0% found this document useful (0 votes)
10 views1 page

Cover Sheets

The document outlines the contract agreement for the Bangalore Metro Rail Project Phase-II, specifically for Contract No. 8 S&T - DM. It involves the design, manufacture, supply, installation, testing, and commissioning of signaling and train control and communication systems for Reach-5 of Phase-II. The contractor is a consortium consisting of Siemens Limited, Siemens Rail Automation S.A.U., and Siemens Mobility GmbH.

Uploaded by

vinay
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
10 views1 page

Cover Sheets

The document outlines the contract agreement for the Bangalore Metro Rail Project Phase-II, specifically for Contract No. 8 S&T - DM. It involves the design, manufacture, supply, installation, testing, and commissioning of signaling and train control and communication systems for Reach-5 of Phase-II. The contractor is a consortium consisting of Siemens Limited, Siemens Rail Automation S.A.U., and Siemens Mobility GmbH.

Uploaded by

vinay
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

BANGALORE METRO RAIL CORPORATION LIMITED

BANGALORE METRO RAIL PROJECT – PHASE-II

CONTRACT AGREEMENT DOCUMENT

CONTRACT NO. 8 S&T - DM

DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING


AND COMMISSIONING OF SIGNALLING & TRAIN CONTROL AND
COMMUNICATION SYSTEMS FOR REACH-5 OF PHASE-II

CONTRACTOR
Consortium comprising of
M/s. Siemens Limited, India (SL)
M/s. Siemens Rail Automation S.A.U., Spain (SRA), and
M/s. Siemens Mobility GmbH, Germany (SMO)