0% found this document useful (0 votes)
97 views6 pages

BQ 49 Kerja Renovation Office JPS Gombak

The document outlines the pricing and specifications for renovation work at the Gombak District Office, including demolition, construction of new walls, mechanical and electrical works, and installation of furniture. It details various tasks with associated quantities and rates, as well as requirements for insurance, site cleanliness, and progress reporting. The total project duration is specified as 48 weeks.

Uploaded by

khairil.areca
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
97 views6 pages

BQ 49 Kerja Renovation Office JPS Gombak

The document outlines the pricing and specifications for renovation work at the Gombak District Office, including demolition, construction of new walls, mechanical and electrical works, and installation of furniture. It details various tasks with associated quantities and rates, as well as requirements for insurance, site cleanliness, and progress reporting. The total project duration is specified as 48 weeks.

Uploaded by

khairil.areca
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

( DOKUMEN MEJA )

JABATAN PENGAIRAN DAN SALIRAN DAERAH GOMBAK

sebutkan harga bagi mengadakan segala bahan-bahan, peralatan, jentera, pengangkutan, upah dan
pekerja-pekerja serta mengikutisyarat-syarat yang ditentukan bagi kerja:-

KERJA-KERJA MENGUBAHSUAI PEJABAT DAN KERJA-KERJA BERKAITAN DI


PEJABAT JPS DAERAH GOMBAK, SELANGOR

Bil Description Unit Quantity Rate Amount


( RM ) ( RM )

PRELIMINARIES

1.0 Subject to another 10% of retention instead of 5%


performance bond, and will be released upon CPC
approval.

2.0 Contractor's All Risks Insurance including Liability


and Workmen's, Compensation of SOCSO for full
value of the Contract or of the labour, costs as
applicable.

3.0 Temporary power and other supplies for works


inclusive of fees, connections, temporary reticulation
works and utilities consumption, removals and
reinstatement upon completion of works etc.

4.0 Keeping site clean at all times inclusive of clearing


of trade debris on daily, basis to designated area on
site and carting away from site on weekly basis or
as per required by Building owner.
5.0 Progress Report: Submission of progress
photograph, submission material sample for
approval prior to commencement and submission of
technical report

6.0 Testing & Commissioning

A DEMOLITION WORK

1.0 Dismantle all partition, doors, carpet ,ceiling & Lot 1


remove and disposal of the existing centralised air
conditioning ducting etc.

2.0 Removal of the unused networking cable & wayar Lot 1

3.0 Removal of the existing centralised air conditioning Lot 1


ducting not in used ( above ceiling)

4.0 Removal of the existing wall paper Lot 1


B NEW WALL, DOORS & WINDOWS

1.0 Dry wall gypsum board M2 151


(Supply and install full height gypsum board c/w
metal framing (approx. 3000mm high)

2.0 10mm thk. Clear tempered glass wall M2 118


(Supply and install tempered glass wall c/w powder
coated black frame with frosted sticker)

3.0 New pivot double glass door ( Main door) Set 1


Re- install back the existing double glass door ( size
1800 x 2100mm )
4.0 Aluminium frame with clear glass Set 9
Supply and install aluminium powder coated frame
with clear glass clear & frosted sticker, door
accessories and locks ( size 900 x 2100mm )

5.0 Existing double leaf timber door and grille Set 1


Repaint existing double leaf timber door and grill

6.0 Allowance for paint works and skim coat M2 770


Supply and install selected 3 layer emulsion paint
up to the S.O satisfaction.

7.0 Roller Blinds M2 45


Supply and install selected roller blinds as per
specification and drawings

C NEW FLOOR AND WALL FINISH

1.0 Carpet tiles M2 430


Supply and install selected carpet tiles

D NEW CEILING FINISH


M2 430
2' x 4' mineral fibre board
Supply & install suspension ceiling 2' x 4' 9mm pin
hole board

E MECHNICAL AND ELECTRICAL WORKS

1.0 13A plug points


Supply and install 13A plug point and fitting No 99
inclusive of rewiring from the existing cable up to the
S.O satisfaction.

2.0 Data Points


Supply and install data point and fitting inclusive of No 27
rewiring of the cable up to the S.O satisfaction.

3.0 HDMI @ Meeting Room


Supply and install HDMI cable No 1

4.0 Telephone point


Supply and install phone point No 26
5.0 LED downlights @ Reception & Meeting room
Supply and install light points and fittings inclusive No 31
of rewiring of the cable

6.0 600 x 1200mm mirror reflected light


Supply and install lighting points and 600 x 1200mm No 55
mirror reflected light

7.0 Emergency light


Supply and install light point & Emergency Light as No 3
per specification

8.0 Keluar Sign


Supply and install light point & Keluar sign as per No 1
specification

9.0 Switches
Supply and install switches fitting inclusive of No 30
rewiring of the cable up to the S.O satisfaction.

10.0 Key phone system


Relocate existing key phone system to existing L/Sump 1
server area

11.0 Air Cond System


Provide labour to dismantle 12 sets wall type split
unit Air – Cond
1.0 HP -1.5 HP Set 7
2.0 HP - 2.5 HP Set 5

To supply and install 5 sets " Daikin" R-410 non


inverter cassette type split unit Air - Cond c/w
0.61mm copper piping drain PVC piping, outgoing
wiring control, air-cond bracket and test run.
(a) Meeting Room : 2.0 HP cassette type Set 2
(b) Technical Room : 2.5 HP cassette type Set 1
(c) Technical Room : 3.0 HP cassette type Set 1
(d) Admin Dept. : 3.0 HP cassette type Set 1

Provide labour to install 7 sets wall type split unit Air


cond c/w 0.61mm copper piping 10ft, drain pvc
piping, outgoing wiring control, air-cond bracket ,
refill gas and test run
(a) Reception : 2 HP wall type Set 1
(b) Discussion Room : 1HP wall type Set 1
(c) Copier Room : 1HP wall type Set 1
(d) PJD Room : 1.5 HP wall type Set 1
(e) JD Room : 2.0 HP wall type Set 1
(f) 36 Room : 1.0 HP wall type Set 1
(g) CC Room : 1.5 HP wall type Set 1

To chemical cleaning 7 sets wall type split unit Air –


Cond
(a) Reception : 2 HP wall type Set 1
(b) Discussion Room : 1HP wall type Set 1
(c) Copier Room : 1HP wall type Set 1
(d) PJD Room : 1.5 HP wall type Set 1
(e) JD Room : 2.0 HP wall type Set 1
(f) 36 Room : 1.0 HP wall type Set 1
(g) CC Room : 1.5 HP wall type Set 1
F BUILT-IN FURNITURE

1.0 Reception counter @ Reception area (BF1)


Supply and install laminate ply finish c/w necessary No 1
accessories as per drawing and specifications

2.0 Filing cabinet @ Admin. Dept. (BF2)


Supply and install laminate ply finish c/w necessary No 1
accessories as per drawing and specifications

3.0 Filing cabinet @ C.C Room ( BF 3)


Supply and install laminate ply finish c/w necessary No 1
accessories as per drawing and specifications

4.0 Filing cabinet @ 36 Room ( BF 4)


Supply and install laminate ply finish c/w necessary No 1
accessories as per drawing and specifications

5.0 Filing cabinet @ JD Room ( BF 5)


Supply and install laminate ply finish c/w necessary No 1
accessories as per drawing and specifications

6.0 Filing cabinet @ JD Room ( BF 6)


Supply and install laminate ply finish c/w necessary No 1
accessories as per drawing and specifications

7.0 Filing cabinet @ PJD Room ( BF 7)


Supply and install laminate ply finish c/w necessary No 1
accessories as per drawing and specifications

8.0 Filing cabinet @ PJD Room ( BF 8)


Supply and install laminate ply finish c/w necessary No 1
accessories as per drawing and specifications

9.0 Filing cabinet @ Technical Dept. ( BF 9)


Supply and install laminate ply finish c/w necessary No 1
accessories as per drawing and specifications

10.0 Pantry cabinet @ Pantry (BF10)


Supply and install laminate ply finish c/w necessary No 1
accessories as per drawing and specifications

11.0 Filing cabinet @ Technical Dept. ( BF 11)


Supply and install laminate ply finish c/w necessary No 1
accessories as per drawing and specifications

12.0 White glass panel @ Meeting Room (BF 15)


Supply and install white glass board with plywood No 2
backing as per drawing

13.0 Box up main entrance


Supply and install laminate ply finish c/w necessary No 1
accessories as per drawing and specifications
G OFFICE FURNITURE

1.0 Workstation for C.C Room


1500/750 x 1700/450 x 750H AYA series aluminium Set 1
frame workstation c/w open shelf & sliding door side
return cabinet, metal modesty panel, 4 gang
aluminium net box & wire riser

2.0 Workstation @ PJD Room


2300/900 x 2000/600 x 760H KAYA presidential Set 1
series table c/w side return cabinet & 2D!F stand
pedestal

3.0 Workstation @ Admin Dept.


1500/750 x 1500/450 x 750/1200H x 5 Silver Pax 6
Anodized aluminium frame workstation in half-
polycarbonate c/w wire trunking, E-model support
leg and 2D1F drawer stand pedestal

4.0 Workstation - cluster of 11 @ Technical Dept.


1500/750 x 1500/450 x 750/1200H x 5 Silver Set 11
Anodized aluminium frame workstation in half-
polycarbonate c/w wire trunking, E-model support
leg and 2D1F drawer stand pedestal

5.0 Meeting table @ Meeting Room


6000 x 1200 x 750H COMO Chrome aluminium No 1
frame meeting table c/w 3 units 4 gang aluminium
net box & wire riser

6.0 Round table @ Discussion Room


1050dia x 750H round metal epoxy finishing base No 1
discussion tab

7.0 Chair @ Meeting Room


Sunny mesh chair in Nylon Base No 18

H PLUMBLING WORK

Provisional sum for plumbing works include wash Lot 1


area @ Pantry Area

I REPAIRING RC ROOF

Repair concrete roof leaking. Supply and lay 'SIKA' M² 460


water proofing exclude hacking concrete slab

TOTAL AMOUNT

( Ringgit Malaysia : .......................................................................................................................................)

Tempoh kerja disiapkan dalam masa : Empat Puluh Lapan ( 48 ) Minggu.