Daily HSE Report/Job Safety Analysis
Date: Location: Doc. Ref. No.
Project Name: Date:
Total Manpower: Page:
Unsafe Act/ Condition Corrective Action
S.N Time Location Area Incharge Completion Date Remarks
Observed Taken
Topic Discussed During Tool
Box Talk
Signed by:
Safety Representative Safety Engineer Site Engineer
Document No. Form (HSE-2), Rev.0, 08/06/2009
Weekly HSE Report
Date: Location: Doc. Ref. No.
Project Name: Date:
Page:
S.No. Observations Yes No Action Taken Responsible Person Completion Date
1 Is Tool Box Talk conducting every day?
Is a facility for HSE Orientation available and records being
2
maintained according to MAKCO Training Card?
Is the use of Personal Protection Gears such as Safety Helmet, Safety
3
Footwear, Safety Google and Safety Harness Apparent?
Is the condition of Scaffolding, Ladders and Work Platforms
4
Satisfactory?
Are openings and other potential fall points appropriately protected
5
or barricaded and marked?
6 Are earth leakage circuit breakers (ELCBs) installed (if required)?
7 Are Electric Equipment earthed properly?
8 Are distribution and switch boards properly insulated/locked?
9 Are Electric connections proper and without bare conductors visible?
10 Is the condition of cables satisfactory?
Are Combustible and Inflammable materials properly stocked to
11
prevent fire hazards?
12 Traffice Signs and Hazard Signs installed?
Document No. Form (HSE-2), Rev.0, 08/06/2009
Weekly HSE Report
Date: Location: Doc. Ref. No.
Project Name: Date:
Page:
13 Are First-aid Room adequately equipeed and Medic available?
Is fire fighting equipment adequate and serviceable and Fire
14
extinguisher tags checked regularly?
15 Is any accident/incident reported? If yes then attach report's copy.
16 Is site and office toilets are clean?
17 Is house keeping in site offices being taken care of?
18 Is house keeping on site being taken care of?
Is house keeping in accommodation and in dinning hall being taking
19
care of? Dinning hygine report is attached.
Other Site Information
Signed by:
Document No. Form (HSE-2), Rev.0, 08/06/2009
Safety Representative Safety Engineer Site Engineer
Document No. Form (HSE-2A), Rev.0, 08/06/2009
Weekly Hygiene & Sanitary Inspection Report (Kitchen & Dining)
Date: Location: Doc. Ref. No.
Project Name: Date:
Page:
Proposed
Corrective Responsible Tentative Days
S.N Activities/Area Satisfactory Un-Satisfactory Status To Date Completion Date Remarks
Action in case of Dept./Section of Completion
Unsatisfaction
1 General House Keeping
2 Food is properly stored and
protected from contamination.
3 Food storage area is clean.
Raw fruits and vegetables are
4 washed throughly before
serving.
Refrigerator is maintained at or
5
below 40 degrees and the
freezer at 0 degree Fahrenheit.
6 Food is being bought from
reliable supplier.
7 Work surfaces ae washed and
cleaned after using.
All small equipment and
8
utensils,including cutting boards
are cleaned before using.
Sink is properly set up for
9
washing.
Kitchen Dust Bins are emptied as
10
necessary.
Document No. Form (HSE-2A), Rev.0, 08/06/2009
Weekly Hygiene & Sanitary Inspection Report (Kitchen & Dining)
Date: Location: Doc. Ref. No.
Project Name: Date:
Page:
Proposed
Corrective Responsible Tentative Days
S.N Activities/Area Satisfactory Un-Satisfactory Status To Date Completion Date Remarks
Action in case of Dept./Section of Completion
Unsatisfaction
11 Exhaust Fans are Clean.
12 Lights Conduction.
13 Tables/Chairs arrangement.
14 Acs are working properly.
Drinking water Test are carried
15
out.
Pipeline of drain water of
16
kitchen is choke and broken.
Inspected By:
Company Health Representative Company Safety Representative Site Engineer
Document No. Form (HSE-3), Rev.0, 08/06/2009
Monthly HSE Report
Month, Year: Location: Doc. Ref. No.
Project Name: Date:
Page:
1 General
- Reached more than hrs.without LTI.
- Tool Box Talk conducting every
- Equipment Inspection started Daily and Monthly
- Safety Induction Training is providing to everyone
- New comers @ Persons
2 Accidents / Incidents
- Zero Accident/Incident
- No Near Miss Reported
3 Statistics
3.1 Project HSE&S Targets
Project Target Month 2009
Hours this month -
Total hours worked -
LTIR
(Lost Time Injury Rate) 0
Lost Time Incidents: 0
Formula:
200000/worked hours*Lost time Incidents
TRIP
(Total Recordable Injury Rate) 0.0 0.0
Recordable Incidents: 0
Formula:
200000/worked hrs*Recoordable Incidents
Major Environmental Spills 0 0
3.2 Manpower
MAKCO @ 00
Sub Cont. @ 00
Total @ 00
3.3 Incidents Overview
This Period Total
Lost Time incidents 0 0
Restricted Work Cases 0 0
Restricted Work Days 0 0
Medical Treatment 0 0
First Aid 0 0
Property Damage 0 0
Environmental Incidents 0 0
Monthly HSE Report
Document No. Form (HSE-3), Rev.0, 08/06/2009
Month, Year: Location: Doc. Ref. No.
Project Name: Date:
Page:
4 Training
4.1 Project Induction
Month 00
Total Trained 00
5 Water and Oil Record (Received)
Diesel 0000 Ltr.
Patrol 0000 Ltr.
Other Oil 0000 Ltr.
Water 0000 Gallon
6 Waste Disposal Record
Sewage Water None
Solid Waste None
7 Site Inspections This Week Total
7.1 Weekly Walk Through 00 00
Signed by:
Safety Representative Safety Engineer
Site Engineer HSE Manager
Project Manager General Manager (Technical)
Document No. Form (HSE-3B), Rev.0, 08/06/2009
Monthly Stationary Equipment/Plant Inspection Report
Project Name: Project No. Doc. Ref. No.
Location: Date:
Plant/Equipment Page:
Points to Check Condition
- Generator
- Engine
- Diesel Tank
- Elec. Connections
- Portable Elec. Equipment
- Regulators
- Flash Back Arrestors
- Hose Clamps
- Gas Cylinders Safety
- Extra Cylinders Safety
- Log Book/Records
- Rigging Codes/directions
- Charts of SWL at different radius
- Reversing/Slewing Indicator
- Out Riggers
- Slings, Ropes & Chains
- Handles/Ladders
- Mushroomed Heads
- Blunt/Worn Out Tools
Checked by:
Name:
Date:
Safety Representative
Document No. Form (HSE-3C), Rev.0, 08/06/2009
Monthly Moving Equipment/Vehicle Inspection Report
Project Name: Project No. Doc. Ref. No.
Location: Date:
Vehicle/Equipment Page:
Points to Check Condition
- Tyres (Pressure)
Tyres (Condition)
Tyres (Spare Wheel Capacity)
Tyres (Wind Screen)
Tyres (Rear Cabin Glass)
Tyres (Window Glasses)
- Brakes (Type of System)
Brakes (Hand Brakes)
- Seat Belts (3 Points)
Seat Belts (2 Points)
- Leakages Points in Fuel & Lubrication
- Tools (Jack)
Tools (Wheel Spanner)
Tools (Tommy Bar)
Tools (Timber Block)
Tools (Tool Box)
- Wipers & Wasers
- Loose Items in Driver's Cabin
- Documents (Registration)
Documents (Test Certificates)
Documents (Driver's License)
- Steering Wheel
- Gauges (Speedometer)
Gauges (Fuel Gauge)
Gauges (Charger)
- Mirrors (Rear View)
Mirrors (Slide View)
- Fuel Tank & System Properly Secured
- Horn (Reverse Horn)
- Head Lights
Tail Lights
Brake Lights
Reverse Lights
Hazard Lights
Signal Indicators
Parking Lights
Cabin Lights
- Battery
- Electrolytes
- Hydraulic System
- Last Service Date
- Fire Extinguisher (Type & No.)
Fire Extinguisher (Capacity)
Checked by:
Name:
Date:
Safety Representative
Document No. Form (HSE-10), Rev.0, 08/06/2009
Job Hazard Analysis Doc.Ref. No.
Date: Location: Revision No.
Project Name: Effective Date:
Activity: Page:
TASK HAZARD RISK ASSESSMENT CONTROLS RISK ASSESSMENT RESIDUAL RISK
Consequence
Consequence
Risk Rating
Risk Rating
Probability
Probability
Who or What
Description of Work Hazard Description & Preventive and
Step No. might be Alarm Level
Sequence Effect Precautionary Measures
affected?
Relevant Guidelines/Procedure:
Prepared by Approved by
JSA-00/ Consequence:1,2,3 (From low to high) Probability: A,B,C (From low to high) Risk Rating: L,M,H (From low to high)
Document No. Form (HSE-20), Rev.0, 08/06/2009
HSE Accident Report Doc. Ref. No.
Project Name: Project No. Time:
Location: Report No. Date:
Incident/Accident Type: Page:
Company Involved:
MAKCO SUB CONTRACTOR SUB CONTRACTOR NAME:
CLIENT CLIENT NAME:
Employee Involved (Injured/Witness):
Name: Employee No. Trade/Craft
1) 1) 1)
2) 2) 2)
3) 3) 3)
4) 4) 4)
Classification: ONE THE JOB OFF THE JOB
Nature:
Human Loss (Severity):
Illness/Medical Treatment RWI LTI Fatality
Property Loss (Severity):
Minor Major Disaster
Environmental Loss (Severity):
Minor Major Catastrophic
Discription:
Corrective Measures Taken:
Safety Representative CC: 1) General Manager (Technical). 2) Project Manager. 3) HSE Manager
Note: This document must be faxed/emailed within 24 hours to the HSE Manager, Project Manager and General Manager (Technical).
Document No. Form (HSE-21), Rev.0, 08/06/2009
HSE Accident Causes Checklist
HSE Accident Report No.: Location: Doc. Ref. No.
Project Name: Date:
Page:
APPARENT CAUSES
SUBSTANDARD ACTIONS SUBSTANDARD CONDITIONS
1.Operating equipment without 1.Inadequate guard or barriers
authority
2. Failure to secure 2.Improper protective equipment
3.Failure to warn 3.Defective tools, equipment
4.Operating at improper speed 4.Conjection or restricted action
5.Making safety device inoperable 5.Inadequate warning system
6.Using defective equipment 6.Fire & explosion hazards
7.Using equipment improperly 7.Poor housekeeping
8.Failure to properly use PPE 8.Environmental conditions
9.Improper loading/placement/lifting 9.Noise
10.Improper position for task 10.Inadequte ventilation
11.Servicing equipment in operation 11.High or low temperatures
12. Horse play 12.Inadequate illumination
LATENT CAUSES
PERSONAL FACTORS JOB FACTORS
1.Inadequate capability 1.Inadequate leadership supervision
2.Lack of knowledge/training 2.Inadequate engineering
3.Lack of skill 3.Inadequate purchasing
4.Stress 4.Inadequate tools/equipment
5.Improper motivation 5.Inadequate maintenance
[] 6.Fatigue 6.Inadequate work standards
[] 7.Mental absence 7.Wear & tear
8.Abuse or misuse
Document No. Form (HSE-50), Rev.0, 08/06/2009
HSE Non-Compliance Observation
Project Name: Project No. Doc. Ref. No.
Location: Date:
Page:
Non-Compliance Observed
Date:
To: Site Engineer
Following HSE non-compliance has been observed at site, please take immediate corrective action and reply.
Description:
cc : - HSE Manager
Initiated by: Site HSE Coordinator - Project Manager
Action Taken
Date:
To: Site HSE Coordinator
The above mentioned non-compliance has been corrected accordingly at hrs. on .
Description:
Reported by: Site Engineer cc : - HSE Manager
- Project Manager