4.
Roads under intervention
Damage Description Accessibility status and
alternative routes Photographical report
Road/area
Collapse of the aqueduct at km 13 at Conditional access via a D-
N1: Anchilo. tour on the site. No truck size
Nampula/N limitation.
amialo
Cut in the backfilling of the south and north Inaccessible. Temporary
joints of the bridge over the Monapo River intervention for rapid circulation
located at km 2 of the intersection started on South joint. The
between N1 and N12 ( Namialo) intervention is still at early stage
N1: Alternative route via
Namialo/N Nampula Lichinga
amapa Cut in the backfilling of the north joint of Inaccessible. Temporary
the bridge over the Mecuburi River located intervention for rapid circulation
at km 90 ( between Nacaroa and Erati started on north joint expected to
Districts boarders) be completed within four days.
1
4. Roads damages and alternative
routes
Accessibility status and alternative
Road/Area Damage Description Reportagem fotográfica
routes
Cut in the backfilling of the south Inaccessible. There is a D-tour using tertiary
R689:
Monapo joint of the bridge over the roads from Meconta to Quixaxe. Payload limit to
Monapo/Quixaxe
Ampuesse River located at km 12 5T.
Cut in the backfilling of the north
R689: km 13
Angoche joint of the bridge over the Inaccessible. No alternative route identified
(Angoche) Liupo
Mutucute River located at km15.5
R699: Erosion in the backfilling of the east Conditional access. limited to
Mossuril Naguema/Chocas joint of the bridge over the Muecate motorbikes and pedestrian crossing.
Mar II River located at km 1.5. Access repair in progress.
4. Roads damages and alternative
routes
Accessibility status and alternative
Road/Area Damage Description Reportagem fotográfica
routes
Inaccessible. No alternative route identified.
R696:
Rapale Cut on the main road Assessment and repairs to start after the
Rapale/Mecuburi
reduction of the water table
R698 Crz N1 Cut in the backfilling of the south Inaccessible. No alternative route identified.
Meconta (Nacavala)/Mueca joint of the bridge over the Monapo Assessment and repairs to start after the
te River reduction of the water table
Inaccessible. No alternative route identified.
R698 Metal bridge on the Muecate river
Muecate Assessment and repairs to start after the
Muecate/Imala was washed away.
reduction of the water table
R696 Inaccessible. No alternative route identified.
Mecuburi Mecuburi/Crz Cut on the main road Assessment and repairs to start after the
R698 (Muite) reduction of the water table
4. Roads damages and alternative
routes
Accessibility status and alternative
Road/Area Damage Description Reportagem fotográfica
routes
Inaccessible. No alternative route identified.
R694: Metal bridges on the Mpuipui and
Ribaue Assessment and repairs to start after the
Ribaue/Lalaua Lalaua rivers were washed away.
reduction of the water table
Inaccessible. No alternative route identified.
R681:Crz N324 Metal bridge on the Manganha river
Larde Assessment and repairs to start after the
(Ivate)/Larde Km 11 was washed away.
reduction of the water table
N104: Conditional access Repairs on the D-tour
Mogovolas Cut on the existing D-tour Km 22
Nametil/Angoche are ongoing. No truck size limitation.
Inaccessible. No alternative route identified.
Nacala-a- R703: Nacala-a- Metal bridge on the Nihequehe
Assessment and repairs to start after the
Velha Velha/Memba river km 23 was washed away.
reduction of the water table
Damages location Mapping
Ministério dos Transportes
11 e Logística
REPORTAGEM FOTOGRÁFICA
Ponte sobre Rio Monapo- N12:Namialo/Nacala- Ponte metálica sobre o rio Mpuipui –
Porto Ribaue/Lalaua
Aqueduto no km 13 próximo do Controlo de ponte metálica sobre o rio Nihequehe-Nacala-a-
Ministério dos Transportes
Anchilo. Ponte sobre Rio Monapo- Nacavala/Muecate Velha/Memba11 e Logística
7