0% found this document useful (0 votes)
562 views15 pages

IEC 60068 2 68 Multi 1000 VDC

The document is a test report from TÜV Rheinland (Shanghai) Co., Ltd. for photovoltaic modules tested for RenewSys India Pvt. Ltd. The report details various tests conducted on the DESERV 3M6-315 modules, including visual inspections, maximum power determinations, insulation tests, and dust and sand tests, with all samples passing the required standards. The tests were performed between April 13 and April 25, 2017, and the report is not permitted to be duplicated without authorization.

Uploaded by

Darren Yang
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
562 views15 pages

IEC 60068 2 68 Multi 1000 VDC

The document is a test report from TÜV Rheinland (Shanghai) Co., Ltd. for photovoltaic modules tested for RenewSys India Pvt. Ltd. The report details various tests conducted on the DESERV 3M6-315 modules, including visual inspections, maximum power determinations, insulation tests, and dust and sand tests, with all samples passing the required standards. The tests were performed between April 13 and April 25, 2017, and the report is not permitted to be duplicated without authorization.

Uploaded by

Darren Yang
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 15

TÜV Rheinland (Shanghai) Co., Ltd.

Solar/ Fuelcell Technology

Test Report

Photovoltaic Module Tests


according to Client’s Requirements

TÜV Report No. 15104057.001

Shanghai, May 2017


Solar/ Fuelcell Technology

Test report No.: 15104057.001 Page 1 / 14


Prüfbericht - Nr.:

Client RenewSys India Pvt. Ltd.


(Customer No. + address):
Plot No. 06, Survey # 114/P,Srinagar Village, Maheshwaram Mandal
Auftraggeber
(Kunden-Nr. + Adresse): Rangareddy Distric t. Telangana-501359, India.

Test Item: Photovoltaic (PV) Module(s) Date of receipt: 03/03/2017


Gegenstand der Prüfung: Eingangsdatum:

Identification:
DESERV 3M6-315
Bezeichnung:

Order No.: Quotation No.:


Auftragsnummer: 154226745 52187459
Angebotsnummer:

Place of testing:
Ort der Prüfung: China Telecommunication Technology Labs

Testing laboratory:
Prüflaboratorium: TÜV Rheinland (Shanghai) Co., Ltd.

Test specification: IEC 60068-2-68:1994, etc


Prüfgrundlage: Refer to details on page 4.

Test Result: Refer to the verdict of the test report


Prüfergebnis:

tested by / geprüft: reviewed by / kontrolliert:

Project Engineer/ Technical Reviewer/


Stan Liu Victor Feng
Date Title/Name Signature Date Title/Name Signature
Datum Titel/Name Unterschrift Datum Titel/Name Unterschrift

Other Aspects / Sonstiges:

N/A

Abkürzungen: P(ass) = entspricht Prüfgrundlage Abbreviations: P(ass) = passed


F(ail) = entspricht nicht Prüfgrundlage F(ail) = failed
N/A = nicht anwendbar N/A = not applicable
N/T = nicht getestet N/T = not tested

This test report relates to the listed test samples. Without permission of the test centre this test report is not permitted
to be duplicated in extracts. This test report does not entitle to carry any safety mark on this or similar products.
Dieser Prüfbericht bezieht sich nur auf die gelisteten Prüfmuster und darf ohne Genehmigung der Prüfstelle nicht
auszugsweise vervielfältigt werden. Dieser Bericht berechtigt nicht zur Verwendung eines Prüfzeichens.

Report no.: 15104057.001


2 / 14

Table of Content

General Information 3
Sampling and Test Assignment 4
Sampling procedure 4
Module test assignment 4
Visual inspection (according to IEC61215:2005, 10.1) 6
Initial maximum power determination (according to IEC61215:2005, 10.2) 6
Initial insulation test (according to IEC61215:2005, 10.3) 6
Initial wet leakage current test (according to IEC61215:2005, 10.15) 6
Initial ground continuity test (refer to IEC61730-2:2004, MST 13) 7
EL-images (Initial) 7
Dust and sand test (according to IEC 60068-2-68:1994) 7
Visual inspection after dust and sand test (according to IEC61215:2005, 10.1) 8
Maximum power determination after dust and sand test (according to IEC61215:2005, 10.2) 8
Insulation test after dust and sand test (according to IEC61215:2005, 10.3) 8
Wet leakage current test after dust and sand test (according to IEC61215:2005, 10.15) 8
Ground continuity test after dust and sand test (refer to IEC61730-2:2004, MST 13) 9
Bypass diode functional test 9
EL-images (Final) 9
Appendix 1: Main measuring equipment and used software 10
Appendix 2: Photos of the modules 11
Appendix 3:EL-images 12

Report no.: 15104057.001


3 / 14

General Information

Date(s) of performance of tests : From 13/04/2017 to 25/04/2017

Reference standard are as follows:


- IEC 60068-2-68:1994 Environmental testing for electric and electronic products-Part 2: Test methods-
Test L: Dust and sand.
- IEC 61215:2005 Crystalline silicon terrestrial photovoltaic (PV) modules – Design qualification and type
approval.
- IEC 61730-2:2004+A1+A2 Photovoltaic (PV) module safety qualification – Part 2: Requirements for
testing.
- IEC 61701:2011 Salt mist corrosion testing of PV modules.

Abbreviations used in the report:


Pmax – Maximum power point Vmpp – Maximum power point voltage
Impp – Maximum power point current Voc – Open circuit voltage
Isc – Short circuit current FF – Fill factor
MPD – Maximum Power determination EL – Electroluminescence imaging

Possible test case verdicts:


Test case does not apply to the test object..............................: N/A
Test object does meet the requirement ...................................: Pass (P)
Test object does not meet the requirement .............................: Fail (F)

Further Remarks

 All tests were performed at China Telecommunication Technology Labs.


 The test verdicts presented in this report relate only to the test specimen.
 This report shall not be reproduced, except in full, without the written approval of the Issuing testing
laboratory.
 IV curves are only included in the report if they show any deviations. If required, other IV curves will be
provided upon request.
 Any question regards the report, please contact to TÜV Rheinland (Shanghai) within one week after
report issued.

Report no.: 15104057.001


4 / 14

Sampling and Test Assignment


Sampling procedure

Random sampling from production (e.g. during factory audit (FA) or inline inspection)

Random sampling from the warehouse, container or transportation boxes

Modules have been submitted by the manufacturer/ client without random sampling by TÜV
Rheinland

Module test assignment


Remarks /
Module manufacturer Module type
constructional characteristics

Renewsys India Pvt Ltd DESERV 3M6-315 6” poly c-Si module, 72 pcs

Sample # 1 2 3

R1000003171238063
R1000003171238073

R1000003171238066
Serial number
Setting of tasks

Test item Test specification


Reference module ×
Initial visual inspection IEC61215:2005, 10.1 × × ×
Initial maximum power determination IEC61215:2005, 10.2 × × ×
Initial insulation test IEC61215:2005, 10.3 × × ×
Initial wet leakage test IEC61215:2005, 10.15 × × ×
Initial ground continuity test IEC61730-2:2004, MST 13 × × ×
Initial EL-images × × ×
Dust and sand test IEC 60068-2-68:1994 × ×
Final visual inspection IEC61215:2005, 10.1 × × ×
Final maximum power determination IEC61215:2005, 10.2 × × ×
Final insulation test IEC61215:2005, 10.3 × × ×
Final wet leakage test IEC61215:2005, 10.15 × × ×
Final ground continuity test IEC61730-2:2004, MST 13 × × ×
Final bypass diode functionality test × ×
Final EL-images × × ×
Legend:
x Selected sample for test

Report no.: 15104057.001


5 / 14

Test sequence and test sample requirement

Report no.: 15104057.001


6 / 14

Tables

Visual inspection (according to IEC61215:2005, 10.1)


Test Date [DD-MM-YYYY] ............................... : 13/04/2017 —
Sample # Nature and position of initial findings Verdict
1 No visual defect found P
2 No visual defect found P
3 No visual defect found P
Supplementary information: N/A

Initial maximum power determination (according to IEC61215:2005, 10.2)


Test Date [DD-MM-YYYY] ............................... : 13/04/2017 —
Test method ..................................................... : indoor outdoor —

Irradiance W/m²............................................. : 1000 —

Module temperature °C ................................. : Corrected to 25 —


Sample # Pmpp W Vmpp V Impp A Voc V Isc A FF %
1 318.9 37.42 8.522 45.75 8.998 77.5
2 319.7 37.51 8.523 45.72 9.014 77.6
3 320.6 37.51 8.547 45.75 8.997 77.9
Supplementary information: N/A

Initial insulation test (according to IEC61215:2005, 10.3)


Test Date [DD/MM/YYYY] ............................... : 14/04/2017 —
Maximum system voltage VDC .................... : 1000 —
High voltage applied VDC ............................. : 6000 —
Insulation resistance measured at VDC ....... : 1000 —
Measured Area Result* Dielectric breakdown
Sample # Verdict
G m² G * m² Yes (description) No
1 >9.90 1.99 >19.70 - No P
2 >9.90 1.99 >19.70 - No P
3 >9.90 1.99 >19.70 - No P
*Minimum requirement acc. to the standard is 0.04 G × m².
Supplementary information: The maximum resistance measurement range is 9900 MΩ.

Initial wet leakage current test (according to IEC61215:2005, 10.15)


Test Date [DD/MM/YYYY] ............................... : 14/04/2017 —
Insulation resistance measured at VDC ....... : 1000 —
Solution resistivity  cm ................................ : < 3500
: —
Solution temperature °C ................................ : 22  3 —
Sample # Measured Area Result* Verdict
Report no.: 15104057.001
7 / 14

G m² G * m²
1 4.98 1.99 9.91 P
2 5.34 1.99 10.63 P
3 5.37 1.99 10.69 P
* Minimum requirement acc. to the standard is 40 M × m².
Supplementary information: N/A

Initial ground continuity test (refer to IEC61730-2:2004, MST 13)


Test date [DD/MM/YYYY] 14/04/2017 —
Maximum over-current protection rating [A] 20 —
Current applied [A] 37.5 —
Location of designated grounding point Grounding point of the long edge —
Location of second contacting point The greatest physical displacement of adjacent side —
Sample No Voltage [V] Resistance [] —
1 0.049 0.0013 P
2 0.050 0.0013 P
3 0.062 0.0017 P
Supplementary information: N/A

EL-images (Initial)
Test date [DD/MM/YYYY] 14/04/2017 —
Forward bias current [A] .................................. : 9.0 —
Sample No Remarks —
1 One cracked cell as marked in EL picture. —
2 One cracked cell as marked in EL picture. —
3 One cracked cell as marked in EL picture. —
Supplementary information: Refer to Appendix 3: EL-images of the appendix for more details.

Dust and sand test (according to IEC 60068-2-68:1994)


Test Date [DD/MM/YYYY / DD/MM/YYYY] ................ : 17/04/2017 – 20/04/2017 —
Sample No ................................................................. : 2, 3 —
Cell interconnection circuit ......................................... : S SP SPS —
Chamber temperature [°C] ........................................ : 40-44 —
Chamber relative humidity [%] ................................... : 4-7 —
Method Lc1 or Lc2 ...................................................... : Lc1 —
Dust/sand type and composition ................................ : Quartz, 95% SiO2 —
Particle size................................................................. : Average 0.5mm —
3
Dust/sand concentration [g/m ] ................................. : 4.8-5.3 —
Wind speed [m/s] ...................................................... : 18.3-20.7 —
Duration [min] ............................................................ : 240 min for front side+240 min for rear side —
Supplementary information: N/A
Report no.: 15104057.001
8 / 14

Visual inspection after dust and sand test (according to IEC61215:2005, 10.1)
Test Date [DD-MM-YYYY] ............................... : 21/04/2017 —
Sample # Nature and position of initial findings Verdict
1 No visual defect found P
2 No visual defect found P
3 No visual defect found P
Supplementary information: N/A

Maximum power determination after dust and sand test (according to IEC61215:2005, 10.2)
Test Date [DD/MM/YYYY] ............................... : 21/04/2017 —
Module temperature °C ................................. : Corrected to 25 —
Irradiance W / m²........................................... : 1000 —
Degradation
Sample # Pmpp W Vmpp V Impp A Voc V Isc A FF % —
[%]
1 318.9 37.41 8.524 45.75 9.002 77.4 0.00 P
2 311.2 37.53 8.291 45.70 8.994 75.7 -2.66 P
3 313.6 37.91 8.271 45.73 8.937 76.7 -2.20 P
Supplementary information: N/A

Insulation test after dust and sand test (according to IEC61215:2005, 10.3)
Test Date [DD/MM/YYYY] ............................... : 21/04/2017 —
Maximum system voltage VDC .................... : 1000 —
High voltage applied VDC ............................. : 6000 —
Insulation resistance measured at VDC ....... : 1000 —
Measured Area Result* Dielectric breakdown
Sample # Verdict
G m² G * m² Yes (description) No
1 >9.90 1.99 >19.70 - No P
2 >9.90 1.99 >19.70 - No P
3 >9.90 1.99 >19.70 - No P
*Minimum requirement acc. to the standard is 0.04 G × m².
Supplementary information: Insulation tester can measure up to 9900.0 M.

Wet leakage current test after dust and sand test (according to IEC61215:2005, 10.15)
Test Date [DD/MM/YYYY] ............................... : 21/04/2017 —
Insulation resistance measured at VDC ....... : 1000 —
Solution resistivity  cm ................................ : < 3500
: —
Solution temperature °C ................................ : 22  3 —
Measured Area Result*
Sample # Verdict
G m² G * m²
1 5.31 1.99 10.57 P

Report no.: 15104057.001


9 / 14

2 5.34 1.99 10.63 P


3 5.28 1.99 10.51 P
* Minimum requirement acc. to the standard is 40 M × m².
Supplementary information: N/A

Ground continuity test after dust and sand test (refer to IEC61730-2:2004, MST 13)
Test date [DD/MM/YYYY] 24/04/2017 —
Maximum over-current protection rating [A] 20 —
Current applied [A] 50.0 —
Location of designated grounding point Grounding point of the long edge —
Location of second contacting point The greatest physical displacement of adjacent side —
Sample No Voltage [V] Resistance [] —
1 0.048 0.0013 P
2 0.051 0.0014 P
3 0.050 0.0013 P
Supplementary information: N/A

Bypass diode functional test


Test Date [DD/MM/YYYY] 24/04/2017
Number of diodes in junction box 3
Diode manufacturer —

Diode type designation —
Max. permissible junction temperature Tjmax
200
°C (according to diode datasheet)
Sample No. Diode 1 Diode 2 Diode 3 —
2 Functional Functional Functional P
3 Functional Functional Functional P
Supplementary information: N/A

EL-images (Final)
Test date [DD/MM/YYYY] 25/04/2017 —
Forward bias current [A] .................................. : 9.0 —
Sample No Remarks —
1 One cracked cell as marked in EL picture. —
2 One cracked cell as marked in EL picture. —
3 One cracked cell as marked in EL picture. —
Supplementary information: Refer to Appendix 3: EL-images of the appendix for more details.

Report no.: 15104057.001


10 / 14

Appendix 1: Main measuring equipment and used software

Measuring equipment

Test equipment Equipment type ID-No. Next calibration

Solar simulator PasanⅢb PAA0352 2017.12.22

Dielectrometer TOS5051A NG001602 2017.11.03

Reference cell CH-2000 10-0118-11 2017.12.15

Infrared thermometer RAYST60XBAP 17200075 2018.01.04

Power supply 62150H-600S GK451 —

Blowing sand test


SC-GF-01 HJ-15-3 2017.11.29
chamber

Multimeter FLUKE289C 33650010 2017.10.31

DC clamp HIOKI 3287 130912099 2017.05.16

Report no.: 15104057.001


11 / 14

Appendix 2: Photos of the modules

Fig. 1: front view of test module Fig. 2: rear view of test module

Fig. 3: rating label of test module Fig. 4: junction box of test module

Report no.: 15104057.001


12 / 14

Appendix 3:EL-images

Fig. 5: EL-image of sample R1000003171238073 (initial)

Fig. 6: EL-image of sample R1000003171238073 (final)

Report no.: 15104057.001


13 / 14

Fig. 7: EL-image of sample R1000003171238063 (initial)

Fig. 8: EL-image of sample R1000003171238063 (final)

Report no.: 15104057.001


14 / 14

Fig. 9: EL-image of sample R1000003171238066 (initial)

Fig. 10: EL-image of sample R1000003171238066 (final)

End of Test Report