PO - 420299 - Compound Wall Fencing Work - 202470
PO - 420299 - Compound Wall Fencing Work - 202470
2 Item Code: XKGSERGS18X 2024/01/31 KG 500.000 215.00 107500.00 9.00 9.00 126850.00
NON-STK-KG SERVICE
Modification /alteration / New of MS/GI Fencing Post at exis
ting MS Structural Steel( ie Angle to Extend the Post Height
) post at existing position with require material included
require hole for fixing the braded wire/coil and Painting on
Whole Y Post ( One Coat Zinc Chromate Yellow Primer +02 Coa
t Black Paint) at Location on Compound Wall as per Alleima E
ngg. and as per sketch/ drg. /as per site requirements(Cutti
ng Welding with line level with Painting work at site )Heigh
t Work Remark ALL PPE Scaffolding Cup Lock Type and material
Handling equipments under Vendor Scope)"Grouting included i
n line and level
3 Item Code: XMTRSERGS18X 2024/01/31 MTR 470.000 705.00 331350.00 9.00 9.00 390993.00
NON-STK-MTR SERVICE
Supplying and erecting hot dipped galvanized, barbed razor
type concertina coil fencing of approved make,at modifiedY
shape M.S angle 50x50x6 post at c/c asper details given be
low 3nosStraight,02 NosDiagonal05 No in Y shape14gauge GI
barbed wire fixed by quarter pin over Yshaped M.S. angle f
or supporting concertina coil fencing.600mm dia Concertina
coil having barbed razor stripof0.5mm thick hot dip galvaniz
ed strip with a width19mm (before wrapping on centralcore(Wi
re)wound over a central core of12 SWG Hot dip galvanized spr
tax ("GST") as envisaged under the Constitution (One hundred and first amendment) Act 2016 and Article 246A of the Constitution of India ("GST Law"):
Page 1(2)
PURCHASE ORDER NO: B-420299 DATE: 2024/01/09
X.2 In the event of failure by the Supplier to comply with the provisions of Clause X.1, the Supplier shall indemnify and hold harmless ALLEIMA in respect of
all
differential tax liabilities, losses, penalties, fee, fines, costs and expenses suffered by ALLEIMAarising as a result of such failure. ALLEIMA shall have the
right to
withhold and set-off amounts, in consideration of such indemnification, from any payments that are due to the Supplier from ALLEIMA.
NOTE1 :-
- Your Invoice must contain valid details: (1) PO. No. (2) PO. Srl.No.(3) Item code (4) correct 8/6/4-digit HSN/SAC code (5) GSTIN & full
description of products/ services;failling which material/services will not be acknowledged as received.
- Goods must be accompanied with all copies of challan, invoice, certificates. Do not supply in excess
of the ordered quantity without prior approval.
- Your vehicle must report to our stores latest by 3.30 p.m. - SUNDAY is our weekly off.
- Plastic less than 75 microns and single use plastic is prohibited for packing/wrapping of material. Any material received using
plastic which is less than 75 microns, will not be accepted
NOTE2 : You should adhere to ALLEIMA supplier code of conduct. Vehicles entering our premises must observe speed limits mentioned on sign boards.
NOTE3 : The vehicles transporting goods andmaterial should follow all the regulations laidby National Road Transport Authority, regional&local authority
and minimizing the risk to road-users or property by preventing Overloading (i.e.excess laden weight, object or cargo that protrudesoutside the body of the
vehicle, etc.)
NOTE4 :Hazardous Goods and Waste - Ensure complianceto safe handling & transportation of Goods/Wasteby placarding containers,providing Material
SafetyData Sheet(MSDS),Chemical Spill Prevention.Selleris solely responsible for the compliance in accordancewith all applicable Hazmat Laws until the
shipment issuccessfully delivered.
Page 2(2)