The document outlines a production data template for a single shift, including calculations for planned production time, operating time, and overall equipment effectiveness (OEE). It provides specific metrics such as availability, performance, quality, and overall OEE percentages. The document emphasizes the importance of OEE in measuring the effectiveness and efficiency of machinery or processes in production environments.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
7 views

OEE Calculation

The document outlines a production data template for a single shift, including calculations for planned production time, operating time, and overall equipment effectiveness (OEE). It provides specific metrics such as availability, performance, quality, and overall OEE percentages. The document emphasizes the importance of OEE in measuring the effectiveness and efficiency of machinery or processes in production environments.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

Fill in the highlighted areas with your production data for a single shift.

In some cases, you may have


to convert units to simplify the calculation. For example, 3600 PPH (Pieces per Hour) is 60 PPM
(Pieces per Minute).

Production Data

Shift Length 8 Hours Minutes 480

Short Breaks 2 Breaks @ 15 30


Minutes Each = Minutes Total
Meal Breaks 1 Breaks @ 30 30
Minutes Each = Minutes Total
Down Time 47 Minutes

Ideal Run Rate 60 PPM (Pieces Per Minute)

Total Pieces 19,271 Pieces

Reject Pieces 423 Pieces

Support Variable Calculation Result


Planned 420
Shift Length - Breaks Minutes
Production Time
Operating Time Planned Production Time - Down Time 373 Minutes

Good Pieces Total Pieces - Reject Pieces 18,848 Pieces

OEE Factor Calculation My OEE%

Availability Operating Time / Planned Production Time 88.81%

Performance (Total Pieces / Operation Time) / Ideal Run Rate 86.11%

Quality Good Pieces / Total Pieces 97.80%

Overall OEE Availability x Performance x Quality 74.79%

=
Overall OEE 74.79%
World
OEE Factor My OEE%
Class
Availability 90.00% 88.81%
Performance 95.00% 86.11%

Quality 99.90% 97.80%

Overall OEE 85.00% 74.79%


140%

120%

100%

80% 74.79%

60%

40%

20%

0%
Overall OEE

97.80%
88.81% 86.11%

Availability Performance Quality


In Lean Six Sigma, OEE stands for Overall Equipment Effectiveness, and is generally considered to refer to a measurement in “T
Productive Maintenance” programs. The measure looks at effectiveness and efficiency of machinery or processes and is comm

Overall Equipment Effectiveness (OEE) Calculator

OEE Score 66%

Availability 92%
Operating Time (hours) 12

Planned Production Time (Hours) 13

Performance 75%
Pieces Produced 1500

Ideal Speed (products per hour) 50

Operating Time (hours) 40

Quality 95%
Acceptable Pieces 950
Total Pieces 1000
ed to refer to a measurement in “Total
achinery or processes and is commonly

Enter Data Here


Enter Data Here

Enter Data Here

Enter Data Here

Enter Data Here

Enter Data Here


Enter Data Here