HN | a
INDEPENDENT CONTRACTORS RATE SHEET 2020-2022
1, Toline out building $200 per running ft
2. Tolay 4” Blocks & fill pockets (Ground Floor) r }
3. Tolay 4” Blocks & fill pockets (First Floor w 5715 per id f
4. Tolay 4” Blocks & fill pockets (Manholes. Drains, Gully Basins jer Sal !
5. Tolay 6” Blocks & fill pockets (Ground Floor er squar
6. To lay 6” Blocks & fill pockets (First Floor w 320 per d
2 O° Bl fill pockets (Mé Drains, Gully Basins) are
8. Tolay 8” Blocks & fill pockets (Ground Floor 0-per square vd |
9. To lay 8* Blocks & fill pockets (First Floor uy u
10. To lay Breather Blocks (6"x6" id? P= id), 12" o/vd? |
11. Lay 9x4” Pavers/Bricks $340 per square ft
12, To roughcast | finish (Manholes, Drains, Gully Basins) $1260
3. To build Circular Blocks & fill pockets ‘$820 per square yd
14, To build stone retaining wall in mortar bed. “$8800 per cuble yd
15. Cut stone facing & build 6” landings $1070 per square ft |
16, To dig foundation 315" deep (compacted sath $1010 per blend
11 Ied sndation 37-5" deep (compacted
iz foundation 3-5" deep i a
19. Ted foundation 3°-5* deep in rock or concrete (no compressor
20. To dig foundation 3°-5" deep in rock or c.c. (with comy er
21. To cast foundation jer Fu
22. To excavate Column Footing $2020 each i
23, ‘To erect Columns $400 per i
24, To erect Circular Columns $460 per ft |
25. To cast Precast Column 8” ‘$1260 each
26. To erect Precast Column 10" $2210 each
27. To cast Precast Column 10” 5
28. To roughcast & granite column (18 girth) 00 per
29, To rou ite column (24 girth run '
30. To roughcast & granite column (36" girth $410 per running ft t
31. To rougheast & granite column (48 girth) x
2, To roughcast ite Circular column_(6” dia) $39
33. To roughcast & granite Circular column (12” di 3715 per running ft I
34, To roughcast & granite Circular column (18 dia) $1010 per running ft
35, To roughcast & granite Circular column (24” dia) er ru
36, To erect L-shaped Column. $550 per ft
37. To cast L-shaped Column $500 per ft
38. “To putup Belting ‘$360 per running ft
39. To cast Belting $360 per tunalngf
40, “To erect Circular Belting $360 per ft
41, To cast Circular Belting $360 per ft
42. ‘To put up Lintel — per running ft
43. To cast Lintel
a To put up Cantilever complete zr r runnit t
5 To dress Cantilever $410 per running i
ae Arch 160
41. Ts cast Arch $360 per runnin; of
48, To put up Templates
49. To roughcast and granite Beam 18” $340 == running ft
50, To roughcast and granite Beam 24” ‘$400 per running ft
51, To rougheast and granite Beam 36” ‘$430 per running ft
52. To rougheast and dress Jamb $280 per ronning ft
53, To hack concrete surfaces for renderit
54, To pebble dash wall only ___ $360 per sauared
55, Zo Tyrolean wall only
56. To rougheast Wall onl sh ber aan id
7. “To rougheast & granite Wall id
58. “To roughcast & Pebble Wall ‘$650 per square yd }
59. To roughcast & Tyrolean Wall er sq
60. To rougheast & Steel finish Wall S715 per square yd61. Spanish Wave only to Wall $400 per square vd
62. To roughcast & Spanish Wave Wall 3740 per. id
63. To paint Bonderete 370 per square yd
64. To Fair face Walls-$240 per square yd _b. To Fairface Ceiling $290 per square yd
65. One coat render to wall/ceiling $360 per square yd
66. To roughoast & render Wall 570 per s id
0
67. To roughcast & render Ceiling S715 per square yd
68. Granite only to ceiling $400 per square yd
ighcast and Gra ig S715 per square yd
69. To roughcast and Granite ceilin; juare
10. To set Screeds to Floor/Roof using mort 0 per 5
71. To spray Florin, 0 per square yd
72. To rod & settle concrete from Premix incl, Labour $630 per square yd
73. To fill & ram Flooring $690 per square yd
74, To mix, rod, settle & dress Florin; 8 id
75. Rod-off & Broom/Wood finish Floor Slabs $310 per square yd
76.
i-off and Stee! Float Floor Siab (manually) 50 per square yd
77. Rod-off and Steel Float Floor Slab (mechanically) $280 per square vd
78, Soteed & dress Riser (6"-8" wide) steel float $210 per running ft
79. To form and dress Water Dri
130 per running ft
80. To lay & grout Terrazzo Tiles 990 per s id
81. To lay. grout & clean Ceramic Floor Tiles (12 170 per square yd
82. To lay, grout & clean Ceramic Floor Tiles (6”x6 0 per square yd
83. To cut, lav, grout & clean Ceramic skirting tiles 4” to 6” high $130 per running ft
84. “To lay & grout Ceramic Wall Tiles to shower $1260 per square yd
85. To lay & grout Marble Tiles (12” up) on floor $1760 per square yd
86. To lay & grout Marble Tiles (12"up) on walls ‘$1860 per square yd
87, To lay, grout, cut & polish thick Marble Tiles (12"up) on floor $2320 per square vd
88. To lay, grout & clean Porcelain Tiles $1470 per square yd
89. Vinyl Tiles with adhesive 5S per square vd
90. Brick Tiles 4” & 8” ‘$1860 per square yd
91. 1x1” Mosaic Tiles on floors & walls $300 per square ft
92. Px”,
Mosaic Tiles on columns & beams $360 per square ft
93. 2°x2” Mosaic Tiles on floors & walls $260 per square ft
94. 2"x2” Mosaic Tiles on columns and beams 3] er square ft
95. Remove & replace 12x12” tiles }200 per square ft
96. ove & replace 6”x6” tiles 3230 per square ft
97. Create recesses & fit Toilet Paper holder, Soap Dish in wall $970 each
98. To fit shower curtain rail, Towel Rail 5950 each
99. To fit Soap Dispenser, surface Mounted toilet paper holder ‘$790 each
100. To fit toothbrush holder $470 each
101. To demolish existing Concrete $850 per square yd
102. To cut Arriss-_ $10( or running ft (b) Curved Axriss $120 per running ft
103. To dress Arriss 3170 per ning ft
104, “To put up precast concrete Baluster $465 each
105. To erect Arch Molding $550 per running ft
106. To erect Double Band Molding $520 per running ft
107, To erect Staircase $2950 per thread
108. To cast Stair: $1890 per thread
109. Labourers 4000-5 jer day
STEELWORK
110. To erect Steel Work $60 per pound
111. To make 4" wire Stirrups ‘$440 per dozen
112, To make 3/8" wire Stirrups ‘$490 per dozen
113. To make 4” Sti sr dozen
114, To make & install 4" Links $390 per dozen
1s. ce & install 3/8" Links 10 per dozen
116, To make & install 4” Links __$560 per dozen
117. SHED.
‘Make Shed Panels incl. door & window opening ‘$60 per square ft
Erect Shed panels incl. blocking to Gables $50 per square ft
shed roof incl. rafters, laths & zine 170 per square ft
Erect timber floor panels incl, support $50 per square ft
jismantle & stack shed materials 0 per square ftPAGE 3
PAINTING
118. Emulston Painting
‘One coat to Wall $75 per square yd Two coats to Wall $140 per sa. vd
Qil Painting
‘One coat er square yd Two coats to Wall ‘$150 per sa. yd
One coat to Pebble dash $90 per square yd Two coats to Pebble Dash - _$460-per sa. yd
One Coat to Ceiling $100 per square yd Two Coats to Ceiling $180 per sq.vd
at to Concrete Louvre $100 per ;d_2 Coats to Con uve rsa.vd
‘Two Coats to skirting 3°-4" $40 per running ft
One coat to Grill work ‘$130 per square vd
Two coats to Grill work, Doors, Frames 230, id
‘One coat to Fascia, Blocking Piece, Rafters $230 per square vd
‘Two coats to Fascia, Blocking Piece, Rafters. ‘$440 per square yd
‘One coat to Shelves. Timber Frame, Metal Column ‘$260 per square vd
‘Two coals to Shelves, Timber Frame, Metal Column sare yd
me Coat to Cupboards $31 uare yd. Two Coats to Cupboards er square yd
‘Water Seal roof (one coat) 5170 per d
Water Seal roof (two coat) ‘$310 per square va
‘Trowel on with colour to wall, floor, driveway. $370 per square vd
‘(CARPENTER
119. Decking 4 inches. $6800 per square ing 6 inches squart
120. Window Frame. $260 per running ft Door Frame. ‘$300 per running ft
121. To put up Flat Stiffener $320 per running ft To putup L Stiffener $480 per running ft
122, ]°x4” Skirting beveled top $55 per ft 1x4” Skirting, molded top- $75 per run. ft
123,2"x4" Handrails WPP__$80 per running ft 2°x6" Handrails WPP- $90 per running ft
124.2°x2” Baluster WPP(unshaped) $50 per running ft
125.2°x2" Baluster Cedar (unshaped)
126. 3-sided Stiffener $360 per running ft
127. Back-up:Board $130 per running fe Form __ $90 per square ft
128, Wall Plate _$120 per running ft Valley, Ridge & Hip $155 per running ft
129. Rafters 2x8" 0 per running ft “Sarking__ $10 per square ft
130. Lathe $95 per running ft Belt Beam $340 per running ft
131. Independent Beam 10"- $410 per running ft ntel 340 per runnin;
132. Scaffolding 10’-20° - $20 per ft?,_20°-30" -
133. Blocking Board - $110 per running ft Battens wr running ft
134, 1x12" Fascia ‘$85 per running ft
135, To lay Flooring Board 200 per square ft
136. To cut & install timber lo tal jamb 5250 each
137. To fit metal Jamb for louvers in timber frame $200 per running ft
138. To fit & hitch Door with Loc
139. To fit & install Closet Doors (pairs) '$1680each
140. To fit & install Steel Door with frame h
141. To fit & install Double Steel Door with frame 5670.
142. To fit & install Casement Door (Large) 2310
143. To fit & install Casement Door (Small 410 each
144, To fit & install glass to Casement Door. 220 are ft
145. To install Casement Stay/Pull h
146, To install Barrel Bolts in floor/wall $440 each
147. To install Window 60
148. To install French Doors (24x80 07 3ox80"
149. To make Kitchen Cupboards (floor) 3°H x2"W 4040 ing ft
150, To make Kitchen Cupboards (wall) 2°Hx l'W (ply & Lam.) $3780 per running ft
151. To fit Night Lock, Indicator/Flush Bolt 1:
152. To fit double action Mortise Li 2
153. “To fit Mortise Lock. $1380 each
154. “To fit Dead Lock $1600 each
155. “To fit Panic LatchiLock with bars/rails 550 en
156, To fit door clo:
157. To install regular Door Pull 770.
158. To fit Miror in Timber frame. er 8
159. To fit mirror on wall $300 per square ft
160. To erect lath, zinc/plywood to posts for hoarding ‘$2080 per 100 square ft
161. To dismantle hoarding & stack material 60. per are ft
eee | rerePAGE 4
ROOFING 2
162. To put up Roofing $16,250 per square
163. To make roof trusses 12’-0” lon; 1520
164, To spray Roofin, er square ve
165. 1"x2” Lathe at 5” for Shingle to roof wall er 100 sq. ft
166. 1°x3” Lathe at 12” for Clay Tiles to roof/wall $8600 per 100 square ft
167, 1°x3" Lathe at 30” for Aluminum rfiwall 0 100 square ft
168. 15 pounds Felt under Tiles/Shingle to Roof Wall $1750 per 100 square ft
169. Fibreglass shingle to Roof/Wall. $8400 per 100 sq
er 100 square ft
170. Wood shingle to roof/wall $10,500 per 100 sq. ft
171. Aluminium shingle to roofwall $5800 per 100 square ft
172. Zine sheets to roofiwall $3820 per 100 square ft
173. To remove Zine Sheets $200 each
174, Aluminium Sheeting only to roofwall $5250 per 100 square ft
175. Clay Tiles to roofiwall $6400 per 100 square ft
176. Aluminium zine sheets to roof/wall on metal purling $6300 per 100 square ft
177. Aluminium zine lining to vallev/gutter of roof ‘$170 per running ft
178, Aluminium Gutter fitted in Metal Brackets 3210 per running ft
179, Capping/Hip to Clay tile roof ine. Grout _$240 per running ft
180. Capping to metal roof 3160 per running ft
181. Shingles to Valleys ine. cut iting (fibre glass- ‘Wooden - running ft
182, To install Gypsum to ceiling/wall ‘$60 per square ft
183. To install 2x4 Gypsum Framing S80 per running ft
184. To install 2x2 Gypsum Framing $50 per running ft
185, To install 3/16 or 3/8 Plywood sheeting $50 per square ft
186. To install hurricane straps S110 each
FOR PROFILE BOARDS
2°X4" pegs in earth $40 each
"x4" ‘marl 0 each
2°X4” pegs in asphalt ea
‘Trap Gully Basin with 4” Blocks Complete
15°15" x15” $4400 each 242424" $7400 each
18°x18°x18" $5940 each
Tobuild Sewer Monboles fr75-6'-Bigeweounpivie:
24°24" x24 ‘59000 each 367x36"x36 $16.550 each
2x24%30. $10,460 each 36°x36"x30. $14,300 each
2430724. $9800 each A8"xA8" x48. $26,600 each
0730730, $12,450 each 48"x48"x60. $32,300 each
3O°x36"24 $12,050 each 18"x18" x24 ‘$7350 each
To dig Absorption pit in compacted earth (depth) $5600 per running ft
To dig Absorption pit in compacted mar] or rock (dept '$12800 per running tt
To-sort and dry pack stones to absorption pit $1020 per square vd
To build Kerb & a 660 ni
“PLEASE NOTE THAT THESE PRICES ARE GU! IDELINES
AND ARE SUBJECT TO CHANGE WITH INFLATION OR
DEFLATION!
Cost-$1000