1.0 EXPRESSION OF INTEREST:
Oil India Limited (OIL) invites Expression of Interest from prospective in-
country vendors for providing a turnkey solution with services for the
production from shut-in oil wells with high pour point and asphaltene
content located in the state of Assam.
2.0 PREAMBLE:
OIL is a Government of India Enterprise under the Ministry of Petroleum
and Natural Gas, and it is a premier upstream Oil Company engaged in
the business of Exploration, Production & Transportation of Crude Oil &
Natural Gas, as well as production of LPG. The company's headquarters is
in Duliajan, Assam, India.
OIL has encountered high pour point crude oil during initial production
testing in few wells in Kharjan, Nadua, Khagorijan, Singhibil, and Central
Small fields under Central & Western Assets (Crude oil sample analysis
report of these wells is enclosed herewith in Annexure-I). Due to the
complex rheology of this high pour point crude oil, with features like high
wax content, high asphaltene, and resin content, these wells had to be
kept shut-in as OIL does not have suitable technology to produce such
crude. These wells also do not have gas-lift network for artificial lift
assistance.
To revitalize the production from these shut-in wells and maximize their
potential, OIL intends to invite prospective bidders to submit an
Expression of Interest (EOI) for providing a turnkey solution with services
for the production from shut-in oil wells with high pour point and
asphaltene content. This project aims to contribute to the overall growth
of our operations by unlocking the potential of these wells.
Page 1|4
2.0 PROJECT OBJECTIVES:
The primary objectives of this project are as follows:
a. Revive production from the shut-in oil wells to their optimal capacity.
b. Mitigate the challenges posed by the high pour point and asphaltene
content through effective treatment and management solutions.
c. Ensure the safety and compliance standards are adhered to throughout
the project execution.
d. Optimize operational efficiency and minimize downtime during the
transition from shut-in to production.
3.0 SCOPE OF WORK:
The scope of work for this project includes, but is not limited to, the following
activities:
a. Engineering and Design:
i. Conduct a comprehensive assessment of the shut-in oil wells, including
their current condition, equipment, and infrastructure.
ii. Develop an engineering plan and design specifications to address the
challenges posed by the high pour point and asphaltene content.
iii. Recommend appropriate equipment, materials, and processes required
for effective production.
b. Procurement:
i. Prepare a detailed procurement plan, including the identification and
sourcing of equipment, chemicals, and materials necessary for the project.
ii. Coordinate with vendors, negotiate pricing, and ensure timely delivery of
all required items.
c. Mobilization and Installation:
i. Mobilize a skilled workforce and required equipment to the project site.
ii. Oversee the installation, commissioning, and testing of the recommended
equipment and systems.
iii. Ensure compliance with all safety regulations and standards during the
mobilization and installation phases.
Page 2|4
d. Operational Support:
i. Provide training and technical support to the operating personnel to ensure
a smooth transition from shut-in to production.
ii. Implement effective monitoring systems and protocols to continuously
evaluate and optimize production performance.
iii. Develop maintenance procedures and schedules to ensure long-term
operational reliability.
e. Reporting and Documentation:
i. Prepare regular progress reports, including project milestones, key
findings, and any challenges encountered.
ii. Provide detailed documentation of the project, including engineering
designs, installation records, and operational guidelines.
3.0 TIMELINE AND DELIVERABLES:
The study phase and mobilization of the contractor’s equipment along with
the chemicals/consumables under the hired services shall be completed
within 90 (days) from the date of Letter of Award for contract through open
tender.
The duration of the proposed contract will be for 03 (three) years
extendable by another 06(six) months).
The contractor should maintain their base office for operation &
maintenance from in and around Duliajan, Assam.
4.0 SUBMISSION OF EXPRESSION OF INTEREST:
Interested parties are requested to submit their EOIs in electronic format
to
[email protected] &
[email protected] or hard copy
may be submitted to the following address no later than 21.08.2023
(14:00 hrs):
CGM-OGPS (HoD)
OILINDIA LIMITED
P.O. DULIAJAN-786602
DIST. DIBRUGARH, ASSAM, INDIA
Page 3|4
The EOI should include the following information:
i. Company profile, including relevant experience in similar projects.
ii. Description of technical capabilities and qualifications.
iii. Outline of proposed methodology and approach.
iv. Tentative Scope of Work
v. Budgetary estimate.
vi. List of key personnel and their roles.
5.0 EVALUATION AND SELECTION:
All submitted EOIs will be evaluated based on predetermined selection criteria,
including technical expertise, experience, proposed approach, and cost
considerations. Shortlisted bidders may be invited for further discussions or
presentations to clarify their proposals.
6.0 CONFIDENTIALITY:
All information provided during the EOI process will be treated as confidential
and used solely for the purpose of evaluating submissions.
Please note that this invitation does not constitute a commitment to award the
project or provide any form of reimbursement for costs incurred during the
preparation of the EOI.
Should you have any questions or require further clarification, please do not
hesitate to contact us at [contact email address]. We look forward to receiving
your Expression of Interest and exploring the potential of working together on
this important project.
****************************************************************************************
Page 4|4
Annexure-I
Crude oil sample Results
Pour Wax Resin
Density Asphaltene
Well No Point API Gravity Content Content
(gm/cm3) content, % w/w
°C % w/w % w/w
A 0.9102 36.0 29.3 14.87 2.89 14.95
B 0.9056 30 24.7 12.2 4.17 14.96
C 0.9181 33 22.5 11.65 4.47 12.80
D NA 42 17.9 NA 23.1 11.2
E NA 51 14.5 NA 6.7 10.2
F NA 24 14.0 9.27 38.0 15.4
G 0.9914 45 12.5 NA 25.8 12.2
Note: The above wells are below 'sub hydrostatic' or 'hydrostatic equilibrium,' and they require artificial lift
assistance for production. These wells also do not have gas-lift network for artificial lift assistance.