JOB CARD NUMBER RECEIVED DATE JOB REQURIMENTS/DESCRIPTION REQUESTED BY JOB SPECIFICATION JOB CARD LOCATION IDENTIFICATION START DATE END DATE STATUS REMARKS
007/2020 3-Jan-20 Fabricate a stand for the UPS MAINTANANCE Completed
012/2020 21-Jan-20 Arrange to cut Tank S7 shell PROJECT PROJECT Tank farm Tank Shell 21st Jan ,2020 Ongoing
014/2020 20-Jan Please check and rectify problem for the truck monitor tender I MAINTANANCE Completed
021/2020 6-Jan-20 Please sand blast and paint the newly fabricated pontoon MAINTANANCE Completed
024/2020 6-Jan-20 Relocate automatic
Fabricate the steel fire extinguisher
structured shadesinstalled
for theincontainerised
wall horizontally
(3pcs)to fire
be installed in the roofand
figting equipment of vertical position
caterpillar fire MAINTANANCE Completed
025/2020 6-Jan-20 water pump (1pc) PROJECT MAINTANANCE Tank farm Workshop Ongoing
026/2020 6-Jan-20 Repair roof and damaged shell at tank S 34 MAINTANANCE Completed
028/2020 6-Jan-20 Fabricate floating pontoon on Tiper jetty; fabricate pontton at workshop MAINTANANCE Completed
030/2020 20-Jan-20 Cleaning of petroleum hydrocarbons at T.Junction soon after SBM receiving operation MAINTANANCE Completed
031/2020 20-Jan-20 Replace coroded roof sheets from fire water pumps shade with new roofing sheets MAINTANANCE Completed
032/2020 7-Jan-20 Conduct corrective and periodic service on generator, trailer tyre, compressor, amarok double cabin MAINTANANCE Ongoing
033/2020 21-Jan-20 Check and rectify right side door mirror for the fire truck tender I .8 fire truck locker HSSEQ MAINTANANCE Fire station Fire truck Tender I and Fire truck locker 22, Jan , 2020 Ongoing
012/2020 21-Jan-20 Arrange to cut Tank S7 shell PROJECT Ongoing
013/2020 21-Jan-20 Carry out welding of the bottom plates for tank S7 PROJECT PROJECT Tank Farm Bottom plates 21st Jan ,2020 Ongoing
034/2020 21-Jan-20 Check and
Provide service
boom outassist
lift to orderingenerator at MOP
CCTV checkup and(Engine not switching
maintainance on)
at T junction area, store yard area, tank farm MAINTANANCE Completed
036/2020 22-Jan-20 area, landfill area, bitumen araea, jetty area FAM MAINTANANCE Tank farm CCTV Camera 28th Feb,2020 Ongoing
037/2020 22-Jan-20 Carry out fabrication
Inspect/conduct and installation
preventive of pipes
maintanance connection
on new ofpumps
transfer fire water container,
located behinddismantling and removing
old laboratory building asold
perp MAINTANANCE Completed
039/2020 22-Jan-20 attached document from the manufacter MAINTANANCE Completed
040/2020 23-Jan-20 Assist using crane or forklift to offload a container from the truck PROJECT MAINTANANCE Store Yard Container Ongoing
041/2020 23-Jan-20 Fabricate storage case for used tools MAINTANANCE Completed
042/2020 23-Jan-20 Repair HSSEQ KPI board located near main gate MAINTANANCE Completed
043/2020 23-Jan-20 Provide transport for carrying diesel from filling station station to power station for generator uses. MAINTANANCE MAINTANANCE Petrol Station Diesel 31st Jan , 2020 Ongoing
044/2020 23-Jan-20 Check and rectify the altermator and battery for tractor T313 AVX not functioning proper MAINTANANCE Completed
045/2020 23-Jan-20 Measuremobile
Provide the rupture
crane glass flange
to assist diameter
shift electricthat
motorarefrom
missing at all flow
82MP6A chambers
to 82MP5B then motor 82MP5B to the return MAINTANANCE Completed
047/2020 22-Jan-20 at workshop for major repair. MAINTANANCE Completed
048/2020 23-Jan-20 Fabricate tripod stand for dome roof assembling PROJECT PROJECT Workshop Tripod stand 23rd Jan , 2020 Completed
050/2020 23-Jan-20 Assist on motor maintainance works at pumps which may involve hotwork MAINTANANCE Completed
052/2020 24-Jan-20 Replacement of new hinges on cctv cabinet door and coluring the whole cabinet MAINTANANCE Completed
053/2020 24-Jan-20 Cut a corroded panel shade near S8 along road number 10 under electricians guide MAINTANANCE Completed
055/2020 24-Jan-20 Check and rectify Godiva water pump engine not starting MAINTANANCE Completed
059/2020 27-Jan-20 Fabricate 3pcs of clamp 10" for operational use MAINTANANCE Completed
065/2020 27-Jan-20 Fabricate
Connecta cover
the AGO for Line
an earth rodMogas
to the chamberlineatflushed
communication
ready tosecurity
be usedtower at MOP
for AGO to 12area
&13 at the popint to be MAINTANANCE Completed
066/2020 27-Jan-20 shown by MOP superitendant MAINTANANCE Completed
068/2020 27-Jan-20 Fabricate access platform arounf tank farm dykes. MAINTANANCE Completed
069/2020 28-Jan-20 Carry out sheel plate welding X-Ray on Tank S7 PROJECT PROJECT Tank farm T s7 X-ray 29th Jan, 2020 Ongoing
071/2020 28-Jan-20 Eliminate water leakage for 6" outlet T-piope connected to 2FWR MAINTANANCE Completed
073/2020 28-Jan-20 Perform color coating on product flow meters at MOP MAINTANANCE Completed
076/2020 31-01-2020 Fabricate 4pcs of stubs as per required dimensions 14" 10" 8"4" MAINTANANCE Completed
075/2020 3-Feb-20 Transport and install floating pontoon with associated facilities at Tipper jetty OPERATIONS MAINTANANCE Tiper Jetty Pontoon installation 7th Feb, 2020 9th April,2020 Completed
078/2020 3-Feb-20 Remove the male coupling from 8 diam water man ring on road no 9 and fabricate and install it on a foam chambeMAINTANANCE Completed
079/2020 3-Feb-20 Replace corroded landing plate on the roof of Tank S23 and install a new alluminium dip hatch cover OPERATIONS MAINTANANCE tank farm Tank 23 3rd March,2020 Ongoing
080/2020 3-Feb-20 Carry out general service of TATA pick up T396 CLF MAINTANANCE Ongoing
081/2020 4-Feb-20 Elongate 4" steel pipe line into DAWASA water reseivor MAINTANANCE Ongoing
082/2020 4-Feb-20 Install TIPER National flag as per requested at TIPER entrance main gate pole HSSEQ MAINTANANCE Main Gate Flag Installation 6th Feb,2020 Ongoing
083/2020 4-Feb-20 Carry out fixing of radiator, air cleaner and general check up of Nissan Uruvan T881 DFT MAINTANANCE Ongoing
085/2020 5-Feb-20 Check and rectify Godiva water pump engine not starting MAINTANANCE Ongoing
087/2020 6-Feb-20 Do repair of tool box cabinet ata workshop MAINTANANCE Ongoing
086/2020 6-Feb-20 Repair corroded lifting chain which held fire tender 1 spare tyre currently ythe spare tyre can not be taken in cas MAINTANANCE Ongoing
089/2020 6-Feb-20 Remove the sunction line for pump 82mp2b for mantainance of the leaking drainage MAINTANANCE Completed
090/2020 7-Feb-20 Sand blast and paint tank 34 MAINTANANCE MAINTANANCE Tank farm Tank S34 Completed
092/2020 7-Feb-20 Fabricate and modify dike valves for all dikes around the tank farm to achieve water tigtness MAINTANANCE Completed
093/2020 6-Feb-20 Mobile crane to assist removing of electrical motor from pump house to workshop to allow major repair MAINTANANCE Completed
095/2020 6-Feb-20 Provide equipments to assist removing of generator and loading to truck MAINTANANCE Completed
096/2020 7-Feb-20 Remove and load on truck the used Air compressor vessel lpc and heater element vessel lpc MAINTANANCE Completed
0100/2020 10-Feb-20 Make an arrangement of wood pallets in painting room at store yard No.5 MAINTANANCE Completed
0103/2020 11-Feb-20 Fabricate and install a cooling ring and foam system at tank no-34 MAINTANANCE Completed
0105/2020 14-Feb-20 Check and rectify access height and eliminate leakage for all Hydrant around Tank farm HSSEQ MAINTANANCE Tank farm Access height 17th Feb,2020 Ongoing
0106/2020 14-Feb-20 Weld foam female coupling on the inlet of foam systems to tank S15 and S14 MAINTANANCE Completed
0108/2020 17-Feb-20 Check and service then start the engine of spill control pump mounted on spill trolley MAINTANANCE Completed
0113/2020 21-Feb-20 Provide mobile Air compressor and operator to facilitate removal of water in tank No-25 MAINTANANCE Completed
0118/2020 19-Feb-20 Please provide a boomlift to maintain a security light at land fall and Tiper Jetty MAINTANANCE MAINTANANCE Land fall Boom lift-Security light 2nd March,2020 28th July,2020 Completed
0117/2020 26-Feb-20 Pls insert roller to a gate and inspect all mechanical part for service MAINTANANCE Completed
0124/2020 2-Mar-20 Eliminate leakage of pipelina outlet from the water pump to monitor of fire truck lender No 1 MAINTANANCE Ongoing
0127/2020 2-Mar-20 Please remove orange strips on AGO pipeline and repaint with yellow strips MAINTANANCE MAINTANANCE Tank farm Color coding 2nd March,2020 Ongoing
0121/2020 27-Feb-20 Repair the waiting bench brocken to be installed at TIPER RECEPTION MAINTANANCE Completed
0122/2020 28-Feb-20 Provide Mobile Crane to facilitate installation of transfer pump 82MP 2B to pump house MAINTANANCE Ongoing
0131/2020 27-Feb-20 Please fabricate sturb 3'' to facilitate installation of hose 3'' into spillage trolley for sucking water inside tank No MAINTANANCE Completed
0120/2020 28-Feb-20 Please sand blast and paint the bottom plates and internal side of the first course shell of the tank S 34 MAINTANANCE Completed
0130/2020 27-Feb-20 Service water cooling ring system on all product tanks HSSQE MAINTANANCE Tank farm Cooling rings Ongoing
0131/2020 27-Feb-20 Flush water cooling ring system on all product tanks in order to disblock cloged sprinklers and removing scales ins HSSQE MAINTANANCE Tank farm Flushing cooling ring Ongoing
0133/2020 4-Mar-20 Move simtank (10000 hrs ) platform from the store yard workshop to the Gantry Area MAINTANANCE Completed
0134/2020 Transfer motor from w/shop to pump house MAINTANANCE Ongoing
0135/2020 5-Mar-20 Assist to offload paints from truck into store yard room MAINTANANCE Completed
0138/2020 6-Mar-20 Please perform general service on new water pump diesel engine then make testing MAINTANANCE Completed
0139/2020 9-Mar-20 Provide transport for stufling motor from w/shop to pump house (82mp5A) MAINTANANCE Completed
0143/2020 11-Mar-20 Piping from diesel tank to pump engine MAINTANANCE Completed
0144/2020 11-Mar-20 Piping work from cooling water or jockey pump to water basin MAINTANANCE Completed
0146/2020 12-Mar-20 Construction of a new metal box and fitting the constructed box to T-junction cctv post MAINTANANCE Completed
0149/2020 18-Mar-20 Full general service of TATA (T396CLF) MAINTANANCE Completed
0150/2020 18-Mar-20 Provide forklift/crane to assist removing of drums at manfold of tank No 20 and no 6 &7 at tank farm MAINTANANCE Completed
0151/2020 18-Mar-20 Make repair of hanger bolts, then check the system of hydraulic oil tractor T313 AVX MAINTANANCE Completed
0152/2020 19-Mar-20 Dismantle by cutting using grinder a pole of security lights ata water tower and install or weld ata tower near API MAINTANANCE Completed
0154/2020 23-Mar-20 Check broken leaf spring then eliminate leakage on radiator water level also check the noise on rear door. MAINTANANCE Ongoing
0156/2020 20-Mar-20 Assist to remove stucked truck near water basin MAINTANANCE Completed
0159/2020 23-Mar-20 Fabricate and fix (fiffed) the handrail on stairs to new mop office MAINTANANCE Completed
0160/2020 23-Mar-20 Sourtot pipe fittings and make re -arrangement0f scrapes at scrap yard MAINTANANCE Ongoing
0161/2020 24-Mar-20 Cold cut and remove bitumen pipes around tank farm OPERATIONS MAINTANANCE Tank farm Bitumen pipes 25th March,2020 Ongoing
0162/2020 23-Mar-20 Assemble and install tension ring ata tank S07 PROJECT PROJECT Tank farm TS7 , Tension ring Ongoing
0164/2020 24-Mar-20 Put gratings to cover open sewer at fire water basin MAINTANANCE Completed
0165/2020 24-Mar-20 Fabricate hangers for clothes to be installed at HSSE lockers MAINTANANCE Completed
0166/2020 25-Mar-20 Fabricate and install safety sign boards required around tank farm HSSEQ MAINTANANCE Workshop Safety sign boards 11th April,2020 Ongoing
0168/2020 25-Mar-20 Clean the eye nozzles for two emergency showers installed at the store yard and Mop pump house to eliminate clo MAINTANANCE Completed
0171/2020 25-Mar-20 Provide air compressor to facilitate removing of water inside tank no 34 MAINTANANCE Completed
0172/2020 30-Mar-20 Install emergency stop button to godiva water and general service HSSEQ MAINTANANCE Tank farm Godiva water pump 1st April,2020 4th Aug,2020 Completed
0173/2020 30-Mar-20 fabricate and install black sewers chamber corner between MOPold offices and MOP new offices MAINTANANCE Completed
0174/2020 27-Mar-20 Open starter with alternator on massey ferguson tractor (T.313 AVX) for repair MAINTANANCE Completed
0176/2020 30-Mar-20 Fabricate 2 pcs of blinds diam 12" MAINTANANCE Completed
0177/2020 30-Mar-20 Provide Mobile Crane to facilitate installation of transfer pump 82MP 2B to pump house MAINTANANCE Completed
0183/2020 2-Apr-20 Fabrication of pipes and welding for tank S7 internal & Fabrication of pipe support (Mechanical and Civil) PROJECT PROJECT Tank farm Tank S7 10th Aug,2020 Ongoing
0184/2020 2-Apr-20 Sandblast and paint 16",14",4",2" pipes for tank S7 internal PROJECT PROJECT Tank farm Site 2nd April,2020 Ongoing
0185/2020 2-Apr-20 Sandblast and paint tank S7 internal PROJECT Ongoing
0188/2020 2-Apr-20 Fabrication of 16" and 14" pipes,sandblast,painting and welding for tank S7 external MAINTANANCE 2nd April,2020 Ongoing
0186/2020 2-Apr-20 Transporting pipe 16" and 14" from laydown to blasting area MAINTANANCE MAINTANANCE Tank farm Site 2nd April,2020 Ongoing
0187/2020 2-Apr-20 Transporting 16", 14",4" and 2" from laydown to blasting area to workshop to site PROJECT PROJECT Tank farm Tank s7 3rd April,2020 Ongoing
0189/2020 2-Apr-20 Provide forklift to facilitate removing of drums from T-junction to API Separator MAINTANANCE Completed
0192/2020 2-Apr-20 Modify the security hut installed at Tiper Jetty to be used by security guard at gantry HSSEQ MAINTANANCE Tiper Jet Security Hut 6th April,2020 25th June,2020 Completed
0193/2020 9-Apr-20 Grind / file the way of motor main gate to enable motor work properly MAINTANANCE Ongoing
0194/2020 9-Apr-20 Troubleshoot and rectify problem on Nissan Uruvan Tiper staff Bus MAINTANANCE Completed
0195/2020 Install pipe supports for firefighting lines on Tank S7 PROJECT PROJECT Tank farm TS7 fire line support 14th April,2020 Ongoing
0196/2020 Provide mobile crane/forklift to facilitate removing of task force boat for major service MAINTANANCE Ongoing
0199/2020 Provide air compressor to facilitate removing of water in tank No.32 MAINTANANCE Ongoing
0200/2020 Check and rectify the over heat and increasing of temperatiure on rear engine T547CAJ MAINTANANCE Ongoing
0202/2020 Assist crane for shifting pump 82MP4A to pump 82MP2B MAINTANANCE Ongoing
0204/2020 Replace the 8" line near firestation MAINTANANCE Completed
0206/2020 Replace rubber coupling at a water pump 79MP1A OPERATIONS MAINTANANCE FWR2 79MP1A 30th April,2020 17th July,2020 Completed
0207/2020 29-Apr-20 Please check and rectify the abnormal sound on Nissan hardbody and general service PROJECT Completed
0208/2020 Cleaning at T-Junction (Water removal) MAINTANANCE Ongoing
0209/2020 4-May-20 Fabricate hooks to be used for installation of fire extinguishers ata MOP and canteen building MAINTANANCE Completed
0211/2020 Fabricate steel stand for tiper task force boat and transport it from w/shop to Tiper jetty for assembly MAINTANANCE Completed
0212/2020 Provide transport to facilitate removing of drums with product from T-junction to API separator MAINTANANCE Ongoing
0213/2020 Fabricate blinds for the following size and quantities : 14"(4pcs), 12"(2pcs),10"(6pcs), 8"(4pcs) MAINTANANCE Ongoing
0214/2020 Inspect TATA vehicle & rectify fault then provide reprt if the vehicle is OK to be used after inspection or not MAINTANANCE Completed
0217/2020 26-May-20 Repair cabinet lock for hose cabinet hooks installed at tank farm MAINTANANCE Completed
0218/2020 27-May-20 Inspect all required parks for routine service Nissan hard board T812 DJU MAINTANANCE Completed
0221/2020 4-Jun-20 Provide mobile crane to assist of transfer pump from pump house to workshop for major repair OPERATIONS MAINTANANCE Pump house Mobile crane 4th June, 2020 17th Aug,2020 Completed
0222/2020 4-Jun-20 Do a repair of exhaust pipe on Nissan urvan then make a bleeding on breaking system MAINTANANCE Completed
0223/2020 Check and rectify problem of overheating of fire truck tender engine tender I and service the truck as its overdue f HSSEQ MAINTANANCE Workshop Overheating of fire truck Tender I engine 5th June,2020 Completed Waiting Approval
0228/2020 9-Jun-20 P'lease Check and Rectify a whitish Substances on Caterpillar Water Pumps Terminals MAINTANANCE Completed
0229/2020 12-Jun-20 Fabrication and Installation of FF System PROJECT MAINTANANCE Tank farm Workshop/ Tank s7 15th June,2020 Ongoing
0230/2022 12-Jun-20 Arrange and Paint yellow marks on all equipments located at workshop ,Offices,Firestation HSSEQ MAINTANANCE Tank farm/ ADM/MOP Painting yellow marks Ongoing
0231/2020 13-Jun-20 Please cut and remove the conduit pipes at MOP pump station MAINTANANCE Completed
0233/2020 16-Jun-20 Check and rectify the abnormal sound on rear door for nissan urvan staff bus T881 DFT MAINTANANCE Completed
0234/2020 17-Jun-20 Repair the leaking weld joint and other leaking spots on fire fighting water pump MAINTANANCE MAINTANANCE Water pump container Pipe leakage repair 18th June,2020 23rd June,2020 Completed Waiting Approval
0236/2020 19-Jun-20 Provide air compressor to facilitate air pump to remove dark stock in Tank No.1 MAINTANANCE Completed
0241/2020 19-Jun-20 Make repair /replace flap guard on vehicle T536 DKU MAINTANANCE Ongoing
0242/2020 20-Jun-20 Make repair by welding a stub of diam 8" to facilitate removing deadstock fuel in Tank No1 MAINTANANCE Completed
0243/2020 22-Jun-20 Repair walkay of Tank S7 and external walkway at Tank S5. All rusted areas should be sablasted and painted. PROJECT MAINTANANCE Tank farm Ts 5&7 23rd June,2020 Ongoing
0244/2020 23-Jun-20 Replace the missing hand wheels of hydrants around tank farm MAINTANANCE
0247/2020 22-Jun-20 Check condition of batteries at the FF pump house and rectify issues MAINTANANCE MAINTANANCE FWR4 FWR4 23 June , 2020 26th June,2020 Completed
0249/2020 23-Jun-20 Install barrier on FWR2 platform in order to avoid falling into deep water hazard MAINTANANCE Completed
0250/2020 9-Jun-20 Pls install water drainage system for 79MP4A water pump in order to avoid corrosion on pump base HSSEQ MAINTANANCE Tank farm Water pump Completed
0244/2020 23-Jun-20 Replace the missing hand wheels of hydrants around tank farm HSSEQ MAINTANANCE Tank farm Hand wheel of hydrant 6th July,2020 Ongoing
0251/2020 29-Jun-20 Inspect and repair the bottom plate and shells for S33, Install steel pipe for tank 33 MOP MAINTANANCE Tank farm Tank s33 30 June,2020 Ongoing
0252/2020 26-Jun-20 Fabricate 5 steel flat bars size 1860x100x10mm with 2 L shaped steel round bars and ragex on bottoms of each foPROJECT PROJECT Workshop steel flat bars Completed
0253/2020 25-Jun-20 Fabricte 6 pcs of steel plate or above with steel round bars for DAWASA water tower PROJECT MAINTANANCE Workshop Steel plate Completed
0254/2020 26-Jun-20 Painting of tiper task force boat and taking off to sea water MAINTANANCE MAINTANANCE Tiper Jet Boat Completed
0255/2020 1-Jul-20 Provide transport for carrying motor from water basin to workshop ELECTRICAL MAINTANANCE Water basin & Workshop Motor 20th July,2020 25th Aug,2020 Completed
0257/2020 1-Jul-20 Fabricate vertical steel raiser for 2X10,000m3 water tank,sandblast,paint and install PROJECT MAINTANANCE Tank farm water tank Ongoing
0258/2020 1-Jul-20 Provide and mobilize truck for collection of materials at KOJ PROJECT PROJECT KOJ KOJ Ongoing
0259/2020 1-Jul-20 Paint the floor of the FF pump container and perform greesing of joints/connections to avoid corrosion PROJECT MAINTANANCE Tank farm FF pump house 8th July,2020 9th July,2020 Completed
0261/2020 2-Jul-20 Shift container from warehouse to site-Tank S7 (lift,transport,offload) PROJECT MAINTANANCE Tank farm Tank S7 Ongoing
0262/2020 2-Jul-20 Please assist to carry foam drums from store yard to fire station HSSEQ MAINTANANCE Tank farm Foam drums Completed
0263/2020 2-Jul-20 Provide crane /forklift to oofload material delivered at site PROJECT PROJECT Tank farm Tank S7 Ongoing
0264/2020 3-Jul-20 Perform civil works for tank s7 bund dyke wall repair PROJECT PROJECT Tank farm Tank S7 Ongoing
0266/2020 3-Jul-20 Fabrication of 6" daimeter blind flange to be used on tank S34 (Including installation) MAINTANANCE MAINTANANCE Tank farm Tank 34 4th Julyl,2020 6th July,2020 Completed
0270/2020 10-Jul-20 Perform the following works on tank s3; Visual inspection, Removing and replacing new cooling rings, replacing f MAINTANANCE MAINTANANCE Tank farm Tank S3 11th July ,2020 Ongoing
0272/2020 13-Jul-20 Check and clean eye nozzels for 2 emergence showers installed at MOP pump house and store yard HSSEQ MAINTANANCE Pump house & Store yard Eye nozzle cleaning Completed
0273/2020 13-Jul-20 Repair the hooks(Fire extinguisher) installed at MOP pump , Administration building and water basin to ensure its HSSEQ MAINTANANCE Adm, MOP pump house and water basProper hook installation Ongoing
0275/2020 6-Jul-20 Inspect batteries and then install at the new FF pump PROJECT MAINTANANCE Tank farm FF pump house Completed
0278/2020 10-Jul-20 Provide crane and operator and assist to lower the boat into ocean from the maintainance stand MAINTANANCE MAINTANANCE Tiper Jet Crane and Operator Completed
0279/2020 13-Jul-20 Move wire mesh from Tank S3 bund dyke to Tiper stores PROJECT MAINTANANCE Tank farm FF Foam Pump house 21st July,2020 Ongoing
0280/2020 13-Jul-20 Weld a piece of steel to the bottom tanks for purpose of connecting earth point (Do this for all tanks missing earth MAINTANANCE MAINTANANCE Tank farm Earth Point Ongoing
0281/2020 13-Jul-20 Fabricate and paint 2pcs of staircases for foam station containers PROJECT MAINTANANCE Tank farm FF pump house 3rd Aug,2020 10th Sept,2020 Completed
0282/2020 13-Jul-20 Perform modification of security tower installed near API separator to comply with OSHA requiremnts HSSEQ MAINTANANCE Near API separator Modification of Security tower Ongoing
0283/2020 13-Jul-20 Provide boomlift to electrian who is going to repair security light at Tiper Jetty MAINTANANCE MAINTANANCE Tiper Jetty Security Light 16th July,2020 Ongoing
0286/2020 10-Jul-20 Please fabricate key cabinate and install it inside HSSEQ office for proper key control HSSEQ MAINTANANCE W shop/HSSEQ Key Cabinet Ongoing
0287/2020 10-Jul-20 Please paint LPG cage near canteen kitchen and barrier mesh as instructed by HSSEQ office HSSEQ MAINTANANCE Canteen LPG Cage 27th July,2020 28th July,2020 Completed
0288/2020 13-Jul-20 Please provide mobile compressor and operator to assist in running pneumatic pump for removing water from ta MAINTANANCE MAINTANANCE Tank farm Compressor Tank S3 16th July,2020 17th July,2020 Completed
0289/2020 22-Jun-20 Please fabricate a stand for MOP base radio MOP MAINTANANCE MOP Radio stand 6th Aug,2020 7thAug,2020 Completed
0292/2020 13-Jul-20 Please fabricate brackets for installation of navigation lights on task force boat MAINTANANCE MAINTANANCE Tiper Jet Navigation lights Ongoing
0298/2020 15-Jul-20 Please perform powerbrush cleaning for tank S24 and S26 bottom PROJECT MAINTANANCE Tank farm S24, S26 16th July,2020 21st July,2020 Completed
0300/2020 14-Jul-20 Please provide transport to carry motor to and from workshop and pump house for testing MAINTANANCE MAINTANANCE Tank farm Motor 20th July,2020 18th Sep,2020 Completed
0301/2020 14-Jul-20 Please do the following on fire fighting water network, replace ruptured and corroded parts and paint the whole firHSSEQ MAINTANANCE Tank farm Fire network 7th July,2020 10th Aug,2020 Completed
0302/2020 16-Jul-20 Please service/repair of Tata vehicle PROJECT MAINTANANCE W shop TATA pick up Ongoing
0304/2020 17-Jul-20 Please provide generator with electric pump to facilitate removing of water in tank S3 PROJECT MAINTANANCE Tank farm Tank S3 18th July,2020 18th July,2020 Completed
0306/2020 17-Jul-20 Write the registration number on TIPER task force boat as per registration certificate MAINTANANCE MAINTANANCE Tiper Jet Task boat 18th July,2020 20th July,2020 Completed
0310/2020 20-Jul-20 Please rectify abnormal sound from right front wheel and abnormal sound heard when starting the car engine MOP MAINTANANCE W/shop Nissan hardbody 29th July,2020 Ongoing
0311/2020 21-Jul-20 Please provide elecrtitcal pump with generator to facilitate removing water inside tank S26&S27 at tank farm MAINTANANCE MAINTANANCE Tank farm S26,S27 21st July,2020 23rd July,2020 Completed
0312/2020 21-Jul-20 Mobile recovery tank pull back to S35 and discharge the product to S35 via manhole MOP MAINTANANCE Tank farm S35 Ongoing
0315/2020 24-Jul-20 Please provide transport to facilitate removing of drums from T junction to MOP OPERATIONS MAINTANANCE Tank farm Drums 24th Jul,2020 24th July,2020 Completed
0318/2020 5-Aug-20 Fabricate and install wire mesh and rebars for S7 bund dyke PROJECT PROJECT Tank farm Tank S7 Ongoing
0323/2020 27-Aug-20 Dermacate scrap yard area inorder to keep other materials stored around the area to be safe from disposal or da HSSEQ MAINTAINANCE Scrap yard Metal barrier Ongoing
0324/2020 29-Jul-20 Please perform painting works on pipe welded connections between T junction and Kigamboni Manifold PROJECT MAINTANANCE Tank farm T junction 6th Aug,2020 2nd Aug,2020 Completed
0325/2020 5-Aug-20 Put up sign board for BQ contractors for tank S7 project PROJECT PROJECT Tank farm Tank S7 Ongoing
0326/2020 30th-July-20 Cut the fuel tank for task force boat to allow space for inside tank cleaning FAM MAINTAINANCE Workshop Fuel Tank Pending Waiting Material
0327/2020 3-Aug-20 Provide air compresssor with operator to facilitate removing of remaining product in Tank No.25, No.22,No.36,N OPERATIONS MAINTANANCE Tank farm Tank 25 Ongoing
0328/2020 3-Aug-20 Perform cleaning using power brush for tank S22, S25, S26, S27, & S36 bottom plate welded joints PROJECT MAINTANANCE Tank farm Tank S26,S27, S36 Ongoing Tank 36 will stop for a while to allow vacum test to be conducted
0330/2020 3-Aug-20 Modify/fabricate metal junction boxes for cable connections and seal after connection for a cable to supply powerMAINTANANCE MAINTANANCE W/shop / Tiper Jetty Metal junction boxes Ongoing
0337/2020 14-Aug-20 Provide air compressor to facilitate air pump to remove remaining fuel in Tank N0-36 to Tank-35 OPERATIONS MAINTAINANCE Tank farm Tank No.36 and 35 14th Aug,2020 24th Aug,2020 Completed
0338/2020 14th-Aug-20 Assist transport for carrying motor from fire water pump to workshop MAINTANANCE MAINTAINANCE Fire water pump Motor Ongoing
0339/2020 5-Aug-20 Remove corroded bolts from three roof manholes on each tank S26. and S27 MOP MAINTANANCE Tank farm Tank 26 and 27 5th Aug,2020 5th Aug,2020 Completed
0340/2020 5-Aug-20 Remove and service the pump from the mobile recovery tank MOP MAINTAINANCE Tank Farm S35 5th Aug,2020 6th Aug,2020 Completed
0341/2020 6-Aug-20 Fabricate stub to install at tank N25 to facilitate transfer of dead stock to tank No22 OPERATIONS MAINTANANCE Workshop Stub Completed
0342/2020 20-Aug-20 Sandblast and paint tank S24,S27,S36,S26 PROJECT MAINTANANCE Tank farm Tank S24,S26,S36, Ongoing
0343/2020 6-Aug-20 Fabricate the hammer blind key tool for the opening MOP MAINTANANCE Workshop Hammer blind Ongoing
0344/2020 7-Aug-20 Service BQ contractors vehicle TATA T 740 AWL PROJECT PROJECT Tank farm Workshop Ongoing
0345/2020 7-Aug-20 Install windsock on tanks as per HSSE instructions HSSEQ MAINTAINANCE Tank farm Windsock 22nd Aug,2020 24th Aug,2020 Completed
0347/2020 11-Aug-20 Transport and install tank S7 Dome roof PROJECT MAINTANANCE Tank farm Tank S7 11 Aug,2020 Ongoing
0348/2020 20-Aug-20 Carry the metal barrier located near old laboratory and install it near main gate parking where there is open cham HSSEQ MAINTAINANCE Reception and parking Metal barrier 21st Aug,2020 31st Aug,2020 Completed
0349/2020 20-Aug-20 Fabricate and repair ladder for pontoon at Tiper Jetty FAM MAINTAINANCE Tiper Jet Ladder 20th Aug,2020 21st Aug,2020 Completed
0350/2020 11-Aug-20 Cut to remove the old steel electriical conduit pipes on the proposed sample room of Mop building MAINTANANCE MAINTAINANCE MOP buildioing Mop building 11th Aug,2020 22nd Aug,2020 Completed
0351/2020 11-Aug-20 Fabricate pole for security light to be installed at Tiper 4MWR and provide transport to designated area MAINTANANCE MAINTAINANCE Workshop Security light pole 21st Aug,2020 22nd Aug,2020 Ongoing
0352/2020 11-Aug-20 Perform maintainance works on foam pumps PROJECT MAINTANANCE Tank farm Foam pump house Ongoing
0353/2020 21-Aug-20 Fabricate/weld a motor cover which is broken MAINTANANCE MAINTAINANCE Workshop Motor Ongoing
0354/2020 22-Aug-20 Conduct hydro-testing (pressure) testing of 18" AGO manifold piece to be installed on AGO line at T-junction MAINTANANCE MAINTAINANCE Tank farm Pressure testing 22 Aug,2020 25th Aug,2020 Completed
0355/2020 12-Aug,2020 Cut and remove redundant 14" elbow pieces from AGO line from Tiper to Land fall 18" TPA AGO line OPERATIONS MAINTAINANCE Tiper Tank farm AGO line cutting Ongoing
0358/2020 25-Aug-20 Transportation and offloading pipes , elbows and flanges FINANCE MAINTAINANCE Store Yard Procurement materials 25 Aug, 2020 Ongoing
0360/2020 26-Aug-20 Make repair of sunction water pipe with their strainer for Uvumba water sunction pipe OPERATIONS MAINTAINANCE Workshop sunction pipe 26 Aug,2020 27th Aug,2020 Completed
0361/2020 6-Aug-20 Transport diesel fuel to the Ffpump house. Provide pump for loading diesel in the tank PROJECT MAINTANANCE Tank farm FF pump house 6th Aug,2020 Ongoing
0362/2020 27-Aug-20 Perform power brush cleaning works on joints of bottom plates tank S3 PROJECT MAINTAINANCE Tank farm Tank S3 Ongoing
0363/2020 Unveil product pumps weather covers to allow for inspection and veil the pumps for inspection MAINTANANCE MAINTAINANCE Tank farm Product pump 31th Aug,2020 Ongoing
0365/2020 Replace / fix gear enagegement pin for TATA smooth gear enagement MOP MAINTAINANCE Mop Gear Box Ongoing Waiting parts (25th sept)
0367/2020 2-Sep-20 Assist to transport security hut from Tiper Jetty to Tiper loading gantry and install it as per HSSEQ instructions HSSEQ MAINTAINANCE Tiper Jetty-Gantry Security Hut Ongoing
0368/2020 2-Sep-20 Fabricate 10pcs of steel flat bars size 800x100x10mm with steel round bars anchorage on their bottoms for concret PROJECT MAINTAINANCE Workshop Flat bars 2nd Sep, 2020 2nd Sep,2020 Completed
0369/2020 Installation of dome roof lifting device (Transportation,Installation, Installation, dismantling , welding) PROJECT PROJECT Tank S7 Lifting device 2nd Sep, 2020 Ongoing
0371/2020 2-Sep-20 Conduct periodic maintanace service and inspection of 600KW centrifugal pumps stored behind the old laboratoryMAINTANANCE MAINTANANCE Tank farm Pump inspection 3rd Sep,2020 3rd Sep,2020 completed
0373/2020 3-Sep-20 Open roof manholes (2) by cutting the corroded bolts on Tank 25 MOP MAINTAINANCE Tank farm Tank 25 3rd Sep,2020 3rd Sep,2020 Completed
0375/2020 3-Sep-20 Assist to drill holes on the siren support as per Tiper electrical team instructions HSSEQ MAINTAINANCE W/shop/F-station Siren Stand Ongoing
0378/2020 3-Sep-20 Fabricate cover pit of earth point at pump house (Two covers) MAINTANANCE MAINTAINANCE Pump house Cover 15th Sep 2020 15th Sep,2020 Completed
0380/2020 4-Sep-20 Provide mobile crane and opertor to assist in lifting of the boat out of the water(sea) for installation of new engineMAINTANANCE MAINTAINANCE Tiper Jetty Mobile crane Ongoing
0381/2020 4-Sep-20 Provide forklift for boarding and unloading two(2) outhourd engines at Tiper depot gate and Tiper Jetty consecutiMAINTANANCE MAINTAINANCE Tiper/Tiper Jetty Trasport/Forklift 6th Sept,2020 8th Sept,2020 Completed
0382/2020 4-Sep-20 Cut diam 1 1/2" domestic water pipeline and install diam 1 1/2" tee on 4 points along road N0.6 to accommodate in MAINTANANCE MAINTAINANCE Road N0.6 Pipes Ongoing
0384/2020 7-Sep-20 UVUMBA diesel engine water pump is overdue for service pls arrange to comply HSSEQ MAINTANANCE Uvumba Pump 7th Sep,2020 Ongoing
0386/2020 9-Sep-20 Please provide means for lifting the a steel base with motor and pump and move it to a nearby place along with twMAINTANANCE MAINTANANCE Tank Farm 82MP10B Pump 9th Sep 2020 Ongoing
0388/2020 10-Sep-20 Please provide forklift and operator to assist transporting recovery mobile tank from MOP to Kigamboni manifold OPERATIONS MAINTANANCE Tank Farm Recovery tank 10th Sep 2020 11th Sep,2020 Completed
0390/2020 11-Sep-20 Eliminate leackage for the fire truck tender 1 HSSEQ MAINTANANCE W/shop Fire truck tender 1 11th Sep 2020 Ongoing
0395/2020 15-Sep-20 Provide transport of carrying cable and metal boxes from w/shop store to TIPER JETTY MAINTANANCE MAINTANANCE Tiper Jetty Cable/boxes 15th Sep 2020 Ongoing
0400/2020 16-Sep-20 Heat shrinking termination cable at workshop MAINTANANCE MAINTAINANCE Workshop 17th Sep,2020 Completed
0401/2020 16-Sep-20 Check and rectify eye nozzels clogging problems for two emergency showers installed at Mop pump houses and stoHSSEQ MAINTAINANCE Mop pump houses/ Store yard Eye nozzle cleaning 28th Aug,2020 28th Aug,2020 Completed
0454/2020 18-Sep-20 Attend to Nissan Urvan intercooler and other technical issues as observed on the car MAINTANANCE MAINTAINANCE Workshop Vehicle-Nissan Urvan Ongoing
0456/2020 18-Sep-20 Offload pipe & Fittingd delivered at TIPER site for truck loading facility project MAINTANANCE MAINTAINANCE Tank Farm Tank 38 19th Sept,2020 Ongoing
0457/2020 21-Sep-20 Weld metal boxes for connection cable at Tiper Jetyy MAINTANANCE MAINTAINANCE Tiper Jetty Metal Boxes Ongoing
0458/2020 21-Sep-20 Assistance of crane for lifting and removing offsite the partial broken reinforced concrete pumps foundation of MAINTANANCE MAINTAINANCE Pump concrete foundation Ongoing
0459/2020 23-Sep-20 Make fabrication of pump case 82MP4B at pump house;Assist mobile crane for lifting of disonected spool piece OPERATIONS MAINTAINANCE Pump house 82MP4B 24th Sept,2020 Ongoing
0460/2020 23-Sep-20 Modification of shelve to be installed inside painter store, cutting and welding MAINTANANCE ENIKON Workshop Shelf modification 24th Sept,2020 Ongoing
0462/2020 24-Sep-20 Fabricate stub of diam 6" to facilitate flashing water on pump case of 82MP4B OPERATIONS MAINTAINANCE Workshop Stub 24th Sept,2020 2nd Oct,2020 Completed
0463/2020 28-Sep-20 Disconect racks from old administration building then install ata dispensary archieve room FAM MAINTAINANCE Old Administration Racks Ongoing
0468/2020 2-Oct-20 Perform installation of rapture disks on MOGAS Tanks PROJECT MAINTAINANCE Tank Farm Rapture Disks Ongoing
0472/2020 2-Oct-20 Fabricate steel flat bar template with six holes as per dimension on pump 82MP10B MAINTANANCE MAINTAINANCE Workshop Template 3-Oct Ongoing
0473/2020 2-Oct-20 Cut and weld diam 1 1/2 galva tees on four points of domestic water supply pipe along road No.6 MAINTANANCE MAINTAINANCE Tank Farm Road No.6 Ongoing
0470/2020 2-Oct-20 Maintain a door /gate to LV cabin at power station house MAINTANANCE MAINTAINANCE Power station Door/Gate 3-Oct
0475/2020 5-Oct-20 Fabricate and install chamber covers on the open chambers and replanning corroded covers for all chambers aro HSSEQ MAINTAINANCE Store Yard Chambers
0477/2020 5-Oct-20 Fabricate and install shed for all fire extinguishers troll type located outside the buildings HSSEQ MAINTAINANCE
0479/2020 5-Oct-20 Weld a 100mm long steel round bar on one side of the 6pcs of steel round threaded bars to form a T-shape for MAINTANANCE MAINTAINANCE Workshop Bolts
0484/2020 8-Oct-20 Perform the following for 10",8",6" pipes for the truck loading facility; Fabricatiion and welding, sandblasting,paintPROJECT MAINTAINANCE Tank farm & TFL Pipes
0485/2020 8-Oct-20 Provide forklift for repair security light at administration block area
0487/2020 8-Oct-20 Remove spool pieces from pump 82MP4B to workshop then fabricate provision for installation of pressure gauge.OPERATIONS MAINTAINANCE Pump house 82MP4B
0488/2020 8-Oct-20 Check and rectify safety latch on overload crane at workshop OPERATIONS MAINTAINANCE Workshop Overhead crane.
0497/2020 12-Oct-20 Perform installation of door lock at the firefighting container PROJECT MAINTAINANCE Ffpump house Firefighting container