The MV Cable IR Test Report includes results from continuity and insulation resistance tests for two MV cables, IP-PS Feeder G02 and G04. Both cables passed the continuity check and exhibited insulation resistance greater than 505 GΩ across all phases. The report is issued by the TIJEUN engineer and includes spaces for signatures and dates.

Uploaded by

Vishnu Pradeep
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
22 views1 page

Pages From r12 s00c03 Tie Itp El 0001 - c3

The MV Cable IR Test Report includes results from continuity and insulation resistance tests for two MV cables, IP-PS Feeder G02 and G04. Both cables passed the continuity check and exhibited insulation resistance greater than 505 GΩ across all phases. The report is issued by the TIJEUN engineer and includes spaces for signatures and dates.

Uploaded by

Vishnu Pradeep
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

MV CABLE IR TEST REPORT

Department ELECTRICAL WIR No.

ITP NO R12-S00C03-TIE-ITP-EL-0001 Check list

CONTUNUITY TEST

Phase Continuity Check Remarks

R-R Yes / No OK

Y-Y Yes / No OK

B-B Yes / No OK

INSULATION RESISTANCE TEST Applied Voltage: 5Kv for 1 minute

Items R-G Y-G B-G R-Y Y-B B-R Remarks

MV Cable
>505 GΩ >505 GΩ >505 GΩ >505 GΩ >505 GΩ >505 GΩ
IP-PS Feeder G02

MV Cable
>505 GΩ >505 GΩ >505 GΩ >505 GΩ >505 GΩ >505 GΩ
IP-PS Feeder G04
REMARKS:

ISSUED BY TIJEUN ENGINEER NOMAC ENGINEER RSG

SIGNATURE

NAME

DATE