Risk Assessment Sheet
Risk Assessment Sheet
Abbreviations:
Building Dimensions:
Length(L) (m): 138.0 Width(W) (m): 19.0 Height(H) (m): 14.0
Rectangular structure
A e = LW + 6H(L+W) + π 9 H2
Ae = 21349.0 m2
C1 = 0.25
Rev. 0
Reference : http://www.nasa.gov/centers/goddard/news/topstory/2004/0621lightning_prt.htm
-6
N d = (N g ) x (A e ) x (C 1 ) x 10
Nd = 0.0267 event/year .
Roof Material
Structure Material Metal Nonmetallic Combustible
Metal 0.5 1.0 2.0
Nonmetallic 1.0 1.0 2.5
Combustible 2.0 2.5 3.0
C2 = 1.0
Rev. 0
C3 Structure Contents
0.5 Low value and noncombustible.
1.0 Standard value and noncombustible.
2.0 High value, moderate combustibility.
3.0 Exceptional value, flammable liquids, computer or electronics.
4.0 Exceptional value, irreplaceable cultural items.
C3 = 0.5
C4 Structure Occupancy
0.5 Unoccupied.
1.0 Normally Occupied.
3.0 Difficult to evacuate or risk of panic.
C4 = 1.0
C5 Lightning Consequence
1.0 Continuity of facility services not required, no environmental impact.
5.0 Continuity of facility services required, no environmental impact.
10.0 Consequences to the environment.
C5 = 1.0
-3
1.5 x 10
Nc =
(C 2 )(C 3 )(C 4 )(C 5 )
Rev. 0
Risk Calculation:
Accordingly,
Should Be Installed