GEnx - FAN MID SHAFT AD 2012-19-08 COMPLIANCE DATA - 15.01.13

The document details the mid-shaft inspection results for GEnx-1B engines as per AD 2012-19-08, conducted at Air India Limited's engine overhaul facility in Mumbai. It includes a table listing aircraft registration numbers, engine part numbers, initial and repeat inspection dates, and compliance status for each engine. The inspections were performed to ensure adherence to maintenance requirements, with specific due dates for future inspections noted.

Uploaded by

raghupathy1366
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
38 views2 pages

GEnx - FAN MID SHAFT AD 2012-19-08 COMPLIANCE DATA - 15.01.13

The document details the mid-shaft inspection results for GEnx-1B engines as per AD 2012-19-08, conducted at Air India Limited's engine overhaul facility in Mumbai. It includes a table listing aircraft registration numbers, engine part numbers, initial and repeat inspection dates, and compliance status for each engine. The inspections were performed to ensure adherence to maintenance requirements, with specific due dates for future inspections noted.

Uploaded by

raghupathy1366
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

AIR INDIA LIMITED

ENGINE OVERHAUL FACILITY, OAP, MUMBAI

GEnx - 1B ENGINES - MID SHAFT INSPECTION PER AD 2012-19-08


15.01.13
ENGINE ENGINE ENGINE REPEAT REPEAT INSP -
S/N A/C REGN ENG. P/N INITIAL INSP. REPEAT INSP -3 REPEAT INSP -4
MODEL NO. POSITION INSP -1 2

COMPLIED ON COMPLIED ON
08.08.12 30.10.12 12.01.13 DUE BEFORE
GEnx - 1B64G03 GEnx - 1B64 956-119 1 TSN/CSN: TSN/CSN:
(BOEING) 12.04.13
677/246 1458/486
1 VT-ANH
COMPLIED ON COMPLIED ON
08.08.12 31.10.12 13.01.13 DUE BEFORE
GEnx - 1B70G03 GEnx - 1B70 956-123 2 TSN/CSN: TSN/CSN:
(BOEING) 13.04.13
677/246 1458/486

COMPLIED ON
10.08.12 02.11.12 DUE BEFORE
2 VT-AND GEnx - 1B64G03 GEnx - 1B64 956-117 1 TSN/CSN:
(BOEING) 31.01.13
498/117

COMPLIED ON
10.08.12 02.11.12 DUE BEFORE
GEnx - 1B64G03 GEnx - 1B64 956-110 2 TSN/CSN:
(BOEING) 31.01.13
498/117
COMPLIED ON
08.08.12 & 27.11.12 DUE BEFORE
3 VT-ANI GEnx - 1B70G03 GEnx - 1B70 956-126 1 20.09.12(BOEING) TSN/CSN: 25.02.13
458/184
COMPLIED ON
08.08.12 & 27.11.12 DUE BEFORE
GEnx - 1B64G03 GEnx - 1B64 956-127 2 20.09.12(BOEING) TSN/CSN: 25.02.13
458/184

DUE
10.12.12
GEnx - 1B64G03 GEnx - 1B64 956-116 1 BEFORE
(BOEING)
10.03.13
4 VT-ANK
DUE
10.12.12
GEnx - 1B64G03 GEnx - 1B64 956-128 2 BEFORE
(BOEING)
10.03.13
DUE
11.12.12
5 VT-ANL GEnx - 1B64G03 GEnx - 1B64 956-118 1 BEFORE
(BOEING)
11.03.13
DUE
11.12.12
GEnx - 1B64G03 GEnx - 1B64 956-122 2 BEFORE
(BOEING)
11.03.13
AIR INDIA LIMITED
ENGINE OVERHAUL FACILITY, OAP, MUMBAI

GEnx - 1B ENGINES - MID SHAFT INSPECTION PER AD 2012-19-08


15.01.13
ENGINE ENGINE ENGINE REPEAT REPEAT INSP -
S/N A/C REGN ENG. P/N INITIAL INSP. REPEAT INSP -3 REPEAT INSP -4
MODEL NO. POSITION INSP -1 2

DUE
21.12.12
6 VT-ANJ GEnx - 1B64G03 GEnx - 1B64 956-120 1 BEFORE
(BOEING)
21.03.13
DUE
21.12.12
GEnx - 1B70G03 GEnx - 1B70 956-115 2 BEFORE
(BOEING)
21.03.13

SPARE ENGINE

ENGINE ENGINE ENGINE ENGINE REPEAT REPEAT INSP -


S/N ENG. P/N INITIAL INSP. REPEAT INSP -3 REPEAT INSP -4
POSITION MODEL NO. POSITION INSP -1 2
COMPLIED ON
COMPLIED ON
11.12.12 DUE BEFORE
1 SPARE GEnx - 1B70G03 GEnx - 1B70 956-129 IN SHOP 14.09.12 TSN/CSN:
TSN/CSN:
NIL/NIL 11.03.13
NIL/NIL

Prepared by : Shanthi M.K.


Dy. CE - EO