Saudi Aramco Inspection & Testing Requirements (Form-175)
## 1. General Information
- **Document Title**: Inspection & Testing Requirements (Saudi Aramco Form-175)
- **Revision Date**: April 24, 2016
- **Previous Version**: October 31, 2012
- **Code Number**: IR270500
- **Scope**: Defines the inspection and testing procedures for fire, smoke, and combination
fire-smoke dampers based on 27-SAMSS-011 and related specifications.
## 2. Inspection & Testing Requirements
The document outlines three key inspection areas:
### (1) Visual Inspection by Buyer’s Representative
- Inspect dampers for physical defects or damage.
### (2) Review & Verification of Material Certificates & Inspection Records
- Verify Material Test Reports to confirm compliance with 27-SAMSS-011.
- Ensure manufacturer details are listed in the UL directory.
- Check UL classification, fire rating, leakage class, and damper size limitations.
### (3) Submission of Manufacturing, Inspection & Quality Records
- Manufacturers must provide design and drawings as per 27-SAMSS-011.
- Submit inspection records and compliance certificates.
## 3. Specific Inspection & Testing Requirements
The document breaks the inspection process into three main phases:
### A. Pre-Fabrication/Production Requirements
- **Material Test Report**: Must comply with 27-SAMSS-011.
- **Design & Drawings**: Must be approved per 27-SAMSS-011.
- **Manufacturer Approval**: Manufacturer must be listed in the UL directory.
- **Damper Data Sheet**: Must conform to 27-SAMSS-011 Table 1.
### B. In-Process Inspection & Testing
- Ensures damper assembly meets Saudi Aramco standards.
### C. Final Inspection & Testing Requirements
- **UL Classification Check**: Model number, mounting position, fire rating, leakage class.
- **Component Verification**: Sleeve, actuator, and other accessories must comply with 27-
SAMSS-011.
- **Construction & Dimensions**: Must match approved drawings and purchase order (PO)
requirements.
- **Marking & UL Stickers**: Verify UL labeling compliance.
- **Functional Testing**: Verify full opening and closing of damper blades.
- **Compliance Certificates**: Must be issued to confirm damper meets 27-SAMSS-011 and
UL standards.
- **Product Test Certificate**: Confirms successful testing results.
## 4. Additional/Supplemental Requirements
- **Installation, Operation, & Maintenance Manual**: Must be provided by the manufacturer
per 27-SAMSS-011 and PO requirements.
- **Reference Document**: Detailed instructions are in Form 175-000003 for proper usage.
## 5. Key Takeaways
- Ensures strict compliance with Saudi Aramco's fire safety standards for HVAC dampers.
- Covers every phase of inspection: from pre-fabrication to final testing.
- Requires UL certification and compliance certificates from the manufacturer.
- Functional testing ensures dampers operate correctly in fire and smoke conditions.
- Mandatory documentation (manuals, certificates, reports) must be submitted for approval.