A-203-01 (R-01) - Second Floor Part Plan-New Building

The document contains architectural elevation drawings and general notes for a new building project, specifying dimensions, materials, and references to related drawings. It emphasizes that all dimensions should be read and not measured, and discrepancies should be reported to the architect. Additionally, it outlines the ownership of the drawings and the necessity to consult various series of drawings for detailed information on specific elements like staircases, ceilings, and plumbing.

Uploaded by

Dipak Borase
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
26 views1 page

A-203-01 (R-01) - Second Floor Part Plan-New Building

The document contains architectural elevation drawings and general notes for a new building project, specifying dimensions, materials, and references to related drawings. It emphasizes that all dimensions should be read and not measured, and discrepancies should be reported to the architect. Additionally, it outlines the ownership of the drawings and the necessity to consult various series of drawings for detailed information on specific elements like staircases, ceilings, and plumbing.

Uploaded by

Dipak Borase
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

ELEVATION- B GENERAL NOTES

1 2a 3 4
R' H F THIS DRAWING IS THE SOLE PROPERTY OF DESIGN COOPERATIVE
AND IS NOT TO BE COPIED OR USED WITHOUT PRIOR PERMISSION.
ALL DIMENSIONS IN THE DRAWING ARE TO BE READ AND NOT TO BE
MEASURED.
ANY DISCREPANCY BETWEEN DRAWINGS SHOULD BE BROUGHT
TO THE ARCHITECTS NOTICE.
18445
ALL DIMENSIONS AND LEVELS ARE FROM UNFINISHED SURFACES.
ALL EXTERIOR AND INTERIOR WALLS TO BE TAKEN AS 300MM &
6575 6575 5300
150MM THICK AAC BLOCKS RESPECTIVELY, UNLESS SPECIFIED
OTHERWISE.

NOTES
THIS DRAWING TO BE READ IN CONJUNCTION WITH BUILDING SET
OUT PLAN, DWG NO. A-101-01
Roofing sheet R1 FOR SECTIONS AND ELEVATIONS, REFER A-300 SERIES OF DRAWINGS.
as per vendor 250mm thk
FOR DOOR, WINDOW, VENTILATOR AND DUCT SHUTTER CIVIL
ledge wall Staircase-5 Rainwater Downtake OPENING SCHEDULE REFER DWG NO. A-401-01.
pipes FOR STAIRCASE DETAILS, REFER A-500 SERIES IF DRAWINGS.
A A FOR FALSE CEILING DETAILS, REFER A-600 SERIES OF DRAWINGS.
FOR FLOORING LAYOUT AND DETAILS, REFER A-701 SERIES OF
DN DRAWINGS.
A FOR TOILET, LAUNDRY, KITCHEN AND PANTRY DETAILS, REFER

3350
A-800 SERIES OF DRAWINGS.
FOR MISCELLANEOUS DETAILS, REFER A-900 SERIES OF DRAWINGS.
4700

UP FOR SHUTTERING LAYOUT, REFER DWG NO. A-911.

UP
B1
Rainwater
Downtake pipe
1500 150x700mm cutout LEGEND
R3
B WS3
300x400mm
D DOORS Dx EXISTING DOORS DUCT CUTOUTS
Cutout 150mm high WINDOWS Wx EXISTING WINDOWS
W

FFTG
DS5 LEVELS

ELEVATION- D
bund wall
V VENTILATORS Vx EXISTING
VENTILATOR
S SCREENS SECTIONS
4700

Railing 1
Roofing sheet Fire Fighting DS DUCT
as per vendor SHUTTER SL SCISSOR LIFT
OHT Railing 5
R4 EXISTING MASONRY GL GOODS LIFT
Rainwater
Downtake pipe EXISTING RCC SLOPE
Slope
C DN
PROPOSED MASONRY EXISTING STRUCTURE

PROPOSED RCC
Plumbing PROPOSED STRUCTURE
Fire Fighting duct 3
B OHT B'
KEY PLAN
4700

150mm high
bund wall
Railing 5
Canopy

D
ELEVATION- C

Plumbing OHTs
150mm high
bund wall NB
39690

4700

OBM
Plumbing duct 4

OBE EXISTING BUILDING


Oil Tanks Future
Rainwater Expansion
Downtake pipe

E
R4 Railing 5
K' A'
150mm high REVISIONS
WS4
bund wall
1z z1 DWG.
NO. DATE DESCRIPTION

250
Storage for Future REV
5950

Expansion R1 04.02.2025 Staricase-5 Design revised


+6.90M L R2 04.02.2025 Wall section and tags
Flat Roof above
Rainwater
Downtake
Rainwater
Downtake
M' 14 added/updated
R-01
G' passage pipe pipe G
R3 50 mm R3 04.02.2025 Cutout sizes for MEP added
+5.05M

250
300x400mm Railing 1 Expansion Joint
Cutout Spout Spout Spout Spout
R4 04.02.2025 Railing 5 added at Second floor
level
F z2
G

FFTG
1900
FFTG

Slope DS5 Slope DS4


DN DN
R4 Railing 5
1200
Storage for Future
W9 W9 W9 z3
4980

4570
150mm high Dining terrace below Flat Roof DN
150 mm high Expansion
bund wall bund wall
+6.90M above
Railing 5 R4 walkway Manufacturing
D D' below
Railing 5 150mm high Q' Q
z4
Rainwater W9 W9 W9 250
bund wall
Downtake pipe
K R3 +5.25M J Staircase-2
200x250mm Roofing sheet Cutout
D
Cutout in slab as per vendor
445 D1b
z5
2770

300Railing 5 150mm high 750mm high


bund wall parapet wall

4570
150 mm high Railing 2 W9 W9 W9
4980

bund wall 250 Skylights

Rainwater
Staircase-4 3070
WS2 z6 PROJECT : MOLYGRAPH, PALGHAR
Rainwater Rainwater
Downtake
N
250

downtake pipe downtake pipe


pipe
250
DN Roofing sheet Slope Flat Roof above Slope
as per vendor W9 W9 W9 DN
walkway DN CLIENT : ANAND ENG PVT. LTD.
P 200x250mm Railing Slope Slope +3.925M +3.925M
Cutout in slab
R3 as per DN DN TITLE : SECOND FLOOR PART
2215

detail E
150x700mm
cutout 750mm high RCC Chajja 1000mm high
z7 50 mm
PLAN- NEW BUILDING
parapet wall parapet wall G
300 Terrace Expansion Joint
P1 +6.90M DATE 04/02/2025 CHECKED QD/IP
150 mm high
4980

bund wall DRAWN AD/VS APPROVED QD


2765

Railing 5 WS1 250 PROJ. NO AD/0122 SCALE 1:100@A1


400 mm
250

thk cavity wall Railing 2

R PMC : MARKS
CONSULTANCY DRG .NO
Roofing sheet
as per vendor STRUCTURAL : SHILP
CONSULTANT CONSULTANCY
LANDSCAPE :
A-203-01
CONSULTANT (R-01)
ELECTRICAL & HVAC : JHAVERI
2540 9225 9225 4120 4045 4045 2890 2490 2490 2490 2490 720 ASSOCIATES
CONSULTANT
175 :
PLUMBING JHAVERI
CONSULTANT ASSOCIATES
SUSTAINABILITY :
R H' F' K A L' M CONSULTANT

1a 1 2 4 4a 5 ELEVATION- A 6 7 8 9 10 11 12 13
FOR CONSTRUCTION DCOOP
ARCHITECTURE.DESIGN.RESEARCH

SPECIFIC NOTES: UNIT NO. 109, 1ST FLOOR, SWASTIK CHAMBERS,


SG BARVE ROAD, CHEMBUR, MUMBAI - 400071
SECOND FLOOR PART PLAN - NEW BUILDING 1. For Part sections, refer dwg no. A-306 PH: 24706945/46 E-MAIL: [email protected]
Scale- 1:100

You might also like