M-19-0004 Electrical Calculation Report Rev. B
M-19-0004 Electrical Calculation Report Rev. B
With 16 x 100 AH battery strings, battery back up time of 4.66 hours can be achieved.
Type of Rectifier System : Huawei ETP48600, R4850G2
Type of Battery Cell : ESM -48100A, 100AH
CONCLUSION:
New ETP48400, R4850G, 6x50A Rectifier Modules are required to carry required loads.
New 16x100AH Battery strings can provide 4.66 hrs Backup Battery Time.
With 13 x 100 AH battery strings, battery back up time of 4.73 hours can be achieved.
Type of Rectifier System : Huawei ETP48600, R4850G2
Type of Battery Cell : ESM -48100A, 100AH
CONCLUSION:
New ETP48400, R4850G, 6x50A Rectifier Modules are required to carry required loads.
New 13x100AH Battery strings can provide 6hrs Backup Battery Time.
NOTE:
The Required DC Power Configuration as per Approved SAF'sConfiguration is (9x50A Rectifier & 12x100AH Battery Strings having
BackUP time of 3.04Hrs.).
NEOM Project in Saudi Arabia
Revision Date: Revision: Document No.:
April 9, 2025 A M-05-00001-EM-Re-0001
NEOM PROJECT
IN
SAUDI ARABIA
7
NEOM Project in Saudi Arabia
Revision Date: Revision: Document No.:
April 9, 2025 A M-05-00001-EM-Re-0001
TABLE OF CONTENTS
8
NEOM Project in Saudi Arabia
Revision Date: Revision: Document No.:
April 9, 2025 A M-05-00001-EM-Re-0001
SECTION 1.0
ELECTRICAL DC CALCULATION
9
NEOM Project in Saudi Arabia
Revision Date: Revision: Document No.:
April 9, 2025 A M-05-00001-EM-Re-0001
SECTION 1.1
DC POWER ANALYSIS
10
NEOM Project in Saudi Arabia
Revision Date: Revision: Document No.:
April 9, 2025 A M-05-00001-EM-Re-0001
SECTION 1.2
11
NEOM Project in Saudi Arabia
Revision Date: Revision: Document No.:
April 9, 2025 A M-05-00001-EM-Re-0001
SECTION 1.3
12
NEOM Project in Saudi Arabia
Revision Date: Revision: Document No.:
April 9, 2025 A M-05-00001-EM-Re-0001
SECTION 1.4
13
NEOM Project in Saudi Arabia
Revision Date: Revision: Document No.:
April 9, 2025 A M-05-00001-EM-Re-0001
SECTION 2.0
ELECTRICAL AC CALCULATION
14
NEOM Project in Saudi Arabia
Revision Date: Revision: Document No.:
April 9, 2025 A M-05-00001-EM-Re-0001
SECTION 2.1
15
NEOM Project in Saudi Arabia
Revision Date: Revision: Document No.:
April 9, 2025 A M-05-00001-EM-Re-0001
Input Voltage, Hz, Phase, PF : 380 V , 60Hz , 3-Phase , 99% PF , 96% eff.
= 19919.6 KVA
= 19.92 KVA
16
NEOM Project in Saudi Arabia
Revision Date: Revision: Document No.:
April 9, 2025 A M-05-00001-EM-Re-0001
SECTION 2.2
17
NEOM Project in Saudi Arabia
Revision Date: Revision: Document No.:
April 9, 2025 A M-05-00001-EM-Re-0001
63 A - 34.53 A
% Spare @ 63 A MCB = x 100% = 45.19%
63 A
Select: 1-4/C 25mm² Unarmored XLPE cable as the main feeder power cable in ground
Therefore, the ampacity of New 1-4/C x 25mm² XLPE cable is adequate to carry load.
18
NEOM Project in Saudi Arabia
Revision Date: Revision: Document No.:
April 9, 2025 A M-05-00001-EM-Re-0001
SECTION 2.3
ADEQUACY CALCULATION OF THE
POWER SOURCE
19
NEOM Project in Saudi Arabia
Revision Date: Revision: Document No.:
April 9, 2025 A M-05-00001-EM-Re-0001
20
NEOM Project in Saudi Arabia
Revision Date: Revision: Document No.:
April 9, 2025 A M-05-00001-EM-Re-0001
SECTION 2.4
ATTACHMENTS A-C
21
NEOM Project in Saudi Arabia
Revision Date: Revision: Document No.:
April 9, 2025 A M-05-00001-EM-Re-0001
ATTACHMENT (A)
NOTE :
These values are from Saudi Cable Company, Low Voltage Cables, Technical Catalogue.
22
NEOM Project in Saudi Arabia
Revision Date: Revision: Document No.:
April 9, 2025 A M-05-00001-EM-Re-0001
Attachment (B)
NOTE :
These values are from Saudi Cable Company, Low Voltage Cables, Technical Catalogue.
23
NEOM Project in Saudi Arabia
Revision Date: Revision: Document No.:
April 9, 2025 A M-05-00001-EM-Re-0001
ATTACHMENT (C)
Rating factors for variation in ground temperature
Ground Temp. (°C) 25 30 35 40 45 50 55
XLPE Insulated Cables 1.09 1.04 1.00 0.95 0.90 0.85 0.80
PVC (rated 85°C) cables 1.10 1.05 1.00 0.95 0.89 0.84 0.77
PVC (rated 70°C) cables 1.13 1.07 1.00 0.93 0.85 0.76 0.65
Rating factors for variation in depth of burial (to center of cable in the trefoil group of cables)
Depth of Laying Size of Conductor
(meter) Up to 50 mm² 70mm² to 300mm² Above 300mm²
0.60 0.99 0.98 0.97
0.80 0.97 0.96 0.94
1.00 0.95 0.93 0.92
1.25 0.94 0.92 0.89
1.50 0.93 0.90 0.87
1.75 0.92 0.89 0.86
2.00 0.91 0.88 0.85
24
STC NEOM NEW SITE Project- in Saudi Arabia
Revision Date: Revision: Document No.:
October 21, 2024 A M-19-0004-EM-Re-0001
Site No.
SAUDI ARABIA
25
STC NEOM NEW SITE Project- in Saudi Arabia
Revision Date: Revision: Document No.:
October 21, 2024 A M-19-0004-EM-Re-0001
TABLE OF CONTENTS
26
STC NEOM NEW SITE Project- in Saudi Arabia
Revision Date: Revision: Document No.:
October 21, 2024 A M-19-0004-EM-Re-0001
SECTION 1.0
ELECTRICAL DC CALCULATION
27
STC NEOM NEW SITE Project- in Saudi Arabia
Revision Date: Revision: Document No.:
October 21, 2024 A M-19-0004-EM-Re-0001
SECTION 1.1
DC POWER ANALYSIS
28
STC NEOM NEW SITE Project- in Saudi Arabia
Revision Date: Revision: Document No.:
October 21, 2024 A M-19-0004-EM-Re-0001
SECTION 1.2
29
STC NEOM NEW SITE Project- in Saudi Arabia
Revision Date: Revision: Document No.:
October 21, 2024 A M-19-0004-EM-Re-0001
SECTION 1.3
30
STC NEOM NEW SITE Project- in Saudi Arabia
Revision Date: Revision: Document No.:
October 21, 2024 A M-19-0004-EM-Re-0001
SECTION 1.4
31
STC NEOM NEW SITE Project- in Saudi Arabia
Revision Date: Revision: Document No.:
October 21, 2024 A M-19-0004-EM-Re-0001
SECTION 2.0
ELECTRICAL AC CALCULATION
32
STC NEOM NEW SITE Project- in Saudi Arabia
Revision Date: Revision: Document No.:
October 21, 2024 A M-19-0004-EM-Re-0001
SECTION 2.1
33
STC NEOM NEW SITE Project- in Saudi Arabia
Revision Date: Revision: Document No.:
October 21, 2024 A M-19-0004-EM-Re-0001
MAX. MAX.
CONNECTED POWER CONNECTED DEMAND
SL NO. LOAD DESCRIPTION UNITS DEMAND DEMAND
LOADS (WATTS) FACTOR LOADS (VA) FACTOR
(kVA) (kW)
2 Socket Outlet 220V_UK Type 1.00 250.00 0.80 312.50 0.75 0.23 0.19
3 Tower/Obstruction Light 1.00 450.00 0.90 500.00 1.00 0.50 0.45
Total Demand Load 19450.00 19751.89 19.67 19.39
Note :
1. For DC analysis calculation, please see Section 1.1.
2. For electrical specifications of the Rectifier Cabinet, please see attachments Section 1.4.
34
STC NEOM NEW SITE Project- in Saudi Arabia
Revision Date: Revision: Document No.:
October 21, 2024 A M-19-0004-EM-Re-0001
SECTION 2.2
35
STC NEOM NEW SITE Project- in Saudi Arabia
Revision Date: Revision: Document No.:
October 21, 2024 A M-19-0004-EM-Re-0001
100 A - 66.27 A
% Spare @ 100 A MCCB = x 100% = 33.73%
100 A
Select: 1-4/C 35mm² Unarmored XLPE cable as the main feeder power cable in ground
Therefore, the ampacity of New 1-4/C x 35mm² XLPE cable is adequate to carry the load.
36
STC NEOM NEW SITE Project- in Saudi Arabia
Revision Date: Revision: Document No.:
October 21, 2024 A M-19-0004-EM-Re-0001
20 A - 1.81 A
% Spare @ 20 A MCB = x 100% = 90.96%
20 A
Select: 1-3/C 4mm² Unarmored XLPE cable as the main feeder power cable in Air
Therefore, the ampacity of New 1-3/C x 4mm² XLPE cable is adequate to carry the Tower Aviation load.
37
STC NEOM NEW SITE Project- in Saudi Arabia
Revision Date: Revision: Document No.:
October 21, 2024 A M-19-0004-EM-Re-0001
16 A - 0.75 A
% Spare @ 16 A MCB = x 100% = 95.29%
16 A
Select: 1-3/C 4mm² Unarmored XLPE cable as the main feeder power cable in Air
Therefore, the ampacity of New 1-3/C x 4mm² XLPE cable is adequate to carry the Socket Outlet load.
38
STC NEOM NEW SITE Project- in Saudi Arabia
Revision Date: Revision: Document No.:
October 21, 2024 A M-19-0004-EM-Re-0001
100 A - 51.63 A
% Spare @ 100 A MCCB = x 100% = 48.37%
100 A
Select: 1-4/C 50mm² Unarmored XLPE cable as the main feeder power cable in ground
Therefore, the ampacity of New 1-4/C x 50mm² XLPE cable is adequate to carry the load.
39
STC NEOM NEW SITE Project- in Saudi Arabia
Revision Date: Revision: Document No.:
October 21, 2024 A M-19-0004-EM-Re-0001
40
STC NEOM NEW SITE Project- in Saudi Arabia
Revision Date: Revision: Document No.:
October 21, 2024 A M-19-0004-EM-Re-0001
41
STC NEOM NEW SITE Project- in Saudi Arabia
Revision Date: Revision: Document No.:
October 21, 2024 A M-19-0004-EM-Re-0001
SECTION 2.4
42
STC NEOM NEW SITE Project- in Saudi Arabia
Revision Date: Revision: Document No.:
October 21, 2024 A M-19-0004-EM-Re-0001
Note: New 30kVA Dual Generator is required to carry the required loads.
43
STC NEOM NEW SITE Project- in Saudi Arabia
Revision Date: Revision: Document No.:
October 21, 2024 A M-19-0004-EM-Re-0001
SECTION 2.5
ATTACHMENTS A-C
44
STC NEOM NEW SITE Project- in Saudi Arabia
Revision Date: Revision: Document No.:
October 21, 2024 A M-19-0004-EM-Re-0001
ATTACHMENT (A)
NOTE :
These values are from Saudi Cable Company, Low Voltage Cables, Technical Catalogue.
45
STC NEOM NEW SITE Project- in Saudi Arabia
Revision Date: Revision: Document No.:
October 21, 2024 A M-19-0004-EM-Re-0001
Attachment (B)
NOTE :
These values are from Saudi Cable Company, Low Voltage Cables, Technical Catalogue.
46
STC NEOM NEW SITE Project- in Saudi Arabia
Revision Date: Revision: Document No.:
October 21, 2024 A M-19-0004-EM-Re-0001
ATTACHMENT (C)
Rating factors for variation in ground temperature
Ground Temp. (°C) 25 30 35 40 45 50 55
XLPE Insulated Cables 1.09 1.04 1.00 0.95 0.90 0.85 0.80
PVC (rated 85°C) cables 1.10 1.05 1.00 0.95 0.89 0.84 0.77
PVC (rated 70°C) cables 1.13 1.07 1.00 0.93 0.85 0.76 0.65
Rating factors for variation in depth of burial (to center of cable in the trefoil group of cables)
Depth of Laying Size of Conductor
(meter) Up to 50 mm² 70mm² to 300mm² Above 300mm²
0.60 0.99 0.98 0.97
0.80 0.97 0.96 0.94
1.00 0.95 0.93 0.92
1.25 0.94 0.92 0.89
1.50 0.93 0.90 0.87
1.75 0.92 0.89 0.86
2.00 0.91 0.88 0.85
47
STC NEOM NEW SITE Project- in Saudi Arabia
Revision Date: Revision: Document No.:
October 21, 2024 A M-19-0004-EM-Re-0001
SECTION 3.0
ELECTRICAL DRAWINGS
48