Residential Smart PV Solution Quick Guide (Single-Phase PV+ESS Scenario + Smart Dongle Networking)
Residential Smart PV Solution Quick Guide (Single-Phase PV+ESS Scenario + Smart Dongle Networking)
Date: 2023-11-13
(Single-Phase PV+ESS Scenario + Smart Dongle Networking)
PV strings
(including optimizers) Slave inverter 2
Critical load 2
PV strings
(including optimizers) Slave inverter 1
SUN2000-(2KTL-6KTL) -L1
A maximum of three SUN2000-(2KTL-6KTL)-L1 inverters can be cascaded.
Inverter SUN2000-(8K, 10K)-LC0
The SUN2000-(8K, 10K)-LC0 or SUN2000-(8K, 10K)-LC0-ZH inverter cannot be
(master and slave)
SUN2000-(8K, 10K)-LC0-ZH cascaded.
Critical load 1 Common load
LUNA2000-(5-30)-S0 • The capacity of a battery module is 5 kWh. A maximum of two ESSs can be
Energy storage
cascaded and the maximum capacity is 30 kWh.
PV strings system (ESS)
Smart Power • If there is only one ESS, it must be connected to the master inverter.
(including optimizers) Master inverter Sensor
Backup Box-B0 • AC input voltage range: 198–253 V
• If there is only one Backup Box, it must be connected to the master inverter.
Backup Box
АC power • SUN2000-(8K, 10K)-LC0 and SUN2000-(8K, 10K)-LC0-ZH cannot be connected
distribution box Power grid to the Backup Box.
DDSU666-H • The Smart Power Sensor must be connected to the master inverter.
Smart Power Sensor YDS70-C16 • It connects to the inverter over RS485 for output power management and
power limiting.
4G Smart Dongle SDongleA-03 (4G) • The Smart Dongle must be connected to the master inverter.
4G Smart Dongle SDongleB-06 (4G) • It connects to the management system and performs power scheduling.
• The SDongleA-03 (4G) is compatible only with the SUN2000-(2KTL-6KTL)-L1.
SDongleA-05 (WLAN-FE)
FusionSolar
management system SUN2000-450W-P
Ethernet
WLAN-FE SUN2000-600W-P: Long and short input cables are available to connect to PV
Smart PV Optimizer SUN2000-450W-P2
Smart Dongle modules with different cable lengths.
Signal cable
WLAN SUN2000-600W-P
Power cable
FE FusionSolar app
Wireless communication
1. The information in this document is subject to change due to version upgrade or other reasons. Every effort has been made in the preparation
of this document to ensure accuracy of the contents, but all statements, information, and recommendations in this document do not constitute
a warranty of any kind, express or implied.
2. For details about the solution components, installation, and cable connections, see the corresponding user manuals and quick guides.
3. The cable colors involved in this document are for reference only. Select cables in accordance with local cable specifications.
1 Copyright © Huawei Digital Power Technologies Co., Ltd. 2023. All rights reserved.
Residential Smart PV Solution Quick Guide
(Single-Phase PV+ESS Scenario + Smart Dongle Networking)
Power grid
Before connecting cables, ensure that all
switches are OFF. Otherwise, electric shocks
may occur. To COM-1 of slave inverter 1 To COM-2 of slave inverter 1 AC power
To COM-7 of ESS 1 To COM-4 of ESS 1
To COM-24 of DDSU666-H
distribution box
To COM-25 of DDSU666-H
To X4-2 of Backup Box To COM-3 of ESS 1
Signal cables must be outdoor shielded To COM-2 of ESS 1 The wiring sequence of the Backup Box must be
To X4-1 of Backup Box
twisted pair cables. consistent with that of the inverter AC terminals.
Backup Box
Critical load
Master inverter
PV strings (including optimizers)
Backup load
power
distribution
AC CT
box
ESS 2 ESS 1
(power control module) (power control module)
Shield layer
grounding
Loads
master inverter.
2
Residential Smart PV Solution Quick Guide
(Single-Phase PV+ESS Scenario + Smart Dongle Networking)
AC
CT
ESS 2 ESS 1
(power control module) (power control module)
Cable One End The Other End Cable One End The Other End
No. No.
Type Component Port Port Component Type Component Port Port Component
Shield layer
Master PV1+ Positive terminal PV Master 24
grounding Signal COM-4
inverter PV1- Negative terminal strings cable inverter COM-3 25 DTSU666-H
DC Master BAT+ BAT+
power ESS 1
inverter BAT- BAT- One End The Other End
cable Cable No.
BAT+ BAT+ Type Component Port Port Component
ESS 1 ESS 2
BAT- BAT- AC-L L
Master AC power
COM-2 (left) COM-2 (right) AC-N N
inverter distribution
Shield layer COM-3 (left) COM-3 (right) AC-PE box
Shield layer AC
PE
grounding grounding COM-4 (left) COM-4 (right)
L 3
ESS 1 power AC power
COM-7 (left) COM-7 (right) ESS 2 cable distribution box DDSU666-H
N 4
Signal COM-8 (left) COM-8 (right)
cable COM-9 (left) AC power 5 DDSU666-H
COM-9 (right) L
distribution box CT
COM-5 COM-2 (right) 6
3
Residential Smart PV Solution Quick Guide
(Single-Phase PV+ESS Scenario + Smart Dongle Networking)
4 System Commissioning
Download and install the FusionSolar app Initial registration Non-initial registration
If the company requires multiple installer accounts, log in to the FusionSolar app and tap Add user to
Create the first installer account, and generate a domain named after the company.
Sign up as an installer (optional, required create another installer account.
for initial registration)
FusionSolar
4
Residential Smart PV Solution Quick Guide
(Single-Phase PV+ESS Scenario + Smart Dongle Networking)
Set the energy storage working mode. Set the communication networking.
In an inverter cascading
scenario, the parameter
synchronization result is
displayed.
5
Residential Smart PV Solution Quick Guide
(Single-Phase PV+ESS Scenario + Smart Dongle Networking)
Settings
Feature parameters
• Off-grid mode
• Backup power SOC
• Grid-tied/Off-grid mode
switching
Power adjustment
Active power
Control mode
• Unlimited
• Grid connected with zero power
• Power-limited grid connected
6
Residential Smart PV Solution Quick Guide
(Single-Phase PV+ESS Scenario + Smart Dongle Networking)
Attaching SN Labels Taking a Photo of the Physical Layout Template Generating a Physical Layout on the App
Ensure that the four positioning points on the Enter the Layout screen.
Remove the SN labels from optimizers and attach them to the physical layout template based
on the actual positions of the optimizers in the plant. template are within the frame.
Positioning point
7
Residential Smart PV Solution Quick Guide
(Single-Phase PV+ESS Scenario + Smart Dongle Networking)
Edit the physical layout and specify the quantity of inverters and PV modules as required.