0% found this document useful (0 votes)
127 views87 pages

33 KV SWG Schematic Incommer

The document outlines the specifications and details of the Erbil Substations Stage 6 project, contracted by ABB Sweden for the Kurdistan Regional Government's Ministry of Electricity. Key technical data includes a rated voltage of 36kV, a service voltage of 33kV, and various protection and operational parameters. The document also includes a comprehensive table of contents and additional information regarding dimensions, materials, and labeling for the electrical equipment involved.

Uploaded by

zlatanebra553
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
127 views87 pages

33 KV SWG Schematic Incommer

The document outlines the specifications and details of the Erbil Substations Stage 6 project, contracted by ABB Sweden for the Kurdistan Regional Government's Ministry of Electricity. Key technical data includes a rated voltage of 36kV, a service voltage of 33kV, and various protection and operational parameters. The document also includes a comprehensive table of contents and additional information regarding dimensions, materials, and labeling for the electrical equipment involved.

Uploaded by

zlatanebra553
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 87

0 1 2 3 4 5 6 7 8 9

Elektrik Sanayi A.S.

END CUSTOMER : KURDISTAN REGIONAL GOVERNMENT, MINISTRY OF ELECTRICITY


CONTRACTOR : ABB SWEDEN
ORDER NO : X13112
PROJECT NAME : ERBIL SUBSTATIONS STAGE 6, KRG - MOE / ES-06b/2011

SWITCHGEAR BASIC DATA ABB PROJECT REALIZATION TEAM


STATION NAME : NOSARAN PROJECT MANAGER : ONUR KARAÇAM
STANDARD : IEC 62271-200 DESIGN ENGINEER : FATİH ŞAHİN
RATED VOLTAGE : 36kV
SERVICE VOLTAGE : 33kV
RATED FREQUENCY : 50 Hz
POWER FREQUENCY WITHSTAND VOLTAGE / BIL : 70kV/170kV
RATED BUSBAR CURRENT : 1600A
RATED SHORT CIRCUIT CURRENT : 31.5kA
RATED SHORT CIRCUIT CURRENT DURATION : 1s
INTERNAL ARC CLASSIFICATION TYPE : AFLR
INTERNAL ARC CLASSIFICATION CURRENT : 31.5kA
INTERNAL ARC CLASSIFICATION TIME : 1s
DEGREE OF PROTECTION : IP4X
DEGREE OF PROTECTION - INTERNAL : IP2X
MV PHASE DESIGNATION : L1,L2,L3
AMBIENT TEMPERATURE : -5°C ... +50°C
ALTITUDE : ≤1000m

F 21/10/2014 UPDATED. Prepared F.Ş. 13/01/14 KURDISTAN REGIONAL GOVERNMENT = H1.Q104


Order no: TITLE PAGE
E 15/10/2014 UPDATED. Checked A.F.U. 15/01/14 MINISTRY OF ELECTRICITY X13112
1YTU130112X1154 + Q104
D 26/09/2014 UPDATED. Approved G.Ö. 15/01/14 33kV TRANSFORMER FEEDER EL11 P. 1
Rev Date Description Contractor: ABB SWEDEN Dept. PPMV NOSARAN SUBSTATION ABB Elektrik San.A.S. 87 P.
0 1 2 3 4 5 6 7 8 9

Table of content
Page Page designation Rev. Date Page Page designation Rev. Date

1 TITLE PAGE F 21/10/14 31 ANNUNCIATOR F 21/10/14

2 TABLE OF CONTENTS F 21/10/14 32 ANNUNCIATOR F 21/10/14

3 TABLE OF CONTENTS F 21/10/14 33 PARALLELING CIRCUIT F 21/10/14


4 TECHNICAL DATA F 21/10/14 34 OUTGOING SIGNALS F 21/10/14

5 SINGLE LINE DIAGRAM F 21/10/14 35 OUTGOING SIGNALS F 21/10/14

6 DC DISTRIBUTION F 21/10/14 36 OUTGOING SIGNALS (CB) F 21/10/14

7 AC DISTRIBUTION F 21/10/14 37 OUTGOING SIGNALS (CB&ES) F 21/10/14

8 CT 1.WINDING F 21/10/14 38 OUTGOING SIGNALS (CONTROL PANEL) F 21/10/14

9 CT 2.WINDING F 21/10/14 39 OUTGOING SIGNALS (CONTROL PANEL) F 21/10/14

10 CT 3.WINDING F 21/10/14 40 OUTGOING SIGNALS (SCADA) F 21/10/14

11 CAPACITIVE VOLTAGE INDICATOR F 21/10/14 41 OUTGOING SIGNALS (SCADA) F 21/10/14


12 VT CONNECTIONS F 21/10/14 42 OUTGOING SIGNALS (SCADA) F 21/10/14

13 VT CONNECTIONS F 21/10/14 43 OUTGOING SIGNALS (IRIG-B) F 21/10/14


14 DEVICE SUPPLY F 21/10/14 44 SPARE TERMINALS F 21/10/14
15 REF630 BINARY INPUTS F 21/10/14 45 REFERENCES F 21/10/14

16 REF630 BINARY INPUTS F 21/10/14 46 CB INTERNAL DIAGRAM (HD4) F 21/10/14

17 REF630 BINARY INPUTS F 21/10/14 47 CB INTERNAL DIAGRAM (HD4) F 21/10/14

18 LOCKOUT RELAY F 21/10/14 48 REFERENCES (REF630) F 21/10/14


19 CONTACT MULTIPLICATION F 21/10/14 49 REFERENCES (REF630) F 21/10/14

20 CONTACT MULTIPLICATION F 21/10/14 50 REFERENCES (REF630) F 21/10/14

21 CONTACT MULTIPLICATION F 21/10/14 51 LVC FRONT VIEW F 21/10/14


22 CB CONTROL F 21/10/14 52 PART LIST F 21/10/14

23 CB CONTROL F 21/10/14 53 PART LIST F 21/10/14


24 PANELS INTERCONNECTION F 21/10/14 54 PART LIST F 21/10/14

25 PANELS INTERCONNECTION F 21/10/14 55 PART LIST F 21/10/14

26 PANELS INTERCONNECTION F 21/10/14 56 TERMINAL DIAGRAM=NOSARAN+Q104-X73 F 21/10/14

27 PANELS INTERCONNECTION F 21/10/14 57 TERMINAL DIAGRAM=NOSARAN+Q104-XA1 F 21/10/14

28 PANELS INTERCONNECTION F 21/10/14 58 TERMINAL DIAGRAM=NOSARAN+Q104-XA2 F 21/10/14


29 REF630 BINARY OUTPUTS F 21/10/14 59 TERMINAL DIAGRAM=NOSARAN+Q104-XA3 F 21/10/14

30 POSITION INDICATORS F 21/10/14 60 TERMINAL DIAGRAM=NOSARAN+Q104-XAC F 21/10/14

F 21/10/2014 UPDATED. Prepared F.Ş. 13/01/14 KURDISTAN REGIONAL GOVERNMENT = H1.Q104


Order no: TABLE OF CONTENTS
E 15/10/2014 UPDATED. Checked A.F.U. 15/01/14 MINISTRY OF ELECTRICITY X13112
1YTU130112X1154 + Q104
D 26/09/2014 UPDATED. Approved G.Ö. 15/01/14 33kV TRANSFORMER FEEDER EL11 P. 2
Rev Date Description Contractor: ABB SWEDEN Dept. PPMV NOSARAN SUBSTATION ABB Elektrik San.A.S. 87 P.
0 1 2 3 4 5 6 7 8 9

Table of content
Page Page designation Rev. Date Page Page designation Rev. Date

61 TERMINAL DIAGRAM=NOSARAN+Q104-XB F 21/10/14

62 TERMINAL DIAGRAM=NOSARAN+Q104-XB F 21/10/14

63 TERMINAL DIAGRAM=NOSARAN+Q104-XC F 21/10/14


64 TERMINAL DIAGRAM=NOSARAN+Q104-XC F 21/10/14

65 TERMINAL DIAGRAM=NOSARAN+Q104-XC F 21/10/14

66 TERMINAL DIAGRAM=NOSARAN+Q104-XD F 21/10/14

67 TERMINAL DIAGRAM=NOSARAN+Q104-XE F 21/10/14

68 TERMINAL DIAGRAM=NOSARAN+Q104-XH F 21/10/14

69 TERMINAL DIAGRAM=NOSARAN+Q104-XI F 21/10/14

70 TERMINAL DIAGRAM=NOSARAN+Q104-XI1 F 21/10/14

71 TERMINAL DIAGRAM=NOSARAN+Q104-XI2 F 21/10/14


72 TERMINAL DIAGRAM=NOSARAN+Q104-XI3 F 21/10/14

73 TERMINAL DIAGRAM=NOSARAN+Q104-XI4 F 21/10/14


74 TERMINAL DIAGRAM=NOSARAN+Q104-XI5 F 21/10/14
75 TERMINAL DIAGRAM=NOSARAN+Q104-XI6 F 21/10/14

76 TERMINAL DIAGRAM=NOSARAN+Q104-XIV F 21/10/14

77 TERMINAL DIAGRAM=NOSARAN+Q104-XR F 21/10/14

78 TERMINAL DIAGRAM=NOSARAN+Q104-XV1 F 21/10/14


79 TERMINAL DIAGRAM=NOSARAN+Q104-XV2 F 21/10/14

80 TERMINAL DIAGRAM=NOSARAN+Q104-XV3 F 21/10/14

81 TERMINAL DIAGRAM=NOSARAN+Q104-XVC F 21/10/14


82 TERMINAL DIAGRAM=NOSARAN+Q104-XX F 21/10/14

83 TERMINAL DIAGRAM=NOSARAN+Q104-XX1 F 21/10/14


84 TERMINAL DIAGRAM=NOSARAN+Q104-XX2 F 21/10/14

85 TERMINAL DIAGRAM=NOSARAN+Q104-XX3 F 21/10/14

86 TERMINAL DIAGRAM=NOSARAN+Q104-XX4 F 21/10/14

87 TERMINAL DIAGRAM=NOSARAN+Q104-XX10 F 21/10/14

F 21/10/2014 UPDATED. Prepared F.Ş. 13/01/14 KURDISTAN REGIONAL GOVERNMENT = H1.Q104


Order no: TABLE OF CONTENTS
E 15/10/2014 UPDATED. Checked A.F.U. 15/01/14 MINISTRY OF ELECTRICITY X13112
1YTU130112X1154 + Q104
D 26/09/2014 UPDATED. Approved G.Ö. 15/01/14 33kV TRANSFORMER FEEDER EL11 P. 3
Rev Date Description Contractor: ABB SWEDEN Dept. PPMV NOSARAN SUBSTATION ABB Elektrik San.A.S. 87 P.
0 1 2 3 4 5 6 7 8 9

OTHER INFORMATIONS:

Width: 1000mm / 1200mm (Please see the layout drawing) Anti-condensation Heaters: CB + Cable Compartment
Height: 2310 mm Internal Lighting: LV Compartment
Depth: 2400mm / 2600mm (Please see the layout drawing) Final Doc. Structure: per Substation
Colour: RAL 7035 Final Doc. Format: 2 hardcopies + 1 CD
Rated Supply Voltage AC: 230V 50Hz CT/VT Manufacturer: ALCE
Control Voltage: 110 V DC CT/VT Routine Test Reports: English
Spring Charging Motor: 110 V DC CB Routine Test Reports: English
Control Wires (DC supply up to MCB): 2.5 mm², H07V-K (BLACK) Busbar Partitioning: No
Control Wires (DC supply after MCB): 1.5 mm², H07V-K (GREY) LV Comp. Door Design: Standard
Supply Interconnection Wires: 4 mm², H07V-K (GREY) Mimic Diagram: Seperate with position indicators (led illumination)
CT Wires: 2.5 mm², H07V-K (L1:RED, L2:YELLOW, L3:BLUE) Mimic Diagram Colour: Green
VT Wires: 2.5 mm², H07V-K (L1:RED, L2:YELLOW, L3:BLUE, N:BLACK) Label Language: English
Voltage Interconnection Wires: 2.5 mm², H07V-K (L1:RED, L2:YELLOW, L3:BLUE, N:BLACK) Cubicle Nameplate Design: Engraved
AC Wires: 2.5 mm², H07V-K (PHASE:RED, N:BLACK) Cubicle Nameplate Colour: Black text on white background
Earthing Wires: 4 mm², H07V-K (GREEN/YELLOW) Device Label Design: Engraved
Terminal Type: Screw Type Device Label Colour: Black text on white background

LEGEND & SYMBOLS:

M
WITHDRAWABLE CIRCUIT BREAKER 3
CAP. VOLTAGE DIVIDER & INDICATOR FIXED TYPE FUSED VOLTAGE TRANSFORMER

3
CURRENT TRANSFORMER (2-CORE)
POWER CABLE CONNECTION

3
EARTHING SWITCH (WITH BLOCKING MAGNET) WITHDRAWABLE FUSED VOLTAGE TRANSFORMER

F 21/10/2014 UPDATED. Prepared F.Ş. 13/01/14 KURDISTAN REGIONAL GOVERNMENT = H1.Q104


Order no: TECHNICAL DATA
E 15/10/2014 UPDATED. Checked A.F.U. 15/01/14 MINISTRY OF ELECTRICITY X13112
1YTU130112X1154 + Q104
D 26/09/2014 UPDATED. Approved G.Ö. 15/01/14 33kV TRANSFORMER FEEDER EL11 P. 4
Rev Date Description Contractor: ABB SWEDEN Dept. PPMV NOSARAN SUBSTATION ABB Elektrik San.A.S. 87 P.
0 1 2 3 4 5 6 7 8 9

=H1.Q104
-H.104
33kV TRANSFORMER FEEDER EL11

REF615(H)
MT440(4) MULTIFUNCTION TRANSDUCER
CEWE E447 ENERGY ANALYZER
CB OPEN/CLOSE PUSH BUTTONS
SELECTOR SWITCH (LOCAL/REMOTE)
2xENTRELEC TEST SW(CURRENT)
4xENTRELEC TEST SW(VOLTAGE)
BSM16-EES54-PRX-T1 ANNUNCIATOR
ABB UniGear type ZS2

50,51,50N,51N,59N,25,86
3~ 36kV 1600A 31.5kA/1s 50Hz

-QA1
M
HD4
36kV 1600A =H1. Q104
31.5kA -H.104

M.I. 2311

-BA1 3
33/√3:0.11/√3-0.11/3kV
Cl. 0.5/3P 1-75VA
3P 75VA
P1
-BC1 3
600-1200/5-5-5A
0.5FS5 15/30VA
5P20 15/30VA
5P20 15/30VA
P2 PU1 TERMINAL STRIPS
-QC9

1 -XA = CURRENT TRANSFORMER CONN.


-XA1 = EXTERNAL CURRENT CONN.
CABLE
-XB = CIRCUIT BREAKER CONNECTIONS
2Cx400mm²/Phase 1200 -XC = EXTERNAL CONNECTIONS
-XD = DIODE TERMINALS
ITEM 1 -XE = EARTHING SWITCH CONNECTIONS
-XH = AC CIRCUIT CONN.
-XI = INTERPANEL CONNECTIONS
-XR = TERMINAL WITH RESISTANCE
-XX = DC CIRCUIT CONNECTIONS
-XX1 = DC CONTROL & PROT. CIRCUIT (+)
-XX2 = DC CONTROL & PROT. CIRCUIT (-)
-XX3 = DC SIGNAL CIRCUIT (+)
-XX4 = DC SIGNAL CIRCUIT (-)
-XC1 = EXTERNAL CONNECTIONS
-XS = SPARE TERMINALS
-PE = EARTHING TERMINALS

F 21/10/2014 UPDATED. Prepared F.Ş. 13/01/14 KURDISTAN REGIONAL GOVERNMENT = H1.Q104


Order no: SINGLE LINE DIAGRAM
E 15/10/2014 UPDATED. Checked A.F.U. 15/01/14 MINISTRY OF ELECTRICITY X13112
1YTU130112X1154 + Q104
D 26/09/2014 UPDATED. Approved G.Ö. 15/01/14 33kV TRANSFORMER FEEDER EL11 P. 5
Rev Date Description Contractor: ABB SWEDEN Dept. PPMV NOSARAN SUBSTATION ABB Elektrik San.A.S. 87 P.
0 1 2 3 4 5 6 7 8 9

+Q103
CONTROL & PROTECTION SIGNALLING MOTOR SUPPLY

-CPX+ -XX 1 +CP -XX 2


-CPX+
+Q103/6.9 +Q105/6.0
-CPX- -XX 3 -CP -XX 4
-CPX-
+Q103/6.9 +Q105/6.0
-SX+ -XX 5 +S -XX 6
-SX+
+Q103/6.9 +Q105/6.0
-SX- -XX 7 -S -XX 8
-SX-
+Q103/6.9 +Q105/6.0
-M+ -XX 9 +M -XX 10
-M+
+Q103/6.9 +Q105/6.0
-M- -XX 11 -M -XX 12
-M-
+Q103/6.9 +Q105/6.0

1 3 -FB1.1 11 1 3 -FB3.1 11 -FB3.2 11 1 3 -FB2.1 11 -FB2.2 11


-FB1 -FB3 -FB2
2A 2 4 12 14 2A 2 4 12 14 12 14 2A 2 4 12 14 12 14
/20.2 /7.7 /34.8 /7.7 /20.3
-KMSS
A1 A2

110Vdc

/1SVR405612R8100
14 11 /7.5
12

-XX1 1 -XX2 1 -XX3 1 -XX4 1 -XB 1 -XB 2

-QA1
CB SPRING 25
CP+ CP- S+ S- CHARGING MOTOR
14.0 14.0 14.0 14.0 1
-MS M
/46.0 2

35

F 21/10/2014 UPDATED. Prepared F.Ş. 13/01/14 KURDISTAN REGIONAL GOVERNMENT = H1.Q104


Order no: DC DISTRIBUTION
E 15/10/2014 UPDATED. Checked A.F.U. 15/01/14 MINISTRY OF ELECTRICITY X13112
1YTU130112X1154 + Q104
D 26/09/2014 UPDATED. Approved G.Ö. 15/01/14 33kV TRANSFORMER FEEDER EL11 P. 6
Rev Date Description Contractor: ABB SWEDEN Dept. PPMV NOSARAN SUBSTATION ABB Elektrik San.A.S. 87 P.
0 1 2 3 4 5 6 7 8 9

+Q103
AC POWER SUPPLY

ACP -XH 1 ACP -XH 2


ACP
+Q103/7.9 +Q105/7.0
ACN -XH 3 ACN -XH 4
ACN
+Q103/7.9 +Q105/7.0

HEATER DC MOTOR LAMP DC SUPPLY MOTOR SIGNALLING LAMP LVC LIGHTING


HEATERS SUPPLY SUPPLY SUPPLY TEST FAIL MCB OFF MCB OFF TEST
ON FAIL FAIL INDICATION

-XH 5 R -XH 6

1 -FBAC.1 11
-FBAC
2A 2 12 14
/20.1
-XH 7 -XH 8

1
SS6
HEATER 2
OFF-ON

12 14 12 14 23 21 11 11 21 21

-KDCS -KMSS SB1 -K1 -FB2.1 -FB3.1 -K2 -BD


-BH 2 /30.0 /7.5 24 22 /6.8 12 /6.5 12 14 /7.6 24 22 LVC DOOR 22
THERMOSTAT 12 14 /23.3 11 /6.7 11 24 14
Θ LAMP POSITION
CABLE
1
-K2 TEST SWITCH
COMPARTMENT /7.6 11

-XH 9 -XH 10 -XH 11


1
-XH 12

-H2 1
GREEN 2
1 1 1 HEATERS -H1 1
ON Red 2
-EH1 -EH2 -EH3 A1 A1 DC SUPPLY
100W 2 100W 2 20W 2 -K1 ~ -K2 ~ FAIL -EL
HEATER HEATER HEATER 230Vac A2 230Vac A2
CB COMP. CABLE COMP. LV COMP.
2

-XH 13 N -XH 14 -XH 15 -XH 16 -XH 17

/1SVR405612R3100 /1SVR405612R3100
24 21 /7.6 14 11 /7.4
22 12
24 21 /7.8
22

F 21/10/2014 UPDATED. Prepared F.Ş. 13/01/14 KURDISTAN REGIONAL GOVERNMENT = H1.Q104


Order no: AC DISTRIBUTION
E 15/10/2014 UPDATED. Checked A.F.U. 15/01/14 MINISTRY OF ELECTRICITY X13112
1YTU130112X1154 + Q104
D 26/09/2014 UPDATED. Approved G.Ö. 15/01/14 33kV TRANSFORMER FEEDER EL11 P. 7
Rev Date Description Contractor: ABB SWEDEN Dept. PPMV NOSARAN SUBSTATION ABB Elektrik San.A.S. 87 P.
0 1 2 3 4 5 6 7 8 9

L1 L2 L3

P1

-C3.CC6
C50.X411
-X1 CCA:431
-XA1 1
4 04
-XAC 1
14

-XA1 2

-XA1 3
POWER FLOW

PE

-XA1 4

-XA1 5
*
-XA1 6

1S1 1S1 1S1


-BC1 -BC2 -BC3
600-1200/5A 1S2 1S2 1S2
0.5FS5 15/30VA
-PJK2 431
1S3 1S3 1S3 CEWE
ELITE 447

-PJK1
MT440
-XA1 7
1 01
-XAC 2
11
3
/45.1
1
/45.0
S1 I1 S2

-XA1 8 -XAC 3
*
2 02 12
6
/45.1
4
/45.0
S1 I2 S2

-XA1 9
3 03
-XAC 4 * 13
9
/45.1
7
/45.0
S1 I3 S2

* DO NOT REMOVE TEMPORARY LINKS UNLESS EXTERNAL CONNECTIONS ARE MADE


F 21/10/2014 UPDATED. Prepared F.Ş. 13/01/14 KURDISTAN REGIONAL GOVERNMENT = H1.Q104
Order no: CT 1.WINDING
E 15/10/2014 UPDATED. Checked A.F.U. 15/01/14 MINISTRY OF ELECTRICITY X13112
1YTU130112X1154 + Q104
D 26/09/2014 UPDATED. Approved G.Ö. 15/01/14 33kV TRANSFORMER FEEDER EL11 P. 8
Rev Date Description Contractor: ABB SWEDEN Dept. PPMV NOSARAN SUBSTATION ABB Elektrik San.A.S. 87 P.
0 1 2 3 4 5 6 7 8 9

L1 L2 L3

-C1.CP2
B50.X11
CCA:432
-XA2 1 -XAC 5
31

-XA2 2 -XAC 6
*
32

-XA2 3 -XAC 7
*
33
POWER FLOW

-XA2 4

TRANSFORMER
-XA2 5
* DIFFERENTIAL
PROTECTION

-XA2 6

2S1 2S1 2S1


-BC1 -BC2 -BC3
600-1200/5A 2S2 2S2 2S2
5P20 15/30VA
432
2S3 2S3 2S3

-XA2 7 -XAC 8
34

-XA2 8

-XA2 9

PE

* DO NOT REMOVE TEMPORARY LINKS UNLESS EXTERNAL CONNECTIONS ARE MADE


F 21/10/2014 UPDATED. Prepared F.Ş. 13/01/14 KURDISTAN REGIONAL GOVERNMENT = H1.Q104
Order no: CT 2.WINDING
E 15/10/2014 UPDATED. Checked A.F.U. 15/01/14 MINISTRY OF ELECTRICITY X13112
1YTU130112X1154 + Q104
D 26/09/2014 UPDATED. Approved G.Ö. 15/01/14 33kV TRANSFORMER FEEDER EL11 P. 9
Rev Date Description Contractor: ABB SWEDEN Dept. PPMV NOSARAN SUBSTATION ABB Elektrik San.A.S. 87 P.
0 1 2 3 4 5 6 7 8 9

L1 L2 L3

-X2 -BCF1 -X101


-XA3 1 REF630
4 04 ILN
08 07
/48.1 CH 4 /48.1

-XA3 2

-XA3 3
POWER FLOW

PE

-XA3 4

-XA3 5

-XA3 6

3S1 3S1 3S1


-BC1 -BC2 -BC3
600-1200/5A 3S2 3S2 3S2
5P20 15/30VA

3S3 3S3 3S3

-XA3 7
1 01
-XA3 10
01 IL1 02
/48.1 CH 1 /48.1

-XA3 8
2 02
-XA3 11
03 IL2 04
/48.1 CH 2 /48.1

-XA3 9
3 03
-XA3 12
05 IL3 06
/48.1 CH 3 /48.1

-XAC 9 -XAC 10
09 CH 5 10
/48.1 /48.1

F 21/10/2014 UPDATED. Prepared F.Ş. 13/01/14 KURDISTAN REGIONAL GOVERNMENT = H1.Q104


Order no: CT 3.WINDING
E 15/10/2014 UPDATED. Checked A.F.U. 15/01/14 MINISTRY OF ELECTRICITY X13112
1YTU130112X1154 + Q104
D 26/09/2014 UPDATED. Approved G.Ö. 15/01/14 33kV TRANSFORMER FEEDER EL11 P. 10
Rev Date Description Contractor: ABB SWEDEN Dept. PPMV NOSARAN SUBSTATION ABB Elektrik San.A.S. 87 P.
0 1 2 3 4 5 6 7 8 9

L1 L2 L3

DC110V_OVI+
14.6

PU1 4
/23.1 /23.1 1
CAPACITIVE
VOLTAGE
INDICATOR
/23.1 /23.1 2
3 5

DC110V_OVI-
14.6

P2 P2 P2

F 21/10/2014 UPDATED. Prepared F.Ş. 13/01/14 KURDISTAN REGIONAL GOVERNMENT = H1.Q104


Order no: CAPACITIVE VOLTAGE INDICATOR
E 15/10/2014 UPDATED. Checked A.F.U. 15/01/14 MINISTRY OF ELECTRICITY X13112
1YTU130112X1154 + Q104
D 26/09/2014 UPDATED. Approved G.Ö. 15/01/14 33kV TRANSFORMER FEEDER EL11 P. 11
Rev Date Description Contractor: ABB SWEDEN Dept. PPMV NOSARAN SUBSTATION ABB Elektrik San.A.S. 87 P.
0 1 2 3 4 5 6 7 8 9

L1 L2 L3

FF1 FF2 FF3


2A 2A 2A

OPEN DELTA VOLTAGE


A N A N A N
-BA1 -BA2 -BA3
33/√3:0.11/√3
Cl. 0.5/3P 1-75VA -BA1 -BA2 -BA3
33/√3:0.11/3kV
a n a n a n 3P 75VA da dn da dn da dn

-XV1 1 3 5 7 -XV1 2 4 6 8 -XV2 1 2

1 2

-RA
47Ω, 100W
1 3 5 11 1 3 5 11
-FBV1 -FBV2 -XV3 15 16
2A 2 4 6 12 14 2A 2 4 6 12 14
-FBV1.1 -FBV2.1
/21.3 /21.3

-X4 1 2 3 4 -X3 1 2 3 4
TEST SW. TEST SW.

01 02 03 04 01 02 03 04

-XV3 1 2 -XV3 3 6 9 12 -XV3 4 7 10 13 -XV3 5 8 11 14


-XVC 1 2 3 4

-BCF1 -PJK2 -PJK1


REF630
-X102 CEWE V1 V2 V3 VN MT440 2 5 8 11
03 04 05 06 07 08 ELITE 447 UL1X UL2X UL3X ULNX
/48.1 /48.1 /48.1 /48.1 /48.1 /48.1 11 12 13 14
13.5 13.5 13.5 13.5
UAN UBN UCN C3.CC6
CH7 CH8 CH9
C50.X412
CCA:436

F 21/10/2014 UPDATED. Prepared F.Ş. 13/01/14 KURDISTAN REGIONAL GOVERNMENT = H1.Q104


Order no: VT CONNECTIONS
E 15/10/2014 UPDATED. Checked A.F.U. 15/01/14 MINISTRY OF ELECTRICITY X13112
1YTU130112X1154 + Q104
D 26/09/2014 UPDATED. Approved G.Ö. 15/01/14 33kV TRANSFORMER FEEDER EL11 P. 12
Rev Date Description Contractor: ABB SWEDEN Dept. PPMV NOSARAN SUBSTATION ABB Elektrik San.A.S. 87 P.
0 1 2 3 4 5 6 7 8 9

UL1X UL2X UL3X ULNX


12.6 12.7 12.7 12.7

11 21 31 41
-KVT
/19.8 14 12 24 22 34 32 44 42

+Q103
-UL1 / +Q103/11.8 -XIV 1 -XIV 2
-UL1 / +Q105/11.1
-UL2 / +Q103/11.8 -XIV 3 -XIV 4
-UL2 / +Q105/11.1
-UL3 / +Q103/11.8 -XIV 5 -XIV 6
-UL3 / +Q105/11.1
-ULN / +Q103/11.8 -XIV 7 -XIV 8
-ULN / +Q105/11.1

-X5 1 2
TEST SW.
TEST SWITCH
VOLTAGE 01 02
BUSBAR

-BCF1
REF630
-X102
09 10
/48.1 /48.1

CH10

F 21/10/2014 UPDATED. Prepared F.Ş. 13/01/14 KURDISTAN REGIONAL GOVERNMENT = H1.Q104


Order no: VT CONNECTIONS
E 15/10/2014 UPDATED. Checked A.F.U. 15/01/14 MINISTRY OF ELECTRICITY X13112
1YTU130112X1154 + Q104
D 26/09/2014 UPDATED. Approved G.Ö. 15/01/14 33kV TRANSFORMER FEEDER EL11 P. 13
Rev Date Description Contractor: ABB SWEDEN Dept. PPMV NOSARAN SUBSTATION ABB Elektrik San.A.S. 87 P.
0 1 2 3 4 5 6 7 8 9

PROTECTION RELAY ALARM ANNUNCIATOR TRANSDUCER ENERGY ANALYZER CAP. INDICATOR


DC SUPPLY DC SUPPLY DC SUPPLY DC SUPPLY DC SUPPLY

6.1 15.0
CP+ -XX1 2 -XX1 3
CP+
6.4 30.0
S+ -XX3 2
S+

-BCF1 PGM
REF630 -X430 EES BSM16 X1 -PJK1 -PJK2 DC110V_OVI+ / 11.4
02 1 MT440 13 CEWE DC+
/45.0 ELITE 447

/45.1
01 2 14
DC- DC110V_OVI- / 11.4

-PE
-PE

6.2 15.0
CP- -XX2 2 -XX2 3
CP-
6.5 30.0
S- -XX4 2
S-

F 21/10/2014 UPDATED. Prepared F.Ş. 13/01/14 KURDISTAN REGIONAL GOVERNMENT = H1.Q104


Order no: DEVICE SUPPLY
E 15/10/2014 UPDATED. Checked A.F.U. 15/01/14 MINISTRY OF ELECTRICITY X13112
1YTU130112X1154 + Q104
D 26/09/2014 UPDATED. Approved G.Ö. 15/01/14 33kV TRANSFORMER FEEDER EL11 P. 14
Rev Date Description Contractor: ABB SWEDEN Dept. PPMV NOSARAN SUBSTATION ABB Elektrik San.A.S. 87 P.
0 1 2 3 4 5 6 7 8 9

CB OPEN CB CLOSED SPRING CB TEST SERVICE REMOTE EARTHSW. OPEN EARTHSW. CLOSED
POSITION POSITION CHARGED POSITION POSITION POSITION POSITION

14.9 16.0
-CP+ -XX1 4 -XX1 5 -CP+

-XB 3 -XB 4 -XB 5 -XE 1 -XE 2

-QA1 11 52
CB 24
-QC9 13 13
EARTHSW.
27 29 2 23 23 BE1 BE2
BB3 /47.6 -BS2 BT2 BT1 /45.1 14 /45.1 14
/47.5 28 30 /47.0 0 /47.8 24 /47.7 24 12
SS2
/22.1 11 15
22 21 34 53 54

-XB 6 7 -XB 8 9 -XB 10 11 -XB 12 13 -XB 14 15 -XE 3 4 -XE 5 6


19.1 19.0 21.1 19.2 19.4 19.6
-CBOFF1 -CBON1 SPRCH -CBTEST1 CBSERV1 ESO1

-BCF1
REF630
-X304 02 03 04 05 07 08 09 10
/49.1 /49.1 /49.1 /49.1 /49.1 /49.1 /49.1 /49.1

DI1 DI2 DI3 DI4 DI5 DI6 DI7 DI8

/49.1 /49.1
01 06

14.9 16.0
-CP- -XX2 4 -XX2 5 -CP-

F 21/10/2014 UPDATED. Prepared F.Ş. 13/01/14 KURDISTAN REGIONAL GOVERNMENT = H1.Q104


Order no: REF630 BINARY INPUTS
E 15/10/2014 UPDATED. Checked A.F.U. 15/01/14 MINISTRY OF ELECTRICITY X13112
1YTU130112X1154 + Q104
D 26/09/2014 UPDATED. Approved G.Ö. 15/01/14 33kV TRANSFORMER FEEDER EL11 P. 15
Rev Date Description Contractor: ABB SWEDEN Dept. PPMV NOSARAN SUBSTATION ABB Elektrik San.A.S. 87 P.
0 1 2 3 4 5 6 7 8 9

CLOSE ENABLE CLOSE COMMAND TRIP COMMAND INSUFF. GAS INSUFF. GAS REF615 LEDS START OF SPARE
FROM H1.Q109 PANEL FROM H1.Q109 PANEL FROM H1.Q109 PANEL PRESSURE PRESSURE TRIP REMOTE INSTANTENOUS
FROM OTHER PANELS RESET OVERCURRENT
TRIP (50)
15.9 17.0
-CP+ -XX1 6 -XX1 7 -CP+

-XI 1 -XI 2 -XI 3 -XB 16 -XI 7 -XI 8 -XC 1


+Q103
-QA1 -SF6IN+ -SF6IN+
-CLEN49 -CLCMD49 -TRCMD49 CB 9 /+Q105/29.7
/+Q103/29.9
+Q109/34.1 +Q109/34.2 +Q109/34.3 HD4
22 21

+Q109 21 -C1.CP2.B50.X113
+Q109/34.1 +Q109/34.2 +Q109/34.3 CBA:611
-CLEN94 -CLCMD94 -TRCMD94 19
-SF6IN- -SF6IN- 22
/+Q103/29.9 /+Q105/29.7

-XI 4 -XI 5 -XI 6 -XB 17 18 -XI 9 -XI 10 -XC 2 -XC 3


21.2
SF6INS

BLCR+
24.4

-BCF1 12 13 14 16 17 18 05 06
REF630
-X304 -X319
/49.1 /49.1 /49.1 /49.1 /49.1 /49.1 /50.1 /50.1

DI9 DI10 DI11 DI12 DI13 DI14


DI2 DI3

/49.1 /49.1
11 15 /50.1
04

BLCR-
24.5

15.9 17.0
-CP- -XX2 6 -CP-

F 21/10/2014 UPDATED. Prepared F.Ş. 13/01/14 KURDISTAN REGIONAL GOVERNMENT = H1.Q104


Order no: REF630 BINARY INPUTS
E 15/10/2014 UPDATED. Checked A.F.U. 15/01/14 MINISTRY OF ELECTRICITY X13112
1YTU130112X1154 + Q104
D 26/09/2014 UPDATED. Approved G.Ö. 15/01/14 33kV TRANSFORMER FEEDER EL11 P. 16
Rev Date Description Contractor: ABB SWEDEN Dept. PPMV NOSARAN SUBSTATION ABB Elektrik San.A.S. 87 P.
0 1 2 3 4 5 6 7 8 9

COMMON SPARE SPARE SPARE SPARE SPARE


CB TRIP

16.9 18.0
-CP+ -XX1 8 -CP+

-XC 20 -XC 21 -XC 22 -XC 23 -XC 24

11
-KCTR
/22.6 14 12

-XC 25 -XC 26 -XC 27 -XC 28 -XC 29

-BCF1 09 10 13 14 17 18
REF630
-X319
/50.1 /50.1 /50.1 /50.1 /50.1 /50.1

DI4 DI5 DI6 DI7 DI8 DI9

/50.1 /50.1 /50.1


08 12 16

16.9 18.0
-CP- -XX2 7 -XX2 8 -CP-

F 21/10/2014 UPDATED. Prepared F.Ş. 13/01/14 KURDISTAN REGIONAL GOVERNMENT = H1.Q104


Order no: REF630 BINARY INPUTS
E 15/10/2014 UPDATED. Checked A.F.U. 15/01/14 MINISTRY OF ELECTRICITY X13112
1YTU130112X1154 + Q104
D 26/09/2014 UPDATED. Approved G.Ö. 15/01/14 33kV TRANSFORMER FEEDER EL11 P. 17
Rev Date Description Contractor: ABB SWEDEN Dept. PPMV NOSARAN SUBSTATION ABB Elektrik San.A.S. 87 P.
0 1 2 3 4 5 6 7 8 9

LOCKOUT SIGNAL LOCKOUT LOCKOUT LOCKOUT


FROM LOCAL REMOTE REMOTE
132kV NETWORK RESET RESET RESET
17.9 19.0
-CP+ -XX1 9 -XX1 10 -CP+

-XC 4

1
3 11
-C6.CX3.Q104.X61
-C1.CP2.B50.X113 SR1 -KRLO CCA:471
CBA:611 LOCKOUT 4 /18.4 14 12
RESET 3
2

-XC 5

-XC 7

BCF2
RXMD1 11 12 14 17 24 27 A1
LOCKOUT -KRLO
RELAY 21 13 15 16 18 23 25 26 28 48VDC A2
/1SVR405612R6100
LOCKOUT

LOCKOUT

LOCKOUT

LOCKOUT
/21.8

/22.9

/35.5

/35.6

14 11 /18.3
12

-XC 6 -XC 8

23

-C6.CX3.Q104.X61
CCA:471

17.9 19.0
-CP- -XX2 9 -CP-

F 21/10/2014 UPDATED. Prepared F.Ş. 13/01/14 KURDISTAN REGIONAL GOVERNMENT = H1.Q104


Order no: LOCKOUT RELAY
E 15/10/2014 UPDATED. Checked A.F.U. 15/01/14 MINISTRY OF ELECTRICITY X13112
1YTU130112X1154 + Q104
D 26/09/2014 UPDATED. Approved G.Ö. 15/01/14 33kV TRANSFORMER FEEDER EL11 P. 18
Rev Date Description Contractor: ABB SWEDEN Dept. PPMV NOSARAN SUBSTATION ABB Elektrik San.A.S. 87 P.
0 1 2 3 4 5 6 7 8 9

CB ON CB ON CB OFF CB OFF CB TEST CB TEST CB SERVICE CB SERVICE CB SERVICE CB SERVICE EARTHSW. OPEN CB ON & SERVICE VT INFO
POS. POS. POS. POS. POS. POS. POS. POS. POS. POS. POSITION POS. CAN BE TRANSFERRED
TO SECONDARY VT BUSBAR
18.9 20.0
-CP+ -XX1 11 -XX1 12 -CP+

11
-KA4
/19.4 14 12

11
-KA1
/19.0 14 12

XI 11

-S1VTINFCO
+Q108/27.0

15.2 15.1 15.3 15.4 15.6 +Q109 +Q109/35.5


-CBON1 -CBOFF1 -CBTEST1 CBSERV1 ESO1
-S1VTINFCO

XI 12

VOLTAGE INFO CAN BE TRANSFERRED TO


SECONDARY LINK UNDER BELOW CONDITIONS:
- VOLTAGE SELECTION SWITCH ON
- BUSBAR VT STAR WIND. MCB OFF OR FUSE BLOWN
- INCOMING CB IN SERVICE AND ON

A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1
-KA1 -KA1.1 -KA2 -KA2.1 -KA3 -KA3.1 -KA4 -KA4.1 -KA4.2 -KA4.3 -KA5 -KA6 -KVT
110VDC A2 110VDC A2 110VDC A2 110VDC A2 110VDC A2 110VDC A2 110VDC A2 110VDC A2 110VDC A2 110VDC A2 110VDC A2 110VDC A2 110VDC A2

18.9 20.0
-CP- -XX2 10 -XX2 11 -CP-

/1SVR405613R8100 /1SVR405613R8100 /1SVR405613R8100 /1SVR405613R8100 /1SVR405613R8100 /1SVR405613R8100 /1SVR405613R8100 /1SVR405613R8100 /1SVR405613R8100 /1SVR405613R8100 /1SVR405613R8100 /1SVR405613R8100 /1SVR405613R8100
14 11 /19.8 14 11 /37.5 14 11 /38.3 14 11 /33.3 14 11 /34.0 14 11 /37.3 14 11 /19.8 14 11 /38.5 14 11 /37.5 14 11 /33.3 14 11 /37.4 14 11 /33.4 14 11 /13.5
12 12 12 12 12 12 12 12 12 12 12 12 12
24 21 /34.1 24 21 /37.6 24 21 /40.3 24 21 /34.2 24 21 /37.3 14 11 /31.3 24 21 /40.5 24 21 /37.6 24 21 /37.5 24 21 /33.5 24 21 /13.5
22 22 22 22 22 12 22 22 22 22 22
34 31 /38.2 34 31 /34.2 34 31 /38.4 34 31 /34.2 34 31 /39.4 34 31 /36.7 34 31 /33.6 34 31 /13.5
32 32 32 32 32 32 32 32
44 41 /40.2 44 41 /34.3 44 41 /40.4 44 41 /34.1 44 41 /36.6 44 41 /36.8 44 41 /13.5
42 42 42 42 42 42 42

F 21/10/2014 UPDATED. Prepared F.Ş. 13/01/14 KURDISTAN REGIONAL GOVERNMENT = H1.Q104


Order no: CONTACT MULTIPLICATION
E 15/10/2014 UPDATED. Checked A.F.U. 15/01/14 MINISTRY OF ELECTRICITY X13112
1YTU130112X1154 + Q104
D 26/09/2014 UPDATED. Approved G.Ö. 15/01/14 33kV TRANSFORMER FEEDER EL11 P. 19
Rev Date Description Contractor: ABB SWEDEN Dept. PPMV NOSARAN SUBSTATION ABB Elektrik San.A.S. 87 P.
0 1 2 3 4 5 6 7 8 9

AC CONTROL & PROTECTION CB MOTOR LOCAL INTERNAL


SUPPLY FAILED DC SUPPLY FAILED SUPPLY MCB FAILED BAY CONTROL RELAY
19.9 FAULT 21.0
-CP+ -XX3 3 -CP+

-BCF1
REF630 -X329
03
/48.4
11 11 11 4
IRF
-FBAC.1 -FB1.1 -FB2.2 SS2
/7.3 12 14 /6.2 12 14 /6.9 12 14 /22.1 3 7 /48.4
02

13 13 13 13 13
-KAC -KDC -KM -KLR -KIRF
110VDC 14 110VDC 14 110VDC 14 110VDC 14 110VDC 14

19.9 21.0
-CP- -XX4 3 -CP-

/1SVR405612R8100 /1SVR405612R8100 /1SVR405612R8100 /1SVR405612R8100 /1SVR405612R8100


14 11 /31.0 14 11 /32.5 14 11 /32.6 14 11 /31.4 14 11 /32.6
12 12 12 12 12
24 21 /39.1 24 21 /39.8 24 21 /39.9 24 21 /39.4 24 21 /39.9
22 22 22 22 22

F 21/10/2014 UPDATED. Prepared F.Ş. 13/01/14 KURDISTAN REGIONAL GOVERNMENT = H1.Q104


Order no: CONTACT MULTIPLICATION
E 15/10/2014 UPDATED. Checked A.F.U. 15/01/14 MINISTRY OF ELECTRICITY X13112
1YTU130112X1154 + Q104
D 26/09/2014 UPDATED. Approved G.Ö. 15/01/14 33kV TRANSFORMER FEEDER EL11 P. 20
Rev Date Description Contractor: ABB SWEDEN Dept. PPMV NOSARAN SUBSTATION ABB Elektrik San.A.S. 87 P.
0 1 2 3 4 5 6 7 8 9

SPRING LOW GAS INSUFF. GAS VT RESIDUAL TRIP CIRCUIT OVERCURRENT EARTH FAULT LOCK-OUT
DISCHARGED PRESSURE PRESSURE MCB ON OVERVOLTAGE TRIP FAILURE TRIP TRIP SIGNAL
20.9 (59N) 22.0
-CP+ -XX1 13 -XX1 14 -XX1 15 -XX1 16 -CP+

-BCF1
-QA1 REF630 -X316 1 3 6 7
CB 12
HD4 /50.7 /50.7 /50.7 /50.7
11 -FBV1.1 11 14
BP /12.2 BCF2
/46.5 14 12 12 14
BO1 BO2 BO3 BO4 /18.1 13 15
LOCKOUT
48 /50.7
/50.7 /50.7 5 /50.7
2 4 8

-FBV2.1 11
/12.4
12 14

-FBV3.1 11

12 14

15.2 16.3
SPRCH SF6INS

A1 A1 A1 A1 A1 A1 A1 A1 A1
-KSC -KP1 -KP2 -KVTON -KROV -KTCS -KOC -KEF -KLO
110VDC A2 110VDC A2 110VDC A2 110VDC A2 110VDC A2 110VDC A2 110VDC A2 110VDC A2 110VDC A2

20.9 22.0
-CP- -XX2 12 -CP-

/1SVR405613R8100 /1SVR405613R8100 /1SVR405613R8100 /1SVR405613R8100 /1SVR405613R8100 /1SVR405613R8100 /1SVR405613R8100 /1SVR405613R8100 /1SVR405613R8100


14 11 /31.3 14 11 /31.2 14 11 /35.1 14 11 /31.1 14 11 /32.2 14 11 /32.4 14 11 /32.0 14 11 /32.1 14 11 /30.8
12 12 12 12 12 12 12 12 12
24 21 /39.3 24 21 /39.2 24 21 /35.2 24 21 /39.2 24 21 /39.5 24 21 /39.7 24 21 /39.6 24 21 /39.7 24 21 /39.5
22 22 22 22 22 22 22 22 22
34 31 /41.2 34 31 /41.2 34 31 /41.6 34 31 /41.6 34 31 /41.4 34 31 /41.5 34 31 /41.3
32 32 32 32 32 32 32
44 41 /34.3 44 41 /32.3
42 42
F 21/10/2014 UPDATED. Prepared F.Ş. 13/01/14 KURDISTAN REGIONAL GOVERNMENT = H1.Q104
Order no: CONTACT MULTIPLICATION
E 15/10/2014 UPDATED. Checked A.F.U. 15/01/14 MINISTRY OF ELECTRICITY X13112
1YTU130112X1154 + Q104
D 26/09/2014 UPDATED. Approved G.Ö. 15/01/14 33kV TRANSFORMER FEEDER EL11 P. 21
Rev Date Description Contractor: ABB SWEDEN Dept. PPMV NOSARAN SUBSTATION ABB Elektrik San.A.S. 87 P.
0 1 2 3 4 5 6 7 8 9

LOCAL REMOTE RELAY RELAY RELAY RELAY LOCAL REMOTE EXTERNAL UNDERVOLTAGE OVERVOLTAGE RES. OVERVOLTAGE ITH BLOCK MAGNET
CB ON CB ON CB ON CB ON CB OFF CB OFF CB OFF CB OFF TRIP PROTECTION PROTECTION PROTECTION LIMITER CLOSE
21.9 (STAGE 2) (STAGE 2) (STAGE 2) TRIP 23.0
-CP+ -XX1 17 -XX1 18 -XX1 19 -CP+
(T) -BCF1
2
4 10 12 18
(T) -XC 12 (T) REF630
1 2

-X6 1 3 4
-X327 5
-SS2 3 7 9 13 11 15 17 19 01
TEST SW.
1:LOCAL 1 5 /20.4 /38.7 /15.4 /40.7 /49.7
-C1.CP2 11 11 11 11
2:REMOTE 01 03 04
CA10-A369V760 B50.X119 -KUV2 -KOV2 -KROV2 -KTR1
/25.4 14 12 /25.5 14 12 /25.6 14 12 /27.5 14 12 BO3
CBA:602
02
/49.7
6
-XC 9 (T) -XC 13

21
1 1 -XC 14
-SC -C3.CC6 -SO -C3.CC6
CB ON 2 C50.X431 -BCF1 -X327 CB OFF 2 C50.X431 01
BUTTON REF630 4 2 BUTTON
CCA:441 /49.7 /49.7 CCA:441 -C2.CC2
A50.X33
22 23
BO2 BO1 CBA:665
02
/49.7 /49.7
3 1 -XC 11
-XC 10 (T) (T) (T) (T)

-XC 15
-XB 19 -XB 20
(T)
-XB 21 -XB 22
(T)

5 17
-QA1
CB A1
BCF2
-BCF1 5 /18.2 16 18
REF630 -BB1 -KCTR LOCKOUT
110VDC A2
/47.1 6
-X319 01 /1SVR405612R8100
/50.1 15 14 11 /17.1
-X6 02 2 (T)
(T) -XR 12

DI1 22K
1
-XB 23 -XB 24 25 26 5W 27 -XB 28
(T)
/50.1
02
-QA1 31
CB 4 29 10
1 25 1
-BB1 -BB3 -BT3
2 26 2
1 19 1
-TR1
-MC - + BB2 -RL1
/46.1 3 . /47.4 20 /46.2 3
-M01
/46.4
..

14 1 40 30 20
41 39
(T)

-XB 31 -PE -PE -XB 32 -XB 29 30 -XB 33

21.9 23.0
-CP- -XX2 13
(T)
-XX2 14 -CP-

F 21/10/2014 UPDATED. Prepared F.Ş. 13/01/14 KURDISTAN REGIONAL GOVERNMENT = H1.Q104


Order no: CB CONTROL
E 15/10/2014 UPDATED. Checked A.F.U. 15/01/14 MINISTRY OF ELECTRICITY X13112
1YTU130112X1154 + Q104
D 26/09/2014 UPDATED. Approved G.Ö. 15/01/14 33kV TRANSFORMER FEEDER EL11 P. 22
Rev Date Description Contractor: ABB SWEDEN Dept. PPMV NOSARAN SUBSTATION ABB Elektrik San.A.S. 87 P.
0 1 2 3 4 5 6 7 8 9

22.9 EARTHSWITCH DC
-CP+ BLOCK MAGNET
-XX1 20
SUPERVISION

-XC 16

10
-C2.CC2
A50.X33
CBA:665
05

-XC 17

23
-K25
/45.2 24
REAR COVER
MIKROSWITCH

-XE 7

-PU1 4
/11.3 /11.4
CAPACITIVE
VOLTAGE
INDICATOR 3 5
/11.4 /11.4

-XE 8 -XE 9 A1
-KDCS
-QC9 110VDC A2
1 1 /1SVR405612R8100
-RL3 H3 14 11 /7.5
/45.8 2 ES CLOSE 2 12
ENABLE

-XE 10 -XE 11

22.9
-CP- -XX2 15

F 21/10/2014 UPDATED. Prepared F.Ş. 13/01/14 KURDISTAN REGIONAL GOVERNMENT = H1.Q104


Order no: CB CONTROL
E 15/10/2014 UPDATED. Checked A.F.U. 15/01/14 MINISTRY OF ELECTRICITY X13112
1YTU130112X1154 + Q104
D 26/09/2014 UPDATED. Approved G.Ö. 15/01/14 33kV TRANSFORMER FEEDER EL11 P. 23
Rev Date Description Contractor: ABB SWEDEN Dept. PPMV NOSARAN SUBSTATION ABB Elektrik San.A.S. 87 P.
0 1 2 3 4 5 6 7 8 9

START OF
INSTANTENOUS
OVERCURRENT
TRIP (50)

+Q103
BL1+ / +Q103/20.7 -XI1 1 -XI1 2
BL1+ / +Q105/20.2

BLC / +Q103/20.7 -XI1 3 -XI1 4


BLC / +Q105/20.2

BL1- / +Q103/20.7 -XI1 5 -XI1 6


BL1- / +Q105/20.2

BLCR+ BLCR-
16.7 16.7

F 21/10/2014 UPDATED. Prepared F.Ş. 13/01/14 KURDISTAN REGIONAL GOVERNMENT = H1.Q104


Order no: PANELS INTERCONNECTION
E 15/10/2014 UPDATED. Checked A.F.U. 15/01/14 MINISTRY OF ELECTRICITY X13112
1YTU130112X1154 + Q104
D 26/09/2014 UPDATED. Approved G.Ö. 15/01/14 33kV TRANSFORMER FEEDER EL11 P. 24
Rev Date Description Contractor: ABB SWEDEN Dept. PPMV NOSARAN SUBSTATION ABB Elektrik San.A.S. 87 P.
0 1 2 3 4 5 6 7 8 9

UNDERVOLTAGE UNDERVOLTAGE OVERVOLTAGE OVERVOLTAGE RES. OVERVOLTAGE RES. OVERVOLTAGE


PROTECTION PROTECTION PROTECTION PROTECTION PROTECTION PROTECTION
(STAGE 1) (STAGE 2) (STAGE 1) (STAGE 2) (STAGE 1) (STAGE 2)

+Q103
T1+ / +Q103/21.7 -XI2 1 -XI2 2
T1+ / +Q105/21.2

TCUV1 / +Q103/21.7 -XI2 3 -XI2 4


TCUV1 / +Q105/21.2

TCUV2 / +Q103/21.7 -XI2 5 -XI2 6


TCUV2 / +Q105/21.2

TCOV1 / +Q103/21.7 -XI2 7 -XI2 8


TCOV1 / +Q105/21.2

TCOV2 / +Q103/21.7 -XI2 9 -XI2 10


TCOV2 / +Q105/21.2

TCROV1 / +Q103/21.7 -XI2 11 -XI2 12


TCROV1 / +Q105/21.2

TCROV2 / +Q103/21.7 -XI2 13 -XI2 14


TCROV2 / +Q105/21.2

T1- / +Q103/21.7 -XI2 15 -XI2 16


T1- / +Q105/21.2

A1 A1 A1
-KUV2 -KOV2 -KROV2
110VDC A2 110VDC A2 110VDC A2

/1SVR405622R8000 /1SVR405622R8000 /1SVR405622R8000


14 11 /22.6 14 11 /22.7 14 11 /22.8
12 12 12

F 21/10/2014 UPDATED. Prepared F.Ş. 13/01/14 KURDISTAN REGIONAL GOVERNMENT = H1.Q104


Order no: PANELS INTERCONNECTION
E 15/10/2014 UPDATED. Checked A.F.U. 15/01/14 MINISTRY OF ELECTRICITY X13112
1YTU130112X1154 + Q104
D 26/09/2014 UPDATED. Approved G.Ö. 15/01/14 33kV TRANSFORMER FEEDER EL11 P. 25
Rev Date Description Contractor: ABB SWEDEN Dept. PPMV NOSARAN SUBSTATION ABB Elektrik San.A.S. 87 P.
0 1 2 3 4 5 6 7 8 9

CB BLOCK MAGNET
TRUCK

+Q103

-STG1 / +Q103/22.7 -XI3 1 -XI3 2


-STG1 /+Q105/22.3
-STG2 / +Q103/22.7 -XI3 3 -XI3 4
-STG2 /+Q105/22.3
-STG3 / +Q103/22.7 -XI3 5 -XI3 6
-STG3 /+Q105/22.3
-STG4 / +Q103/22.7 -XI3 7 -XI3 8
-STG4 /+Q105/22.3
-BBESOFF / +Q103/22.7 -XI3 9 -XI3 10
-BBESOFF /+Q105/22.3

-XC 18

03
-C2.CC2
A50.X33

04

-XC 19

-XB 34

-QA1
CB 45

1
-RL2
/46.3 2

46

-XB 35

-BB- -XI3 11 -XI3 12


-BB- /+Q105/22.3
+Q103/22.7

F 21/10/2014 UPDATED. Prepared F.Ş. 13/01/14 KURDISTAN REGIONAL GOVERNMENT = H1.Q104


Order no: PANELS INTERCONNECTION
E 15/10/2014 UPDATED. Checked A.F.U. 15/01/14 MINISTRY OF ELECTRICITY X13112
1YTU130112X1154 + Q104
D 26/09/2014 UPDATED. Approved G.Ö. 15/01/14 33kV TRANSFORMER FEEDER EL11 P. 26
Rev Date Description Contractor: ABB SWEDEN Dept. PPMV NOSARAN SUBSTATION ABB Elektrik San.A.S. 87 P.
0 1 2 3 4 5 6 7 8 9

ITH LIMITER
TRIP

+Q103
-XI4 1 -XI4 2
ITH1+ / +Q105/23.2
ITH1+ / +Q103/23.7

XX10 1 XX10 2 XX10 3

2BN 4GY 2BN 4GY 2BN 4GY


BPA1 BPA2 BPA3
CB 1BK BUSBAR 1BK CABLE 1BK
COMP. COMP. COMP.

XX10 4 XX10 5 XX10 6

-XI4 3 -XI4 4
ITHC / +Q105/23.2
ITHC / +Q103/23.7

-XI4 5 -XI4 6
ITH1- / +Q105/23.2
ITH1- / +Q103/23.7

A1
-KTR1
110VDC A2

/1SVR405622R8000
14 11 /22.8
12
24 21 /32.4
22

F 21/10/2014 UPDATED. Prepared F.Ş. 13/01/14 KURDISTAN REGIONAL GOVERNMENT = H1.Q104


Order no: PANELS INTERCONNECTION
E 15/10/2014 UPDATED. Checked A.F.U. 15/01/14 MINISTRY OF ELECTRICITY X13112
1YTU130112X1154 + Q104
D 26/09/2014 UPDATED. Approved G.Ö. 15/01/14 33kV TRANSFORMER FEEDER EL11 P. 27
Rev Date Description Contractor: ABB SWEDEN Dept. PPMV NOSARAN SUBSTATION ABB Elektrik San.A.S. 87 P.
0 1 2 3 4 5 6 7 8 9

+Q103
SP1 / +Q103/24.8 -XI5 1 -XI5 2
SP1 / +Q105/24.1
SP2 / +Q103/24.8 -XI5 3 -XI5 4
SP2 / +Q105/24.1
SP3 / +Q103/24.8 -XI5 5 -XI5 6
SP3 / +Q105/24.1
SP4 / +Q103/24.8 -XI5 7 -XI5 8
SP4 / +Q105/24.1

F 21/10/2014 UPDATED. Prepared F.Ş. 13/01/14 KURDISTAN REGIONAL GOVERNMENT = H1.Q104


Order no: PANELS INTERCONNECTION
E 15/10/2014 UPDATED. Checked A.F.U. 15/01/14 MINISTRY OF ELECTRICITY X13112
1YTU130112X1154 + Q104
D 26/09/2014 UPDATED. Approved G.Ö. 15/01/14 33kV TRANSFORMER FEEDER EL11 P. 28
Rev Date Description Contractor: ABB SWEDEN Dept. PPMV NOSARAN SUBSTATION ABB Elektrik San.A.S. 87 P.
0 1 2 3 4 5 6 7 8 9

COS FI COS FI H04 PANEL REPETITIVE FAULT SPARE SPARE SPARE SPARE SPARE
OK LOW CABLE SIDE TRIP SIGNAL
VOLTAGE OK TO 132kV SIDE

+Q107 +Q109

+Q107/18.2 +Q109/16.2
-CAP_AUTO -CABLIVE1

-XI 13 -XI 14 -XI 17 -XC 30 -XC 32 -XC 81 -XC 83 -XC 95 -XC 85

-BCF1
REF630 -X327 7 9 11 13 15 17 -X316 11 15 18

/49.7 /49.7 /49.7 /49.7 /49.7 /49.7 /50.7 /50.7 /50.7


11
BO4 BO5 BO6 BO7 BO8 BO9 BO6 BO7 BO8 BO9
14 12
/49.7 /49.7 /49.7
8 10 /49.7 /49.7 /49.7 /50.7 /50.7 /50.7 /50.7 /50.7
12 12 13 14 17 16
14 16 18

-XI 15 -XI 16 -XI 18 -XC 31 -XC 33 -XC 82 -XC 84 -XC 96 -XC 97 -XC 86

-TRCMD47 -CLCMD47 -CABLIVE1


+Q107/14.1 +Q107/14.0 +Q109/16.2

F 21/10/2014 UPDATED. Prepared F.Ş. 13/01/14 KURDISTAN REGIONAL GOVERNMENT = H1.Q104


Order no: REF630 BINARY OUTPUTS
E 15/10/2014 UPDATED. Checked A.F.U. 15/01/14 MINISTRY OF ELECTRICITY X13112
1YTU130112X1154 + Q104
D 26/09/2014 UPDATED. Approved G.Ö. 15/01/14 33kV TRANSFORMER FEEDER EL11 P. 29
Rev Date Description Contractor: ABB SWEDEN Dept. PPMV NOSARAN SUBSTATION ABB Elektrik San.A.S. 87 P.
0 1 2 3 4 5 6 7 8 9

LAMP TEST CB ON CB OFF CB TEST CB SERVICE E/S OPEN E/S CLOSED SYNCHRO. LOCKOUT
POSITION POSITION POSITION POSITION POSITION POSITION OK SIGNAL
14.9 31.0
S+ -XX3 4 -XX3 5 -XX3 6 S+

-XB 36 -XB 37 -XB 38 -XE 12 -XE 13

-QA1 -BCF1
28 49 REF630 -X316 9
CB 7 -QC9
EARTHSW. /50.7
23 23
17 15 13 13 BE1 BE2
-BB2 BB2 BT2 BT1 /45.2 24 /45.3 24 BO5
/47.3 18 /47.3 16 /47.7 14 /47.6 14

13 23
/50.7
-SB1 17 38 50 51 10
LAMP 14 24
TEST /7.6

-XB 39 40 -XB 41 42 -XB 43 44 -XB 45 46 -XE 14 15 -XE 16 17

+ + + + + + + 11
-XD 1 2 3 4 5 6 7 -KLO
- - - - - - - /21.8 14 12

1 X1
H4 SR1
2 3 2 3 2 3 2 3 SYNCHRO. 2 LOCKOUT X2
OK RESET
PX1 PX2 PX3 PX4 BUTTON
BULB

1 1 1 1

14.9 31.0
S- -XX4 4 S-

F 21/10/2014 UPDATED. Prepared F.Ş. 13/01/14 KURDISTAN REGIONAL GOVERNMENT = H1.Q104


Order no: POSITION INDICATORS
E 15/10/2014 UPDATED. Checked A.F.U. 15/01/14 MINISTRY OF ELECTRICITY X13112
1YTU130112X1154 + Q104
D 26/09/2014 UPDATED. Approved G.Ö. 15/01/14 33kV TRANSFORMER FEEDER EL11 P. 30
Rev Date Description Contractor: ABB SWEDEN Dept. PPMV NOSARAN SUBSTATION ABB Elektrik San.A.S. 87 P.
0 1 2 3 4 5 6 7 8 9

AC VT MCB LOW SF6 SPRING CB NOT FULLY LOCAL


SPARE SPARE SPARE SPARE
SUPPLY FAILED OFF PRESSURE DISCHARGED RACKED IN BAY CONTROL

30.9 32.0
S+ -XX3 7 S+

-XC 98 -XC 99 -XC 100 -XC 101

11 11 11 11 11 11
-KAC -KVTON -KP1 -KSC -KA4 -KLR
/20.1 14 12 /21.4 14 12 /21.1 14 12 /21.1 14 12 /19.4 14 12 /20.4 14 12

-XC 102 -XC 103 -XC 104 -XC 105

PGM
EES BSM16
X10 X11
1 2 3 4 5 6 7 8 1 2

9 3

30.9 32.0
S- -XX4 5 S-

F 21/10/2014 UPDATED. Prepared F.Ş. 13/01/14 KURDISTAN REGIONAL GOVERNMENT = H1.Q104


Order no: ANNUNCIATOR
E 15/10/2014 UPDATED. Checked A.F.U. 15/01/14 MINISTRY OF ELECTRICITY X13112
1YTU130112X1154 + Q104
D 26/09/2014 UPDATED. Approved G.Ö. 15/01/14 33kV TRANSFORMER FEEDER EL11 P. 31
Rev Date Description Contractor: ABB SWEDEN Dept. PPMV NOSARAN SUBSTATION ABB Elektrik San.A.S. 87 P.
0 1 2 3 4 5 6 7 8 9

OVERCURRENT EARTH FAULT RESIDUAL 110VDC INTERNAL 110VDC


LOCKOUT ITH LIMITER TRIP CIRCUIT GROUP A GROUP B
PROTECTION PROTECTION OVERVOLTAGE TRIP PROT. RELAY MOTOR
SIGNAL TRIP FAULTY SIGNAL SIGNAL
OPERATED OPERATED OPERATED SUPPLY FAIL FAULT SUPPLY FAIL
31.9
S+ -XX3 8 -XX3 9 -XX3 10

11 11 11 41 21 11 11 11 11
-KOC -KEF -KROV -KLO -KTR1 -KTCS -KDC -KIRF -KM
/21.6 14 12 /21.7 14 12 /21.5 14 12 /21.8 44 42 /27.5 24 22 /21.6 14 12 /20.2 14 12 /20.5 14 12 /20.3 14 12

PGM
EES BSM16
X12 X2
1 2 3 4 5 6 7 8 2 5

9 3 6

13 13
-KRGA -KRGB
110VDC 14 110VDC 14

31.9
S- -XX4 6 -XX4 7

/1SVR405612R8100 /1SVR405612R8100
14 11 /41.7 14 11 /41.8
12 12

F 21/10/2014 UPDATED. Prepared F.Ş. 13/01/14 KURDISTAN REGIONAL GOVERNMENT = H1.Q104


Order no: ANNUNCIATOR
E 15/10/2014 UPDATED. Checked A.F.U. 15/01/14 MINISTRY OF ELECTRICITY X13112
1YTU130112X1154 + Q104
D 26/09/2014 UPDATED. Approved G.Ö. 15/01/14 33kV TRANSFORMER FEEDER EL11 P. 32
Rev Date Description Contractor: ABB SWEDEN Dept. PPMV NOSARAN SUBSTATION ABB Elektrik San.A.S. 87 P.
0 1 2 3 4 5 6 7 8 9

CB CB CB CB
SERVICE&OFF SERVICE&ON SERVICE&ON SERVICE&ON
POS. POS. POS. POS.

+Q109-PAR1
+Q109/33.3

-XI6 1 -XI6 2 -XI6 5 -XI6 7

11
-KA2.1
/19.2 14 12
CB OFF
POS. 11 21 31
-KA6 -KA6 -KA6
11 /19.7 14 12 /19.7 24 22 /19.7 34 32
-KA4.3 CB ON&SERVICE CB ON&SERVICE CB ON&SERVICE
POS. POS. POS.
/19.6 14 12
CB SERVICE
POS.

-XI6 3 -XI6 4 -XI6 6 -XI6 8

PAR2 PAR3
+Q109/33.3 +Q109/33.4

F 21/10/2014 UPDATED. Prepared F.Ş. 13/01/14 KURDISTAN REGIONAL GOVERNMENT = H1.Q104


Order no: PARALLELING CIRCUIT
E 15/10/2014 UPDATED. Checked A.F.U. 15/01/14 MINISTRY OF ELECTRICITY X13112
1YTU130112X1154 + Q104
D 26/09/2014 UPDATED. Approved G.Ö. 15/01/14 33kV TRANSFORMER FEEDER EL11 P. 33
Rev Date Description Contractor: ABB SWEDEN Dept. PPMV NOSARAN SUBSTATION ABB Elektrik San.A.S. 87 P.
0 1 2 3 4 5 6 7 8 9

CB TEST CB SERVICE & ON CB SERVICE & OFF CB TEST / OFF SECTION1 HORN SIGNALLING MCB
POSITION POSITION POSITION INC. VT METERING OUTPUT OFF
HEALTHY

+Q103 +Q107 +Q109

-TST -SERVON -SERVOFF1 -TSTOFF1 S1INCVTMH


+Q103/29.0 +Q107/14.2 +Q109/16.1 +Q109/16.1 +Q109/15.2

+Q103 +Q103

-XI 19 -XI 21 -XI 23 -XI 25 -XI 27 -HORN+ -XI 29 -XI 30


-HORN+ -SMCBOFF+ -XI 33 -XI 34
-SMCBOFF+
/+Q103/29.3 /+Q105/29.2 /+Q103/29.6 /+Q105/29.5

41 31 PGM
-KA4 -KA4 EES X2
/19.4 44 42 /19.4 34 32 BSM16 8
CB SERVICE CB SERVICE
11 POS. POS.
21 41 41 -FB3.2 11
-KA3
/19.2 14 12 -KA3 -KA2 -KVTON /6.6
/19.2 24 22 /19.1 44 42 /21.4 44 42 9 12 14
21 31
CB TEST CB OFF
-KA1 -KA2 POS. POS.
/19.0 24 22 /19.1 34 32
CB ON CB OFF
POS. POS.

-XI 20 -XI 22 -XI 24 -XI 26 -XI 28 -HORN- -XI 31 -XI 32


-HORN- -SMCBOFF- -XI 35 -XI 36
-SMCBOFF-
/+Q103/29.3 /+Q105/29.2 /+Q103/29.6 /+Q105/29.5

-TST -SERVON SERVOFF1 TSTOFF1 S1INCVTMH


+Q105/29.0 +Q107/14.2 +Q109/16.1 +Q109/16.1 +Q109/15.2

F 21/10/2014 UPDATED. Prepared F.Ş. 13/01/14 KURDISTAN REGIONAL GOVERNMENT = H1.Q104


Order no: OUTGOING SIGNALS
E 15/10/2014 UPDATED. Checked A.F.U. 15/01/14 MINISTRY OF ELECTRICITY X13112
1YTU130112X1154 + Q104
D 26/09/2014 UPDATED. Approved G.Ö. 15/01/14 33kV TRANSFORMER FEEDER EL11 P. 34
Rev Date Description Contractor: ABB SWEDEN Dept. PPMV NOSARAN SUBSTATION ABB Elektrik San.A.S. 87 P.
0 1 2 3 4 5 6 7 8 9

SF6 SF6 LIVE LOCKOUT LOCKOUT


INSUFFICIENT INSUFFICIENT RELAY

-XC 106 -XC 108 -XC 110 -XC 112 -XC 114

PGM
EES BSM16 X2
11

11 21 24 27
12
-KP2 -KP2 BCF2 BCF2
/21.2 14 12 /21.2 24 22 /18.2 23 25 /18.2 26 28

-XC 107 -XC 109 -XC 111 -XC 113 -XC 115

F 21/10/2014 UPDATED. Prepared F.Ş. 13/01/14 KURDISTAN REGIONAL GOVERNMENT = H1.Q104


Order no: OUTGOING SIGNALS
E 15/10/2014 UPDATED. Checked A.F.U. 15/01/14 MINISTRY OF ELECTRICITY X13112
1YTU130112X1154 + Q104
D 26/09/2014 UPDATED. Approved G.Ö. 15/01/14 33kV TRANSFORMER FEEDER EL11 P. 35
Rev Date Description Contractor: ABB SWEDEN Dept. PPMV NOSARAN SUBSTATION ABB Elektrik San.A.S. 87 P.
0 1 2 3 4 5 6 7 8 9

CB OFF CB OFF CB ON CB ON CB SERVICE CB SERVICE CB SERVICE CB SERVICE


POSITION POSITION POSITION POSITION POSITION POSITION POSITION POSITION

-XB 47 -XB 49 -XB 51 XB 53 -XB 59 -XC 116 -XC 118 -XC 120

-QA1 8 23 6 32 55
CB

3 11 13 21 53 41 31 41
-BB1
/47.1
-BB2 -BB2 -BB3 BT1 -KA4.1 -KA4.2 -KA4.2
4 /47.2 12 /47.2 14 /47.4 22 /47.8 54 /19.4 44 42 /19.5 34 32 /19.5 44 42

18 33 16 42
56

-XB 48 -XB 50 -XB 52 XB 54 -XB 60 -XC 117 -XC 119 -XC 121

F 21/10/2014 UPDATED. Prepared F.Ş. 13/01/14 KURDISTAN REGIONAL GOVERNMENT = H1.Q104


Order no: OUTGOING SIGNALS (CB)
E 15/10/2014 UPDATED. Checked A.F.U. 15/01/14 MINISTRY OF ELECTRICITY X13112
1YTU130112X1154 + Q104
D 26/09/2014 UPDATED. Approved G.Ö. 15/01/14 33kV TRANSFORMER FEEDER EL11 P. 36
Rev Date Description Contractor: ABB SWEDEN Dept. PPMV NOSARAN SUBSTATION ABB Elektrik San.A.S. 87 P.
0 1 2 3 4 5 6 7 8 9

CB OFF & ES OPEN CB TEST CB TEST CB TEST EARTHSW. OPEN EARTHSW. OPEN CB ON&IN SERVICE CB ON&IN SERVICE ES CLOSED
POS. POSITION POS. POS. POS. POS. POSITION POSITION POS.

-C1.CP2 -C1.CP3 -C2.CC3 -C2.CC3


B50.X33 B50.X33 A50.X33 A50.X33
CBA:631 CBA:631 CBA:666 CBA:633
34 21 16 18 21

XB 55 -XB 57 -XC 87 -XC 89 -XC 91 -XC 93 -XC 122 -XC 124 -XE 28

-QA1 27
CB

23
BB3
/47.5 24 -QA1 57 11 21
CB -KA1.1 -KA1.1
/19.1 14 12 /19.1 24 22 -QC9
37 53
53
BT2 11 21 11 21 BE2
XB 56 /47.9 54 -KA3.1 -KA3.1 -KA5 -KA5 /45.8 54
/19.3 14 12 /19.3 24 22 /19.6 14 12 /19.6 24 22
11 21
58 -KA4.2 -KA4.2
-XE 26
/19.5 14 12 /19.5 24 22

-QC9
53
BE1
/45.7 54

-XE 27 -XB 58 -XC 88 -XC 90 -XC 92 -XC 94 -XC 123 -XC 125 -XE 29

33 37 17 19 38

-C1.CP2 -C1.CP3 -C2.CC3 -C2.CC3


B50.X33 B50.X33 A50.X33 A50.X33
CBA:631 CBA:631 CBA:666 CBA:633

F 21/10/2014 UPDATED. Prepared F.Ş. 13/01/14 KURDISTAN REGIONAL GOVERNMENT = H1.Q104


Order no: OUTGOING SIGNALS (CB&ES)
E 15/10/2014 UPDATED. Checked A.F.U. 15/01/14 MINISTRY OF ELECTRICITY X13112
1YTU130112X1154 + Q104
D 26/09/2014 UPDATED. Approved G.Ö. 15/01/14 33kV TRANSFORMER FEEDER EL11 P. 37
Rev Date Description Contractor: ABB SWEDEN Dept. PPMV NOSARAN SUBSTATION ABB Elektrik San.A.S. 87 P.
0 1 2 3 4 5 6 7 8 9

CB ON CB OFF CB TEST CB SERVICE ES OPEN ES CLOSE LOCAL


POS. POS. POS. POS. POS. POS. BAY CONTROL

-XE 18 -XE 19

-QC9
31 11 31 11 33 33 10
-KA1 -KA2 -KA3 -KA4.1 BE1 BE2 SS2
/19.0 34 32 /19.1 14 12 /19.2 34 32 /19.4 14 12 /45.4 34 /45.5 34 /22.1 9 13

-XE 20 -XE 21

-XC 34 -XC 35 -XC 36 -XC 37 -XC 38 -XC 39 -XC 40 -XC 41

24 25 26 31 32 29 28 30

C3.CC6.C50.X431 C3.CC6.C50.X431
CCA:441 CCA:451

F 21/10/2014 UPDATED. Prepared F.Ş. 13/01/14 KURDISTAN REGIONAL GOVERNMENT = H1.Q104


Order no: OUTGOING SIGNALS (CONTROL PANEL)
E 15/10/2014 UPDATED. Checked A.F.U. 15/01/14 MINISTRY OF ELECTRICITY X13112
1YTU130112X1154 + Q104
D 26/09/2014 UPDATED. Approved G.Ö. 15/01/14 33kV TRANSFORMER FEEDER EL11 P. 38
Rev Date Description Contractor: ABB SWEDEN Dept. PPMV NOSARAN SUBSTATION ABB Elektrik San.A.S. 87 P.
0 1 2 3 4 5 6 7 8 9

AC VT LOW SF6 SPRING CB NOT FULLY LOCAL RESIDUAL LOCKOUT OVERCURRENT EARTH FAULT TRIP CIRCUIT 110VDC PROT. INTERNAL 110VDC MOTOR
SUPPLY FAILED MCB TRIP PRESSURE DISCHARGED RACKED IN BAY CONTROL OVERVOLTAGE SIGNAL PROTECTION PROTECTION FAULTY SUPPLY FAIL RELAY SUPPLY FAIL
OPERATED OPERATED OPERATED FAULT
(59N)

21 21 21 21 31 21 21 21 21 21 21 21 21 21
-KAC -KVTON -KP1 -KSC -KA4.1 -KLR -KROV -KLO -KOC -KEF -KTCS -KDC -KIRF -KM
/20.1 24 22 /21.4 24 22 /21.1 24 22 /21.1 24 22 /19.4 34 32 /20.4 24 22 /21.5 24 22 /21.8 24 22 /21.6 24 22 /21.7 24 22 /21.6 24 22 /20.2 24 22 /20.5 24 22 /20.3 24 22

-XC 42 -XC 43 -XC 44 -XC 45 -XC 46 -XC 47 -XC 48 -XC 49 -XC 50 -XC 51 -XC 52 -XC 53 -XC 54 -XC 55

2 401 402 403 404 405 406 407 408 409 410 414 415 416

C3.CC6.C50.X441 C3.CC6.C50.X441
CCA:26 CCA:461

F 21/10/2014 UPDATED. Prepared F.Ş. 13/01/14 KURDISTAN REGIONAL GOVERNMENT = H1.Q104


Order no: OUTGOING SIGNALS (CONTROL PANEL)
E 15/10/2014 UPDATED. Checked A.F.U. 15/01/14 MINISTRY OF ELECTRICITY X13112
1YTU130112X1154 + Q104
D 26/09/2014 UPDATED. Approved G.Ö. 15/01/14 33kV TRANSFORMER FEEDER EL11 P. 39
Rev Date Description Contractor: ABB SWEDEN Dept. PPMV NOSARAN SUBSTATION ABB Elektrik San.A.S. 87 P.
0 1 2 3 4 5 6 7 8 9

CB ON CB OFF CB TEST CB SERVICE ES OPEN ES CLOSE LOCAL


POS. POS. POS. POS. POS. POS. BAY CONTROL

-COM1 / 41.1

-XE 22 -XE 23

-QC9
41 21 41 21 43 43 18
-KA1 -KA2 -KA3 -KA4.1 BE1 BE2 SS2
/19.0 44 42 /19.1 24 22 /19.2 44 42 /19.4 24 22 /45.5 44 /45.6 44 /22.2 17 19

-XE 24 -XE 25

-XC 56 -XC 57 -XC 58 -XC 59 -XC 60 -XC 61 -XC 62 -XC 63

4 7 8 9 10 11 12 13

C6.CX3.Q104.X61
CCA:472

F 21/10/2014 UPDATED. Prepared F.Ş. 13/01/14 KURDISTAN REGIONAL GOVERNMENT = H1.Q104


Order no: OUTGOING SIGNALS (SCADA)
E 15/10/2014 UPDATED. Checked A.F.U. 15/01/14 MINISTRY OF ELECTRICITY X13112
1YTU130112X1154 + Q104
D 26/09/2014 UPDATED. Approved G.Ö. 15/01/14 33kV TRANSFORMER FEEDER EL11 P. 40
Rev Date Description Contractor: ABB SWEDEN Dept. PPMV NOSARAN SUBSTATION ABB Elektrik San.A.S. 87 P.
0 1 2 3 4 5 6 7 8 9

VT LOW SF6 LOCK-OUT OVERCURRENT EARTH FAULT TRIP CIRCUIT RESIDUAL GROUP A GROUP B
MCB TRIP PRESSURE SIGNAL PROTECTION PROTECTION FAILURE OVERVOLTAGE SIGNAL SIGNAL
OPERATED OPERATED OPERATED
(59N)

-COM1 / 40.7

31 31 31 31 31 31 31 11 11
-KVTON -KP1 -KLO -KOC -KEF -KTCS -KROV -KRGA -KRGB
/21.4 34 32 /21.1 34 32 /21.8 34 32 /21.6 34 32 /21.7 34 32 /21.6 34 32 /21.5 34 32 /32.7 14 12 /32.8 14 12

-XC 64 -XC 65 -XC 66 -XC 67 -XC 68 -XC 69 -XC 70 -XC 71 -XC 72

14 15 16 17 18 19 20 5 6

C6.CX3.Q104.X61
CCA:472

F 21/10/2014 UPDATED. Prepared F.Ş. 13/01/14 KURDISTAN REGIONAL GOVERNMENT = H1.Q104


Order no: OUTGOING SIGNALS (SCADA)
E 15/10/2014 UPDATED. Checked A.F.U. 15/01/14 MINISTRY OF ELECTRICITY X13112
1YTU130112X1154 + Q104
D 26/09/2014 UPDATED. Approved G.Ö. 15/01/14 33kV TRANSFORMER FEEDER EL11 P. 41
Rev Date Description Contractor: ABB SWEDEN Dept. PPMV NOSARAN SUBSTATION ABB Elektrik San.A.S. 87 P.
0 1 2 3 4 5 6 7 8 9

TRANSDUCER TRANSDUCER TRANSDUCER TRANSDUCER


OUTPUT OUTPUT OUTPUT OUTPUT
(UL13) (IL2) (P) (Q)

C2.CC2.A50.X34
CBA:571 C6.CX3.Q104.XI6
21 3 5 7

-XC 73 -XC 75 -XC 77 -XC 79

-PJK1
MT440 15 17 19 21
/45.0 /45.0 /45.0 /45.0
+ + + +

/45.1 /45.1 /45.1 /45.1


16 18 20 22

-XC 74 -XC 76 -XC 78 -XC 80

22 4 6 8

C2.CC2.A50.X34 C6.CX3.Q104.XI6
CBA:571

F 21/10/2014 UPDATED. Prepared F.Ş. 13/01/14 KURDISTAN REGIONAL GOVERNMENT = H1.Q104


Order no: OUTGOING SIGNALS (SCADA)
E 15/10/2014 UPDATED. Checked A.F.U. 15/01/14 MINISTRY OF ELECTRICITY X13112
1YTU130112X1154 + Q104
D 26/09/2014 UPDATED. Approved G.Ö. 15/01/14 33kV TRANSFORMER FEEDER EL11 P. 42
Rev Date Description Contractor: ABB SWEDEN Dept. PPMV NOSARAN SUBSTATION ABB Elektrik San.A.S. 87 P.
0 1 2 3 4 5 6 7 8 9

-BCF1 -X4
REF630

IRIG-B+
-X73 1
04
/48.4

IRIG-B-
-X73 2
03
/48.4

GND
-X73 3
01
/48.4

F 21/10/2014 UPDATED. Prepared F.Ş. 13/01/14 KURDISTAN REGIONAL GOVERNMENT = H1.Q104


Order no: OUTGOING SIGNALS (IRIG-B)
E 15/10/2014 UPDATED. Checked A.F.U. 15/01/14 MINISTRY OF ELECTRICITY X13112
1YTU130112X1154 + Q104
D 26/09/2014 UPDATED. Approved G.Ö. 15/01/14 33kV TRANSFORMER FEEDER EL11 P. 43
Rev Date Description Contractor: ABB SWEDEN Dept. PPMV NOSARAN SUBSTATION ABB Elektrik San.A.S. 87 P.
0 1 2 3 4 5 6 7 8 9

-XS 1 2 3 4 XS 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36

F 21/10/2014 UPDATED. Prepared F.Ş. 13/01/14 KURDISTAN REGIONAL GOVERNMENT = H1.Q104


Order no: SPARE TERMINALS
E 15/10/2014 UPDATED. Checked A.F.U. 15/01/14 MINISTRY OF ELECTRICITY X13112
1YTU130112X1154 + Q104
D 26/09/2014 UPDATED. Approved G.Ö. 15/01/14 33kV TRANSFORMER FEEDER EL11 P. 44
Rev Date Description Contractor: ABB SWEDEN Dept. PPMV NOSARAN SUBSTATION ABB Elektrik San.A.S. 87 P.
0 1 2 3 4 5 6 7 8 9

-QC9
EARTHSWITCH 1
13 13 23 23 33 33 43 43 53 53
BE1 BE2 BE1 BE2 BE1 BE2 BE1 BE2 BE1 BE2 -RL3
/15.5 /15.6 /30.6 /30.6 /38.5 /38.6 /40.5 /40.6 /37.0 /37.7
14 14 24 24 34 34 44 44 54 54 /23.1 2

-K25
-K25011V
REAR COVER MIKROSWITCH

11 23 33
/23.1
12 24 34

- The diagram indicates the condition of contacts when mikroswitch is not pushed.

-PJK1
MT440
1 Current L1 3
/8.5 /8.4

4 Current L2 6
/8.5 /8.4

7 Current L3 9
/8.5 /8.4

2 Voltage L1
/12.5

5 Voltage L2
/12.5

8 Voltage L3
/12.6

11 Voltage N
/12.6

13 Supply 14
/14.4 /14.4

15 4-20mA OUTPUT 16
/42.1 /42.1

17 4-20mA OUTPUT 18
/42.2 /42.2

19 4-20mA OUTPUT 20
/42.2 /42.2

21 4-20mA OUTPUT 22
/42.3 /42.3

F 21/10/2014 UPDATED. Prepared F.Ş. 13/01/14 KURDISTAN REGIONAL GOVERNMENT = H1.Q104


Order no: REFERENCES
E 15/10/2014 UPDATED. Checked A.F.U. 15/01/14 MINISTRY OF ELECTRICITY X13112
1YTU130112X1154 + Q104
D 26/09/2014 UPDATED. Approved G.Ö. 15/01/14 33kV TRANSFORMER FEEDER EL11 P. 45
Rev Date Description Contractor: ABB SWEDEN Dept. PPMV NOSARAN SUBSTATION ABB Elektrik San.A.S. 87 P.
0 1 2 3 4 5 6 7 8 9

SPRING CHARGING CLOSING BLOCKING MAGNET BLOCKING MAGNET TRIP


MOTOR SF6 PRESSURE
COIL (CLOSING) (RACKING) COIL

NORMAL LOW INSUFFICIENT


-QA1

25 4 10 45 31 41 12 9

10

45

31

41

12

9
-XB2 -XB15

1 1
-BT3 -RL2
2 /26.6 2
25

-XB2 -XB15
70

-XB61 -XB5

508

511
601
1 25 11 22
-BB1 -BB3 -BP
2 26 /21.1 14 12 21
2

602

509

510

512
-BS1
1 -XB61 -XB5

- -TR1 +
73

1 1 1 .
-MS M -MC -RL1 -M01
/6.7 2 /22.3 3 /22.9 3 /22.6 ..
30
35

46
14

20

47

48

19
35 14 20 46 30 47 48 19

FIG. 1 FIG. 2 FIG. 3 FIG. 4 FIG. 7 FIG. 11

F 21/10/2014 UPDATED. Prepared F.Ş. 13/01/14 KURDISTAN REGIONAL GOVERNMENT = H1.Q104


Order no: CB INTERNAL DIAGRAM (HD4)
E 15/10/2014 UPDATED. Checked A.F.U. 15/01/14 MINISTRY OF ELECTRICITY X13112
1YTU130112X1154 + Q104
D 26/09/2014 UPDATED. Approved G.Ö. 15/01/14 33kV TRANSFORMER FEEDER EL11 P. 46
Rev Date Description Contractor: ABB SWEDEN Dept. PPMV NOSARAN SUBSTATION ABB Elektrik San.A.S. 87 P.
0 1 2 3 4 5 6 7 8 9

SPRING OPEN CLOSED OPEN CLOSED OPEN CLOSED OPEN CLOSED OPEN OPEN CLOSED SERVICE TEST SERVICE TEST SERVICE TEST
CHARGED POSITION POSITION POSITION POSITION POSITION POSITION

-QA1
HD4

24 8 5 23 6 28 7 29 32 27 11 49 52 55 57

-XB12 1 -XB13 1

-XB61 3 5 -XB62 1 3 5 7 9 1 3 7 XB7 1 4 7 9

2
603

605

611

613

615

617

619
13 13 23 23 53 53
-BS2 3 5 11 13 15 17 19 21 23 27 29
/15.2 0 -BB1 -BB2 -BB3
/36.1 4 /22.5 6 /36.2 12 /36.3 14 /30.3 16 /30.2 18 /22.6 20 /36.4 22 /37.0 24 /15.0 28 /15.1 30 BT1 14 BT2 14 BT1 24 BT2 24 BT1 54 BT2 54
/30.5 /30.4 /15.4 /15.3 /36.5 /37.2
604

606

612

614

616

618

620
-XB61 4 6 -XB62 2 4 6 8 10 -XB3 2 4 8 9 XB7 3 2 6 5 8 10

-XB12 2 -XB13 2

34 18 15 33 16 38 17 39 42 37 22 21 51 50 54 53 56 58

FIG. 22 FIG. 51
FIG. 32

F 21/10/2014 UPDATED. Prepared F.Ş. 13/01/14 KURDISTAN REGIONAL GOVERNMENT = H1.Q104


Order no: CB INTERNAL DIAGRAM (HD4)
E 15/10/2014 UPDATED. Checked A.F.U. 15/01/14 MINISTRY OF ELECTRICITY X13112
1YTU130112X1154 + Q104
D 26/09/2014 UPDATED. Approved G.Ö. 15/01/14 33kV TRANSFORMER FEEDER EL11 P. 47
Rev Date Description Contractor: ABB SWEDEN Dept. PPMV NOSARAN SUBSTATION ABB Elektrik San.A.S. 87 P.
0 1 2 3 4 5 6 7 8 9

ANALOG INPUTS POWER SUPPLY & COMMUNICATION


-BCF1 -X101 -BCF1
01 /10.4 -X410
CT
02 /10.5 + 03
Uaux
02
03 /10.4
CT - 01
04 /10.5

05 /10.4
CT -X329
06 /10.5
03 /20.5
07 /10.5 IRF 02 /20.5
CT
08 /10.4 01

09 /10.4
CT
10 /10.5

-X9

IEC61850
TX
LC
RX

-X102 -X4
03 /12.1 GNDC 01 /43.5
VT
04 /12.1 NC 02
IRIG-B- 03 /43.5
05 /12.1
VT IRIG-B+ 04 /43.5
06 /12.1

07 /12.2
VT
08 /12.2

09 /13.3
VT
10 /13.4

F 21/10/2014 UPDATED. Prepared F.Ş. 13/01/14 KURDISTAN REGIONAL GOVERNMENT = H1.Q104


Order no: REFERENCES (REF630)
E 15/10/2014 UPDATED. Checked A.F.U. 15/01/14 MINISTRY OF ELECTRICITY X13112
1YTU130112X1154 + Q104
D 26/09/2014 UPDATED. Approved G.Ö. 15/01/14 33kV TRANSFORMER FEEDER EL11 P. 48
Rev Date Description Contractor: ABB SWEDEN Dept. PPMV NOSARAN SUBSTATION ABB Elektrik San.A.S. 87 P.
0 1 2 3 4 5 6 7 8 9

-BCF1 DIGITAL INPUTS -BCF1 DIGITAL OUTPUTS

-X304 -X327
02 CB OPEN POSITION
DI1 /15.0
01
/15.0
1 BO1_PO_TCS
/22.3
DI2 03
/15.1 CB CLOSED POSITION RELAY CB OFF /22.3
2 TCS

04 BO2_PO_TCS
DI3 /15.2 SPRING CHARGED /22.3
3

RELAY CB ON /22.3
4 TCS

DI4 05
/15.3 CB TEST POSITION
5 BO3_PO_TCS
/22.9
BLOCK MAGNET CLOSE /22.9
6 TCS
07 SERVICE POSITION
DI5 /15.4
06
/15.4
7 BO4_PO
/29.1
08 REMOTE 8
DI6 /15.4 COS FI OK /29.1

09
/15.5 EARTHSW. OPEN POSITION 9 BO5_PO
DI7 /29.2
10
COS FI LOW /29.2

10 EARTHSW. CLOSED POSITION


DI8 /15.6
11 BO6_PO
/29.3
12
H04 PANEL CABLE SIDE VOLTAGE OK /29.3
12 CLOSE ENABLE FROM H1.Q109 PANEL
DI9 /16.0
11
/16.0
13
/29.4
13
/16.1 CLOSE COMMAND FROM H1.Q109 PANEL BO7_SO
DI10 REPETITIVE FAULT TRIP SIGNAL TO 132kV SIDE /29.4
14

15
/29.4
14 TRIP COMMAND FROM H1.Q109 PANEL
/16.2
DI11 16 BO8_SO
SPARE /29.4

17
/29.5
16 INSUFF. GAS PRESSURE
DI12 /16.3
BO9_SO
15 18
/16.3 SPARE /29.5

17 INSUFF. GAS PRESSURE TRIP FROM OTHER PANELS


DI13 /16.5

18 REF615 LEDS REMOTE RESET


DI14 /16.6

F 21/10/2014 UPDATED. Prepared F.Ş. 13/01/14 KURDISTAN REGIONAL GOVERNMENT = H1.Q104


Order no: REFERENCES (REF630)
E 15/10/2014 UPDATED. Checked A.F.U. 15/01/14 MINISTRY OF ELECTRICITY X13112
1YTU130112X1154 + Q104
D 26/09/2014 UPDATED. Approved G.Ö. 15/01/14 33kV TRANSFORMER FEEDER EL11 P. 49
Rev Date Description Contractor: ABB SWEDEN Dept. PPMV NOSARAN SUBSTATION ABB Elektrik San.A.S. 87 P.
0 1 2 3 4 5 6 7 8 9

-BCF1 DIGITAL INPUTS DIGITAL OUTPUTS

-X319 -BCF1 -X316


02
DI1 /22.0 LOCAL CB ON
01
/22.0
03
1
/21.5
DI2 05
/16.7 START OF INSTANTENOUS OVERCURRENT TRIP (50)
BO1_PO
04 2
/16.7 RESIDUAL OVERVOLTAGE TRIP (59N) /21.5

3
DI3 06
/16.8 SPARE /21.6
07 BO2_PO
4
TRIP CIRCUIT FAILURE /21.6
DI4 09
/17.1 COMMON CB TRIP
08 5
/17.1 /21.6
BO3_PO
6
DI5 10
/17.2 SPARE OVERCURRENT TRIP /21.6
11
7
/21.7
DI6 13
/17.3 SPARE
8 BO4_SO
12 EARTH FAULT TRIP /21.7
/17.3
9
/30.7
DI7 14
/17.4 SPARE
15 BO5_SO
10
SYNCHRO. OK /30.7
DI8 17
/17.4 SPARE
11
16 /29.6
/17.4
12 BO6_SO
SPARE /29.6
DI9 18
/17.5 SPARE
13
SPARE /29.7
14
/29.7 BO7_SO
15 BO8_SO
/29.7

16
/29.8
17
SPARE /29.8 BO9_SO
18
SPARE /29.8

F 21/10/2014 UPDATED. Prepared F.Ş. 13/01/14 KURDISTAN REGIONAL GOVERNMENT = H1.Q104


Order no: REFERENCES (REF630)
E 15/10/2014 UPDATED. Checked A.F.U. 15/01/14 MINISTRY OF ELECTRICITY X13112
1YTU130112X1154 + Q104
D 26/09/2014 UPDATED. Approved G.Ö. 15/01/14 33kV TRANSFORMER FEEDER EL11 P. 50
Rev Date Description Contractor: ABB SWEDEN Dept. PPMV NOSARAN SUBSTATION ABB Elektrik San.A.S. 87 P.
0 1 2 3 4 5 6 7 8 9

-PX2 CB
SI10-T SERVICE/TEST

SYNCHRO.
OK

-PX1 CB
SI10-B ON/OFF

-H4
LOW VOLTAGE COMPARTMENT (LVC) DOOR

-PX3 CB
SI10-T SERVICE/TEST

EARTHSW.
ON/OFF
TEST SWITCH TEST SWITCH TEST SWITCH
CURRENT CURRENT VOLTAGE HEATER
MEASUREMENT PROTECTION MEASUREMENT

ESSAILEC ESSAILEC ESSAILEC OFF ON

entrelec

entrelec

entrelec
-PX4
SI10-B

ESSAILEC

ESSAILEC

ESSAILEC
-PGM
1YTU130112X9001 -SS6
BSM16 CA10-A200
entrelec entrelec entrelec
HEATERS DC SUPPLY ES CLOSE
ON FAIL ENABLE
-X1 -X2 -X3
LOCAL REMOTE
TEST SWITCH TEST SWITCH
-BCF1 VOLTAGE VOLTAGE
TEST SWITCH
TRIP
UBFNABABBAAZANBAXC PROTECTION BUSBAR LOCAL REMOTE
REF 630 -H2 -H1 -H3
ESSAILEC entrelec ESSAILEC ESSAILEC

entrelec

entrelec
-PJK2 -SS2 CB CB LOCKOUT LAMP
1YTU130112X0608 OFF ON RESET TEST
ESSAILEC

ESSAILEC

ESSAILEC
ELITE 447

entrelec entrelec entrelec


CA10-A369V760
-SO -SC -SR1 -SB1
-X4 -X5 -X6
DOOR AND CB DOOR
BETWEEN LVC

-PU1
5001740

F 21/10/2014 UPDATED. Prepared F.Ş. 13/01/14 KURDISTAN REGIONAL GOVERNMENT = H1.Q104


Order no: LVC FRONT VIEW
E 15/10/2014 UPDATED. Checked A.F.U. 15/01/14 MINISTRY OF ELECTRICITY X13112
1YTU130112X1154 + Q104
D 26/09/2014 UPDATED. Approved G.Ö. 15/01/14 33kV TRANSFORMER FEEDER EL11 P. 51
Rev Date Description Contractor: ABB SWEDEN Dept. PPMV NOSARAN SUBSTATION ABB Elektrik San.A.S. 87 P.
0 1 2 3 4 5 6 7 8 9

Part List
Designation: Qty: Part Description: Type: Manufacturer: Part Number:

-BA1 1 VT, FIXED, FUSED, 33/√3 : 0.11/√3 : 0.11/3kV, Cl. 0.5/3P 1-75VA, 3P 75VA VBF36 ALCE 1YTU130112X0531
-BA2 1 VT, FIXED, FUSED, 33/√3 : 0.11/√3 : 0.11/3kV, Cl. 0.5/3P 1-75VA, 3P 75VA VBF36 ALCE 1YTU130112X0531
-BA3 1 VT, FIXED, FUSED, 33/√3 : 0.11/√3 : 0.11/3kV, Cl. 0.5/3P 1-75VA, 3P 75VA VBF36 ALCE 1YTU130112X0531
-BC1 1 CT, 36kV, 31.5kA/1s, 600-1200/5-5-5A, 0.5FS5 15/30VA, 5P20 15/30VA, 5P20 15/30VA ALCE 1YTU130112X0512
-BC2 1 CT, 36kV, 31.5kA/1s, 600-1200/5-5-5A, 0.5FS5 15/30VA, 5P20 15/30VA, 5P20 15/30VA ALCE 1YTU130112X0512
-BC3 1 CT, 36kV, 31.5kA/1s, 600-1200/5-5-5A, 0.5FS5 15/30VA, 5P20 15/30VA, 5P20 15/30VA ALCE 1YTU130112X0512
-BCF1 1 PROT. RELAY, 48-125VDC, 5 CURRENT INP., 4 VOLTAGE INP., 23 BIN. INPUTS, 18 BIN. OUTPUTS, COMM: IEC 61850/LC CONNECTOR REF 630 ABB UBFNABABBAAZANBAXC
-BCF2 1 LOCKOUT RELAY, 110VDC RXMD1 ABB 1MRK001602-AN
-BD 1 LIMIT SWITCH BS1011 EMAS 1YTU010720K01
-BH 1 THERMOSTAT,TH-H, 0-35 øC,220VAC(Recommended setting: 30øC) TY90-B RO/SE TERMOSTAT/220V
-BPA1 1 PRESSURE LIMIT SWITCH - ABB FLP_SWITCH
-BPA2 1 PRESSURE LIMIT SWITCH - ABB FLP_SWITCH
-BPA3 1 PRESSURE LIMIT SWITCH - ABB FLP_SWITCH
-EH1 1 ANTI-CONDENSATION HEATER WITH 3.5m CABLE,IN CB COMP. 220VAC,100W,250x100mm BOXIN 1YTU110302K01
-EH2 1 ANTI-CONDENSATION HEATER WITH 5m CABLE,IN CABLE COMP. 220VAC,100W,250x100mm BOXIN 1YTU110301K01
-EH3 1 ANTI-CONDENSATION HEATER FOR LV COMP. 230VAC, 20W C75 NIMBUS NIMBUSC7520W230V
-EL 1 FLOURESCENT LAMP, 220VAC, WITH ON/OFF SWITCH HOROZ VT 2001 6
-FB1 1 MCB, 2P, 2A, C S202 M-C2 ABB /2CDS272001R0024
-FB1.1 1 AUX. CONTACT FOR MCB, 1CO S 2C-H6R ABB /2CDS200912R0001
-FB2 1 MCB, 2P, 2A, K S202 P-K2 ABB /2CDS282001R0277
-FB2.1 1 AUX. CONTACT FOR MCB, 1CO S 2C-H6R ABB /2CDS200912R0001
-FB2.2 1 AUX. CONTACT FOR MCB, 1CO S 2C-H6R ABB /2CDS200912R0001
-FB3 1 MCB, 2P, 2A, C S202 M-C2 ABB /2CDS272001R0024
-FB3.1 1 AUX. CONTACT FOR MCB, 1CO S 2C-H6R ABB /2CDS200912R0001
-FB3.2 1 AUX. CONTACT FOR MCB, 1CO S 2C-H6R ABB /2CDS200912R0001
-FBAC 1 MCB, 1P, 2A, C S201 M-C 2 ABB /2CDS271001R0024
-FBAC.1 1 AUX. CONTACT FOR MCB, 1CO S 2C-H6R ABB /2CDS200912R0001
-FBV1 1 MCB, 3P, 2A S203 M-C2 ABB /2CDS273001R0024
-FBV1.1 1 AUX. CONTACT FOR MCB, 1CO S 2C-H6R ABB /2CDS200912R0001
-FBV2 1 MCB, 3P, 2A S203 M-C2 ABB /2CDS273001R0024
-FBV2.1 1 AUX. CONTACT FOR MCB, 1CO S 2C-H6R ABB /2CDS200912R0001
-FBV3.1 1 AUX. CONTACT FOR MCB, 1CO S 2C-H6R ABB /2CDS200912R0001
-FF1 1 VT PRIMARY FUSE, 36KV, 2A ALCE MTA7987003
-FF2 1 VT PRIMARY FUSE, 36KV, 2A ALCE MTA7987003
-FF3 1 VT PRIMARY FUSE, 36KV, 2A ALCE MTA7987003
-H1 1 LAMP BLOCK WITH LED, RED, 230VAC MLBL-07R ABB /1SFA611621R1071
-H2 1 LAMP BLOCK WITH LED, GREEN, 230VAC MLBL-07G ABB /1SFA611621R1072
-H3 1 LAMP BLOCK WITH LED, GREEN, 110-130VDC MLBL-05G ABB /1SFA611621R1052
-H4 1 LAMP BLOCK WITH LED, GREEN, 110-130VDC MLBL-05G ABB /1SFA611621R1052
-K1 1 AUX.RELAY, 3 CO CONTACT, 230V AC CR-M230AC3L ABB /1SVR405612R3100
-K1 1 AUX. RELAY SOCKET FOR ABB RELAYS CR-M3SS ABB /1SVR405651R2000
-K2 1 AUX.RELAY, 3 CO CONTACT, 230V AC CR-M230AC3L ABB /1SVR405612R3100
-K2 1 AUX. RELAY SOCKET FOR ABB RELAYS CR-M3SS ABB /1SVR405651R2000
-K25 1 MV CELL SWITCH 1NC, 2N0 CONTACTS K25011V EMAS K25011V
-KA1 1 AUX.RELAY, 4 CO CONTACT, 110V DC CR-M110DC4L ABB /1SVR405613R8100
-KA1 1 AUX. RELAY SOCKET FOR ABB RELAYS CR-M4SS ABB /1SVR405651R3000
-KA1.1 1 AUX.RELAY, 4 CO CONTACT, 110V DC CR-M110DC4L ABB /1SVR405613R8100
-KA1.1 1 AUX. RELAY SOCKET FOR ABB RELAYS CR-M4SS ABB /1SVR405651R3000
-KA2 1 AUX.RELAY, 4 CO CONTACT, 110V DC CR-M110DC4L ABB /1SVR405613R8100
-KA2 1 AUX. RELAY SOCKET FOR ABB RELAYS CR-M4SS ABB /1SVR405651R3000
-KA2.1 1 AUX.RELAY, 4 CO CONTACT, 110V DC CR-M110DC4L ABB /1SVR405613R8100
-KA2.1 1 AUX. RELAY SOCKET FOR ABB RELAYS CR-M4SS ABB /1SVR405651R3000
-KA3 1 AUX.RELAY, 4 CO CONTACT, 110V DC CR-M110DC4L ABB /1SVR405613R8100
-KA3 1 AUX. RELAY SOCKET FOR ABB RELAYS CR-M4SS ABB /1SVR405651R3000
-KA3.1 1 AUX.RELAY, 4 CO CONTACT, 110V DC CR-M110DC4L ABB /1SVR405613R8100

F 21/10/2014 UPDATED. Prepared F.Ş. 13/01/14 KURDISTAN REGIONAL GOVERNMENT = H1.Q104


Order no: PART LIST
E 15/10/2014 UPDATED. Checked A.F.U. 15/01/14 MINISTRY OF ELECTRICITY X13112
1YTU130112X1154 + Q104
D 26/09/2014 UPDATED. Approved G.Ö. 15/01/14 33kV TRANSFORMER FEEDER EL11 P. 52
Rev Date Description Contractor: ABB SWEDEN Dept. PPMV NOSARAN SUBSTATION ABB Elektrik San.A.S. 87 P.
0 1 2 3 4 5 6 7 8 9

Part List
Designation: Qty: Part Description: Type: Manufacturer: Part Number:

-KA3.1 1 AUX. RELAY SOCKET FOR ABB RELAYS CR-M4SS ABB /1SVR405651R3000
-KA4 1 AUX.RELAY, 4 CO CONTACT, 110V DC CR-M110DC4L ABB /1SVR405613R8100
-KA4 1 AUX. RELAY SOCKET FOR ABB RELAYS CR-M4SS ABB /1SVR405651R3000
-KA4.1 1 AUX.RELAY, 4 CO CONTACT, 110V DC CR-M110DC4L ABB /1SVR405613R8100
-KA4.1 1 AUX. RELAY SOCKET FOR ABB RELAYS CR-M4SS ABB /1SVR405651R3000
-KA4.2 1 AUX.RELAY, 4 CO CONTACT, 110V DC CR-M110DC4L ABB /1SVR405613R8100
-KA4.2 1 AUX. RELAY SOCKET FOR ABB RELAYS CR-M4SS ABB /1SVR405651R3000
-KA4.3 1 AUX.RELAY, 4 CO CONTACT, 110V DC CR-M110DC4L ABB /1SVR405613R8100
-KA4.3 1 AUX. RELAY SOCKET FOR ABB RELAYS CR-M4SS ABB /1SVR405651R3000
-KA5 1 AUX.RELAY, 4 CO CONTACT, 110V DC CR-M110DC4L ABB /1SVR405613R8100
-KA5 1 AUX. RELAY SOCKET FOR ABB RELAYS CR-M4SS ABB /1SVR405651R3000
-KA6 1 AUX.RELAY, 4 CO CONTACT, 110V DC CR-M110DC4L ABB /1SVR405613R8100
-KA6 1 AUX. RELAY SOCKET FOR ABB RELAYS CR-M4SS ABB /1SVR405651R3000
-KAC 1 AUX.RELAY, 3 NO CONTACT, 110VDC CR-M110DC3L ABB /1SVR405612R8100
-KAC 1 AUX. RELAY SOCKET FOR ABB RELAYS CR-M3SS ABB /1SVR405651R2000
-KCTR 1 AUX.RELAY, 3 NO CONTACT, 110VDC CR-M110DC3L ABB /1SVR405612R8100
-KCTR 1 AUX. RELAY SOCKET FOR ABB RELAYS CR-M3SS ABB /1SVR405651R2000
-KDC 1 AUX.RELAY, 3 NO CONTACT, 110VDC CR-M110DC3L ABB /1SVR405612R8100
-KDC 1 AUX. RELAY SOCKET FOR ABB RELAYS CR-M3SS ABB /1SVR405651R2000
-KDCS 1 AUX.RELAY, 3 NO CONTACT, 110VDC CR-M110DC3L ABB /1SVR405612R8100
-KDCS 1 AUX. RELAY SOCKET FOR ABB RELAYS CR-M3SS ABB /1SVR405651R2000
-KEF 1 AUX.RELAY, 4 CO CONTACT, 110V DC CR-M110DC4L ABB /1SVR405613R8100
-KEF 1 AUX. RELAY SOCKET FOR ABB RELAYS CR-M4SS ABB /1SVR405651R3000
-KIRF 1 AUX.RELAY, 3 NO CONTACT, 110VDC CR-M110DC3L ABB /1SVR405612R8100
-KIRF 1 AUX. RELAY SOCKET FOR ABB RELAYS CR-M3SS ABB /1SVR405651R2000
-KLO 1 AUX.RELAY, 4 CO CONTACT, 110V DC CR-M110DC4L ABB /1SVR405613R8100
-KLO 1 AUX. RELAY SOCKET FOR ABB RELAYS CR-M4SS ABB /1SVR405651R3000
-KLR 1 AUX.RELAY, 3 NO CONTACT, 110VDC CR-M110DC3L ABB /1SVR405612R8100
-KLR 1 AUX. RELAY SOCKET FOR ABB RELAYS CR-M3SS ABB /1SVR405651R2000
-KM 1 AUX.RELAY, 3 NO CONTACT, 110VDC CR-M110DC3L ABB /1SVR405612R8100
-KM 1 AUX. RELAY SOCKET FOR ABB RELAYS CR-M3SS ABB /1SVR405651R2000
-KMSS 1 AUX.RELAY, 3 NO CONTACT, 110VDC CR-M110DC3L ABB /1SVR405612R8100
-KMSS 1 AUX. RELAY SOCKET FOR ABB RELAYS CR-M3SS ABB /1SVR405651R2000
-KOC 1 AUX.RELAY, 4 CO CONTACT, 110V DC CR-M110DC4L ABB /1SVR405613R8100
-KOC 1 AUX. RELAY SOCKET FOR ABB RELAYS CR-M4SS ABB /1SVR405651R3000
-KOV2 1 AUX.RELAY, 3 CO CONTACT, 110VDC CR-U110DC3 ABB /1SVR405622R8000
-KOV2 1 AUX. RELAY SOCKET FOR CR-U110DC3 ABB RELAYS CR-U3S ABB /1SVR405660R0000
-KP1 1 AUX.RELAY, 4 CO CONTACT, 110V DC CR-M110DC4L ABB /1SVR405613R8100
-KP1 1 AUX. RELAY SOCKET FOR ABB RELAYS CR-M4SS ABB /1SVR405651R3000
-KP2 1 AUX.RELAY, 4 CO CONTACT, 110V DC CR-M110DC4L ABB /1SVR405613R8100
-KP2 1 AUX. RELAY SOCKET FOR ABB RELAYS CR-M4SS ABB /1SVR405651R3000
-KRGA 1 AUX.RELAY, 3 NO CONTACT, 110VDC CR-M110DC3L ABB /1SVR405612R8100
-KRGA 1 AUX. RELAY SOCKET FOR ABB RELAYS CR-M3SS ABB /1SVR405651R2000
-KRGB 1 AUX.RELAY, 3 NO CONTACT, 110VDC CR-M110DC3L ABB /1SVR405612R8100
-KRGB 1 AUX. RELAY SOCKET FOR ABB RELAYS CR-M3SS ABB /1SVR405651R2000
-KRLO 1 AUX.RELAY, 3 NO CONTACT, 48VDC CR-M048DC3L ABB /1SVR405612R6100
-KRLO 1 AUX. RELAY SOCKET FOR ABB RELAYS CR-M3SS ABB /1SVR405651R2000
-KROV 1 AUX.RELAY, 4 CO CONTACT, 110V DC CR-M110DC4L ABB /1SVR405613R8100
-KROV 1 AUX. RELAY SOCKET FOR ABB RELAYS CR-M4SS ABB /1SVR405651R3000
-KROV2 1 AUX.RELAY, 3 CO CONTACT, 110VDC CR-U110DC3 ABB /1SVR405622R8000
-KROV2 1 AUX. RELAY SOCKET FOR CR-U110DC3 ABB RELAYS CR-U3S ABB /1SVR405660R0000
-KSC 1 AUX.RELAY, 4 CO CONTACT, 110V DC CR-M110DC4L ABB /1SVR405613R8100
-KSC 1 AUX. RELAY SOCKET FOR ABB RELAYS CR-M4SS ABB /1SVR405651R3000
-KTCS 1 AUX.RELAY, 4 CO CONTACT, 110V DC CR-M110DC4L ABB /1SVR405613R8100
-KTCS 1 AUX. RELAY SOCKET FOR ABB RELAYS CR-M4SS ABB /1SVR405651R3000

F 21/10/2014 UPDATED. Prepared F.Ş. 13/01/14 KURDISTAN REGIONAL GOVERNMENT = H1.Q104


Order no: PART LIST
E 15/10/2014 UPDATED. Checked A.F.U. 15/01/14 MINISTRY OF ELECTRICITY X13112
1YTU130112X1154 + Q104
D 26/09/2014 UPDATED. Approved G.Ö. 15/01/14 33kV TRANSFORMER FEEDER EL11 P. 53
Rev Date Description Contractor: ABB SWEDEN Dept. PPMV NOSARAN SUBSTATION ABB Elektrik San.A.S. 87 P.
0 1 2 3 4 5 6 7 8 9

Part List
Designation: Qty: Part Description: Type: Manufacturer: Part Number:

-KTR1 1 AUX.RELAY, 3 CO CONTACT, 110VDC CR-U110DC3 ABB /1SVR405622R8000


-KTR1 1 AUX. RELAY SOCKET FOR CR-U110DC3 ABB RELAYS CR-U3S ABB /1SVR405660R0000
-KUV2 1 AUX.RELAY, 3 CO CONTACT, 110VDC CR-U110DC3 ABB /1SVR405622R8000
-KUV2 1 AUX. RELAY SOCKET FOR CR-U110DC3 ABB RELAYS CR-U3S ABB /1SVR405660R0000
-KVT 1 AUX.RELAY, 4 CO CONTACT, 110V DC CR-M110DC4L ABB /1SVR405613R8100
-KVT 1 AUX. RELAY SOCKET FOR ABB RELAYS CR-M4SS ABB /1SVR405651R3000
-KVTON 1 AUX.RELAY, 4 CO CONTACT, 110V DC CR-M110DC4L ABB /1SVR405613R8100
-KVTON 1 AUX. RELAY SOCKET FOR ABB RELAYS CR-M4SS ABB /1SVR405651R3000
-PE 7 EARTHING TERMINALS, SCREW TYPE CONNECTION UT 4-PE PHOENIX 3044128
-PGM 1 ALARM ANNUNCIATOR BSM16 EES 1YTU130112X9001
-PJK1 1 MULTIFUNCTION TRANSDUCER, PROGRAMMED:(U,I,P,Q), SUPPLY:110VDC, OUTPUT: 3 x (4-20mA) MT440 1YTU130112X0612
-PJK2 1 ENERGY ANALYZER ELITE 447 CEWE 1YTU130112X0608
-PU1 1 CAPACITIVE VOLTAGE INDICATOR, 22nF, 1C/O CONTACT, 110VDC SUPPLY OVI+R 5001740
-PX1 1 POSITION INDICATOR ON/OFF 36X36mm,AC24V~240V/DC30V~220V SI10-B PEAKS SI10-B
-PX2 1 POSITION INDICATOR TEST/SERVICE 36X36mm,AC24V~240V/DC30V~220V SI10-T PEAKS SI10-T
-PX3 1 POSITION INDICATOR TEST/SERVICE 36X36mm,AC24V~240V/DC30V~220V SI10-T PEAKS SI10-T
-PX4 1 POSITION INDICATOR ON/OFF 36X36mm,AC24V~240V/DC30V~220V SI10-B PEAKS SI10-B
-QA1 1 CB, SF6, 36KV, 1600A, 31.5kA-1s, AUX.VOL./MOT.VOL.: 110VDC HD4/W ABB 1YTU130112X0502
-QC9 1 EARTHSWITCH, 36kV ST-US 36.25 ABB EARTHSWITCH36
-QC9-RL3 1 EARTHSWITCH INTERLOCK COIL, 110VDC UXAB599815734 ABB ESCOIL110VDC
-RA 1 RESISTOR, 100V, 47 OHM,200W TKR-2 ALCE TKR-2
-SB1 1 PUSH BUTTON, BLACK M P1-10B ABB /1SFA611100R1006
-SC 1 PUSH BUTTON, GREEN M P1-10G ABB /1SFA611100R1002
-SO 1 PUSH BUTTON, RED M P1-10R ABB /1SFA611100R1001
-SR1 1 PUSH BUTTON, ILLUMINATED, YELLOW MP1-11Y ABB /1SFA611100R1103
-SR1 1 PUSH-BUTTON&LAMB BLOCK AND HOLDER MCBH-101 ABB /1SFA611605R1201
-SS2 1 SELECTOR SWITCH, 5-POLE, 2-POS, 1-2,WITH KEY CA10-A369 KRAUSS&NAIMER CA10-A369V760
-SS6 1 SELECTOR SWITCH, 1-POLE, 2-POS CA10-A200 KRAUSS&NAIMER CA10-A200
-X1 1 TEST SWITCH, 4 CONTACT, CURRENT Entrelec /1SNA166625R2000
-X2 1 TEST SWITCH, 4 CONTACT, CURRENT Entrelec /1SNA166625R2000
-X3 1 TEST SWITCH, 4 CONTACT, VOLTAGE Entrelec /1SNA166627R2200
-X4 1 TEST SWITCH, 4 CONTACT, VOLTAGE Entrelec /1SNA166627R2200
-X5 1 TEST SWITCH, 4 CONTACT, VOLTAGE Entrelec /1SNA166627R2200
-X6 1 TEST SWITCH, 4 CONTACT, VOLTAGE Entrelec /1SNA166627R2200
-X73 3 TERMINAL BLOCK,SCREW TYPE CONNECTION UT 4 PHOENIX 3044102
-XA1 9 DISCONNECTABLE TERMINAL BLOCK UTME 4-P/P PHOENIX 3047453
-XA2 9 DISCONNECTABLE TERMINAL BLOCK UTME 4-P/P PHOENIX 3047453
-XA3 12 DISCONNECTABLE TERMINAL BLOCK UTME 4-P/P PHOENIX 3047453
-XAC 10 DISCONNECTABLE TERMINAL BLOCK UTME 4-P/P PHOENIX 3047453
-XB 60 TERMINAL BLOCK,SCREW TYPE CONNECTION UT 4 PHOENIX 3044102
-XC 125 TERMINAL BLOCK,SCREW TYPE CONNECTION UT 4 PHOENIX 3044102
-XD 7 DIODE TERMINAL BLOCK, SCREW TYPE CONNECTION UTTB 4-DIO/O-U PHOENIX 3046809
-XE 29 TERMINAL BLOCK,SCREW TYPE CONNECTION UT 4 PHOENIX 3044102
-XH 17 TERMINAL BLOCK,SCREW TYPE CONNECTION UT 4 PHOENIX 3044102
-XI 36 TERMINAL BLOCK,SCREW TYPE CONNECTION UT 4 PHOENIX 3044102
-XI1 6 TERMINAL BLOCK,SCREW TYPE CONNECTION UT 4 PHOENIX 3044102
-XI2 16 TERMINAL BLOCK,SCREW TYPE CONNECTION UT 4 PHOENIX 3044102
-XI3 12 TERMINAL BLOCK,SCREW TYPE CONNECTION UT 4 PHOENIX 3044102
-XI4 6 TERMINAL BLOCK,SCREW TYPE CONNECTION UT 4 PHOENIX 3044102
-XI5 8 TERMINAL BLOCK,SCREW TYPE CONNECTION UT 4 PHOENIX 3044102
-XI6 8 TERMINAL BLOCK,SCREW TYPE CONNECTION UT 4 PHOENIX 3044102
-XIV 8 TERMINAL BLOCK,SCREW TYPE CONNECTION UT 4 PHOENIX 3044102
-XR 1 P-CO RESISTOR PLUG P-CO PHOENIX 3036796
-XR 1 TERMINAL FOR COMPONENT UT 4-TG PHOENIX 3046142
-XR 1 RESISTOR, 22 kOhm, 5W - RESISTOR 22K 5W

F 21/10/2014 UPDATED. Prepared F.Ş. 13/01/14 KURDISTAN REGIONAL GOVERNMENT = H1.Q104


Order no: PART LIST
E 15/10/2014 UPDATED. Checked A.F.U. 15/01/14 MINISTRY OF ELECTRICITY X13112
1YTU130112X1154 + Q104
D 26/09/2014 UPDATED. Approved G.Ö. 15/01/14 33kV TRANSFORMER FEEDER EL11 P. 54
Rev Date Description Contractor: ABB SWEDEN Dept. PPMV NOSARAN SUBSTATION ABB Elektrik San.A.S. 87 P.
0 1 2 3 4 5 6 7 8 9

Part List
Designation: Qty: Part Description: Type: Manufacturer: Part Number:

-XS 4 DISCONNECTABLE TERMINAL BLOCK UTME 4-P/P PHOENIX 3047453


-XS 32 TERMINAL BLOCK,SCREW TYPE CONNECTION UT 4 PHOENIX 3044102
-XV1 8 DISCONNECTABLE TERMINAL BLOCK UTME 4-P/P PHOENIX 3047453
-XV2 2 DISCONNECTABLE TERMINAL BLOCK UTME 4-P/P PHOENIX 3047453
-XV3 16 TERMINAL BLOCK,SCREW TYPE CONNECTION UT 4 PHOENIX 3044102
-XVC 4 DISCONNECTABLE TERMINAL BLOCK UTME 4-P/P PHOENIX 3047453
-XX 12 TERMINAL BLOCK,SCREW TYPE CONNECTION UT 4 PHOENIX 3044102
-XX1 20 TERMINAL BLOCK,SCREW TYPE CONNECTION UT 4 PHOENIX 3044102
-XX2 15 TERMINAL BLOCK,SCREW TYPE CONNECTION UT 4 PHOENIX 3044102
-XX3 10 TERMINAL BLOCK,SCREW TYPE CONNECTION UT 4 PHOENIX 3044102
-XX4 7 TERMINAL BLOCK,SCREW TYPE CONNECTION UT 4 PHOENIX 3044102
-XX10 6 TERMINAL BLOCK,SCREW TYPE CONNECTION UT 4 PHOENIX 3044102

F 21/10/2014 UPDATED. Prepared F.Ş. 13/01/14 KURDISTAN REGIONAL GOVERNMENT = H1.Q104


Order no: PART LIST
E 15/10/2014 UPDATED. Checked A.F.U. 15/01/14 MINISTRY OF ELECTRICITY X13112
1YTU130112X1154 + Q104
D 26/09/2014 UPDATED. Approved G.Ö. 15/01/14 33kV TRANSFORMER FEEDER EL11 P. 55
Rev Date Description Contractor: ABB SWEDEN Dept. PPMV NOSARAN SUBSTATION ABB Elektrik San.A.S. 87 P.
0 1 2 3 4 5 6 7 8 9

/43.5

/43.5

/43.5
04

03

01
-BCF1-X4

-BCF1-X4

-BCF1-X4
=NOSARAN+Q104-X73
Terminal diagram

F 21/10/2014 UPDATED. Date 21/10/14 Order no:


KURDISTAN REGIONAL GOVERNMENT, MINISTRY OF ELECTRICITY TERMINAL DIAGRAM=NOSARAN+Q104-X73 =NOSARAN
KURDISTAN REGIONAL GOVERNMENT
E 15/10/2014 UPDATED. Design F.Ş. MINISTRY OF ELECTRICITY
X13112 +Q104

D 26/09/2014 UPDATED. Check GO 22/10/14 P. 56


Rev Date Description Contractor: ABB SWEDEN Dept. PPMV ABB Elektrik San.A.S. 87 P.
0 1 2 3 4 5 6 7 8 9

/8.2

/8.2

/8.2

/8.2

/8.2

/8.2

/8.2

/8.2

/8.2
1S1

1S1

1S1

1S2

1S2

1S2

1S3

1S3

1S3
-BC1

-BC2

-BC3

-BC1

-BC2

-BC3

-BC1

-BC2

-BC3
=NOSARAN+Q104-XA1
Terminal diagram

9
-PE
-X1

-X1

-X1

-X1
.:.
4

F 21/10/2014 UPDATED. Date 21/10/14 Order no:


KURDISTAN REGIONAL GOVERNMENT, MINISTRY OF ELECTRICITY TERMINAL DIAGRAM=NOSARAN+Q104-XA1 =NOSARAN
KURDISTAN REGIONAL GOVERNMENT
E 15/10/2014 UPDATED. Design F.Ş. MINISTRY OF ELECTRICITY
X13112 +Q104

D 26/09/2014 UPDATED. Check GO 22/10/14 P. 57


Rev Date Description Contractor: ABB SWEDEN Dept. PPMV ABB Elektrik San.A.S. 87 P.
0 1 2 3 4 5 6 7 8 9

/9.2

/9.2

/9.2

/9.2

/9.2

/9.2

/9.2

/9.2

/9.2
2S1

2S1

2S1

2S2

2S2

2S2

2S3

2S3

2S3
-BC1

-BC2

-BC3

-BC1

-BC2

-BC3

-BC1

-BC2

-BC3
=NOSARAN+Q104-XA2
Terminal diagram

9
-XAC

-XAC

-XAC

-XAC

-PE
.:.
5

F 21/10/2014 UPDATED. Date 21/10/14 Order no:


KURDISTAN REGIONAL GOVERNMENT, MINISTRY OF ELECTRICITY TERMINAL DIAGRAM=NOSARAN+Q104-XA2 =NOSARAN
KURDISTAN REGIONAL GOVERNMENT
E 15/10/2014 UPDATED. Design F.Ş. MINISTRY OF ELECTRICITY
X13112 +Q104

D 26/09/2014 UPDATED. Check GO 22/10/14 P. 58


Rev Date Description Contractor: ABB SWEDEN Dept. PPMV ABB Elektrik San.A.S. 87 P.
0 1 2 3 4 5 6 7 8 9

/10.2

/10.2

/10.2

/10.2

/10.2

/10.2

/10.2

/10.2

/10.2

/10.6

/10.6

/10.6
3S1

3S1

3S1

3S2

3S2

3S2

3S3

3S3

3S3

02

04

06
-BCF1-X101

-BCF1-X101

-BCF1-X101
-BC1

-BC2

-BC3

-BC1

-BC2

-BC3

-BC1

-BC2

-BC3
=NOSARAN+Q104-XA3
Terminal diagram

10

11

12
1

9
-BCF1-X101
-PE
-X2

-X2

-X2

-X2

07
.:.
4

F 21/10/2014 UPDATED. Date 21/10/14 Order no:


KURDISTAN REGIONAL GOVERNMENT, MINISTRY OF ELECTRICITY TERMINAL DIAGRAM=NOSARAN+Q104-XA3 =NOSARAN
KURDISTAN REGIONAL GOVERNMENT
E 15/10/2014 UPDATED. Design F.Ş. MINISTRY OF ELECTRICITY
X13112 +Q104

D 26/09/2014 UPDATED. Check GO 22/10/14 P. 59


Rev Date Description Contractor: ABB SWEDEN Dept. PPMV ABB Elektrik San.A.S. 87 P.
0 1 2 3 4 5 6 7 8 9

/10.4

/10.5
/9.3

/9.3

/9.3

/9.3
/8.7

/8.7

/8.7

/8.7
S2

S2

S2
04

10
1

-BCF1-X101
-PJK2-I1

-PJK2-I2

-PJK2-I3

-XA2

-XA2

-XA2

-XA2
-X1
=NOSARAN+Q104-XAC
Terminal diagram

10
1

9
-BCF1-X101
09

F 21/10/2014 UPDATED. Date 21/10/14 Order no:


KURDISTAN REGIONAL GOVERNMENT, MINISTRY OF ELECTRICITY TERMINAL DIAGRAM=NOSARAN+Q104-XAC =NOSARAN
KURDISTAN REGIONAL GOVERNMENT
E 15/10/2014 UPDATED. Design F.Ş. MINISTRY OF ELECTRICITY
X13112 +Q104

D 26/09/2014 UPDATED. Check GO 22/10/14 P. 60


Rev Date Description Contractor: ABB SWEDEN Dept. PPMV ABB Elektrik San.A.S. 87 P.
F
E
D
Terminal diagram

Rev Date
0

=NOSARAN+Q104-XB

26/09/2014 UPDATED.
15/10/2014 UPDATED.
21/10/2014 UPDATED.
25 -QA1 -FB2 2
/6.7

Description
1
35 -QA1 -FB2 4
2 /6.8

11 -QA1 -XX1 4
3 /15.0

24 -QA1
4 /15.2
1

52 -QA1
5 /15.4

02 -BCF1-X304 -QA1 22
6 /15.0

A1 -KA2
7 /15.1

03 -BCF1-X304 -QA1 21
8 /15.1

Date

Check
A1 -KA1
9 /15.1
2

Design F.Ş.
04 -BCF1-X304 -QA1 34
10 /15.2

21/10/14
A1 -KSC

GO 22/10/14
11 /15.2

05 -BCF1-X304 -QA1 53
12 /15.3

A1 -KA3
13 /15.3

07 -BCF1-X304 -QA1 54
14 /15.4
3

A1 -KA4
15 /15.4

Contractor: ABB SWEDEN


9 -QA1 -XX1 6

MINISTRY OF ELECTRICITY
16 /16.3

16 -BCF1-X304 -QA1 19
17 /16.3

KURDISTAN REGIONAL GOVERNMENT


A1 -KP2
18 /16.3

-SO 2
19 /22.5
20
4

-XB
5 -QA1 -XC 11
20 /22.5
-XB 19

-XC 13
21 /22.6
-XB 20

A1 14

KURDISTAN REGIONAL GOVERNMENT, MINISTRY OF ELECTRICITY


-KCTR -KUV2
/22.6

X13112
22 21

Order no:
-XB
4 -QA1 -BCF1-X327 3
/22.3

Dept. PPMV
23
-X6 2
24 /22.5
25
5

-XB
-QA1 15
25 /22.5
-XB 24

-XR 1
26 /22.5
-XB 25

29 -QA1 -XR 1
27 /22.6

10 -QA1 -BCF2 18
28 /22.9

-QA1 41
29 /22.6
6

-QA1 39
TERMINAL DIAGRAM=NOSARAN+Q104-XB

30 /22.6

13 -XX2 -QA1 14
31 /22.3

32 /22.5

-QA1 20
33 /22.9

45 -QA1 -XC 19
34 /26.6
7

12 -XI3 -QA1 46
35 /26.6

7 -QA1 -XX3 4
36 /30.2

28 -QA1
37 /30.3

49 -QA1
38 /30.5

7:- -XD
39 /30.2
8

2 -PX1 -QA1 17
40 /30.2

6:- -XD
41 /30.3
+Q104

ABB Elektrik San.A.S.

3 -PX1 -QA1 38
42 /30.3
=NOSARAN

5:- -XD
43 /30.4

2 -PX2 -QA1 50
44 /30.4
9

4:- -XD
P.

45 /30.4
87 P.
61
0 1 2 3 4 5 6 7 8 9

/30.5

/36.1

/36.1

/36.2

/36.2

/36.3

/36.3

/36.4

/36.4

/36.5

/36.5
/37.0

/37.0

/37.2

/37.2
51

18

33

16

42

37

58

56
-QA1

-QA1

-QA1

-QA1

-QA1

-QA1

-QA1

-QA1
=NOSARAN+Q104-XB
Terminal diagram

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60
-QA1

-QA1

-QA1

-QA1

-QA1

-QA1

-QA1
-PX3

-XE
23

32

27

26

57

55
3

F 21/10/2014 UPDATED. Date 21/10/14 Order no:


KURDISTAN REGIONAL GOVERNMENT, MINISTRY OF ELECTRICITY TERMINAL DIAGRAM=NOSARAN+Q104-XB =NOSARAN
KURDISTAN REGIONAL GOVERNMENT
E 15/10/2014 UPDATED. Design F.Ş. MINISTRY OF ELECTRICITY
X13112 +Q104

D 26/09/2014 UPDATED. Check GO 22/10/14 P. 62


Rev Date Description Contractor: ABB SWEDEN Dept. PPMV ABB Elektrik San.A.S. 87 P.
F
E
D
Terminal diagram

Rev Date
0

=NOSARAN+Q104-XC

26/09/2014 UPDATED.
15/10/2014 UPDATED.
21/10/2014 UPDATED.
-XX1 7
/16.6

Description
1
18 -BCF1-X304
2 /16.6

06 -BCF1-X319
3 /16.8

-XX1 9
4 /18.1
1

11 -BCF2
5 /18.1

9 -XX2 -BCF2 21
6 /18.1

A1 -KRLO
7 /18.4

-KRLO A2
8 /18.4

Date

Check
-SS2 5
9 /22.1
2

Design F.Ş.
2 -SC
10 /22.1

21/10/14
20 -XB

GO 22/10/14
11 /22.5

-XX1 18
12 /22.6

21 -XB
13 /22.6

-BCF1-X327 6
14 /22.9
3

17 -BCF2
15 /22.9

Contractor: ABB SWEDEN


-XX1 20

MINISTRY OF ELECTRICITY
16 /23.1

23 -K25
17 /23.1

KURDISTAN REGIONAL GOVERNMENT


-XI3 10
18 /26.6

34 -XB
19 /26.6
4

-XX1 8
20 /17.2

21 /17.3

KURDISTAN REGIONAL GOVERNMENT, MINISTRY OF ELECTRICITY


/17.4

X13112
22

Order no:
/17.4

Dept. PPMV
23

24 /17.5
5

10 -BCF1-X319
25 /17.2

13 -BCF1-X319
26 /17.3

14 -BCF1-X319
27 /17.4

17 -BCF1-X319
28 /17.4

18 -BCF1-X319
29 /17.5
6

13 -BCF1-X327
TERMINAL DIAGRAM=NOSARAN+Q104-XC

30 /29.4

-BCF1-X327 14
31 /29.4

15 -BCF1-X327
32 /29.4

-BCF1-X327 16
33 /29.4

-KA1 31
34 /38.1
7

-KA1 34
35 /38.2

-KA2 14
36 /38.3

-KA3 34
37 /38.4

-KA4.1 14
38 /38.5

-XE 20
39 /38.5
8

-XE 21
40 /38.6

-SS2 9
41 /38.7
+Q104

ABB Elektrik San.A.S.

-KAC 21
42 /39.0
=NOSARAN

-KAC 24
43 /39.1

-KVTON 22
44 /39.2
9

-KP1 24
P.

45 /39.2
87 P.
63
F
E
D
Terminal diagram

Rev Date
0

=NOSARAN+Q104-XC

26/09/2014 UPDATED.
15/10/2014 UPDATED.
21/10/2014 UPDATED.
-KSC 24
/39.3

Description
46
-KA4.1 32
47 /39.4

-KLR 24
48 /39.4

-KROV 24
49 /39.5
1

-KLO 24
50 /39.5

-KOC 24
51 /39.6

-KEF 24
52 /39.7

-KTCS 24
53 /39.7

Date

Check
-KDC 24
54 /39.8
2

Design F.Ş.
-KM 24
55 /39.9

21/10/14
-KA1 41

GO 22/10/14
56 /40.1

-KA1 44
57 /40.2

-KA2 24
58 /40.3

-KA3 44
59 /40.4
3

-KA4.1 24
60 /40.5

Contractor: ABB SWEDEN


-XE 24

MINISTRY OF ELECTRICITY
61 /40.5

-XE 25
62 /40.6

KURDISTAN REGIONAL GOVERNMENT


-SS2 17
63 /40.7

-KVTON 32
64 /41.2
4

-KP1 34
65 /41.2

-KLO 34
66 /41.3

34

KURDISTAN REGIONAL GOVERNMENT, MINISTRY OF ELECTRICITY


-KOC
/41.4

X13112
67

Order no:
-KEF 34
/41.5

Dept. PPMV
68
-KTCS 34
69 /41.6
5

-KROV 34
70 /41.6

-KRGA 14
71 /41.7

-KRGB 14
72 /41.8

15 -PJK1
73 /42.1

-PJK1 16
74 /42.1
6

17 -PJK1
TERMINAL DIAGRAM=NOSARAN+Q104-XC

75 /42.2

-PJK1 18
76 /42.2

19 -PJK1
77 /42.2

-PJK1 20
78 /42.2

21 -PJK1
79 /42.3
7

-PJK1 22
80 /42.3

17 -BCF1-X327
81 /29.5

-BCF1-X327 18
82 /29.5

11 -BCF1-X316
83 /29.6

-BCF1-X316 12
84 /29.6
8

18 -BCF1-X316
85 /29.8

-BCF1-X316 17
86 /29.8
+Q104

ABB Elektrik San.A.S.

11 -KA3.1
87 /37.3
=NOSARAN

-KA3.1 14
88 /37.3

21 -KA3.1
89 /37.3
9

-KA3.1 24
P.

90 /37.3
87 P.
64
F
E
D
Terminal diagram

Rev Date
0

=NOSARAN+Q104-XC

26/09/2014 UPDATED.
15/10/2014 UPDATED.
21/10/2014 UPDATED.
11 -KA5
/37.4

Description
91
-KA5 14
92 /37.4

21 -KA5
93 /37.5

-KA5 24
94 /37.5
1

15 -BCF1-X316
95 /29.7

-BCF1-X316 13
96 /29.7

-BCF1-X316 14
97 /29.7

-XX3 7
98 /31.5

Date

Check
99 /31.6
2

Design F.Ş.
100 /31.7

21/10/14

GO 22/10/14
101 /31.7

7 -PGM-X10
102 /31.5

8 -PGM-X10
103 /31.6

1 -PGM-X11
104 /31.7
3

2 -PGM-X11
105 /31.7

Contractor: ABB SWEDEN


11 -KP2

MINISTRY OF ELECTRICITY
106 /35.1

-KP2 14
107 /35.1

KURDISTAN REGIONAL GOVERNMENT


21 -KP2
108 /35.2

-KP2 24
109 /35.2
4

11 -PGM-X2
110 /35.4

-PGM-X2 12
111 /35.4

24

KURDISTAN REGIONAL GOVERNMENT, MINISTRY OF ELECTRICITY


-BCF2
/35.5

X13112
112

Order no:
-BCF2 23
/35.5

Dept. PPMV
113
27 -BCF2
114 /35.6
5

-BCF2 26
115 /35.6

41 -KA4.1
116 /36.6

-KA4.1 44
117 /36.6

31 -KA4.2
118 /36.7

-KA4.2 34
119 /36.7
6

41 -KA4.2
TERMINAL DIAGRAM=NOSARAN+Q104-XC

120 /36.8

-KA4.2 44
121 /36.8

11 -KA1.1
122 /37.5

-KA4.2 14
123 /37.5

21 -KA1.1
124 /37.6
7

-KA4.2 24
125 /37.6
8

+Q104

ABB Elektrik San.A.S.


=NOSARAN
9

P.
87 P.
65
0 1 2 3 4 5 6 7 8 9

/30.0

/30.0

/30.0

/30.1

/30.1

/30.1

/30.1
14
-SB1
=NOSARAN+Q104-XD
Terminal diagram

7
-BCF1-X316
-H4

-XB

-XB

-XB

-XB
-XE

-XE
10

16

14

45

43

41

39
1

F 21/10/2014 UPDATED. Date 21/10/14 Order no:


KURDISTAN REGIONAL GOVERNMENT, MINISTRY OF ELECTRICITY TERMINAL DIAGRAM=NOSARAN+Q104-XD =NOSARAN
KURDISTAN REGIONAL GOVERNMENT
E 15/10/2014 UPDATED. Design F.Ş. MINISTRY OF ELECTRICITY
X13112 +Q104

D 26/09/2014 UPDATED. Check GO 22/10/14 P. 66


Rev Date Description Contractor: ABB SWEDEN Dept. PPMV ABB Elektrik San.A.S. 87 P.
F
E
D
Terminal diagram

Rev Date
0

=NOSARAN+Q104-XE

26/09/2014 UPDATED.
15/10/2014 UPDATED.
21/10/2014 UPDATED.
13 -QC9-BE1 -XX1 5
/15.5

Description
1
13 -QC9-BE2
2 /15.6

09 -BCF1-X304 -QC9-BE1 14
3 /15.5

A1 -KA5
4 /15.5
1

10 -BCF1-X304 -QC9-BE2 14
5 /15.6

6 /15.6

4 -PU1 -K25 24
7 /23.1

1 -QC9-RL3 -PU1 5
8 /23.1

Date

Check
1 -H3
9 /23.2
2

Design F.Ş.
15 -XX2 -QC9-RL3 2
10 /23.1

21/10/14
-H3 2

GO 22/10/14
11 /23.2

23 -QC9-BE1 -XX3 5
12 /30.6

23 -QC9-BE2
13 /30.6

3:- -XD
14 /30.5
3

2 -PX4 -QC9-BE1 24
15 /30.6

Contractor: ABB SWEDEN


2:- -XD

MINISTRY OF ELECTRICITY
16 /30.6

3 -PX4 -QC9-BE2 24
17 /30.6

KURDISTAN REGIONAL GOVERNMENT


33 -QC9-BE1 -KA4.1 11
18 /38.5

33 -QC9-BE2 -SS2 10
19 /38.6
4

39 -XC -QC9-BE1 34
20 /38.5

40 -XC -QC9-BE2 34
21 /38.6

43 21

KURDISTAN REGIONAL GOVERNMENT, MINISTRY OF ELECTRICITY


-QC9-BE1 -KA4.1
/40.5

X13112
22

Order no:
43 -QC9-BE2 -SS2 18
/40.6

Dept. PPMV
23
61 -XC -QC9-BE1 44
24 /40.5
5

62 -XC -QC9-BE2 44
25 /40.6

53 -QC9-BE1 -XB 56
26 /37.0

-QC9-BE1 54
27 /37.0

53 -QC9-BE2
28 /37.7

-QC9-BE2 54
29 /37.7
6

TERMINAL DIAGRAM=NOSARAN+Q104-XE
7
8

+Q104

ABB Elektrik San.A.S.


=NOSARAN
9

P.
87 P.
67
0 1 2 3 4 5 6 7 8 9

/7.1

/7.8

/7.1

/7.8

/7.2

/7.9

/7.5

/7.6

/7.3

/7.3

/7.4

/7.8

/7.2

/7.3

/7.4

/7.6

/7.9
A2
12

12

22
2

2
+Q103-XH

+Q103-XH

-KMSS

-EH1

-EH3
-BD
-BH
-XH

-XH
-K2

-K1

-EL
=NOSARAN+Q104-XH
Terminal diagram

10

11

12

13

14

15

16

17
1

9
+Q105-XH

+Q105-XH

-FBAC

-EH1

-EH2

-EH3

-EH2
-SB1
-XH

-XH

-H2

-H1
-K1

-EL
13

23

21
5

F 21/10/2014 UPDATED. Date 21/10/14 Order no:


KURDISTAN REGIONAL GOVERNMENT, MINISTRY OF ELECTRICITY TERMINAL DIAGRAM=NOSARAN+Q104-XH =NOSARAN
KURDISTAN REGIONAL GOVERNMENT
E 15/10/2014 UPDATED. Design F.Ş. MINISTRY OF ELECTRICITY
X13112 +Q104

D 26/09/2014 UPDATED. Check GO 22/10/14 P. 68


Rev Date Description Contractor: ABB SWEDEN Dept. PPMV ABB Elektrik San.A.S. 87 P.
F
E
D
Terminal diagram

Rev Date
0

=NOSARAN+Q104-XI

26/09/2014 UPDATED.
15/10/2014 UPDATED.
21/10/2014 UPDATED.
43 +Q109-XI -XX1 6
/16.0

Description
1
45 +Q109-XI
2 /16.1

47 +Q109-XI
3 /16.2

12 -BCF1-X304 +Q109-XI 44
4 /16.0
1

13 -BCF1-X304 +Q109-XI 46
5 /16.1

14 -BCF1-X304 +Q109-XI 48
6 /16.2

12 +Q103-XI -XX1 7
7 /16.5

11 +Q105-XI
8 /16.5

Date

Check
17 -BCF1-X304 +Q103-XI 14
9 /16.5
2

Design F.Ş.
+Q105-XI 13
10 /16.5

21/10/14
3 +Q108-XI -KA1 14

GO 22/10/14
11 /19.8

A1 -KVT +Q109-XI 71
12 /19.8

7 -BCF1-X327 +Q107-XI 5
13 /29.1

9 -BCF1-X327
14 /29.2
3

3 +Q107-XI -BCF1-X327 8
15 /29.1

Contractor: ABB SWEDEN


2 +Q107-XI -BCF1-X327 10

MINISTRY OF ELECTRICITY
16 /29.2

11 -BCF1-X327 +Q109-XI 19
17 /29.3

KURDISTAN REGIONAL GOVERNMENT


28 +Q109-XI -BCF1-X327 12
18 /29.3

11 -KA3 +Q103-XI 2
19 /34.0
4

1 +Q105-XI -KA3 14
20 /34.0

41 -KA4 +Q107-XI 1
21 /34.1

4 24

KURDISTAN REGIONAL GOVERNMENT, MINISTRY OF ELECTRICITY


+Q107-XI -KA1
/34.1

X13112
22

Order no:
31 -KA4 +Q109-XI 17
/34.2

Dept. PPMV
23
26 +Q109-XI -KA2 34
24 /34.2
5

21 -KA3 +Q109-XI 18
25 /34.2

27 +Q109-XI -KA3 24
26 /34.2

41 -KVTON +Q109-XI 2
27 /34.3

10 +Q109-XI -KVTON 44
28 /34.3

8 -PGM-X2 +Q103-XI 4
29 /34.5
6

3 +Q105-XI
TERMINAL DIAGRAM=NOSARAN+Q104-XI

30 /34.6

9 -PGM-X2 +Q103-XI 6
31 /34.5

5 +Q105-XI
32 /34.6

11 -FB3.2 +Q103-XI 8
33 /34.8

7 +Q105-XI
34 /34.8
7

12 -FB3.2 +Q103-XI 10
35 /34.8

9 +Q105-XI
36 /34.8
8

+Q104

ABB Elektrik San.A.S.


=NOSARAN
9

P.
87 P.
69
0 1 2 3 4 5 6 7 8 9

/24.3

/24.3

/24.3
/24.7

/24.7

/24.7
05

04
2

6
-BCF1-X319

-BCF1-X319
+Q103-XI1

+Q103-XI1

+Q103-XI1
=NOSARAN+Q104-XI1
Terminal diagram

6
+Q105-XI1

+Q105-XI1

+Q105-XI1
1

F 21/10/2014 UPDATED. Date 21/10/14 Order no:


KURDISTAN REGIONAL GOVERNMENT, MINISTRY OF ELECTRICITY TERMINAL DIAGRAM=NOSARAN+Q104-XI1 =NOSARAN
KURDISTAN REGIONAL GOVERNMENT
E 15/10/2014 UPDATED. Design F.Ş. MINISTRY OF ELECTRICITY
X13112 +Q104

D 26/09/2014 UPDATED. Check GO 22/10/14 P. 70


Rev Date Description Contractor: ABB SWEDEN Dept. PPMV ABB Elektrik San.A.S. 87 P.
0 1 2 3 4 5 6 7 8 9

/25.2

/25.2

/25.2

/25.2

/25.2

/25.2

/25.2

/25.2
/25.7

/25.7

/25.7

/25.7

/25.7

/25.7

/25.7

/25.7
A1

A1

A1

A2
10

12

14

16
2

8
+Q103-XI2

+Q103-XI2

+Q103-XI2

+Q103-XI2

+Q103-XI2

+Q103-XI2

+Q103-XI2

+Q103-XI2
-KROV2

-KROV2
-KOV2
-KUV2
=NOSARAN+Q104-XI2
Terminal diagram

10

11

12

13

14

15

16
1

9
+Q105-XI2

+Q105-XI2

+Q105-XI2

+Q105-XI2

+Q105-XI2

+Q105-XI2

+Q105-XI2

+Q105-XI2
11

13

15
1

F 21/10/2014 UPDATED. Date 21/10/14 Order no:


KURDISTAN REGIONAL GOVERNMENT, MINISTRY OF ELECTRICITY TERMINAL DIAGRAM=NOSARAN+Q104-XI2 =NOSARAN
KURDISTAN REGIONAL GOVERNMENT
E 15/10/2014 UPDATED. Design F.Ş. MINISTRY OF ELECTRICITY
X13112 +Q104

D 26/09/2014 UPDATED. Check GO 22/10/14 P. 71


Rev Date Description Contractor: ABB SWEDEN Dept. PPMV ABB Elektrik San.A.S. 87 P.
0 1 2 3 4 5 6 7 8 9

/26.4

/26.4

/26.4

/26.4

/26.4

/26.4
/26.7

/26.7

/26.7

/26.7

/26.7

/26.7
10

18

12

35
2

8
+Q103-XI3

+Q103-XI3

+Q103-XI3

+Q103-XI3

+Q103-XI3

+Q103-XI3
-XC

-XB
=NOSARAN+Q104-XI3
Terminal diagram

10

11

12
1

9
+Q105-XI3

+Q105-XI3

+Q105-XI3

+Q105-XI3

+Q105-XI3

+Q105-XI3
11
1

F 21/10/2014 UPDATED. Date 21/10/14 Order no:


KURDISTAN REGIONAL GOVERNMENT, MINISTRY OF ELECTRICITY TERMINAL DIAGRAM=NOSARAN+Q104-XI3 =NOSARAN
KURDISTAN REGIONAL GOVERNMENT
E 15/10/2014 UPDATED. Design F.Ş. MINISTRY OF ELECTRICITY
X13112 +Q104

D 26/09/2014 UPDATED. Check GO 22/10/14 P. 72


Rev Date Description Contractor: ABB SWEDEN Dept. PPMV ABB Elektrik San.A.S. 87 P.
0 1 2 3 4 5 6 7 8 9

/27.3

/27.3

/27.3
/27.7

/27.7

/27.7
A1

A2
2

6
+Q103-XI4

+Q103-XI4

+Q103-XI4
-KTR1

-KTR1
=NOSARAN+Q104-XI4
Terminal diagram

6
+Q105-XI4

+Q105-XI4

+Q105-XI4
-XX10

-XX10
1

F 21/10/2014 UPDATED. Date 21/10/14 Order no:


KURDISTAN REGIONAL GOVERNMENT, MINISTRY OF ELECTRICITY TERMINAL DIAGRAM=NOSARAN+Q104-XI4 =NOSARAN
KURDISTAN REGIONAL GOVERNMENT
E 15/10/2014 UPDATED. Design F.Ş. MINISTRY OF ELECTRICITY
X13112 +Q104

D 26/09/2014 UPDATED. Check GO 22/10/14 P. 73


Rev Date Description Contractor: ABB SWEDEN Dept. PPMV ABB Elektrik San.A.S. 87 P.
0 1 2 3 4 5 6 7 8 9

/28.2

/28.2

/28.2

/28.2
/28.7

/28.7

/28.7

/28.7
2

8
+Q103-XI5

+Q103-XI5

+Q103-XI5

+Q103-XI5
=NOSARAN+Q104-XI5
Terminal diagram

8
+Q105-XI5

+Q105-XI5

+Q105-XI5

+Q105-XI5
1

F 21/10/2014 UPDATED. Date 21/10/14 Order no:


KURDISTAN REGIONAL GOVERNMENT, MINISTRY OF ELECTRICITY TERMINAL DIAGRAM=NOSARAN+Q104-XI5 =NOSARAN
KURDISTAN REGIONAL GOVERNMENT
E 15/10/2014 UPDATED. Design F.Ş. MINISTRY OF ELECTRICITY
X13112 +Q104

D 26/09/2014 UPDATED. Check GO 22/10/14 P. 74


Rev Date Description Contractor: ABB SWEDEN Dept. PPMV ABB Elektrik San.A.S. 87 P.
0 1 2 3 4 5 6 7 8 9

/33.3

/33.4

/33.3

/33.4

/33.5

/33.5

/33.6

/33.6
14

14

24

34
2
+Q109-XI6

-KA4.3

-KA6

-KA6

-KA6
=NOSARAN+Q104-XI6
Terminal diagram

8
+Q109-XI6

+Q109-XI6
-KA2.1

-KA6

-KA6

-KA6
11

11

21

31
4

F 21/10/2014 UPDATED. Date 21/10/14 Order no:


KURDISTAN REGIONAL GOVERNMENT, MINISTRY OF ELECTRICITY TERMINAL DIAGRAM=NOSARAN+Q104-XI6 =NOSARAN
KURDISTAN REGIONAL GOVERNMENT
E 15/10/2014 UPDATED. Design F.Ş. MINISTRY OF ELECTRICITY
X13112 +Q104

D 26/09/2014 UPDATED. Check GO 22/10/14 P. 75


Rev Date Description Contractor: ABB SWEDEN Dept. PPMV ABB Elektrik San.A.S. 87 P.
0 1 2 3 4 5 6 7 8 9

/13.2

/13.2

/13.2

/13.2
/13.7

/13.7

/13.7

/13.7
14

24

34

44
2

8
+Q103-XIV

+Q103-XIV

+Q103-XIV

+Q103-XIV
-KVT

-KVT

-KVT

-KVT
=NOSARAN+Q104-XIV
Terminal diagram

8
+Q105-XIV

+Q105-XIV

+Q105-XIV

+Q105-XIV
-X5

-X5
1

F 21/10/2014 UPDATED. Date 21/10/14 Order no:


KURDISTAN REGIONAL GOVERNMENT, MINISTRY OF ELECTRICITY TERMINAL DIAGRAM=NOSARAN+Q104-XIV =NOSARAN
KURDISTAN REGIONAL GOVERNMENT
E 15/10/2014 UPDATED. Design F.Ş. MINISTRY OF ELECTRICITY
X13112 +Q104

D 26/09/2014 UPDATED. Check GO 22/10/14 P. 76


Rev Date Description Contractor: ABB SWEDEN Dept. PPMV ABB Elektrik San.A.S. 87 P.
0 1 2 3 4 5 6 7 8 9

22K 5W
/22.6
27
-XB
=NOSARAN+Q104-XR
Terminal diagram

1
-XB
26

F 21/10/2014 UPDATED. Date 21/10/14 Order no:


KURDISTAN REGIONAL GOVERNMENT, MINISTRY OF ELECTRICITY TERMINAL DIAGRAM=NOSARAN+Q104-XR =NOSARAN
KURDISTAN REGIONAL GOVERNMENT
E 15/10/2014 UPDATED. Design F.Ş. MINISTRY OF ELECTRICITY
X13112 +Q104

D 26/09/2014 UPDATED. Check GO 22/10/14 P. 77


Rev Date Description Contractor: ABB SWEDEN Dept. PPMV ABB Elektrik San.A.S. 87 P.
0 1 2 3 4 5 6 7 8 9

/12.1

/12.3

/12.1

/12.3

/12.2

/12.4

/12.2

/12.4
n
a

a
-BA1

-BA2

-BA3

-BA3
=NOSARAN+Q104-XV1
Terminal diagram

8
-FBV1

-FBV2

-FBV1

-FBV2

-FBV1

-FBV2

-X4

-X3
1

F 21/10/2014 UPDATED. Date 21/10/14 Order no:


KURDISTAN REGIONAL GOVERNMENT, MINISTRY OF ELECTRICITY TERMINAL DIAGRAM=NOSARAN+Q104-XV1 =NOSARAN
KURDISTAN REGIONAL GOVERNMENT
E 15/10/2014 UPDATED. Design F.Ş. MINISTRY OF ELECTRICITY
X13112 +Q104

D 26/09/2014 UPDATED. Check GO 22/10/14 P. 78


Rev Date Description Contractor: ABB SWEDEN Dept. PPMV ABB Elektrik San.A.S. 87 P.
0 1 2 3 4 5 6 7 8 9

/12.8
/12.7

dn
da
-BA1

-BA3
=NOSARAN+Q104-XV2
Terminal diagram

2
-XV3

-XV3
-RA

-RA
15

16
1

F 21/10/2014 UPDATED. Date 21/10/14 Order no:


KURDISTAN REGIONAL GOVERNMENT, MINISTRY OF ELECTRICITY TERMINAL DIAGRAM=NOSARAN+Q104-XV2 =NOSARAN
KURDISTAN REGIONAL GOVERNMENT
E 15/10/2014 UPDATED. Design F.Ş. MINISTRY OF ELECTRICITY
X13112 +Q104

D 26/09/2014 UPDATED. Check GO 22/10/14 P. 79


Rev Date Description Contractor: ABB SWEDEN Dept. PPMV ABB Elektrik San.A.S. 87 P.
0 1 2 3 4 5 6 7 8 9

/12.1

/12.2

/12.3

/12.5

/12.6

/12.3

/12.5

/12.4

/12.6

/12.4

/12.6

/12.8
/12.7

/12.7

/12.7

/12.7
04

04

01

02

03

04
1

2
-BCF1-X102

-XVC

-XVC

-XVC

-XVC

-XV2

-XV2
-X4

-X3

-X3

-X3

-X3
=NOSARAN+Q104-XV3
Terminal diagram

10

11

12

13

14

15

16
1

9
-BCF1-X102

-BCF1-X102

-PJK2

-PJK1

-PJK2

-PJK1

-PJK2

-PJK1

-PJK2

-PJK1
-KVT

-KVT

-KVT

-KVT
VN
V1

V2

V3
06

08

11

21

31

11

41
2

F 21/10/2014 UPDATED. Date 21/10/14 Order no:


KURDISTAN REGIONAL GOVERNMENT, MINISTRY OF ELECTRICITY TERMINAL DIAGRAM=NOSARAN+Q104-XV3 =NOSARAN
KURDISTAN REGIONAL GOVERNMENT
E 15/10/2014 UPDATED. Design F.Ş. MINISTRY OF ELECTRICITY
X13112 +Q104

D 26/09/2014 UPDATED. Check GO 22/10/14 P. 80


Rev Date Description Contractor: ABB SWEDEN Dept. PPMV ABB Elektrik San.A.S. 87 P.
0 1 2 3 4 5 6 7 8 9

/12.8

/12.8

/12.9

/12.9
11

14
5

8
-XV3

-XV3

-XV3

-XV3
=NOSARAN+Q104-XVC
Terminal diagram

F 21/10/2014 UPDATED. Date 21/10/14 Order no:


KURDISTAN REGIONAL GOVERNMENT, MINISTRY OF ELECTRICITY TERMINAL DIAGRAM=NOSARAN+Q104-XVC =NOSARAN
KURDISTAN REGIONAL GOVERNMENT
E 15/10/2014 UPDATED. Design F.Ş. MINISTRY OF ELECTRICITY
X13112 +Q104

D 26/09/2014 UPDATED. Check GO 22/10/14 P. 81


Rev Date Description Contractor: ABB SWEDEN Dept. PPMV ABB Elektrik San.A.S. 87 P.
0 1 2 3 4 5 6 7 8 9

/6.1

/6.8

/6.1

/6.8

/6.1

/6.8

/6.1

/6.8

/6.1

/6.8

/6.1

/6.8
10

12
2

8
+Q103-XX

+Q103-XX

+Q103-XX

+Q103-XX

+Q103-XX

+Q103-XX
=NOSARAN+Q104-XX
Terminal diagram

10

11

12
1

9
+Q105-XX

+Q105-XX

+Q105-XX

+Q105-XX

+Q105-XX

+Q105-XX
-FB1

-FB1

-FB3

-FB3

-FB2

-FB2

11
1

F 21/10/2014 UPDATED. Date 21/10/14 Order no:


KURDISTAN REGIONAL GOVERNMENT, MINISTRY OF ELECTRICITY TERMINAL DIAGRAM=NOSARAN+Q104-XX =NOSARAN
KURDISTAN REGIONAL GOVERNMENT
E 15/10/2014 UPDATED. Design F.Ş. MINISTRY OF ELECTRICITY
X13112 +Q104

D 26/09/2014 UPDATED. Check GO 22/10/14 P. 82


Rev Date Description Contractor: ABB SWEDEN Dept. PPMV ABB Elektrik San.A.S. 87 P.
F
E
D
Terminal diagram

Rev Date
0

=NOSARAN+Q104-XX1

26/09/2014 UPDATED.
15/10/2014 UPDATED.
21/10/2014 UPDATED.
-FB1 2
/6.1

Description
1
13 -PJK1 -BCF1-X430 02
2 /14.2

1 -PU1 -PJK2 DC+


3 /14.6

12 -SS2 -XB 3
4 /15.2
1

-XE 1
5 /15.6

16 -XB -XI 1
6 /16.2

1 -XC -XI 7
7 /16.5

20 -XC -KCTR 11
8 /17.2

Date

Check
-XC 4
9 /18.1
2

Design F.Ş.
11 -KRLO -SR1 3
10 /18.2

21/10/14

GO 22/10/14
11 /19.1

3 -XX3 -KA4 11
12 /19.8

11 -FBV1.1 -XX3 3
13 /21.2
-QA1 12

3 -BCF1-X316 -BCF1-X316 1
14 /21.6
3

7 -BCF1-X316 -BCF1-X316 6
15 /21.7

Contractor: ABB SWEDEN


-BCF2 14

MINISTRY OF ELECTRICITY
16 /21.8

4 -BCF1-X327 -SS2 2
17 /22.1

KURDISTAN REGIONAL GOVERNMENT


12 -XC -X6 1
18 /22.4

5 -BCF1-X327 -KUV2 11
19 /22.8
4

A1 -KDCS -XC 16
20 /23.2

KURDISTAN REGIONAL GOVERNMENT, MINISTRY OF ELECTRICITY


X13112
Order no:

Dept. PPMV
5
6

TERMINAL DIAGRAM=NOSARAN+Q104-XX1
7
8

+Q104

ABB Elektrik San.A.S.


=NOSARAN
9

P.
87 P.
83
0 1 2 3 4 5 6 7 8 9

/15.2

/15.6

/16.2

/18.1

/19.1

/19.8

/21.2

/22.1

/22.8

/23.2
/14.2

/14.6

/17.2

/17.5
/6.2

DC-

A2

A2

A2

A2
01

01

11

08

16

02

10
4

3
-BCF1-X430

-BCF1-X304

-BCF1-X304

-BCF1-X319

-BCF1-X319

-BCF1-X319

-KCTR
-PJK2

-KVT

-KSC
-KA1

-XX4
-FB1

-XC

-XE
=NOSARAN+Q104-XX2
Terminal diagram

10

11

12

13

14

15
1

9
-BCF1-X304

-BCF1-X304

-BCF1-X319

-KDCS
-PJK1

-PU1

-XX4

-XB

A2
14

06

15

12

31
2

F 21/10/2014 UPDATED. Date 21/10/14 Order no:


KURDISTAN REGIONAL GOVERNMENT, MINISTRY OF ELECTRICITY TERMINAL DIAGRAM=NOSARAN+Q104-XX2 =NOSARAN
KURDISTAN REGIONAL GOVERNMENT
E 15/10/2014 UPDATED. Design F.Ş. MINISTRY OF ELECTRICITY
X13112 +Q104

D 26/09/2014 UPDATED. Check GO 22/10/14 P. 84


Rev Date Description Contractor: ABB SWEDEN Dept. PPMV ABB Elektrik San.A.S. 87 P.
0 1 2 3 4 5 6 7 8 9

/20.2

/30.1

/30.6

/30.9

/31.3

/32.3

/32.9
/14.3

/32.7
/6.4

12

11

13

12

11

11

11

11
2

2
-PGM-X1

-FBAC.1

-KOC
-KAC
-KLO
-SB1
-XX1

-XX3
-FB3

-KM
-XE
=NOSARAN+Q104-XX3
Terminal diagram

10
1

9
-BCF1-X316

-PGM-X2
-KDC
-XX3

-XX1

-XC
-XB
13

36

98

11
4

F 21/10/2014 UPDATED. Date 21/10/14 Order no:


KURDISTAN REGIONAL GOVERNMENT, MINISTRY OF ELECTRICITY TERMINAL DIAGRAM=NOSARAN+Q104-XX3 =NOSARAN
KURDISTAN REGIONAL GOVERNMENT
E 15/10/2014 UPDATED. Design F.Ş. MINISTRY OF ELECTRICITY
X13112 +Q104

D 26/09/2014 UPDATED. Check GO 22/10/14 P. 85


Rev Date Description Contractor: ABB SWEDEN Dept. PPMV ABB Elektrik San.A.S. 87 P.
0 1 2 3 4 5 6 7 8 9

/20.2

/30.4

/31.3

/32.3

/32.9
/14.3
/6.5

11

14
4

9
-PGM-X10

-PGM-X12
-PGM-X1

-KAC
-PX1
-XX2

-XX4
-FB3
=NOSARAN+Q104-XX4
Terminal diagram

7
-PGM-X11

-KRGA
-XX4

-XX2
12

14
4

F 21/10/2014 UPDATED. Date 21/10/14 Order no:


KURDISTAN REGIONAL GOVERNMENT, MINISTRY OF ELECTRICITY TERMINAL DIAGRAM=NOSARAN+Q104-XX4 =NOSARAN
KURDISTAN REGIONAL GOVERNMENT
E 15/10/2014 UPDATED. Design F.Ş. MINISTRY OF ELECTRICITY
X13112 +Q104

D 26/09/2014 UPDATED. Check GO 22/10/14 P. 86


Rev Date Description Contractor: ABB SWEDEN Dept. PPMV ABB Elektrik San.A.S. 87 P.
0 1 2 3 4 5 6 7 8 9

/27.4

/27.5

/27.5

/27.4

/27.5

/27.6
1BK

1BK

1BK
1

-BPA1

-BPA2

-BPA3
-XI4
=NOSARAN+Q104-XX10
Terminal diagram

6
-BPA1

-BPA2

-BPA3

-XI4
2BN

2BN

2BN

F 21/10/2014 UPDATED. Date 21/10/14 Order no:


KURDISTAN REGIONAL GOVERNMENT, MINISTRY OF ELECTRICITY TERMINAL DIAGRAM=NOSARAN+Q104-XX10 =NOSARAN
KURDISTAN REGIONAL GOVERNMENT
E 15/10/2014 UPDATED. Design F.Ş. MINISTRY OF ELECTRICITY
X13112 +Q104

D 26/09/2014 UPDATED. Check GO 22/10/14 P. 87


Rev Date Description Contractor: ABB SWEDEN Dept. PPMV ABB Elektrik San.A.S. 87 P.