light black /
11.22.2 dark red/off
white with crystal of other colours and
various
pattern
9.86 QTY BF MB 1358 ,PG 35 PR
9.86 Sqm Total , FR = 1901.70 1800.00 17748 17748

Providing and applying white cement


based putty of average
thickness 1 mm, of approved brand
and manufacturer, Like
birla white /JK white or equivalent,
19 13.41 over the plastered wall
surface to prepare the surface even
and smooth i/c all cost of
material, labour and scaffold etc in all
position complete.
751.48 QTY BF MB - 1356 ,PG - 10
751.48 sqm Total 66.60 50049 50049

20 13.3 20 mm cement plaster of mix :


13.3.2 1:6 (1 cement : 6 sand)
413.52 QTY BF MB - 1356 ,PG - 10 PR
413.52 sqm Total , FR =140.40/- 120.00 49622 49622

TOTAL CIVIL AMOUNT (A) 5846499 623307

Page 59 of 97
AMOUNT
S. Qty Unit SOR Description of Items Rate
No No. Since
Up to Date previous Bill

TOTAL ELECTRICAL AMOUNT (B) 650366 280776.00

TOTAL (A+B) 6496865 904083

Less 23.86% Below SOR rate as per 1550152 215714


agreement

TOTAL 4946713 688369

Add GST 12% 593606 82604

Net Payble Amount 5540319 770973

Page 60 of 97
AMOUNT
Quantity
Since
(executed Item of work or suppliers
previous Bill
Unit forSupplied up (grouped under sub head Rate Rem
Up to Date (total for
to date as per and works of Estimate) ark
each sub
measurement
head)
1 2 3 4 5 6 7
6185190.00 1238477.00
B.F.

Add GST 12% 742223.00 148617.00

6927413.00 1387094.00
GRAND TOTAL
Total value of work done or supplied made to date 6927413.00 1387094.00
(A)
Deduct value of work or supplies shown on previous bill (-)
5540319

Net value of work supplies bill Figure in words 1387094.00 1387094.00


rupees................................................................(F)

II - CERTIFICATE AND SIGNATURES

The measurement were made by Avinash Pahade (F.E)


and or Recorded at Measurement Book No- 1358, PAGE( 37 - 44 ) , MB 1357 PAGE ( 29-
31),MB 1356 PAGE ( 18-22)
and Bill recorded at MB(1359 ) Page No. ( 41 to 51)
No Advance payment has been made previously without detailed measurements.

Signature of Officer Project Engineer


preparing the bill P.W.D. P.I.U. Bhopal

Thumb Impression or
Signature of Contractor
Date.................2021

Signature of Officer
authorized Payment ………………………………………………………….
………………………………………………………
Date.................2021 ……………………………………………………

Page 61
III - MEMORANDUM OF PAYMENT
1 Total value of work done as per account column 5 Rs
entries (A) P
2 Deduct amount with held Rs P

(a) From previous bill as per last Running


account
A Figure or
Work abstract
Rs P Bill.............................................................

(b) From this bill.........................................

3 Balance i.e. up to date payment item 1-2


(k)
4 Total amount of payment all ready made
as per entry (K) of last Running Account
Bill No............
of dated.............................2018
5 Payment now to be made as detailed
below
(a) By recovery of amount creditable to
this works
Total 2 (a) + (c) G
(b) By recovery of amount creditable in Rs Rs
other work D head of account

(c) By Cheque
Total (a) + (b) + (c) H

Pay Rs..........................................................
Dated............................................................ Initial of Distributing Officer

Received
Rs ......................................................................................................................................
...
as per above memorandum on account of this work in full setalment of all demand.
(Amount in Vauchure)

Date.................
...... Full Signature of Contactor

Paid by me.................................Vide Cheque No .......................................Date....................2020

Date...................2020 Initials of the person actually


making the payment
IV - Remarks Vide Note 6

Page 62
FIFTH RUNNING ACCOUNT BILL

CONSTRUCTION OF COMPUTER CENTRE BLOCK


AND RENOVATION WORK OF AUDITORIUM AT GOVERNMENT M.V.M COLLEGE BHOPAL
20/PIU/2019-20 Dt.10/02/2020
AMOUNT
S. SOR Description of Items Qty Unit Rate Since
No No. Up to Date previous
Bill previous
Bill
PART A - RENOVATION

Dismantling cement asbestos or other


1 15.38 hard board ceiling or
partition walls including stacking of
serviceable materials and
disposal of unserviceable materials
within 50 metres lead.
QTY BF TMB ,P-04R 1116.19
Total 1116.19 Sqm 11.70 13059 13059 0

Removal of old Tarfelt i/c disposal as


2 15.25 directed by Engineer in
charge

QTY BF TMB ,P-04R 963.78


QTY BF 1356 ,PG-5R
Total 963.78 Sqm 7.83 7546 7546 0

Removing mortar from and cleaning


3 15.10 stones and concrete
articles

15.10.2 In cement mortar


QTY BF TMB ,P-04R 17.41
QTY BF 1356 ,PG-5R
Total 17.41 CUM 145.80 2538 2538 0

Grading roof for water proofing


4 22.14 treatment with
Cement concrete 1:2:4 (1 cement: 2
sand : 4 graded stone
22.14.1 aggregate 20 mm nominal size)

QTY BF TMB ,P-04R 57.83


Total 57.83 CUM 4112.10 237790 237790 0

Extra for providing and mixing water


proofing material as per IS
standard in cement concrete work
5 4.12 quantity as prescribed by the
manufacturer

QTY BF TMB ,P-04R 241.80


QTY BF 1356 ,PG-6L 116.75
Per
Total 358.55 50kg 39.60 14198 14198 0
bag

Page 63 of 97
AMOUNT
S. SOR Description of Items Qty Unit Rate Since
No No. Up to Date previous
Bill previous
Bill

Providing and laying water proofing


treatment on roofs of slabs
by applying cement slurry mixed with
water proofing cement
compound consisting of applying :
a) after surface preparation, first layer
of slurry of cement @
6 22.6 0.488 kg/sqm mixed with water
proofing cement compound @
0.253 kg/sqm.
22.6
b) laying second layer of Fibre glass
cloth when the first layer is
still green. Overlaps of joints of fibre
cloth should not be less
than 10 cm.
c) third layer of 1.5 mm thickness
consisting of slurry of cement
@ 1.289 kg/sqm mixed with water
proofing cement compound @
0.670 kg/sqm and sand @ 1.289
kg/sqm. This will be allowed to
air cure for 4 hours followed by water
curing for 48 hours. The PR 80%
entire treatment will be taken upto
30cm on parapet wall and
tucked into groove in parapet all
around.

QTY BF TMB ,P-05L 963.78


QTY BF 1356 ,PG-6R
Total FR 304.20 963.78 CUM 243.74 234908 234908 0

Dismantling wood work in frames,


trusses, purlins and rafters
upto 10 metres span and 5 metres
7 15.16 height including stacking the
material within 50 metres lead:

Page 64 of 97
AMOUNT
S. SOR Description of Items Qty Unit Rate Since
No No. Up to Date previous
Bill previous
Bill
Of sectional area below 40 square
15.16.2 centimetres.
QTY BF TMB ,P-05L 2093.54
Total 2093.54 rm 3.69 7725 7725 0

Dismantling wooden boardings in


lining of walls and
8 15.36 partitions, excluding supporting
members but including
stacking within 50 metres lead :
15.36.3 Thickness above 25 mm upto 40 mm
QTY BF TMB ,P-05L 149.44
Total 149.44 sqm 19.80 2959 2959 0

Providing and fixing false ceiling at all


height including
providing and fixing of frame work
9 12.49 made of special
sections, power pressed from M.S.
sheets and galvanized
with zinc coating of 120 gms/sqm
(both side inclusive) as
12.5 mm thick tapered edge gypsum
12.49.3 moisture PR 0.80 0.8
resistant board

FR = 828.00
QTY BF TMB ,PG- 17 112.57
QTY BF MB 1356 ,PG- 14 35.45
Total 148.02 sqm 700.00 103614 63042 40572

Providing and fixing of Mineral Fibre


Acoustical
Suspended Ceiling System with
10 12.62 16mm thick tegular edge PR
tiles of size 595x595mm as approved
by Engineer-incharge,
in true horizontal level suspended on
inter locking
FR = 1658.70
QTY BF MB ,PG 278.66
QTY BF MB 1356 ,PG 14 40.92
Total 319.58 sqm 1250.00 399475 278660 120815

Removing white or colour wash by


scrapping and sand papering
and preparing the surface smooth
11 14.27. including necessary repairs to PR
scratches etc. complete

QTY BF MB - 1356 ,PG - 08 1369.45


QTY BF MB - 1356 ,PG - 04 529.82
Total 1899.27 sqm 4.59 8718 6286 2432

Page 65 of 97
AMOUNT
S. SOR Description of Items Qty Unit Rate Since
No No. Up to Date previous
Bill previous
Bill
Applying one coat of water thinnable
cement primer of
12 13.46 approved brand and manufacture on PR
wall surface :

13.46.1 Water thinnable cement primer.


QTY BF MB - 1356 ,PG - 10 1369.45
QTY BF MB - 1356 ,PG - 13 951.28
QTY BF MB - 1356 ,PG - 06 529.82
Total 2850.55 sqm 21.60 61572 29580 31992

Providing and applying white cement


based putty of average
thickness 1 mm, of approved brand
and manufacturer, Like
birla white /JK white or equivalent,
13 13.41 over the plastered wall
surface to prepare the surface even
and smooth i/c all cost of
material, labour and scaffold etc in all
position complete.
QTY BF MB - 1356 ,PG - 10 733.62
QTY BF MB - 1356 ,PG - 15 951.28
QTY BF MB - 1356 ,PG - 15 148.02
Total 1832.92 sqm 66.60 122072 91205 30867

Providing and applying white cement


based putty of average
thickness 1 mm, of approved brand
and manufacturer, Like
birla white /JK white or equivalent,
14 2.30 over the plastered wall PR
surface to prepare the surface even
and smooth i/c all cost of
material, labour and scaffold etc in all
position complete.
Treatment of existing masonry using
chemical
2.30.4 emulsion @ one litre per hole at 300
mm
interval including drilling 10mm dia
and 200mm
With Chlorpyriphos/ Lindane E.C.
2.30.4.1 20%
with 1% concentration

QTY BF MB ,PG 256.52


Total 256.52 Rm 45.00 11543 11543 0

Providing and applying white cement


based putty of average
thickness 1 mm, of approved brand
and manufacturer, Like
birla white /JK white or equivalent,
15 2.30 over the plastered wall PR
surface to prepare the surface even
and smooth i/c all cost of
material, labour and scaffold etc in all
position complete.

Page 66 of 97
AMOUNT
S. SOR Description of Items Qty Unit Rate Since
No No. Up to Date previous
Bill previous
Bill
Along external wall where the apron is
not
2.30.1 provided using chemical emulsion @
7.5 litres /
sqm of the vertical surface of the
substructure to
With Chlorpyriphos/ Lindane E.C.
2.30.1.1 20%
with 1% concentration.

QTY BF MB ,PG 70.00


Total 70.00 Rm 32.40 2268 2268 0

Providing and fixing M.S. grills of


required pattern in frames
of windows etc. with M.S. flats, square
or round bars etc.
including priming coat with approved
16 9.43 steel primer all PR
complete.

Fixed to openings /wooden frames


with rawl plugs
9.43.2 screws etc

QTY BF TMB ,PG 397.15


QTY BF MB 1356 ,PG 15 6.80
Total 403.95 kg 90.00 36356 35744 612

Providing and fixing M.S. Tubular


frames for doors, windows,
ventilators and cupboard with
rectangular/ L-Type sections,
made of 1.60 mm thick M.S. Sheet,
17 10.14 joints mitred, welded and PR
grinded finish, with profiles of required
size, as per drawing,
including fixing of necessary butt
hinges, stays and screws
and applying
Fixing a priming
withsteel
15x3 mm lugscoat
10ofcm. long
approved
embedded in primer
10.14.1 cement concrete block 15x10x10 cm S
of Cement
Concrete 1:3:6 (1 Cement : 3 sand : 6
graded stone
QTY BF MB 1356 ,PG 09 299.41
QTY BF MB 1356 ,PG 15 36.21
Total 335.62 kg 104.58 35099 31312 3787

Brick work with fly ash lime bricks


(FALG Bricks) conforming
to IS:12894-2002, in super structure
18 6.7 above plinth level up to
floor II level in

Page 67 of 97
AMOUNT
S. SOR Description of Items Qty Unit Rate Since
No No. Up to Date previous
Bill previous
Bill

6.7.3 having 50 kg / cm2 average


compressive strength

6.7.3.2 Cement
sand)
mortar 1:6 (1 cement : 6

QTY BF MB-1358 , PG- 20 6.63


QTY BF MB-1358 , PG- 28 48.93
Total 55.56 CUM 3990.00 221684 26454 195230

Repairs to plaster of thickness 12mm


to 20mm in patches of area
2.5 sq. metres and under including
cutting the patch in proper
shape, raking out joints and preparing
and plastering the surface
of the walls complete including
19 14.1 disposal of rubbish to the
dumping ground within 50metres
lead :

14.1.1 With
sand)
cement mortar 1:4 (1 cement : 4

QTY BF MB 1356 , P - 09 63.45


Total 63.45 SQM 162.00 10279 10279 0

Dismantling doors, windows and


clerestory windows (steel or
wood) shutter including chowkhats,
architrave, holdfasts etc.
complete and stacking within 50
20 15.14 metres lead :

15.14.1 Of area 3 sq. metres and below


QTY BF MB 1356 , P - 08 9.00
Total 9.00 Nos 76.50 689 689 0

15.14.2 Of area beyond 3 sq. metres


QTY BF MB 1356 , P - 08 7.00
Total 7.00 Nos 105.30 737 737 0

Page 68 of 97
AMOUNT
S. SOR Description of Items Qty Unit Rate Since
No No. Up to Date previous
Bill previous
Bill
Providing and fixing ISI marked flush
door shutters
conforming to IS: 2202 (Part I)
decorative type, core of block
board construction with frame of 1st
class hard wood and well
matched teak 3 ply veneering with
vertical grains or cross
21 9.18 bands and face veneers on both faces
of shutters of such as
duro board, century or equivelant
make

30 mm thick including ISI marked


9.18.2 Stainless Steel butt
hinges with necessary screws.

QTY BF MB 1356 , P - 16 20.07


Total 20.07 SQM 3294.00 66111 0 66111

Demolishing brick work manually/ by


mechanical means
including stacking of serviceable
material and disposal of
22 15.6 unserviceable material within 50
metres lead as per direction
of Engineer-in-charge

15.6.3 In cement mortar


QTY BF MB 1356 , P - 13 2.42
Total 2.42 CUM 438.30 1061 0 1061

PART B - COMPUTER BLOCK

Earth work in excavation by


mechanical means (Hydraulic
excavator )/ manual means over
areas (exceeding 30cm in depth. 1.5m
in width as well as 10 sqm on plan)
including dressing of sides and
1 2.6 ramming of bottom disposal of
excavated earth, lead upto 50m and
lift upto 1.5m, disposed earth to be
levelled and neatly dressed. (No extra
lift is payable if work is done by
mechanical means)

All kinds of soil


QTY BF TMB ,P-05L 27.84
Total 27.84 Cum 116.10 3232 3232 0

Page 69 of 97
AMOUNT
S. SOR Description of Items Qty Unit Rate Since
No No. Up to Date previous
Bill previous
Bill
Earth work in excavation/ by
mechanical means
(HydraulicExcavator)/ manual means
over areas (exceeding 30 cm in depth,
2 2.7 1.5m in width as well as 10 sqm on
plan) including dressing of sides and
ramming of bottom disposal of
excavated earth, lead up to 50 m and
lift up to 1.5 m, disposed earth to
2.7.3 be
Hard levelled and neatly
rock (blasting dressed.
prohibited)
QTY BF TMB ,P-05R 142.62
Total 142.62 Cum 441.90 63024 63024 0

4.1 Providing and laying in position


3 4.1 cement concrete of specified grade
excluding the cost of centering and
shuttering - All work up to plinth level :

4.1.2 4.1.2 With 40mm nominal size


graded stone aggregate.
4.1.2.1 4.1.2.1 M 15 - Grade concrete
QTY BF TMB ,P-05R 21.92
Total 21.92 Cum 3962.70 86862 86862 0

Centering and shuttering including


4 4.3 strutting, propping etc. and removal of
form work for :

4.3.1 Foundations, footings, bases for


columns.
QTY BF TMB ,P-06L 45.41
Total 45.41 Sqm 152.10 6907 6907 0

Reinforcement for R.C.C. work


including straightening, cutting,
bending, placing in position and
binding up to floor two level
including cost of binding wire, all
wastage and lappage /overlap
5 5.16 (overlaps shall be provided as per
requirement of IS 13920 for ductile
detailing, IS 456 Design & SP
34 Reinforcement detailing) etc
complete ( Note :- Spacer bar
(chairs) shall be paid seperately as
shown in the drawing and as per
direction of engineer in charge

Thermo-Mechanically Treated bars.


5.16 (TMT) Fe 500 D conforming to IS
1786

Page 70 of 97
AMOUNT
S. SOR Description of Items Qty Unit Rate Since
No No. Up to Date previous
Bill previous
Bill
QTY BF TMB ,P-06L 24281.43
QTY BF 1357 ,P-26 430.18
QTY BF 1357 ,P-28 537.19
QTY BF 1357 ,P-29 206.62
QTY BF 1358 PG 25 170.94
Total 25626.36 Kg 60.00 1537582 1456886 80696

Providing and laying / erecting design


mix in situ or precast or combination
of in siti and precast
cement concrete of specified grade as
per approved design of
R.C.C work prepared by only weight
batching and machine
mixing at site/yard/RMC plant
6 5.44 includind transportation to any
lead by any means such as chute ,
conveyor belt ,truck
,RMCtransit mixer etc, placed /
erected by any mechanical
meanssuch as bucket hoist ,
pump,crane , hydraetc. Including
cost of all materials such as
admixtures/plastizers to achieve the
designed retarded/accelerate setting
time and suitable
All work up to plinth level ( footing ,
raft,pedestal R.C.C drain,
5.44.1 R.C.C retaining wall , R.C.C Pier ,
plinth beam , grade slab
,curtain wall, poles R.C.C barrier etc.)

5.44.1.1 M-20 Grade Concrete


QTY BF TMB ,P-06R 71.40
QTY BF MB 1358, P
QTY BF MB 1358, P
Total 71.40 Cum 5000.00 357000 357000 0

Page 71 of 97
AMOUNT
S. SOR Description of Items Qty Unit Rate Since
No No. Up to Date previous
Bill previous
Bill
Filling available excavated earth
(excluding hard
rock/Ordinary rock) in trenches, plinth,
sides of foundations
etc. in layers not exceeding 20cm in
7 2.25 depth, consolidating
each deposited layer by ramming and
watering, lead up to
50 m and lift upto 1.5 m.

QTY BF TMB ,P-07L 27.84


Total 27.84 Cum 64.80 1804 1804 0

Supplying and filling in plinth with soil


(other than B.C.
soil) having MDD not less then 1.85
t/m³ under floors
including watering ramming
compacting (minimum of
7 2.28.2 compacting 95% of MDD) in layers
not exceeding 15cm in
depth and dressing
complete.

QTY BF TMB ,P-07L 201.74


Total 201.74 Cum 225.00 45392 45392 0

Supplying and filling in plinth with hard


muram/hard copra
having MDD not less then 2.0 t/m³
under floors including
watering ramming compacting
(minimum of compacting
8 2.28.1 95% of MDD) in layers not exceeding
20cm in thick and
dressing complete. (Note-maximum
thick thickness of this
layer to be provided shall be 30cm.)

QTY BF MB-1358 , PG- 12R 41.29


Total 41.29 Cum 270.00 11148 11148 0

Page 72 of 97
AMOUNT
S. SOR Description of Items Qty Unit Rate Since
No No. Up to Date previous
Bill previous
Bill
Preconstruction antitermite treatment
to the building under
construction by providing
122.40
Stage 1: Treating the bottom and the
sides (upto 30cm hight
9 2.32 of the excavated trench @ 5 litter per
sqm of the surface
area.
2.32
Stage 2: After masonry/RCC work, the
backfill in the
immdiate contact with the foundation
structure treatment @
QTY BF MB-1358 , PG- 13L 252.72
Total 252.72 SQM 122.40 30933 30933 0

Supplying and filling in plinth with


crusher stone dust /
coarse sand under floors including,
watering, ramming
10 2.27 consolidating in layers not exceeding
20cm in depth and
dressing complete

QTY BF MB-1358 , PG- 13R 20.65


Total 20.65 CUM 604.80 12489 12489 0

Providing and laying in position


cement concrete of specified
grade excluding the cost of centering
11 4.1 and shuttering - All work up
to plinth level

4.1.1 With 20mm nominal size graded stone


aggregate.
4.1.1.3 M 15 – Grade concrete
QTY BF MB-1358 , PG- 14L 20.65
Total 20.65 CUM 4023.90 83094 83094 0

R.C.C With Shuttering : Providind and


laying / erecting design
mix in situ or precast or combination
of in siti and precast
12 5.44 cement concrete of specified grade as
per approved design of
R.C.C work prepared by only weight
batching and machine
mixing at site/yard/RMC plant
includind transportation to any
All work up to floor two level walls
5.44.2 ( any thickness ) coloumn
,piller pier , post and struts etc
5.44.2.1 M - 20
QTY BF MB-1358 , PG- 14R 31.96
QTY BF MB-1358 , PG- 27 3.78

Page 73 of 97
AMOUNT
S. SOR Description of Items Qty Unit Rate Since
No No. Up to Date previous
Bill previous
Bill
Total 35.74 CUM 5270.00 188350 168429 19921

R.C.C With Shuttering : Providind and


laying / erecting design
mix in situ or precast or combination
of in siti and precast
13 5.44 cement concrete of specified grade as
per approved design of
R.C.C work prepared by only weight
batching and machine
Suspended floor roof having
mixing at site/yard/RMC plantslope of
any degree
includind , landing to any
transportation
,balconies ,access platform, floor
5.44.3 beam , girders, bressumers and
cantilevers, shelves,
chujjas,lintels,bands , staircases and
5.44.3.1 spiral
M - 20
staircases, coffer slab.
QTY BF MB-1358 , PG- 15L 99.67
QTY BF MB-1358 , PG- 26 6.19

Total 105.86 CUM 5390.00 570585 537221 33364

Providing and laying cement concrete


in retaining walls, return
walls, walls (any thickness) including
attached pilasters, columns,
14 4.2 pillars, posts, struts, buttresses, string
or lacing courses, parapets,
coping, bed blocks, anchor blocks,
plain window sills, fillets etc.
up to floor two level, excluding the
cost of centering, shuttering
4.2.1 With 20mm nominal size graded stone
aggregate
4.2.1.3 M 15 – Grade concrete
QTY BF MB-1358 , PG- 16L 2.55
QTY BF MB-1358 , PG- 30 4.21
QTY BF MB-1358 , PG- 25 2.89
Total 9.65 CUM 4242.60 40924 10802 30122

Brick work with fly ash lime bricks


(FALG Bricks) conforming
to IS:12894-2002, in super structure
15 6.7 above plinth level up to
floor II level in

6.7.3 having 50 kg / cm2 average


compressive strength

6.7.3.2 Cement
sand)
mortar 1:6 (1 cement : 6

QTY BF MB-1358 , PG- 20 51.14


Total 51.14 CUM 3990.00 204049 204049 0

Page 74 of 97
AMOUNT
S. SOR Description of Items Qty Unit Rate Since
No No. Up to Date previous
Bill previous
Bill
Providing and fixing M.S. grills of
required pattern in frames
of windows etc. with M.S. flats, square
or round bars etc.
including priming coat with approved
16 9.43 steel primer all PR
complete.

Fixed to openings /wooden frames


with rawl plugs
9.43.2 screws etc

QTY BF MB 1358 ,PG 21 437.41


QTY BF MB 1358 ,PG 32 742.23
Total 1179.64 kg 90.00 106168 39367 66801

Providing and fixing M.S. grills of


required pattern in frames
of windows etc. with M.S. flats, square
or round bars etc.
including priming coat with approved
17 10.14 steel primer all PR
complete.

Fixed to openings /wooden frames


with rawl plugs
10.14.1 screws etc

QTY BF MB 1358 ,PG 21 219.86


QTY BF MB 1358 ,PG 33 101.65
Total 321.51 kg 104.58 33624 22993 10631

Half brick masonry with fly ash lime


Gypsum bricks (FALG
bricks) conforming to IS : 12894, in
super structure above
plinth and upto floor two level with 2
18 6.15 nos 10mm dia. M.S Bar at
every third course of brick masonary
which shall be paid
separately.

having 50 kg/cm2 average


6.15.3 compressive strength
Cement mortar 1 : 4 (1 cement : 4
6.15.3.2 sand)
QTY BF MB 1358 PG 27 133.05
Total 133.05 sqm 459.00 61070 0 61070

19 13.8 6 mm cement plaster of mix


13.8.1 1:3 (1 cement : 3 sand)

Page 75 of 97
AMOUNT
S. SOR Description of Items Qty Unit Rate Since
No No. Up to Date previous
Bill previous
Bill
QTY BF MB 1358 PG 31 250.64
Total 250.64 sqm 86.40 21655 0 21655

20 13.1 12 mm cement plaster of mix :


13.1.2 1:4 (1 cement : 4 sand)
QTY BF MB 1358 PG 31 269.76
Total 269.76 sqm 99.00 26706 0 26706

15 mm cement plaster on the rough


21 13.2 side of single or half
brick wall of mix

13.2.2 1:4 (1 cement : 4 sand)


QTY BF MB 1358 PG 32 231.08
Total 231.08 sqm 115.20 26620 0 26620

Page 76 of 97
AMOUNT
S. SOR Description of Items Qty Unit Rate Since
No No. Up to Date previous
Bill previous
Bill
5121220 4250155 871065
TOTAL CIVIL AMOUNT (A)

369590 369590 0
TOTAL ELECTRICAL AMOUNT (B)

5490810 4619745 871065


TOTAL (A+B)

1310107 1102271 207836


Less 23.86% Below SOR rate as per
agreement
4180703 3517474 663229
TOTAL

501684 422097 79587


Add GST 12%

4682387 3939571 742816


Net Payble Amount

( Field Engineer ) ( A.R.E ) ( Team Leader )


(SQC SEGPL BHOPAL) (SQC SEGPL BHOPAL) (SQC SEGPL BHOPAL)

Project Engineer
Assistant Project Engineer PWD P.I.U. Bhopal
PWD P.I.U. Bhopal
(PWD PIU BHOPAL) (PWD PIU BHOPAL)

Page 77 of 97
7th RUNNING ACCOUNT BILL

CONSTRUCTION OF COMPUTER CENTRE BLOCK


AND RENOVATION WORK OF AUDITORIUM AT GOVERNMENT M.V.M COLLEGE BHOPAL
20/PIU/2019-20 Dt.10/02/2020
AMOUNT
S. SOR Description of Items Qty Unit Rate
No No. Since
Up to Date previous Bill previous Bill
PART A - RENOVATION

Dismantling cement asbestos or other


1 15.38 hard board ceiling or
partition walls including stacking of
serviceable materials and
disposal of unserviceable materials
within 50 metres lead.
QTY BF TMB ,P-04R 1116.19
Total 1116.19 Sqm 11.70 13059 13059 0

Removal of old Tarfelt i/c disposal as


2 15.25 directed by Engineer in
charge
QTY BF TMB ,P-04R 963.78
Total 963.78 Sqm 7.83 7546 7546 0

Removing mortar from and cleaning


3 15.10 stones and concrete
articles
15.10.2 In cement mortar
QTY BF TMB ,P-04R 17.41
Total 17.41 CUM 145.80 2538 2538 0

Grading roof for water proofing


4 22.14 treatment with
Cement concrete 1:2:4 (1 cement: 2
sand : 4 graded stone
22.14.1 aggregate 20 mm nominal size)

QTY BF TMB ,P-04R 57.83


Total 57.83 CUM 4112.10 237790 237790 0

Extra for providing and mixing water


proofing material as per IS
standard in cement concrete work
5 4.12 quantity as prescribed by the
manufacturer

QTY BF TMB ,P-04R 358.55


Per
Total 358.55 50kg 39.60 14198 14198 0
bag

Page 78 of 97
AMOUNT
S. SOR Description of Items Qty Unit Rate
No No. Since
Up to Date previous Bill previous Bill
Providing and laying water proofing
treatment on roofs of slabs
by applying cement slurry mixed with
water proofing cement
compound consisting of applying :
a) after surface preparation, first layer
of slurry of cement @
6 22.6 0.488 kg/sqm mixed with water
proofing cement compound @
0.253 kg/sqm.
22.6
b) laying second layer of Fibre glass
cloth when the first layer is
still green. Overlaps of joints of fibre
cloth should not be less
than 10 cm.
c) third layer of 1.5 mm thickness
consisting of slurry of cement
@ 1.289 kg/sqm mixed with water
proofing cement compound @
0.670 kg/sqm and sand @ 1.289
kg/sqm. This will be allowed to
air cure for 4 hours followed by water
curing for 48 hours. The PR 80%
entire treatment will be taken upto
30cm on parapet wall and
tucked into groove in parapet all
around.

QTY BF TMB ,P-05L 963.78


Total FR 304.20 963.78 CUM 243.74 234908 234908 0

Dismantling wood work in frames,


trusses, purlins and rafters
upto 10 metres span and 5 metres
7 15.16 height including stacking the
material within 50 metres lead:

Of sectional area below 40 square


15.16.2 centimetres.
QTY BF TMB ,P-05L 2093.54
Total 2093.54 rm 3.69 7725 7725 0

Dismantling wooden boardings in


lining of walls and
8 15.36 partitions, excluding supporting
members but including
stacking within 50 metres lead :
15.36.3 Thickness above 25 mm upto 40 mm
QTY BF TMB ,P-05L 149.44
Total 149.44 sqm 19.80 2959 2959 0

Providing and fixing false ceiling at all


height including
providing and fixing of frame work
9 12.49 made of special FR 828
sections, power pressed from M.S.
sheets and galvanized
with zinc coating of 120 gms/sqm
(both side inclusive) as
12.5 mm thick tapered edge gypsum
12.49.3 moisture 0.80 0.8
resistant board

FR = 828.00
QTY BF MB ,PG 140.52 PR
Total 140.52 sqm 800.00 112416 112416 0

Page 79 of 97
AMOUNT
S. SOR Description of Items Qty Unit Rate
No No. Since
Up to Date previous Bill previous Bill
Providing and fixing of Mineral Fibre
Acoustical
Suspended Ceiling System with
10 12.62 16mm thick tegular edge
tiles of size 595x595mm as approved
by Engineer-incharge,
in true horizontal level suspended on
inter locking
FR = 1658.70
QTY BF MB ,PG 319.58 PR
Total , FR 1658.70 319.58 sqm 1500.00 479370 479370 0

Removing white or colour wash by


scrapping and sand papering
and preparing the surface smooth
11 14.27. including necessary repairs to
scratches etc. complete

QTY BF MB - 1356 ,PG - 08 2320.73


QTY BF MB - 1356 ,PG - 20 707.26
Total 3027.99 sqm 4.59 13898 10652 3246

Applying one coat of water thinnable


cement primer of
12 13.46 approved brand and manufacture on
wall surface :

13.46.1 Water thinnable cement primer.


QTY BF MB - 1356 ,PG - 10 2796.37
Total 2796.37 sqm 21.60 60402 60402 0

Providing and applying white cement


based putty of average
thickness 1 mm, of approved brand
and manufacturer, Like
birla white /JK white or equivalent,
13 13.41 over the plastered wall
surface to prepare the surface even
and smooth i/c all cost of
material, labour and scaffold etc in all
position complete.
QTY BF MB - 1356 ,PG - 10 1832.92
QTY BF MB - 1356 ,PG - 20 294.51
Total 2127.43 sqm 66.60 141687 122072 19615

Diluting and injecting chemical


emulsion for
POSTCONSTRUCTIONAL anti-
termite treatment (excluding the cost
14 2.30 of chemical emulsion) :

Treatment of existing masonry using


chemical
2.30.4 emulsion @ one litre per hole at 300
mm
interval including drilling 10mm dia
and 200mm
With Chlorpyriphos/ Lindane E.C.
2.30.4.1 20%
with 1% concentration
QTY BF MB ,PG 256.52
Total 256.52 Rm 45.00 11543 11543 0

Page 80 of 97
AMOUNT
S. SOR Description of Items Qty Unit Rate
No No. Since
Up to Date previous Bill previous Bill
Diluting and injecting chemical
emulsion for
POSTCONSTRUCTIONAL anti-
termite treatment (excluding the cost
15 2.30 of chemical emulsion) :

Along external wall where the apron is


not
2.30.1 provided using chemical emulsion @
7.5 litres /
sqm of the vertical surface of the
substructure to
With Chlorpyriphos/ Lindane E.C.
2.30.1.1 20%
with 1% concentration.
QTY BF MB ,PG 70.00
Total 70.00 Rm 32.40 2268 2268 0

Providing and fixing M.S. grills of


required pattern in frames
of windows etc. with M.S. flats, square
or round bars etc.
including priming coat with approved
16 9.43 steel primer all
complete.

Fixed to openings /wooden frames


with rawl plugs
9.43.2 screws etc

QTY BF MB ,PG 403.95


Total 403.95 kg 90.00 36356 36356 0

Providing and fixing M.S. Tubular


frames for doors, windows,
ventilators and cupboard with
rectangular/ L-Type sections,
made of 1.60 mm thick M.S. Sheet,
17 10.14 joints mitred, welded and
grinded finish, with profiles of required
size, as per drawing,
including fixing of necessary butt
hinges, stays and screws
and applying
Fixing a priming
with 15x3 mm lugscoat
10ofcm. long
approved
embeddedsteelin primer
10.14.1 cement concrete block 15x10x10 cm
of Cement
Concrete 1:3:6 (1 Cement : 3 sand : 6
graded stone
QTY BF MB 1356 ,PG 09 335.62
Total 335.62 kg 104.58 35099 35099 0

Brick work with fly ash lime bricks


(FALG Bricks) conforming
to IS:12894-2002, in super structure
18 6.7 above plinth level up to
floor II level in

6.7.3 having 50 kg / cm2 average


compressive strength

6.7.3.2 Cement
sand)
mortar 1:6 (1 cement : 6

QTY BF MB-1358 , PG- 20 6.63

Page 81 of 97
AMOUNT
S. SOR Description of Items Qty Unit Rate
No No. Since
Up to Date previous Bill previous Bill
Total 6.63 CUM 3990.00 26454 26454 0

Repairs to plaster of thickness 12mm


to 20mm in patches of area
2.5 sq. metres and under including
cutting the patch in proper
shape, raking out joints and preparing
and plastering the surface
of the walls complete including
19 14.1 disposal of rubbish to the
dumping ground within 50metres
lead :

14.1.1 With
sand)
cement mortar 1:4 (1 cement : 4

QTY BF MB 1356 , P - 09 63.45


Total 63.45 SQM 162.00 10279 10279 0

Dismantling doors, windows and


clerestory windows (steel or
wood) shutter including chowkhats,
architrave, holdfasts etc.
complete and stacking within 50
20 15.14 metres lead :

15.14.1 Of area 3 sq. metres and below


QTY BF MB 1356 , P - 08 9.00
Total 9.00 Nos 76.50 689 689 0

15.14.2 Of area beyond 3 sq. metres


QTY BF MB 1356 , P - 08 7.00
Total 7.00 Nos 105.30 737 737 0

Demolishing brick work manually/ by


mechanical means
including stacking of serviceable
21 15.6 material and disposal of
unserviceable material within 50
metres lead as per direction
of Engineer-in-charge.

15.6.3 In cement mortar


QTY BF MB 1356 , P - 13 2.42
Total 2.42 Cum 438.30 1061 1061 0

Providing and fixing ISI marked flush


door shutters
conforming to IS: 2202 (Part I)
22 9.18 decorative type, core of block
board construction with frame of 1st
class hard wood and well
matched teak 3 ply veneering with
vertical grains or cross
bands and face veneers on both faces
of shutters
30 mm thickofincluding
such as ISI marked
9.18.2 Stainless Steel butt
hinges with necessary screws.
QTY BF MB 1356 , P - 13 20.07
Total 20.07 Sqm 3294.00 66111 66111 0

Page 82 of 97
AMOUNT
S. SOR Description of Items Qty Unit Rate
No No. Since
Up to Date previous Bill previous Bill
Finishing walls with Deluxe Multi
surface paint system for
interiors and exteriors using Primer as
23 13.57 per manufacturers
specifications :

Two or more coats applied on walls @


13.57.1 1.25 ltr/10
sqm. over and including one coat of FR= 72.90
Special primer
applied @ 0.75 ltr / 10 sqm.

QTY BF MB 1356 , P - 13 2495.88


Total 2495.88 Sqm 60.00 149753 149753 0
PR

Providing and installation of acoustical


wall panelling wood
finish Slats made out of HDF board ,
Melamine / veneer
laminated finish, perforated wooden
grooved slats (2mm
grooves @ 8mm centers) / (2mm
Slats @16mm pitch) / (2mm
24 9.148 grooves @ 32mm centers) / (2mm FR= 4661.10
grooves @ 64mm centers),
backlined with black acoustical fleece,
tongue-groove edge for
a seamless look, FR grade, of lineal
dimension size 128mm x
2440mm x 16mm thick having density
1000Kg /m3, weight
12.8Kgs/m2
QTY MB installed
BF The 1356 by using GI strut
system. GI st , P - 13 131.94
Total 131.94 Sqm 2500.00 329850 329850 0
PR

Providing and laying vitrified floor tiles


Multi/Double
Charged (Minimum tooop layer
thickness 2.0 mm) Nano
Polished self design, in different sizes
with water
absoroption less than 0.05% and
conforming to IS: 15622
25 11.90 of approved make in all colours &
shades, 1st quality
premium in flooring. laid on 12 mm
thick cement mortar
1:4 (1 cement:4 sand) including
grouting the joints with
white cement and matching pigments
etc. complete.
In light shade glossy/rustic/satin
11.90.1 finished
(b) Size 800x800 mm thikness 11‐12
11.90.1B mm
QTY BF MB 1356 , P - 21 306.37
Total ,FR 1010.70 306.37 Sqm 800.00 245096 0 245096
PR

Finishing walls with Acrylic Smooth


26 13.55 exterior paint of
required shade:

Page 83 of 97
AMOUNT
S. SOR Description of Items Qty Unit Rate
No No. Since
Up to Date previous Bill previous Bill
New work (Two or more coat applied
@ 1.67 ltr/10
sqm over and including priming coat
13.55.1 of exterior
primer applied @ 2.20 kg/ 10 sqm).

QTY BF MB 1356 , P - 21 294.51


QTY BF MB 1356 , P - 21 619.13
Total 913.64 Sqm 78.30 71538 0 71538

Providing and fixing Chlorinated


Polyvinyl Chloride (CPVC)
pipes, having thermal stability for hot
and cold water supply
including all CPVC plain and brass
27 18.8 threaded fittings i/c fixing the
pipe with clamps at 1.00 m spacing.
This includes jointing of
pipes and fittings with one step CPVC
solvent cement and the
cost of cutting chases and making
Concealed
good the sameworkincluding
includingtesting
cutting
chases and making good the
walls etc.,
18.8.2 20 mm nominal outer dia .Pipes
QTY BF MB 1356 , P - 18 81.00
Total 81.00 Rm 210.60 17059 0 17059

18.8.3 25 mm nominal outer dia .Pipes


QTY BF MB 1356 , P - 18 18.00
Total 18.00 Rm 259.20 4666 0 4666

Providing and fixing uPVC trap of self


cleaning design complet.
28 17.61 Including cost of cutting and making
good the wall and floors

17.61.1 100 mm inlet and 75 mm outlet


QTY BF MB 1356 , P - 19 12.00
Total 12.00 No. 465.30 5584 0 5584

Providing and fixing unplasticised


Rigid PVC soil and waste
29 17.58 pipes conforming to IS: 13592 Type B
including jointing with
seal ring conforming to IS : 5382
leaving 10 mm gap for thermal
17.58.1 75mm diameter OD (minimum wall
thickness 3.2
QTY BF MB 1356 , P - 19 11.75
Total 11.75 Rm 122.40 1438 0 1438

17.58.2 110 mm diameter OD (minimum wall


thickness 3.2
QTY BF MB 1356 , P - 19 8.50
Total 8.50 Rm 214.20 1821 0 1821

Providing and fixing unplasticised


PVC moulded fittings/
30 17.59 accessories for unplasticised Rigid
PVC soil and waste pipes
conforming to IS: 13592 Type A
including jointing with seal ring
17.59.1.2 coupler
QTY BF MB 1356 , P - 11.00
Total 11.00 each 138.60 1525 0 1525

Page 84 of 97
AMOUNT
S. SOR Description of Items Qty Unit Rate
No No. Since
Up to Date previous Bill previous Bill
17.59.5.2 Bend
QTY BF MB 1356 , P - 8.00
Total 8.00 each 154.80 1238 0 1238

17.59.4.2 Bend
QTY BF MB 1356 , P - 5.00
Total 5.00 each 239.40 1197 0 1197

Providing and fixing water closet


squatting pan (Indian type W.C.
31 17.1 pan) with 100mm sand cast Iron P or
S trap, uPVC P or S trap, 10
litre low level white P.V.C. flushing
cistern,Vitreous
White including flushOrissa
china pipe, pattern
W.C. pan of size
17.1.1 580x440mm with integral type foot
rests.

QTY BF MB 1356 , P - 22 6.00


Total 6.00 each 2695.50 16173 0 16173

PART B - COMPUTER BLOCK

Earth work in excavation by


mechanical means (Hydraulic
excavator )/ manual means over
areas (exceeding 30cm in depth. 1.5m
in width as well as 10 sqm on plan)
including dressing of sides and
ramming of bottom disposal of
excavated earth, lead upto 50m and
1 2.6 lift upto 1.5m, disposed earth to be
levelled and neatly dressed. (No extra
lift is payable if work is done by
mechanical means)

All kinds of soil


QTY BF TMB ,P-05L 27.84
Total 27.84 Cum 116.10 3232 3232 0
Earth work in excavation/ by
mechanical means
(HydraulicExcavator)/ manual means
over areas (exceeding 30 cm in depth,
2 2.7 1.5m in width as well as 10 sqm on
plan) including dressing of sides and
ramming of bottom disposal of
excavated earth, lead up to 50 m and
lift up to 1.5 m, disposed earth to
2.7.3 be
Hard levelled and neatly
rock (blasting dressed.
prohibited)
QTY BF TMB ,P-05R 142.62
Total 142.62 Cum 441.90 63024 63024 0

4.1 Providing and laying in position


3 4.1 cement concrete of specified grade
excluding the cost of centering and
shuttering - All work up to plinth level :

4.1.2 4.1.2 With 40mm nominal size


graded stone aggregate.
4.1.2.1 4.1.2.1 M 15 - Grade concrete
QTY BF TMB ,P-05R 21.92

Page 85 of 97
AMOUNT
S. SOR Description of Items Qty Unit Rate
No No. Since
Up to Date previous Bill previous Bill
Total 21.92 Cum 3962.70 86862 86862 0

Centering and shuttering including


4 4.3 strutting, propping etc. and removal of
form work for :

4.3.1 Foundations, footings, bases for


columns.
QTY BF TMB ,P-06L 45.41
Total 45.41 Sqm 152.10 6907 6907 0

Reinforcement for R.C.C. work


including straightening, cutting,
bending, placing in position and
binding up to floor two level
including cost of binding wire, all
wastage and lappage /overlap
5 5.16 (overlaps shall be provided as per
requirement of IS 13920 for ductile
detailing, IS 456 Design & SP
34 Reinforcement detailing) etc
complete ( Note :- Spacer bar
(chairs) shall be paid seperately as
shown in the drawing and as per
direction of engineer in charge

Thermo-Mechanically Treated bars.


5.16 (TMT) Fe 500 D conforming to IS
1786
QTY BF TMB ,P-06L 25387.76
Total 25387.76 Kg 60.00 1523266 1523266 0

Providing and laying / erecting design


mix in situ or precast or combination
of in siti and precast
cement concrete of specified grade as
per approved design of
R.C.C work prepared by only weight
batching and machine
mixing at site/yard/RMC plant
includind transportation to any
lead by any means such as chute ,
6 5.44 conveyor belt ,truck
,RMCtransit mixer etc, placed /
erected by any mechanical
meanssuch as bucket hoist ,
pump,crane , hydraetc. Including
cost of all materials such as
admixtures/plastizers to achieve the
designed retarded/accelerate setting
time and suitable
workability ,centering ,shuttering ,strut
ting,compacting and

All work up to plinth level ( footing ,


raft,pedestal R.C.C drain,
5.44.1 R.C.C retaining wall , R.C.C Pier ,
plinth beam , grade slab
,curtain wall, poles R.C.C barrier etc.)

5.44.1.1 M-20 Grade Concrete


QTY BF TMB ,P-06R 71.40
Total 71.40 Cum 5000.00 357000 357000 0

Page 86 of 97
AMOUNT
S. SOR Description of Items Qty Unit Rate
No No. Since
Up to Date previous Bill previous Bill

Filling available excavated earth


(excluding hard
rock/Ordinary rock) in trenches, plinth,
sides of foundations
etc. in layers not exceeding 20cm in
7 2.25 depth, consolidating
each deposited layer by ramming and
watering, lead up to
50 m and lift upto 1.5 m.

QTY BF TMB ,P-07L 27.84


Total 27.84 Cum 64.80 1804 1804 0

Supplying and filling in plinth with soil


(other than B.C.
soil) having MDD not less then 1.85
t/m³ under floors
including watering ramming
compacting (minimum of
7 2.28.2 compacting 95% of MDD) in layers
not exceeding 15cm in
depth and dressing
complete.

QTY BF TMB ,P-07L 201.74


Total 201.74 Cum 225.00 45392 45392 0

Supplying and filling in plinth with hard


muram/hard copra
having MDD not less then 2.0 t/m³
under floors including
watering ramming compacting
(minimum of compacting
8 2.28.1 95% of MDD) in layers not exceeding
20cm in thick and
dressing complete. (Note-maximum
thick thickness of this
layer to be provided shall be 30cm.)

QTY BF MB-1358 , PG- 12R 41.29


Total 41.29 Cum 270.00 11148 11148 0

Preconstruction antitermite treatment


to the building under
construction by providing
122.40
Stage 1: Treating the bottom and the
sides (upto 30cm hight
9 2.32 of the excavated trench @ 5 litter per
sqm of the surface
area.
2.32
Stage 2: After masonry/RCC work, the
backfill in the
immdiate contact with the foundation
structure treatment @
QTY BF MB-1358 , PG- 13L 252.72
Total 252.72 SQM 122.40 30933 30933 0

Page 87 of 97
AMOUNT
S. SOR Description of Items Qty Unit Rate
No No. Since
Up to Date previous Bill previous Bill
Supplying and filling in plinth with
crusher stone dust /
coarse sand under floors including,
watering, ramming
10 2.27 consolidating in layers not exceeding
20cm in depth and
dressing complete

QTY BF MB-1358 , PG- 13R 20.65


Total 20.65 CUM 604.80 12489 12489 0

Providing and laying in position


cement concrete of specified
grade excluding the cost of centering
11 4.1 and shuttering - All work up
to plinth level

4.1.1 With 20mm nominal size graded stone


aggregate.
4.1.1.3 M 15 – Grade concrete
QTY BF MB-1358 , PG- 14L 20.65
Total 20.65 CUM 4023.90 83094 83094 0

R.C.C With Shuttering : Providind and


laying / erecting design
mix in situ or precast or combination
of in siti and precast
12 5.44 cement concrete of specified grade as
per approved design of
R.C.C work prepared by only weight
batching and machine
mixing at site/yard/RMC plant
includind transportation to any
All work up to floor two level walls
5.44.2 ( any thickness ) coloumn
,piller pier , post and struts etc
5.44.2.1 M - 20
QTY BF MB-1358 , PG- 14R 35.74
Total 35.74 CUM 5270.00 188350 188350 0

R.C.C With Shuttering : Providind and


laying / erecting design
mix in situ or precast or combination
of in siti and precast
13 5.44 cement concrete of specified grade as
per approved design of
R.C.C work prepared by only weight
batching and machine
Suspended floor roof having
mixing at site/yard/RMC plantslope of
any degree
includind , landing to any
transportation
,balconies ,access platform, floor
5.44.3 beam , girders, bressumers and
cantilevers, shelves,
chujjas,lintels,bands , staircases and
5.44.3.1 spiral
M - 20
staircases, coffer slab.
QTY BF MB-1358 , PG- 15L 105.86
Total 105.86 CUM 5390.00 570585 570585 0

Providing and laying cement concrete


in retaining walls, return
walls, walls (any thickness) including
attached pilasters, columns,
14 4.2 pillars, posts, struts, buttresses, string
or lacing courses, parapets,
coping, bed blocks, anchor blocks,
plain window sills, fillets etc.
up to floor two level, excluding the
cost of centering, shuttering

Page 88 of 97
AMOUNT
S. SOR Description of Items Qty Unit Rate
No No. Since
Up to Date previous Bill previous Bill

4.2.1 With 20mm nominal size graded stone


aggregate
4.2.1.3 M 15 – Grade concrete
QTY BF MB-1358 , PG- 16L 6.76
QTY BF MB-1357 , PG- 30 1.69
Total 8.45 CUM 4242.60 35833 28663 7170

Brick work with fly ash lime bricks


(FALG Bricks) conforming
to IS:12894-2002, in super structure
15 6.7 above plinth level up to
floor II level in

6.7.3 having 50 kg / cm2 average


compressive strength

6.7.3.2 Cement
sand)
mortar 1:6 (1 cement : 6

QTY BF MB-1358 , PG- 20 100.07


Total 100.07 CUM 3990.00 399279 399279 0

Providing and fixing M.S. grills of


required pattern in frames
of windows etc. with M.S. flats, square
or round bars etc.
including priming coat with approved
16 9.43 steel primer all
complete.

Fixed to openings /wooden frames


with rawl plugs
9.43.2 screws etc

QTY BF MB 1358 ,PG 21 1179.64


Total 1179.64 kg 90.00 106168 106168 0

Providing and fixing M.S. grills of


required pattern in frames
of windows etc. with M.S. flats, square
or round bars etc.
including priming coat with approved
17 10.14 steel primer all
complete.

Fixed to openings /wooden frames


with rawl plugs
10.14.1 screws etc

QTY BF MB 1358 ,PG 21 321.51


Total 321.51 kg 104.58 33624 33624 0

Page 89 of 97
AMOUNT
S. SOR Description of Items Qty Unit Rate
No No. Since
Up to Date previous Bill previous Bill
Half brick masonry with fly ash lime
Gypsum bricks (FALG
bricks) conforming to IS : 12894, in
super structure above
plinth and upto floor two level with 2
17 6.15 nos 10mm dia. M.S Bar at
every third course of brick masonary
which shall be paid
separately.

having 50 kg/cm2
6.15.3 average compressive strength
Cement mortar 1 : 4 (1 cement : 4
6.15.3.2 sand)
QTY BF MB 1358 ,PG 27 133.05
Total 133.05 Sqm 459.00 61070 61070 0

17 13.8 6 mm cement plaster of mix :


13.8.1 1:3 (1 cement : 3 sand)
QTY BF MB 1358 ,PG 31 250.64
QTY BF MB 1358 ,PG 37 343.84
Total 594.48 Sqm 86.40 51363 49285 2078

Providing and fixing chicken mesh as


per ISI specification and in the
17 13.3 required width with 50mm long
Bombay nails on vertical and
horizontal junctions of RCC and brick
wall including scaffolding and all lead
and lift etc. complete before plastering
upt 10 meter height
QTY BF MB 1358 ,PG 32 123.17
Total 123.17 Sqm 86.40 10642 10642 0

17 13.1 12 mm cement plaster of mix :


13.1.2 1:3 (1 cement : 3 sand)
QTY BF MB 1358 ,PG 33 269.76
QTY BF MB 1358 ,PG 38 515.00
Total 784.76 Sqm 99.00 77691 53807 23884

17 13.2 15 mm cement plaster on the rough


side of single or half brick wall of mix :
13.2.2 1:6 (1 cement : 6 sand)
QTY BF MB 1358 ,PG 34 231.08
QTY BF MB 1358 ,PG 153.22
Total 384.30 Sqm 115.20 44271 26620 17651

Providing and fixing 18mm thick gang


saw cut mirror
polished (premoulded and
prepolished) machine cut for
kitchen platforms, vanity counters,
window sills , facias and
similar locations of required size of
18 11.22 approved shade, colour FR 1901.7
and texture laid over 20mm thick base
cement mortar 1:4
(1 cement : 4 sand) with joints treated
with white cement,
mixed with matching pigment, epoxy
touch ups, including
rubbing, curing moulding and
polishing to edge to give

Page 90 of 97
AMOUNT
S. SOR Description of Items Qty Unit Rate
No No. Since
Up to Date previous Bill previous Bill

Granite coarse grained light black /


11.22.2 dark red/off
white with crystal of other colours and
various
pattern
QTY BF MB 1358 ,PG 35 9.86 PR
Total , FR = 1901.70 9.86 Sqm 1800.00 17748 17748 0

Providing and applying white cement


based putty of average
thickness 1 mm, of approved brand
and manufacturer, Like
birla white /JK white or equivalent,
19 13.41 over the plastered wall
surface to prepare the surface even
and smooth i/c all cost of
material, labour and scaffold etc in all
position complete.
QTY BF MB - 1358 ,PG - 36 751.48
QTY BF MB - 1358 ,PG - 39 1721.27
QTY BF MB - 1358 ,PG - 42 56.78
Total 2529.53 sqm 66.60 168467 50049 118418

20 13.3 20 mm cement plaster of mix :


13.3.2 1:6 (1 cement : 6 sand)
QTY BF MB - 1358 ,PG - 38 709.22
Total , FR =140.40/- 709.22 sqm 140.40 99574 49622 49952

Providing and fixing Chlorinated


Polyvinyl Chloride (CPVC)
pipes, having thermal stability for hot
and cold water supply
including all CPVC plain and brass
21 18.8 threaded fittings i/c fixing the
pipe with clamps at 1.00 m spacing.
This includes jointing of
pipes and fittings with one step CPVC
solvent cement and the
cost of cutting chases and making
good the same
Concealed workincluding
includingtesting
cutting
18.8.2 chases and making good the
walls etc.,
20 mm nominal outer dia .Pipes
QTY BF MB - 1357 ,PG - 29 42.15
Total , 42.15 Rm 210.60 8877 0 8877

Concealed work including cutting


22 18.8.3 chases and making good the
walls etc.,
25 mm nominal outer dia .Pipes
QTY BF MB - 1357 ,PG - 29 71.40
Total , 71.40 Rm 259.20 18507 0 18507

Providing and placing on terrace (at


all floor levels) polyethylene
water storage tank ISI : 12701 marked
with cover and suitable
23 18.49 locking arrangement and making
necessary holes for inlet, outlet
and overflow pipes but without fittings
and the base support for
tank
Concealed work including cutting
chases and making good the
walls etc.,

Page 91 of 97
AMOUNT
S. SOR Description of Items Qty Unit Rate
No No. Since
Up to Date previous Bill previous Bill
QTY BF MB - 1357 ,PG - 31 4500.00
Total , 4500.00 ltr 6.30 28350 0 28350

Providing and fixing unplasticised


Rigid PVC soil and waste
pipes conforming to IS: 13592 Type B
including jointing with
24 17.58.2 seal ring conforming to IS : 5382
leaving 10 mm gap for thermal
expansion. Single socketed pipes for
working pressure of 4
kg/sqcm.
110 mm diameter OD (minimum wall
thickness 3.2mm)
QTY BF MB - 1357 ,PG - 30 26.00
Total , 26.00 Rm 214.20 5569 0 5569

Providing and fixing unplasticised


PVC moulded fittings/
25 17.59 accessories for unplasticised Rigid
PVC soil and waste pipes
conforming to IS: 13592 Type A
including jointing with seal ring
25a 17.59.1.2 coupler
QTY BF MB 1357 , P - 30 13.00
Total 13.00 each 138.60 1802 0 1802

25b 17.59.5.2 Bend


QTY BF MB 1357 , P - 30 23.00
Total 23.00 each 154.80 3560 0 3560

25c 17.59.4.2 Sigle T


QTY BF MB 1357 , P - 30 8.00
Total 8.00 each 239.40 1915 0 1915

Providing and fixing on wall face


Unplasticised Rigid PVC
26 12.32 rain water pipes conforming to IS :
13592 Type A including
jointing with seal ring conforming to IS
: 5382 leaving 10
12.32.2 110 mm diameter (minimum wall
thickness 2.2mm)
QTY BF MB 1357 , P - 31 130.24
Total 130.24 Rm 214.20 27897 0 27897

Providing and fixing on wall face


Unplasticised - PVC
27 12.33 moulded fittings/ accessories for
Unplasticised Rigid PVC
rain water pipes conforming to IS :
13592 Type A including
12.33.6.2 shoe 110 mm diameter (minimum wall
thickness 2.2mm)
QTY BF MB 1357 , P - 31 13.00
Total 13.00 each 270.00 3510 0 3510

Providing and laying vitrified floor tiles


Multi/Double
28 11.90 Charged (Minimum tooop layer
thickness 2.0 mm) Nano
Polished self design, in different sizes
with water
In light shade glossy/rustic/satin
11.90.1 finished

11.90.1A (a)
mm
Size 600x600 mm thikness 9‐10

QTY BF MB 1358 , P - 40 331.58


Total 331.58 sqm 903.60 299616 0 299616

Page 92 of 97
AMOUNT
S. SOR Description of Items Qty Unit Rate
No No. Since
Up to Date previous Bill previous Bill
Providing and laying rectified Glazed
Ceramic floor tiles
300x300 mm or more (having
thickness 9 to 10mm) of 1st
quality conforming to IS : 15622 of
29 11.49 approved make in
colours White, Ivory, Grey, Fume Red
Brown, laid on
20mm thick cement mortar 1:4 (1
Cement : 4 sand)
including grouting the joints with white
QTY BFand
cement MB 1358 , P - 40 27.29
Total 27.29 sqm 579.60 15817 0 15817

Providing and laying rectified Glazed


Ceramic wall tiles
300x450 mm or more (thickness to be
specified by the
manufacturer) of 1st quality
30 11.50 conforming to IS : 15622 of
approved make in colours White,
Ivory, Grey, Fume Red
Brown, laid on 12 mm thick cement
mortar 1:3 (1 Cement :
3 sand) prepared same day when
QTY BFisMB
mortar still 1358
green, i.e.
P- 102.90
Total 102.90 sqm 628.20 64642 0 64642

Providing and fixing false ceiling at all


height including
providing and fixing of frame work
31 12.49 made of special FR 828
sections, power pressed from M.S.
sheets and galvanized
with zinc coating of 120 gms/sqm
(both side inclusive) as
12.5 mm thick tapered edge gypsum
12.49.3 moisture
resistant board

FR = 828.00
QTY BF MB ,PG 56.78 PR
Total 56.78 sqm 800.00 45424 0 45424

Providing and fixing of Mineral Fibre


Acoustical
Suspended Ceiling System with
32 12.62 16mm thick tegular edge
tiles of size 595x595mm as approved
by Engineer-incharge,
in true horizontal level suspended on
inter locking
FR = 1658.70
QTY BF MB 1358 ,PG 42 151.99 PR
Total , FR 1658.70 151.99 sqm 1500.00 227985 0 227985

Grading roof for water proofing


33 22.14 treatment with
Cement concrete 1:2:4 (1 cement: 2
sand : 4 graded stone
22.14.1 aggregate 20 mm nominal size)

QTY BF MB1358, ,P-43 20.47


Total 20.47 CUM 4112.10 84175 0 84175

Page 93 of 97
AMOUNT
S. SOR Description of Items Qty Unit Rate
No No. Since
Up to Date previous Bill previous Bill
Extra for providing and mixing water
proofing material as per IS
standard in cement concrete work
34 4.12 quantity as prescribed by the
manufacturer

QTY BF MB1358, ,P- 126.91


Per
Total 126.91 50kg 39.60 5026 0 5026
bag

Providing and laying water proofing


treatment on roofs of slabs
by applying cement slurry mixed with
water proofing cement
compound consisting of applying :
35 22.6 a) after surface preparation, first layer
of slurry of cement @
0.488 kg/sqm mixed with water
proofing cement compound @
0.253 kg/sqm.
22.6
c) third layer of 1.5 mm thickness
consisting of slurry of cement
@ 1.289 kg/sqm mixed with water
proofing cement compound @
0.670 kg/sqm and sand @ 1.289 PR 80%
kg/sqm. This will be allowed to
air cure for 4 hours followed by water
curing for 48 hours. The
entire treatment will be taken upto
30cm on parapet wall and
QTY BF MB1358, ,P- 227.99
Total FR 304.20 227.99 CUM 243.74 55569 0 55569

Providing and laying gang saw cut 18


mm thick, mirror
polished pre moulded (wherever
required) and pre polished
machine cut granite stone of required
size and shape of
approved shade, colour and texture in
flooring laid over
20mm thick base of cement mortar
1:4 (1cement : 4 sand)
36 11.29 including grouting the joints with white
cement mixed with
matching pigment, epoxy touch ups
etc. complete as per
direction of engineer-in-Charge

11.29.1 Area of slab over 0.50 sqm


11.29.1.2 Course grained light Black/light Red/
off White
QTY BF MB1358, ,P-43 51.09
Total 51.09 sqm 1922.40 98215 0 98215

Page 94 of 97
AMOUNT
S. SOR Description of Items Qty Unit Rate
No No. Since
Up to Date previous Bill previous Bill
Providing and laying vitrified floor tiles
Multi/Double
Charged (Minimum tooop layer
thickness 2.0 mm) Nano
Polished self design, in different sizes
with water
absoroption less than 0.05% and
conforming to IS: 15622
of approved make in all colours &
shades, 1st
37 11.91 quality/premium in skirting. laid on 12
mm thick cement
mortar 1:3 (1 cement:3 sand)
including grouting the joints
with white cement and matching
pigments etc. complete

11.91.1 In light shade glossy/rustic/satin


finished
(a) Size 600x600 mm thikness 9‐10
mm
QTY BF MB1358, ,P-44 8.32
Total 8.32 sqm 893.70 7436 0 7436

Providing and fixing Unplasticised -


PVC pipe clips of
approved design to Unplasticised -
PVC rain water pipes by
means of bombay nail of required
38 12.34 length including making
good the wall etc. complete.

12.342 110 mm (minimum wall thickness


2.2mm)
QTY BF MB1357, ,P- 31 130.00
Total 130.00 no. 102.60 13338 0 13338

Page 95 of 97
AMOUNT
S. SOR Description of Items Qty Unit Rate
No No. Since
Up to Date previous Bill previous Bill

TOTAL CIVIL AMOUNT (A) 7473078 5846499 1626579

TOTAL ELECTRICAL AMOUNT (B) 650366 650366 0.00

TOTAL (A+B) 8123444 6496865 1626579

Less 23.86% Below SOR rate as per 1938254 1550152 388102


agreement

TOTAL 6185190 4946713 1238477

Add GST 12% 742223 593606 148617

Net Payble Amount 6927413 5540319 1387094

( Field Engineer ) ( A.R.E ) ( Team Leader )


(SQC SEGPL BHOPAL) (SQC SEGPL BHOPAL) (SQC SEGPL BHOPAL)

Assistant Project Engineer Project Engineer


PWD P.I.U. Bhopal PWD P.I.U. Bhopal
(PWD PIU BHOPAL) (PWD PIU BHOPAL)

Page 96 of 97
CONSTRUCTION OF COMPUTER CENTRE BLOCK
AND RENOVATION WORK OF AUDITORIUM AT GOVERNMENT M.V.M COLLEGE BHOPAL

20/PIU/2019-20 Dt.10/02/2020

QUANTITY OF MATERIAL FOR ROYALTY ( RA-6 )BILL


Stone
S. No Perticular of Item Quantity Cofficent Sand Metal copra/
dust
1 M-15
Item No 4.1.1 20.47 Per Cum
Sand 0.450 9.21
Metel 0.880 18.01
2 M-20 R.C.C.
Item No 5.44 0.00 Cum
Item No 0.00 Cum
Item No 0.00 Cum
sub Total 0.00 Cum
Sand 0.428 0.00
Metel 0.856 0.00
3 Copra
Item no.2.28.2
Item no.2.28.1
4 Stone Dust
Item no.2.27

5 Plaster Per Sqm


6mm 343.000 0.009 3.09
12mm 515.000 0.0148 7.62
15mm 153.220 0.0150 2.30
20mm 709.220 0.0150 10.64

TOTAL 32.86 18.01 0.00 0.00

1 SAND 32.86 Cum 120.00 3943


2 METEL 18.01 Cum 120.00 2162
3 Copra 0.00 Cum 50.00 0
4 Stone Dust 0.00 Cum 50.00 0
TOTAL RS. 6105