0% found this document useful (0 votes)
25 views5 pages

CV of Mritunjay For Transportation

Mritunjay Godiyal is a Civil Engineering graduate with over 8 years of experience in construction and supervision of highway projects. He has held positions as Assistant Bridge Engineer and Assistant Highway Engineer, working on various projects for the National Highway Authority of India. His skills include construction supervision, quantity measurement, and proficiency in software like AutoCAD and MS Office.

Uploaded by

ajay
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
25 views5 pages

CV of Mritunjay For Transportation

Mritunjay Godiyal is a Civil Engineering graduate with over 8 years of experience in construction and supervision of highway projects. He has held positions as Assistant Bridge Engineer and Assistant Highway Engineer, working on various projects for the National Highway Authority of India. His skills include construction supervision, quantity measurement, and proficiency in software like AutoCAD and MS Office.

Uploaded by

ajay
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

CURRICULAM VITAE

Personal Details: -

Name : Mritunjay Godiyal

Father’s Name : S.R.Godiyal

D.O.B : 10/12/1995

Email : [email protected]

Contact No : 8192921190

Address : S/o S. R. Godiyal, Vill- Daldhung, Tegar- Badiyargarh, Distt-. Tehri


Garhwal, Uttarakhand-249161.

Education:
B. Tech. (Civil Engineering) from Graphic Era Hill University, Dehradun – 2016.
Career Objectives:
I want to be a part of an organization which can help me to utilize my technical knowledge and
to merge my creativity and ideas with my skills.
Experience:
I have almost 8 + years of professional in the field of construction & supervision of IE/AE
projects of National Highway/state Highways of Road construction of civil work.
Some of the relevant projects are: -

1. Since August , 2024 to Till Date.

Organization: - SAPTAGON ASIA PVT. LTD. Formerly known As G-Eng Advisory Services
PVT. LTD.

Project: - Consultancy services for Authority Engineer for the Projects:-


(i) 4-Laning of Najibabad Bypass of NH-119 from Km. 105.423 to Km.118.373 (Excluding 2.45 km.
of NH-74 Bypass).
(ii) 2-Lane with paved shoulders of Najibabad - Kotdwar Section of NH-119 from Design Chainage
122+200 to 137+760.

Details of structure: - Flyover at Ch.0+075 & 9+646, Length=500mtr & 350mtr respectively, Span
arrangement=30m x 3 & 25m x 3, Super structure:- PSC Girders, Foundation=Open Foundation (Raft).
2. Major bridge at Ch.6+615 & 9+646, Length= 300 mtr, Span Arrangement=35m x 3 & 30 x 3 respectively
Super Structure ;- PSC Girders, Foundation = Pile Foundation.

Client: - National Highway Authority of India (PIU- Najibabad).


Designation: - Assistant Bridge Engineer.
As, Assistant Bridge Engineer responsible for the day to day construction,
supervision of all structure work including of foundation (Raft). Checking profiling, reinforcement,
shuttering & stressing of PSc Girders (post Tensioned). Also responsible for the BBS preparation &
quantity measurement work of all structure component like foundation, sub- structure, super structure,
girder erection, approach slab & Deck slab etc.
Since March, 2023 to July 2024.

Organization: - MSV International Inc. in Association with MSPARK Futuristics & Associates

Project: -
Consultancy Services for Supervision Consultant (SC) For DLP/ O&M Stage Of 2 Projects (Item
Rate Basis Projects) & For Construction Supervision & O&M Of 1 Project (EPC Mode Project) In
the State of Uttarakhand: -
(I) Four Lane of Haridwar- Dehradun Section from Km 158+900 (Mohakampur) To Km 181+100
(Laltappar) Of NH-72 On Item Rate Basis (Pkg-II) (Length: 22.20 Km)- DLP/ O&M Stage.
(II) Four Lane of Haridwar- Dehradun Section from Km 181+100 (Laltappar) To Km 188+324
(Nepali Farm) Of NH-72 & From Km 209+100 (Haridwar) To Km 216+824 (Nepali Farm) Of NH-
58 On ItemRate Basis (Pkg-I) (Length: 14.95 Km)- DLP/ O&M Stage. (Cost=7.90cr).
(III)Construction of Dudhadhari Elevated Flyover Including Approaches on Muzaffarnagr-
Haridwar Section from Km 206+220 to Km 208+870 Of NH-58 On EPC Mode. (Length: 2.65
Km)-. Cost= 111.10cr. Length= 2.65km

Client: - National Highway Authority of India (PIU- Roorke & PIU -


Vasant Vihar, Dehradun).

Designation: - Assistant Bridge Engineer.


As, Assistant Bridge Engineer responsible for the day-to-day construction,
supervision of all structure work including of foundation (Raft). Checking profiling, reinforcement,
shuttering & stressing of PSC Girders (pre- tensioned pre stressed girders). Also responsible for
the BBS preparation & quantity measurement work of all structure’s component like foundation,
sub- structure, super structure, girder erection, approach slab & Deck slab etc.

Since May, 2022 to March 2023.


Organization: - Lion Engineering Consultant Pvt. Ltd. /Synergy Engineering
Group Pvt. Ltd.
Project: - Construction of Dudhadhari Elevated Flyover Including Approaches on Muzaffarnagar-
Haridwar Section from Km 206+220 to Km 208+870 Of NH-58 On EPC Mode. (Length: 2.65 Km)-. Cost=
111.10cr. Length= 2.65km.

Details of structure: - Flyover at Ch.206+220, Length=2.65km, Span arrangement=30mx53, Super


structure: PSC Girders, Foundation=Open Foundation (Raft).

Client: - National Highway Authority of India (PIU- Roorkee).


Designation: - Assistant Bridge Engineer.
As, Assistant Bridge Engineer responsible for the day to day
construction,supervision of all structure work including of foundation(Raft). Checking profiling,
reinforcement, shuttering & stressing of Psc Girders (pre- tensioned pre stressed girders). Also
responsible for the BBS preparation & quantity measurement work of all structures component like
foundation, sub- structure, super structure, girder erection ,approach slab & Deck slab etc.
Since July, 2020 to 7th Feb 2022.

Organization – SA Infrastructure Consultants Pvt.Ltd.


Project: - Independent Engineer 4-laning of Muzaffarnagar to Haridwar section of NH-58

(km.131+000 to km.211+000) Elevated Structure between km 200+900 to 201+700 including major


bridge on Mayapuri Escape channel at km. 201+450 in Haridwar on Mujaffar Nagar –
Haridwar section of NH-58 in the state of Uttarakhand. Cost= 45cr. Length= 1.05km

Details of Structure: - Major Bridge/Flyover at Ch.201+450, Length=1.05 km, Span


arrangement=18mx35, Super structure: PSC Girders, Foundation=Open Foundation (Raft & Pile).

Client: - National Highway Authority of India (PIU-Dehradun).


Designation: - Assistant Bridge Engineer

As, Assistant Bridge Engineer responsible for the day to day


construction,supervision of all structure work including of foundation(Raft & pile). Checking
profiling,reinforcement,shuttering & stressing of Psc Girders(pre- tensioned pre stressed girders).Also
responsible for the BBS preparation & quantity measurement work of all structures component like
foundation, sub- structure, super structure, girder erection ,approach slab & Deck slab etc.

Since April, 2018 to 10 July 2020.

Organization – LEA Associates South Asia Pvt. Ltd

Project: - Independent Engineers services for the construction of 4-laning of Chutmalpur-Ganeshpur


of NH-72A from chainage 0.000 to 17.900 & Roorkee- Chutmalpur-Gagalheri of NH-73 from chainage
0.00 to 35.400 in the state of Uttar Pradesh & Uttarakhand. (Pkg-1, Cost =942cr, Length=53.30 km).
And 4 laning of Gagalheri- Saharanpur- Yamuna nagar(UP/Harayana Border) section of NH-73 from
km 33.000 (Design Ch. 35.400) to km 71.640 ( Design ch.86.855) in the state of Uttar Pradesh &
Uttarakhand under NHDP-IV on Hybrid Annuity Mode.(Pkg-2, Cost=1184cr & Length=51.45 km).

Client: - National Highway Authority of India (PIU- Dehradun).


Designation: - Assistant Highway Engineer.
As, Assistant Highway engineer responsible for the construction,
supervision work of different activity Earthwork in embankment construction, sub grade, GSB, Dry lean
concrete layer, Pavement quality concrete layer & Bituminous work as per MORTH technical
specifications & relevant IRC standard. Also fully responsible for day to day checking of different road
component to ensure that the work is being done as per the drawing & specifications.

Since July, 2016 to April 2018.

Organization – M/s Ayoleeza Consultants Pvt. Ltd.

Project: - Construction and widening of 2- laning with geometric improvement of NH-87


EXTN. (New NH-109) from km 35.000 to 45.000 (khaima to kakrighat) executed as BOT+
(Toll)Annuity basis in the state of Uttarakhand on EPC mode , Section Rampur-Kthgodam-
Nanital ofNH-87. (cost =33cr, Length= 10km).

Client: - National Highway (PWD)


Designation: - Field Engineer
As, Field Engineer is responsible for construction supervision of
earth work, sub- base, WMM, bituminous work like BM,DBM & BC. Also responsible for testing of
construction material and monitoring the day-to-day activity and process in accordance with the
approval work program.

Education Activities:
S.No Class/Standard Board/University Year of passing Percentage/CGPA
01 High School UK Board 2010 62 %
02 Intermediate UK Board 2012 69 %
03 B.Tech Graphic Era Hill 2016 First Division
(Civil Engineering) University, CGPA= 6.8
Dehradun

Other Curricular Activities:


 As Site Engineer responsible for construction of all structures work up to superstructure.
Also responsible for respective activities top level checking.
 Prepared the documentation like MPR, QPR etc.

Computer Qualification:
Auto-cad, Auto-cad civil 3D, MS- Office, Excel, Power Point & internet etc.

Languages:
Speaking Reading Writing
English Good Good Good
Hindi Good Good Good
Declaration:
I, the undersigned, certified that to the best of my knowledge and belief these data correctly
describe my qualification my experience and me.

Date:
Place: (Mritunjay Godiyal)

You might also like