Clamshell lathe
(Cut or Cut & Bevel) <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm 750mm 800mm 900mm 1050mm 1200mm 1400 1800
OD of pipe 60.3 88.9 114.3 168.3 219.3 273.1 323.9 355.6 406.4 457.2 508.0 609.6 762.0 812.8 914.4 1066.8 1219.2 1422.4 1828.8
Circumference 189.5 279.3 359.1 528.8 689.0 858.1 1017.7 1117.3 1276.9 1436.5 1596.1 1915.4 2394.2 2553.8 2873.0 3351.9 3830.7 4469.2 5746.1
Depth of Cut 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
Travel Speed mm per/m 1842.0 1842.0 1842.0 1842.0 1842.0 1842.0 1842.0 1842.0 1842.0 1842.0 1842.0 1842.0 2000.0 2000.0 2000.0 2000.0 2000.0 2000.0 2000.0
WT SCH 40 3.91 5.49 6.02 7.11 8.18 9.27 10.31 11.10 12.70 14.27 15.06 17.46 10 17 19 10 10 10 10
WT SCH 80 5.54 7.62 8.56 10.97 12.70 15.06 17.48 19.05 21.41 23.80 26.19 30.94 13 13 13 13 13 13 13
WT SCH 160 8.71 11.10 13.49 18.24 23.01 28.58 33.32 35.71 40.46 45.24 49.99 59.51 13 13 13 13 13 13 13
STD
XS
SCH 20 2.64
SCH 30 0.08 0.15 0.15 0.19 0.35 0.38 0.38 0.77 0.96 1.34 1.92 2.30
SCH 40 1.58 1.65 1.65 1.69 1.85 1.88 1.88 2.27 2.46 2.84 3.42 3.80
SCH 40 Comparison 2.01 4.16 5.87 10.21 15.30 21.59 28.48 33.66 44.02 55.64 65.25 90.78 2.45 3.36 3.78 2.83 3.02 3.27 3.78
SCH 60 0.51 2.66 4.37 8.71 13.80 20.09 26.98 32.16 42.52 54.14 63.75 89.28
SCH 80 1.65 1.73 1.73 1.85 1.92 2.08 2.08 3.03 3.23 3.80 4.95 6.10
SCH 80 Comparison 0.02 0.02 0.02 0.03 0.03 0.04 0.05 0.05 0.06 0.06 0.07 0.08
SCH 100
SCH 120
SCH 160 1.77 1.77 1.77 2.27 2.46 2.84 2.84 4.38 4.95 6.10 7.25 8.40
SCH 160 Comparison
Reference: Notes: Mechtech norms + 15%. Based on 2 competent operators on an unobstructed horizontal line. Rate
Machtech tools Norm includes for set-up 60 mins & dismantle 30 mins. Clamshell lathe can do straight cut or simulataneous cut & bevel, depending upon tooling Table
Additional factors to be applied for location, access, position (Vertical or horizontal), material or operator competence CS2
06-009-PRM-003
CONTENTS APPENDIX 1 - PIPING
Rev 5
ONSHORE CARBON STEEL PIPING MAN-HOUR RATES
Machine Cut <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm 700mm 750mm 900mm 1050mm 1200mm 1400 1800
STD 0.23 0.23 0.33 0.46 0.74 1.02 1.43 1.55 2.17 2.43 3.06 3.70 5.61
XS 0.33 0.33 0.46 0.61 0.97 1.43 2.05 2.43 2.89 3.58 4.34 4.85 7.15
SCH 20 1.02 1.43 1.55 2.17 2.43 3.06 3.70 5.61
SCH 30 1.02 1.43 1.55 2.17 2.43 3.58 4.98 7.53
SCH 40 0.23 0.23 0.33 0.46 0.74 1.02 1.43 1.92 2.55 3.58 4.34 5.36 7.91
SCH 60 1.30 2.05 2.89 3.20 3.96 4.85 5.75 8.30
SCH 80 0.33 0.33 0.46 0.61 0.97 1.43 2.20 3.04 3.70 4.21 5.11 6.13 8.56
SCH 100 1.69 2.43 3.29 3.96 4.73 5.75 6.76 9.32
SCH 120 0.84 1.25 1.92 2.76 3.83 4.34 5.11 6.13 7.15 10.34
SCH 160 0.46 0.46 0.61 0.92 1.40 2.53 3.83 4.54 5.36 6.51 8.04 9.44 13.14
8.75mmWT 10.34 10.98 14.81 20.80 29.87 37.33 47.99
12.5mmWT 12.89 13.92 17.74 23.75 31.41 39.24 50.45
31.25mmWT 16.22 17.10 20.80 26.17 34.47 43.07 55.37
Reference: Notes: As there are no tables for Cold Cut or Machine Cut (Fien saw, Grinder) in the Field the above rates are based upon Shop Machine Cut rates plus 15%.
J S Page 5th Edition (1999) Man hours are for cutting pipe with plain ends only and do not include bevelling, threading, etc. P1
eProcs Norm Group: 42005 Assumes cut with grinder or similar method
Machine Bevel <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm 700mm 750mm 900mm 1050mm 1200mm 1400 1800
STD 0.35 0.35 0.41 0.45 0.53 0.72 1.05 1.12 1.54 1.73 2.17 2.62 3.98
XS 0.41 0.41 0.45 0.48 0.68 1.05 1.45 1.73 2.04 2.53 3.08 3.44 5.07
SCH 20 0.72 1.05 1.12 1.54 1.73 2.17 2.62 3.98
SCH 30 0.72 1.05 1.12 1.54 1.73 2.53 3.53 5.35
SCH 40 0.38 0.38 0.41 0.45 0.53 0.72 1.05 1.36 1.81 2.53 3.08 3.81 5.61
SCH 60 0.93 1.45 2.04 2.27 2.81 3.44 4.07 7.06
SCH 80 0.41 0.41 0.45 0.48 0.68 1.05 1.56 2.15 2.62 2.99 3.69 5.22 7.28
SCH 100 1.21 1.73 2.33 3.37 4.03 4.89 5.76 7.94
SCH 120 0.83 0.95 1.36 1.94 3.25 3.69 4.35 5.22 6.08 8.80
SCH 160 1.00 1.00 1.07 1.14 1.33 2.15 3.25 3.85 4.57 5.54 6.84 8.04 11.19
8.75mmWT 5.49 5.86 7.88 11.09 15.92 19.91 25.59
12.5mmWT 6.85 7.38 9.45 12.66 16.73 20.92 26.90
31.25mmWT 9.20 9.71 11.81 14.86 19.56 24.45 31.43
Reference: Notes: As there are no tables for Cold Bevel or Machine Bevel in the Field the above rates are based upon Shop Machine Bevel rates plus 15%.
J S Page 5th Edition (1999) Man hours are for bevelling only and do not include cutting or internal machining. P2
eProcs Norm Group: 42010 Assumes usage of grinder or similar
Clamshell Lathe <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm 700mm 750mm 800mm 900mm 1050mm 1200mm 1500mm
Cut or Cut and Bevel Carbon Steel Schedule 40 sizes which are not available as a standard pipe size have been shown as STD and are highlighted in Yellow
STD 4.09 5.41 6.01 15.52
Schedule 80 and 160 sizes which are not available as a standard pipe size have been shown as XS and are highlighted in Green
XS 4.32 4.60 5.06 5.71 6.33 15.95
SCH 30
SCH 40 1.81 1.86 1.91 1.98 2.06 2.61 3.22 3.84 4.99 5.62
SCH 60
SCH 80 1.86 1.96 2.03 2.16 2.32 2.89 3.80 4.63
SCH 100
SCH 120
SCH 160 1.96 2.14 2.31 2.59 2.89 3.80 5.04 6.32
Reference: Notes: Mechtech norms + 15%. Based on 2 competent operators on an unobstructed horizontal line.
Machtech tools Norm includes set up time based on weight of clamshell and "structural medium" installation norm factored to 50% for disassembly. Weight of clamsheel derived from Hydratight clamshell charts. P2a
eProcs Norm Group: 42011 Additional factors to be applied for location, access, position (Vertical or horizontal), material or operator competence
Butt Weld <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm 700mm 750mm 900mm 1050mm 1200mm 1400 1800
STD 0.96 1.20 1.56 1.80 2.40 3.12 3.72 4.32 5.16 6.00 7.08 7.56 8.28
XS 1.08 1.20 1.68 2.16 3.00 3.96 4.80 5.64 6.84 7.92 9.24 10.08 12.12
SCH 20 3.12 3.72 4.32 5.16 6.00 7.08 7.56 8.28
SCH 30 3.12 3.72 4.32 5.16 6.00 8.16 10.08 13.32
SCH 40 0.96 1.20 1.56 1.80 2.40 3.12 3.72 4.92 6.00 7.92 10.32 11.28 15.96
SCH 60 3.60 4.80 6.24 8.16 10.08 13.44 16.56 24.12
SCH 80 1.08 1.20 1.68 2.16 3.00 3.96 6.12 7.92 11.52 14.88 19.68 23.40 30.24
SCH 100 5.52 8.16 11.88 15.84 23.40 26.16 31.20 42.96
SCH 120 3.36 4.56 7.20 11.28 14.64 19.44 24.84 30.72 38.28 52.20
SCH 160 1.56 1.92 2.52 3.60 5.88 10.32 15.72 21.48 27.24 33.24 40.44 48.96 71.16
8.75mmWT 12.00 15.00 27.60 44.28 65.40 82.80 106.46
12.5mmWT 15.72 18.24 29.64 48.48 71.88 91.44 117.57
31.25mmWT 35.16 38.04 54.24 82.56 109.08 131.40 168.94
Reference: Notes: The above hours reflect MMAW welding with an allowance (factor 1.2) for GTAW root and hot pass with inert gas purge. Wall thickness greater than 19.1mm will require Stress Relieving.
J S Page 5th Edition (1999) Pg 93 There is no allowance within these norms for Permit's, JSA's or QA/QC for inter pass temperatures and welding parameter monitoring. P3a
eProcs Norm Group: 42015 The above hours do not include the erection of humpies or the fire watchers required inside & outside the humpy during hot work.
Bevel + Butt Weld <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm 700mm 750mm 900mm 1050mm 1200mm 1400 1800
STD 1.31 1.55 1.97 2.25 2.93 3.84 4.77 5.44 6.70 7.73 9.25 10.18 12.26
XS 1.49 1.61 2.13 2.64 3.68 5.01 6.25 7.37 8.88 10.45 12.32 13.52 17.19
SCH 20 3.84 4.77 5.44 6.70 7.73 9.25 10.18 12.26
SCH 30 3.84 4.77 5.44 6.70 7.73 10.69 13.61 18.67
SCH 40 1.34 1.58 1.97 2.25 2.93 3.84 4.77 6.28 7.81 10.45 13.40 15.09 21.57
SCH 60 4.53 6.25 8.28 10.43 12.89 16.88 20.63 31.18
SCH 80 1.49 1.61 2.13 2.64 3.68 5.01 7.68 10.07 14.14 17.87 23.37 28.62 37.52
SCH 100 6.73 9.89 14.21 19.21 27.43 31.05 36.96 50.90
SCH 120 4.19 5.51 8.56 13.22 17.89 23.13 29.19 35.94 44.36 61.00
SCH 160 2.56 2.92 3.59 4.74 7.21 12.47 18.97 25.33 31.81 38.78 47.28 57.00 82.35
8.75mmWT 17.49 20.87 35.48 55.37 81.32 102.71 132.05
12.5mmWT 22.57 25.62 39.09 61.14 88.61 112.36 144.47
31.25mmWT 44.36 47.75 66.05 97.42 128.64 155.85 200.38
Reference: Notes: The above hours reflect MMAW welding with an allowance for GTAW root and hot pass with inert gas purge. Wall thickness greater than 19.1mm will require Stress Relieving.
J S Page 5th Edition (1999) The composite rates above are calculated by the addition of bevel rates to the butt weld rate.
Page 93 This allowance is for 1 bevel + 1 butt weld. Norms reflect addition of the two individual norms P3b
eProcs Norm Group: 42020 The above hours do not include for erection of humpies or the fire watchers required inside & outside humpy
Cut + Bevel + Butt Weld <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm 700mm 750mm 900mm 1050mm 1200mm 1400 1800
STD 1.54 1.78 2.30 2.71 3.67 4.86 6.20 6.99 8.87 10.16 12.31 13.88 17.87
XS 1.82 1.94 2.59 3.25 4.65 6.44 8.30 9.80 11.77 14.03 16.66 18.37 24.34
SCH 20 4.86 6.20 6.99 8.87 10.16 12.31 13.88 17.87
SCH 30 4.86 6.20 6.99 8.87 10.16 14.27 18.59 26.20
SCH 40 1.57 1.81 2.30 2.71 3.67 4.86 6.20 8.20 10.36 14.03 17.74 20.45 29.48
SCH 60 5.83 8.30 11.17 13.63 16.85 21.73 26.38 39.48
SCH 80 1.82 1.94 2.59 3.25 4.65 6.44 9.88 13.11 17.84 22.08 28.48 34.75 46.08
SCH 100 8.42 12.32 17.50 23.17 32.16 36.80 43.72 60.22
SCH 120 5.03 6.76 10.48 15.98 21.72 27.47 34.30 42.07 51.51 71.34
SCH 160 3.02 3.38 4.20 5.66 8.61 15.00 22.80 29.87 37.17 45.29 55.32 66.44 95.49
8.75mmWT 27.82 31.85 50.30 76.18 111.19 140.04 180.05
12.5mmWT 35.46 39.54 56.84 84.89 120.02 151.60 194.92
31.25mmWT 60.58 64.85 86.85 123.59 163.11 198.92 255.75
Reference: Notes: The above hours reflect MMAW welding with an allowance for GTAW root and hot pass with inert gas purge. Wall thickness greater than 19.1mm will require Stress Relieving.
J S Page 5th Edition (1999) The composite rates above are calculated by the addition of the cut and bevel rates to the butt weld rate.
Page 93 This allowance is for 1 cut + 1 bevel + 1 butt weld. Norms reflect addition of the three individual norms P3c
eProcs Norm Group: 42025 The above hours do not include for erection of humpies or the fire watchers required inside & outside humpy
Erect Spools <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm 700mm 750mm 900mm 1050mm 1200mm 1400 1800
Man hours per m
SCH 10 to 60 1.05 1.12 1.28 1.35 1.54 1.87 2.36 2.89 3.31 4.17 4.86 5.71 6.36
SCH 80 to 100 1.21 1.31 1.57 1.71 2.10 2.66 3.28 4.04 4.79 5.61 6.43 7.28 8.23
SCH 120 to 160 1.48 1.61 1.94 2.17 2.76 3.25 4.53 5.54 6.59 7.68 8.83 9.97 11.25
<20mm WT 6.79 7.15 8.50 9.78 10.99 14.04 18.05
31.25mm WT 8.30 8.56 10.10 11.61 13.09 16.70 21.47
Reference: Notes: Man hours include handling and hauling from local storage yard, unloading and rigging and aligning in place. It does not include welding, bolt-ups,
J S Page 5th Edition (1999) Pg79 make-ons or scaffolding. P4
eProcs Norm Group: 42030
Erect Straight Pipe <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm 700mm 750mm 900mm 1050mm 1200mm 1400 1800
Man hours per m
SCH 10 to 60 0.62 0.66 0.75 0.82 0.92 1.12 1.41 1.71 2.10 2.46 2.89 3.38 3.77
SCH 80 to 100 0.72 0.79 0.92 1.02 1.25 1.57 1.97 2.40 2.85 3.35 3.84 4.33 4.89
SCH 120 to 160 0.89 0.95 1.15 1.28 1.64 2.13 2.69 3.28 3.90 4.56 5.25 5.94 6.69
<20mm WT 4.59 4.89 6.17 7.41 8.66 11.15 14.34
31.25mm WT 5.61 5.87 7.32 8.79 10.30 13.25 17.04
Reference: Notes: Man hours include all labour for unloading and storing in yard, loading and hauling to erection site and rigging and aligning in place. It does not
J S Page 5th Edition (1999) Pg 76 include welding, bolt-ups, make-ons or scaffolding. P5
eProcs Norm Group: 42035
Remove Spools <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm 700mm 750mm 900mm 1050mm 1200mm 1400mm 1800mm
Man hours per m
SCH 10 to 60 0.63 0.67 0.77 0.81 0.92 1.12 1.42 1.73 1.99 2.50 2.92 3.43 3.82
SCH 80 to 100 0.73 0.79 0.94 1.03 1.26 1.60 1.97 2.42 2.87 3.37 3.86 4.37 4.94
SCH 120 to 160 0.89 0.97 1.16 1.30 1.66 1.95 2.72 3.32 3.95 4.61 5.30 5.98 6.75
<20mm WT 4.07 4.29 5.10 5.87 6.59 8.43 10.83
31.25mm WT 4.98 5.14 6.06 6.97 7.85 10.02 12.88
Bolt Up <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm 700mm 750mm 900mm 1050mm 1200mm 1400mm 1800mm
150# 0.80 0.80 0.92 1.38 1.72 2.42 3.11 3.91 4.37 5.06 5.52 6.32 7.59 8.51 8.97 10.35 11.61 13.80 16.10 18.63
300# 0.92 0.92 1.04 1.61 1.95 2.76 3.45 4.37 4.94 5.64 6.21 7.13 8.51 10.00 11.50 12.88 15.18 17.71 20.70
600# 1.04 1.04 1.15 1.72 2.07 2.99 3.68 4.71 5.29 5.98 6.67 7.59 9.08 10.81 12.42 13.92 16.56 19.32 22.77
900# 1.15 1.15 1.38 1.95 2.42 3.45 4.26 5.40 6.10 6.90 7.70 8.74 10.46 12.30 14.15 15.87
1500# 1.38 1.38 1.72 2.42 2.99 4.26 5.29 6.67 7.48 8.51 9.43 10.70 12.88
2500# 1.84 1.84 2.30 3.22 3.91 5.64 7.01 8.85
Reference: Notes: The above man hours do not include for Hydraulic Bolt Tensioning, Internal inspection, or any of the documentation required as part of the Flange checklist PNF-097.
J S Page 5th Edition (1999) Man hours are for each joint on valves, flanged fittings and spools. They do not include handling of valves, fittings or spools. The handling of bolts or studs and gaskets is included.
Page 84 Note 1: WEL Std W1000SM3131997 - Hydraulic Bolt Tensioning on bolt diameters 1 3/8" and greater, 150# 750nb and above, 300# 600nb and above,600# 350nb and above, 900# 200nb and above, 1500# 150nb and above and P7
eProcs Norm Group: 42045 2500# 100nb and above.
Release Flange <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm 700mm 750mm 900mm 1050mm 1200mm 1400mm 1800mm
150# 0.32 0.32 0.37 0.55 0.69 0.97 1.24 1.56 1.75 2.02 2.21 2.53 3.04 3.40 3.59 4.14 4.65 5.52 6.44 7.45
300# 0.37 0.37 0.41 0.64 0.78 1.10 1.38 1.75 1.98 2.25 2.48 2.85 3.40 4.00 4.60 5.15 6.07 7.08 8.28
600# 0.41 0.41 0.60 0.69 0.83 1.20 1.47 1.89 2.12 2.39 2.67 3.04 3.63 4.32 4.97 5.57 6.62 7.73 9.11
900# 0.46 0.46 0.72 0.78 0.97 1.38 1.70 2.16 2.44 2.76 3.08 3.50 4.19 4.92 5.66 6.35
1500# 0.55 0.55 0.90 0.97 1.20 1.70 2.12 2.67 2.99 3.40 3.77 4.28 5.15
2500# 0.74 0.74 1.20 1.29 1.56 2.25 2.81 3.54
Reference: Notes: The above man hours are calculated at 40% of the bolt up rate.
J S Page 5th Edition (1999) Pg84 Man hours are for each joint on valves, flanged fittings and spools. They do not include handling of valves, fittings or spools. The handling of bolts P8
eProcs Norm Group: 42050 or studs and gaskets is included.
Insert or Remove Spade <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm 700mm 750mm 900mm 1050mm 1200mm 1400mm 1800mm
150# 1.33 1.38 1.89 2.78 3.51 4.78 6.15 7.62 8.67 10.03 11.08 12.70 14.88 16.56 17.41 19.94 22.21 25.82 29.54 33.91
300# 1.49 1.69 2.20 3.25 4.09 5.56 6.93 8.67 9.92 11.44 12.74 14.58 17.06 19.91 22.70 25.28 29.10 33.19 37.98
600# 1.95 2.10 2.75 3.72 4.55 6.29 7.70 9.75 11.16 12.77 14.54 16.58 19.52 22.88 26.09 29.03 33.58 38.25 44.48
900# 2.11 2.26 3.10 4.04 5.03 6.93 8.51 10.72 12.28 14.06 15.99 18.19 21.45 24.98 28.50 31.77
1500# 2.53 2.68 3.83 4.93 6.24 8.61 10.81 13.59 15.72 18.26 20.75 23.92 28.38
2500# 3.28 3.48 4.80 6.21 7.52 10.84 13.32 17.15
Reference: Notes: The above man hour rates are calculated as Release Flange + Handle Valve x 50% + Bolt Up.
J S Page 5th Edition (1999) Pg83 & 84 P9
eProcs Norm Group: 42055
Install Blind Flange <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm 700mm 750mm 900mm 1050mm 1200mm 1400mm 1800mm
150# 0.90 0.93 1.22 1.81 2.28 3.12 4.01 4.98 5.65 6.54 7.19 8.25 9.72 10.84 11.40 13.08 14.59 17.05 19.60 22.54
300# 1.02 1.12 1.41 2.11 2.63 3.61 4.50 5.65 6.44 7.41 8.24 9.43 11.09 12.95 14.80 16.51 19.10 21.91 25.20
600# 1.29 1.36 1.65 2.38 2.89 4.04 4.96 6.29 7.16 8.18 9.27 10.57 12.49 14.68 16.77 18.69 21.76 24.92 29.07
900# 1.40 1.47 1.88 2.61 3.24 4.50 5.53 6.98 7.97 9.10 10.31 11.71 13.86 16.18 18.49 20.65
1500# 1.68 1.76 2.32 3.19 4.02 5.58 6.99 8.79 10.10 11.68 13.20 15.17 18.06
2500# 2.19 2.29 2.95 4.07 4.94 7.11 8.76 11.23
Reference: Notes: The above man hour rates are calculated as Handle Valve x 25% + Bolt Up.
J S Page 5th Edition (1999) Pg83 & 84 P10
eProcs Norm Group: 42060
Handle Valve <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm 700mm 750mm 900mm 1050mm 1200mm 1400mm 1800mm
150# 0.40 0.50 1.20 1.70 2.20 2.80 3.60 4.30 5.10 5.90 6.70 7.70 8.50 9.30 9.70 10.90 11.90 13.00 14.00 15.66
300# 0.40 0.80 1.50 2.00 2.70 3.40 4.20 5.10 6.00 7.10 8.10 9.20 10.30 11.80 13.20 14.50 15.70 16.80 18.00
600# 1.00 1.30 2.00 2.60 3.30 4.20 5.10 6.30 7.50 8.80 10.40 11.90 13.60 15.50 17.40 19.10 20.80 22.40 25.20
900# 1.00 1.30 2.00 2.60 3.30 4.20 5.10 6.30 7.50 8.80 10.40 11.90 13.60 15.50 17.40 19.10
1500# 1.20 1.50 2.40 3.10 4.10 5.30 6.80 8.50 10.50 12.70 15.10 17.90 20.70
2500# 1.40 1.80 2.60 3.40 4.10 5.90 7.00 9.50 11.40 13.00 15.80 18.40 21.50
Reference: Notes: Man hours include for handling screwed, flanged and welded valves. No Manhours for welds, making-on or bolt up included.
J S Page 5th Edition (1999) Pg83 P11a
eProcs Norm Group: 42065
Install Bolted Valve <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm 700mm 750mm 900mm 1050mm 1200mm 1400mm 1800mm
150# 2.01 2.11 3.04 4.46 5.65 7.63 9.81 12.12 13.84 16.02 17.74 20.35 23.68 26.32 27.64 31.60 35.13 40.60 46.20 52.92
300# 2.24 2.64 3.57 5.22 6.61 8.92 11.10 13.84 15.89 18.37 20.52 23.46 27.32 31.81 36.20 40.26 46.06 52.22 59.40
600# 3.07 3.37 4.30 6.05 7.44 10.18 12.46 15.73 18.08 20.76 23.74 27.08 31.77 37.12 42.24 46.93 53.92 61.04 70.74
900# 3.30 3.60 4.76 6.51 8.13 11.10 13.61 17.11 19.69 22.60 25.81 29.38 34.53 40.11 45.69 50.84
1500# 3.96 4.26 5.85 7.93 10.08 13.81 17.38 21.84 25.45 29.72 33.96 39.29 46.46
2500# 5.08 5.48 7.20 9.84 11.92 17.17 21.03 27.21
Reference: Notes: The above man hours are calculated as Handle Valve + Bolt Up x2.
J S Page 5th Edition (1999) Pg83 & 84 P11b
eProcs Norm Group: 42070
Remove Bolted Valve <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm 700mm 750mm 900mm 1050mm 1200mm 1400mm 1800mm
150# 1.04 1.14 1.94 2.80 3.58 4.73 6.08 7.43 8.60 9.95 11.12 12.76 14.57 16.11 16.88 19.18 21.19 24.04 26.88 30.56
300# 1.14 1.54 2.33 3.29 4.26 5.61 6.96 8.60 9.96 11.61 13.07 14.90 17.11 19.80 22.40 24.80 27.84 30.97 34.56
600# 1.83 2.13 3.20 3.98 4.96 6.59 8.04 10.07 11.73 13.58 15.74 17.97 20.87 24.15 27.34 30.23 34.05 37.86 43.42
900# 1.92 2.22 3.44 4.16 5.23 6.96 8.50 10.62 12.38 14.32 16.56 18.89 21.97 25.34 28.72 31.80
1500# 2.30 2.60 4.20 5.03 6.49 8.70 11.03 13.84 16.48 19.51 22.64 26.46 31.00
2500# 2.87 3.27 5.00 5.98 7.23 10.41 12.61 16.58
Reference: Notes: The above man hours are calculated as Release Flange x2 + Handle Valve.
J S Page 5th Edition (1999) Pg83 & 84 Remove Valve rate does not include for Installation of Blind Flanges. P11c
eProcs Norm Group: 42075
Replace Bolted Valve <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm 700mm 750mm 900mm 1050mm 1200mm 1400mm 1800mm
150# 3.05 3.25 4.98 7.26 9.23 12.36 15.89 19.55 22.44 25.97 28.86 33.11 38.25 42.43 44.52 50.78 56.32 64.64 73.08 83.48
300# 3.38 4.18 5.90 8.51 10.87 14.53 18.06 22.44 25.85 29.98 33.59 38.36 44.43 51.61 58.60 65.06 73.90 83.19 93.96
600# 4.90 5.50 7.50 10.03 12.40 16.77 20.50 25.80 29.81 34.34 39.48 45.05 52.64 61.27 69.58 77.16 87.97 98.90 114.16
900# 5.22 5.82 8.20 10.67 13.36 18.06 22.11 27.73 32.07 36.92 42.37 48.27 56.50 65.45 74.41 82.64
1500# 6.26 6.86 10.05 12.96 16.57 22.51 28.41 35.68 41.93 49.23 56.60 65.75 77.46
2500# 7.95 8.75 12.20 15.82 19.15 27.58 33.64 43.79
Reference: Notes: The above man hours are calculated as Release Flange x2 + Handle Valve x2 + Bolt Up x2.
J S Page 5th Edition (1999) Pg83 & 84 P11d
eProcs Norm Group: 42080
Thread Pipe <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
STD 0.20 0.20 0.30 0.42 0.70 0.97 1.38 1.53 2.07 2.37 2.95 3.54 5.18
XS 0.30 0.30 0.42 0.58 0.93 1.35 1.84 2.44 2.67 3.45 4.14 4.72 6.89
SCH 20 0.97 1.38 1.53 2.07 2.37 2.95 3.54 5.18
SCH 30 0.97 1.38 1.53 2.07 2.37 3.65 4.72 7.23
SCH 40 0.20 0.20 0.30 0.42 0.70 0.97 1.38 2.07 2.67 3.45 4.14 5.68 7.67
SCH 60 1.26 1.84 2.75 2.95 3.71 4.38 6.16 7.93
SCH 80 0.30 0.30 0.42 0.58 0.93 1.35 2.11 2.90 3.39 4.14 4.87 6.49 8.37
SCH 100 1.64 2.44 3.17 3.85 4.38 5.42
SCH 120 0.84 1.18 1.83 2.58 3.65 4.14 4.87
SCH 160 0.42 0.42 0.58 0.90 1.35 2.38 3.65 4.38
Make Screwed Joint <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
Fittings and Valves
Plain 0.30 0.30 0.40 0.50 0.70 0.90 1.10 1.20 1.30 1.40 1.50 1.60 1.70
Flanges
150# 1.20 1.20 1.40 1.70 2.10 2.50 3.10 3.70 4.50 5.40 6.50 7.70 11.00
300# 1.40 1.40 1.60 2.00 2.30 2.80 3.40 4.10 5.10 6.10 7.30 8.70 12.50
Reference: Notes: Man hours per connection only. For cutting, threading, field handling and erection, additional man hours are required.
J S Page 5th Edition (1999) Pg82 & 85 Screwed Flange Joint includes for; cutting, threading pipe and making on flange. P13
eProcs Norm Group: 42090
Olet Welds <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
90 Degrees
STD 5.80 7.80 10.60 14.00 17.40 19.40 27.20 38.00 42.40 50.20 59.40 71.40 105.60
XS 7.40 9.60 13.60 17.00 19.80 21.20 38.80 45.00 47.60 54.80 65.40 79.80 126.80
>XS 9.80 12.80 21.20 22.60 32.00 37.80 60.40 89.40 117.40 152.40 196.00 217.60 261.00
Other than 90 Degrees
STD 8.70 11.70 15.90 21.00 26.10 29.10 40.80 57.00 63.60 75.30 89.10 107.10 158.40
XS 11.10 14.40 20.40 25.50 29.70 31.80 58.20 67.50 71.40 82.20 98.10 119.70 190.20
>XS 14.70 19.20 31.80 33.90 48.00 56.70 90.60 134.10 176.10 228.60 294.00 326.40 391.50
Reference: Notes: The above hours reflect MMAW & GTAW welding with an allowance for inert gas purge, as per JS Page (base norm multiplied by 2).
J S Page 5th Edition (1999) Man hours are based on the outlet size and schedule except where the run schedule is greater than the outlet schedule, in which case the man P14
Page 108 hours are based on the outlet size and run schedule. The above hours include for cut into existing header & olet weld.
eProcs Norm Group: 42095 & 42100 For Dummy Olet - factor by 0.7.
Welding Slip On Flanges <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
150# 1.00 1.30 1.80 2.40 3.60 5.10 6.30 7.70 9.00 10.50 12.20 14.60 18.30
300# 1.30 1.40 2.10 2.60 3.90 5.40 6.80 8.30 10.00 11.30 13.50 16.00 20.10
600# 1.40 1.80 2.90 3.80 5.90 8.00 11.10 13.70 16.20 18.40 21.10 23.70 31.20
900# 1.80 2.40 3.60 4.80 7.20 9.90 12.50 15.30 17.70 20.10 23.70 27.50 34.80
1500# 2.10 2.70 4.00 5.40 8.10 11.00 14.00 17.20 19.80 22.40 26.60 30.80 38.90
2500# 2.30 3.00 4.40 5.90 8.90 12.00 15.50 19.00
Reference: Notes: Man hours include for fitting flange and manual welding front and back.
J S Page 5th Edition (1999) Pg88 P15
eProcs Norm Group: 42105
Branch Welds <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
90 Deg Unreinforced
STD 4.80 5.00 6.40 8.00 10.80 12.60 14.20 16.20 18.60 21.20 23.20 26.00 28.40
XS 5.20 6.20 8.80 11.20 15.00 17.80 20.60 23.60 27.20 30.40 32.60 36.60 39.60
SCH 20 12.60 14.20 16.20 18.60 21.20 23.20 26.00 28.40
SCH 30 12.60 14.20 16.20 18.60 21.20 30.20 36.60 42.40
SCH 40 4.80 5.00 6.40 8.00 10.80 12.60 14.20 19.80 23.20 30.40 38.20 44.60 55.40
SCH 60 16.60 20.60 26.20 32.00 40.40 50.80 65.20 83.40
SCH 80 5.20 6.20 8.80 11.20 15.00 17.80 25.20 34.00 45.40 53.60 60.20 70.80 92.00
SCH 100 24.00 32.80 47.00 57.80 73.00 88.20 102.00 129.60
SCH 120 14.00 21.80 30.40 42.20 57.40 69.20 82.80 98.00 111.80 139.40
SCH 160 8.00 10.60 13.20 17.20 27.80 43.00 65.60 78.40 95.80 110.60 138.40 155.40 181.80
Reference: Notes: The above hours reflect MMAW & GTAW welding with an allowance for inert gas purge, as per JS Page (base norm multiplied by 2).
J S Page 5th Edition (1999) Pg96 & 97 Wall thickness of the pipe used for the nozzle determines the man hours that will apply. P16a
eProcs Norm Group: 42110
Branch Welds <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
90 Deg Reinforced
STD 10.00 10.60 13.40 16.20 20.40 23.40 25.40 28.40 32.00 35.80 38.20 42.20 44.60
XS 10.80 11.80 15.80 20.00 25.60 29.00 32.60 36.60 41.40 46.40 47.60 53.20 55.40
SCH 20 23.40 25.40 28.40 32.00 35.80 38.20 42.20 44.60
SCH 30 23.40 25.40 28.40 32.00 35.80 44.20 52.80 60.60
SCH 40 10.00 10.60 13.40 16.20 20.40 23.40 25.40 30.60 35.60 45.60 60.00 64.60 73.00
SCH 60 26.80 32.60 40.60 48.60 60.20 74.80 94.40 105.00
SCH 80 10.80 11.80 15.80 20.00 25.60 29.00 40.40 52.60 69.00 80.20 90.00 111.00 119.00
SCH 100 39.60 52.00 71.00 88.00 109.60 119.00 127.60 144.80
SCH 120 25.00 37.00 49.00 62.00 79.00 93.60 115.00 123.80 147.60 171.40
SCH 160 15.40 19.80 24.00 30.60 46.20 65.60 78.20 95.40 121.20 140.00 175.20 196.80 230.00
Reference: Notes: The above hours reflect MMAW & GTAW welding with an allowance for inert gas purge, as per JS Page (base norm multiplied by 2).
J S Page 5th Edition (1999) Pg96 & 97 Wall thickness of the pipe used for the nozzle determines the man hours that will apply. P16b
eProcs Norm Group: 42115
Branch Welds cont <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
45 Deg Unreinforced
STD 6.40 6.60 8.80 11.00 14.20 17.20 19.20 21.80 24.80 28.40 31.00 34.20 37.60
XS 7.20 8.20 11.80 15.20 20.00 23.40 27.40 31.40 36.40 40.40 43.20 47.40 53.20
SCH 20 17.20 19.20 21.80 24.80 28.40 31.00 34.20 37.60
SCH 30 17.20 19.20 21.80 24.80 28.40 40.20 45.40 63.60
SCH 40 6.40 6.60 8.80 11.00 14.20 17.20 19.20 26.00 30.60 40.40 51.00 59.20 71.00
SCH 60 22.20 27.40 35.00 42.80 53.60 68.60 86.60 96.00
SCH 80 7.20 8.20 11.80 15.20 20.00 23.40 33.20 45.80 60.20 70.60 81.20 93.80 110.00
SCH 100 31.80 43.60 48.40 76.80 97.40 118.20 136.60 173.60
SCH 120 18.80 29.00 40.20 56.20 77.20 91.80 109.60 131.40 149.80 186.80
SCH 160 10.80 14.20 17.80 22.80 36.80 57.20 87.40 104.40 128.40 148.20 185.40 208.20 243.60
Reference: Notes: The above hours reflect MMAW & GTAW welding with an allowance for inert gas purge, as per JS Page (base norm multiplied by 2).
J S Page 5th Edition (1999) Pg 99 & 100 Wall thickness of the pipe used for the nozzle determines the man hours that will apply. P16c
eProcs Norm Group: 42120
Branch Welds cont <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
45 Deg Reinforced
STD 13.60 13.80 17.40 22.40 27.60 31.60 34.60 38.40 42.00 47.40 51.00 56.40 59.00
XS 14.20 15.40 21.00 27.00 34.20 43.20 43.40 48.60 55.20 60.40 63.20 71.20 76.80
SCH 20 31.60 34.60 38.40 42.00 47.40 51.00 56.40 59.00
SCH 30 31.60 34.60 38.40 42.00 47.40 58.80 71.20 77.40
SCH 40 13.60 13.80 17.40 22.40 27.60 31.60 34.60 41.00 46.80 60.40 74.80 86.80 102.20
SCH 60 36.20 43.40 54.20 65.20 80.20 100.40 125.80 142.40
SCH 80 14.20 15.40 21.00 27.00 34.20 43.20 52.00 70.80 91.80 105.80 119.00 142.60 153.60
SCH 100 52.80 64.20 91.40 105.20 131.40 159.40 171.00 194.20
SCH 120 65.60 89.00 103.40 124.40 165.20 165.80 197.80 229.60
SCH 160 20.40 26.60 32.20 40.40 62.80 89.00 106.40 141.80 162.40 187.60 234.80 263.80 308.20
Reference: Notes: The above hours reflect MMAW & GTAW welding with an allowance for inert gas purge, as per JS Page (base norm multiplied by 2).
J S Page 5th Edition (1999) Pg 99 & 100 Wall thickness of the pipe used for the nozzle determines the man hours that will apply. P16d
eProcs Norm Group: 42125
Preheat Welds <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
Butt & Flange Welds
STD 0.20 0.20 0.50 0.60 0.80 0.90 1.30 1.50 1.90 2.20 2.60 3.10 3.70
XS 0.30 0.30 0.60 0.70 1.00 1.30 1.80 2.00 2.50 3.30 3.50 4.10 5.00
SCH 20 0.90 1.30 1.50 1.90 2.20 2.60 3.10 3.70
SCH 30 0.90 1.30 1.50 1.90 2.20 3.10 4.10 5.30
SCH 40 0.20 0.20 0.50 0.60 0.80 0.90 1.30 1.90 2.20 3.00 4.10 5.20 6.40
SCH 60 1.30 1.80 2.20 3.00 3.80 5.00 6.30 7.80
SCH 80 0.30 0.30 0.60 0.70 1.00 1.30 2.00 2.80 3.50 4.50 6.00 7.40 9.30
SCH 100 1.80 2.40 3.30 4.40 5.40 7.00 8.70 10.40
SCH 120 0.90 1.30 1.90 2.70 3.80 5.00 6.00 7.90 9.80 11.70
SCH 160 0.50 0.50 0.70 0.90 1.50 2.50 3.80 5.30 6.60 8.50 10.50 12.90 15.20
Preheat Welds cont <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
90 Deg Branch Unreinforced
STD 0.50 0.50 0.60 0.90 1.30 1.80 2.00 2.50 3.00 3.40 4.20 5.00 6.00
XS 0.60 0.60 0.90 1.00 1.80 2.10 2.70 3.30 3.80 4.60 5.50 6.50 7.80
SCH 20 1.70 2.00 2.50 3.00 3.40 4.20 5.00 6.00
SCH 30 1.70 2.00 2.50 3.00 3.40 4.80 6.50 8.50
SCH 40 0.50 0.50 0.60 0.90 1.30 1.70 2.00 2.80 3.50 4.60 6.30 8.30 10.30
SCH 60 2.00 2.70 3.50 4.60 5.90 7.90 10.10 12.50
SCH 80 0.60 0.60 0.90 1.00 1.80 2.10 3.10 4.50 5.90 7.20 9.60 11.80 15.10
SCH 100 2.70 3.80 5.20 6.60 8.50 10.50 13.70 16.50
SCH 120 1.40 2.00 3.10 4.50 6.00 7.80 9.80 12.70 15.60 18.90
SCH 160 0.70 0.70 1.00 1.70 2.40 4.10 5.90 8.30 10.50 13.70 17.00
Preheat Welds cont <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
90 Deg Branch Reinforced
STD 1.00 1.00 1.20 1.80 2.60 3.60 4.00 5.00 6.00 6.80 8.40 10.00 12.00
XS 1.20 1.20 1.80 2.00 3.60 4.20 5.40 6.60 7.60 9.20 11.00 13.00 15.60
SCH 20 3.40 4.00 5.00 6.00 6.80 8.40 10.00 12.00
SCH 30 3.40 4.00 5.00 6.00 6.80 9.60 13.00 17.00
SCH 40 1.00 1.00 1.20 1.80 2.60 3.40 4.00 5.60 7.00 9.20 12.60 16.60 20.60
SCH 60 4.00 5.40 7.00 9.20 11.80 15.80 20.20 25.00
SCH 80 1.20 1.20 1.80 2.00 3.60 4.20 6.20 9.00 11.80 14.40 19.20 23.60 30.20
SCH 100 5.40 7.60 10.40 13.20 17.00 21.00 27.40 33.00
SCH 120 2.80 4.00 6.20 9.00 12.00 15.60 19.60 25.40 31.20 37.80
SCH 160 1.40 1.40 2.00 3.40 4.80 8.20 11.80 16.60 21.00 27.40 34.00
Preheat Welds cont <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
45 Deg Branch Unreinforced
STD 0.75 0.75 0.90 1.35 1.95 2.70 3.00 3.75 4.50 5.10 6.30 7.50 9.00
XS 0.90 0.90 1.35 1.50 2.70 3.15 4.05 4.95 5.70 6.90 8.25 9.75 11.70
SCH 20 2.55 3.00 3.75 4.50 5.10 6.30 7.50 9.00
SCH 30 2.55 3.00 3.75 4.50 5.10 7.20 9.75 12.75
SCH 40 0.75 0.75 0.90 1.35 1.95 2.55 3.00 4.20 5.25 6.90 9.45 12.45 15.45
SCH 60 3.00 4.05 5.25 6.90 8.85 11.85 15.15 18.75
SCH 80 0.90 0.90 1.35 1.50 2.70 3.15 4.65 6.75 8.85 10.80 14.40 17.70 22.65
SCH 100 4.05 5.70 7.80 9.90 12.75 15.75 20.55 24.75
SCH 120 2.10 3.00 4.65 6.75 9.00 11.70 14.70 19.05 23.40 28.35
SCH 160 1.05 1.05 1.50 2.55 3.60 6.15 8.85 12.45 15.75 20.55 25.50
Preheat Welds cont <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
45 Deg Branch Reinforced
STD 1.25 1.25 1.50 2.25 3.25 4.50 5.00 6.25 7.50 8.50 10.50 12.50 15.00
XS 1.50 1.50 2.25 2.50 4.50 5.25 6.75 8.25 9.50 11.50 13.75 16.25 19.50
SCH 20 4.25 5.00 6.25 7.50 8.50 10.50 12.50 15.00
SCH 30 4.25 5.00 6.25 7.50 8.50 12.00 16.25 21.25
SCH 40 1.25 1.25 1.50 2.25 3.25 4.25 5.00 7.00 8.75 11.50 15.75 20.75 25.75
SCH 60 5.00 6.75 8.75 11.50 14.75 19.75 25.25 31.25
SCH 80 1.50 1.50 2.25 2.50 4.50 5.25 7.75 11.25 14.75 18.00 24.00 29.50 37.75
SCH 100 6.75 9.50 13.00 16.50 21.25 26.25 34.25 41.25
SCH 120 3.50 5.00 7.75 11.25 15.00 19.50 24.50 31.75 39.00 47.25
SCH 160 1.75 1.75 2.50 4.25 6.00 10.25 14.75 20.75 26.25 34.25 42.50
Hydrotesting <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm 700mm 750mm
1. Pressurisation & Curing of Leaks 0.35 0.35 0.50 0.50 0.50 0.80 0.80 0.80 1.40 1.40 1.40 1.40 2.00 2.00 2.00
Man hours Per Metre of Pipe
MH Ea
2. Postion Flush Pump 5.0
3. Flushing (Per Flush - Air) 4.0
4. Install Pressure Test Equip 7.0
5. Remove Test Equip & Drain 10.0
6. Calibrate Gauges 1.0
7. Holding under Pressure 1.0
Reference: Notes: Norms deemed to include for all operations necessary to test the pipework including installation & subsequent removal of testing & flushing pumps,
Shell Expro temporary non structural supports, bringing up to pressure, test duration, testing, flushing & draining.
EA/106 Rev2 NB: Norms for breaking flanges, bolt-ups, removal & reinstalling valves, taking down & re-erecting pipework to be calculated using the appropriate norm P18
Pressurisation & Curing - assume a minimum of 4hrs per test to a maximum of 24hrs.
eProcs Norm Group: 42155 For use of a flange tester, time for pressurisation & curing equivalent to 1m of the appropriate line size.
Pipe Supports <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
U Bolts 0.67 0.67 0.83 0.83 1.00 1.00 1.00 1.17 1.17 1.33 1.33 1.33 1.33
Girder Clips 1.00 1.00 1.17 1.17 1.33 1.33 1.33 1.33 1.50 1.50 1.67 1.67 1.67
Pipe Clamps 1.33 1.33 1.67 1.67 1.83 1.83 1.83 1.83 1.83 2.00 2.00 2.00 2.00
Straps 0.67 0.67 0.83 0.83 1.00 1.00 1.00 1.17 1.17 1.33 1.33 1.33 1.33
Rods 0.50 0.50 0.67 0.67 0.67 0.83 0.83 0.83 0.83 1.00 1.00 1.00 1.00
Pipe Shoes 1.33 1.33 1.67 1.67 2.00 2.00 2.00 2.33 2.33 2.67 2.67 2.67 2.67
Reference: Notes: Man hours include for selecting materials, and all fitting, erection and bolting required for installation. (This excludes drilling, welding and cutting; Refer to the relevant structural norms for thes man hour rates)
Shell Expro EA106 RevE The rates have been factored down from Offshore values. P19
eProcs Norm Group: 42205
Welding Humpy
2.4m x 2.1m x 2m 4.8m x 2.1m x 2m 6m x 2.1m x 2m
Measure Collect and Return Scaffold 12.00 12.00 12.00
Measure Collect and Return Tarping 6.00 6.00 6.00
Tarp Erect & Dismantle MH 5.16 8.24 9.85
Scaffold Frame Erect & Dismantle MH 3.48 5.23 6.97
Total Humpy Hours 26.64 31.47 34.82
Reference: Notes: Measure, Collect and Return covers the scaff and tarp components.
Karratha site experience A factor of 1.2 has been applied to the TW NZ standard norms for the complexities associated with manipulating and sealing the tarp P20
eProcs Norm Group: 42210
Machine Cut <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm 700mm 750mm 900mm 1050mm 1200mm 1400 1800
STD 0.23 0.23 0.33 0.46 0.74 1.02 1.43 1.55 2.17 2.43 3.06 3.70 5.61
XS 0.33 0.33 0.46 0.61 0.97 1.43 2.05 2.43 2.89 3.58 4.34 4.85 7.15
P1 1.02 1.43 1.55 2.17 2.43 3.06 3.70 5.61
SCH 30 1.02 1.43 1.55 2.17 2.43 3.58 4.98 7.53
SCH 40 0.23 0.23 0.33 0.46 0.74 1.02 1.43 1.92 2.55 3.58 4.34 5.36 7.91
SCH 60 1.30 2.05 2.89 3.20 3.96 4.85 5.75 8.30
SCH 80 0.33 0.33 0.46 0.61 0.97 1.43 2.20 3.04 3.70 4.21 5.11 6.13 8.56
SCH 100 1.69 2.43 3.29 3.96 4.73 5.75 6.76 9.32
SCH 120 0.84 1.25 1.92 2.76 3.83 4.34 5.11 6.13 7.15 10.34
SCH 160 0.46 0.46 0.61 0.92 1.40 2.53 3.83 4.54 5.36 6.51 8.04 9.44 13.14
8.75mmWT 10.34 10.98 14.81 20.80 29.87 37.33 47.99
12.5mmWT 12.89 13.92 17.74 23.75 31.41 39.24 50.45
31.25mmWT 16.22 17.10 20.80 26.17 34.47 43.07 55.37
Reference: Notes: As there are no tables for Cold Cut or Machine Cut (Fien saw, Grinder) in the Field the above rates are based upon Shop Machine Cut rates plus 15%.
J S Page 5th Edition (1999) Man hours are for cutting pipe with plain ends only and do not include bevelling, threading, etc. P1
Machine Bevel <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm 700mm 750mm 900mm 1050mm 1200mm 1400 1800
STD 0.35 0.35 0.41 0.45 0.53 0.72 1.05 1.12 1.54 1.73 2.17 2.62 3.98
XS 0.41 0.41 0.45 0.48 0.68 1.05 1.45 1.73 2.04 2.53 3.08 3.44 5.07
SCH 20 0.72 1.05 1.12 1.54 1.73 2.17 2.62 3.98
SCH 30 0.72 1.05 1.12 1.54 1.73 2.53 3.53 5.35
SCH 40 0.38 0.38 0.41 0.45 0.53 0.72 1.05 1.36 1.81 2.53 3.08 3.81 5.61
SCH 60 0.93 1.45 2.04 2.27 2.81 3.44 4.07 7.06
SCH 80 0.41 0.41 0.45 0.48 0.68 1.05 1.56 2.15 2.62 2.99 3.69 5.22 7.28
SCH 100 1.21 1.73 2.33 3.37 4.03 4.89 5.76 7.94
SCH 120 0.83 0.95 1.36 1.94 3.25 3.69 4.35 5.22 6.08 8.80
SCH 160 1.00 1.00 1.07 1.14 1.33 2.15 3.25 3.85 4.57 5.54 6.84 8.04 11.19
8.75mmWT 5.49 5.86 7.88 11.09 15.92 19.91 25.59
12.5mmWT 6.85 7.38 9.45 12.66 16.73 20.92 26.90
31.25mmWT 9.20 9.71 11.81 14.86 19.56 24.45 31.43
Reference: Notes: As there are no tables for Cold Bevel or Machine Bevel in the Field the above rates are based upon Shop Machine Bevel rates plus 15%.
J S Page 5th Edition (1999) Man hours are for bevelling only and do not include cutting or internal machining. P2
Clamshell Lathe <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm 700mm 750mm 800mm 900mm 1050mm 1200mm 1500mm
Cut or Cut and Bevel Carbon Steel Schedule 40 sizes which are not available as a standard pipe size have been shown as STD and are highlighted in Yellow
STD 4.09 5.41 6.01 15.52
Schedule 80 and 160 sizes which are not available as a standard pipe size have been shown as XS and are highlighted in Green
XS 4.32 4.60 5.06 5.71 6.33 15.95
SCH 30
SCH 40 1.81 1.86 1.91 1.98 2.06 2.61 3.22 3.84 4.99 5.62
SCH 60
SCH 80 1.86 1.96 2.03 2.16 2.32 2.89 3.80 4.63
SCH 100
SCH 120
SCH 160 1.96 2.14 2.31 2.59 2.89 3.80 5.04 6.32
Reference: Notes: Mechtech norms + 15%. Based on 2 competent operators on an unobstructed horizontal line.
Machtech tools Norm includes set up time based on weight of clamshell and "structural medium" installation norm factored to 50% for disassembly. Weight of clamsheel derived from Hydratight clamshell charts. P2a
Additional factors to be applied for location, access, position (Vertical or horizontal), material or operator competence
Butt Weld <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm 700mm 750mm 900mm 1050mm 1200mm 1400 1800
STD 0.80 1.00 1.30 1.50 2.00 2.60 3.10 3.60 4.30 5.00 5.90 6.30 6.90
XS 0.90 1.00 1.40 1.80 2.50 3.30 4.00 4.70 5.70 6.60 7.70 8.40 10.10
SCH 20 2.60 3.10 3.60 4.30 5.00 5.90 6.30 6.90
SCH 30 2.60 3.10 3.60 4.30 5.00 6.80 8.40 11.10
SCH 40 0.80 1.00 1.30 1.50 2.00 2.60 3.10 4.10 5.00 6.60 8.60 9.40 13.30
SCH 60 3.00 4.00 5.20 6.80 8.40 11.20 13.80 20.10
SCH 80 0.90 1.00 1.40 1.80 2.50 3.30 5.10 6.60 9.60 12.40 16.40 19.50 25.20
SCH 100 4.60 6.80 9.90 13.20 19.50 21.80 26.00 35.80
SCH 120 2.80 3.80 6.00 9.40 12.20 16.20 20.70 25.60 31.90 43.50
SCH 160 1.30 1.60 2.10 3.00 4.90 8.60 13.10 17.90 22.70 27.70 33.70 40.80 59.30
8.75mmWT 10.00 12.50 23.00 36.90 54.50 69.00 88.71
12.5mmWT 13.10 15.20 24.70 40.40 59.90 76.20 97.97
31.25mmWT 29.30 31.70 45.20 68.80 90.90 109.50 140.79
Reference: Notes: The above hours reflect MMAW welding with no allowance for GTAW root and hot pass or inert gas purge. Wall thickness greater than 19.1mm will require Stress Relieving.
J S Page 5th Edition (1999) There is no allowance within these norms for Permit's, JSA's or QA/QC for inter pass temperatures and welding parametre monitoring. P3a
Page 93 The above hours do not include the erection of humpies or the fire watchers required inside & outside the humpy during hot work.
Bevel + Butt Weld <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm 700mm 750mm 900mm 1050mm 1200mm 1400 1800
STD 1.15 1.35 1.71 1.95 2.53 3.32 4.15 4.72 5.84 6.73 8.07 8.92 10.88
XS 1.31 1.41 1.85 2.28 3.18 4.35 5.45 6.43 7.74 9.13 10.78 11.84 15.17
SCH 20 3.32 4.15 4.72 5.84 6.73 8.07 8.92 10.88
SCH 30 3.32 4.15 4.72 5.84 6.73 9.33 11.93 16.45
SCH 40 1.18 1.38 1.71 1.95 2.53 3.32 4.15 5.46 6.81 9.13 11.68 13.21 18.91
SCH 60 3.93 5.45 7.24 9.07 11.21 14.64 17.87 27.16
SCH 80 1.31 1.41 1.85 2.28 3.18 4.35 6.66 8.75 12.22 15.39 20.09 24.72 32.48
SCH 100 5.81 8.53 12.23 16.57 23.53 26.69 31.76 43.74
SCH 120 3.63 4.75 7.36 11.34 15.45 19.89 25.05 30.82 37.98 52.30
SCH 160 2.30 2.60 3.17 4.14 6.23 10.75 16.35 21.75 27.27 33.24 40.54 48.84 70.49
8.75mmWT 15.49 18.37 30.88 47.99 70.42 88.91 114.31
12.5mmWT 19.95 22.58 34.15 53.06 76.63 97.12 124.87
31.25mmWT 38.50 41.41 57.01 83.66 110.46 133.95 172.22
Cut + Bevel + Butt Weld <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm 700mm 750mm 900mm 1050mm 1200mm 1400 1800
STD 1.38 1.58 2.04 2.41 3.27 4.34 5.58 6.27 8.01 9.16 11.13 12.62 16.49
XS 1.64 1.74 2.31 2.89 4.15 5.78 7.50 8.86 10.63 12.71 15.12 16.69 22.32
SCH 20 4.34 5.58 6.27 8.01 9.16 11.13 12.62 16.49
SCH 30 4.34 5.58 6.27 8.01 9.16 12.91 16.91 23.98
SCH 40 1.41 1.61 2.04 2.41 3.27 4.34 5.58 7.38 9.36 12.71 16.02 18.57 26.82
SCH 60 5.23 7.50 10.13 12.27 15.17 19.49 23.62 35.46
SCH 80 1.64 1.74 2.31 2.89 4.15 5.78 8.86 11.79 15.92 19.60 25.20 30.85 41.04
SCH 100 7.50 10.96 15.52 20.53 28.26 32.44 38.52 53.06
SCH 120 4.47 6.00 9.28 14.10 19.28 24.23 30.16 36.95 45.13 62.64
SCH 160 2.76 3.06 3.78 5.06 7.63 13.28 20.18 26.29 32.63 39.75 48.58 58.28 83.63
8.75mmWT 25.82 29.35 45.70 68.80 100.29 126.24 162.30
12.5mmWT 32.84 36.50 51.90 76.81 108.04 136.36 175.32
31.25mmWT 54.72 58.51 77.81 109.83 144.93 177.02 227.59
Erect Spools <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm 700mm 750mm 900mm 1050mm 1200mm 1400 1800
Man hours per m
SCH 10 to 60 1.05 1.12 1.28 1.35 1.54 1.87 2.36 2.89 3.31 4.17 4.86 5.71 6.36
SCH 80 to 100 1.21 1.31 1.57 1.71 2.10 2.66 3.28 4.04 4.79 5.61 6.43 7.28 8.23
SCH 120 to 160 1.48 1.61 1.94 2.17 2.76 3.25 4.53 5.54 6.59 7.68 8.83 9.97 11.25
<20mm WT 6.79 7.15 8.50 9.78 10.99 14.04 18.05
31.25mm WT 8.30 8.56 10.10 11.61 13.09 16.70 21.47
Reference: Notes: Man hours include handling and hauling from local storage yard, unloading and rigging and aligning in place. It does not include welding, bolt-ups,
J S Page 5th Edition (1999) make-ons or scaffolding. P4
Page 79
Erect Straight Pipe <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm 700mm 750mm 900mm 1050mm 1200mm 1400 1800
Man hours per m
SCH 10 to 60 0.62 0.66 0.75 0.82 0.92 1.12 1.41 1.71 2.10 2.46 2.89 3.38 3.77
SCH 80 to 100 0.72 0.79 0.92 1.02 1.25 1.57 1.97 2.40 2.85 3.35 3.84 4.33 4.89
SCH 120 to 160 0.89 0.95 1.15 1.28 1.64 2.13 2.69 3.28 3.90 4.56 5.25 5.94 6.69
<20mm WT 4.59 4.89 6.17 7.41 8.66 11.15 14.34
31.25mm WT 5.61 5.87 7.32 8.79 10.30 13.25 17.04
Reference: Notes: Man hours include all labour for unloading and storing in yard, loading and hauling to erection site and rigging and aligning in place. It does not
J S Page 5th Edition (1999) include welding, bolt-ups, make-ons or scaffolding. P5
Page 76
Remove Spools <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm 700mm 750mm 900mm 1050mm 1200mm 1400mm 1800mm
Man hours per m
SCH 10 to 60 0.63 0.67 0.77 0.81 0.92 1.12 1.42 1.73 1.99 2.50 2.92 3.43 3.82
SCH 80 to 100 0.73 0.79 0.94 1.03 1.26 1.60 1.97 2.42 2.87 3.37 3.86 4.37 4.94
SCH 120 to 160 0.89 0.97 1.16 1.30 1.66 1.95 2.72 3.32 3.95 4.61 5.30 5.98 6.75
<20mm WT 4.07 4.29 5.10 5.87 6.59 8.43 10.83
31.25mm WT 4.98 5.14 6.06 6.97 7.85 10.02 12.88
Bolt Up <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm 700mm 750mm 900mm 1050mm 1200mm 1400mm 1800mm
150# 0.80 0.80 0.92 1.38 1.72 2.42 3.11 3.91 4.37 5.06 5.52 6.32 7.59 8.51 8.97 10.35 11.61 13.80 16.10 18.63
300# 0.92 0.92 1.04 1.61 1.95 2.76 3.45 4.37 4.94 5.64 6.21 7.13 8.51 10.00 11.50 12.88 15.18 17.71 20.70
600# 1.04 1.04 1.15 1.72 2.07 2.99 3.68 4.71 5.29 5.98 6.67 7.59 9.08 10.81 12.42 13.92 16.56 19.32 22.77
900# 1.15 1.15 1.38 1.95 2.42 3.45 4.26 5.40 6.10 6.90 7.70 8.74 10.46 12.30 14.15 15.87
1500# 1.38 1.38 1.72 2.42 2.99 4.26 5.29 6.67 7.48 8.51 9.43 10.70 12.88
2500# 1.84 1.84 2.30 3.22 3.91 5.64 7.01 8.85
Reference: Notes: The above man hours do not include for Hydraulic torque tightening, Internal inspection, or any of the documentation required as part of the Flange checklist PNF-097.
J S Page 5th Edition (1999) Man hours are for each joint on valves, flanged fittings and spools. They do not include handling of valves, fittings or spools. The handling of bolts or studs and gaskets is included.
Page 84 Note 1: WEL Std W1000SM3131997 - Hydraulic Bolt Tensioning on bolt diameters 1 3/8" and greater, 150# 750nb and above, 300# 600nb and above,600# 350nb and above, 900# 200nb and above, 1500# 150nb and above and P7
2500# 100nb and above.
Release Flange <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm 700mm 750mm 900mm 1050mm 1200mm 1400mm 1800mm
150# 0.32 0.32 0.37 0.55 0.69 0.97 1.24 1.56 1.75 2.02 2.21 2.53 3.04 3.40 3.59 4.14 4.65 5.52 6.44 7.45
300# 0.37 0.37 0.41 0.64 0.78 1.10 1.38 1.75 1.98 2.25 2.48 2.85 3.40 4.00 4.60 5.15 6.07 7.08 8.28
600# 0.41 0.41 0.60 0.69 0.83 1.20 1.47 1.89 2.12 2.39 2.67 3.04 3.63 4.32 4.97 5.57 6.62 7.73 9.11
900# 0.46 0.46 0.72 0.78 0.97 1.38 1.70 2.16 2.44 2.76 3.08 3.50 4.19 4.92 5.66 6.35
1500# 0.55 0.55 0.90 0.97 1.20 1.70 2.12 2.67 2.99 3.40 3.77 4.28 5.15
2500# 0.74 0.74 1.20 1.29 1.56 2.25 2.81 3.54
Reference: Notes: The above man hours are calculated at 40% of the bolt up rate.
J S Page 5th Edition (1999) Man hours are for each joint on valves, flanged fittings and spools. They do not include handling of valves, fittings or spools. The handling of bolts P8
Page 84 or studs and gaskets is included.
Insert or Remove Spade <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm 700mm 750mm 900mm 1050mm 1200mm 1400mm 1800mm
150# 1.33 1.38 1.89 2.78 3.51 4.78 6.15 7.62 8.67 10.03 11.08 12.70 14.88 16.56 17.41 19.94 22.21 25.82 29.54 33.91
300# 1.49 1.69 2.20 3.25 4.09 5.56 6.93 8.67 9.92 11.44 12.74 14.58 17.06 19.91 22.70 25.28 29.10 33.19 37.98
600# 1.95 2.10 2.75 3.72 4.55 6.29 7.70 9.75 11.16 12.77 14.54 16.58 19.52 22.88 26.09 29.03 33.58 38.25 44.48
900# 2.11 2.26 3.10 4.04 5.03 6.93 8.51 10.72 12.28 14.06 15.99 18.19 21.45 24.98 28.50 31.77
1500# 2.53 2.68 3.83 4.93 6.24 8.61 10.81 13.59 15.72 18.26 20.75 23.92 28.38
2500# 3.28 3.48 4.80 6.21 7.52 10.84 13.32 17.15
Reference: Notes: The above man hour rates are calculated as Release Flange + Handle Valve x 50% + Bolt Up.
J S Page 5th Edition (1999) P9
Page 83 & 84
Install Blind Flange <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm 700mm 750mm 900mm 1050mm 1200mm 1400mm 1800mm
150# 0.90 0.93 1.22 1.81 2.28 3.12 4.01 4.98 5.65 6.54 7.19 8.25 9.72 10.84 11.40 13.08 14.59 17.05 19.60 22.54
300# 1.02 1.12 1.41 2.11 2.63 3.61 4.50 5.65 6.44 7.41 8.24 9.43 11.09 12.95 14.80 16.51 19.10 21.91 25.20
600# 1.29 1.36 1.65 2.38 2.89 4.04 4.96 6.29 7.16 8.18 9.27 10.57 12.49 14.68 16.77 18.69 21.76 24.92 29.07
900# 1.40 1.47 1.88 2.61 3.24 4.50 5.53 6.98 7.97 9.10 10.31 11.71 13.86 16.18 18.49 20.65
1500# 1.68 1.76 2.32 3.19 4.02 5.58 6.99 8.79 10.10 11.68 13.20 15.17 18.06
2500# 2.19 2.29 2.95 4.07 4.94 7.11 8.76 11.23
Reference: Notes: The above man hour rates are calculated as Handle Valve x 25% + Bolt Up.
J S Page 5th Edition (1999) P10
Page 83 & 84
Handle Valve <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm 700mm 750mm 900mm 1050mm 1200mm 1400mm 1800mm
150# 0.40 0.50 1.20 1.70 2.20 2.80 3.60 4.30 5.10 5.90 6.70 7.70 8.50 9.30 9.70 10.90 11.90 13.00 14.00 15.66
300# 0.40 0.80 1.50 2.00 2.70 3.40 4.20 5.10 6.00 7.10 8.10 9.20 10.30 11.80 13.20 14.50 15.70 16.80 18.00
600# 1.00 1.30 2.00 2.60 3.30 4.20 5.10 6.30 7.50 8.80 10.40 11.90 13.60 15.50 17.40 19.10 20.80 22.40 25.20
900# 1.00 1.30 2.00 2.60 3.30 4.20 5.10 6.30 7.50 8.80 10.40 11.90 13.60 15.50 17.40 19.10
1500# 1.20 1.50 2.40 3.10 4.10 5.30 6.80 8.50 10.50 12.70 15.10 17.90 20.70
2500# 1.40 1.80 2.60 3.40 4.10 5.90 7.00 9.50 11.40 13.00 15.80 18.40 21.50
Reference: Notes: Man hours include for handling screwed, flanged and welded valves. No Manhours for welds, making-on or bolt up included.
J S Page 5th Edition (1999) P11a
Page 83
Install Bolted Valve <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm 700mm 750mm 900mm 1050mm 1200mm 1400mm 1800mm
150# 2.01 2.11 3.04 4.46 5.65 7.63 9.81 12.12 13.84 16.02 17.74 20.35 23.68 26.32 27.64 31.60 35.13 40.60 46.20 52.92
300# 2.24 2.64 3.57 5.22 6.61 8.92 11.10 13.84 15.89 18.37 20.52 23.46 27.32 31.81 36.20 40.26 46.06 52.22 59.40
600# 3.07 3.37 4.30 6.05 7.44 10.18 12.46 15.73 18.08 20.76 23.74 27.08 31.77 37.12 42.24 46.93 53.92 61.04 70.74
900# 3.30 3.60 4.76 6.51 8.13 11.10 13.61 17.11 19.69 22.60 25.81 29.38 34.53 40.11 45.69 50.84
1500# 3.96 4.26 5.85 7.93 10.08 13.81 17.38 21.84 25.45 29.72 33.96 39.29 46.46
2500# 5.08 5.48 7.20 9.84 11.92 17.17 21.03 27.21
Reference: Notes: The above man hours are calculated as Handle Valve + Bolt Up x2.
J S Page 5th Edition (1999) P11b
Page 83 & 84
Remove Bolted Valve <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm 700mm 750mm 900mm 1050mm 1200mm 1400mm 1800mm
150# 1.04 1.14 1.94 2.80 3.58 4.73 6.08 7.43 8.60 9.95 11.12 12.76 14.57 16.11 16.88 19.18 21.19 24.04 26.88 30.56
300# 1.14 1.54 2.33 3.29 4.26 5.61 6.96 8.60 9.96 11.61 13.07 14.90 17.11 19.80 22.40 24.80 27.84 30.97 34.56
600# 1.83 2.13 3.20 3.98 4.96 6.59 8.04 10.07 11.73 13.58 15.74 17.97 20.87 24.15 27.34 30.23 34.05 37.86 43.42
900# 1.92 2.22 3.44 4.16 5.23 6.96 8.50 10.62 12.38 14.32 16.56 18.89 21.97 25.34 28.72 31.80
1500# 2.30 2.60 4.20 5.03 6.49 8.70 11.03 13.84 16.48 19.51 22.64 26.46 31.00
2500# 2.87 3.27 5.00 5.98 7.23 10.41 12.61 16.58
Reference: Notes: The above man hours are calculated as Release Flange x2 + Handle Valve.
J S Page 5th Edition (1999) Remove Valve rate does not include for Installation of Blind Flanges. P11c
Page 83 & 84
Replace Bolted Valve <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm 700mm 750mm 900mm 1050mm 1200mm 1400mm 1800mm
150# 3.05 3.25 4.98 7.26 9.23 12.36 15.89 19.55 22.44 25.97 28.86 33.11 38.25 42.43 44.52 50.78 56.32 64.64 73.08 83.48
300# 3.38 4.18 5.90 8.51 10.87 14.53 18.06 22.44 25.85 29.98 33.59 38.36 44.43 51.61 58.60 65.06 73.90 83.19 93.96
600# 4.90 5.50 7.50 10.03 12.40 16.77 20.50 25.80 29.81 34.34 39.48 45.05 52.64 61.27 69.58 77.16 87.97 98.90 114.16
900# 5.22 5.82 8.20 10.67 13.36 18.06 22.11 27.73 32.07 36.92 42.37 48.27 56.50 65.45 74.41 82.64
1500# 6.26 6.86 10.05 12.96 16.57 22.51 28.41 35.68 41.93 49.23 56.60 65.75 77.46
2500# 7.95 8.75 12.20 15.82 19.15 27.58 33.64 43.79
Reference: Notes: The above man hours are calculated as Release Flange x2 + Handle Valve x2 + Bolt Up x2.
J S Page 5th Edition (1999) P11d
Page 83 & 84
Thread Pipe <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
STD 0.20 0.20 0.30 0.42 0.70 0.97 1.38 1.53 2.07 2.37 2.95 3.54 5.18
XS 0.30 0.30 0.42 0.58 0.93 1.35 1.84 2.44 2.67 3.45 4.14 4.72 6.89
SCH 20 0.97 1.38 1.53 2.07 2.37 2.95 3.54 5.18
SCH 30 0.97 1.38 1.53 2.07 2.37 3.65 4.72 7.23
SCH 40 0.20 0.20 0.30 0.42 0.70 0.97 1.38 2.07 2.67 3.45 4.14 5.68 7.67
SCH 60 1.26 1.84 2.75 2.95 3.71 4.38 6.16 7.93
SCH 80 0.30 0.30 0.42 0.58 0.93 1.35 2.11 2.90 3.39 4.14 4.87 6.49 8.37
SCH 100 1.64 2.44 3.17 3.85 4.38 5.42
SCH 120 0.84 1.18 1.83 2.58 3.65 4.14 4.87
SCH 160 0.42 0.42 0.58 0.90 1.35 2.38 3.65 4.38
Make Screwed Joint <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
Fittings and Valves
Plain 0.30 0.30 0.40 0.50 0.70 0.90 1.10 1.20 1.30 1.40 1.50 1.60 1.70
Flanges
150# 1.20 1.20 1.40 1.70 2.10 2.50 3.10 3.70 4.50 5.40 6.50 7.70 11.00
300# 1.40 1.40 1.60 2.00 2.30 2.80 3.40 4.10 5.10 6.10 7.30 8.70 12.50
Reference: Notes: Man hours per connection only. For cutting, threading, field handling and erection, additional man hours are required.
J S Page 5th Edition (1999) Screwed Flange Joint includes for; cutting, threading pipe and making on flange. P13
Page 82 & 85
Olet Welds <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
90 Degrees
STD 2.90 3.90 5.30 7.00 8.70 9.70 13.60 19.00 21.20 25.10 29.70 35.70 52.80
XS 3.70 4.80 6.80 8.50 9.90 10.60 19.40 22.50 23.80 27.40 32.70 39.90 63.40
>XS 4.90 6.40 10.60 11.30 16.00 18.90 30.20 44.70 58.70 76.20 98.00 108.80 130.50
Other than 90 Degrees
STD 4.35 5.85 7.95 10.50 13.05 14.55 20.40 28.50 31.80 37.65 44.55 53.55 79.20
XS 5.55 7.20 10.20 12.75 14.85 15.90 29.10 33.75 35.70 41.10 49.05 59.85 95.10
>XS 7.35 9.60 15.90 16.95 24.00 28.35 45.30 67.05 88.05 114.30 147.00 163.20 195.75
Welding Slip On Flanges <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
150# 1.00 1.30 1.80 2.40 3.60 5.10 6.30 7.70 9.00 10.50 12.20 14.60 18.30
300# 1.30 1.40 2.10 2.60 3.90 5.40 6.80 8.30 10.00 11.30 13.50 16.00 20.10
600# 1.40 1.80 2.90 3.80 5.90 8.00 11.10 13.70 16.20 18.40 21.10 23.70 31.20
900# 1.80 2.40 3.60 4.80 7.20 9.90 12.50 15.30 17.70 20.10 23.70 27.50 34.80
1500# 2.10 2.70 4.00 5.40 8.10 11.00 14.00 17.20 19.80 22.40 26.60 30.80 38.90
2500# 2.30 3.00 4.40 5.90 8.90 12.00 15.50 19.00
Reference: Notes: Man hours include for fitting flange and manual welding front and back.
J S Page 5th Edition (1999) P15
Page 88
Branch Welds <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
90 Deg Unreinforced
STD 2.40 2.50 3.20 4.00 5.40 6.30 7.10 8.10 9.30 10.60 11.60 13.00 14.20
XS 2.60 3.10 4.40 5.60 7.50 8.90 10.30 11.80 13.60 15.20 16.30 18.30 19.80
SCH 20 6.30 7.10 8.10 9.30 10.60 11.60 13.00 14.20
SCH 30 6.30 7.10 8.10 9.30 10.60 15.10 18.30 21.20
SCH 40 2.40 2.50 3.20 4.00 5.40 6.30 7.10 9.90 11.60 15.20 19.10 22.30 27.70
SCH 60 8.30 10.30 13.10 16.00 20.20 25.40 32.60 41.70
SCH 80 2.60 3.10 4.40 5.60 7.50 8.90 12.60 17.00 22.70 26.80 30.10 35.40 46.00
SCH 100 12.00 16.40 23.50 28.90 36.50 44.10 51.00 64.80
SCH 120 7.00 10.90 15.20 21.10 28.70 34.60 41.40 49.00 55.90 69.70
SCH 160 4.00 5.30 6.60 8.60 13.90 21.50 32.80 39.20 47.90 55.30 69.20 77.70 90.90
Branch Welds <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
90 Deg Reinforced
STD 5.00 5.30 6.70 8.10 10.20 11.70 12.70 14.20 16.00 17.90 19.10 21.10 22.30
XS 5.40 5.90 7.90 10.00 12.80 14.50 16.30 18.30 20.70 23.20 23.80 26.60 27.70
SCH 20 11.70 12.70 14.20 16.00 17.90 19.10 21.10 22.30
SCH 30 11.70 12.70 14.20 16.00 17.90 22.10 26.40 30.30
SCH 40 5.00 5.30 6.70 8.10 10.20 11.70 12.70 15.30 17.80 22.80 30.00 32.30 36.50
SCH 60 13.40 16.30 20.30 24.30 30.10 37.40 47.20 52.50
SCH 80 5.40 5.90 7.90 10.00 12.80 14.50 20.20 26.30 34.50 40.10 45.00 55.50 59.50
SCH 100 19.80 26.00 35.50 44.00 54.80 59.50 63.80 72.40
SCH 120 12.50 18.50 24.50 31.00 39.50 46.80 57.50 61.90 73.80 85.70
SCH 160 7.70 9.90 12.00 15.30 23.10 32.80 39.10 47.70 60.60 70.00 87.60 98.40 115.00
Branch Welds cont <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
45 Deg Unreinforced
STD 3.20 3.30 4.40 5.50 7.10 8.60 9.60 10.90 12.40 14.20 15.50 17.10 18.80
XS 3.60 4.10 5.90 7.60 10.00 11.70 13.70 15.70 18.20 20.20 21.60 23.70 26.60
SCH 20 8.60 9.60 10.90 12.40 14.20 15.50 17.10 18.80
SCH 30 8.60 9.60 10.90 12.40 14.20 20.10 22.70 31.80
SCH 40 3.20 3.30 4.40 5.50 7.10 8.60 9.60 13.00 15.30 20.20 25.50 29.60 35.50
SCH 60 11.10 13.70 17.50 21.40 26.80 34.30 43.30 48.00
SCH 80 3.60 4.10 5.90 7.60 10.00 11.70 16.60 22.90 30.10 35.30 40.60 46.90 55.00
SCH 100 15.90 21.80 24.20 38.40 48.70 59.10 68.30 86.80
SCH 120 9.40 14.50 20.10 28.10 38.60 45.90 54.80 65.70 74.90 93.40
SCH 160 5.40 7.10 8.90 11.40 18.40 28.60 43.70 52.20 64.20 74.10 92.70 104.10 121.80
Branch Welds cont <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
45 Deg Reinforced
STD 6.80 6.90 8.70 11.20 13.80 15.80 17.30 19.20 21.00 23.70 25.50 28.20 29.50
XS 7.10 7.70 10.50 13.50 17.10 21.60 21.70 24.30 27.60 30.20 31.60 35.60 38.40
SCH 20 15.80 17.30 19.20 21.00 23.70 25.50 28.20 29.50
SCH 30 15.80 17.30 19.20 21.00 23.70 29.40 35.60 38.70
SCH 40 6.80 6.90 8.70 11.20 13.80 15.80 17.30 20.50 23.40 30.20 37.40 43.40 51.10
SCH 60 18.10 21.70 27.10 32.60 40.10 50.20 62.90 71.20
SCH 80 7.10 7.70 10.50 13.50 17.10 21.60 26.00 35.40 45.90 52.90 59.50 71.30 76.80
SCH 100 26.40 32.10 45.70 52.60 65.70 79.70 85.50 97.10
SCH 120 32.80 44.50 51.70 62.20 82.60 82.90 98.90 114.80
SCH 160 10.20 13.30 16.10 20.20 31.40 44.50 53.20 70.90 81.20 93.80 117.40 131.90 154.10
Preheat Welds <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
Butt & Flange Welds
STD 0.20 0.20 0.50 0.60 0.80 0.90 1.30 1.50 1.90 2.20 2.60 3.10 3.70
XS 0.30 0.30 0.60 0.70 1.00 1.30 1.80 2.00 2.50 3.30 3.50 4.10 5.00
SCH 20 0.90 1.30 1.50 1.90 2.20 2.60 3.10 3.70
SCH 30 0.90 1.30 1.50 1.90 2.20 3.10 4.10 5.30
SCH 40 0.20 0.20 0.50 0.60 0.80 0.90 1.30 1.90 2.20 3.00 4.10 5.20 6.40
SCH 60 1.30 1.80 2.20 3.00 3.80 5.00 6.30 7.80
SCH 80 0.30 0.30 0.60 0.70 1.00 1.30 2.00 2.80 3.50 4.50 6.00 7.40 9.30
SCH 100 1.80 2.40 3.30 4.40 5.40 7.00 8.70 10.40
SCH 120 0.90 1.30 1.90 2.70 3.80 5.00 6.00 7.90 9.80 11.70
SCH 160 0.50 0.50 0.70 0.90 1.50 2.50 3.80 5.30 6.60 8.50 10.50 12.90 15.20
Preheat Welds cont <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
90 Deg Branch Unreinforced
STD 0.50 0.50 0.60 0.90 1.30 1.80 2.00 2.50 3.00 3.40 4.20 5.00 6.00
XS 0.60 0.60 0.90 1.00 1.80 2.10 2.70 3.30 3.80 4.60 5.50 6.50 7.80
SCH 20 1.70 2.00 2.50 3.00 3.40 4.20 5.00 6.00
SCH 30 1.70 2.00 2.50 3.00 3.40 4.80 6.50 8.50
SCH 40 0.50 0.50 0.60 0.90 1.30 1.70 2.00 2.80 3.50 4.60 6.30 8.30 10.30
SCH 60 2.00 2.70 3.50 4.60 5.90 7.90 10.10 12.50
SCH 80 0.60 0.60 0.90 1.00 1.80 2.10 3.10 4.50 5.90 7.20 9.60 11.80 15.10
SCH 100 2.70 3.80 5.20 6.60 8.50 10.50 13.70 16.50
SCH 120 1.40 2.00 3.10 4.50 6.00 7.80 9.80 12.70 15.60 18.90
SCH 160 0.70 0.70 1.00 1.70 2.40 4.10 5.90 8.30 10.50 13.70 17.00
Preheat Welds cont <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
90 Deg Branch Reinforced
STD 1.00 1.00 1.20 1.80 2.60 3.60 4.00 5.00 6.00 6.80 8.40 10.00 12.00
XS 1.20 1.20 1.80 2.00 3.60 4.20 5.40 6.60 7.60 9.20 11.00 13.00 15.60
SCH 20 3.40 4.00 5.00 6.00 6.80 8.40 10.00 12.00
SCH 30 3.40 4.00 5.00 6.00 6.80 9.60 13.00 17.00
SCH 40 1.00 1.00 1.20 1.80 2.60 3.40 4.00 5.60 7.00 9.20 12.60 16.60 20.60
SCH 60 4.00 5.40 7.00 9.20 11.80 15.80 20.20 25.00
SCH 80 1.20 1.20 1.80 2.00 3.60 4.20 6.20 9.00 11.80 14.40 19.20 23.60 30.20
SCH 100 5.40 7.60 10.40 13.20 17.00 21.00 27.40 33.00
SCH 120 2.80 4.00 6.20 9.00 12.00 15.60 19.60 25.40 31.20 37.80
SCH 160 1.40 1.40 2.00 3.40 4.80 8.20 11.80 16.60 21.00 27.40 34.00
Preheat Welds cont <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
45 Deg Branch Unreinforced
STD 0.75 0.75 0.90 1.35 1.95 2.70 3.00 3.75 4.50 5.10 6.30 7.50 9.00
XS 0.90 0.90 1.35 1.50 2.70 3.15 4.05 4.95 5.70 6.90 8.25 9.75 11.70
SCH 20 2.55 3.00 3.75 4.50 5.10 6.30 7.50 9.00
SCH 30 2.55 3.00 3.75 4.50 5.10 7.20 9.75 12.75
SCH 40 0.75 0.75 0.90 1.35 1.95 2.55 3.00 4.20 5.25 6.90 9.45 12.45 15.45
SCH 60 3.00 4.05 5.25 6.90 8.85 11.85 15.15 18.75
SCH 80 0.90 0.90 1.35 1.50 2.70 3.15 4.65 6.75 8.85 10.80 14.40 17.70 22.65
SCH 100 4.05 5.70 7.80 9.90 12.75 15.75 20.55 24.75
SCH 120 2.10 3.00 4.65 6.75 9.00 11.70 14.70 19.05 23.40 28.35
SCH 160 1.05 1.05 1.50 2.55 3.60 6.15 8.85 12.45 15.75 20.55 25.50
Preheat Welds cont <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
45 Deg Branch Reinforced
STD 1.25 1.25 1.50 2.25 3.25 4.50 5.00 6.25 7.50 8.50 10.50 12.50 15.00
XS 1.50 1.50 2.25 2.50 4.50 5.25 6.75 8.25 9.50 11.50 13.75 16.25 19.50
SCH 20 4.25 5.00 6.25 7.50 8.50 10.50 12.50 15.00
SCH 30 4.25 5.00 6.25 7.50 8.50 12.00 16.25 21.25
SCH 40 1.25 1.25 1.50 2.25 3.25 4.25 5.00 7.00 8.75 11.50 15.75 20.75 25.75
SCH 60 5.00 6.75 8.75 11.50 14.75 19.75 25.25 31.25
SCH 80 1.50 1.50 2.25 2.50 4.50 5.25 7.75 11.25 14.75 18.00 24.00 29.50 37.75
SCH 100 6.75 9.50 13.00 16.50 21.25 26.25 34.25 41.25
SCH 120 3.50 5.00 7.75 11.25 15.00 19.50 24.50 31.75 39.00 47.25
SCH 160 1.75 1.75 2.50 4.25 6.00 10.25 14.75 20.75 26.25 34.25 42.50
Hydrotesting <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm 700mm 750mm
1. Pressurisation & Curing of Leaks 0.35 0.35 0.50 0.50 0.50 0.80 0.80 0.80 1.40 1.40 1.40 1.40 2.00 2.00 2.00
Man hours Per Metre of Pipe
MH Ea
2. Postion Flush Pump 5.0
3. Flushing (Per Flush - Air) 4.0
4. Install Pressure Test Equip 7.0
5. Remove Test Equip & Drain 10.0
6. Calibrate Gauges 1.0
7. Holding under Pressure 1.0
Reference: Notes: Norms deemed to include for all operations necessary to test the pipework including instalaltion & subsequent removal of testing & flushing pumps,
Shell Expro temporary non structural supports, bringing up to pressure, test duration, testing, flushing & draining.
EA/106 Rev2 Norms for breaking flanges, bolt-ups, removal & reinstalling valves, taking down & re-erecting pipework tobe calculated using the appropriate norm P18
Pressurisation & Curing - assume a minimum of 4hrs per test to a maximum of 24hrs.
For use of a flange tester, time for pressurisation & curing equivalent to 1m of the appropriate line size.
Pipe Supports <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
U Bolts 0.67 0.67 0.83 0.83 1.00 1.00 1.00 1.17 1.17 1.33 1.33 1.33 1.33
Girder Clips 1.00 1.00 1.17 1.17 1.33 1.33 1.33 1.33 1.50 1.50 1.67 1.67 1.67
Pipe Clamps 1.33 1.33 1.67 1.67 1.83 1.83 1.83 1.83 1.83 2.00 2.00 2.00 2.00
Straps 0.67 0.67 0.83 0.83 1.00 1.00 1.00 1.17 1.17 1.33 1.33 1.33 1.33
Rods 0.50 0.50 0.67 0.67 0.67 0.83 0.83 0.83 0.83 1.00 1.00 1.00 1.00
Pipe Shoes 1.33 1.33 1.67 1.67 2.00 2.00 2.00 2.33 2.33 2.67 2.67 2.67 2.67
Reference: Notes: Man hours include for selecting materials, and all fitting, erection and bolting required for installation. (This excludes drilling, welding and cutting; Refer to the relevant structural norms for thes man hour rates)
Shell Expro The rates have been factored down from Offshore values. P19
EA/106 Rev2
Welding Humpy
2.4m x 2.1m x 2m 4.8 x 2.1 x 2m 6 x 2.1 x 2m
Measure Collect and Return Scaffold 12.00 12.00 12.00
Measure Collect and Return Tarping 6.00 6.00 6.00
Tarp Erect & Dismantle MH 5.16 8.24 9.85
Scaffold Frame Erect & Dismantle MH 3.48 5.23 6.97
Total Humpy Hours 26.64 31.47 34.82
Reference: Notes: Measure, Collect and Return covers the scaff and tarp components.
Karratha site experience A factor of 1.2 has been applied to the TW NZ standard norms for the complexities associated with manipulating and sealing the tarp P20
<=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm 700mm 750mm 900mm 1050mm 1200mm 1400mm 1800mm
P1 COLD CUT 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20
P2 COLD BEVEL 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20
P3a BUTT WELD 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20
P3b BEVEL + BUTT WELD Use individual rates as ratios between Bevel and Butt Weld change with sizes
P3c CUT+BEVEL+BUTT WELD Use individual rates as ratios between Cut, Bevel and Butt Weld change with sizes
P4 ERECT SPOOLS 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
P5 ERECT STRAIGHT PIPE 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
P6 REMOVE SPOOLS 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
P7 BOLT UP 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
P8 RELEASE FLANGE 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
P9 INSERT OR REMOVE SPADE 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
P10 INSTALL BLIND FLANGE 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
P11a HANDLE VALVE 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
P11b INSTALL BOLTED VALVE 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
P11c REMOVE BOLTED VALVE 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
P11d REPLACE BOLTED VALVE 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
P12 THREAD PIPE 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
P13 MAKE SCREWED JOINT
Fittings and Valves 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Plain 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
P15 SLIP-ON FLANGE 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20
BRANCH WELDS
P16a 90 Deg Unreinforced 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20
P16b 90 Deg Reinforced 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20
P16c 45 Deg Unreinforced 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20
P16d 45 Deg Reinforced 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20
PREHEAT WELDS
P17a Butt & Flange Welds 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
P17b 90 Deg Branch Unreinforced 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
P17c 90 Deg Branch Reinforced 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
P17d 45 Deg Branch Unreinforced 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
P17e 45 Deg Branch Reinforced 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
P18 HYDROTESTING 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Reference: Notes: The above factors are to be applied to the 'Onshore Carbon Steel Piping Man Hour Rates' to give rates applicable to Stainless Steel types 304 and 316 grades
Shell EA106 Offshore norms piping items.
<=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm 700mm 750mm 900mm 1050mm 1200mm 1400mm 1800mm
P1 COLD CUT 1.32 1.32 1.35 1.38 1.43 1.48 1.54 1.58 1.62 1.67 1.75 1.83 1.93
P2 COLD BEVEL 1.32 1.32 1.35 1.38 1.43 1.48 1.54 1.58 1.62 1.67 1.75 1.83 1.93
P3a BUTT WELD 1.48 1.48 1.52 1.57 1.64 1.72 1.81 1.86 1.93 2.00 2.12 2.24 2.39
P3b BEVEL + BUTT WELD Use individual rates as ratios between Bevel and Butt Weld change with sizes
P3c CUT+BEVEL+BUTT WELD Use individual rates as ratios between Cut, Bevel and Butt Weld change with sizes
P4 ERECT SPOOLS 1.32 1.32 1.35 1.38 1.43 1.48 1.54 1.58 1.62 1.67 1.75 1.83 1.93 2.09 2.16 2.40 2.63
P5 ERECT STRAIGHT PIPE 1.32 1.32 1.35 1.38 1.43 1.48 1.54 1.58 1.62 1.67 1.75 1.83 1.93 2.09 2.16 2.40 2.63
P6 REMOVE SPOOLS 1.32 1.32 1.35 1.38 1.43 1.48 1.54 1.58 1.62 1.67 1.75 1.83 1.93 2.09 2.16 2.40 2.63
P7 BOLT UP 1.45 1.45 1.49 1.54 1.60 1.68 1.77 1.82 1.88 1.95 2.06 2.17 2.32 2.54 2.65 2.98 3.31
P8 RELEASE FLANGE 1.45 1.45 1.49 1.54 1.60 1.68 1.77 1.82 1.88 1.95 2.06 2.17 2.32 2.54 2.65 2.98 3.31
P9 INSERT OR REMOVE SPADE 1.45 1.45 1.49 1.54 1.60 1.68 1.77 1.82 1.88 1.95 2.06 2.17 2.32 2.54 2.65 2.98 3.31
P10 INSTALL BLIND FLANGE 1.45 1.45 1.49 1.54 1.60 1.68 1.77 1.82 1.88 1.95 2.06 2.17 2.32 2.54 2.65 2.98 3.31
P11a HANDLE VALVE 1.32 1.36 1.39 1.43 1.46 1.61 1.76 1.91 1.06 2.21 2.37 2.52 2.82 3.13 3.28 3.73 4.19
P11b INSTALL BOLTED VALVE Use individual rates as ratios between Handling Valves and Bolt Ups change with sizes
P11c REMOVE BOLTED VALVE Use individual rates as ratios between Handling Valves and Bolt Ups change with sizes
P11d REPLACE BOLTED VALVE Use individual rates as ratios between Handling Valves and Bolt Ups change with sizes
P12 THREAD PIPE 1.38 1.38 1.42 1.46 1.51 1.58 1.65 1.69
P13 MAKE SCREWED JOINT
Fittings and Valves 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Plain 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
P15 SLIP-ON FLANGE 1.48 1.48 1.52 1.57 1.64 1.72 1.81 1.86 1.93 2.00 2.12 2.24 2.39
BRANCH WELDS
P16a 90 Deg Unreinforced 1.48 1.48 1.52 1.57 1.64 1.72 1.81 1.86 1.93 2.00 2.12 2.24 2.39
P16b 90 Deg Reinforced 1.48 1.48 1.52 1.57 1.64 1.72 1.81 1.86 1.93 2.00 2.12 2.24 2.39
P16c 45 Deg Unreinforced 1.48 1.48 1.52 1.57 1.64 1.72 1.81 1.86 1.93 2.00 2.12 2.24 2.39
P16d 45 Deg Reinforced 1.48 1.48 1.52 1.57 1.64 1.72 1.81 1.86 1.93 2.00 2.12 2.24 2.39
PREHEAT WELDS
P17a Butt & Flange Welds 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
P17b 90 Deg Branch Unreinforced 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
P17c 90 Deg Branch Reinforced 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
P17d 45 Deg Branch Unreinforced 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
P17e 45 Deg Branch Reinforced 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
P18 HYDROTESTING 1.10 1.10 1.10 1.12 1.13 1.14 1.16 1.17 1.19 1.20 1.22 1.25 1.28
Reference: Notes: The above factors are to be applied to the 'Onshore Carbon Steel Piping Man Hour Rates' to give rates applicable to Stainless Steel types 304 and 316 grades
J S Page 4th Edition piping items.
006-009-PRM-003
39 of 101 878701304.xls
Rev 3
WOODS
A
IDE
U S T R A L I A N E N E R G Y
ONSHORE CARBON STEEL PIPING MAN-HOUR RATES
COLD CUT <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
STD 0.23 0.23 0.33 0.46 0.74 1.02 1.43 1.55 2.17 2.43 3.06 3.70 5.61
XS 0.33 0.33 0.46 0.61 0.97 1.43 2.05 2.43 2.89 3.58 4.34 4.85 7.15
SCH 20 1.02 1.43 1.55 2.17 2.43 3.06 3.70 5.61
SCH 30 1.02 1.43 1.55 2.17 2.43 3.58 4.98 7.53
SCH 40 0.23 0.23 0.33 0.46 0.74 1.02 1.43 1.92 2.55 3.58 4.34 5.36 7.91
SCH 60 1.30 2.05 2.89 3.20 3.96 4.85 5.75 8.30
SCH 80 0.33 0.33 0.46 0.61 0.97 1.43 2.20 3.04 3.70 4.21 5.11 6.13 8.56
SCH 100 1.69 2.43 3.29 3.96 4.73 5.75 6.76 9.32
SCH 120 0.84 1.25 1.92 2.76 3.83 4.34 5.11 6.13 7.15 10.34
SCH 160 0.46 0.46 0.61 0.92 1.40 2.53 3.83 4.54 5.36 6.51 8.04 9.44 13.14
Reference: Notes: As there are no tables for Cold Cut or Machine Cut in the Field the above rates are based upon Shop Flame Cut rates plus 15%. Rate
J S Page 4th Edition Man hours are for cutting pipe with plain ends only and do not include bevelling, threading, etc. Table
P1
COLD BEVEL <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
STD 0.35 0.35 0.41 0.45 0.53 0.72 1.05 1.12 1.54 1.73 2.17 2.62 3.98
XS 0.41 0.41 0.45 0.48 0.68 1.05 1.45 1.73 2.04 2.53 3.08 3.44 5.07
SCH 20 0.72 1.05 1.12 1.54 1.73 2.17 2.62 3.98
SCH 30 0.72 1.05 1.12 1.54 1.73 2.53 3.53 5.35
SCH 40 0.38 0.38 0.41 0.45 0.53 0.72 1.05 1.36 1.81 2.53 3.08 3.81 5.61
SCH 60 0.93 1.45 2.04 2.27 2.81 3.44 4.07 7.06
SCH 80 0.41 0.41 0.45 0.48 0.68 1.05 1.56 2.15 2.62 2.99 3.69 5.22 7.28
SCH 100 1.21 1.73 2.33 3.37 4.03 4.89 5.76 7.94
SCH 120 0.83 0.95 1.36 1.94 3.25 3.69 4.35 5.22 6.08 8.80
SCH 160 1.00 1.00 1.07 1.14 1.33 2.15 3.25 3.85 4.57 5.54 6.84 8.04 11.19
Reference: Notes: As there are no tables for Cold Bevel or Machine Bevel in the Field the above rates are based upon Shop Flame Bevel rates plus 15%. Rate
J S Page 4th Edition Man hours are for bevelling only and do not include cutting or internal machining. Table
BUTT WELD <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
STD 0.80 1.00 1.30 1.50 2.00 2.60 3.10 3.60 4.30 5.00 5.90 6.30 6.90
XS 0.90 1.00 1.40 1.80 2.50 3.30 4.00 4.70 5.70 6.60 7.70 8.40 10.10
SCH 20 2.60 3.10 3.60 4.30 5.00 5.90 6.30 6.90
SCH 30 2.60 3.10 3.60 4.30 5.00 6.80 8.40 11.10
SCH 40 0.80 1.00 1.30 1.50 2.00 2.60 3.10 4.10 5.00 6.60 8.60 9.40 13.30
SCH 60 3.00 4.00 5.20 6.80 8.40 11.20 13.80 20.10
SCH 80 0.90 1.00 1.40 1.80 2.50 3.30 5.10 6.60 9.60 12.40 16.40 19.50 25.20
SCH 100 4.60 6.80 9.90 13.20 19.50 21.80 26.00 35.80
SCH 120 2.80 3.80 6.00 9.40 12.20 16.20 20.70 25.60 31.90 43.50
SCH 160 1.30 1.60 2.10 3.00 4.90 8.60 13.10 17.90 22.70 27.70 33.70 40.80 59.30
Reference: Notes: The above hours reflect manual butt welding. Rate
J S Page 4th Edition Table
Page 93 P3a
BEVEL + BUTT WELD <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
STD 1.15 1.35 1.71 1.95 2.53 3.32 4.15 4.72 5.84 6.73 8.07 8.92 10.88
XS 1.31 1.41 1.85 2.28 3.18 4.35 5.45 6.43 7.74 9.13 10.78 11.84 15.17
SCH 20 3.32 4.15 4.72 5.84 6.73 8.07 8.92 10.88
SCH 30 3.32 4.15 4.72 5.84 6.73 9.33 11.93 16.45
SCH 40 1.18 1.38 1.71 1.95 2.53 3.32 4.15 5.46 6.81 9.13 11.68 13.21 18.91
SCH 60 3.93 5.45 7.24 9.07 11.21 14.64 17.87 27.16
SCH 80 1.31 1.41 1.85 2.28 3.18 4.35 6.66 8.75 12.22 15.39 20.09 24.72 32.48
SCH 100 5.81 8.53 12.23 16.57 23.53 26.69 31.76 43.74
SCH 120 3.63 4.75 7.36 11.34 15.45 19.89 25.05 30.82 37.98 52.30
SCH 160 2.30 2.60 3.17 4.14 6.23 10.75 16.35 21.75 27.27 33.24 40.54 48.84 70.49
Reference: Notes: The above hours reflect manual butt welding. Rate
J S Page 4th Edition The composite rates above are calculated by the addition of bevel rates to the butt weld rate. Table
Page 93 P3b
CUT+BEVEL+BUTT WELD <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
STD 1.38 1.58 2.04 2.41 3.27 4.34 5.58 6.27 8.01 9.16 11.13 12.62 16.49
XS 1.64 1.74 2.31 2.89 4.15 5.78 7.50 8.86 10.63 12.71 15.12 16.69 22.32
SCH 20 4.34 5.58 6.27 8.01 9.16 11.13 12.62 16.49
SCH 30 4.34 5.58 6.27 8.01 9.16 12.91 16.91 23.98
SCH 40 1.41 1.61 2.04 2.41 3.27 4.34 5.58 7.38 9.36 12.71 16.02 18.57 26.82
SCH 60 5.23 7.50 10.13 12.27 15.17 19.49 23.62 35.46
SCH 80 1.64 1.74 2.31 2.89 4.15 5.78 8.86 11.79 15.92 19.60 25.20 30.85 41.04
SCH 100 7.50 10.96 15.52 20.53 28.26 32.44 38.52 53.06
SCH 120 4.47 6.00 9.28 14.10 19.28 24.23 30.16 36.95 45.13 62.64
SCH 160 2.76 3.06 3.78 5.06 7.63 13.28 20.18 26.29 32.63 39.75 48.58 58.28 83.63
Reference: Notes: The above hours reflect manual butt welding. Rate
J S Page 4th Edition The composite rates above are calculated by the addition of the cut and bevel rates to the butt weld rate. Table
Page 93 P3c
ERECT SPOOLS <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
Man hours per m
SCH 10 to 60 1.05 1.12 1.28 1.35 1.54 1.87 2.36 2.89 3.31 4.17 4.86 5.71 6.36
SCH 80 to 100 1.21 1.31 1.57 1.71 2.10 2.66 3.28 4.04 4.79 5.61 6.43 7.28 8.23
SCH 120 to 160 1.48 1.61 1.94 2.17 2.76 3.25 4.53 5.54 6.59 7.68 8.83 9.97 11.25
Reference: Notes: Man hours include handling and hauling from storage yard, unloading and rigging and aligning in place. It does not include welding, bolt-ups, Rate
J S Page 4th Edition make-ons or scaffolding. Table
Page 79 P4
ERECT STRAIGHT PIPE <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
Man hours per m
SCH 10 to 60 0.62 0.66 0.75 0.82 0.92 1.12 1.41 1.71 2.10 2.46 2.89 3.38 3.77
SCH 80 to 100 0.72 0.79 0.92 1.02 1.25 1.57 1.97 2.40 2.85 3.35 3.84 4.33 4.89
SCH 120 to 160 0.89 0.95 1.15 1.28 1.64 2.13 2.69 3.28 3.90 4.56 5.25 5.94 6.69
Reference: Notes: Man hours include all labour for unloading and storing in yard, loading and hauling to erection site and rigging and aligning in place. It does not Rate
J S Page 4th Edition include welding bolt-ups, make-ons or scaffolding. Table
Page 76 P5
REMOVE SPOOLS <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
Man hours per m
SCH 10 to 60 0.63 0.67 0.77 0.81 0.92 1.12 1.42 1.73 1.99 2.50 2.92 3.43 3.82
SCH 80 to 100 0.73 0.79 0.94 1.03 1.26 1.60 1.97 2.42 2.87 3.37 3.86 4.37 4.94
SCH 120 to 160 0.89 0.97 1.16 1.30 1.66 1.95 2.72 3.32 3.95 4.61 5.30 5.98 6.75
Reference: Notes: Man hours calculated at 60% of Erect Spools rate. Rate
J S Page 4th Edition Table
Page 79 P6
BOLT UP <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
150# 1.05 1.05 1.20 1.65 2.25 3.15 4.05 5.10 5.70 6.60 7.20 8.25 9.90
300# 1.20 1.20 1.35 2.10 2.55 3.60 4.50 5.70 6.45 7.35 8.10 9.30 11.10
600# 1.35 1.35 1.50 2.25 2.70 3.90 4.80 6.15 6.90 7.80 8.70 9.90 11.85
900# 1.50 1.50 1.80 2.55 3.15 4.50 5.55 7.05 7.95 9.00 10.05 11.40 13.65
1500# 1.80 1.80 2.25 3.15 3.90 5.55 6.90 8.70 9.75 11.10 12.30 13.95 16.80
2500# 2.40 2.40 3.00 4.20 5.10 7.35 9.15 11.55
Reference: Notes: The above man hours have been increased by 50% above the book value to include for torque tightening. Rate
J S Page 4th Edition Man hours are for each joint on valves, flanged fittings and spools. They do not include handling of valves, fittings or spools. The handling of bolts Table
Page 84 or studs and gaskets is included. P7
RELEASE FLANGE <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
150# 0.42 0.42 0.48 0.66 0.90 1.26 1.62 2.04 2.28 2.64 2.88 3.30 3.96
300# 0.48 0.48 0.54 0.84 1.02 1.44 1.80 2.28 2.58 2.94 3.24 3.72 4.44
600# 0.54 0.54 0.60 0.90 1.08 1.56 1.92 2.46 2.76 3.12 3.48 3.96 4.74
900# 0.60 0.60 0.72 1.02 1.26 1.80 2.22 2.82 3.18 3.60 4.02 4.56 5.46
1500# 0.72 0.72 0.90 1.26 1.56 2.22 2.76 3.48 3.90 4.44 4.92 5.58 6.72
2500# 0.96 0.96 1.20 1.68 2.04 2.94 3.66 4.62
Reference: Notes: The above man hours are calculated at 40% of the bolt up rate. Rate
J S Page 4th Edition Man hours are for each joint on valves, flanged fittings and spools. They do not include handling of valves, fittings or spools. The handling of bolts Table
Page 84 or studs and gaskets is included. P8
INSERT OR REMOVE SPADE <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
150# 1.67 1.72 2.28 3.16 4.25 5.81 7.47 9.29 10.53 12.19 13.43 15.40 18.11
300# 1.88 2.08 2.64 3.94 4.92 6.74 8.40 10.53 12.03 13.84 15.39 17.62 20.69
600# 2.39 2.54 3.10 4.45 5.43 7.56 9.27 11.76 13.41 15.32 17.38 19.81 23.39
900# 2.60 2.75 3.52 4.87 6.06 8.40 10.32 13.02 14.88 17.00 19.27 21.91 25.91
1500# 3.12 3.27 4.35 5.96 7.51 10.42 13.06 16.43 18.90 21.89 24.77 28.48 33.87
2500# 4.06 4.26 5.50 7.58 9.19 13.24 16.31 20.92
Reference: Notes: The above man hour rates are calculated as Release Flange + Handle Valve x 50% + Bolt Up. Rate
J S Page 4th Edition Table
Page 83 & 84 P9
INSTALL BLIND FLANGE <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
150# 1.15 1.18 1.50 2.08 2.80 3.85 4.95 6.18 6.98 8.08 8.88 10.18 12.03
300# 1.30 1.40 1.73 2.60 3.23 4.45 5.55 6.98 7.95 9.13 10.13 11.60 13.68
600# 1.60 1.68 2.00 2.90 3.53 4.95 6.08 7.73 8.78 10.00 11.30 12.88 15.25
900# 1.75 1.83 2.30 3.20 3.98 5.55 6.83 8.63 9.83 11.20 12.65 14.38 17.05
1500# 2.10 2.18 2.85 3.93 4.93 6.88 8.60 10.83 12.38 14.28 16.08 18.43 21.98
2500# 2.75 2.85 3.65 5.05 6.13 8.83 10.90 13.93
Reference: Notes: The above man hour rates are calculated as Handle Valve x 25% + Bolt Up. Rate
J S Page 4th Edition Table
Page 83 & 84 P10
HANDLE VALVE <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
150# 0.40 0.50 1.20 1.70 2.20 2.80 3.60 4.30 5.10 5.90 6.70 7.70 8.50
300# 0.40 0.80 1.50 2.00 2.70 3.40 4.20 5.10 6.00 7.10 8.10 9.20 10.30
600# 1.00 1.30 2.00 2.60 3.30 4.20 5.10 6.30 7.50 8.80 10.40 11.90 13.60
900# 1.00 1.30 2.00 2.60 3.30 4.20 5.10 6.30 7.50 8.80 10.40 11.90 13.60
1500# 1.20 1.50 2.40 3.10 4.10 5.30 6.80 8.50 10.50 12.70 15.10 17.90 20.70
2500# 1.40 1.80 2.60 3.40 4.10 5.90 7.00 9.50 11.40 13.00 15.80 18.40 21.50
Reference: Notes: Man hours include for handling screwed, flanged and welded valves. No Manhours for welds, making-on or bolt up included. Rate
J S Page 4th Edition Table
Page 83 P11a
INSTALL BOLTED VALVE <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
150# 2.50 2.60 3.60 5.00 6.70 9.10 11.70 14.50 16.50 19.10 21.10 24.20 28.30
300# 2.80 3.20 4.20 6.20 7.80 10.60 13.20 16.50 18.90 21.80 24.30 27.80 32.50
600# 3.70 4.00 5.00 7.10 8.70 12.00 14.70 18.60 21.30 24.40 27.80 31.70 37.30
900# 4.00 4.30 5.60 7.70 9.60 13.20 16.20 20.40 23.40 26.80 30.50 34.70 40.90
1500# 4.80 5.10 6.90 9.40 11.90 16.40 20.60 25.90 30.00 34.90 39.70 45.80 54.30
2500# 6.20 6.60 8.60 11.80 14.30 20.60 25.30 32.60
Reference: Notes: The above man hours are calculated as Handle Valve + Bolt Up x2. Rate
J S Page 4th Edition Table
Page 83 & 84 P11b
REMOVE BOLTED VALVE <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
150# 1.24 1.34 2.16 3.02 4.00 5.32 6.84 8.38 9.66 11.18 12.46 14.30 16.42
300# 1.36 1.76 2.58 3.68 4.74 6.28 7.80 9.66 11.16 12.98 14.58 16.64 19.18
600# 2.08 2.38 3.20 4.40 5.46 7.32 8.94 11.22 13.02 15.04 17.36 19.82 23.08
900# 2.20 2.50 3.44 4.64 5.82 7.80 9.54 11.94 13.86 16.00 18.44 21.02 24.52
1500# 2.64 2.94 4.20 5.62 7.22 9.74 12.32 15.46 18.30 21.58 24.94 29.06 34.14
2500# 3.32 3.72 5.00 6.76 8.18 11.78 14.32 18.74
Reference: Notes: The above man hours are calculated as Release Flange x2 + Handle Valve. Rate
J S Page 4th Edition Remove Valve rate does not include for Installation of Blind Flanges. Table
Page 83 & 84 P11c
REPLACE BOLTED VALVE <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
150# 3.74 3.94 5.76 8.02 10.70 14.42 18.54 22.88 26.16 30.28 33.56 38.50 44.72
300# 4.16 4.96 6.78 9.88 12.54 16.88 21.00 26.16 30.06 34.78 38.88 44.44 51.68
600# 5.78 6.38 8.20 11.50 14.16 19.32 23.64 29.82 34.32 39.44 45.16 51.52 60.38
900# 6.20 6.80 9.04 12.34 15.42 21.00 25.74 32.34 37.26 42.80 48.94 55.72 65.42
1500# 7.44 8.04 11.10 15.02 19.12 26.14 32.92 41.36 48.30 56.48 64.64 74.86 88.44
2500# 9.52 10.32 13.60 18.56 22.48 32.38 39.62 51.34
Reference: Notes: The above man hours are calculated as Release Flange x2 + Handle Valve x2 + Bolt Up x2. Rate
J S Page 4th Edition Table
Page 83 & 84 P11d
THREAD PIPE <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
STD 0.20 0.20 0.30 0.42 0.70 0.97 1.38 1.53 2.07 2.37 2.95 3.54 5.18
XS 0.30 0.30 0.42 0.58 0.93 1.35 1.84 2.44 2.67 3.45 4.14 4.72 6.89
SCH 20 0.97 1.38 1.53 2.07 2.37 2.95 3.54 5.18
SCH 30 0.97 1.38 1.53 2.07 2.37 3.65 4.72 7.23
SCH 40 0.20 0.20 0.30 0.42 0.70 0.97 1.38 2.07 2.67 3.45 4.14 5.68 7.67
SCH 60 1.26 1.84 2.75 2.95 3.71 4.38 6.16 7.93
SCH 80 0.30 0.30 0.42 0.58 0.93 1.35 2.11 2.90 3.39 4.14 4.87 6.49 8.37
SCH 100 1.64 2.44 3.17 3.85 4.38 5.42
SCH 120 0.84 1.18 1.83 2.58 3.65 4.14 4.87
SCH 160 0.42 0.42 0.58 0.90 1.35 2.38 3.65 4.38
Reference: Notes: Thread Pipe rate includes for pipe cutting. Rate
J S Page 4th Edition Table
Page 114 P12
MAKE SCREWED JOINT <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
Fittings and Valves
Plain 0.30 0.30 0.40 0.50 0.70 0.90 1.10 1.20 1.30 1.40 1.50 1.60 1.70
Flanges
150# 1.20 1.20 1.40 1.70 2.10 2.50 3.10 3.70 4.50 5.40 6.50 7.70 11.00
300# 1.40 1.40 1.60 2.00 2.30 2.80 3.40 4.10 5.10 6.10 7.30 8.70 12.50
Reference: Notes: Man hours per connection only. For cutting, threading, field handling and erection, additional man hours are required. Rate
J S Page 4th Edition Screwed Flange Joint includes for; cutting, threading pipe and making on flange. Table
Page 82 & 85 P13
'OLET WELDS <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
90 Degrees
STD 2.90 3.90 5.30 7.00 8.70 9.70 13.60 19.00 21.20 25.10 29.70 35.70 52.80
XS 3.70 4.80 6.80 8.50 9.90 10.60 19.40 22.50 23.80 27.40 32.70 39.90 63.40
>XS 4.90 6.40 10.60 11.30 16.00 18.90 30.20 44.70 58.70 76.20 98.00 108.80 130.50
Other than 90 Degrees
STD 4.35 5.85 7.95 10.50 13.05 14.55 20.40 28.50 31.80 37.65 44.55 53.55 79.20
XS 5.55 7.20 10.20 12.75 14.85 15.90 29.10 33.75 35.70 41.10 49.05 59.85 95.10
>XS 7.35 9.60 15.90 16.95 24.00 28.35 45.30 67.05 88.05 114.30 147.00 163.20 195.75
Reference: Notes: Man hours include for cutting and welding. Rate
J S Page 4th Edition Man hours are based on the outlet size and schedule except where the run schedule is greater than the outlet schedule, in which case the man Table
Page 108 hours are based on the outlet size and run schedule. P14
SLIP-ON FLANGE <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
150# 1.00 1.30 1.80 2.40 3.60 5.10 6.30 7.70 9.00 10.50 12.20 14.60 18.30
300# 1.30 1.40 2.10 2.60 3.90 5.40 6.80 8.30 10.00 11.30 13.50 16.00 20.10
600# 1.40 1.80 2.90 3.80 5.90 8.00 11.10 13.70 16.20 18.40 21.10 23.70 31.20
900# 1.80 2.40 3.60 4.80 7.20 9.90 12.50 15.30 17.70 20.10 23.70 27.50 34.80
1500# 2.10 2.70 4.00 5.40 8.10 11.00 14.00 17.20 19.80 22.40 26.60 30.80 38.90
2500# 2.30 3.00 4.40 5.90 8.90 12.00 15.50 19.00
Reference: Notes: Man hours include for fitting flange and manual welding front and back. Rate
J S Page 4th Edition Table
Page 88 P15
BRANCH WELDS <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
90 Deg Unreinforced
STD 2.40 2.50 3.20 4.00 5.40 6.30 7.10 8.10 9.30 10.60 11.60 13.00 14.20
XS 2.60 3.10 4.40 5.60 7.50 8.90 10.30 11.80 13.60 15.20 16.30 18.30 19.80
SCH 20 6.30 7.10 8.10 9.30 10.60 11.60 13.00 14.20
SCH 30 6.30 7.10 8.10 9.30 10.60 15.10 18.30 21.20
SCH 40 2.40 2.50 3.20 4.00 5.40 6.30 7.10 9.90 11.60 15.20 19.10 22.30 27.70
SCH 60 8.30 10.30 13.10 16.00 20.20 25.40 32.60 41.70
SCH 80 2.60 3.10 4.40 5.60 7.50 8.90 12.60 17.00 22.70 26.80 30.10 35.40 46.00
SCH 100 12.00 16.40 23.50 28.90 36.50 44.10 51.00 64.80
SCH 120 7.00 10.90 15.20 21.10 28.70 34.60 41.40 49.00 55.90 69.70
SCH 160 4.00 5.30 6.60 8.60 13.90 21.50 32.80 39.20 47.90 55.30 69.20 77.70 90.90
Reference: Notes: Man hours include for cutting and welding. Rate
J S Page 4th Edition Wall thickness of the pipe used for the nozzle determines the man hours that will apply. Table
Page 96 and 97 P16a
BRANCH WELDS cont. <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
90 Deg Reinforced
STD 5.00 5.30 6.70 8.10 10.20 11.70 12.70 14.20 16.00 17.90 19.10 21.10 22.30
XS 5.40 5.90 7.90 10.00 12.80 14.50 16.30 18.30 20.70 23.20 23.80 26.60 27.70
SCH 20 11.70 12.70 14.20 16.00 17.90 19.10 21.10 22.30
SCH 30 11.70 12.70 14.20 16.00 17.90 22.10 26.40 30.30
SCH 40 5.00 5.30 6.70 8.10 10.20 11.70 12.70 15.30 17.80 22.80 30.00 32.30 36.50
SCH 60 13.40 16.30 20.30 24.30 30.10 37.40 47.20 52.50
SCH 80 5.40 5.90 7.90 10.00 12.80 14.50 20.20 26.30 34.50 40.10 45.00 55.50 59.50
SCH 100 19.80 26.00 35.50 44.00 54.80 59.50 63.80 72.40
SCH 120 12.50 18.50 24.50 31.00 39.50 46.80 57.50 61.90 73.80 85.70
SCH 160 7.70 9.90 12.00 15.30 23.10 32.80 39.10 47.70 60.60 70.00 87.60 98.40 115.00
Reference: Notes: Man hours include for cutting and welding. Rate
J S Page 4th Edition Wall thickness of the pipe used for the nozzle determines the man hours that will apply. Table
BRANCH WELDS cont. <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
45 Deg Unreinforced
STD 3.20 3.30 4.40 5.50 7.10 8.60 9.60 10.90 12.40 14.20 15.50 17.10 18.80
XS 3.60 4.10 5.90 7.60 10.00 11.70 13.70 15.70 18.20 20.20 21.60 23.70 26.60
SCH 20 8.60 9.60 10.90 12.40 14.20 15.50 17.10 18.80
SCH 30 8.60 9.60 10.90 12.40 14.20 20.10 22.70 31.80
SCH 40 3.20 3.30 4.40 5.50 7.10 8.60 9.60 13.00 15.30 20.20 25.50 29.60 35.50
SCH 60 11.10 13.70 17.50 21.40 26.80 34.30 43.30 48.00
SCH 80 3.60 4.10 5.90 7.60 10.00 11.70 16.60 22.90 30.10 35.30 40.60 46.90 55.00
SCH 100 15.90 21.80 24.20 38.40 48.70 59.10 68.30 86.80
SCH 120 9.40 14.50 20.10 28.10 38.60 45.90 54.80 65.70 74.90 93.40
SCH 160 5.40 7.10 8.90 11.40 18.40 28.60 43.70 52.20 64.20 74.10 92.70 104.10 121.80
Reference: Notes: Man hours include for cutting and welding. Rate
J S Page 4th Edition Wall thickness of the pipe used for the nozzle determines the man hours that will apply. Table
Page 99 and 100 P16c
BRANCH WELDS cont. <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
45 Deg Reinforced
STD 6.80 6.90 8.70 11.20 13.80 15.80 17.30 19.20 21.00 23.70 25.50 28.20 29.50
XS 7.10 7.70 10.50 13.50 17.10 21.60 21.70 24.30 27.60 30.20 31.60 35.60 38.40
SCH 20 15.80 17.30 19.20 21.00 23.70 25.50 28.20 29.50
SCH 30 15.80 17.30 19.20 21.00 23.70 29.40 35.60 38.70
SCH 40 6.80 6.90 8.70 11.20 13.80 15.80 17.30 20.50 23.40 30.20 37.40 43.40 51.10
SCH 60 18.10 21.70 27.10 32.60 40.10 50.20 62.90 71.20
SCH 80 7.10 7.70 10.50 13.50 17.10 21.60 26.00 35.40 45.90 52.90 59.50 71.30 76.80
SCH 100 26.40 32.10 45.70 52.60 65.70 79.70 85.50 97.10
SCH 120 32.80 44.50 51.70 62.20 82.60 82.90 98.90 114.80
SCH 160 10.20 13.30 16.10 20.20 31.40 44.50 53.20 70.90 81.20 93.80 117.40 131.90 154.10
Reference: Notes: Man hours include for cutting and welding. Rate
J S Page 4th Edition Wall thickness of the pipe used for the nozzle determines the man hours that will apply. Table
PREHEAT WELDS <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
Butt & Flange Welds
STD 0.20 0.20 0.50 0.60 0.80 0.90 1.30 1.50 1.90 2.20 2.60 3.10 3.70
XS 0.30 0.30 0.60 0.70 1.00 1.30 1.80 2.00 2.50 3.30 3.50 4.10 5.00
SCH 20 0.90 1.30 1.50 1.90 2.20 2.60 3.10 3.70
SCH 30 0.90 1.30 1.50 1.90 2.20 3.10 4.10 5.30
SCH 40 0.20 0.20 0.50 0.60 0.80 0.90 1.30 1.90 2.20 3.00 4.10 5.20 6.40
SCH 60 1.30 1.80 2.20 3.00 3.80 5.00 6.30 7.80
SCH 80 0.30 0.30 0.60 0.70 1.00 1.30 2.00 2.80 3.50 4.50 6.00 7.40 9.30
SCH 100 1.80 2.40 3.30 4.40 5.40 7.00 8.70 10.40
SCH 120 0.90 1.30 1.90 2.70 3.80 5.00 6.00 7.90 9.80 11.70
SCH 160 0.50 0.50 0.70 0.90 1.50 2.50 3.80 5.30 6.60 8.50 10.50 12.90 15.20
PREHEAT WELDS cont. <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
90 Deg Branch Unreinforced
STD 0.50 0.50 0.60 0.90 1.30 1.80 2.00 2.50 3.00 3.40 4.20 5.00 6.00
XS 0.60 0.60 0.90 1.00 1.80 2.10 2.70 3.30 3.80 4.60 5.50 6.50 7.80
SCH 20 1.70 2.00 2.50 3.00 3.40 4.20 5.00 6.00
SCH 30 1.70 2.00 2.50 3.00 3.40 4.80 6.50 8.50
SCH 40 0.50 0.50 0.60 0.90 1.30 1.70 2.00 2.80 3.50 4.60 6.30 8.30 10.30
SCH 60 2.00 2.70 3.50 4.60 5.90 7.90 10.10 12.50
SCH 80 0.60 0.60 0.90 1.00 1.80 2.10 3.10 4.50 5.90 7.20 9.60 11.80 15.10
SCH 100 2.70 3.80 5.20 6.60 8.50 10.50 13.70 16.50
SCH 120 1.40 2.00 3.10 4.50 6.00 7.80 9.80 12.70 15.60 18.90
SCH 160 0.70 0.70 1.00 1.70 2.40 4.10 5.90 8.30 10.50 13.70 17.00
PREHEAT WELDS cont. <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
90 Deg Branch Reinforced
STD 1.00 1.00 1.20 1.80 2.60 3.60 4.00 5.00 6.00 6.80 8.40 10.00 12.00
XS 1.20 1.20 1.80 2.00 3.60 4.20 5.40 6.60 7.60 9.20 11.00 13.00 15.60
SCH 20 3.40 4.00 5.00 6.00 6.80 8.40 10.00 12.00
SCH 30 3.40 4.00 5.00 6.00 6.80 9.60 13.00 17.00
SCH 40 1.00 1.00 1.20 1.80 2.60 3.40 4.00 5.60 7.00 9.20 12.60 16.60 20.60
SCH 60 4.00 5.40 7.00 9.20 11.80 15.80 20.20 25.00
SCH 80 1.20 1.20 1.80 2.00 3.60 4.20 6.20 9.00 11.80 14.40 19.20 23.60 30.20
SCH 100 5.40 7.60 10.40 13.20 17.00 21.00 27.40 33.00
SCH 120 2.80 4.00 6.20 9.00 12.00 15.60 19.60 25.40 31.20 37.80
SCH 160 1.40 1.40 2.00 3.40 4.80 8.20 11.80 16.60 21.00 27.40 34.00
PREHEAT WELDS cont. <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
45 Deg Branch Unreinforced
STD 0.75 0.75 0.90 1.35 1.95 2.70 3.00 3.75 4.50 5.10 6.30 7.50 9.00
XS 0.90 0.90 1.35 1.50 2.70 3.15 4.05 4.95 5.70 6.90 8.25 9.75 11.70
SCH 20 2.55 3.00 3.75 4.50 5.10 6.30 7.50 9.00
SCH 30 2.55 3.00 3.75 4.50 5.10 7.20 9.75 12.75
SCH 40 0.75 0.75 0.90 1.35 1.95 2.55 3.00 4.20 5.25 6.90 9.45 12.45 15.45
SCH 60 3.00 4.05 5.25 6.90 8.85 11.85 15.15 18.75
SCH 80 0.90 0.90 1.35 1.50 2.70 3.15 4.65 6.75 8.85 10.80 14.40 17.70 22.65
SCH 100 4.05 5.70 7.80 9.90 12.75 15.75 20.55 24.75
SCH 120 2.10 3.00 4.65 6.75 9.00 11.70 14.70 19.05 23.40 28.35
SCH 160 1.05 1.05 1.50 2.55 3.60 6.15 8.85 12.45 15.75 20.55 25.50
PREHEAT WELDS cont. <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
45 Deg Branch Reinforced
STD 1.25 1.25 1.50 2.25 3.25 4.50 5.00 6.25 7.50 8.50 10.50 12.50 15.00
XS 1.50 1.50 2.25 2.50 4.50 5.25 6.75 8.25 9.50 11.50 13.75 16.25 19.50
SCH 20 4.25 5.00 6.25 7.50 8.50 10.50 12.50 15.00
SCH 30 4.25 5.00 6.25 7.50 8.50 12.00 16.25 21.25
SCH 40 1.25 1.25 1.50 2.25 3.25 4.25 5.00 7.00 8.75 11.50 15.75 20.75 25.75
SCH 60 5.00 6.75 8.75 11.50 14.75 19.75 25.25 31.25
SCH 80 1.50 1.50 2.25 2.50 4.50 5.25 7.75 11.25 14.75 18.00 24.00 29.50 37.75
SCH 100 6.75 9.50 13.00 16.50 21.25 26.25 34.25 41.25
SCH 120 3.50 5.00 7.75 11.25 15.00 19.50 24.50 31.75 39.00 47.25
SCH 160 1.75 1.75 2.50 4.25 6.00 10.25 14.75 20.75 26.25 34.25 42.50
HYDROTESTING <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
STD 0.46 0.46 0.56 0.66 0.82 0.89 1.02 1.12 1.25 1.44 1.67 1.87 2.49
XS 0.52 0.52 0.62 0.79 0.95 1.05 1.15 1.28 1.44 1.61 1.90 2.20 2.82
SCH 20 0.89 1.02 1.12 1.25 1.44 1.67 1.87 2.49
SCH 30 0.89 1.02 1.12 1.25 1.44 1.80 2.20 2.85
SCH 40 0.46 0.46 0.56 0.66 0.82 0.89 1.02 1.25 1.35 1.61 2.10 2.56 3.77
SCH 60 0.98 1.15 1.44 1.64 2.03 2.53 3.12 4.63
SCH 80 0.52 0.52 0.62 0.79 0.95 1.05 1.35 1.74 2.03 2.46 3.12 3.77 5.74
SCH 100 1.28 1.61 2.00 2.26 2.82 3.54 4.36 6.56
SCH 120 1.05 1.28 1.51 1.80 2.23 2.56 3.18 4.04 4.95 7.55
SCH 160 0.82 0.82 1.02 1.18 1.54 1.87 2.30 2.85 3.48 4.40 5.38 6.66 9.97
Reference: Notes: Man hours include for placing and removing blinds as required, opening and closing of valves, removal and replacement of valves, orifice plates,
J S Page 4th Edition expansion joints and short pieces of pipe as may be required. Also includes block up and block removal of spring and counterweight supported Rate
Page 132 lines, air purging of lines before hydro-test, soap testing and draining of lines after testing. Table
These rates assume individual segments or spools being tested separately. P18
PIPE SUPPORTS <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
U Bolts 0.67 0.67 0.83 0.83 1.00 1.00 1.00 1.17 1.17 1.33 1.33 1.33 1.33
Girder Clips 1.00 1.00 1.17 1.17 1.33 1.33 1.33 1.33 1.50 1.50 1.67 1.67 1.67
Pipe Clamps 1.33 1.33 1.67 1.67 1.83 1.83 1.83 1.83 1.83 2.00 2.00 2.00 2.00
Straps 0.67 0.67 0.83 0.83 1.00 1.00 1.00 1.17 1.17 1.33 1.33 1.33 1.33
Rods 0.50 0.50 0.67 0.67 0.67 0.83 0.83 0.83 0.83 1.00 1.00 1.00 1.00
Pipe Shoes 1.33 1.33 1.67 1.67 2.00 2.00 2.00 2.33 2.33 2.67 2.67 2.67 2.67
Reference: Notes: Man hours include for selecting materials and all drilling, bolting, welding and cutting required for installation. Rate
Shell Expro The rates have been factored down from Offshore values. Table
EA/106 Rev2 P19
WELDING HUMPY <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
Erect 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00
Dismantle 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00
Reference: Notes: Man hours include for all activities for the construction of a welding humpy on site and its subsequent dismantling. Rate
Karratha site experience Table
P20
COLD CUT <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
STD #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
XS #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 20 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 30 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 40 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 60 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 80 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 100 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 120 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 160 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Reference: Notes: As there are no tables for Cold Cut or Machine Cut in the Field the above rates are based upon Shop Flame Cut rates plus 15%. Rate
J S Page 4th Edition Man hours are for cutting pipe with plain ends only and do not include bevelling, threading, etc. Table
P1
COLD BEVEL <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
STD #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
XS #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 20 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 30 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 40 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 60 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 80 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 100 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 120 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 160 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Reference: Notes: As there are no tables for Cold Bevel or Machine Bevel in the Field the above rates are based upon Shop Flame Bevel rates plus 15%. Rate
J S Page 4th Edition Man hours are for bevelling only and do not include cutting or internal machining. Table
BUTT WELD <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
STD #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
XS #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 20 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 30 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 40 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 60 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 80 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 100 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 120 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 160 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Reference: Notes: The above hours reflect manual butt welding. Rate
J S Page 4th Edition Table
Page 93 P3a
BEVEL + BUTT WELD <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
STD #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
XS #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 20 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 30 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 40 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 60 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 80 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 100 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 120 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 160 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Reference: Notes: The above hours reflect manual butt welding. Rate
J S Page 4th Edition The composite rates above are calculated by the addition of bevel rates to the butt weld rate. Table
Page 93 P3b
CUT+BEVEL+BUTT WELD <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
STD #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
XS #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 20 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 30 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 40 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 60 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 80 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 100 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 120 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 160 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Reference: Notes: The above hours reflect manual butt welding. Rate
J S Page 4th Edition The composite rates above are calculated by the addition of the cut and bevel rates to the butt weld rate. Table
Page 93 P3c
ERECT SPOOLS <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
Man hours per m
SCH 10 to 60 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 80 to 100 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 120 to 160 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Reference: Notes: Man hours include handling and hauling from storage yard, unloading and rigging and aligning in place. It does not include welding, bolt-ups, Rate
J S Page 4th Edition make-ons or scaffolding. Table
Page 79 P4
ERECT STRAIGHT PIPE <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
Man hours per m
SCH 10 to 60 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 80 to 100 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 120 to 160 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Reference: Notes: Man hours include all labour for unloading and storing in yard, loading and hauling to erection site and rigging and aligning in place. It does not Rate
J S Page 4th Edition include welding bolt-ups, make-ons or scaffolding. Table
Page 76 P5
REMOVE SPOOLS <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
Man hours per m
SCH 10 to 60 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 80 to 100 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 120 to 160 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Reference: Notes: Man hours calculated at 60% of Erect Spools rate. Rate
J S Page 4th Edition Table
Page 79 P6
BOLT UP <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
150# #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
300# #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
600# #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
900# #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
1500# #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
2500# #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Reference: Notes: The above man hours have been increased by 50% above the book value to include for torque tightening. Rate
J S Page 4th Edition Man hours are for each joint on valves, flanged fittings and spools. They do not include handling of valves, fittings or spools. The handling of bolts Table
Page 84 or studs and gaskets is included. P7
RELEASE FLANGE <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
150# #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
300# #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
600# #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
900# #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
1500# #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
2500# #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Reference: Notes: The above man hours are calculated at 40% of the bolt up rate. Rate
J S Page 4th Edition Man hours are for each joint on valves, flanged fittings and spools. They do not include handling of valves, fittings or spools. The handling of bolts Table
Page 84 or studs and gaskets is included. P8
INSERT OR REMOVE SPADE <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
150# #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
300# #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
600# #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
900# #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
1500# #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
2500# #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Reference: Notes: The above man hour rates are calculated as Release Flange + Handle Valve x 50% + Bolt Up. Rate
J S Page 4th Edition Table
Page 83 & 84 P9
INSTALL BLIND FLANGE <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
150# #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
300# #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
600# #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
900# #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
1500# #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
2500# #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Reference: Notes: The above man hour rates are calculated as Handle Valve x 25% + Bolt Up. Rate
J S Page 4th Edition Table
Page 83 & 84 P10
HANDLE VALVE <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
150# #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
300# #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
600# #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
900# #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
1500# #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
2500# #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Reference: Notes: Man hours include for handling screwed, flanged and welded valves. No Manhours for welds, making-on or bolt up included. Rate
J S Page 4th Edition Table
Page 83 P11a
INSTALL BOLTED VALVE <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
150# #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
300# #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
600# #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
900# #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
1500# #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
2500# #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Reference: Notes: The above man hours are calculated as Handle Valve + Bolt Up x2. Rate
J S Page 4th Edition Table
Page 83 & 84 P11b
REMOVE BOLTED VALVE <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
150# #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
300# #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
600# #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
900# #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
1500# #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
2500# #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Reference: Notes: The above man hours are calculated as Release Flange x2 + Handle Valve. Rate
J S Page 4th Edition Remove Valve rate does not include for Installation of Blind Flanges. Table
Page 83 & 84 P11c
REPLACE BOLTED VALVE <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
150# #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
300# #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
600# #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
900# #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
1500# #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
2500# #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Reference: Notes: The above man hours are calculated as Release Flange x2 + Handle Valve x2 + Bolt Up x2. Rate
J S Page 4th Edition Table
Page 83 & 84 P11d
THREAD PIPE <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
STD #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
XS #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 20 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 30 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 40 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 60 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 80 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 100 #REF! #REF! #REF! #REF! #REF! #REF!
SCH 120 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 160 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Reference: Notes: Thread Pipe rate includes for pipe cutting. Rate
J S Page 4th Edition Table
Page 114 P12
MAKE SCREWED JOINT <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
Fittings and Valves
Plain #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Flanges
150# #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
300# #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Reference: Notes: Man hours per connection only. For cutting, threading, field handling and erection, additional man hours are required. Rate
J S Page 4th Edition Screwed Flange Joint includes for; cutting, threading pipe and making on flange. Table
Page 82 & 85 P13
'OLET WELDS <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
90 Degrees
STD #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
XS #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
>XS #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Other than 90 Degrees
STD #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
XS #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
>XS #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Reference: Notes: Man hours include for cutting and welding. Rate
J S Page 4th Edition Man hours are based on the outlet size and schedule except where the run schedule is greater than the outlet schedule, in which case the man Table
Page 108 hours are based on the outlet size and run schedule. P14
SLIP-ON FLANGE <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
150# #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
300# #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
600# #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
900# #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
1500# #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
2500# #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Reference: Notes: Man hours include for fitting flange and manual welding front and back. Rate
J S Page 4th Edition Table
Page 88 P15
BRANCH WELDS <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
90 Deg Unreinforced
STD #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
XS #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 20 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 30 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 40 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 60 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 80 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 100 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 120 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 160 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Reference: Notes: Man hours include for cutting and welding. Rate
J S Page 4th Edition Wall thickness of the pipe used for the nozzle determines the man hours that will apply. Table
Page 96 and 97 P16a
BRANCH WELDS cont. <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
90 Deg Reinforced
STD #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
XS #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 20 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 30 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 40 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 60 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 80 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 100 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 120 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 160 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Reference: Notes: Man hours include for cutting and welding. Rate
J S Page 4th Edition Wall thickness of the pipe used for the nozzle determines the man hours that will apply. Table
BRANCH WELDS cont. <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
45 Deg Unreinforced
STD #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
XS #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 20 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 30 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 40 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 60 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 80 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 100 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 120 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 160 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Reference: Notes: Man hours include for cutting and welding. Rate
J S Page 4th Edition Wall thickness of the pipe used for the nozzle determines the man hours that will apply. Table
Page 99 and 100 P16c
BRANCH WELDS cont. <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
45 Deg Reinforced
STD #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
XS #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 20 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 30 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 40 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 60 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 80 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 100 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 120 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 160 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Reference: Notes: Man hours include for cutting and welding. Rate
J S Page 4th Edition Wall thickness of the pipe used for the nozzle determines the man hours that will apply. Table
PREHEAT WELDS <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
Butt & Flange Welds
STD #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
XS #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 20 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 30 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 40 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 60 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 80 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 100 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 120 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 160 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
PREHEAT WELDS cont. <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
90 Deg Branch Unreinforced
STD #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
XS #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 20 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 30 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 40 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 60 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 80 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 100 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 120 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 160 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
PREHEAT WELDS cont. <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
90 Deg Branch Reinforced
STD #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
XS #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 20 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 30 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 40 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 60 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 80 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 100 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 120 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 160 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
PREHEAT WELDS cont. <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
45 Deg Branch Unreinforced
STD #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
XS #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 20 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 30 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 40 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 60 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 80 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 100 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 120 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 160 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
PREHEAT WELDS cont. <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
45 Deg Branch Reinforced
STD #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
XS #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 20 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 30 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 40 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 60 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 80 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 100 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 120 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 160 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
HYDROTESTING <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
STD #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
XS #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 20 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 30 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 40 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 60 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 80 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 100 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 120 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SCH 160 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Reference: Notes: Man hours include for placing and removing blinds as required, opening and closing of valves, removal and replacement of valves, orifice plates,
J S Page 4th Edition expansion joints and short pieces of pipe as may be required. Also includes block up and block removal of spring and counterweight supported Rate
Page 132 lines, air purging of lines before hydro-test, soap testing and draining of lines after testing. Table
These rates assume individual segments or spools being tested separately. P18
PIPE SUPPORTS <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
U Bolts #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Girder Clips #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Pipe Clamps #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Straps #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Rods #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Pipe Shoes #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Reference: Notes: Man hours include for selecting materials and all drilling, bolting, welding and cutting required for installation. Rate
Shell Expro The rates have been factored down from Offshore values. Table
EA/106 Rev2 P19
WELDING HUMPY <=40mm 50mm 80mm 100mm 150mm 200mm 250mm 300mm 350mm 400mm 450mm 500mm 600mm
Erect #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Dismantle #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Reference: Notes: Man hours include for all activities for the construction of a welding humpy on site and its subsequent dismantling. Rate
Karratha site experience Table
P20
SECTION NUMBER 7. OFFSHORE MINERAL WOOL INSULATION TO PIPEWORK, VESSELS & COLUMNS
I 1 FABRICATE AND ERECT MINERAL WOOL FIBRE, INCLUDING METAL CLADDING TO PIPEWORK,
I 2 FABRICATE AND ERECT MINERAL WOOL FIBRE, INCLUDING METAL CLADDING TO PIPEWORK, AND TO
94 95
85,86,87
80 81
122 123
127 128
130 131
76 77
Only under Shop Fabrication
WOODS
A
IDE
U S T R A L I A N E N E R G Y
ONSHORE CARBON STEEL PIPING MAN-HOUR RATES
<=40 50 80 100 150 200 250 300 350 400 450 500 600
FLAME CUT
STD 0.10 0.10 0.15 0.21 0.33 0.46 0.64 0.70 0.98 1.09 1.42 1.71 2.60
XS 0.15 0.15 0.21 0.28 0.45 0.64 0.92 1.09 1.30 1.61 2.01 2.24 3.30
SCH 20 0.46 0.64 0.70 0.98 1.09 1.42 1.71 2.60
SCH 30 0.46 0.64 0.70 0.98 1.09 1.65 2.30 3.48
SCH 40 0.10 0.10 0.15 0.21 0.33 0.46 0.64 0.86 1.15 1.61 2.01 2.48 3.66
SCH 60 0.59 0.92 1.30 1.44 1.78 2.24 2.66 3.84
SCH 80 0.15 0.15 0.21 0.29 0.45 0.64 0.99 1.37 1.67 1.90 2.36 2.83 3.95
SCH 100 0.76 1.09 1.48 1.78 2.13 2.66 3.13 4.31
SCH 120 0.38 0.56 0.86 1.24 1.73 1.96 2.30 2.83 3.30 4.78
SCH 160 0.21 0.21 0.28 0.41 0.63 1.14 1.73 2.05 2.42 2.93 3.72 4.37 6.08
FLAME BEVEL
STD 0.08 0.08 0.12 0.16 0.26 0.37 0.51 0.55 0.57 0.86 1.11 1.35 2.04
XS 0.12 0.12 0.16 0.22 0.35 0.51 0.72 0.86 1.02 1.27 1.58 1.77 2.60
SCH 20 0.37 0.51 0.55 0.77 0.86 1.11 1.35 2.04
SCH 30 0.37 0.51 0.55 0.77 0.86 1.30 1.82 2.74
SCH 40 0.08 0.08 0.12 0.16 0.26 0.37 0.51 0.68 0.91 1.27 1.58 1.95 2.88
SCH 60 0.46 0.72 1.02 1.13 1.40 1.77 2.15
SCH 80 0.12 0.12 0.16 0.22 0.35 0.51 0.78 1.08 1.31 1.55
SCH 100 0.60 0.86 1.18
SCH 120 0.30 0.45 0.68 0.95
SCH 160 0.16 0.16 0.22 0.32 0.49
MACHINE BEVEL
STD 0.35 0.35 0.41 0.45 0.53 0.72 1.05 1.12 1.54 1.73 2.17 2.62 3.98
XS 0.41 0.41 0.45 0.48 0.68 1.05 1.45 1.73 2.04 2.53 3.08 3.44 5.07
SCH 20 0.72 1.05 1.12 1.54 1.73 2.17 2.62 3.98
SCH 30 0.72 1.05 1.12 1.54 1.73 2.53 3.53 5.35
SCH 40 0.38 0.38 0.41 0.45 0.53 0.72 1.05 1.36 1.81 2.53 3.08 3.81 5.61
SCH 60 0.93 1.45 2.04 2.27 2.81 3.44 4.07 7.06
SCH 80 0.41 0.41 0.45 0.48 0.68 1.05 1.56 2.15 2.62 2.99 3.69 5.22 7.28
SCH 100 1.21 1.73 2.33 3.37 4.03 4.89 5.76 7.94
SCH 120 0.83 0.95 1.36 1.94 3.25 3.69 4.35 5.22 6.08 8.80
SCH 160 1.00 1.00 1.07 1.14 1.33 2.15 3.25 3.85 4.57 5.54 6.84 8.04 11.19
TRADE Notes/Ref: Page and Nation Fourth Edition - Page No. 42 and 46
Pipefitter As there are no tables for Machine Cut and Bevel in the Field the above rates are based upon Shop rates plus 15%.
Rigger
Welder
THREAD PIPE
STD 0.20 0.20 0.30 0.42 0.70 0.97 1.38 1.53 2.07 2.37 2.95 3.54 5.18
XS 0.30 0.30 0.42 0.58 0.93 1.35 1.84 2.44 2.67 3.45 4.14 4.72 6.89
SCH 20 0.97 1.38 1.53 2.07 2.37 2.95 3.54 5.18
SCH 30 0.97 1.38 1.53 2.07 2.37 3.65 4.72 7.23
SCH 40 0.20 0.20 0.30 0.42 0.70 0.97 1.38 2.07 2.67 3.45 4.14 5.68 7.67
SCH 60 1.26 1.84 2.75 2.95 3.71 4.38 6.16 7.93
SCH 80 0.30 0.30 0.42 0.58 0.93 1.35 2.11 2.90 3.39 4.14 4.87 6.49 8.37
SCH 100 1.64 2.44 3.17 3.85 4.38 5.42
SCH 120 0.84 1.18 1.83 2.58 3.65 4.14 4.87
SCH 160 0.42 0.42 0.58 0.90 1.35 2.38 3.65 4.38
TRADE Notes/Ref: Page and Nation Fourth Edition - Page No. 114 and 86
Pipefitter Thread Pipe rate includes for pipe cutting.
Rigger Screwed Flange Joint includes for; cutting, making on flange, seal welding back and front and refacing.
Welder
BUTT WELD
STD 0.80 1.00 1.30 1.50 2.00 2.60 3.10 3.60 4.30 5.00 5.90 6.30 6.90
XS 0.90 1.00 1.40 1.80 2.50 3.30 4.00 4.70 5.70 6.60 7.70 8.40 10.10
SCH 20 2.60 3.10 3.60 4.30 5.00 5.90 6.30 6.90
SCH 30 2.60 3.10 3.60 4.30 5.00 6.80 8.40
SCH 40 0.80 1.00 1.30 1.50 2.00 2.60 3.10 4.10 5.00 6.60 8.60 9.40 13.30
SCH 60 3.00 4.00 5.20 6.80 8.40 11.20 13.80 20.10
SCH 80 0.90 1.00 1.40 1.80 2.50 3.30 5.10 6.60 9.60 12.40 16.40 19.50 25.20
SCH 100 4.60 6.80 9.90 13.20 19.50 21.80 26.00 35.80
SCH 120 2.80 3.80 6.00 9.40 12.20 16.20 20.70 25.60 31.90 43.50
SCH 160 1.30 1.60 2.10 3.00 4.90 8.60 13.10 17.90 22.70 27.70 33.70 40.80 59.30
SOCKET WELD
SCH 40 0.90 1.00 1.40
SCH 80 0.90 1.00 1.40
SCH 100+ 1.20 1.50 2.00
SLIP-ON FLANGE
150# 1.00 1.30 1.80 2.40 3.60 5.10 6.30 7.70 9.00 10.50 12.20 14.60 18.30
300# 1.30 1.40 2.10 2.60 3.90 5.40 6.80 8.30 10.00 11.30 13.50 16.00 20.10
600# 1.40 1.80 2.90 3.80 5.90 8.00 11.10 13.70 16.20 18.40 21.10 23.70 31.20
90 Deg Reinforced
STD 5.00 5.30 6.70 8.10 10.20 11.70 12.70 14.20 16.00 17.90 19.10 21.10 22.30
XS 5.40 5.90 7.90 10.00 12.80 14.50 16.30 18.30 20.70 23.20 23.80 26.60 27.70
TRADE Notes/Ref: Page and Nation Fourth Edition - Page No. 96 and 97
Pipefitter
Rigger
Welder
BRANCH WELDS cont.
45 Deg Unreinforced
STD 3.20 3.30 4.40 5.50 7.10 8.60 9.60 10.90 12.40 14.20 15.50 17.10 18.80
XS 3.60 4.10 5.90 7.60 10.00 11.70 13.70 15.70 18.20 20.20 21.60 23.70 26.60
SCH 20 8.60 9.60 10.90 12.40 14.20 15.50 17.10 18.80
SCH 30 8.60 9.60 10.90 12.40 14.20 20.10 22.70 31.80
SCH 40 3.20 3.30 4.40 5.50 7.10 8.60 9.60 13.00 15.30 20.20 25.50 29.60 35.50
SCH 60 11.10 13.70 17.50 21.40 26.80 34.30 43.30 48.00
SCH 80 3.60 4.10 5.90 7.60 10.00 11.70 16.60 22.90 30.10 35.30 40.60 46.90 55.00
SCH 100 15.90 21.80 24.20 38.40 48.70 59.10 68.30 86.80
SCH 120 9.40 14.50 20.10 28.10 38.60 45.90 54.80 65.70 74.90 93.40
SCH 160 5.40 7.10 8.90 11.40 18.40 28.60 43.70 52.20 64.20 74.10 92.70 104.10 121.80
45 Deg Reinforced
STD 6.80 6.90 8.70 11.20 13.80 15.80 17.30 19.20 21.00 23.70 25.50 28.20 29.50
XS 7.10 7.70 10.50 13.50 17.10 21.60 21.70 24.30 27.60 30.20 31.60 35.60 38.40
SCH 20 15.80 17.30 19.20 21.00 23.70 25.50 28.20 29.50
SCH 30 15.80 17.30 19.20 21.00 23.70 29.40 35.60 38.70
SCH 40 6.80 6.90 8.70 11.20 13.80 15.80 17.30 20.50 23.40 30.20 37.40 43.40 51.10
SCH 60 18.10 21.70 27.10 32.60 40.10 50.20 62.90 71.20
SCH 80 7.10 7.70 10.50 13.50 17.10 21.60 26.00 35.40 45.90 52.90 59.50 71.30 76.80
SCH 100 26.40 32.10 45.70 52.60 65.70 79.70 85.50 97.10
SCH 120 32.80 44.50 51.70 62.20 82.60 82.90 98.90 114.80
SCH 160 10.20 13.30 16.10 20.20 31.40 44.50 53.20 70.90 81.20 93.80 117.40 131.90 154.10
TRADE Notes/Ref: Page and Nation Fourth Edition - Page No. 99 and 100
Pipefitter
Rigger
Welder
PREHEAT WELDS
Butt & Flange Welds
STD 0.20 0.20 0.50 0.60 0.80 0.90 1.30 1.50 1.90 2.20 2.60 3.10 3.70
XS 0.30 0.30 0.60 0.70 1.00 1.30 1.80 2.00 2.50 3.30 3.50 4.10 5.00
SCH 20 0.90 1.30 1.50 1.90 2.20 2.60 3.10 3.70
SCH 30 0.90 1.30 1.50 1.90 2.20 3.10 4.10 5.30
SCH 40 0.20 0.20 0.50 0.60 0.80 0.90 1.30 1.90 2.20 3.00 4.10 5.20 6.40
SCH 60 1.30 1.80 2.20 3.00 3.80 5.00 6.30 7.80
TRADE Notes/Ref: Page and Nation Fourth Edition - Page No. 121
Pipefitter
Rigger
Welder
PREHEAT WELDS cont.
90 Deg Branch Unreinforced
STD 0.50 0.50 0.60 0.90 1.30 1.80 2.00 2.50 3.00 3.40 4.20 5.00 6.00
XS 0.60 0.60 0.90 1.00 1.80 2.10 2.70 3.30 3.80 4.60 5.50 6.50 7.80
TRADE Notes/Ref: Page and Nation Fourth Edition - Page No. 124
Pipefitter
Rigger
Welder
X-RAY INSPECTION
Butt Welds
<=XS 0.86 0.86 0.86 0.98 1.20 1.35 1.51 1.71 1.86 2.08 2.32 2.55 3.15
>XS-SCH 120 1.13 1.40 1.54 1.73 1.97 2.14 2.39 2.67 2.94 3.62
>SCH 120 1.13 1.13 1.13 1.27 1.56 1.75 1.97 2.23 2.42 2.70 3.01 3.34 4.08
TRADE Notes/Ref: Page and Nation Fourth Edition - Page No. 126 and 129
Pipefitter
Rigger
Welder
BOLT UP
150# 0.70 0.70 0.80 1.10 1.50 2.10 2.70 3.40 3.80 4.40 4.80 5.50 6.60
300# 0.80 0.80 0.90 1.40 1.70 2.40 3.00 3.80 4.30 4.90 5.40 6.20 7.40
600# 0.90 0.90 1.00 1.50 1.80 2.60 3.20 4.10 4.60 5.20 5.80 6.60 7.90
900# 1.00 1.00 1.20 1.70 2.10 3.00 3.70 4.70 5.30 6.00 6.70 7.60 9.10
1500# 1.20 1.20 1.50 2.10 2.60 3.70 4.60 5.80 6.50 7.40 8.20 9.30 11.20
2500# 1.60 1.60 2.00 2.80 3.40 4.90 6.10 7.70
RELEASE FLANGE
150# 0.47 0.47 0.53 0.73 1.00 1.40 1.80 2.27 2.53 2.93 3.20 3.67 4.40
300# 0.53 0.53 0.60 0.93 1.13 1.60 2.00 2.53 2.87 3.27 3.60 4.13 4.93
600# 0.60 0.60 0.67 1.00 1.20 1.73 2.13 2.73 3.07 3.47 3.87 4.40 5.27
900# 0.67 0.67 0.80 1.13 1.40 2.00 2.47 3.13 3.53 4.00 4.47 5.07 6.07
1500# 0.80 0.80 1.00 1.40 1.73 2.47 3.07 3.87 4.33 4.93 5.47 6.20 7.47
2500# 1.07 1.07 1.33 1.87 2.27 3.27 4.07 5.13
INSERT/REMOVE SPADE
150# 1.37 1.42 1.93 2.68 3.60 4.90 6.30 7.82 8.88 10.28 11.35 13.02 15.25
300# 1.53 1.73 2.25 3.33 4.18 5.70 7.10 8.88 10.17 11.72 13.05 14.93 17.48
600# 2.00 2.15 2.67 3.80 4.65 6.43 7.88 9.98 11.42 13.07 14.87 16.95 19.97
900# 2.17 2.32 3.00 4.13 5.15 7.10 8.72 10.98 12.58 14.40 16.37 18.62 21.97
1500# 2.60 2.75 3.70 5.05 6.38 8.82 11.07 13.92 16.08 18.68 21.22 24.45 29.02
2500# 3.37 3.57 4.63 6.37 7.72 11.12 13.67 17.58
INSTALL VALVE
150# 1.80 1.90 2.80 3.90 5.20 7.00 9.00 11.10 12.70 14.70 16.30 18.70 21.70
300# 2.00 2.40 3.30 4.80 6.10 8.20 10.20 12.70 14.60 16.90 18.90 21.60 25.10
600# 2.80 3.10 4.00 5.60 6.90 9.40 11.50 14.50 16.70 19.20 22.00 25.10 29.40
900# 3.00 3.30 4.40 6.00 7.50 10.20 12.50 15.70 18.10 20.80 23.80 27.10 31.80
1500# 3.60 3.90 5.40 7.30 9.30 12.70 16.00 20.10 23.50 27.50 31.50 36.50 43.10
2500# 4.60 5.00 6.60 9.00 10.90 15.70 19.20 24.90
REMOVE VALVE
150# 1.34 1.44 2.26 3.16 4.20 5.60 7.20 8.84 10.16 11.76 13.10 15.04 17.30
300# 1.46 1.86 2.70 3.86 4.96 6.60 8.20 10.16 11.74 13.64 15.30 17.46 20.16
600# 2.20 2.50 3.34 4.60 5.70 7.66 9.36 11.76 13.64 15.74 18.14 20.70 24.14
REPLACE VALVE
150# 3.14 3.34 5.06 7.06 9.40 12.60 16.20 19.94 22.86 26.46 29.40 33.74 39.00
300# 3.46 4.26 6.00 8.66 11.06 14.80 18.40 22.86 26.34 30.54 34.20 39.06 45.26
600# 5.00 5.60 7.34 10.20 12.60 17.06 20.86 26.26 30.34 34.94 40.14 45.80 53.54
900# 5.34 5.94 8.00 10.86 13.60 18.40 22.54 28.26 32.66 37.60 43.14 49.14 57.54
1500# 6.40 7.00 9.80 13.20 16.86 22.94 28.94 36.34 42.66 50.06 57.54 66.80 78.74
2500# 8.14 8.94 11.86 16.14 19.54 28.14 34.34 44.66
ERECT SPOOLS
SCH 10 to 60 1.05 1.12 1.28 1.35 1.54 1.87 2.36 2.89 3.31 4.17 4.86 5.71 6.36
SCH 80 to 100 1.21 1.31 1.57 1.71 2.10 2.66 3.28 4.04 4.79 5.61 6.43 7.28 8.23
SCH 120 to 160 1.48 1.61 1.94 2.17 2.76 3.25 4.53 5.54 6.59 7.68 8.83 9.97 11.25
REMOVE SPOOLS
SCH 10 to 60 0.63 0.67 0.77 0.81 0.92 1.12 1.42 1.73 1.99 2.50 2.92 3.43 3.82
SCH 80 to 100 0.73 0.79 0.94 1.03 1.26 1.60 1.97 2.42 2.87 3.37 3.86 4.37 4.94
SCH 120 to 160 0.89 0.97 1.16 1.30 1.66 1.95 2.72 3.32 3.95 4.61 5.30 5.98 6.75
HYDROTESTING
PVC PIPING
Handle Pipe 0.08 0.09 0.10 0.11 0.12 0.14 0.17 0.20
Cemented Joints 0.29 0.33 0.45 0.55 0.70 0.80 1.00 1.25
Saddles 0.45 0.50 0.63 0.73 0.90 1.00 1.20 1.40
Handle Valves 0.25 0.35 0.85 1.25 1.60 1.95 2.50 3.00
TRADE Notes/Ref: Page and Nation Fourth Edition - Page No. 76,79,132 and 137
Pipefitter Remove Spools rate is based on Erect Spools x 60%.
Rigger Hydrotesting rate is based on Page and Nation x 10.
Welder