Ce37b2 G2 WR2

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
10 views5 pages

Ce37b2 G2 WR2

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

COLLEGE OF ENGINEERING

CIVIL ENGINEERING DEPARTMENT

A MATERIAL ESTIMATION AND WORK BREAKDOWN


STRUCTURE FOR A TWO-STORY RESIDENTIAL BUILDING

WEEKLY PROGRESS REPORT 2

SUBMITTED BY:
Basma, Anna Zaynab
Co, Ela Mae D.
Dago-oc, Chantal Lorraine
Elot, Kier Andrew
Estimos, Gem Kevin
Fajanilbo, John Michael

SUBMITTED TO:
Engr. William M. Turno

February 10, 2025


TABLE OF CONTENTS

MASTER SCHEDULE AND PLANNING OF WEEKLY TASKS................................................... 2

WEEKLY PROGRESS REPORT SUMMARY...............................................................................3

GOOGLE DRIVE LINK..................................................................................................................4

1
MASTER SCHEDULE AND PLANNING OF WEEKLY TASKS

Table 1. Gantt Chart of Schedule


Tasks Week 1 Week 2 Week 3 Week 4 Week 5

Planning (WBS, Plan Acquisition)

Designating Tasks

Materials Estimations

Completing the Work Breakdown


Structure (WBS) tasks

LEGEND
Red - Not yet started
Orange - On-going
Green - Completed

2
WEEKLY PROGRESS REPORT SUMMARY (GROUP 2)

Week 2: February 3 – February 8

Group Leader: Ela Mae Co


Group Members:
1.​ Anna Zaynab A. Basman
2.​ Chantal Lorraine C. Dago-oc
3.​ Kier Andrew P. Elot
4.​ Gem Kevin S. Estimos
5.​ John Michael Fajanilbo

Name Task Assignment Status


(Pending, On-going, Completed)

Co Designating tasks for the On-going


week, overseeing the project’s
progress, and helping
accomplish other tasks.

Basman Assessment of current Completed


progress and summary of
accomplished work.

Dago-oc Listing the required materials On-going


based on the project needs.

Elot Formatting the weekly report Completed


and planning on upcoming
tasks for the following week.

Estimos Designing and making of Completed


WBS format.

Fajanilbo Begin estimating the required On-going


materials based on the project
needs.

Planned Work:
●​ Designate tasks to accomplish in preparation for the second week.
●​ Begin estimating and listing required materials based on the project needs.
●​ Group meetings and analysis of plans and tasks.
●​ Assessment of current progress and summary of accomplished work for this week.

3
Accomplished Works:
●​ Tasks were successfully assigned to each team member based on the work breakdown
structure.
●​ Ensured that all team members acknowledged their roles and responsibilities.
●​ Prepared a weekly report outlining the team's advancement on the project.
●​ Reviewed the work breakdown structure (WBS).
●​ Improve formatting of weekly reports and implementation of additional information.

Work Planned for the Following Week:


●​ Improve the list of required materials and cross-check with the project specifications.
●​ Continue estimating the quantities of materials needed for the project.
●​ Consult adviser regarding the Work Breakdown Structure (WBS).
●​ Start designating tasks for the Project Initiation and Planning (refer to the project’s WBS)

Google Drive Link (WBS and Plan):


https://drive.google.com/drive/folders/1XXjxZAdH_ZeD5OMIo3qk91Svye2O6BL2?usp=sharin
g