The document outlines the Inspection and Testing Plan (ITP) for the TBM drives of the Greater Cairo Metro Line 4, specifically for grouting from the vertical shaft to station no. 6. It includes detailed specifications, acceptance criteria, and testing frequencies for various materials and processes involved in the project. The plan emphasizes the roles of different engineering and quality control personnel in ensuring compliance with the standards set forth in the tender documents.

Uploaded by

ahmedmessbah3
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
26 views7 pages

ITP FOR TBM Grouting Final

The document outlines the Inspection and Testing Plan (ITP) for the TBM drives of the Greater Cairo Metro Line 4, specifically for grouting from the vertical shaft to station no. 6. It includes detailed specifications, acceptance criteria, and testing frequencies for various materials and processes involved in the project. The plan emphasizes the roles of different engineering and quality control personnel in ensuring compliance with the standards set forth in the tender documents.

Uploaded by

ahmedmessbah3
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 7

ARAB REPUBLIC OF EGYPT

MINISTRY OF TRANSPORTION

NATIONAL AUTHORITY FOR TUNNELS

Greater Cairo Metro


Line 4 – Phase 1 – New CP401
(GCML4-P1-NCP401)

Layout Ref: Tender Documents for CP401/Vol3/P1-1

INSPECTION AND TESTING PLAN (ITP) FOR TBM (Drives Down line East
bound From vertical shaft to station no .6)Grouting

Rev
Format: A4 REF: R-401-ALL-QUC-02-00 Pages:
A

A
01-08-2023

Eng. ayman el
Eng.Ahmed Morad Eng.Sherif Abd Elfatah
shabrawy
B 31-8-2023

REV. DATE PREPARED BY CHECKED BY APPROVED BY AMENDMENTS


GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401

INSPECTION AND TESTING PLAN (ITP) FOR TBM Drives Down line East bound From vertical shaft to station no .6 Grouting

Abbreviations

CSE Contractor Site Engineer NAT Client , Employer or Owner

CQCE Contractor Quality control Engineer ENG Consultant

IR Inspection Request 100% All items

RMG Ready Mixed Concrete MTC Mill Test Certificate


RDM Random check MDS Materials data sheet

MS Method statement ICL Inspection Check List

Specs Specifications MIR Materials Inspection request


MRSF MATERIAL RELATED SUBMISSION FORM OAB Once At Beginning

MEP Mechanical – Electrical – Plumping IFC Issued For Construction


Inspection Involvement Codes

Code Description

H Hold : Subsequent work not to be proceed until inspection / test is accepted


W Witness : Subsequent work could proceed / but IR submission is mandatory

S Surveillance : Works could be proceeded without IRS


R Review of drawings , documents or records
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401

INSPECTION AND TESTING PLAN (ITP) FOR TBM Drives Down line East bound From vertical shaft to station no .6 Grouting

Inspection/Test Involvement
Characteristic to be Details Verifying
Item Activity Reference Document Acceptance Criteria Frequency
Verified Documents
CSE CQCE ENG
1.0 Raw Materials

1.1: Coarse Aggregates – Small size (D/d=5.6/2)

 Particular Specifications
1.1.1 Grading of coarse aggregates Review of sieve analysis H H R Monthly
Vol. 4 Part 9 clause  BS EN 12620 Test report
test results
2.3.13
 Particular Specifications
1.1.2 Silt content / Fines Review of test result Vol. 4 Part 9 clause H H R Monthly Test report
 Max 1.5%
2.3.13
BS EN 12620
 Particular Specifications
1.1.3 Vol. 4 Part 4 clause H H R Monthly
Water absorption of aggregate  Max 2.5% Test report
Review of test result 4.3.2

 Particular
Specifications
1.1.4 Specific gravity (app) of H H R Monthly
Review of test result Vol. 4 Part 9 clause  N/A Test report
aggregates
2.3.13

 Particular
Specifications
1.1.5 H H R Monthly
Chloride content Review of test result Vol. 4 Part 4clause  Max 0.04% Test report
4.3.2

 Specifications
1.1.6 Vol. 4 Part 4clause H H R Monthly
Sulphate content Review of test result  Max 0.4% Test report
4.3.2

1.2: Filler (D/d = 2/0)

1.2.1 Review of sieve analysis Particular Specifications H H R Monthly Test report


Grading of coarse aggregates  BS EN 12620
test results Vol. 4 Part 9 clause 2.3.12
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401

INSPECTION AND TESTING PLAN (ITP) FOR TBM Drives Down line East bound From vertical shaft to station no .6 Grouting

Inspection/Test Involvement
Characteristic to be Details Verifying
Item Activity Reference Document Acceptance Criteria Frequency
Verified Documents
CSE CQCE ENG

1.2.2 Review of test result H H R Monthly Test report


Organic impurities ASTM C40 Nill

 Particular
Specifications
1.2.3 H H R Monthly Test report
Chloride content Review of test result Vol. 4 Part 4clause  Max 0.06%
4.3.2

 Specifications
1.2.4 Vol. 4 Part 4clause H H R Monthly Test report
Sulphate content Review of test result Max 0.4%
4.3.2

1.3 Fine Aggregates ( Natural sand )

 Particular Specifications
Review of sieve analysis Vol. 4 Part 9 clause Grading zone to be C,M
1.3.1 Grading of fine aggregates H H R Monthly Test report
test results 23.13 BS or fine
 EN 12620

 Particular Specifications
Vol. 4 Part 9 clause
1.3.2 Silt content / Fines  Review of test result 2.3.12 Max 3.0% H H R Monthly Test report
 BS EN 12620

 Particular
Specifications
1.3.3 Chloride content  Review of test result Vol. 4 Part 4clause Max 0.06% H H R Monthly Test report
4.3.2
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401

INSPECTION AND TESTING PLAN (ITP) FOR TBM Drives Down line East bound From vertical shaft to station no .6 Grouting

Inspection/Test Involvement
Characteristic to be Details Verifying
Item Activity Reference Document Acceptance Criteria Frequency
Verified Documents
CSE CQCE ENG

 Specifications
Vol. 4 Part 4clause
1.3.4 Sulphate content  Review of test result Max 0.4% H H R Monthly Test report
4.3.2

 Particular Specifications
Vol. 4 Part 4 clause
1.3.5 Water absorption of aggregate Max 2.5% H H R Monthly Test report
 Review of test result 4.3.2

 Particular
Specifications
Specific gravity (app) of
1.3.6 Review of test result Vol. 4 Part 9 clause N/A H H R Monthly Test report
aggregates
2.3.12

1.4 Cementitious materials

 Particular
 Type and source
1.4.1 Specifications H H R Monthly Test report
Cementitious materials SR3  Chemical analysis  Related standards
Vol. 4 Part 9 clause
 Physical tests 2.3.9
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401

INSPECTION AND TESTING PLAN (ITP) FOR TBM Drives Down line East bound From vertical shaft to station no .6 Grouting

Inspection/Test Involvement
Characteristic to be Details Verifying
Item Activity Reference Document Acceptance Criteria Frequency
Verified Documents
CSE CQCE ENG

 Particular
Specifications
1.4.2 Cementitious materials  Review of mill test H R R Monthly MTC
Vol. 4 Part 9 clause  Related standards
delivery certificates
2.3.9

1.5 Admixtures / Additives

*Chloride content  Particular


*Acid soluble alkali Specifications
1.5.1  As per material H H W Monthly Test report
Admixtures / Additives content Vol. 4 Part 9 clause
data sheet
*Specific gravity 2.3.15

1.6 Batching water

 Particular  Particular
-Chloride content
Specifications Specifications
1.6.1 -PH value H H R Monthly Test report
Batching water Vol. 4 Part 9 clause Vol. 4 Part 9
-Dissolved solids
2.3.14 clause 2.3.14

1.7 Bentonite (Slurry)

Every day and


 Approved design mix  Approved design mix
1.7.1 H H R before each shift Test report
Bentonite (Slurry) Density
when starting

2- Grouting Mix Design

-Fresh grout mortal


2.1 tests assessment  According to approval  According to approval H H R OAB Test report
Mix Approval
-Hardened grout mortal mix design WF014337 mix design
tests assessment
GREATER CAIRO METRO LINE 4 PHASE (1) – NEW CP401

INSPECTION AND TESTING PLAN (ITP) FOR TBM Drives Down line East bound From vertical shaft to station no .6 Grouting

Inspection/Test Involvement
Characteristic to be Details Verifying
Item Activity Reference Document Acceptance Criteria Frequency
Verified Documents
CSE CQCE ENG
3- Fresh grout mortar testing and pouring

 Slump  Approved design mix  100mm ± 40mm


 Temperature  delivery note (Printout)  Max 35˚C For each truck
 Brass flow table  ASTM C1437  200mm+-40mm mixer

3.1 H H H Test report


Fresh grout mortar Tests  Bleeding
 Exudation
 Check of delivery note  Max 2.0%
For every shift
for amount, type,  ASTM C940  Max 6.0%
quantity, cement
content, etc...

4- Hardened Grout mortar Tests (100 mm. cubes)

 Particular
Specifications 6 cubes For
4.1 H H H IR + Test report
Hardened Grout mortar Tests  Compressive strength Vol. 4 Part 4 clause  3.0Mpa every shift
6.11.1

 Particular  Particular
Specifications Specifications
4.2 H H R Monthly Test report
Hardened Grout mortar Tests  Sulphate resistance Vol. 4 Part 4 clause Vol. 4 Part 4
6.11.1 clause 6.11.1
 