0% found this document useful (0 votes)
3 views

ITS03-01 Bank Panel

The document is a question bank for an Electrical Panel Building training course, designed for instrumentation technician apprentices. It includes multiple-choice questions covering various aspects of electrical panel construction, safety equipment, and testing procedures. The document also contains sections for recording trainee information and scores.

Uploaded by

Cetty Xo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
3 views

ITS03-01 Bank Panel

The document is a question bank for an Electrical Panel Building training course, designed for instrumentation technician apprentices. It includes multiple-choice questions covering various aspects of electrical panel construction, safety equipment, and testing procedures. The document also contains sections for recording trainee information and scores.

Uploaded by

Cetty Xo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 10

Question Bank

ITS03 – Electrical Panel Building

INSTRUMENTATION TECHNICIAN APPRENTICESHIP

DURATION 1 HOUR(S)
Name :
Position :
Training Date :
Possible : Marks
Actual :
Percentage :
Trainer’s Name :
Trainer’s Signature :
NMA-APP-DA-ITS03-01
ELECTRICAL PANEL BUILDING
Revision: A

Written: 9 Apr 2022 Page 2 of 10


NMA-APP-DA-ITS03-01
ELECTRICAL PANEL BUILDING
Revision: A

Q01. How to protect panel from solid objects / liquids is called? Marks

A Enclosure ( 1 )
IP rating
C Barricade
D None of the above

Q02. Appropriate Personal Protective Equipment should be worn to protect from hazards that Marks
may be encountered during activities of electrical panel building?
A Safety glasses ( 1 )
B Face shield
C Safety gloves
All of the above

Q03. Such an item would be known as a control panel and could control many items of Marks
equipment but for this unit you will be just building a basic control panel that will?
A Give a degree of physical protection ( 1 )
B Have a basic method of isolation
C Be able to switch on and off the motor
All of the above

Q04. What drawings do you need to produce? Marks

Layout and schematic drawings. ( 1 )


B Hazardous Area Classification Drawing
C Escape route drawing
D None of the above

Q05. They are many different types of control panels such as? Marks

A Motor Control Centre (MCC) ( 1 )


B Power Control Centre (PCC)
C PLC Control Panel
All of the above

Written: 9 Apr 2022 Page 3 of 10


NMA-APP-DA-ITS03-01
ELECTRICAL PANEL BUILDING
Revision: A

Q06. Devices or modules are installed within a Control Panel? Marks

A Fuses ( 1 )
B Miniature Circuit Breaker (MCB)
C Contactor
All of the above

Q07. What the function of fuses in a Control Panel? Marks

A To stop working if the electric current is too high ( 1 )


B To prevent fire
C To prevent other damage
All of the above

Q08. What is the basis the fuses can work? Marks

Thermal property of current ( 1 )


B Overload of power
C Unbalance load
D None of the above

Q09. Below is the function of Push Button? Marks

A Make or break an electric circuit ( 1 )


B Interrupting the current
C Diverting it from one conductor to another
All of the above

Q10. Below is categorized as special PPEs for Electrical Panel Building Marks

A Masker ( 1 )
Hand gloves and safety goggles
C Full-body harness with connector and anchorage
D High visible vest

Written: 9 Apr 2022 Page 4 of 10


NMA-APP-DA-ITS03-01
ELECTRICAL PANEL BUILDING
Revision: A

Q11. What is the function of Emergency Stop push button? Marks

A To start / stop button ( 1 )


To break the live control circuit immediately if emergency condition
C As an alarm indication
D None of the above

Q12. Where is Emergency Stop push button should be installed? Marks

Where very easy to access on it ( 1 )


B Where limited access on it
C Where people get the difficult to access it
D None of the above

Q13. What is function of indicator lamp? Marks

To indicate whether power is on or a motor is in operation ( 1 )


B To illuminate the panel
C To give alarm during emergency condition
D None of the above

Q14. What is main purpose of Isolator? Marks

A To open or close another circuit ( 1 )


To isolate one portion of the circuit from the other and is not intended to be opened
while current is flowing in the line
C To switch an electrical power circuit
D None of the above

Q15. Where is Isolator will be used? Marks

A On incoming of the breaker ( 1 )


B On outgoing of the breaker
On both ends of the breaker
D None of the above

Written: 9 Apr 2022 Page 5 of 10


NMA-APP-DA-ITS03-01
ELECTRICAL PANEL BUILDING
Revision: A

Q16. What is the function of Cable Trunking in Electrical Panel? Marks

A As an accessory ( 1 )
B To indicate cable location
To protect cables and provide space for other electrical equipment
D None of the above

Written: 9 Apr 2022 Page 6 of 10


NMA-APP-DA-ITS03-01
ELECTRICAL PANEL BUILDING
Revision: A

Q17. In wiring application, where the cable protection is essential, you will use? Marks

A PVC conduit ( 1 )
Open slot PVC Trunking
C Cable Trunking
D None of the above

Q18. What is function Spiral Web? Marks

To protect cables which are routed near equipment which may trap them such as ( 1 )
across door hinges
B To protect cable connection inside panel
C To make distance between cables inside panel
D None of the above

Q19. Why is Modular Connection Block mounted on a rail? Marks

To ensure they stay in their fixed position ( 1 )


B To ensure they do not fall
C To make great position
D None of the above

Q20. What will be used to connect between electrical load or feeder to electrical panel? Marks

A Wiring or cable ( 1 )
B Ladder or tray
Cable Trunking
D None of the above

Written: 9 Apr 2022 Page 7 of 10


NMA-APP-DA-ITS03-01
ELECTRICAL PANEL BUILDING
Revision: A

Q21. Which one is correct in steps to design and build a Control Panel? Marks

A Drawing  Purpose  List of Materials and Tools  Fitting Equipment’s  ( 1 )


Working with the box  Wiring  Function Test  Commissioning
Purpose  Drawing  List of Materials and Tools  Working with the box 
Fitting Equipment’s  Wiring  Function Test  Commissioning
C Purpose  Drawing  List of Materials and Tools  Fitting Equipment’s 
Working with the box  Wiring Function Test  Commissioning
D Purpose  Drawing  List of Materials and Tools  Working with the box 
Wiring  Fitting Equipment’s  Function Test  Commissioning

Q22. You require drawings in building Electrical Panel, which one is correct? Marks

A Layout drawing ( 1 )
B A schematic diagram showing the control side of the circuit
C A schematic showing the power side of the circuit
All of the above

Q23. What is purpose of Testing the Control Panel? Marks

A To get required value ( 1 )


B To ensure the Control Panel is safe
To indicate Control Panel is ready to be used
D To complete step in designing and building

Q24. Following test are required to test the panel? Marks

A Continuity tests ( 1 )
B Earthing continuity test
C Insulation resistance test
All of the above

Written: 9 Apr 2022 Page 8 of 10


NMA-APP-DA-ITS03-01
ELECTRICAL PANEL BUILDING
Revision: A

Q25. After testing the panel is complete, you require final test is called? Marks

A Commissioning ( 1 )
B Function Test
C Pre-commissioning
All of the above

TOTAL SCORE

END OF TEST

Written: 9 Apr 2022 Page 9 of 10


NMA-APP-DA-ITS03-01
ELECTRICAL PANEL BUILDING
Revision: A

Document Development History


Prepared / Approved &
Date Rev Description
Reviewed by Signed by
A Issued for Review

Document Information Entry Form


Test Type: QUESTION BANK
Test Title: ELECTRICAL PANEL BUILDING
Long Doc. Number: NMA-APP-DA-ITS03-01
Current Revision: A
Date written: 9 Apr 2022

Written: 9 Apr 2022 Page 10 of 10

You might also like