Gulbarga Electricity Supply Company Limited (GESCOM)
Estimated Location: HOSPET CSC-3
Estimate is prepared for replacement of detoriated or providing intermediate poles due to sagging at various location in unit1 usd1 gescom hospet
Estimate No: 370832 Report Taken Date: 28/03/2025 5:03PM
Estimated by: madival nagaraj
Estimated Date: 23/07/2024
Work Type : Extension and improvement to the existing generation,Transmission
and Distibution System
Work CategoryCAPITAL WORK
Execution Type : Partial Contract
Work Nature : Hazardious
Part-A
Sl.No. Particulars Unit Material Cost Labour Cost
Qty Rate Amt Labour Desc Qty Rate Amt
1 0.00 0.00 0.00 Releasing and refixing of 4.0000 304.0000 1216.0000
4/2 pin crossarms with
clamps bolts and nuts.
2 straightening of slant or 2.0000 1192.5000 2385.0000
bent poles for 9.5 mtr long
3 200105-RCC Pole-9.0M Long,145 kg WL Nos. 16.00 8349.68 133594.88 Erection of RCC/PSC 16.0000 1113.0000 17808.0000
poles 9 to 10 mtr long but
in a pit of 1.8 mtr depth
4 Ordinary Soil 16.0000 629.0000 10064.0000
5 Releasing and releasing 16.0000 8.3200 133.1200
& Restringing/Tightening
of loose spans b)Rabbit
6 Releasing Of Ordinary 16.0000 566.1000 9057.6000
Soil
7 27901204-4 pin cross arm with pole clam Nos. 8.00 495.60 3964.80 Fixing of 4 Pin cross arm 8.0000 160.0000 1280.0000
with insulator and Braces
fixing.
8 27901205-11 kV Horizontal cross arm wit Nos. 16.00 762.28 12196.48 Fixing of V- 16.0000 257.0000 4112.0000
Shape/Horizontal cross
arm including single top
support Braces and
Insulators fixing.
9 285508-Rabbit to Rabbit (P G Clamps) Nos. 48.00 120.36 5777.28
Total 155533.44 46055.7200
Page No. : 1 of 2
Sl.No. Material Labour
1 Part A in Rs. : 155533.44 46055.72
Total 155533.44 46055.72
Sl.No. Other Charges Details
1 GST 18% For Labour 8290.03
2 Area Specific - Kalyana Karnataka 8893.19
3 Area Specific - GST 1600.77
Total Estimate cost 220373.15
Certificate : Certified that I have personally inspected the spot and prepared this estimate as per the current Schedule of rates for most economical and safe way of
execution of works.
Report:This estimate is costing of Rs.220373.15 is prepared Estimate is prepared for replacement of detoriated or providing intermediate poles due to sagging at
various location in unit1 usd1 gescom hospetHOSPET CSC-3.
Estimate is prepared for replacement of detoriated or providing intermediate poles due to sagging at various location in unit1 usd1 gescom hospet
Section Officer
HOSPET CSC-3
Certificate : Certified that I have personally inspected the spot and got prepared this estimate to execute the works using current Schedule of rates in safe way and
economically.
SubDivision Office
HOSPET URBAN-1
Gulbarga Electricity Supply Company Limited (GESCOM)
HOSPET URBAN DIVISION
Work Order Sanction
WorkOrderNO: D3567A / 000 / Work Order Date: 26/03/2025
000
Account NO: A-14.119 / B-0 / C-0
Allocated Budget: 220373.15
Budget In Words: Two Lakhs Twenty Thousand Three Hundred and
Seventy Three Rupees Fifteen Paise
AE(Tech) AEE(0) AO EE(El)
Page No. : 2 of 2